Loading...
HomeMy WebLinkAboutNCC241927_Site Plan or Location Map_20240624 • FINAL APPROVAL 6/14/2024 EROSION CONTROL PLAN LEGEND SHEET ISSUE: TION SEQUENCE GENERAL EROSION AND SEDIMENT CONTROL NOTES: 5. CONTRACTOR SHALL APPOINT A REPRESENTATIVE TO MONITOR AND INSPECT GROUND COVER AT PROJECT NUMBER: HTFRSD-2023-00002 LEAST ONCE PER WEEK AND WITHIN 24 HOURS AFTER A STORM GREATER THAN I INCH.CEIARLO I I I- >N CONTROL PI 'OF CHARLOTTE. 14. CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL 1. EXCAVATION AND EARTH MOVING OPERATIONS SHALL BE CONDUCTED UNDER THE SUPERVISION OF REPRESENTATIVE SHALL BE A LICENSED ENGINEER IN THE STATE OF NORTH CAROLINA OR A ----- - R/VV,PROPERTY LINE DEVICES AND STRUCTURES TO MINIMIZE EROSION.THE CONTRACTOR SHALL MAINTAIN CLOSE THE OWNERS GEOTECHNICAL ENGINEER. CHARLOTTE/MECKLENBURG CERTIFIED SITE INSPECTOR(CMGS!)IN CURRENT STANDING WITH THE CONTACT WITH THE EROSION CONTROL INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE CITY OF CHARLOTTE AND MECKLENBURG COUNTY LUESA.CONTRACTOR SHALL PRODUCE AND KEEP X X SILT FENCE 4- ENGINEERING' REDUCE SUCH PERFORMED AT THE APPROPRIATE STAGES OF CONSTRUCTION. ONSITE ALL MONITORING AND INSPECTION LOGS REQUIRED BY THE AUTHORITIES HAVING Keith Schell- 2. SPLCONSTRUNTIONSHALLBEPERNCDEQANDCITYOFCHARLOTESTANDARDSAND JURISDICTION.CONTRACTOR SHALL PROVIDE OWNER AND CIVIL ENGINEER WITH THE NAME AND TREE PROTECTION FENCE SPECIFICATIONS. LICENSE OR CERTIFICATION NUMBER OF THE EROSION CONTROL CONTRACTOR PRIOR TO INSTALLING PCSOJ/DVTENTION/DRAINAGE PLAN \SIN Na E 1,SEDIMENT 15. FOR PHASED EROSION CONTROL PLANS,CONTRACTOR SHALL MEET WITH EROSION CONTROL EROSION CONTROL MEASURES. Y AS NECESSARY TO INSPECTOR PRIOR TO COMMENCING EACH PHASE OF EROSION CONTROL MEASURES. 3. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO - - LIMITS OF DISTURBANCE I CONSTRUCTION.EXISTING UTILITIES SHOWN ARE FROM THE BEST AVAILABLE RECORDS AND FROM A 6. ALL SLOPES GREATER THAN 2.5:1 SHALL BE STABILIZED WITH EROSION MATTING. - - - - EROSION CONTROL Peter Rodriguez 18. THE LAND ENT INSPECTOR SHOULD BE CALLED TO CONDUCT INSPECTIONS ON STORM DRAINAGE,SIDEWALKS,DRIVEWAY ON STORM DRAINAGE, IMPROVEMENTS, SUCY OFRVEY OF ABOVE THEEIFORMATION.OALL EXUND ISTING UTILITURES. IES SHOULD BE WARRANTY IS GIVENCONSIDERED OR LAPPR APPROXIMATE IN LOCIED AS TO THE ATION BAFFLES ' WERT RUNOFF 7. ADDITIONAL MEASURES MAY BE REQUIRED BY THE INSPECTOR TO CONTROL EROSION AND AND ALL ASPECTS OF ROAD CONSTRUCTION. AND VERIFIED PRIOR TO COMMENCING ACTIVITY ON SITE. SEDIMENTATION OF THE SITE. --y - DIVERSION DITCH -- URBAN FORESTRY 17. