Loading...
HomeMy WebLinkAboutSW3240601_Stormwater Report_20240618 Mikrill111 STORMWATER MANAGEMENT REPORT FOR: THOMAS HUTTON GRACE CHURCH ROAD INDUSTRIAL SALISBURY, NC PREPARED FOR: SJP PROPERTIES 31296.0001 APRIL 2024 \`�I11�i11►,„� \\\ .�H CARP iii� ���auunluaa, Iiii •::,f.S •‘ , ..0A ‘...mrro AL r• — THOMAS. . IS Z. 0499 8 HUTTON '(. ,Vr 1> : `O2c�= ENGINEERING 49 ..YGINE� • .: � co. ' 1. No. F-0871 .:, r II t HMO l 111 ��� OF AO iiiinu mun1���``% thornasandhutton.corn TGrace Church Road Industrial J:31296.0001 HSalisbury, NC April 2024 Stormwater Management Report STORMWATER MANAGEMENT REPORT Grace Church Road Industrial Project: Gace Church Road Industrial T&H Job Number: J-31296.0001 Location: Grace Church Rd Salisbury, NC 28147 Parcel ID: 477 079 Date Prepared: April 2024 Owner: SJP Properties Owner Address: 389 Interpace Parkway Parsippany, NJ 07054 Engineer: Thomas & Hutton Engineer Address: 1020 Euclid Avenue Charlotte, NC 28203 Phone: 980-201-5505 H THOMAS & HUTTON Page 1 TGrace Church Road Industrial J:31296.0001 HSalisbury, NC April 2024 Stormwater Management Report TABLE OF CONTENTS Section 1 -Summary of Results Page 3 Section 2- Project Narrative Page 3 Section 3- Purpose Page 4 Section 4- Regulatory Summary Page 4 Section 5-Methodology Page 5 Section 6- Hydrology Page 6 Section 7- Runoff Calculations Page 6 Section 8- Existing Conditions Page 7 Section 9- Post Development Conditions Page 8 TABLES Comparison of Pre- and Post-Development Total Runoff Rates (cfs) 1 Sand Filter/Dry Pond SCM 01 2 Sand Filter/Dry Pond SCM 02 3 FIGURES Site Location Map 1 Topographic Map 2 FEMA Map 3 Pre-Development Drainage Map 4 Post-Development Drainage Map 5 APPENDICES Hydrologic Soils Report A Existing Conditions SSA Reports B Proposed Conditions SSA Reports C Sand Filter Design Worksheet D Riprap Outlet Protection E Spillway Calculations F HEC-22 Report G Channel Protection Analysis H H THOMAS & HUTTON Page 2 TGrace Church Road Industrial J:31296.0001 HSalisbury, NC April 2024 Stormwater Management Report SECTION 1 - SUMMARY OF RESULTS Table 1 -_Comparison of Pre- and Post-Develoament Total Runoff Rates (cfs) Storm Event Pre-Development Post-Development DIFFERENCE 2-year 119.45 96.80 22.65 10-Year 231.92 201.20 30.72 25-Year 305.37 277.72 27.65 SECTION 2 - PROJECT NARRATIVE The Grace Church Rd project is a proposed industrial development within Salisbruy, North Carolina. This development consists of an approximately 294,133 sf industrial facility with an adjacent parking lot. The site is located in Rowan County south of Grace Church Road, east of Roseman Road, and west of Route 29. The approximately 34 acre parcel is currently entirely wooded with an understory of brush. The site naturally drains from east to west and is discharged to a tributary to Grants Creek that flows along a portion of the northwest boundary of the site. There are also approximately 78 acres of offsite drainage area within the pre-development drainage basins containing a field, two ponds, and an industrial site from which stormwater runoff naturally drains toward the site and discharges to the same tributary. The pre-development drainage basins are delineated and illustrated in the Pre-Development Drainage Map found at the end of this report. For the purpose of this report, we will compare the pre-development runoff rates to the post- development runoff rates as shown in the Section 1 summary above. All pre-development basins flow to a tributary of Grants Creek. The site drainage basins that are affected by construction will be routed through one of two Stormwater Control Measures (SCMs) and outfall into the existing Grants Creek tributary to be analyzed at the same spot as pre-development conditions. Each of these SCMs (Pond-01 and Pond-02) consists of a dry pond with an open-bottom sand filter. The unaffected portions of these basins will be routed around or through the site by either a drainage ditch, or pipes. The post-development sub-basins are delineated and illustrated in the Post-Development Drainage Map found at the end of this report. All design information for the closed bottom sand filter, dry ponds, and associated drainage pipes and structures can be found in the appendices of this report. The soils within these sub-basins consist of type B, C, and C/D hydrologic soil groups which are shown on the attached National Resources Conservation Service (NRCS) soils map within Appendix A. H THOMAS & HUTTON Page 3 TGrace Church Road Industrial J:31296.0001 HSalisbury, NC April 2024 Stormwater Management Report SECTION 3 - PURPOSE The purposes of this report are: 1. To delineate all pre-development basins that are within this project and determine which drainage basins will be affected by the proposed development. 2. To develop a stormwater model that will: a. Be in compliance with the North Carolina Department of Environmental Quality. b. Simulate the pre- and post-development conditions for the project. c. Predict water elevations for all proposed ponds during different storm events. d. Provide design flows (under future build out conditions) for the major drainage structures that can be used to properly size improvements, if needed. e. Provide sand filter design in accordance with NCDEQ Stormwater Design Manual C-6. 3. To document that the stormwater management measures and equipment installed on site will be adequate for all existing and proposed development on the site. Two drainage models are included in this report. • Pre-Development: examines the drainage basin prior to any development within the site. • Post-Development: examines the drainage basin after site improvements have been installed. The model may need to be revised and updated as the site plan evolves. SECTION 4 - REGULATORY SUMMARY North Carolina Department of Environmental Quality-Stormwater The North Carolina Department of Environmental Quality (NC DEQ) is responsible for administering the state's storm water management program. Development or re-development activities are required to apply for and receive a stormwater permit from the NC DEQ. These permits address water quality and quantity. NC DEQ regulations require that peak post-development discharge rates from the basin shall be at or below pre-development rates for the 2, 10, and 25-year 24-hour storm events. The regulations also specify the 1-inch storm runoff volume treatment drawdown time shall be greater than 48 hours and less than 120 hours to achieve optimal efficiency for channel protection control. See attached Appendix C for post-development peak flow control calculations, Appendix D for water quality calculations, and Appendix E for riprap outlet protection calculations. H THOMAS & HUTTON Page 4 TGrace Church Road Industrial J:31296.0001 HSalisbury, NC April 2024 Stormwater Management Report SECTION 5 - METHODOLOGY The pre- and post-development conditions of the site were analyzed using the Storm and Sanitary Analysis (SSA) program developed by Autodesk. The program is used to model rainfall and stormwater runoff and to perform hydraulic routing through the storm drainage system (including existing and proposed storage/detention features such as wetlands, ponds, and lakes). SSA is an advanced, powerful, and comprehensive modeling package for analyzing and designing drainage systems, stormwater sewers, and sanitary sewers. The software can simultaneously model complex hydrology, hydraulics, and water quality. The SSA program is built on the highly tested and widely utilized SWMM methodologies. For this application of the SSA program, the hydrology was simulated using the NRCS (SCS) TR-55 methodology. The hydraulics were simulated utilizing hydrodynamic routing. Hydrodynamic routing solves the complete Saint- Venant equations throughout the drainage network and includes modeling of backwater effects, flow reversal, surcharging, looped connections, pressure flow, tidal outfalls, and inter- connected ponds. The SSA program graphical user interface (GUI) allows for the input of hydrologic data for each drainage sub-basin. See the appendices for input variables including runoff curve number, rainfall distribution pattern, hydrograph peaking factor, area of each drainage sub-basin, and time of concentration. The SSA program generates runoff hydrographs for each sub-basin based on these user-specified variables. Hydrographs are generated by SSA using the NRCS Unit Hydrograph (TR-55) Method. The model's hydraulic input data consists of a system of nodes and links. Nodes represent locations where flows enter or exit the system, pipe or channel characteristics change, or where stage/storage/time relationships are provided. Links represent traditional types of hydraulic conveyance such as pipes, channels, control structures, weirs, etc. The sizes, inverts, lengths, and Manning "n" values for all pipes connecting the ponds or lakes are input into the model. In addition to pipe information, all pond, lake, and detention area stage-area information and the respective control structure information is input into the model. The node and link conditions are analyzed within the model for a given storm, and flow conditions are determined. Hydrographs for each drainage area are merged within the SSA program, and the hydrologic results are then combined with the hydraulic information to model the hydraulic interactions of the entire drainage system. The results include pond area and discharge rates and stage/storage information during the storm events. The storm drainage infrastructure onsite was modeled using HEC-22 functionality within Civil 3D.This program utilizes the model rainfall and stormwater runoff through the storm drainage infrastructure to provide hydraulic grade line calculations and profiles for analyzing the proposed storm drain network.These computations can be found in Appendix G. H THOMAS & HUTTON Page 5 TGrace Church Road Industrial J:31296.0001 HSalisbury, NC April 2024 Stormwater Management Report SECTION 6 - HYDROLOGY • SCS TR-55 Method was used. • The rainfall intensity used for each storm event was obtained from National Oceanic and Atmospheric Administration (NOAA) Atlas 14. The following design storms are used in the model simulations: - 2-year, 24-hour Design Storm = 3.32 inches - 10-year, 24-hour Design Storm = 4.84 inches - 25-year, 24-hour Design Storm = 5.74 inches - 100-year, 24-hour Design Storm = 7.20 inches • SCS Type II Statistical Rainfall Distribution was used. This distribution pattern is determined by the Soil Conservation Service comparing regional rain-gage data. • Soils present within the drainage basins consist of the following: - Cecil Sandy Clay Loam, 2 to 8 percent slopes, moderately eroded (CeB2) - HSG B - Enon Fine Sandy Loam, 2 to 8 percent slopes (EnB) - HSG C - Enon-Urban Land Complex, 2 to 10 percent slopes (EuB) - HSG C - Lloyd Clay Loam, 2 to 8 percent slopes, moderately eroded (LdB2) - HSG B - Mecklenburg Loam, 2 to 8 percent slopes (MdB) - HSG C - Sedgefield Fine Sandy Loam, 1 to 6 percent slopes (SeB) - HSG C/D SECTION 7 - RUNOFF CALCULATIONS Peak flow rates for the watersheds were calculated by the SSA Program for each design storm.The pre- and post-development drainage basins are shown in appendicies that follow this report. Curve Numbers Curve numbers were generated according to procedures set forth in SCS Technical Release 55. The composite curve numbers for each drainage basin were calculated using soils information from the Soil Survey of Union County, NC provided by The United States Department of Agriculture Soil Conservation Service. Curve numbers were weighted based on the land use and soil group within each basin. Time of Concentration Times of concentration were calculated according to procedures set forth in SCS Technical Release (TR) 55. The travel times (Tt) for overland flow, shallow concentrated flow, and channel flow are added together for the drainage basin to get the time of concentration Tc. Basin information for the area of interest was collected for use in the SSA models. Basins were delineated using surveyed topographic information. Basins were drawn and the most hydarulically distant flow paths were found. The times of concentration were calculated based on the NRCS, three part travel time method documented in TR-55. The three equations used are summarized below: H THOMAS & HUTTON Page 6 TGrace Church Road Industrial J:31296.0001 HSalisbury, NC April 2024 Stormwater Management Report Sheet Flow: (hr) Symbol Dimension Units 0.007(nL)°,8 n Manning's n -- t1 P °.