Loading...
HomeMy WebLinkAboutWQ0014391_Monitoring - 02-2024_20240620Permit #:" Name of Facility:" Month:" February Report Information WQ0014391 Builders First Source Type" NDMR, NDAR-1, NDAR-2, NDMLR Year:" 2024 Upload Document" BFS NDMR 2-24.pdf PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address:" biowater@aol.com Name of Submitter:" Randall Jarrell Signature:" IFc Submittal Date: 6/20/2024 Will be filled out automatically. 5.65 M B FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page t of & Permit No.: W00014391 Facility Name: Builders FirstSource - Apex Yard WWTF County: Chatham Month: February Year: 2024 PPI: 002 Flow Measuring Point: Z influent ❑ Effluent ❑ No flow generated Parameter Monitoring Point: ❑ influent 2] Effluent ❑ Groundwater Lowering ❑ Surface water Parameter Code 10 50050 00310 31616 00610 00625 00620 00600 00400 00665 00530 !7 lG ,i Q >` O� C E ,Q; F Cn O O LL 0 O m E m O N- LL O U O >= E L C Y Y oZ �0 % ..� Z C m O F- := Z 2 Nl 2 so 0 O CL F- N 0 0 N M c 'a O Q O , fn ~cn 24-hr hrs GPD mg/L #1100 mL mg/L mg/L mg/L mg/L su mg/L mg/L 1 760 2 760 3 760 4 760 5 09:15 0.58 760 8.91 6 744 7 744 8 744 9 744 10 744 11 744 121 14:50 0.33 744 7.49 13 709 14 709 15 709 16 709 17 709 181 11:40 0.58 709 7.29 19 554 20 554 21 554 22 554 23 554 241 554 25 554 26 12:35 0.42 554 7.03 27 686 28 686 29 686 30 31 Average: 681 Daily Maximum: 760 8.91 Daily Minimum: 554 7.03 Sampling Type: Estimate Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: 3,750 30 200 15 30 Daily Limit: Sample Frequency: Monthly 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year Weekly 3 X Year 3 X Year FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page 9- of Sampling Person(s) 11 Certified Laboratories Name: Randall Jarrell Name: Eurofins Name: Name: Wastewater Management, L.L.C. Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? ❑ Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification I ORC: Randall Jarrell Certification No.: 23925 Grade: Phone Number: 919-210-2500 Has the ORC changed since the previous NDMR? ❑ Yes 0 No I -t 3 22 t Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. Permittee Certification Permittee: Goldston - Apex Properties, L.L.C. Signing Official: Randall Jarrell Signing Official's Title: ORC Phone Number: Permit Expiration: u Signature Date I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page '_ of '? Permit No.: WQ0014391 Facility Name: Builders• - Apex Yard WWTF County:•February •irrigationoccur Field Namem 1 • 1 • 1 • 1 this facility? Area (ac s):1 • 1 • 1 • 1 • at I Cover Crop: YES NO 1 Hourly Rate Annual Rate (in): r Field lrrigatedi 0 • • •. • • • .. • ■ I • • •. • D • logo 11-MMMI-MMME ---- -_-- -_-- m ___ __ -__- -----_-- ® mmM-_-- ® ___ __ -_-- ---- -_-- ---- Monthly•.• • �j�jj�/ 1 11 jj�jj��jj/�j/ 1 11j/�jj/��jjj/ 12 Month Floating Total (in): FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page '-k of Permit No.: WQ0014391 Facility Name: Builders FirstSource - Apex Yard WWTF County: Chatham Month: February Did irrigation occur Field Name: this facility? • rea. at I . .. -• .. -. .. -. .. -• mil .... .. ■ p •Field Irrigated?■ p • .. ■ ■ • Irrigated? ■ p - Julio I-MMMIMMMIMMMI ® mm '®©� ---- ---- -_-- -_-- ® mmm m� -_-- ---- -_-- -_-- m mmm m� -_-- ---- -_-- ---- FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page s of •.: VVQ0014391 Facility Name: Builders• - Apex Yard WWTF County:•nth: February1 •irrigationoccur at this facility? Area (acres):1 - 1 1 : 1 Cover Crop: YES NO Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): Annual Rate (in) Annual Rate (in): Annud-?Rate (in):: ••.Field lrrigated?lp •Field •. ■ Field •. p •Fial.. p • m -__ __ ---_ -_-- -_-- ---- Monthly•.• • Month12 •. • Total FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page oo of Permit • !1114391 Facility Name: Builders • - Apex • -• 1 •irrigationoccur at this facility? Area (acres):1 1 1 q F-1 YES NO 1 Hourly Rate (in): Hourly Rate (in): Annual Rate (in):' nwffTIITMI- Annud-?-Rate (in): Field Irrigated? MonthlyCove •.• • FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page A of Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑ Compliant ❑ Non -Compliant 0 Compliant ❑ Non -Compliant ❑ Compliant ❑ Non -Compliant 21 Compliant ❑ Non -Compliant 0 Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Randall Jarrell Permittee: Goldston -Apex Properties, L.L.C. Certification No.: 23925 Signing Official: Randall Jarrell Grade: Phone Number: 919-210-2500 Signing Official's Title: ORC Has the ORC changed since the previous NDAR-1? ❑ Yes Fal No Phone Number: 919-201-0347 Permit Exp.: Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Builders First Source 12 Month Rolling Total Application In Inches 2024 2024 2023 2023 2023 2023 2023 2023 2023 2023 2023 2023 2024 Field Jan Feb March April May June july August Sept Oct Nov Dec Total 1 0 0 0 3.88 0 0 0 0 0 2.8 0 0 6.68 2 0 0 0 3.88 0 0 0 0 0 2.8 0 0 6.68 3 0 0 0 3.93 0 0 0 0 0 2.88 0 0 6.81 4 0 0 0 3.88 0 0 0 0 0 3.9 0 0 6.75 5 0 0 0 3.97 0 0 0 0 0 2.8 0 0 6.77 6 0 0 0 3.97 0 0 0 0 0 2.8 0 0 6.77 7 0 0 0 3.97 0 0 0 0 0 2.87 0 0 6.76 8 0 0 0 3.88 0 0 0 0 0 2.87 0 0 6.75 9 0 0 0 0 0 0 4.78 0 0 0 0 1.92 6.7 10 0 0 0 0 0 0 3.91 0 0 0 0 1.59 5.5 11 0 0 0 0 0 0 3.07 0 0 0 0 1.29 4.36 12 0 0 0 0 0 0 3.74 0 0 0 0 1.52 5.26 13 0 0 0 0 0 0 2.69 0 0 0 0 1.08 3.77 14 0 0 0 0 0 0 3.44 0 0 0 0 1.38 4.82 15 0 0 0 0 0 0 3.07 0 0 0 0 1.2 4.27 16 0 0 0 0 0 0 2.69 0 0 0 0 1.04 3.73