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 4. ALL ADJACENT ROADS TO THE SITE ARE TO BE SWEPT AND WASHED AT THE END OF EACH WORK DAY 8. SITE SOILS C ASSIFICATION IS COB2,COD2,CUB,CUD,Mo and PaE. Craig Robinson TO ENSURE NO SEDIMENT COLLECTS ON THE ROADWAYS. ._�_ TREE ORDINANCE 18. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO THE REMOVAL OF EROSION 9. THE TOTAL SITE ACREAGE IS 17.949 ACRES,THE DENUDED AREA ON SITE IS 10.34 ACRES,AND THEla CONSTRUCTION ENTRANCE 4- CONTROL MEASURE. 5. NO STAGING SHALL BE ALLOWED IN TREE PROTECTION AREAS INCLUDING SUPPLIES,EQUIPMENT, DENUDED AREA OFF SITE 0.25 ACRES.THE TOTAL DENUDED AREA IS 10.59 ACRES. -� 6 " L F..JNS„_ .___ CN E',1,, 'ROVED I._'ECTO SUES GRADING VEHICLES,ETC. CDO'P"IIT AND CLEARING AND GRUBBING I Jacobus u C eaters 19. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. 0. SEE SHEET C-803 AND C-804 FOR REQUIRED SEEDING SCHEDULES. v' V \I R/ �7 EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL,U.S.DEPARTMENT OF 6. INSPECT AND PROPERLY MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES WEEKLY AND at SILT FENCE CONCENTRATION 4- EROSION II �^��� AGRICULTURE,MECKLENBURG COUNTY EROSION CONTROL ORDINANCE,AND THE CHARLOTTE AFTER EVERY RAINFALL EVENT. 11. ALL PERIMETER DIKES,SWALES,DITCHES,PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 OUTLET ••ei NOTES SCFVERIL PRE-CONSTRUCTION MEE I�A ING. LAND DEVELOPMENT STANDARDS. 7. CONTRACTOR TO PROVIDE ANY ADDITIONAL EROSION CONTROL MEASURES AS NECESSARY TO HORIZONTAL TO VERTICAL(3:1)SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION . •• AT LEAST 48 HRS.PRIOR TO ANY LAND 'AS THAT WILL BE`:..3 GRADED.SEDIMENT PREVENT SEDIMENT RUNOFF. WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM HALF RING INLET PROTECTION -I- DISTURBING ACTIVITY USING THE ONLINE 20. REMOVE ALL ACCUMULATED SEDIMENT FROM BASINS AND RESTORE WET POND TO PLAN THE LAST LAND-DISTURBING ACTIVITY.ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TIMMONS GROUP =ORM FOUND AT htt harlotteoU, ov Id AREAS MUST ALRI='.EY BE INSTALLED AND TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN o�..i:io..�wi..o...o���i�..- P//e _ 9,.��„„,.,�� �,,.,L LS UNDER TO PREVENTIEROSION OF THE SE EPOSSIBLE, CONTOURS. 