°s X S°4 L Length of flow ft 2 2 yr event P2 rainfall in S Slope ft/ft Shallow Concentrated Flow: (hr) Symbol Dimension Units L L Length of flow ft t2 3600 X V V* Velocity ft/s *Based on TR-55 velocity-slope relationship Channel Flow: (hr) Symbol Dimension Units L L Length of flow ft t3 = 3600 X V V* Velocity ft/s *Assumed to be 2 ft/s Time of Concentration: (hr) tc = tl + t2 + t3 Appendices B and C with time of concentration information are attached. SECTION 8 - EXISTING CONDITIONS While the site itself is just over 34 acres, the total acreage of the drainage basins analyzed in the stormwater calculations is approximately 112.3 acres. The existing conditions described in this narrative will refer to the pre-development condition of the site. The pre-development conditions for the site consist predominantly of wooded area with an understory of brush where the proposed site is as well as about 78.3 acres of offsite drainage area consisting of two ponds, a grass field, low-density residential area, and two small industrial facilities. Stormwater runoff on the site was delineated according to the existing drainage patterns found at the site and upon the field topographic survey completed within the site. The watershed delineation was conducted to provide a comparison for pre-development and post- development flows. The outfall of this site discharges into an existing tributary to Grants Creek (See Pre Development Drainage Map- Figure 4). H THOMAS & HUTTON Page 7 TGrace Church Road Industrial J:31296.0001 HSalisbury, NC April 2024 Stormwater Management Report SECTION 9 - POST- DEVELOPMENT CONDITIONS The post-development drainage basin is shown on the Post-Development Drainage Map located in Figure 5 of this report. The total post-development watershed area analyzed for this project is approximately 112.3 acres. All post-development watershed areas drain toward and are analyzed at the same Outfall so as to have an accurate comparison to the pre- development drainage conditions which are analyzed at the same location. Total post- development peak flows are less than total pre-development conditions for the 2-yr, 10-yr, and 25-yr storm events. See Appendices B and C for pre- and post-development SSA model input and results. See Summary of pre-development versus post-development results at the beginning of report. After development, the site will consist of one approximately 294,133 sf industrial building with adjacent parking spots as well as a driveway, an additional roughly 2 acre parking lot, and stormwater management features such as drainage swales, two closed bottom sand filters, and two dry ponds. Stormwater runoff from site will be conveyed to one of two proposed dry ponds each with a closed-bottom sand filter. The sand filters will meet North Carolina Department of Environmental Quality pre- and post-development flows for the two (2) year, ten (10) year, and twenty-five (25) year storm events as well as be able to accommodate the one hundred (100) year storm event. The proposed sand filters were designed to meet criteria found in the NCDEQ BMP Design Manual. The dry ponds as well as each respective outfall structure and spillway have been designed to accommodate up to the one hundred year storm event. The spillway calculations can be seen in Appendix F. The following tables illustrate the maximum water surface elevation for the 2-year, 10- year, 25-year, and 100-year storm events: H THOMAS & HUTTON Page 8 TGrace Church Road Industrial J:31296.0001 HSalisbury, NC April 2024 Stormwater Management Report Table 2-Sand Filter/Dry Pond SCM 01 Bottom of Pond = 735.50 Crest of Emergency Spillway = 740.5 ft Top of Embankment = 741.5 ft Pond 01 Max Elevation Storm Event (f) 2-Year 739.11 10-Year 740.27 25-Year 740.76 100-Year 741.19 1" Rainfall WSEL: 736.8 ft Table 3-Sand Filter/Dry Pond SCM 02 Bottom of Pond = 758 ft Crest of Emergency Spillway= 761 ft Top of Embankment = 762 ft Pond 02 Max Elevation Storm Event (ft) 2-Year 759.04 10-Year 759.52 25-Year 759.79 100-Year 760.2 1" Rainfall WSEL: 758.26 H THOMAS & HUTTON Page 9 HT THOMAS & HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Figure 1 Site Location Map J - 3129 6.0001 April 2024 Thomason dhuttan.ocm *• M j4 4 ? _ �O04 Meadoh.w 07,.., 1►,..._...t,.... ',•i >A •' '' ". •' •; THOMAS �� 1 a gran �� ♦" r. t piltio, /' .. 1 ram• .,.• • ..4. L. _ HI T T O N 1. 0. " ;= ff y Grace Church �4'' �' • « M• 1p6. -'4 - # Road Industrial -.,;% °• �� .. ,�;; ,— ;;,<< la r' Site Location Map • old CamP Rdm+f' " -,,i!, r r 6" ,. 4$ , -,fti,* / , ' CS 4 ' 411- f A , 4.44. 0, , 11‘ i ,, - 4 ,,,,.... i, . c. 1 fro Imo. • /A . t, iiii IN *. ^ NO t./ •N , 111N- , /7/1 a'.4 /it • ie Q `' •t T. O." • W ` R �� in • i. ak. �a 1021 t�-♦ (��j >11(41' • 41r 1 `v s41t . 4. , .. • .414 ' A,. •44' )4) Qt- . rz, •- • // 1 Inch= 1,200 Feet '..� • •../.. , , •• , 4 / ....emir.. . ink'. ' geo This map was created using geothinQ I www.geothinQ.corn I Mapping Smart Land Decisions HT THOMAS HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Figure 2 Topographic Map J - 3129 6.0001 April 2024 Iax 1. 1 r THOMAS ..a. HUTTON ir. 1.111Ik CH h o Grace Church k-. .e Road Industrial � . . .0 o,eh Ra ' Topographic Map / - � ' r Il11 lit,)1 k ip, • ' ' 0, i iir ' /, 1 4\ : t rff:/,,,, 4 So . 725 7 r� p, .........? (.......<,,, _ . r...\\j •M 1.0 0" "r , ,,....._S„,,,,,, r \re) �M a: C:::;) • . 1 / ... .....- 4.: 1 Inch—500 Feet 'k� {`. .1110- At)jitg I I\ All(*. Feet This map was created using geothinQ I www.geothinQ.com I Mapping Smart Land Decisions HT THOMAS & HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Figure 3 FEMA Map J - 31296.0001 April 2024 Thomason dhutton.com STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM zOxE AS =_,,,.,..,,, ()' S 1 hun' LEGEND 6 ,r�,__. 1..am FEE ,r 3]11215 .. s� er,w i .nap FEET JOINS PANEL SS. - .em FFF, FLOOD HAZARD AREAS (SE000 SUBJECT TO wnE .1 ret, 1 S s 9e SPECIAL IS,ANNUAL FLOOD ( ZONE AS - '-il " (a°ywen� t.atro vmwnssne_eeaea in are,ore.rearM arcm�iwmme rJ ZONE ire; The Base Rood smarm xm. MEM y T..I Y I —�/ // o/ ,PEomE �■■■�■we � waxaox FROM can `�_ __ 1` ..,. / / ( iial'.I EEa rone Ao of tmr her k'umvi�a,ns arwnnot Elmou Base lood / ' dePs determined or(usually .20 fan mo 9m m..emoo s.a. ZONE AL �m mgmraaK ZONE AR shed MEM■■■■■■■� ZONE ,.IF.ak.�,m a T ta �/ mum hang .nw..a MM..■■iiiiiii■■■■■■ ' ronEA �M.�,aNm ■ ■■■■ ■■■■■■■� \ mE�mw a..� ■ ■■■■�■■■■■ ° ! . =ONE. roNE4E x,mm,m.,haab,w...mn,Eaw Dad Fenton ■■■■■■■■■■�� _ .I FLOODWAS AREAS IN ZONE Af —T—'MEEM�M!MM�A■■ _ e \ tm 1%a..n m.txe be mug f a N o.. -. / rues MECELExBIL CAEARRx, i ,wN < �/ - I,ZONE x�e Am.a...w 16. annual chage flood,area of I%annual cl.ce E.. • ill"F DATUM INFORMATION I I- � r �• \ , t E..FEET �/ sw \ roNEx n e.x,.are e.np.� 1 \ 4 T n ewm .Zneyxyx C s ef a33 p- MC°ASrn9na RESOURCES SVOrRM(cMs)AREAS WTI I Transverse �� I �C5aa `0`W'w n,an. ,�9. FIRM onhler.are SurwF.awho / � E°. ,and N.n„m.xm.,W.xd.,th,.mmm Spa...x w.w�,A+Y Matra 1 1 °� Y� ` W_Y! - mmer.A has been computed for awn H.Caro.county Thg onset was then applied to the NOVO 29 flood elevations I.were nal raped dor,the creation of I. Malawi.formai FIRM The arrears for each counly shown on mis FIRM panel are amuse ma I s /, V.; i v,mm °r _ xoaa �' o- mm... < NEx naaac. „A.,.a.,.mu w. Me „o.w»n. M..Q.m.tam,.w..rawm. 121 enJones Sant mmm Raleigh.xry NxxFFot m2.• idt ,wew.e M — ,\ �j�j%r BMSs,oa mm.e,M1elnFrm�nonth been deny...eilhere�Pacing�M,p.n sourc coastal analysis or es .sied e analyses isled • L i. ,�./; .. . _ '^•.: .Mss® xnNw .pump .. „B FLOOD HAZARD DATA TABLE utu mm , `,+ 410101PS`- -"."+.. .x / / '^. Doss ee. ee. ucnrnoe `P.z 1, - 'LY �/" \ L„ / TOWN CREEK mm tex NAppe T.Fboe.ervn ✓ .. , / � ,Y m oewN •47 k1] / ` 431 x91W .IA 3 SN 03. 4e4 NO ' ' / < ,Y • .� Fen a nn Too NA 7603 3EE , :.'F j . _ ZONEAE s. Se2SmFF ; e oNEx �. \ n / EaoNORnu.saN1 r - - .1r1�. •035'r • ..g � I I'll r�IPJ PANEL 5648J wt® �/ 1 r ' ' \ FIRM / • �y -w. °� FLOOD INSURANCE RATE MAP - 1u.• I. _ o NORTH CAROLINA • I i. aJJ PANEL 5616 ''' sjv • ,. T CS ssNMIN, an.ax e FORS. I5 xp 6YGY oss ...FEET - ressar .. JOINS PANEL NNE v KK„� 000 FFFT ,v.EpFEET bN� Str 0 1.aim FEET IMO am FEET NOTES TO USERS This map is for use in ibe mt n Swaei FNm....enmFrmoaea.e M Rood coma atop.. con4Swnon Mal mow ▪ ry as; m amo� x,mmm mm t �� ,toM�.,. .w,N.mne,m..2.1211 .ao��.o.mm • fl .P REPOSITORY ood hazard a.p. �a _ .a.m ne mmmeFmd EFFECTIVE DATE OFFLOODNSURANCERATEMAPPANEL o l a1 SKKO mseonstny• vas. am and ae+PNe, used ce.. Mad rem In.=es ma am ut.. M may ai des map ,,urvE to mos o.."ac.m'"• "". 2 as mum papal. e Sava m. P.wa re.,mx.,eme tmp O 0. ms �.m.n .erne=:red m M,Or. m""'=. s11P°7 `7:-4 7 m o,N pr.01 rma "�^�/ m EFFECTIVE wTF s of RE,ns owls TO Try s PANEL 11 ....rt.m.amm a Pe..se ra,M purposes n .t he ose ns Me sole w,n nu envwt Bean m .Ma �� ®bdato. ,avet.base panels onwm�mill This Nnmmmm,n wa ne w,g or me ?^rvm.�aam.mecem M1,nnr,mmwmm Flood Insurance Rate Map IFI NN aemo.n be.uve'm,r,:®x source nmma xewm° t.mnam. reooewu eya FlaNbemema.Fnnomt mnewamypepweea. wtheEM'n%a F�NN.eP.mo,u.tme�r=emnao,Amewm m.m.m.,. ml¢B°°mn„"'°"xi°1°w "N�.6 eermse N'�a mw'�'a.....rt a "a youha. a,.n m.mp nm o,2NRmm,tmm� u.Nnmel Fwm mm,.. Q EFFECTNE DATE MAP NUMBER Ema.epial 1 Nonn°edu n..m in.P.a«a ^.-..aN....N..,Ale Pe,n..n me F S Ms...N n °n` ap"' En FEMA MAP(1A77.13.02,or von m.FEMA JUNE 16,2009 3710564800J Em.ta..w a norm c....n.. a. m. PNw.g E, costs assoaaled.0 flooding This IS demonstrated M e rces nw mn Q aN m .r hap _Insurance Se.__2 Map Ramon(LOAM)or Letter of MaP re w n Carolina ma Sat agreement wm FEMA to mrw Ma.°c ma..Dean emap 11.plain areas al the local level As a pad of Mis ell.the state el Nadh in nq m.a. aa.mawee 'iom,FlaFwv°O.e�un . O ;�w�° produce n tanN a FIRM. sand Ninon Yowled can.°',.p°.....o .e.x....m,,.,,.,,t,.,em.�.,m,.., N.,,,,..°m°,.�.,. f� ^.��.. ..,,,,,..are prose.in.Flood Insurance Mucly IFIM report 101 01.•Junglaion The FIS repon �xM«wPa.. "m rth Carolina www.nefloodmapa.eom puree., M red memo. O m r n 1..sa.x..o.me.wem,.n.a Nt.,t..m.mP.n.epmmeen.a,.. p.a.e.mm aa.,x,,.xmeooe, 1 Won..on MI ralated products 1.6604O1.1 wee ea FIRM The Ff MA M.Senr.COMO! }mrgency Management �� �� ` I�adaml LanorSancy M°nxgamenT Agency HT THOMAS & HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Figure 4 Pre-Development Drainage Map J - 3129 6.0001 April 2024 Thomason dhutton.com PRE-DEVELOPMENT FLOW SCS 24-HOUR (cfs) .glkiopi Storm Event 2yr Storm 10yr Storm 25yr Storm 50yr Storm 100yr Stor . - *-74r7---4 PoPF ,, int of Anal sis 119.45 231.92 305.37 365.11 428.62 Y _ r i lir r r' w • -..: It r a i P. Alb, s r 1r ILK "�T' I � ' `a:` •¢ '' isoi.t A. ram. � . . ,A .•':. ' '' '' I., In,Ne 44111VS1/4, i V. • ‘41.111"..\- -- 1 , . , £ . �. - ;tom'►' - r . ., 4... ,. rsi- _ _ -- .. ,T _ . 4 , ., _,. ,. , _ IP -' ' Iity . • ,4 0 X i I ,__.' Ak .. , Alik . . , . . . t f- - , ; ,../14!". __ kt „.,,,i,,,,% ...„ „„,„„„ i ,_:\ „ ... , .,,, _. • . • , . ... - ,..., .r.1., 7 tr Niko. .,' . 441 . 1 -41111111114111111111116,:lilik*/ l'ilk.---,441' / r . ,,/, / •, % 4 Basin 3 - , , Basin 9 �' • 9.40ac. t- .. 4.--- A 7j0.85ac. ., C N. 79/59 ( 71 .25- . 1.4), Y W8�.70m in ' 24.26min ��r,A.- - ,, tii:". ///• . - . . ,/,, t . : 'IL ' 01 -- ',.•.• ,, . et . -):7;.?‘ . , , a _ ht ,,, , , . .A---i, t: i _... , , 1. ..-- ., . . . -01W_asiii, • -. / , , ___ /i.(11/11"1. ~`- Ili ". Q a \, i f + ' Basin 2 40ll: o 1�2.90ac. ` ., C N:69 36 , / 1 25.04min 1 i i if � I ir ;,... , : . 19.1►lac. - its 71 .5s, / . e \\\,,,,,,,,,,...___\., ,,:k:\r: ' Va 6.52min o. ' i . . 17 ° + F ` 0 , • . 4i1 I 1 Legend . e, �, o Sheet Flow Ris, a .� Shallow Concentrated Flow . ,r/ Channel Flow I t � ' - / % � 0 •�,' :it: :ysis . �l.rv,fitt/ . A`� - ' , . e / 0 4N g C- Basins .4 a Q Property Boundary 4 a , a .1/.� • 0 0 100 200 400 . 800 _ ' - //-z._,\\:f_\_?\.._.,,<: j 0D (p),- i_ Qv' g` O 'Fee} } ; al inch=167 feet O �' - t C / O �O'-` ` Job Number 1296 Produced 12/6/2023 Modified 4/1/2024Modified:i 3 \3 G M\1229612960001\IS\xtl\3 1296-GroceCburc,M1 Wok Map RE mxtl Vr File icalDafum.NnVD BB Thomas&Mutton complied the map information from the following sources: Pre-Development Drainage Area Exhibit Data Source Date 1020 U C L I D A V E N U E Aenals ESRI 3/11/2024 Topography NOAA 4/1/2024 CHARLOTTE, NC 28203 980.201.5505 Grace Church Road Industrial WWW.THOMASANDHUTTON.COM DISCLAIMER '„";;„ER THOMAS GEOGRAPHIC INFORMATION SYSTEMS a,fofM1eac y p e'e„o°;M1edCopyrght o1Sbhomes6Mullen ocum 'aM1o.of, p ,aeda,a,e,. Rowan County, NC b as& �� o ofine lets uas 'M1a tle tlaf antl e;PS oec e5nfo MUTTON COPYRIGHT O2020 HTHOMASs MUTTON Copyright IB]O15 by Thomas 6 Mullen No part of this document maybe reproduced without written permission from an officer of Thomas B.Hutton. HT THOMAS & HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Figure 5 Post-Development Drainage Map J - 3129 6.0001 April 2024 Thomason dhutton.com f POST-DEVELOPMENT FLOW SCS 24-HOUR (cfs) - . t Storm Event 2yr Storm 10yr Storm 25yr Storm 50yr Storm 100yr Storm .` Point of Analysis 96.8 201.2 277.72 346.85 411.9 r 1 . ''''• T •+k f'-ti ~e r tJ r s r• I �t i r e. Alie . 'N''; ,. --,---•4111110 illh illlikirmwiew _. Basing 0.84ac. 98 .. 'Mt _` _ . 15.00min • Basing l 2Oac. r � piiii � a @Ca3` Basin V �,,,� 1 5.00min i, _ --: 10.20ac. - - t T', '. , . i.. r aj ,I . . .. . .. 44.4 ..,,,;.• _ _ i 1111!,.. .I,.l .e . ... t. 126.37 i . T tic it d • f� 14 s Basin 6 }z , _ 19.E _ _ i .• .,.. (° $ 94.00 % 1, ' � s '" 1 5.00m in . �f `' • ., : 1 Basing �. a ��NI1 49.28ac. _ • .. .. !11 a6 - 81 .21 di- „, # . �? ¶ ri83rnin = vii Ahaii.„._ , , _ ii.. -...s,„ .-4 g iiis 0 .14 ' i� 4tOpp . , • / / Basin .14 •Of.% 441144 f 5.87ac. 10,„;, o C N: 67.09K r ti ;\' TC: 5.00min Basin A5.68ac. • il Ificr- 5.00min I yI_St„ Basin 5 '� 20.06ac. @GI74.21 , • 1 6.52min, ,. : - Legend ', • 0 Point of Analysis - '� '"irfk am Proposed Culverts 4. s-� Drainage Paths Proposed SCMs . Q Post-Development Basins _ Property Boundary At times,the NRCS unit dimensionless hydrograph is not used when the computation interval is greater than 0.29 times the lag time of the watershed. p y This limitation translates into a minimum time of concentration(Tc)of 5.75 minutes which typically occurs in small watersheds.The result of • 0 0o zoo 400 boo sou -•- exceeding this limitation is that the resulting hydrograph may underestimate the peak flow by computing the peak flow values on either side of the 0 peak of the hydrograph.Because of this,all basins with minimal Tc's were rounded to 5 minutes. F 1 inch=400 feet . C11r Z Alb Numbe,:3r 296 129d/w23 Mmsetl:a/3no2a Flk:i\31296V31296.OW1VGI5VMxtlV31296-GaceCM1ercM1 Woh MapPOSimxtl Ver�i�ol DoyNm.NAVD BB Thomas&Hutton compiled the map Information from the following sources: Post-Development Drainage Area Exhibit Data source Date Aenah ESRI 24 0 0N EC U C L I D AVENUE .5505Topography NOAA 541/2024 CHARLOT Grace Church WWW.THOMASANDHUTTON.COM°'"'m`" GEOGRAPHIC INFORMATION SYSTEMS THOMAS mus a Hutt n uvea me tlutu�usts�M1a�maaecno ir,aepenaem in�e�tlgation of meM1aa a,vana makes no repre e5m -5- ustomeuccuucy rc p eness ofta Copyrght02015 by ThuomasoB H1tMlabie aocumemahon of its pective tlutuser Rowan County, NC HUTTON COPYRIGHT 02020 ITt THOMAS.HUTTON No part of this document maybe reproduced without written permission from on officer of Thomas S.Hutton. HT THOMAS & HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Appendix A Hydrologic Soils Report J - 3129 6.0001 April 2024 Thomason dhuttan.ocm Hydrologic Soil Group—Rowan County, North Carolina 3 M M $ W W 540700 540800 540900 541000 541100 541200 541300 541400 541500 541600 541700 541800 541900 542000 542100 542200 542300 8 35°37 5"N - - - —z7. 