Loading...
HomeMy WebLinkAboutNCC241715_Site Plan or Location Map_20240621 000.0 '' L I i � ( , \ \ . ® ESTgR, / I \ I NeN10gp • CONSTRUCTION SCHEDULE 300 \ / \ I i ( I I \ \ A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY ® NC xwrn I.Obtain all necessary permits and plan approvals.Erosion and Sediment Control(E&SC)permit and a Certificate of Coverage / NCGS 113A-54.1°IS AVAILABLE FOR USE IT CAN BE COMPLETED BY HAND OR I . (COC)must be obtained before any land disturbing acmifesaam.campy of Ne E&SC pgmd,the COC»dabW copy of Ne / \ `- III COMPLETED AS AN EXCEL SPREADSHEET. plan must be kept on site,preferably in a permits box,and accessible during inspection / 1IAN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED ' 2.Install gavel wnatmetionentrances first,Men silt fence,reinforced silt fence \ `, \ I I I 1 I \ EROSION AND unets and WSUISS / \ 1 \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A 3.Finish clearing and grubbing any necessary areas on Helots as they are sinned. I NCAC 04B.0131 STATES THAT°...DOCUMENTATION SHALL BE ACCOMPLISHED BY n,EMwc RowD o pro O.Begin lotgrading and excavation activities I INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE srVo iC• ea.mwsrz Lpot S.Begino undone with nuua..unawamn activities. / / I I I APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, 6.Finish all rough Igading and n.ua°construction.All areas not disturbed for]days needs to have temporary or prominent ` ,yq8 I \ • \ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, groundcover costa ed. \ I / l\ \ I ` Y PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION �'""'� -� '.Bunsen fine gradingwalksof to and Patios. \ \ \\ CONTROL PLAN.. 6.Re in fine din of areas 1 9.Final grassing,mulching and stabilizing of lot.In most cases this will involve the installation of sod on the lot The silt fence will 9d 1 \ L. SLTNro<NST re 'n to pleceu tit the lo[is sodded orgresstng is stabilized end takes hold \ I I \ I' REET 10.TLecono-acro shallcanduUself-inspeUtons oftheemsionandsedimenmtionceudalmeazmes»dcomplUethefollowtpag N r = ombin d self-insp cti�n fa o d on tM1e DEMLRwebsim 1 Otip M1tlps://www.degncgov/ebouUdivisions/cncrgy�mincral-and-land-reaouroes/s[°rmwater/srotmwetm-program/npdes-construction-progam. 111 ' ` \ 1 \ \ \ \ SODDING 'Twelve months of complete inspection forms shall be kept on site and available for inspection M all times.It is recommended Ili\1 l\ \` i copy be kept in a permits box.Ref 0.S.113A-54.1 Moo.G.S.1136-57 Sections 15A NCAC 04A.w01 rluuugh 15A \ ty.sv NCAC 04E.o504 General Permit NCO 010000 NPDE$for COnso-uction AUivities. \ `_ 1 \ \ �� my son is 1 STAMM. 9� 11.Self-inspectiore for erosion and eedimentation cmmal Cr: to be performed az least once every seven calendar days and SITE ey w htn hours of ev ry rein evrnt ofgreeter th 1 inh.Any n d d repast shall be m de immedieUly to maintain coati ores» 0 `cC designed.All ESC measures shall be maintained as specified in the cons@ction details on this plan.A rain gauge shall be installed\ I ` \ \\ \ \ � R, o UNepro;xt site for mannadng _ J \ \ \ �� �G�O����l�eNl/I�!! p 12.Inspection and final acceptance letters.When the project is complete,the potatoes shall contact DEMLR to close out the E&SC ax°s ul°raaaxlxs metes. 49, aEMs'RT1'ROAp Plan A.DEMLR Informs the permlttee of the project close o.t via inspection report,the prnnittee shall visit ..c..u.)"7."