HomeMy WebLinkAboutWQ0014391_Monitoring - 05-2024_20240616Monitoring Report Submittal
Permit Number#*
Name of Facility:*
Month: * May
WQ0014391
Builders First Source
Report Information
Type *
NDMR, NDAR-1, NDAR-2, NDMLR
Confirmation Email Address:
Name of Submitter: *
Signature:
Date of submittal:
Initial Review
biowater@aol.com
Randall Jarrell
Reviewer: Wanda.Gerald
Year:* 2024
Upload Document*
BFS NDMR 5-24.pdf
PDF Only
5.57 M B
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
6/16/2024
This will be filled in automatically
Is the project number correct?* W00014391
Is the monitoring report accepted?* Yes NO
Regional Office* Raleigh
Reviewer: _anonymous
Review Date: 6/21/2024
FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page '% of e
Permit No.: WQ0014391
Facility Name: Builders FirstSource - Apex Yard WWTF
County: Chatham
Month: May
Year: 2024
PPI: 002
Flow Measuring Point: (] Influent El Effluent ❑ No flow generated
Parameter Monitoring Point: ❑ Influent ❑ Effluent El Groundwater Lowering ❑ Surface Water
Parameter Code 0
50050
00310
31616
00610
00625
00620
00600
00400
00665
00530
Q E
O
c
OL
F
O
0
LO
O
m
E
v O
—
li U
E
E
r
0
ZZ
O
-
O
0
Z
X:
i
tE
O
y
0
a-
~mO m'Q6e_
'O
0 COO
to
24-hr
hrs
GPD
mg/L
#/100 mL
mg/L
mg/L
mg/L
mg/L
su
mg/L
mg/L
1
650
2
650
3
650
4
650
5
650
6
1 13:35
1 0.83
650
6.67
7
707
8
707
9
707
10
707
11
707
121
707
13
12:30
0.5
707
6.46
14
699
15
699
16
699
17
699
181
699
19
699
20
13:10
0.5
699
8_89
21
519
22
519
23
519
241
519
25
519
26
519
27
519
28
09:40
0.92
519
7.75
29
708
301
708
311
708
Average:
646
Daily Maximum:
708
8.89
Daily Minimum:
519
6.46
Sampling Type:
Estimate
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Grab
Monthly Limit:
3,750
30
200
15
30
Daily Limit:
Sample Frequency: 1
Monthly 1
3 X Year 1
3 X Year 1
3 X Year 1
3 X Year 1
3 X Year 1
3 X Year I
Weekly 1
3 X Year 1
3 X Year
FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page :I- of
Sampling Person(s) 11 Certified Laboratories
Name: Randall Jarrell Name: Eurofins
Name: Name: Wastewater Management, L.L.C.
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? E Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
IOperator in Responsible Charge (ORC) Certification 11 Permittee Certification
ORC: Randall Jarrell
Certification No.: 23925
Grade: Phone Number: 919-210-2500
Has the ORC changed since the previous NDMR? ❑ Yes 2 No
Permittee: Goldston -Apex Properties, L.L.C.
Signing official: Randall Jarrell
Signing Official's Title: ORC
Phone Number: Permit Expiration:
Signature Date Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for
knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 3 of z5
•.: W00014391
Facility Name: Builders• - Apex Yard WWTF
County: Chatham
•irrigation•
601
at this facility?
Area (acres):
-
Cover Crop:
F� YES NO
Hou rly Rate (in):
Hourly Rate (in):
Hourly Rate
Ho v Rate (in)7
Annual ate (in):
Annual Rate (in):;���
Annual Rate (in):'
Annual Rate (in):
®
___
__
-_--
----
-_--
-_--
• n t h I y L •.• i n •
jjjjj�
��j���jjjj%��jjjij���//j/jjj/jjjjj//����/�jjjj�jj��ji.':jjjjjjj
j�jj/
•1jjjj
FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page ai of b
•.: WQ0014391
Facility Name: Builders• - Apex Yard WWTF
County:•
1 ,
•irrigationoccur
at this facility?
i Cover Crop:
F-1 YES B NO
Hourly -
-Houny
-
1®
I-
HourlyRate
1
M
►r
Annual
-•••. •
• •. -•
0 •
• •. -•
•
- r•Irrigated?0
•
- • Irrigated?•�
•
Julio!
lmmmlmmmm
®___
__
-_--
--_-
-_--
---■
MonthFy-L-oading.
FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page s of �-'
PermitNo.:l111 4i•1
Facility Name: Builders FirstSource Apex YardMonth:1
Did irrigation occur
at this facility?
Area (acres):
.21
Pine Trees
YES NO
mouny Fate p"
1111111MIRMIMM
Annual Rate (in):
Annual Rate (in),
Fieli! Irrigated?
Field Irri
Monthly24
•. • •
Month12 •. • Total
jjjjjjj�
�jjj/�//.�jjjjjjj
jjj�j�j�
���jj/����jj�/%
������/jj�j�j
• • •
�jjjj/�i%���jjjj/jjj��j
i 1 •
�j�jj/
FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page �,-_ of -z
\NQ0014391
Facility Name: Builders• Apex Yard WWTF
County: Chatham
Month: May
irrigation occur
FieldDid
Field
Field
at this facility?
Area (acres):1
1
/
1
C+v&r Crop:
Civer Crop -
Cover Crw
YES NO
Hourly Rate (in):'
ouny Kate (in)--
Hourly Rate (in):
Hourly Rate �(Wny:
I
Annual Rate (in):
Annual Rate (in):'
Annudi-Rate (in):
Annual Rate (in
Field Irrigated?
Fia[1 Irrigated?
Field Irrigated?
Field Irrigated?
m
___
__
-_--
----
-_--
-_--
®
___
__
----
----
-_--
_--■
Monthly•.• .
12 M,tnth Floating
j�����j
�j�j/j�jj��jj�
�jj�j��/jj/�jj/��j�/��jj�jjjj�jjjjjj/��jjjjjji.'•��jjjjjji
j�jj/�j
••
j�jjj�/
FORM: NDAR-1 05-16 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 'Z of 8
Did the application rates exceed the limits in Attachment B of your permit?
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
Was a suitable vegetative cover maintained on all sites as specified in your permit?
Were all setbacks listed in your permit maintained for every application to each permitted site?
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
0 Compliant
❑ Non -Compliant
❑ Compliant
❑ Non -Compliant
❑ Compliant
❑ Non -Compliant
❑ Compliant
❑ Non -Compliant
❑ Compliant
❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Randall Jarrell
Permittee:
Goldston -Apex Properties, L.L.C.
Certification No.: 23925
Signing Official: Randall Jarrell
Grade: Phone Number: 919-210-2500
Signing Official's Title: ORC
Has the ORC changed since the previous NDAR-1? ❑ Yes [21 No
Phone Number: 919-201-0347 Permit Exp.:
6 (�- 2.1(
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
}5
Builders First Source
12 Month Rolling Total Application In Inches
2024 2024 2024 2024 2024 2023 2023 2023 2023 2023 2023 2023 2024
Field Jan
Feb
March April
May
June
July
August
Sept
Oct Nov
Dec
Total
1
0
0
0
0
0
0
0
0
0
2.8
0
0
2.8
2
0
0
0
0
0
0
0
0
0
2.8
0
0
2.8
3
0
0
0
0
0
0
0
0
0
2.88
0
0
2.88
4
0
0
0
0
0
0
0
0
0
3.9
0
0
3.9
5
0
0
0
0
0
0
0
0
0
2.8
0
0
2.8
6
0
0
0
0
0
0
0
0
0
2.8
0
0
2.8
7
0
0
0
0
0
0
0
0
0
2.87
0
0
2.87
8
0
0
0
0
0
0
0
0
0
2.87
0
0
2.87
9
0
0
3.56
0
0
0
4.78
0
0
0
0
1.92
10.26
10
0
0
2.91
0
0
0
3.91
0
0
0
0
1.59
8.41
11
0
0
2.3
0
0
0
3.07
0
0
0
0
1.29
6.66
12
0
0
2.8
0
0
0
3.74
0
0
0
0
1.52
8.06
13
0
0
2.04
0
0
0
2.69
0
0
0
0
1.08
5.81
14
0
0
2.61
0
0
0
3.44
0
0
0
0
1.38
7.43
15
0
0
2.3
0
0
0
3.07
0
0
0
0
1.2
6.57
16
0
0
1.96
0
0
0
2.69
0
0
0
0
1.04
5.69