35°37'5"N • q r_ �� �/ Ilie e %:441('ADITH' m bB i yod 9eq Ilk cr \Ng am_ Glace �` CeB2 ��1 r, 7‘A / f- A k f , r .fly'o� SeB E B lei ' _, SeB '' ` M� E //i f; .- .--.-- - ir 411 \ ---/'N. --... if, r,r -444/ i r, f , \MbB _11.1 • a 1 ,sk 8 �o0 idap�A G10t b' e80od ate tUioct 8c6a0@° v. 35°36'29"N ~+ 35°36'29"N 540700 540800 540900 541000 541100 541200 541300 541400 541500 541600 541700 541800 541900 542000 542100 542200 542300 7.1 3 3 M Map Scale:1:7,750 if printed on A landscape(11"x 8.5")sheet. N Meters 0 100 200 400 600 8 A 0 350 700 1400 2100 Map projection:Web Mercator Corner coordinates:WG584 Feet Edge tics:UTM Zone 17N WG584 USDA Natural Resources Web Soil Survey 3/13/2024 Conservation Service National Cooperative Soil Survey Page 1 of 3 Hydrologic Soil Group—Rowan County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p c The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. 0 CID Soils • D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons l A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil n A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed n B scale. Transportation Q B/D r4-1. Rails Please rely on the bar scale on each map sheet for map n C measurements. ti Interstate Highways n CID US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) n Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts • • A distance and area.A projection that preserves area,such as the 1111 Aerial Photography Albers equal-area conic projection,should be used if more • • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as , B/D of the version date(s)listed below. • r C Soil Survey Area: Rowan County,North Carolina Survey Area Data: Version 21,Sep 13,2023 • • CID Soil map units are labeled(as space allows)for map scales • • D 1:50,000 or larger. • w Not rated or not available Date(s)aerial images were photographed: Mar 13,2022—May Soil Rating Points 9,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background O A/D imagery displayed on these maps.As a result,some minor • B shifting of map unit boundaries may be evident. • B/D USDA Natural Resources Web Soil Survey 3/13/2024 Conservation Service National Cooperative Soil Survey Page 2 of 3 Hydrologic Soil Group—Rowan County,North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CeB2 Cecil sandy clay loam,2 B 0.9 0.8% to 8 percent slopes, moderately eroded EnB Enon fine sandy loam,2 C 55.3 49.3% to 8 percent slopes EuB Enon-Urban land C 0.3 0.3% complex,2 to 10 percent slopes LdB2 Lloyd clay loam,2 to 8 B 7.2 6.4% percent slopes, moderately eroded MbB Mecklenburg loam,2 to C 13.7 12.2% 8 percent slopes SeB Sedgefield fine sandy C/D 16.4 14.6% loam, 1 to 6 percent slopes Uf Urban land 13.1 11.7% W Water 5.3 4.8% Totals for Area of Interest 112.3 100.0% Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff- None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 3/13/2024 Conservation Service National Cooperative Soil Survey Page 3 of 3 HT THOMAS HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Appendix B Existing Conditions SSA Reports J - 3129 6.0001 April 2024 Pre-Development 1 inch Page 1 Project Description File Name 31296.0001-Pre.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Tune Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements ery Rain Gages 1 Subbasins 4 Nodes 2 Junctions 1 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 1 Channels 0 Pipes 1 Pumps 0 Orifices 0 Wens 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 lime Series 1S-001in Cumulative inches 0.00 Pre-Development 1 inch Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 70.85 484.00 79.59 1.00 0.08 5.53 2.00 0 00:27:42 2 2 12.90 484.00 69.36 1.00 0.00 0.04 0.01 0 00:25:02 3 3 9.40 484.00 71.25 1.00 0.01 0.08 0.01 0 00:24:15 4 4 19.12 484.00 71.59 1.00 0.01 0.19 0.02 0 00:06:31 Pre-Development 1 inch Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak IvhxHGL Max Mn Time of Total Total Time ID Type Elevation (Ivhx) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Hooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 5-Jun Junction 732.50 9999.00 732.50 9999.00 1.00 1.97 732.50 0.00 9266.50 0 00:00 0.00 0.00 2 Out-05 Outfall 726.00 1.97 726.00 Pre-Development 1 inch Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow PeakFlow Peak Flow Total lime Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 Link-07 Pipe 5-Jun Out-05 372.12 0.00 0.00 0.0000 0.000 0.0130 1.97 0.00 0.00 0.00 0.00 0.00 0.00 Pre-Development 1 inch Page 5 Subbas in Hydrology Subbasin:1 Input Data Area(ac) 70.85 Peak Rate Factor 484 Weighted Curve Number 79.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Pond 5.33 D 98 <50%grass cover,Poor 0.86 B 79 Pasture,grassland,or range,Fair 18.42 C 79 Urban commercial,85%imp 2.61 C 94 Woods,Fair 11.11 C 73 Pasture,grassland,or range,Fair 1.56 D 84 Brush,Good 3.32 D 73 Urban commercial,85%imp 0.6 D 95 Woods,Fair 6.23 D 79 >75%grass cover,Good 17.3 C 74 Urban commercial,85%imp 2.38 C 94 Paved parking&roofs 1.12 D 98 Composite Area&Weighted CN 70.84 79.59 Time ofConcentration 1OC Nkthod:SCS 1R 55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^0.8))/((P^0.5)*(SP0.4)) Where: Tc=Time of Concentration(hr) n =Muffling's roughness ]f=Flow Length(it) P=2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(SP0.5)(unpaved surface) V=20.3282*(SP0.5)(paved surface) V=15.0*(SP0.5)(grassed waterway surface) V=10.0*(SP0.5)(nearlybare&unfilled surface) V=9.0*(SP`0.5)(cultivated straight rows surface) V=7.0*(SP`0.5)(short grass pasture surface) V=5.0*(SP0.5)(woodland surface) V=2.5*(Sf"0.5)(forestw/heavy litter surface) Tc=(Lf/y/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(Sf`0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(he) Lf=How Length(ft) R=Hydraulic Radius(ft) Aq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Nhnning's roughness Pre-Development 1 inch Page 6 Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374.084 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 ComputedFlowlime(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 459.068 389.48 0 Channel Slope(%): 2.396 1.284 0 Cross Section Area(ft'): 8.3 16.63 0 Wetted Perimeter(ft): 13.5 26.947 0 Velocity(ft/sec): 5.56 4.9 0 Computed Flow Time(min): 1.38 1.33 0 Total TOC(min) 27.70 Subbasin RunoffRe sults Total Rainfall(in) 1 Total Runoff(in) 0.08 PeakRunoff(cfs) 2 Weighted Curve Number 79.59 Time of Concentration(days hh:mm:ss) 0 00:27:42 Pre-Development 1 inch Page 7 Subbas in:1 Rainfall Intensity Graph 1.4 1.35 1.3 1.25 1.2 1.15 - 1.1 1.05 1 0.95 _ 0.9 0.85 t 0.8 c 0.75 m 0.7 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 - 0.2 0.15 0.1 0.05 k 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 2.1 2- 1.9- 1.8 1.7 1.6 1.5 1.4 1.3- w 1.2- 1.1 g z K 0.9 0.8 0.7 0.5: 0.4 0.3 0.2. 0.1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 1 inch Page 8 Subbasin:2 Input Data Area(ac) 12.9 Peak Rate Factor 484 Weighted Curve Number 69.36 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.38 D 79 Woods,Fair 5.59 B 60 Woods,Fair 4.96 C 73 Urban industrial,72%imp 0.97 C 91 Composite Area&Weighted CN 12.9 69.36 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C tvbnning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 6 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow lime(min): 15.82 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 461.67 0 0 Slope(%): 4.44 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.05 0 0 Computed Flow-rime(min): 7.33 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow length(ft): 307.134 463.446 0 Channel Slope(%): 2.93 3.21 0 Cross Section Area(ft'): 6.5 9 0 Wetted Perimeter(ft): 13.15 9.85 0 Velocity(ft/sec): 4.56 10.05 0 Computed Flow Time(min): 1.12 0.77 0 Total IOC(min) 25.04 Subbasin RunoffResults Total Rainfall(in) 1 Total Runoff(in) 0 Peak l unoff(cfs) 0.01 Weighted Curve Number 69.36 Time of Concentration(days hh:mm:ss) 0 00:25:02 Pre-Development 1 inch Page 9 Subbasin:2 Rainfall Intensity Graph 1.45_ 1.4 1.35 1.3 1.25 1.2 1.15 1.1 1.05 1 0.95 0.9 • 0.85 t 0.8 c --%0.75 m 0.7_ -c 0.65 Ce 0.6_ 0.55_ 0.5 0.45_0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05_ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 0.008 0.008 0.007- 0.007 — — 0.006 o.00s- NO.0o5 o w 0.004 0 c C20.004 0.004 0.003- 0.003- 0.002 0.002- 0.001 . i . . 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 1 inch Page 10 Subbasin:3 Input Data Area(ac) 9.4 Peak Rate Factor 484 Weighted Curve Number 71.25 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.35 D 79 Woods,Fair 1.89 B 60 Woods,Fair 6.17 C 73 Composite Area&Weighted CN 9.41 71.25 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C tvhnning's Roughness: 0.5 0 0 Flow length(ft): 100 0 0 Slope(%): 7 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow Time(min): 14.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 516.6346 0 0 Slope(%): 5.03 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.12 0 0 Computed Flow Time(min): 7.69 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow Length(ft): 260.65 631.3 0 Channel Slope(%): 4.8 0.95 0 Cross Section Area(ft2): 5.5 32 0 Wetted Perimeter(ft): 5.59 17.89 0 Velocity(ft/sec): 9.23 8.56 0 Computed Flow lime(min): 0.47 1.23 0 Total TOC(min) 24.26 Subbasin RunoffResults Total Rainfall(in) 1 Total Runoff(in) 0.01 Peak l unoff(cfs) 0.01 Weighted Curve Number 71.25 Time of Concentration(days hh:mm:ss) 0 00:24:16 Pre-Development 1 inch Page 11 Subbasin:3 Rainfall Intensity Graph 1.45 1.4 1.35 1.3 1.25 1.2 1.15 1.1 1.05 1 0.95 0.9 0.85 t 0.8 c 0.75 - m 0.7 0.65 IX 0.6 0.55 0.5 0.45_0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 0.01 0.009 0.009- 0.008 I — 0.008- 0.007- 0.007 0.006 m - 1,20.006 c0.005 0_ 0.004- 0.004- 0.004 0.003- 0.003- 0.002 0.002 0.001- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 1 inch Page 12 Subbasin:4 Input Data Area(ac) 19.12 Peak Rate Factor 484 Weighted Curve Number 71.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 12.98 C 73 Woods,Fair 1.97 D 79 Woods,Fair 3.2 B 60 Woods&grass combination,Fair 0.96 C 76 Composite Area&Weighted CN 19.11 71.59 Time of Concentration Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 100 0 0 Slope(%): 4.5 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.06 0 0 ComputedFlowlime(min): 1.57 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 1784.43 28.4281 0 Channel Slope(%): 1.61 1.75883 0 Cross Section Area(ftF): 12 12 0 Wetted Perimeter(ft): 12.65 12.65 0 Velocity(ftlsec): 6.08 7.63 0 Computed Flow lime(min): 4.89 0.06 0 Total lOC(min) 6.52 Subbasin Runoff Results Total Rainfall(in) 1 Total Runoff(in) 0.01 PeakRunoff(cfs) 0.02 Weighted Curve Number 71.59 Time of Concentration(days hh:mm:ss) 0 00:06:31 Pre-Development 1 inch Page 13 Subbasin:4 Rainfall Intensity Graph 1.45 1.4 1.35 1.3 1.25 1.2 1.15 1.1 1.05 1 0.95 0.9 0.85 t 0.8 . c 0.75 - m 0.7 0.65 IX 0.6 0.55 0.5 0.45_0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 0.022 0.0211-1 - 0.02 .1 0.019 0.018 0.017 0.016 0.015 0.014- 00.013- �0.012 20.011- z K 0.01 0.009 - 0.008 0.007- 0.006- 0.005 0.004 0.003 0.002 0.001 . 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 1 inch Page 14 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Ivfinning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (eft) 1 Link-07 372.12 0.00 -732.50 0.00 -726.00 0.00 0.0000 Dummy 0.000 0.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Pre-Development 1 inch Page 15 Pipe Results SN Element Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Tune Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 L nk-07 1.97 0 12:25 0.00 0.00 0.00 0.00 0.00 0.00 Pre-Development 002-Year Page 1 Project Description File Name 31296.0001-Pre.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS'IR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Tune Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements ety Rain Gages 1 Subbasins 4 Nodes 2 Junctions 1 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 1 Channels 0 Pipes 1 Pumps 0 Orifices 0 Wens 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series 1S-002 Intensity inches North Carolina Rowan 2.00 3.32 SCS Type ll24-hr Pre-Development 002-Year Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 70.85 484.00 79.59 3.32 1.47 103.93 94.87 0 00:27:42 2 2 12.90 484.00 69.36 3.32 0.87 11.17 9.79 0 00:25:02 3 3 9.40 484.00 71.25 3.32 0.96 9.06 8.36 0 00:24:15 4 4 19.12 484.00 71.59 3.32 0.98 18.80 26.97 0 00:06:31 Pre-Development 002-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak vhxHGL Max Mn Time of Total Total Time ID Type Elevation (Mix) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfe) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 5-Jun Junction 732.50 9999.00 732.50 9999.00 1.00 119.45 732.50 0.00 9266.50 0 00:00 0.00 0.00 2 Out-05 Outfall 726.00 119.45 726.00 Pre-Development 002-Year Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total lime Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) ($/sec) (ft) (min) 1 Link-07 Pipe 5-Jun Out-05 372.12 0.00 0.00 0.0000 0.000 0.0130 119.45 0.00 0.00 0.00 0.00 0.00 0.00 Pre-Development 002-Year Page 5 Subbas in Hydrology Subbasin:1 Input Data Area(ac) 70.85 Peak Rate Factor 484 Weighted Curve Number 79.