6 GEOTCONTHERMAL WELLS ACTOR TO S NECESSARYINATE ?RUCTION WITH SITE MECHANICL PLANS AND PROTECT ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. INLET PROTECTION -/- YBIBC E EAST TTIE,NHEAD SSTREET, S E.27 ---- ------ --- 21. CALL THE WATER QUALITY INSPECTOR TO SET UP A BMP PRE-CONSTRUCTION MEETING PRIOR TO STARTING AND WORK ON BMP'S.THIS MEETING SHOULD TAKE PLACE AT LEAST 48 HOURS 12. ALL CLDSM STANDARD NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDS NORTH CAROUNA LICENSE NO.C.165' 9. BEGIN ROUGH GRADING. MANUAL. (- PRIORTOSTARTINGCONSTRUCTIONONANYBMPANDSHALLINCLUDETHEDESIGNENGINEER EROSION CONTROL NOTES: a CHECK DAM TO INSURE ENGINEER INSPECTIONS ARE PERFORMED AT KEY BMP INSTALLATION PHASES. -. / co.... 10. PROCEED WITH FILL PLACEMENT AND SITE GRADING.BRING PADS AND ROADS UP TO GRADE. 13. ON-SITE BURIAL PITS ARE NOT ALLOWED. PI iy,��l a' 1. ANY GRADING BEYOND THE DENUDED LIMITS INDICATED ON THE CONSTRUCTION DOCUMENTS IS A VlC EI '�� RIP RAP APRON -/- W Z C 22. THE DESIGN ENGINEER MUST VERIFY AND CERTIFY THAT THE DRAINAGE AREA IS PROPERLY 11. ONCE AREAS ARE BROUGHT TO FINAL GRADE,THEY SHALL BE SEEDED AND MULCHED AS SOON VIOLATION AND IS SUBJECT TO A FINE. CENT£ E -.�/IWzU STABILIZED;MEASURES ARE IN PLACE TO PREVENT SEDIMENTATION INTO THE BMP,THE STORM • lrrn c AS POSSIBLE,BUT NOT LATER THAN 5 CLENDAR DAYS FOLLOWING COMPLETION OF GRADING. r LDRAINS,INLETS,AND PAVEMENT HAVE BEEN PROPERLY CLEANED PRIOR TO COMMENCEMENT --_ I I pE FZ(_2. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION I - '��-_ I I flbl NO C0OF BMP CONSTRUCTION. -F I12. INSTALL STORM DRAIN SYSTEM AND PLACE INLET PROTECTION AS EACH INLET IS INSTLLED. AND IS SUBJECT TO A FINE. mod\ I I I Rd1 UNDISTURBED TREE SAVE AREA -/- WU'y/ c',♦ I I I 0 T113. DIVERSION BERMS SHALL BE MAINTAINED ALONG TOP OF FILL SLOPES THROUGHOUT 3. APPROVAL OF CONSTRUCTION DOCUMENTS IS NOT AN AUTHORIZATION TO GRADE ADJACENT 1 I " N\ I / ?�IIIN- CONSTRUCTION TO DIVERT RUNOFF TO SEDIMENT BASINS. PROPERTIES.WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING,PERMISSION SHALL BE ,TN \IT, I I I 1' O OBTAINED BY CONTRACTOR FROM THE AFFECTED PROPERTY OWNERS AND THE AUTHORITIES HAVING T T�\ \ 1 I I 'y in /++� \ I Ca W 6'�yI �\ JURISDICTION SHALL BE NOTIFIED. .FpMyrAS MENTf\\ I I l' v \ I I I 2 \=/(4 PlD 1 921228\ 6.w a /\ I F C N 4. CONTRACTOR SHALL MEET REQUIREMENTS SET FORTH IN THE"NEW GROUND STABILIZATION \'.