Loading...
HomeMy WebLinkAboutNCG050081_Inspection_20240620 ROY COOPER Governor ELISABETH BISER Secretary WILLIAM E.TOBY VINSON,JR. Interim Director June 20, 2024 Teknor Apex-North Carolina Attention: Ed Morris, Plant Manager 3518 Dillon Rd Jamestown,NC 27282 Subject: Compliance Evaluation Inspection Teknor Apex-North Carolina NPDES Certificate of Coverage—NCG050081 Guilford County, North Carolina Dear Sir or Madam, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Teknor Apex facility on June 11, 2024. Please note that in the stormwater inspection report summary we ask that you begin analytical monitoring and update the facility address. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact Ashley Vikara at (336) 776-9655 or by E-mail at Ashley.vikara@deq.nc.gov. Sincerely _ �j Tamera Eplieineer E Regional En Land Quality Section Enclosure c: Laserfiche Lkw North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources EWinston-Salem Regional Office 1450 Hanes Mill Road,Suite 3001 Winston-Salem,North Carolina 27105 336-776-9800 Compliance Inspection Report Permit:NCG050081 Effective: 06/01/23 Expiration: 05/31/28 Owner: Teknor Apex-North Carolina SOC: Effective: Expiration: Facility: Teknor Apex-North Carolina County: Guilford 109 Ragsdale Rd Region: Winston-Salem Jamestown NC 27282 Contact Person:Mark Segee Title: Phone: 864-408-6445 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 06/11/2024 Entry Time 10:OOAM Exit Time: 11:30AM Primary Inspector:Ashley J Vikara Phone: 336-776-9655 Secondary Inspector(s): Margeory Castellanos Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG050081 Owner-Facility:TeknorApex-North Carolina Inspection Date: 06/11/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: The facility was inspected on June 11, 2024, due to a complaint.All outfalls were observed and the SWPPP was reviewed. The permit renewed and began requiring analytical monitoring. The facility should begin analytical monitoring and submitting DMRs. The address listed is 109 Ragsdale Rd it is also recommended to update the address. Page 2 of 3 Permit: NCG050081 Owner-Facility:Teknor Apex-North Carolina Inspection Date: 06/11/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? # Does the Plan include a"Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 El 0 El #Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? N ❑ ❑ # Does the facility provide all necessary secondary containment? 0 El El EJ # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ EJ # Does the facility provide and document Employee Training? ❑ 1-1 # Does the Plan include a list of Responsible Party(s)? 0 El ❑ El # Is the Plan reviewed and updated annually? 0 ❑ El ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 El ❑ EJ Comment: SWPPP last reviewed 4/23/24 Qualitative Monitorinq Yes No NA NE Has the facility conducted its Qualitative Monitoring? R ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: The permit recently begun requiring analytical monitoring. Permit and Outfalis Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ ❑ #Were all outfalls observed during the inspection? ❑ El 0 ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ El ❑ ❑ # Has the facility evaluated all illicit(non stormwater)discharges? ❑ El El ❑ Comment: Page 3 of 3