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Pond 5.33 D 98 <50%grass cover,Poor 0.86 B 79 Pasture,grassland,or range,Fair 18.42 C 79 Urban commercial,85%imp 2.61 C 94 Woods,Fair 11.11 C 73 Pasture,grassland,or range,Fair 1.56 D 84 Brush,Good 3.32 D 73 Urban commercial,85%imp 0.6 D 95 Woods,Fair 6.23 D 79 >75%grass cover,Good 17.3 C 74 Urban commercial,85%imp 2.38 C 94 Paved parking&roofs 1.12 D 98 Composite Area&Weighted CN 70.84 79.59 Time of Concentration 1OC Nkthod:SCS 1R 55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^0.8))/((P^0.5)*(SP0.4)) Where: Tc=Time of Concentration(hr) n =Muffling's roughness ]f=Flow Length(it) P=2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(SP0.5)(unpaved surface) V=20.3282*(SP0.5)(paved surface) V=15.0*(SP0.5)(grassed waterway surface) V=10.0*(SP0.5)(nearlybare&unfilled surface) V=9.0*(SP`0.5)(cultivated straight rows surface) V=7.0*(SP`0.5)(short grass pasture surface) V=5.0*(SP0.5)(woodland surface) V=2.5*(Sf"0.5)(forestw/heavy litter surface) Tc=(Lf/y/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(Sf`0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(he) Lf=How Length(ft) R=Hydraulic Radius(ft) Aq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Nhnning's roughness Pre-Development 002-Year Page 6 Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374.084 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 ComputedFlowlime(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 459.068 389.48 0 Channel Slope(%): 2.396 1.284 0 Cross Section Area(ft'): 8.3 16.63 0 Wetted Perimeter(ft): 13.5 26.947 0 Velocity(ft/sec): 5.56 4.9 0 Computed Flow Time(min): 1.38 1.33 0 Total TOC(min) 27.70 Subbasin RunoffRe sults Total Rainfall(in) 3.32 TotalRunoff(in) 1.47 PeakRunoff(cfs) 94.87 Weighted Curve Number 79.59 Time of Concentration(days hh:mm:ss) 0 00:27:42 Pre-Development 002-Year Page 7 Subbas in:1 Rainfall Intensity Graph 4.6 4.4- 4.2 4 3.8 3.6 3.2 3 2.8 t 2.6 c 2.4 2 2.2 . c @ 2 1.8 1.6 1.4 - 1.2 1 — 0.8 _ 0.6 t4 0.4- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 100 95_ 90- 85- 80 75 70 65- 60 55- o 50 0 c 3 45 40- — 35 30- 25- 20 15- 10- 5 - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 002-Year Page 8 Subbasin:2 Input Data Area(ac) 12.9 Peak Rate Factor 484 Weighted Curve Number 69.36 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.38 D 79 Woods,Fair 5.59 B 60 Woods,Fair 4.96 C 73 Urban industrial,72%imp 0.97 C 91 Composite Area&Weighted CN 12.9 69.36 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C tvbnning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 6 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow lime(mm 15.82 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 461.67 0 0 Slope(%): 4.44 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.05 0 0 Computed Flow-rime(min): 7.33 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow length(ft): 307.134 463.446 0 Channel Slope(%): 2.93 3.21 0 Cross Section Area(ft'): 6.5 9 0 Wetted Perimeter(ft): 13.15 9.85 0 Velocity(ft/sec): 4.56 10.05 0 Computed Flow Time(min): 1.12 0.77 0 Total IOC(min) 25.04 Subbasin RunoffResults Total Rainfall(in) 3.32 Total Runoff(in) 0.87 Peak l unoff(cfs) 9.79 Weighted Curve Number 69.36 Time of Concentration(days hh:mm:ss) 0 00:25:02 Pre-Development 002-Year Page 9 Subbasin:2 Rainfall Intensity Graph 4.8 4.6 1 4.4 4.2 4 3.8 3.6 3.4 3.2 3 11- 2.8 s c 2.6 • - 2.4 m - c 2.2 Ce 2 1.8 1.6 • • 1.4 1.2 1 , • 0.8 0.6 0.4 0.2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 10.5 10- 9.5_ 9 8.5 8 7.5 7 6.5- m 6- 5.5 g 5- K 4.5 4 3.5 3- 2.5- 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 002-Year Page 10 Subbasin:3 Input Data Area(ac) 9.4 Peak Rate Factor 484 Weighted Curve Number 71.25 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.35 D 79 Woods,Fair 1.89 B 60 Woods,Fair 6.17 C 73 Composite Area&Weighted CN 9.41 71.25 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C tvhnning's Roughness: 0.5 0 0 Flow length(ft): 100 0 0 Slope(%): 7 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow Time(min): 14.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 516.6346 0 0 Slope(%): 5.03 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.12 0 0 Computed Flow Time(min): 7.69 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow Length(ft): 260.65 631.3 0 Channel Slope(%): 4.8 0.95 0 Cross Section Area(ft2): 5.5 32 0 Wetted Perimeter(ft): 5.59 17.89 0 Velocity(ft/sec): 9.23 8.56 0 Computed Flow lime(min): 0.47 1.23 0 Total TOC(min) 24.26 Subbasin RunoffRe sults Total Rainfall(in) 3.32 Total Runoff(in) 0.96 Peak l unoff(cfs) 8.36 Weighted Curve Number 71.25 Time of Concentration(days hh:mm:ss) 0 00:24:16 Pre-Development 002-Year Page 11 Subbasin:3 Rainfall Intensity Graph 4.8 4.6 1 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 _c c 2.6 • - 2.4 m - c 2.2 Ce 2 • 1.8 1.6 • • 1.4 1.2 1 , • 0.8 0.6 0.4 0.2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 9 8.5- 8 7.5 7 6.5 6 5.5 m 5_ 0 4.5 0 c 4 3.5- 3 2.5 2- 1.5 1_ 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 002-Year Page 12 Subbasin:4 Input Data Area(ac) 19.12 Peak Rate Factor 484 Weighted Curve Number 71.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 12.98 C 73 Woods,Fair 1.97 D 79 Woods,Fair 3.2 B 60 Woods&grass combination,Fair 0.96 C 76 Composite Area&Weighted CN 19.11 71.59 Time ofConcentration Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 100 0 0 Slope(%): 4.5 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.06 0 0 ComputedFlowlime(min): 1.57 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 1784.43 28.4281 0 Channel Slope(%): 1.61 1.75883 0 Cross Section Area(ftF): 12 12 0 Wetted Perimeter(ft): 12.65 12.65 0 Velocity(ftlsec): 6.08 7.63 0 Computed Flow lime(min): 4.89 0.06 0 Total lOC(min) 6.52 Subbasin RunoffResults Total Rainfall(in) 3.32 Total Runoff(in) 0.98 PeakRunoff(cfs) 26.97 Weighted Curve Number 71.59 Time of Concentration(days hh:mm:ss) 0 00:06:31 Pre-Development 002-Year Page 13 Subbasin:4 Rainfall Intensity Graph 4.8 4.6 1 4.4 4.2 4 3.8 3.6 3.4 3.2 3 , • 2.8 s c 2.6 • - 2.4 c 2.2 Ce 2 , • 1.8 1.6 • • 1.4 1.2 1 , • 0.8 0.6 0.4 0.2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 28 27 - — 26 25 24 23 22 21 20 19 18 17 w 16 O 15 14 0 • 13 • 12 11 10 9 8 7 6 5 4 3 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 002-Year Page 14 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Ivfinning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (cfs) 1 Link-07 372.12 0.00 -732.50 0.00 -726.00 0.00 0.0000 Dummy 0.000 0.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Pre-Development 002-Year Page 15 Pipe Results SNElement Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) ($/sec) (min) ($) (min) 1 L nk-07 119.45 0 12:15 0.00 0.00 0.00 0.00 0.00 0.00 Pre-Development 010-Year Page 1 Project Description File Name 31296.0001-Pre.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Tune Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements ety Rain Gages 1 Subbasins 4 Nodes 2 Junctions 1 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 1 Channels 0 Pipes 1 Pumps 0 Orifices 0 Wens 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series 1S-010 Intensity inches North Carolina Rowan 10.00 4.84 SCS Type ll24-hr Pre-Development 010-Year Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 70.85 484.00 79.59 4.84 2.72 192.49 178.34 0 00:27:42 2 2 12.90 484.00 69.36 4.84 1.87 24.10 23.00 0 00:25:02 3 3 9.40 484.00 71.25 4.84 2.02 18.96 18.58 0 00:24:15 4 4 19.12 484.00 71.59 4.84 2.04 39.07 58.73 0 00:06:31 Pre-Development 010-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak vhxHGL Max Mn Time of Total Total Time ID Type Elevation (Ivhx) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfe) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 5-Jun Junction 732.50 9999.00 732.50 9999.00 1.00 231.92 732.50 0.00 9266.50 0 00:00 0.00 0.00 2 Out-05 Outfall 726.00 231.92 726.00 Pre-Development 010-Year Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total lime Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) ($/sec) (ft) (min) 1 Link-07 Pipe 5-Jun Out-05 372.12 0.00 0.00 0.0000 0.000 0.0130 231.92 0.00 0.00 0.00 0.00 0.00 0.00 Pre-Development 010-Year Page 5 Subbas in Hydrology Subbasin:1 Input Data Area(ac) 70.85 Peak Rate Factor 484 Weighted Curve Number 79.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Pond 5.33 D 98 <50%grass cover,Poor 0.86 B 79 Pasture,grassland,or range,Fair 18.42 C 79 Urban commercial,85%imp 2.61 C 94 Woods,Fair 11.11 C 73 Pasture,grassland,or range,Fair 1.56 D 84 Brush,Good 3.32 D 73 Urban commercial,85%imp 0.6 D 95 Woods,Fair 6.23 D 79 >75%grass cover,Good 17.3 C 74 Urban commercial,85%imp 2.38 C 94 Paved parking&roofs 1.12 D 98 Composite Area&Weighted CN 70.84 79.59 Time of Concentration 1OC Nkthod:SCS 1R 55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^0.8))/((P^0.5)*(SP0.4)) Where: Tc=Time of Concentration(hr) n =Muffling's roughness ]f=Flow Length(it) P=2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(SP0.5)(unpaved surface) V=20.3282*(SP0.5)(paved surface) V=15.0*(SP0.5)(grassed waterway surface) V=10.0*(SP0.5)(nearlybare&unfilled surface) V=9.0*(SP`0.5)(cultivated straight rows surface) V=7.0*(SP`0.5)(short grass pasture surface) V=5.0*(SP0.5)(woodland surface) V=2.5*(Sf"0.5)(forestw/heavy litter surface) Tc=(Lf/y/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=How Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(Sf`0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(he) Lf=How Length(ft) R=Hydraulic Radius(ft) Aq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Nhnning's roughness Pre-Development 010-Year Page 6 Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374.084 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 ComputedFlowlime(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 459.068 389.48 0 Channel Slope(%): 2.396 1.284 0 Cross Section Area(ft'): 8.3 16.63 0 Wetted Perimeter(ft): 13.5 26.947 0 Velocity(ft/sec): 5.56 4.9 0 Computed Flow Time(min): 1.38 1.33 0 Total TOC(min) 27.70 Subbasin RunoffRe sults Total Rainfall(in) 4.84 Total Runoff(in) 2.72 PeakRunoff(cfs) 178.34 Weighted Curve Number 79.59 Time of Concentration(days hh:mm:ss) 0 00:27:42 Pre-Development 010-Year Page 7 Subbas in:1 Rainfall Intensity Graph 7 6.5 1 6 5.5 5 4.5 . 4 . c - 3.5 cm g . 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 190 180 - 170 160- 150- 140- 130- 120- CI) 100 - - c 90 — K 80_ 70- 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 010-Year Page 8 Subbasin:2 Input Data Area(ac) 12.9 Peak Rate Factor 484 Weighted Curve Number 69.36 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.38 D 79 Woods,Fair 5.59 B 60 Woods,Fair 4.96 C 73 Urban industrial,72%imp 0.97 C 91 Composite Area&Weighted CN 12.9 69.36 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C tvbnning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 6 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow lime(mm): 15.82 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 461.67 0 0 Slope(%): 4.44 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.05 0 0 Computed Flow-rime(min): 7.33 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow length(ft): 307.134 463.446 0 Channel Slope(%): 2.93 3.21 0 Cross Section Area OP): 6.5 9 0 Wetted Perimeter(ft): 13.15 9.85 0 Velocity(ft/sec): 4.56 10.05 0 Computed Flow Time(min): 1.12 0.77 0 Total IOC(min) 25.04 Subbasin RunoffRe sults Total Rainfall(in) 4.84 Total ltunoff(in) 1.87 Peak l unoff(cfs) 23 Weighted Curve Number 69.36 Time of Concentration(days hh:mm:ss) 0 00:25:02 Pre-Development 010-Year Page 9 Subbasin:2 Rainfall Intensity Graph 7.5 • 7- - 6.5 6 5.5 5 4.5 - c 4 m c 3.5 m - IX 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 24 22- 22 21 20 19 18 17 16 15 14 Ca 46 13 12 0 c 11 K 10 9 8 7 6- 5 4 3- 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 010-Year Page 10 Subbasin:3 Input Data Area(ac) 9.4 Peak Rate Factor 484 Weighted Curve Number 71.25 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.35 D 79 Woods,Fair 1.89 B 60 Woods,Fair 6.17 C 73 Composite Area&Weighted CN 9.41 71.25 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C tvhnning's Roughness: 0.5 0 0 Flow length(ft): 100 0 0 Slope(%): 7 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow Time(min): 14.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 516.6346 0 0 Slope(%): 5.03 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.12 0 0 Computed Flow Time(min): 7.69 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow Length(ft): 260.65 631.3 0 Channel Slope(%): 4.8 0.95 0 Cross Section Area(ft2): 5.5 32 0 Wetted Perimeter(ft): 5.59 17.89 0 Velocity(ft/sec): 9.23 8.56 0 Computed Flow lime(min): 0.47 1.23 0 Total TOC(min) 24.26 Subbasin RunoffRe sults Total Rainfall(in) 4.84 Total Runoff(in) 2.02 Peak l unoff(cfs) 18.58 Weighted Curve Number 71.25 Time of Concentration(days hh:mm:ss) 0 00:24:16 Pre-Development 010-Year Page 11 Subbasin:3 Rainfall Intensity Graph 7.5 7- — 6.5 6 5.5 5 4.5 - c 4 m c 3.5 m - Ce 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 20 19- 18- 17- 16 15 14 13- 12 11- o 10 7 9 8- 7 — 6- 5- 4 3- 2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 010-Year Page 12 Subbasin:4 Input Data Area(ac) 19.12 Peak Rate Factor 484 Weighted Curve Number 71.