� I AL/CE PRAYLON\ TOP OF BANK I �K� • / ,V I I I I I O O N 03 REQUIREMENTS"NPDES PERMIT EFFECTIVE AUGUST 3,2011 FOR THE EPA EFFLUENT GUIDELINES. \ 081317PG 890 \ \ I 1 / .r ,/ \ \' ' g' r /t /I/' //// / fn Z E �� r\ si I1,'�i�/e 3 N ,//I III, /// // NO�� LIMIT$OF DISTURBANCE C \I I 1 11 i j' 1n///1�/ ,/////,//I 1 \ \ �\ ,,,� �„, (OFII SITE FOR SEWER ` ////// ///I / N.‘, \ o \ (��SN...Rod�' CONSTRUCTION) I I I �` / / //// /// /// \, \ w \ V`�"ES>,$/O•:/�'% =0.25t AC. `: I 1/,I$ te/,( / / /r/// , // .�,( \`/ ° // 222 E� ;=9Q`d+.1lllFf/:,9'; Ile", /L a�Al i/l� ,.:/ ////� Ili// .///./� 10 i6g21 CROOK _ ' '_34288 '� `ING r�/ss I W�JI ///',\h//// I !/ • �, KR`'xkP 1 PG 750 Y =_a,. '9 �> / O 6 15 5/09/24 p0 FIAp ?f \ i► I'.• I I , /, / / /.\.ERE pet LEFAM oA••.,p ,i'�C \(OT O'1CDE q/CCERd *I I� III 1 //, l ' I,%I/�y y �. -rt^ISU''Oi '-,„4,�NPI.A. ', . \ < N IEF,q sos • ) 1 Z1 I I I . / ✓/ ',/p / / -9% , ,..14„ o�tiq�o CF V( 1).1, �e'• T, .I I� I / �,j / • / i/ -po ff . 1,� ,.1 .1-" (II ',I III �� - Iv 1 '11jil/11/ Y' /y .if .� _ .,- \ T \ ,mho \ ye'm Si',,c, -- - 1 III I I a 1,.. v THIN rl I, . ' /t - js-_- ...= 2 R o> °'3.om c��.-+a,o 7 i" )11)I II II // ' / 1 VW / �f FAIR UBMEN O a'i VIM,a, A�'m v��N \ T g,,�ti� V -I I I))I I I I I I)I/I/ /li' I I , v IIII.n�., ���l/%/ • �Y - 50'P aoory zi Cr H�,m 3`0� - \\ \•�/. / /// / // I \ I Y► 44 -f j ,/ , E b'1A nl 4161T`O'n mA A1- ..^ )l) 1/ /,' /Ill li fir►\ I /i \` M - " ao z � \ Ns�'>\�Wiz„ �' ///// I ► /i N m zo ��' m^' � oz I III /I / I I ►osmeb no \m,�A- A>c o= 1I1 ly fro-4 wl� 7_ - W aoy '^8 pp � o; emu:an°° ! ^: _--- / //1 1' 1/I' llll�llti Imo' / 1 '+ ,/'" -- - -- __ 1 111 K Z rn 1 I I I ?N S"' g'�- 'p\a x \m v`a ,I I /1 I I/ `aj .c � `` _•a 3^'�^ LJJ H o- ul > m� cia- / / 11/ I II n' / I/ .'��,' .i _ - � (n o I I -mom➢N\ �g '�-' z� � �NSii /�__-- __-_- / / /// I II IIIIIII / �y� ; �1�5 - - � _-� \ 7 O z N p z Z v m�•\z3 'JD t ---.7--; F'I' ---_- / /ll II •/ / S o �a� L m �J -4,,,,,,„oAo N\�N ��� // III /' 1 �� y rr'sn -_ -� W rn al I \m�,i<G� \3 \m �m, m2 ' %�':/./ - I. Gd0 //// /1 j•I•a / '\ 1.I i 1,\� �\ / 1 - m o z, o rm z m � rm a / / O O x I o� v m,o n,v, / /�i i - 1 / / /. ,1 605 Z LL z at > i .•�' // '� /._ -!�1 FEMA FLOOD/ \ �; \1 t ` a v C,o y���o \� $a \\Jym t� ��„j i �645 � //i /� -�. lelN! e•i /� FRINGE I 1 \�' co U o c,m-a 3,, \ z F - ''/ /.' • .line% r / / \ 1% I I I O il Q m o o"' ' G 6p0 i�':%/ �,i•t�ieies as iii�iai u i i1 / I I "\v aewaeeea •eeuea I 1 7 oQ S^d � � /, � ! '''','/ / -•%ieeee eei ee oee lia � \ ` I \I = r _ -• -s-e s a easae.e w u a i 1 I --.