HomeMy WebLinkAbout310180_Compliance Evaluation Inspection_20230627rvision of Water Resources
Facility Number - ® O Division of Soil and Water Conservation
O Other Agency :1
Type of Visit: oo pliance Inspection Operation Review O Structure Evaluation Q Technical Assistance
Reason for Visit: ?Routine Q Complaint O Follow-up Q Referral Q Emergency Q Other Q Denied Access
Date of Visit: (LSel�1!ffi1J Arrival Time: Departure Time: County: Region: LMD
Farm Name: N Lc �` �);,�j Owner Email:
Owner Name: N t� ZtA nc _ Phone:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative: leq,�-
Certified Operator:
Back-up Operator:
Location of Farm:
Design Current
Swine Capacity Pop.
Wean to Finish
can to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Boars
Other
Title:
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current
Wet Poultry Capacity Pop.
Layer
Non -La er
Design Current
Dry Poultry Capacity Pon.
La ers
Non -Layers
Pullets
Turkeys
Turkey Puults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
t vv 769:�
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes [] .D ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
❑ Yes []No ❑ NA ❑ NE
❑ Yes � ❑ NA ❑ NE
❑ Yes [ to ❑ NA ❑ NE
Page 1 of 3 5/I2/2020 Continuer/
Facili Number: 55t - too jDate of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate'? ❑ Yes D�No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard?
Structure 1 Structure 2 Structure 3 Structure 4
Identifier:
Spillway?:
Designed Freeboard (in): _
Observed Freeboard (in): _
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
❑ Yes ❑ No ❑ NA ❑ NE
Structure 5 Structure 6
❑ Yes MI ❑ NA ❑ NE
❑ Yes No ❑ NA ❑ NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes EErNo ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
(not applicable to roofed pits, dry stacks, and/or wet stacks)
❑ Yes L2"N'o ❑ NA ❑ NE
9. Does any part of the waste management system other than the waste structures require ❑ Yes [a'o ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes 71Xo ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. [—]-Yes NA ❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 101bs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
acres determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
the appropriate box.
❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Yes
E314q
❑ NA
❑ NE
❑ Yes
E3 <o
❑ NA
❑ NE
❑ Yes
E3 o
❑ NA
❑ NE
❑ Yes
E�Xo
❑ NA
❑ NE
[:]Yes
CDXo
❑ NA
❑ NE
[:]Yes
ODXo
❑ NA
❑ NE
❑ Yes
Z�<o
❑ NA
❑ NE
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes E]Ao
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes ��No
ElYesNo
❑ NA ❑ NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: I ( Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes
❑ No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes
❑ No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑ Yes
❑ No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
❑ No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
Ea"'No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
q2<o ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
[],<o ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
®.36o ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
too ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑Yes
�❑ No NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
No ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings offfacility to better explain situations (use additional pages as necessary).
iJS.- C►ed t �47�Q 4_ko d'n -7na2 s . Z ss4Ia sgGGui)
f
T1C�j Ci34
aj s � �u� �� � � ,1�e
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone: 0116), QH G(v LDG
Date: ee /-1-7
511212020