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 12.98 C 73 Woods,Fair 1.97 D 79 Woods,Fair 3.2 B 60 Woods&grass combination,Fair 0.96 C 76 Composite Area&Weighted CN 19.11 71.59 Time of Concentration Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 100 0 0 Slope(%): 4.5 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.06 0 0 ComputedFlowlime(min): 1.57 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 1784.43 28.4281 0 Channel Slope(%): 1.61 1.75883 0 Cross Section Area(ftF): 12 12 0 Wetted Perimeter(ft): 12.65 12.65 0 Velocity(ftlsec): 6.08 7.63 0 Computed Flow lime(min): 4.89 0.06 0 Total lOC(min) 6.52 Subbasin Runoff Results Total Rainfall(in) 4.84 Total Runoff(in) 2.04 PeakRunoff(cfs) 58.73 Weighted Curve Number 71.59 Time of Concentration(days hh:mm:ss) 0 00:06:31 Pre-Development 010-Year Page 13 Subbas in:4 Rainfall Intensity Graph 7.5 7- — 6.5 6 5.5 5 - 4.5 - c 4 m c 3.5 m • 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 62 60 58 56 54 52 50 48 46 44 42 40 38 - 36 w 34 U 32 O 30 S 28 • 26 24 22 20 18 16 14 12 10 4 2 . . 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 010-Year Page 14 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Ivfinning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (cfs) 1 Link-07 372.12 0.00 -732.50 0.00 -726.00 0.00 0.0000 Dummy 0.000 0.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Pre-Development 010-Year Page 15 Pipe Results SNElement Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow PeakFlow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) ($/sec) (min) ($) (min) 1 L nk-07 231.92 0 12:15 0.00 0.00 0.00 0.00 0.00 0.00 Pre-Development 025-Year Page 1 Project Description File Name 31296.0001-Pre.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS'IR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Tune Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements ety Rain Gages 1 Subbasins 4 Nodes 2 Junctions 1 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 1 Channels 0 Pipes 1 Pumps 0 Orifices 0 Wens 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series 1S-025 Intensity inches North Carolina Rowan 25.00 5.74 SCS Type ll24-hr Pre-Development 025-Year Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 70.85 484.00 79.59 5.74 3.51 248.46 229.97 0 00:27:42 2 2 12.90 484.00 69.36 5.74 2.54 32.79 31.80 0 00:25:02 3 3 9.40 484.00 71.25 5.74 2.71 25.51 25.30 0 00:24:15 4 4 19.12 484.00 71.59 5.74 2.74 52.47 79.54 0 00:06:31 Pre-Development 025-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak vhxHGL Max Mn Time of Total Total Time ID Type Elevation (Ivhx) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (fl) (fl) (fl) (ft') (cfe) (5) (5) (5) (days hh:mm) (ac-in) (min) 1 5-Jun Junction 732.50 9999.00 732.50 9999.00 1.00 305.37 732.50 0.00 9266.50 0 00:00 0.00 0.00 2 Out-05 Outfall 726.00 305.37 726.00 Pre-Development 025-Year Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total lime Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) ($) (%) (in) (cfs) (cfs) ($/sec) (ft) (min) 1 Link-07 Pipe 5-Jun Out-05 372.12 0.00 0.00 0.0000 0.000 0.0130 305.37 0.00 0.00 0.00 0.00 0.00 0.00 Pre-Development 025-Year Page 5 Subbas in Hydrology Subbasin:1 Input Data Area(ac) 70.85 Peak Rate Factor 484 Weighted Curve Number 79.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Pond 5.33 D 98 <50%grass cover,Poor 0.86 B 79 Pasture,grassland,or range,Fair 18.42 C 79 Urban commercial,85%imp 2.61 C 94 Woods,Fair 11.11 C 73 Pasture,grassland,or range,Fair 1.56 D 84 Brush,Good 3.32 D 73 Urban commercial,85%imp 0.6 D 95 Woods,Fair 6.23 D 79 >75%grass cover,Good 17.3 C 74 Urban commercial,85%imp 2.38 C 94 Paved parking&roofs 1.12 D 98 Composite Area&Weighted CN 70.84 79.59 Time of Concentration 1OC Nkthod:SCS 1R 55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^0.8))/((P^0.5)*(SP0.4)) Where: Tc=Time of Concentration(hr) n =Muffling's roughness ]f=Flow Length(it) P=2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(SP0.5)(unpaved surface) V=20.3282*(SP0.5)(paved surface) V=15.0*(SP0.5)(grassed waterway surface) V=10.0*(SP0.5)(nearlybare&unfilled surface) V=9.0*(SP`0.5)(cultivated straight rows surface) V=7.0*(SP`0.5)(short grass pasture surface) V=5.0*(SP0.5)(woodland surface) V=2.5*(Sf"0.5)(forestw/heavy litter surface) Tc=(Lf/y/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(Sf`0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(he) Lf=How Length(ft) R=Hydraulic Radius(ft) Aq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Nhnning's roughness Pre-Development 025-Year Page 6 Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374.084 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 ComputedFlowlime(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 459.068 389.48 0 Channel Slope(%): 2.396 1.284 0 Cross Section Area(ft'): 8.3 16.63 0 Wetted Perimeter(ft): 13.5 26.947 0 Velocity(ft/sec): 5.56 4.9 0 Computed Flow Time(min): 1.38 1.33 0 Total TOC(min) 27.70 Subbasin RunoffRe sults Total Rainfall(in) 5.74 Total Runoff(in) 3.51 PeakRunoff(cfs) 229.97 Weighted Curve Number 79.59 Time of Concentration(days hh:mm:ss) 0 00:27:42 Pre-Development 025-Year Page 7 Subbas in:1 Rainfall Intensity Graph 8 7.5 7 6.5 6 5.5 5 t 4.5 c - 4 2 c .@ 3.5 3 2.5 2 1.5 • 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 240 230 220 210 200 190 180 170 160 150 - 140 w o 130 • 120 0 110 100 90 80 70 60- 50 40 30- 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 025-Year Page 8 Subbasin:2 Input Data Area(ac) 12.9 Peak Rate Factor 484 Weighted Curve Number 69.36 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.38 D 79 Woods,Fair 5.59 B 60 Woods,Fair 4.96 C 73 Urban industrial,72%imp 0.97 C 91 Composite Area&Weighted CN 12.9 69.36 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C tvbnning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 6 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow lime(mm): 15.82 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 461.67 0 0 Slope(%): 4.44 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.05 0 0 Computed Flow-rime(min): 7.33 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow length(ft): 307.134 463.446 0 Channel Slope(%): 2.93 3.21 0 Cross Section Area OP): 6.5 9 0 Wetted Perimeter(ft): 13.15 9.85 0 Velocity(ft/sec): 4.56 10.05 0 Computed Flow Time(min): 1.12 0.77 0 Total IOC(min) 25.04 Subbasin RunoffResults Total Rainfall(in) 5.74 Total Runoff(in) 2.54 Peak l unoff(cfs) 31.8 Weighted Curve Number 69.36 Time of Concentration(days hh:mm:ss) 0 00:25:02 Pre-Development 025-Year Page 9 Subbasin:2 Rainfall Intensity Graph 8.5 8 7.5 7 6.5 - 6 5.5 5 4.5 @ 4 c m Ce 3.5 3 2.5 2 1.5 1 0.5 _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 34 32 30 28 26 24- 22 20 m • 18 — c 16 z • 14 12 10 8 6 4 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 025-Year Page 10 Subbasin:3 Input Data Area(ac) 9.4 Peak Rate Factor 484 Weighted Curve Number 71.25 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.35 D 79 Woods,Fair 1.89 B 60 Woods,Fair 6.17 C 73 Composite Area&Weighted CN 9.41 71.25 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C tvhnning's Roughness: 0.5 0 0 Flow length(ft): 100 0 0 Slope(%): 7 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow Time(min): 14.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 516.6346 0 0 Slope(%): 5.03 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.12 0 0 Computed Flow Time(min): 7.69 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow Length(ft): 260.65 631.3 0 Channel Slope(%): 4.8 0.95 0 Cross Section Area(ft2): 5.5 32 0 Wetted Perimeter(ft): 5.59 17.89 0 Velocity(ft/sec): 9.23 8.56 0 Computed Flow lime(min): 0.47 1.23 0 Total TOC(min) 24.26 Subbasin Runoff Results Total Rainfall(in) 5.74 Total Runoff(in) 2.71 Peak l unoff(cfs) 25.3 Weighted Curve Number 71.25 Time of Concentration(days hh:mm:ss) 0 00:24:16 Pre-Development 025-Year Page 11 Subbasin:3 Rainfall Intensity Graph 8.5 8 7.5 7 6.5 — 6 5.5 5 4.5 @ 4 c m Ce 3.5 3 • 2.5 2 1.5 1 0.5 _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 26 25 24 23 22 21 20 19 18 17 16 w 15 0 14 13 0 S 12 K 11 10 9 8 7 6 5 4 3 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 025-Year Page 12 Subbasin:4 Input Data Area(ac) 19.12 Peak Rate Factor 484 Weighted Curve Number 71.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 12.98 C 73 Woods,Fair 1.97 D 79 Woods,Fair 3.2 B 60 Woods&grass combination,Fair 0.96 C 76 Composite Area&Weighted CN 19.11 71.59 Time of Concentration Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 100 0 0 Slope(%): 4.5 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.06 0 0 ComputedFlowlime(min): 1.57 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 1784.43 28.4281 0 Channel Slope(%): 1.61 1.75883 0 Cross Section Area(ftF): 12 12 0 Wetted Perimeter(ft): 12.65 12.65 0 Velocity(ftlsec): 6.08 7.63 0 Computed Flow lime(min): 4.89 0.06 0 Total lOC(min) 6.52 Subbasin RunoffResults Total Rainfall(in) 5.74 Total Runoff(in) 2.74 PeakRunoff(cfs) 79.54 Weighted Curve Number 71.59 Time of Concentration(days hh:mm:ss) 0 00:06:31 Pre-Development 025-Year Page 13 Subbasin:4 Rainfall Intensity Graph 8.5 8 7.5 7 6.5 - 6 5.5 5 4.5 @ 4 c m - Ce 3.5 3 2.5 2 1.5 1 0.5 _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 85 80— 75_ 70 65 60 55 50 w - 46 45 c 40 z Ce 35 30 25 20 15 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 025-Year Page 14 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Ivfinning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (cfs) 1 Link-07 372.12 0.00 -732.50 0.00 -726.00 0.00 0.0000 Dummy 0.000 0.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Pre-Development 025-Year Page 15 Pipe Results SNElement Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) ($/sec) (min) ($) (min) 1 L nk-07 305.37 0 12:10 0.00 0.00 0.00 0.00 0.00 0.00 Pre-Development 050-Year Page 1 Project Description File Name 31296.0001-Pre.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Tune Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements ety Rain Gages 1 Subbasins 4 Nodes 2 Junctions 1 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Links 1 Channels 0 Pipes 1 Pumps 0 Orifices 0 Wens 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series 1S-050 Intensity inches North Carolina Rowan 50.00 6.46 SCS Type ll24-hr Pre-Development 050-Year Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 70.85 484.00 79.59 6.46 4.16 294.37 272.33 0 00:27:42 2 2 12.90 484.00 69.36 6.46 3.11 40.13 39.16 0 00:25:02 3 3 9.40 484.00 71.25 6.46 3.30 31.01 30.82 0 00:24:15 4 4 19.12 484.00 71.59 6.46 3.33 63.71 96.65 0 00:06:31 Pre-Development 050-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak vhxHGL Max Mn Time of Total Total Time ID Type Elevation (Ivhx) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfe) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 5-Jun Junction 732.50 9999.00 732.50 9999.00 1.00 365.11 732.50 0.00 9266.50 0 00:00 0.00 0.00 2 Out-05 Outfall 726.00 365.11 726.00 Pre-Development 050-Year Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total lime Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) ($) (%) (in) (cfs) (cfs) ($/sec) (ft) (min) 1 Link-07 Pipe 5-Jun Out-05 372.12 0.00 0.00 0.0000 0.000 0.0130 365.11 0.00 0.00 0.00 0.00 0.00 0.00 Pre-Development 050-Year Page 5 Subbas in Hydrology Subbasin:1 Input Data Area(ac) 70.85 Peak Rate Factor 484 Weighted Curve Number 79.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Pond 5.33 D 98 <50%grass cover,Poor 0.86 B 79 Pasture,grassland,or range,Fair 18.42 C 79 Urban commercial,85%imp 2.61 C 94 Woods,Fair 11.11 C 73 Pasture,grassland,or range,Fair 1.56 D 84 Brush,Good 3.32 D 73 Urban commercial,85%imp 0.6 D 95 Woods,Fair 6.23 D 79 >75%grass cover,Good 17.3 C 74 Urban commercial,85%imp 2.38 C 94 Paved parking&roofs 1.12 D 98 Composite Area&Weighted CN 70.84 79.59 Time of Concentration 1OC Nkthod:SCS 1R 55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^0.8))/((P^0.5)*(SP0.4)) Where: Tc=Time of Concentration(hr) n =Muffling's roughness ]f=Flow Length(it) P=2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(SP0.5)(unpaved surface) V=20.3282*(SP0.5)(paved surface) V=15.0*(SP0.5)(grassed waterway surface) V=10.0*(SP0.5)(nearlybare&unfilled surface) V=9.0*(SP`0.5)(cultivated straight rows surface) V=7.0*(SP`0.5)(short grass pasture surface) V=5.0*(SP0.5)(woodland surface) V=2.5*(Sf"0.5)(forestw/heavy litter surface) Tc=(Lf/y/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(Sf`0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(he) Lf=How Length(ft) R=Hydraulic Radius(ft) Aq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Nhnning's roughness Pre-Development 050-Year Page 6 Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374.084 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 ComputedFlowlime(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 459.068 389.48 0 Channel Slope(%): 2.396 1.284 0 Cross Section Area(ft'): 8.3 16.63 0 Wetted Perimeter(ft): 13.5 26.947 0 Velocity(ft/sec): 5.56 4.9 0 Computed Flow Time(min): 1.38 1.33 0 Total TOC(min) 27.70 Subbasin RunoffRe sults Total Rainfall(in) 6.46 TotalRunoff(in) 4.16 PeakRunoff(cfs) 272.33 Weighted Curve Number 79.59 Time of Concentration(days hh:mm:ss) 0 00:27:42 Pre-Development 050-Year Page 7 Subbas in:1 Rainfall Intensity Graph 9 8.5 8 7.5 7_ 6.5 6 5.5 s 5 c 4.5 c 4_ 3.5 3 2.5 2 1.5 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 290 280 270 260 250 240 230 220 210 200 190 180 170 160 U 150 0 140 c 130 120 110 100 90 80 70 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 050-Year Page 8 Subbasin:2 Input Data Area(ac) 12.9 Peak Rate Factor 484 Weighted Curve Number 69.36 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.38 D 79 Woods,Fair 5.59 B 60 Woods,Fair 4.96 C 73 Urban industrial,72%imp 0.97 C 91 Composite Area&Weighted CN 12.9 69.36 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C tvbnning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 6 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow lime(mm): 15.82 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 461.67 0 0 Slope(%): 4.44 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.05 0 0 Computed Flow-rime(min): 7.33 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow length(ft): 307.134 463.446 0 Channel Slope(%): 2.93 3.21 0 Cross Section Area OP): 6.5 9 0 Wetted Perimeter(ft): 13.15 9.85 0 Velocity(ft/sec): 4.56 10.05 0 Computed Flow Time(min): 1.12 0.77 0 Total IOC(min) 25.04 Subbasin RunoffResults Total Rainfall(in) 6.46 Total Runoff(in) 3.11 Peak l unoff(cfs) 39.16 Weighted Curve Number 69.36 Time of Concentration(days hh:mm:ss) 0 00:25:02 Pre-Development 050-Year Page 9 Subbasin:2 Rainfall Intensity Graph 9.5 9- 8.5 8 7.5 7 6.5 - 6- 5.5 5 • 4.5 c 4 3.5 -J 3 2.5 2 1.5 0.5 L 7- I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 42 40- 38- 36 34 32 30 28 26- 24 • 22 c 20- c - • 18 16 14 12- 10- 8 6 4 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 050-Year Page 10 Subbasin:3 Input Data Area(ac) 9.4 Peak Rate Factor 484 Weighted Curve Number 71.25 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.35 D 79 Woods,Fair 1.89 B 60 Woods,Fair 6.17 C 73 Composite Area&Weighted CN 9.41 71.25 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C tvhnning's Roughness: 0.5 0 0 Flow length(ft): 100 0 0 Slope(%): 7 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow Time(min): 14.