•., a _, Or / / �y°'.. yacsceee a e e_i e444s4 eeee / \ \ _ i \I O -o �I ,.\. .a \ _.. -- ---.1. (I't5'// a o e e••eeo eeie�aee was ulwaaeeae plaeee•!a I/, I \ \ \ I O o s i - / ,. -/. •%e�ei�c�es�i:�ee�li alCi�eii�ieaiiwiiiiiiui7��/ II - Z PID 787792a81111 AI�ON YANVPN�..,, i+` ® - _ : ,_ _ �; - - _ _ ,//.a saoa6lssee•_eaewiee•e'D•e oiee•saes•.ee-•aeee \ r,,,-.ram\� COMMUNITY U N O o JOHNNYAMCENTYRE SR I 1 N155 H ,i . - _ J % %S % ' -'e a i ie�'e ew�a a•eesee�ail i iiiei eia_i i e e��i�i��' // 5 `� - \\`FLOOD FRINGE LL 0, P 1Ix' ( �� P'±P•'e leolier..!•a e-1 ilesee ewe le®• -�_ 11‘ i/ i,- G_eieew�e�eieuuu��e iesa�esasae9 s�Cil���a-u_awq +' +o, \ �l'i `� FEMA FLOODWAY 0 &SIMAE L• / '- '�\ _ - � i-i iieiliea•aaw.Dwiiawlili ee r_l_a�91•a•-- .'_ f \ 4 MB1a JOHNNIENPG IE MA I 4L /\ i - e e s s••••e..••e = _ ` 1 ENCROACHMENT R.d/SINGLE FAMILY a1 O I 10169P1 8 -� // -,,,, - _ !i!e•e w e e 1ai e i G.J i -_ -- _ _ II 9 r P BOYO Y4 , I///.1/l r - - ''% ►.,eaeeeo claea•a seise eaes•�iw• E - .... h m F I GO tP M 80 .3 \ /_ '// /O./ 630���a _ / / e-!s ,� • •eeo se•aiuui y „ - \ N`8 SR. 7HlLLS r.: • E h4.. I C$ ROBERMB j1 Pr1ILy / /11�.' %// ///Do-///'`-_. IOW _ _ iesisiespao.e. a / .. 5.-UBLI R/ b I n O T 10. �� __ , - / `\ -e�i /, ' 7'1 �\ K �- J x N. % I IIIIIII I 0,,,6E N,,,,ssooN m ^ _ �.i !_• / ,;;.-'i, /-�'�:.% /" cos i __ COMMUNITY `.....,�,.\ E I I�I BRP iEPR N 263 �•. - a% / CEO i ��- 4 - y - - PID 15719107 (.') If OE ELB 11PO ICY _ !- - .may sir / :-. ��: _ ��` /- FLOODWAY ®`CARL,IHowARpIII 1I 2 ISAM OT 22.^^B=FA^" i- -=66�: j- 'i/ �;,'� ,%>\ \•� i- "ail\ •, ENCROACHMENT • ,MB 1a 235 I 101�2H MPB3LRAISIN,..- - ��-�_ /%, - �! �-I:' ..R-45INGL FAMILYA I I; P NYPT PG 26Y 'yh _--3,Pi 'jii,/,a ' -_i_ :\ >//r// // i% 620- I.//I I J051 MB IE EPM0. ^ ��. - i 1' - _3p -/// •.. / � -�\�� �'/II' Ib /s1NQL ";\;°.'�Gy ,\\ CN ��y:,.� t _ r <"i - 6 0��Ii I/Till - \ \ \ \\.\\\\\�s "�sd,��C;��� „ y�e� i - / 65,::-, -- � ` \���s2 ���-P11 i/ / 1 vAvv\ VA ��I, • i / /� ///iii� � � ss o i �� Iil. sal v _ ,' 1itiI11`,',,yvAvv6,1', �� __ "e -:-- 1 IL say ', %! %�' i/' =-�:� v0yvI' �1p11: \ vv'vl I .iv 1 wv vv\.�A: "' 0 'i1�pA' 11 ��� a %i: vA`vvwwv�Av v II :':�Iilvvi vvvv- AA11Ava, ) /111\vvvvv ��� III I illLil'Ni�ii�!r`v I��111111� 1����I � S _ vvv.`vvV`�1N�/�: -�/ %, C-300 FOR NOTES&SHEET W ql I I/1 1 vvvv �.