Loading...
HomeMy WebLinkAbout20072028 Ver 1_Approval Letter_20071210WATE Michael F. Easley, Governor Q iQ OCR QG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources ` Vj 'Yr., Coleen Sullins, Director ~ ~ Division of Water Quality o ~ December 10, 2007 Franklin County DWQ Project No. 20072028 Bridge 38 on SR 1239 Moving Ahead # 05012B APPROVAL of 401 WATER QUALITY CERTIFICATION and TAR-PAMLICO BUFFER AUTHORIZATION, with ADDITIONAL CONDITIONS Mr. J. W. Bowman, P.E., Division Engineer NCDOT, Division 5 2612 North Duke Street Durham, NC 27704 Dear Mr. Bowman: You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of replacing Bridge 38 in Franklin County: Stream imnacts in the Tar-Pamlico River Basin Site Streambank Stabilization to Perennial Stream linear ft Temporary Fill in Perennial Stream linear ft Total Stream Impact linear ft 1 40 40 concurrent 40 Total 40 40 concurrent 40 Total Stream Impact for Project: 401inear feet. Wetland. Im acts in the Franklin River Basin Site Mechanized Clearin ac Total Wetland Im act ac 1 0.01 0.01 Total 0.01 0.01 Total Wetland Impact for Project: 0.01 acres. Tar-Pamlico Riparian Buffer Impacts Site Zone 1 minus =Zone 1 Zone 1 Buffer Zone 2 minus =Zone 2 Zone 2 Buffer Impact Wetlands Buffers (not Mitigation Impact Wetlands Buffers. Mitigation (sq ft) in Zone 1 wetlands) Required (sq ft) in Zone 2 (not Required (using (sq ft) (sq ft) (using 3:1 ratio) (sq ft) wetlands) 1.5:1 ratio) s ft 1 3,560 353 3,207 N/A 1,485 0 1,485 N/A Totals 3,560. 353 3,207 0 1,485. 0 1,485. 0 * n/a = No mitigation required for this impact. Total Buffer Impact for Project: 5,045 square feet. The project shall be constructed in accordance with your application dated received December 5, 2007. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Numbers 3687, 3689, and 3688. This certification corresponds to the Nationwide Permits 3, 13, and 33 issued by .the Corps of Engineers. This approval is also valid for the Tar-Pamlico Riparian Buffer Rules (15A NCAC 2B.0259). In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. N~one~Carolina Transportation Permitting Unit ~ "`tura~~i/ 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Internet: http:/lh2o.enr.state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer- 50°k Recycled110% Post Consumer Paper O~ WAT~~ Michael F. Easley, Governor William G. Ross Jr., Secretary `OCR QG North Carolina Department of Environment and Natural Resources Uj ~ Coleen Sullins, Director ~ Division of Water Quality 1 1 O ` This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification as well as those listed below. Conditions of Certification: 1. The post-construction removal of any temporary bridge structures must return the project site to its preconstruction contours and elevations. The impacted areas shall be revegetated with appropriate native species. 2. Strict adherence to the most recent version of NCDOT's Best Management Practices For Bridge Demolition and Removal approved by the US Army Corps of Engineers is a condition of the 401 Water Quality Certification. 3. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes, vegetated buffers, etc.) before entering the stream. Please refer to the most current version of Stormwater Best Management Practices. 4. All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the preconstructioncontourS and revegetated. Maintained buffers shall be permanently revegetated with non-woody species by the end of the growing season following completion of construction. For the purpose of this condition, maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular DOT maintenance activities including mowing. The area with non-maintained buffers shall be permanently revegetated,. with native woody species before the next growing season following completion of construction. 5. Pursuant to NCAC I SA 2B.0259(6), sediment and erosion control devices shall not be placed in Zone 1 of any Tar-Pamlico Buffer without prior approval by the NCDWQ. At this time, the NCDWQ has approved no sediment and erosion control devices in Zone 1, outside of the approved project impacts, anywhere on this project. Moreover,. sediment and erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised and that discharge is released as diffuse flow. 6. All Stormwater runoff shall be directed as sheetflow through stream buffers at nonerosive velocities, unless otherwise approved by this certification. 7. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 8. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 9. The dimension, pattern and profile of the stream above and below the crossing shall not be modified. Disturbed floodplains and streams shall be restored to natural geomorphic conditions. 10. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 11. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. - None Carolina Transportation Permitting Unit ~ "'~uCQ~~i/ 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-689311ntemet htto•/lh2o.enr.state.nc.uslncwetlands An Equal OpportunitylAffirmative Action Employer - 50% Recycled/10% Post Consumer Paper ' Michael F. Easley, Governor William G. Ross Jr., Secretary oFWATfiR • `OC~' QG North Carolina Department of Environment and Natural Resources ~ r Coleen Sullins, Director ~ Division of Water Quality ~ ~ 12. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. 13. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 14. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 15. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. 16. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 17. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification.. 18. A copy of this Water Quality Certification shall be maintained on site at the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. 19. -The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to anyland disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. 20. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that maybe imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 21. The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours of discovery. 22. Upon completion of the project (including any impacts at associated borrow or waste site),. the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401 Certification has been completed. 23. Native riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 24. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required .since that is a direct impact from road construction activities. 25. Where placement of sediment and erosion control devices in wetlands and/or waters is unavoidable, they shall be removed and the natural grade restored upon completion of the project. No ` Carolina Transportation Pennitting Unit ~~urallZ,J 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-6893 / Internet htto~l/h2o enr.state.nc.us/ncwetlands An Equal OpportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper 0~ ~AT~~ Michael F. Easley, Governor William G. Ross Jr., Secretary \~~ QG North Carolina Department of Environment and Natural Resources ~ ~ Coleen Sullins, Director } ~ Division of Water Quality ~ Y 26. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask .for a hearing, send a written petition. that conforms. to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center,- Raleigh, N.C. 27699. This certification and its conditions'are fmal and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Rob. Ridings at (919) 733-9817. Sincerely, Coleen Sullins Director Attachments (General Certification and Certificate of Completion form) cc: Chris Murray, Division 5 Environmental Officer Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office Travis Wilson, NC Wildlife Resources Commission File Copy N~e Cazolina Transportation Permitting Unit 1~urQ~~~J 1650 Mail Service Center, Ralegh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931Intemet: http•!/h2o enr.state.nc.us/ncwetlands An Equal OpportunitylAffirmativeAaion Empbyer - 50°k Recycled/10°k Post Consumer Paper