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 516.6346 0 0 Slope(%): 5.03 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.12 0 0 Computed Flow Time(min): 7.69 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow Length(ft): 260.65 631.3 0 Channel Slope(%): 4.8 0.95 0 Cross Section Area(ft2): 5.5 32 0 Wetted Perimeter(ft): 5.59 17.89 0 Velocity(ft/sec): 9.23 8.56 0 Computed Flow lime(min): 0.47 1.23 0 Total TOC(min) 24.26 Subbasin RunoffRe sults Total Rainfall(in) 6.46 Total Runoff(in) 3.3 Peak l unoff(cfs) 30.82 Weighted Curve Number 71.25 Time of Concentration(days hh:mm:ss) 0 00:24:16 Pre-Development 050-Year Page 11 Subbasin:3 Rainfall Intensity Graph 9.5 9- 8.5 8 7.5 7 6.5 - 6- 5.5 5 • 4.5 c 4 3.5 -J 3 2.5 2 1.5 0.5 L 7— I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 34 32 30 28 26 24 22 20 m • 18 c 16 • 14 12 10 8 6 4 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 050-Year Page 12 Subbasin:4 Input Data Area(ac) 19.12 Peak Rate Factor 484 Weighted Curve Number 71.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 12.98 C 73 Woods,Fair 1.97 D 79 Woods,Fair 3.2 B 60 Woods&grass combination,Fair 0.96 C 76 Composite Area&Weighted CN 19.11 71.59 Time ofConcentration Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 100 0 0 Slope(%): 4.5 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.06 0 0 ComputedFlowlime(min): 1.57 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 1784.43 28.4281 0 Channel Slope(%): 1.61 1.75883 0 Cross Section Area(ftF): 12 12 0 Wetted Perimeter(ft): 12.65 12.65 0 Velocity(ftlsec): 6.08 7.63 0 Computed Flow lime(min): 4.89 0.06 0 Total lOC(min) 6.52 Subbasin RunoffResults Total Rainfall(in) 6.46 Total Runoff(in) 3.33 PeakRunoff(cfs) 96.65 Weighted Curve Number 71.59 Time of Concentration(days hh:mm:ss) 0 00:06:31 Pre-Development 050-Year Page 13 Subbasin:4 Rainfall Intensity Graph 9.5 9- 8.5 8 7.5 7 6.5 - 6- 5.5 5 4.5 c ix 4 3.5 -J 3 2.5 2 1.5 0.5 L 7- I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 100 95- 90- 85- if 80 75 70 65- 60 55- o 50 0 c 3 45 40- — 35 30- 25- 20 15- 10- 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 050-Year Page 14 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Ivfinning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (cfs) 1 Link-07 372.12 0.00 -732.50 0.00 -726.00 0.00 0.0000 Dummy 0.000 0.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Pre-Development 050-Year Page 15 Pipe Results SNElement Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) ($/sec) (min) ($) (min) 1 L nk-07 365.11 0 12:10 0.00 0.00 0.00 0.00 0.00 0.00 Pre-Development 100-Year Page 1 Project Description File Name 31296.0001-Pre.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Tune Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements ery Rain Gages 1 Subbasins 4 Nodes 2 Junctions 1 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 0 Imlcs 1 Channels 0 Pipes 1 Pumps 0 Orifices 0 Wens 0 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 lime Series 1S-100 Intensity inches User Defined Pre-Development 100-Year Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 70.85 484.00 79.59 7.20 4.83 342.47 315.93 0 00:27:42 2 2 12.90 484.00 69.36 7.20 3.72 47.93 46.84 0 00:25:02 3 3 9.40 484.00 71.25 7.20 3.92 36.85 36.84 0 00:24:15 4 4 19.12 484.00 71.59 7.20 3.96 75.65 114.79 0 00:06:31 Pre-Development 100-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak vhxHGL Max Mn Time of Total Total Time ID Type Elevation (Ivhx) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) (ft') (cfe) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 5-Jun Junction 732.50 9999.00 732.50 9999.00 1.00 428.62 732.50 0.00 9266.50 0 00:00 0.00 0.00 2 Out-05 Outfall 726.00 428.62 726.00 Pre-Development 100-Year Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total lime Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity Design Flow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) ($/sec) (ft) (min) 1 Link-07 Pipe 5-Jun Out-05 372.12 0.00 0.00 0.0000 0.000 0.0130 428.62 0.00 0.00 0.00 0.00 0.00 0.00 Pre-Development 100-Year Page 5 Subbas in Hydrology Subbasin:1 Input Data Area(ac) 70.85 Peak Rate Factor 484 Weighted Curve Number 79.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Pond 5.33 D 98 <50%grass cover,Poor 0.86 B 79 Pasture,grassland,or range,Fair 18.42 C 79 Urban commercial,85%imp 2.61 C 94 Woods,Fair 11.11 C 73 Pasture,grassland,or range,Fair 1.56 D 84 Brush,Good 3.32 D 73 Urban commercial,85%imp 0.6 D 95 Woods,Fair 6.23 D 79 >75%grass cover,Good 17.3 C 74 Urban commercial,85%imp 2.38 C 94 Paved parking&roofs 1.12 D 98 Composite Area&Weighted CN 70.84 79.59 Time of Concentration 1OC tvkthod:SCS 1R 55 Sheet Flow Equation: Tc=(0.007*((n*Lf)^0.8))/((P^0.5)*(SP0.4)) Where: Tc=Time of Concentration(hr) n =Muffling's roughness ]f=Flow Length(it) P=2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(SP0.5)(unpaved surface) V=20.3282*(SP0.5)(paved surface) V=15.0*(SP0.5)(grassed waterway surface) V=10.0*(SP0.5)(nearlybare&unfilled surface) V=9.0*(SP`0.5)(cultivated straight rows surface) V=7.0*(SP`0.5)(short grass pasture surface) V=5.0*(SP0.5)(woodland surface) V=2.5*(Sf"0.5)(forestw/heavy litter surface) Tc=(Lf/y/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=How Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(Sf`0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(he) Lf=How Length(ft) R=Hydraulic Radius(ft) Aq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Nhnning's roughness Pre-Development 100-Year Page 6 Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374.084 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 ComputedFlowlime(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 459.068 389.48 0 Channel Slope(%): 2.396 1.284 0 Cross Section Area(ft'): 8.3 16.63 0 Wetted Perimeter(ft): 13.5 26.947 0 Velocity(ft/sec): 5.56 4.9 0 Computed Flow Time(min): 1.38 1.33 0 Total TOC(min) 27.70 Subbasin RunoffRe sults Total Rainfall(in) 7.2 Total Runoff(in) 4.83 PeakRunoff(cfs) 315.93 Weighted Curve Number 79.59 Time of Concentration(days hh:mm:ss) 0 00:27:42 Pre-Development 100-Year Page 7 Subbas in:1 Rainfall Intensity Graph 10 9.5 9 8.5 8 7.5 7 6.5 6 5.5 5 , m 4.5 . • 4 3.5 . 3 . 2.5 . 2 . 1.5 1 0.5 - L J I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 340 320 300 280 260 240 220 200 w - • 180 c 160 z 0_ 140 120 100 80 60 40 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 100-Year Page 8 Subbasin:2 Input Data Area(ac) 12.9 Peak Rate Factor 484 Weighted Curve Number 69.36 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.38 D 79 Woods,Fair 5.59 B 60 Woods,Fair 4.96 C 73 Urban industrial,72%imp 0.97 C 91 Composite Area&Weighted CN 12.9 69.36 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C tvbnning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 6 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow lime(mm 15.82 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 461.67 0 0 Slope(%): 4.44 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.05 0 0 Computed Flow-rime(min): 7.33 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow length(ft): 307.134 463.446 0 Channel Slope(%): 2.93 3.21 0 Cross Section Area(ft'): 6.5 9 0 Wetted Perimeter(ft): 13.15 9.85 0 Velocity(ft/sec): 4.56 10.05 0 Computed Flow Time(min): 1.12 0.77 0 Total IOC(min) 25.04 Subbasin RunoffRe sults Total Rainfall(in) 7.2 Total Runoff(in) 3.72 Peak l unoff(cfs) 46.84 Weighted Curve Number 69.36 Time of Concentration(days hh:mm:ss) 0 00:25:02 Pre-Development 100-Year Page 9 Subbasin:2 Rainfall Intensity Graph 10.5 10 9.5 9 8.5 8 7.5 7 6.5 t 6 c 5.5 5 c - 4 3.5 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 50 48- 46- 44 42- 40 38 36 34 32- 30 w 28- P6_ o 24 K 22 20- 12 10 8- 4. 6- /1 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 100-Year Page 10 Subbasin:3 Input Data Area(ac) 9.4 Peak Rate Factor 484 Weighted Curve Number 71.25 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 1.35 D 79 Woods,Fair 1.89 B 60 Woods,Fair 6.17 C 73 Composite Area&Weighted CN 9.41 71.25 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C tvhnning's Roughness: 0.5 0 0 Flow length(ft): 100 0 0 Slope(%): 7 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.11 0 0 Computed Flow Time(min): 14.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 516.6346 0 0 Slope(%): 5.03 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.12 0 0 Computed Flow Time(min): 7.69 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nsnning's Roughness: 0.035 0.025 0 Flow Length(ft): 260.65 631.3 0 Channel Slope(%): 4.8 0.95 0 Cross Section Area(ft2): 5.5 32 0 Wetted Perimeter(ft): 5.59 17.89 0 Velocity(ft/sec): 9.23 8.56 0 Computed Flow lime(min): 0.47 1.23 0 Total TOC(min) 24.26 Subbasin RunoffRe sults Total Rainfall(in) 7.2 Total Runoff(in) 3.92 Peak l unoff(cfs) 36.84 Weighted Curve Number 71.25 Time of Concentration(days hh:mm:ss) 0 00:24:16 Pre-Development 100-Year Page 11 Subbasin:3 Rainfall Intensity Graph 10.5 10 9.5 9 8.5 8 7.5 7 6.5 t 6 c 5.5 m 5 c 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 38 36 34 T �, 32- 30- 28- 26- 24- 22 w 20 c 18- c K 16_ 14- 12 10 8 6 4 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 100-Year Page 12 Subbasin:4 Input Data Area(ac) 19.12 Peak Rate Factor 484 Weighted Curve Number 71.59 Rain Gage ID Rain Gage-001 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 12.98 C 73 Woods,Fair 1.97 D 79 Woods,Fair 3.2 B 60 Woods&grass combination,Fair 0.96 C 76 Composite Area&Weighted CN 19.11 71.59 Time of Concentration Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 100 0 0 Slope(%): 4.5 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 1.06 0 0 ComputedFlowlime(min): 1.57 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0.025 0 Flow Length(ft): 1784.43 28.4281 0 Channel Slope(%): 1.61 1.75883 0 Cross Section Area(ftF): 12 12 0 Wetted Perimeter(ft): 12.65 12.65 0 Velocity(ftlsec): 6.08 7.63 0 Computed Flow lime(min): 4.89 0.06 0 Total lOC(min) 6.52 Subbasin Runoff Results Total Rainfall(in) 7.2 Total Runoff(in) 3.96 PeakRunoff(cfs) 114.79 Weighted Curve Number 71.59 Time of Concentration(days hh:mm:ss) 0 00:06:31 Pre-Development 100-Year Page 13 Subbasin:4 Rainfall Intensity Graph 10.5 10 9.5 9 8.5 8 7.5 7 6.5 t 6 c 5.5 m 5 c - 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 120 115 15- 105 100 95 90 85 80 75 70 w 0 65 60 0 S 55 K 50 45 40 35 30- 25 20 15- 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Pre-Development 100-Year Page 14 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Ivfinning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameter or Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (ft) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (cfs) 1 Link-07 372.12 0.00 -732.50 0.00 -726.00 0.00 0.0000 Dummy 0.000 0.000 0.0130 0.5000 0.5000 0.0000 0.00 No 1 Pre-Development 100-Year Page 15 Pipe Results SNElement Peak Time of Design Flow Peak Flow/ Peak Flow Travel Peak Flow Peak Flow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) ($/sec) (min) ($) (min) 1 L nk-07 428.62 0 12:10 0.00 0.00 0.00 0.00 0.00 0.00 HT THOMAS & HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Appendix C Proposed Conditions SSA Reports J - 31296.0001 April 2024 Thomason dhutton.com Post-Development 1 inch Page 1 Project Description File Name 31296.0001-Post.