HomeMy WebLinkAbout310112_Compliance Evaluation Inspection_20230928 Division of Water Resources
Facility Number 3 - 1 O Division of Soil and Water Conservation
O Other Agency
Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
0 Reason for Visit: outine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: jr?j Arrival Time: Departure Time: County: in Region:
Farm Name: 640/, EGI,VYIS Owner Email:
Owner Name: Ckla�p_ M aCke.t,\ Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
/�/J
Onsite Representative: J'01o' 1 ! ' l i Integrator:
Certified Operator: a ct/w Certification Number: Ct�Uoo`I
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish I 11-aycr = I Dairy Cow
can to Feeder 5pjyo I jNon-l.ayer I I Ed Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes Q o ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes Flo ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes &No DNA ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facilit Number: - ��a Date of luspection:
Waste Collection &Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes ❑_*r— ❑ NA ❑ NI:
a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in): _ 0
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Q No ❑ NA ❑ NE
(i.e., large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ N1:
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? 'Yes ❑ N A ❑ N E,
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [g-No ❑ NA ❑ N F,
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes EErlFloZ ❑ NA ❑ N I
maintenance or improvement?
Waste Application
10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes (,No ❑ NA ❑ N E
maintenance or improvement?
11. is there evidence of incorrect land application?If yes,check the appropriate box below. [:] Yes ETN- o ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12.Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes (;Vo ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes 0-Ko' ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes OL]Xo ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes Eio ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑`NVo ❑ NA ❑ NE
Required Records& Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes Q o ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes �o ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists [:]Design [:]Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes LJNo ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and I" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes K:jAo ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facili Number: Date of Inspection: 2 laa --
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes J t�No
❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ®-Ko'_ ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No �A ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes to ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes [Q-.No ❑ NA ❑ N E
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes [l,1Vo ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Eg-iVo ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? Yes YN
❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ NA ❑ NI?
Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
l/t�� l C�/(�w r h G'1 Cit CCJ'1
Reviewer/Inspector Name: Phone: j�U j�V121
Reviewer/Inspector Signature: Date: O
Page 3 of 3 S/1212020