...., ¢ sR-1010 "deq.vc.gavMCG01"to submit an electronic Nmlceo[tmminatlon(o-NNOT).A 9120 annual general permit tee will be charged yg'v' until the a-NOT has filed out. \ \\ \ Allan e I I I I � IT:\:, - �� 55 \ \ \ � f ,. {III II� � \ 0�j IIIL . III,lI,_;1I1111yII aTaPaTORLw%KowaI I � \ \ \ \\ wnxTxeaolt.ACHIEVE Fl. TA�.ro proe.=TM °w`eu xmWHEN THE SOD IS ESTABLIEFIED-Iry 2-3 t a.. E:.ewEx S.:N',:':.,::',\''...'..,,,,••,,„.:'' -,...'N.----- I i ( 1 il srtoPoRo� III1 \ \ \ \ APPEARANCE OF GOOD SOD VICINITY MAP I 1 \ - _ Z....._ \ \ 11 $ taw a, .T. \ \ `) \ ,rg,,T, n e I I - .- \ V \ cat DATEcra PAGE: 1 J / MIN .{ /BILTFENDE I \ 294 A / 1,,- ---) 4 \ 'tr., Illlllllll IIIIIIII IIIIII ;1 V ii - � � � � d • - DATE: PAGE: TOP oasLTa MusT eE AT Lrns .' - - �_ ABOVE THE TO ---- THEwwsNEosTONE [ 1 \ - _i __28=_ - 5 / t'� 19 / 1 �,A.. �,B„ .,C„ ,�D�� ��E�, �.F�� .G.. STEEL FENCE POST HARDWARE CLOTH FRONT VIEW \BUR r / ------- FILTER -\� R ll P' '� , WASHED 67 I STEELEFENCE AND HARDWARE ATH DW RE y \ 2T� \ �- F MOUS R ll Mll HousHous r- Hous� n'NOUS Hous Harts OST T MAX .:+ • oN caouxD NOTES: rvro oORouNo� \\ 3tj4 \ \ \ trt "�_ n->-,ink-I Is--s-T ns ns-x� Tt>- I 1.H rdware cloth and gravel should overlay Ne s It fence at least 12 / '- ittioo EOP y+�Tn--sT u • • Inch °�� '.°'I 2.Intone outlets should be etl on low elevation areas of silt fence ^ / \\ I / LEGEND Notes: ...: si.c:•i I P ac k 290 - 1.If needed,Tree Protection fencing should be installed along the buffer zone,wetland and based on Feld conditions. D] 4 �\ MAINTENANCES N� \ / % 21 \ 1 E, - beuntlaryand/or around protected trees,providinga radius of at least 1.25 feet for each BURY WIRE FENCE AND ear s'oF UPPER EocE of 1.Per EGO Inspect outlet at lest once and after each or 0D L / / 1 s' N I Flow DIREcnoN i- inch of trunk diameter. t rainfall event.Complete d re V "n o \ 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on HARDWARE 00010 FILTER FABRIC N TRENCH greater liana p e e tiny required 0e rs tamed artily �, �� DIVERSION DiTcH -TIP-TB- schematiddiegrem and field adjusted.f necessary,for placement at low points.If lots are 2 Freshen stone when sediment accumulation exceeds 6lnches O \ CONSTRUCTION \ 0 , n gi ous 3 3 Keep mesh free of debris to pray tle adequate flow. 2 :f cot and have different land owners or builders,each lot should have individual Silt C 2T ENTRANCE • 11 Fences. E xvlEw 4 Remove sediment when half of stone outlet s covered Z -� \ IL�T 1'� ® 3.Install required Silt Fence writ n 10 feel of property line ID ensure there Is no conflict with 5 Replace stone as needed to facltate de-watering. n ilk \NC Envirpl ten utpey s�O - -- / �. \'}\ CONSTRUCTION ENTRAN- septic system.It sihresponsibility of the builder t re the netallabon Of sediment J O I \ 4 1 S T antral measures does t'pet thept' yt d pair area(s) L. SILT FENCE OUTLET _ _ tiA �t 1 1 E c� 4 Atleast one Crol.uer E t /E c t binstalledperle / /"Te 'e \ �4 \ I �. 5.Waste bins and other dedicated for bulldog og material waste shall be at d SILT / \ 1 • 1 \ \ 22 \ / no otherast 50 feet away from storm altenativee sts if this separationcannot be n inleN or drainage ditches ved,these esea asb shown that Ib FENCE - t\\� R{1 ach unless the It areas muss be contained 2 25 4\1\\•c1 a CON LIM OTON_/ \/\ a Inlets downbstream ohind ffdisturbances should be protected streets should be swept when 1 1tY \ 1Id - DATE: PAGE: - 1 , \ /\ C. N .2Bg- sediment0fromihe enconstruct on activity acre Construction Ent and other s t sack/watt. Sill Sock/watt. NOTE / $� CONSTRUE,IN kl �� N�\ \\//TT�S' w �U \ T. prowtied on ails for dditional