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements Qty Rain Gages 1 Subbasins 8 Nodes 11 Junctions 8 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 2 Links 14 Channels 3 Pipes 5 Pumps 0 Orifices 3 Wens 3 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 lime Series 1S-1" Cumulative inches 0.00 Post-Development 1 inch Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 1.20 484.00 73.57 1.00 0.02 0.02 0.00 0 00:06:00 2 2 49.28 484.00 81.21 1.00 0.10 4.98 2.16 0 00:31:49 3 3 5.87 484.00 67.09 1.00 0.00 0.00 0.00 0 00:06:00 4 4 5.68 484.00 73.92 1.00 0.02 0.13 0.01 0 00:06:00 5 5 20.06 484.00 74.21 1.00 0.03 0.50 0.06 0 00:06:31 6 6 19.13 484.00 94.00 1.00 0.50 9.64 14.85 0 00:06:00 7 7 10.20 484.00 75.10 1.00 0.03 0.32 0.04 0 00:26:22 8 8 0.84 484.00 98.00 1.00 0.79 0.66 0.97 0 00:06:00 Post-Development 1 inch Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak MaxHGL Max Mm Tnne of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) OP) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Channell Junction 748.00 999.00 748.00 999.00 1.00 2.17 748.28 0.00 250.72 0 00:00 0.00 0.00 2 Channel2 Junction 743.00 999.00 743.00 999.00 0.00 2.31 743.29 0.00 255.71 0 00:00 0.00 0.00 3 OCS-01 Junction 735.50 741.50 735.50 741.50 0.00 0.03 735.53 0.00 5.97 0 00:00 0.00 0.00 4 SiteOutfall Junction 728.00 999.00 728.00 999.00 1.00 1.91 728.22 0.00 270.78 0 00:00 0.00 0.00 5 Subl Junction 765.02 999.00 765.02 999.00 0.00 0.00 765.04 0.00 233.96 0 00:00 0.00 0.00 6 Sub2 Junction 750.04 999.00 750.04 999.00 0.00 2.15 750.27 0.00 248.73 0 00:00 0.00 0.00 7 Sub3 Junction 748.88 757.17 748.88 999.00 1.00 0.00 748.88 0.00 8.29 0 00:00 0.00 0.00 8 Sub4 Junction 746.58 752.95 746.58 999.00 1.00 0.01 746.68 0.00 6.27 0 00:00 0.00 0.00 9 Out-Ol Outfall 726.00 1.78 726.24 10 Pond-01 Storage Node 735.50 741.50 735.50 1.00 14.51 736.80 0.00 0.00 11 Pond-02 Storage Node 758.00 762.00 758.00 1.00 0.97 758.26 0.00 0.00 Post-Development 1 inch Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ PeakFlow Peak Flow Peak Flow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity DesignFlow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 Culvert Pipe Sub2 Channell 88.35 750.04 748.99 1.1900 48.000 0.0150 2.14 355.14 0.01 1.74 0.18 0.04 0.00 Calculated 2 OCS-01-Outfall Pipe OCS-01 SiteOutfall 100.00 735.50 728.00 7.5000 30.000 0.0150 0.03 97.35 0.00 2.81 0.12 0.05 0.00 Calculated 3 Pipe-01 Pipe Subl Channell 108.46 765.02 762.81 2.0400 18.000 0.0150 0.00 13.00 0.00 1.06 0.01 0.01 0.00 Calculated 4 Pipe-02 Pipe Sub3 Channell 138.00 750.00 749.62 0.2800 24.000 0.0150 0.00 10.29 0.00 0.00 0.00 0.00 0.00 Calculated 5 Pipe-03 Pipe Sub4 Channel2 409.00 746.58 745.71 0.2100 30.000 0.0150 0.01 16.40 0.00 0.52 0.06 0.02 0.00 Calculated 6 Channel-01 Channel Channell Channel2 389.00 748.00 743.00 1.2900 48.240 0.0320 2.31 2792.46 0.00 1.99 0.27 0.07 0.00 7 Channel-02 Channel Channel2 SiteOutfall 1441.00 743.00 728.00 1.0400 48.240 0.0320 1.84 2512.98 0.00 1.59 0.25 0.06 0.00 8 Channel-03 Channel SiteOutfall Out-01 100.00 728.00 726.00 2.0000 48.240 0.0320 1.78 3483.30 0.00 1.42 0.23 0.06 0.00 9 Orifice-01 Orifice Pond-01 OCS-01 735.50 735.50 1.000 0.03 10 Orifice-02 Orifice Pond-02 Channell 758.00 748.00 1.000 0.01 11 Rim-01 Orifice Pond-01 OCS-01 735.50 735.50 48.000 0.00 12 Spillway-0O1 Weir Pond-Ol SiteOutfall 735.50 728.00 0.00 13 Spillway-02 Weir Pond-02 Channell 758.00 748.00 0.00 14 Weir-Ol Weir Pond-Ol OCS-01 735.50 735.50 0.00 Post-Development 1 inch Page 5 Subbas in Hydrology Subbasin:1 Input Data Area(ac) 1.2 Peak Rate Factor 484 Weighted Curve Number 73.57 Rain Gage ID Rain Gage-01 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 0.52 C 73 >75%grass cover,Good 0.68 C 74 Composite Area&Weighted CN 1.2 73.57 Time ofConcentration TOC Ivkthod:SCS TR 55 Sheet Flow Equation: Tc=(0.007*((n*If)^0.8))/((P^0.5)*(Sf`0.4)) Where: Tc=Time of Concentration(hr) n =Ivlanning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(Sf`0.5)(unpaved surface) V=20.3282*(Sf`0.5)(paved surface) V=15.0*(Sf`0.5)(grassed waterway surface) V=10.0*(Sf`0.5)(nearlybare&untffied surface) V=9.0*(S14.5)(cultivated straight rows surface) V=7.0*(S14.5)(short grass pasture surface) V=5.0*(S14.5)(woodland surface) V=2.5*(Sl"0.5)(forest w/heavy litter surface) Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(SF 0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Rf=Flow Length(It) R=Hydraulic Radius(ft) Pq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Ivhnning's roughness User-Defined'IOC override(minutes):5 Subbasin RunoffRe sults Total Rainfall(in) 1 Total Runoff(in) 0.02 Peak R unoff(cfs) 0 Post-Development 1 inch Page 6 Weighted Curve Number 73.57 Time of Concentration(days hh:mm:ss) 000:05:00 Post-Development 1 inch Page 7 Subbas in:1 Rainfall Intensity Graph 1.4 1.35 1.3 1.25 1.2 1.15 - 1.1 1.05 1 0.95 _ 0.9 0.85 t 0.8 c 0.75 m 0.7 . 0.65 0.6 0.55 0.5 0.45 0.4 0.35 0.3 0.25 - 0.2 0.15 0.1 0.05 k 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 0.003 0.003 0.003_ 0.003 0.003 0.003 0.003 0.003 0.002 0.002 41)30.002 w0.002 0 50.002 0.002 0.002- 0.002— —, 0.002 0.002- 0.001- 0.001 0.001 0.001- 0.001- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 1 inch Page 8 Subbasin:2 Input Data Area(ac) 49.28 Peak Rate Factor 484 Weighted Curve Number 81.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number pond 5.34 - 99 <50%grass cover,Poor 0.86 B 79 >75%grass cover,Good 16.97 C 74 Pavedparking&roofs 2.16 C 98 Woods,Fair 3.39 C 73 Pasture,grassland,or range,Fair 1.55 D 84 Brush,Fair 3.32 D 77 Paved parking&roofs 0.6 D 98 Woods,Fair 0.54 D 79 >75%grass cover,Good 11.06 D 80 Paved parking&roofs 2.38 C 98 Brush,Fair 1.12 D 77 Composite Area&Weighted CN 49.29 81.21 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flowlength(ft): 100 0 0 Slope(%): 3 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.08 0 0 Computed Flow Time(min): 20.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 712.71 0 0 Slope(%): 3 0 0 Surface Type: Grass pasture Unpaved Unpaved Velocity(ft/sec): 1.21 0 0 Computed Flow Time(min): 9.82 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0 0 Flowlength(ft): 1410 0 0 Channel Slope(%): 2 0 0 Cross Section Area(ft'): tO 0 0 Wetted Perimeter(ft): 2 0 0 Velocity(ft/sec): 20.54 0 0 Computed Flow Time(min): 1.14 0 0 Total TOC(min) 31.83 Subbasin RunoffResults Total Rainfall(in) 1 Total Runoff(in) 0.1 PeakRunoff(cB) 2.16 Weighted Curve Number 81.21 Time of Concentration(days hh:mm:ss) 0 00:31:50 Post-Development 1 inch Page 9 Subbasin:2 Rainfall Intensity Graph 1.45 1.4 1.35 1.3 1.25 1.2 1.15 1.1 1.05 1 0.95 0.9 • 0.85 t 0.8 . c 0.75 m 0.7 0.65 IX 0.6 0.55 0.5 0.45_0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 2.3 2.2 2.1- 2 1.9- 1.8 1.7 1.6- 1.5 1.4 w 1.3- 1.2 g 1.1 II• 1 0.9 0.8- 0.7 0.6 0.2- 0.1_ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 1 inch Page 10 Subbasin:3 Input Data Area(ac) 5.87 Peak Rate Factor 484 Weighted Curve Number 67.09 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 1.18 C 74 Paved parking&roofs 0.13 C 98 Woods,Fair 1.43 C 73 Woods,Good 0.1 D 77 Woods,Fair 3.04 B 60 Composite Area&Weighted CN 5.88 67.09 Time ofConcentration User-Defined TOC override(minutes):5.00 Subbasin RunoffRe sults Total Rainfall(in) 1 Total Runoff(in) 0 Peak Runoff(cfs) 0 Weighted Curve Number 67.09 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 1 inch Page 11 Subbasin:3 Rainfall Intensity Graph 1.45_ 1.4 1.35 1.3 1.25 1.2 1.15 1.1 1.05 1 0.95 0.9 0.85 t 0.8 c 0.75 m 0.7 0.65 IX 0.6_ 0.55_ 0.5 0.45_0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05_ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 0.001 0.001 0.001- 0.001- 0.001 0.001 0.001- 0.001 0.001- w0.001 . o w0.001 - - - - - 0 c 0.000 0.000 0.000 0.000 • 0.000 0.000 - - - - - 0.000 0.000 0 • - 0 i . . i . . 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 1 inch Page 12 Subbasin:4 Input Data Area(ac) 5.68 Peak Rate Factor 484 Weighted Curve Number 73.92 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.09 B 60 Woods,Fair 2.3 C 73 Paved parking&roofs 1.29 D 98 Composite Area&Weighted CN 5.68 73.92 Time of Concentration User-Defined TOC override(minutes):5 Subbasin RunoffRe sults Total Rainfall(in) 1 Total Runoff(in) 0.02 PeakRunoff(cfs) 0.01 Weighted Curve Number 73.92 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 1 inch Page 13 Subbasin:4 Rainfall Intensity Graph 1.45_ 1.4 1.35 1.3 1.25 1.2 1.15 1.1 1.05 1 0.95 0.9 0.85 t 0.8 . c 0.75 m 0.7 0.65 IX 0.6_ 0.55_ 0.5 0.45_0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05_ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 0.015 0.015 — - — 0.014 0.014 0.013 0.013 0.012 0.012 0.011 0.011 0.01 0.01 No.009 (50.009 0.008 0 0.008 K 0.007 0.007 0.006 0.006 0.005 0.004 0.004 0.004 0.003 0.003 0.002 0.002 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 1 inch Page 14 Subbasin:5 Input Data Area(ac) 20.06 Peak Rate Factor 484 Weighted Curve Number 74.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 6.48 D 79 Woods,Fair 7.67 C 73 Woods,Fair 1.38 B 60 Woods&grass combination,Good 0.96 C 72 3.57 - 74.21 Composite Area&Weighted CN 20.06 74.21 Time of Concentration User-Defined TOC override(minutes):6.52 Subbasin RunoffResults Total Rainfall(in) 1 Total Runoff(in) 0.03 Peak Runoff(cfs) 0.06 Weighted Curve Number 74.21 Time of Concentration(days hh:mm:ss) 0 00:06:31 Post-Development 1 inch Page 15 Subbasin:5 Rainfall Intensity Graph 1.45_ 1.4 1.35 1.3 1.25 1.2 1.15 1.1 1.05 1 0.95 0.9 0.85 t 0.8 . c 0.75 m 0.7 0.65 IX 0.6_ 0.55_ 0.5 0.45_0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05_ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 0.058 0.056 - - 0.054 - 0.052 0.05 0.048 0.046 0.044 - 0.042 0.04 0.038 0.036 -A.034 14-\\MN11111 00.032 w 0.03 '0.028 if0.026 0.024 0.022 0.02 0.018 0.016 0.014 0.012 0.01 0.008 0.006 0.004 0.002 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 1 inch Page 16 Subbasin:6 Input Data Area(ac) 19.13 Peak Rate Factor 484 Weighted Curve Number 94 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Urban commercial,85%imp 19.13 C 94 Composite Area&Weighted CN 19.13 94 Time ofConcentration User-Defined'IOC override(minutes):5.00 Subbasin RunoffRe sults Total Rainfall(in) 1 Total Runoff(in) 0.5 Peak Runoff(cfs) 14.85 Weighted Curve Number 94 lime of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 1 inch Page 17 Subbasin:6 Rainfall Intensity Graph 1.45 1.4 1.35 1.3 1.25 1.2 1.15 1.1 1.05 1 0.95 0.9 • 0.85 t• 0.8 . c 0.75 m 0.7 0.65 IX 0.6 0.55 0.5 0.45_0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 15.5 15 14.5 --1 14 13.5 13 12.5 12 11.5 11 10.5 10 9.5 - 9 - w 8.5 8 - O 7.5 c 7 • 6.5 6 5.5 5 4.5 4 - 3.5 - 3 - 2.5 - 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 1 inch Page 18 Subbasin:7 Input Data Area(ac) 10.2 Peak Rate Factor 484 Weighted Curve Number 75.1 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.06 C 73 Woods,Fair 2.65 D 79 >75%grass cover,Good 5.49 C 74 Composite Area&Weighted CN 10.2 75.1 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 Computed Flow Time(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nbnning's Roughness: 0.03 0 0 Flow Length(ft): 459 0 0 Channel Slope(%): 2.396 0 0 Cross Section Area(ft2): 8.3 0 0 Wetted Perimeter(ft): 13.5 0 0 Velocity(ft/sec): 5.56 0 0 Computed Flow lime(min): 1.38 0 0 Total TOC(min) 26.37 Subbasin RunoffRe sults Total Rainfall(in) 1 Total Runoff(in) 0.03 Peak Runoff(cfs) 0.04 Weighted Curve Number 75.1 Time of Concentration(days hh:mm:ss) 0 00:26:22 Post-Development 1 inch Page 19 Subbasin:7 Rainfall Intensity Graph 1.45_ 1.4 1.35 1.3 1.25 1.2 1.15 1.1 1.05 1 0.95 0.9 0.85 t 0.8 c 0.75 m 0.7 0.65 IX 0.6_ 0.55_ 0.5 0.45_0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05_ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 0.042 0.04 - 0.038 / 11\Lutt\_1_uu\ 0.036 0.034 0.032- 0.03 0.028 0.026 w0.024- U - w0.022 1 s 0.02 Ce0.018- 0.016 0.014- 0.012- 0.01 0.008- 0.006- 0.004 0.002- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 1 inch Page 20 Subbasin:8 Input Data Area(ac) 0.84 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.84 C 98 Composite Area&Weighted CN 0.84 98 Time of Concentration User-Defined'IOC override(minutes):5 Subbasin RunoffResults Total Rainfall(in) 1 Total Runoff(in) 0.79 Peak Runoff(cfs) 0.97 Weighted Curve Number 98 lime of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 1 inch Page 21 Subbasin:8 Rainfall Intensity Graph 1.45_ 1.4 1.35 1.3 1.25 1.2 1.15 1.1 1.05 1 0.95 0.9 0.85 t 0.8 . c 0.75 m 0.7 0.65 IX 0.6_ 0.55_ 0.5 0.45_0.4 0.35 0.3 0.25 0.2 0.15 0.1 0.05 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 1.05 1- 0.95- 0.9 0.85 0.8 0.75 0.7 0.65- w 0.6- 0.55 0.5 z K 0.45 0.4 0.35 0.3- 0.25- 0.2 0.15 0.1 0.05- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 1 inch Page 22 Channel Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Fait/Bend Additional Initial Flap ID Invert Invert Invert Invert Lop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Channe1-01 389.00 748.00 0.00 743.00 0.00 5.00 1.2900 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 2 Channel-02 1441.00 743.00 0.00 728.00 0.00 15.00 1.0400 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 3 Channel-03 100.00 728.00 0.00 726.00 0.00 2.00 2.0000 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No Post-Development 1 inch Page 23 Channel Results SN Element Peak Time of DesignFlow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow Totallime Froude Reported ID Flow PeakFlow Capacity DasignFlow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cis) (ft/sec) (min) (ft) (min) 1 Channe1-01 2.31 0 12:28 2792.46 0.00 1.99 3.26 0.27 0.07 0.00 2 Channel-02 1.84 0 12:44 2512.98 0.00 1.59 15.10 0.25 0.06 0.00 3 Channel-03 1.78 0 12:53 3483.30 0.00 1.42 1.17 0.23 0.06 0.00 Post-Development 1 inch Page 24 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (It) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (cfs) 1 Culvert 88.35 750.04 0.00 748.99 0.99 1.05 1.1900 Rectangular 48.000 84.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 2 OCS-01-Outfall 100.00 735.50 0.00 728.00 0.00 7.50 7.5000 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 3 Pipe-01 108.46 765.02 0.00 762.81 14.81 2.21 2.0400 CIRCULAR 18.000 18.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 4 Pipe-02 138.00 750.00 1.12 749.62 1.62 0.38 0.2800 CIRCULAR 24.000 24.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 5 Pipe-03 409.00 746.58 0.00 745.71 2.71 0.87 0.2100 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 Post-Development 1 inch Page 25 Pipe Results SN Bement Peak Time of DesignFlow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow TotalTime Froude Reported ID Flow PeakFlow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Culvert 2.14 0 12:25 355.14 0.01 1.74 0.85 0.18 0.04 0.00 Calculated 2 OCS-01-Outfall 0.03 1 00:00 97.35 0.00 2.81 0.59 0.12 0.05 0.00 Calculated 3 Pipe-Ol 0.00 0 15:37 13.00 0.00 1.06 1.71 0.01 0.01 0.00 Calculated 4 Pipe-02 0.00 0 00:00 10.29 0.00 0.00 0.00 0.00 0.00 Calculated 5 Pipe-03 0.01 0 15:10 16.40 0.00 0.52 13.11 0.06 0.02 0.00 Calculated Post-Development 1 inch Page 26 Storage Nodes Storage Node:Pond-01 Input Data Invert Elevation(ft) 735.50 Max(Rim)Elevation(ft) 741.50 Max(Rim)Offset(ft) 6.00 Initial Water Elevation(ft) 735.50 Initial Water Depth(ft) 0.00 Ponded Area(ft5) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (It) (ft) (It) (ft) 1 Spillway-Ol Trapezoidal No 740.50 5.00 20.00 1.00 3.33 2 Weir-Ol Rectangular No 738.00 2.50 4.00 2.