Loading...
HomeMy WebLinkAbout310580_Compliance Evaluation Inspection_20230628 ivision of Water Resources Facility Number ® - � (� 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 9 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access(,, Date of Visit: Arrival Time: Departure Time: County: Region: W IX-6 Farm Name: �(A�,A PIl( Owner Email: Owner Name: ��� PAC(�� Phone: Mailing Address: Physical Address: Facility Contact: / Title: Phone: Onsite Representative: zr'pzt� dA Integrator: Certified Operator: �UC Klljct`) Certification Number: 0c, C) '/ Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer I Dairy Cow can to Feeder I lNon-1,aver Dairy Calf Feeder to Finish q Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers 113eef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults ther Dischames and Stream Impacts 1.Is any discharge observed from any part of the operation? ❑ Yes ®--Ko- ❑ NA 0 NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA 0 NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ff]_IN'o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes �o ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Continued Facility Number: jDate of Inspection: 3 Waste Collection &Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes QJi[ei❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No [] NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: r Spillway?: Designed Freeboard(in): Observed Freeboard(in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes S-1-'0 ❑ NA ❑ NE (i.e., large trees,severe erosion, seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a [] Yes En No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes tl-NQ ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [D-No— ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks,or compliance alternatives that need ❑ Yes [3-N-o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 24 ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn, etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes E.K-b- ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable [] Yes [3-Ko- ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? 0 Yes L.No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �o ❑ NA ❑ NE Required Records&Documents 19. Did the facility fail to have the Certificate of Coverage& Permit readily available? ❑ Yes [!J-No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes E]1 o ❑ NA [] NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes EgNe ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and I" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E>o ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes F7'N'o ❑ NA ❑ NE Page 2 of 3 511212020 Continuer! Facility Number: - (>_j jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ©--N+'o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes L:_ND__ ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes J_ `No ❑ NA ❑ Nl: and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ®,K-o ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ o ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Ycs ❑'Ko_ ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes L:; �' ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes eNNo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? E] Yest No ❑ NA ❑ NE Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). Reviewer/Inspector Name: ( /r Phone: 9/0 Reviewer/Inspector Signature: ��, Date: 4cj Page 3 of 3 511212020