--Vvvo��� /�/ii tiq 1 1�63� �I) Ili,- ma's==_ \v,�///)d/v�o, INDEXING ONLY.SEE SHEETS • 1 ,; sc. \ V , ,III )11 I) AAV�\AAAA v ,o�°° /'i , .4 / „lip - // v ='% e y I \•\ \ III 1 \ 1 \\ l°J IIII, !,//,r),/{ / �.I(1/// q/c \ C-301 8r C-302 FOR PLAN DETAILS. I I I A V A)1 I 1 A I 1 1 1A d III'/i l/�i/F. ��� 40 J�l =; � � �/1 III IIIv�v (III I IV-III 1 A• ‘,/ vI 111 I ' I I m // �� _ , / nv v'ts // I , 111s \ . \ Inn '\I l l I111 I I I I ' I I // //+� (,!/I�1II1, / //r., 650 =---___\��\,,,,,,II/1/ L� -�- ---- 1 1 1 \\\\\`� 1 \ I I)1 1 1 1 1 1 1 1111 1 I I ' / ////// / I /,' 9` I / " / --��� - \\,. 1/1 Alt; \V1♦ A �v ) )'11L \111 IIII ) / /// ///' 777///��( ;�► 655� '�I IIT� C ( \ ,A1 111 11 1 I/ /, /�// //, ✓.w'.•.G .//dI -� V1 AA\\i 1An�1�1A� .�;� �• \\\\\ \, \ ,. III )111 11 1 I/ / ///,,/,,,,,,„ \ ,, 660 -\. 11\n - '\ VA♦ A V 1 III V l / / // 1 1 � � ��//�i 665 v•� V A 1 1 VA ,/ ,\\\ \ \ I 11\ 111(I I II II 1 I II / // )I \ E / ..% i 67G o `\.\\\1/ 1''\ \ \g\ `\\\\\\\ •�- \ 11)1 \IIIIIII IIIIIII III�'IQIi/// i////�id 1\1\\\`�I fN���lii�,,.,/,'ol �, r.'.' - s1`\\\\.\`\ ' 11�\ /� • \I \\ \\ \\\ ` \ \,, 11111111IIIo11 Iu�1\I\3'\\L\/ .\\\ \\:\\ 1/1/,///l/ ;•%,/lI IIII I \//). I ,'I'I / lY �/ \ \ \ I \ \ 1 11 111 111111 b\ \ \\\ \\:�` ~`-\ // // / // / III / i i ._,.. 0 \ \ \ 1 \I I o m \ \\ \ � \ ,,,, ,,,,• I \ ••• tI 302 \�:`1°\\\\\ \ \ \ 1 \ 111,111A1'11 II \\ \ \\\\\\\\� �.�\\ .7a 7,12 tAY1Mr.- II _ `\\\\ / \ \ \Lnl l ml ...fa - \ Cn \ \\\\\\\\\\\\ % \ \\\1,1111?1111\11\1\\1\1\, .._ SVP � 0:,_,,,,,,,,,,,,, %%"i'iiii// _/ / ----1' / a \\ \\\, \\\\)\\.`, ♦ ``S \ \IIII II\1111 \ +�:ay,��_ a A ,,-/'''' .i /, ,. \\\ \z I 1 i\ \ 1 III 1,,,..i'e." Y 'C"' \ „;,...,..._,-4-, s.._ _4__________„_ --/_�'W..___ _ ' - AI V A�.' --_ v. v,r - N \ .=- - \N6B LIMITS OF DISTURBANCE o NN \\ - n- - 8'I (ON SITE) Z LL O Z s•\I\ 1 1,..1 '_, �- ,/II /,• =10.343 AC. a U) Lir 9105 10-8/SCHOOL CK Z 1=1- 'G 2S2NTY \\\\\ \ v'►•oyi I„ NP NE 1 OH- \VA \VA �•�\ OEANTE OpIVE C 30 ■ -I Z-1 ,\\\\ \ t \ 08VA SCALE 1"=80' J_ Q J \. '\\\\ \ \ 0 80' 160' Q LL CV co LL m U ri JOB NUMBER: ( PRELIMINARY PLANNED 1 ar.811.Orq ? MULTI-FAMILY SUBDIVISION ExIaTINO0TILITIEa 2021.06 ARE LOCATED PRIOR TO CONSTRUCTION. 9 w APPROVAL 2. CONTRACTOR FLAG MEN.ETC.AS NECESSARY TO INSURE SAFETY TOTHE USING 0 a OVERALL EROSION CHARLOTTE-MECKLENBURG PLANNING DEPARTMENT PUBLIC. 1 ALL PAVEMENT Jennifer Frixen TO TRANSPORTATION OF THE NORTH THCARO CONCRETE OR ASPHALT.ARE TO BE 2 CONTROL PHASEIPLAN 0 06/03/2024 J PSHORING WILL BE ACCORDINGART,..SNaFRTPORAa NENOEO. NCNINOaTANOAROa P C-300 L