anal sheets Erosce So Fence uontand sediment control details arenotdrewnutreoa are Other r - ONSIMITS ON LIMIT• \! WA/ FL°W_�� be 11 �.Ij� againsterosmatsubstituteda LIMITS ENTRANCE lcccErTivE pa,.f 6/2/2020 Ala TYPICAL LOT LAYOUT WITH ROADSIDE DITCHES t_eC M If II..:.1f if-11 2. F9 REINFORCED WATTLE - E \ • 1 \ 55 \ +2 ' lengt TFENCE F: RE FO CE th.. O SECTION Stakes I Stakes 3. ...alders)Mould bean.11ed para.. \ - OUTLET �-- S TFE CE \\�, -�t�\ •t�f� ` \O j�\ DATE: PAGE: SECTION and a minimum of 10Mt beyond the roe ofa m OUTL T t`- Tw j slope.Sin Sock/W taw)located below // \ gat areas noun be loaed at edge of red \ disturbance.aIudhew aa°i,�tynpa silt �- _ r / _Barmen-Road- �sk20 0 \ �� \ J \\ \\ around »d me / �aI-U(C a hardwoodLI) W inch x 2 inch cross section °°°r of GROUND STABILIZATION ! InILUTLECE\ \ \ / •i volcally Own,through Ow_ � \ \ a CO TR J beaplmenLa.with a SITE AREA STABILIZATION / - - \ \ \ \ NTRAPICC\• \ \\ oaJ •_( maximum interval of 4 Meer "m EXCEPTIONS ` @\ of 8 feet WM silt N..pla<.e n.4 nest DESCRIPTION TIME FRAME �_ \ ` \ \\' �\AG� / I �-lf ten,.,wTa UNTRENCTo Wood l N2 ALLATIION log st g rid a Mn a t PERIMETER DIKES, 7 DAYS NONE / / . \\ \ \ \ \ QJ � �at-� coed N HE INSTALLATION ENTRENCHED nsrwkwT ON• ccoo.ti.ks shall be used behind ree silt SWALES,DITCHES \ ..,,...�T°.awmt.Cmuwnxwuao.r.xx.wur.xmwTz. sookrwattle to hold it in plare during pontiff me.. &SLOPES \ f.a tet �!���!!!���� ISOMETRICv SOCK xnu now RATES 1. Inspect silt saldwattle at leest weekly and after a. HIGH DUALITY 7 DAYS NONE / / �- \\\ WATER ZONES / i- \ \ •'._ .. •1 1 1 1 I I I I I 1•t Mu@ or amps (HOW) \ \ \ / A __.:.- �� ii�i• mru"tenc"d I Be omen po eta COMPOST,i s(Iaoo",m)Al:')IMO ram) a(21 a 1epece°f" SLOPES STEEPER 7 DAYS IF SLOPES ARE �� \ \ \.\ \ \ \ �, e x" 5. ?w?11;;IO4tP THAN 3:1 10'OR LESS IN - d'Sheet F Flew-. Silt Dock/M9inmca c;a3rmi ig50 rmi I�e�°t Irt° Ira50.t s LENGTH AND ARE • / / / \\ \\ �\ \` \ \ \ iir` n?�n_ wpt le (305 m) (398 m) (50°'") magea Inagedre. NOT STEEPER \ - s"Tr tam.6 is g'jn g vrro Irma 2mia gem@apo, THAN 2:1, 14 <g+ a1 en) [2a1 e3,. 4 ° Ms been verma a nure an»"e.me DAYS ARE // / \ \\ \ \ Construction, Maintenance: /m/m) /m/m) /m/m) /m/m) /m/m) s pe a until tied ALLOWED / / \ \ \\ \ --- 1 Clear the entrance and exit area of all vegetation,roots,and other objectionable i Per NGG 01 spec[at least once a week and after each i inch or SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION \ \ \ matekaland propenesevR. greater rainfal¢make anyregnhetlrepaintImmediately. SLOPES 3:1 OR 14 DAYS 7 DAYS FOR ( \� \ z.Place me Ito the acme d and shown on megrave pad prevent/ / \ \ \\ grave p grade pans,and 2.Maintain the din a conditionmud or sediment FLATTER SLOPES GREATER \ 1 smooth iL from leaving the construction site.This may require periodic THAN(50r IN \ S7 \ \ N. 1 3.Provide d otle la to cony water to a sediment trap or other suitable outlet. toptlressing with 2 inch stone. LENGTH JI \ \ 4.Use geotea1ile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or ALL OTHER AREAS 14 DAYS NONE EXCEPT ) aubied to seepage or high water Iable. Iracked onto public roadways. WITH SLOPES FOR PERIMETERS -� \ FLATTER THAN 4:1 AND HOW ZONES) L) / I ) ) ) \ \ CONSTRUCTION ENTRANCE/EXIT DATE: Wve FenceFilter Fabric PAGE: �� -/ strong. Nnout rare con woe Fence Wire and t `� // sy \ ) / Steel Post thoroughly General Erosion Control Notes / 7 \ ....Pp.t ry a.m...Emm, fUrelope 1..... ,na Only the D shownshall be disturbed. - �� - / \ PAGE 1 of 2 Plastic or �9x I T 2. All disturbed areas troll be grassed and _ \ I I I \ TOTAL DISTURBED ACREAGE: 1.44 ACRES :We ties nr,d, mulched as soon as possible and maintained ii PemDnent pryer s established. - - \ / LOT EROSION CONTROL PLAN j < I I I \\ \ LOTS 2, 22 & 23 t"° `�° lid \ I I C TURLINGTON 1 Filter Fabric J 1 \ \ Construction: / \ / I t2..E;mRme„.plghtoldiesediee%oes ore I aovetheground DRoBBBEGn°"VIEW MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION ACRES may irmound volumes of w.r sufficient to xis mneca the structure) S.Construct the securely fabric theael rtiomnenba 0I to Me Sahli a Met minimum oveineoWhen he neixttpo>i. FOR strength ranbrmbeofthekn..Fastened»wrelvmm.pent,Pe thaeeofmn Meunsixtand General-All measures will be inspected and corrections made after runoff producing falls,or at least once per week minimum.The builder will insure that the construction activities on an particular lot do not adverse) affect an of the installed erosion control measures.If lot construction dictates,measures will be a.support andardorength o bottom r plastic by..mooda.mn mewreammr<amemereiiea strength. .Pore rote Ip grain P any adversely Y side of the fence k:nyea a pairsim alter relocated on the lot to insure that the potential for sedimentation runoff is eliminated as muoh as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. A<7CG RESIDENTIAL, LLC M1oeu Nlenceas u»E,space posts a maximum or a feet apart speeds should be driven 2.Shoulellheetabr,c�or.llseUment fence cow,tear,¢eremp»„, Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the Construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all securely esrfame tom 8rooPelepeelms does not.quirea Are mesh support rence.Dearely objectionable materials spilled,washed,or tracked onto public roadways. GROVE TOWNSHIP HARNETT COUNTY e.�BtenMenitarfabrmeirectlytoprals.WireorplastiiczipllesshouldhaveammlmumofStenrdtensue Remove rthenetrainadareacepresureonthe Silt Fence-Sedimentfencesshouldbeinspectedatleastonceaweekandaftereachrainfallevent.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insureSCALE: 1x=1 APRIL 2024 .axle m y nu,es wide and B inchesdeep e proposed tine aloe pants and 3 fence. ke°rema"°'e undermining me fence eating that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. oOr Exca me them appro.i taI 4i Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE la e 4 .Place 1 ace Inches of along me bottom and side of the trench. and bring theae fencing m grade l sand stabilllzel n after the contributing 100 0 50 100 200 400 g.Backlit.trench with soil placed over me Wermbdc and comma Thorough compaction of me 161.11s drainage area has been properly stabulzea and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendation and type of grass recommendations when and if possible. 10.oanmIa silt erIefilter aenamac a. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = MMI ° repaired,and reseeded as soon as possible.If the time of year does not permit the establishment ofa permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. sera Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET ) .ANC-Envirq,men tol.Jpeg SILT FENCE sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. t inch = 100 ft. JReinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE BF-0106 LAST SAVED:4/8/2024 10.47 AM LAST PLOTTED:4/8/2024 11:16 AM PLOTTED Si.Dennis Gilbert nssoout:G\CURRENT JOBS\A&G RESIDENTIAL LLC\23-2655-00 TURLINGTON ACRES-EC\PLA.NS\TURununoncC-LOT52.22623.DWG