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (in) (m) (ft) 1 Orifice-01 Side CIRCULAR No 1.00 733.00 0.61 2 Rim-01 Bottom Rectangular No 48.00 48.00 740.50 0.63 Output Summary Results Peak Inflow(cfs) 14.51 Peak Lateral Inflow(cfs) 14.51 PeakOutflow(cfs) 0.03 Peak Ead'iltration Flow Rate(cfm) 0 MaxHGLFevation Attained(ft) 736.8 Max HGLDepth Attained(ft) 1.3 Average HGLElevation Attained(ft) 736.06 Average HGLDepth Attained(ft) 0.56 Time of MaxHGLOccurrence(days hh:mm) 1 00:00 Total Exfiltration Volume(1000-fl3) 0 Total Hooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention lime(sec) 0 Post-Development 1 inch Page 27 Storage Node:Pond-02 Input Data Invert Elevation(ft) 758.00 Max(Rim)Elevation(ft) 762.00 Max(Rim)Offset(ft) 4.00 Initial Water Elevation(ft) 758.00 Initial Water Depth(ft) 0.00 Ponded Area(ft) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (It) (ft) 1 Spillway-02 llapezoidal No 761.00 3.00 20.00 1.00 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (m) (in) (ft) 1 Orifice-02 Side CIRCULAR No 1.00 755.50 0.61 Output Summary Results Peak Inflow(cfs) 0.97 Peak Lateral Inflow(cfs) 0.97 PeakOutflow(cfs) 0.01 Peak Eadiltration Flow Rate(cfm) 0 Max HGLElevation Attained(ft) 758.26 Max HGLDepth Attained(ft) 0.26 Average HGLElevation Attained(ft) 758.13 Average HGLDepth Attained(ft) 0.13 Time of MaxHGLOccurrence(days hh:mm) 0 19:12 Total Exfiltration Volume(1000-00 0 Total Hooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention Time(sec) 0 Post-Development 002-Year Page 1 Project Description File Name 31296.0001-Post.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS'IR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Tune Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements Qty Rain Gages 1 Subbasins 8 Nodes 11 Junctions 8 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 2 Links 14 Channels 3 Pipes 5 Pumps 0 Orifices 3 Wens 3 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series 1S-02 Intensity inches North Carolina Rowan 2.00 3.32 SCS Type ll24-hr Post-Development 002-Year Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 1.20 484.00 73.57 3.32 1.09 1.31 1.95 0 00:06:00 2 2 49.28 484.00 81.21 3.32 1.58 77.81 65.82 0 00:31:49 3 3 5.87 484.00 67.09 3.32 0.76 4.43 6.06 0 00:06:00 4 4 5.68 484.00 73.92 3.32 1.11 6.32 9.42 0 00:06:00 5 5 20.06 484.00 74.21 3.32 1.13 22.67 33.28 0 00:06:31 6 6 19.13 484.00 94.00 3.32 2.66 50.88 74.48 0 00:06:00 7 7 10.20 484.00 75.10 3.32 1.18 12.06 11.03 0 00:26:22 8 8 0.84 484.00 98.00 3.32 3.09 2.58 3.53 0 00:06:00 Post-Development 002-Year Page 3 Node Summary SN Element Element Invert Ground/Rim Initial Surcharge Ponded Peak MaxHGL Max Mm Tnne of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (ft) (ft) (ft) (ft) OP) (cfs) (ft) (ft) (ft) (days hh:mm) (ac-in) (min) 1 Channell Junction 748.00 999.00 748.00 999.00 1.00 77.36 748.93 0.00 250.07 0 00:00 0.00 0.00 2 Channel2 Junction 743.00 999.00 743.00 999.00 0.00 79.92 743.97 0.00 255.03 0 00:00 0.00 0.00 3 OCS-01 Junction 735.50 741.50 735.50 741.50 0.00 15.68 736.22 0.00 5.28 0 00:00 0.00 0.00 4 SiteOutfall Junction 728.00 999.00 728.00 999.00 1.00 97.33 728.95 0.00 270.05 0 00:00 0.00 0.00 5 Subl Junction 765.02 999.00 765.02 999.00 0.00 1.86 765.43 0.00 233.57 0 00:00 0.00 0.00 6 Sub2 Junction 750.04 999.00 750.04 999.00 0.00 64.39 752.33 0.00 246.67 0 00:00 0.00 0.00 7 Sub3 Junction 748.88 757.17 748.88 999.00 1.00 6.03 751.19 0.00 5.98 0 00:00 0.00 0.00 8 Sub4 Junction 746.58 752.95 746.58 999.00 1.00 8.97 748.02 0.00 4.93 0 00:00 0.00 0.00 9 Out-Ol Outfall 726.00 96.80 726.93 10 Pond-01 Storage Node 735.50 741.50 735.50 1.00 73.83 739.11 0.00 0.00 11 Pond-02 Storage Node 758.00 762.00 758.00 1.00 3.51 759.04 0.00 0.00 Post-Development 002-Year Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow Peak Flow Peak Flow Total Tune Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity DesignFlow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 Culvert Pipe Sub2 Channell 88.35 750.04 748.99 1.1900 48.000 0.0150 64.37 355.14 0.18 5.59 1.64 0.41 0.00 Calculated 2 OCS-01-Outfall Pipe OCS-01 SiteOutfall 100.00 735.50 728.00 7.5000 30.000 0.0150 15.68 97.35 0.16 11.07 0.83 0.33 0.00 Calculated 3 Pipe-01 Pipe Subl Channell 108.46 765.02 762.81 2.0400 18.000 0.0150 1.86 13.00 0.14 5.02 0.39 0.26 0.00 Calculated 4 Pipe-02 Pipe Sub3 Channell 138.00 750.00 749.62 0.2800 24.000 0.0150 5.99 10.29 0.58 3.69 1.03 0.51 0.00 Calculated 5 Pipe-03 Pipe Sub4 Channel2 409.00 746.58 745.71 0.2100 30.000 0.0150 8.82 16.40 0.54 3.74 1.21 0.48 0.00 Calculated 6 Channel-01 Channel Channell Channel2 389.00 748.00 743.00 1.2900 48.240 0.0320 77.39 2792.46 0.03 3.23 0.95 0.24 0.00 7 Channel-02 Channel Channel2 SiteOutfall 1441.00 743.00 728.00 1.0400 48.240 0.0320 76.69 2512.98 0.03 3.05 0.96 0.24 0.00 8 Channel-03 Channel SiteOutfall Out-01 100.00 728.00 726.00 2.0000 48.240 0.0320 96.80 3483.30 0.03 4.00 0.94 0.23 0.00 9 Orifice-01 Orifice Pond-01 OCS-01 735.50 735.50 1.000 0.05 10 Orifice-02 Orifice Pond-02 Channell 758.00 748.00 1.000 0.03 11 Rim-01 Orifice Pond-01 OCS-01 735.50 735.50 48.000 0.00 12 Spillway-0O1 Weir Pond-Ol SiteOutfall 735.50 728.00 0.00 13 Spillway-02 Weir Pond-02 Channell 758.00 748.00 0.00 14 Weir-01 Weir Pond-01 OCS-01 735.50 735.50 15.63 Post-Development 002-Year Page 5 Subbas in Hydrology Subbasin:1 Input Data Area(ac) 1.2 Peak Rate Factor 484 Weighted Curve Number 73.57 Rain Gage ID Rain Gage-01 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 0.52 C 73 >75%grass cover,Good 0.68 C 74 Composite Area&Weighted CN 1.2 73.57 Time ofConcentration TOC Ivkthod:SCS TR 55 Sheet Flow Equation: Tc=(0.007*((n*If)^0.8))/((P^0.5)*(Sf`0.4)) Where: Tc=Time of Concentration(hr) n =Ivlanning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(Sf`0.5)(unpaved surface) V=20.3282*(Sf`0.5)(paved surface) V=15.0*(Sf`0.5)(grassed waterway surface) V=10.0*(Sf`0.5)(nearlybare&untffied surface) V=9.0*(S14.5)(cultivated straight rows surface) V=7.0*(S14.5)(short grass pasture surface) V=5.0*(S14.5)(woodland surface) V=2.5*(Sf 0.5)(forestw/heavy litter surface) Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(SF 0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) rf=Flow Length(It) R=Hydraulic Radius(ft) Pq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Ivhnning's roughness User-Defined'IOC override(minutes):5 Subbasin RunoffRe sults Total Rainfall(in) 3.32 Total Runoff(in) 1.09 Peak R unoff(cfs) 1.95 Post-Development 002-Year Page 6 Weighted Curve Number 73.57 Time of Concentration(days hh:mm:ss) 000:05:00 Post-Development 002-Year Page 7 Subbas in:1 Rainfall Intensity Graph 4.6 4.4- 4.2 4 3.8 3.6 3.4 3.2 3 2.8 t 2.6 c 2.4 I2 2.2 . c .% 2 1.8 1.6 1.4 - 1.2 — 1. 0.8 _ 0.6 t4 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 2 1.9- 1.8- 1.7- 1.6 1.5 1.4 1.3- 1.2 i5 1.1- U 1 0 0.9 0.8- 0.7 0.6- 0.5- 0.4 0.3- 0.2- 0.1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 002-Year Page 8 Subbasin:2 Input Data Area(ac) 49.28 Peak Rate Factor 484 Weighted Curve Number 81.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number pond 5.34 - 99 <50%grass cover,Poor 0.86 B 79 >75%grass cover,Good 16.97 C 74 Pavedparking&roofs 2.16 C 98 Woods,Fair 3.39 C 73 Pasture,grassland,or range,Fair 1.55 D 84 Brush,Fair 3.32 D 77 Paved parking&roofs 0.6 D 98 Woods,Fair 0.54 D 79 >75%grass cover,Good 11.06 D 80 Paved parking&roofs 2.38 C 98 Brush,Fair 1.12 D 77 Composite Area&Weighted CN 49.29 81.21 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flowlength(ft): 100 0 0 Slope(%): 3 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.08 0 0 Computed Flow Time(min): 20.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 712.71 0 0 Slope(%): 3 0 0 Surface Type: Grass pasture Unpaved Unpaved Velocity(ft/sec): 1.21 0 0 Computed Flow Time(min): 9.82 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0 0 Flowlength(ft): 1410 0 0 Channel Slope(%): 2 0 0 Cross Section Area(ft'): tO 0 0 Wetted Perimeter(ft): 2 0 0 Velocity(ft/sec): 20.54 0 0 Computed Flow Time(min): 1.14 0 0 Total TOC(min) 31.83 Subbasin RunoffResults Total Rainfall(in) 3.32 TotalRunoff(in) 1.58 Peak Runoff(cfs) 65.82 Weighted Curve Number 81.21 Time of Concentration(days hh:mm:ss) 0 00:31:50 Post-Development 002-Year Page 9 Subbasin:2 Rainfall Intensity Graph 4.8 4.6 1 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 s c 2.6 • - 2.4 c 2.2 Ce 2 • 1.8 1.6 1.4 1.2 1 , • 0.8 0.6 0.4 0.2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 70 65 60 55 50 45 w 40_ U 35 0 c o 30 25- 20- 15- 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 002-Year Page 10 Subbasin:3 Input Data Area(ac) 5.87 Peak Rate Factor 484 Weighted Curve Number 67.09 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 1.18 C 74 Paved parking&roofs 0.13 C 98 Woods,Fair 1.43 C 73 Woods,Good 0.1 D 77 Woods,Fair 3.04 B 60 Composite Area&Weighted CN 5.88 67.09 Time of Concentration User-Defined TOC override(minutes):5.00 Subbasin RunoffResults Total Rainfall(in) 3.32 Total Runoff(in) 0.76 Peak Runoff(cfs) 6.06 Weighted Curve Number 67.09 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 002-Year Page 11 Subbasin:3 Rainfall Intensity Graph 4.8 4.6 1 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 s c 2.6 • - 2.4 c 2.2 Ce 2 • 1.8 1.6 • • 1.4 1.2 1 , • 0.8 0.6 0.4 0.2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 7 6.5 6- 5.5 5 4.5 0 3.5 0 c o K 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 002-Year Page 12 Subbasin:4 Input Data Area(ac) 5.68 Peak Rate Factor 484 Weighted Curve Number 73.92 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.09 B 60 Woods,Fair 2.3 C 73 Paved parking&roofs 1.29 D 98 Composite Area&Weighted CN 5.68 73.92 Time of Concentration User-Defined TOC override(minutes):5 Subbasin RunoffRe sults Total Rainfall(in) 3.32 Total Runoff(in) 1.11 PeakRunoff(cfs) 9.42 Weighted Curve Number 73.92 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 002-Year Page 13 Subbasin:4 Rainfall Intensity Graph 4.8 4.6 1 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 _c c 2.6 • - 2.4 c 2.2 Ce 2 • 1.8 1.6 • • 1.4 1.2 1 , • 0.8 0.6 0.4 0.2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 9.5 9 8.5 8- 7.5- 7_ 6.5- 6- 5.5 o w 5 - 4.5- K 4_ 3.5- 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 002-Year Page 14 Subbasin:5 Input Data Area(ac) 20.06 Peak Rate Factor 484 Weighted Curve Number 74.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 6.48 D 79 Woods,Fair 7.67 C 73 Woods,Fair 1.38 B 60 Woods&grass combination,Good 0.96 C 72 3.57 - 74.21 Composite Area&Weighted CN 20.06 74.21 Time of Concentration User-Defined TOC override(minutes):6.52 Subbasin RunoffResults Total Rainfall(in) 3.32 Total Runoff(in) 1.13 Peak Runoff(cfs) 33.28 Weighted Curve Number 74.21 Time of Concentration(days hh:mm:ss) 0 00:06:31 Post-Development 002-Year Page 15 Subbasin:5 Rainfall Intensity Graph 4.8 4.6 1 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 s c 2.6 • - 2.4 c 2.2 (X 2 , • 1.8 1.6 1.4 1.2 1 , • 0.8 0.6 0.4 0.2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 34 32 30 28 26 24 22 20 18 c 16 14 12 10 8 6 4 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 002-Year Page 16 Subbasin:6 Input Data Area(ac) 19.13 Peak Rate Factor 484 Weighted Curve Number 94 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Urban commercial,85%imp 19.13 C 94 Composite Area&Weighted CN 19.13 94 Time ofConcentration User-Defined'IOC override(minutes):5.00 Subbasin RunoffRe sults Total Rainfall(in) 3.32 Total Runoff(in) 2.66 Peak Runoff(cfs) 74.48 Weighted Curve Number 94 Tame of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 002-Year Page 17 Subbasin:6 Rainfall Intensity Graph 4.8 4.6 1 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 s c 2.6 • - 2.4 c 2.2 Ce 2 1.8 1.6 • • 1.4 1.2 1 , • 0.8 0.6 0.4 0.2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 80 75 70 65 60 55 50 w 45 U 40 0 c K 35 30 25 20 15 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 002-Year Page 18 Subbasin:7 Input Data Area(ac) 10.2 Peak Rate Factor 484 Weighted Curve Number 75.1 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.06 C 73 Woods,Fair 2.65 D 79 >75%grass cover,Good 5.49 C 74 Composite Area&Weighted CN 10.2 75.1 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 Computed Flow Time(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nbnning's Roughness: 0.03 0 0 Flow Length(ft): 459 0 0 Channel Slope(%): 2.396 0 0 Cross Section Area(ft2): 8.3 0 0 Wetted Perimeter(ft): 13.5 0 0 Velocity(ft/sec): 5.56 0 0 Computed Flow lime(min): 1.38 0 0 Total TOC(min) 26.37 Subbasin RunoffRe sults Total Rainfall(in) 3.32 Total Runoff(in) 1.18 Peak l unoff(cfs) 11.03 Weighted Curve Number 75.1 Time of Concentration(days hh:mm:ss) 0 00:26:22 Post-Development 002-Year Page 19 Subbasin:7 Rainfall Intensity Graph 4.8 4.6 1 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 s c 2.6 • - 2.4 c 2.2 Ce 2 , • 1.8 1.6 • • 1.4 1.2 1 , • 0.8 0.6 0.4 0.2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 12 11.5 11 10.5 10 9.5 9 8.5 8 7.5 7 w 0 6.5 6 0 5.5 K 5 4.5 4 3.5 3- 2.5 2 1.5- 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 002-Year Page 20 Subbasin:8 Input Data Area(ac) 0.84 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.84 C 98 Composite Area&Weighted CN 0.84 98 Time ofConcentration User-Defined'IOC override(minutes):5 Subbasin RunoffRe sults Total Rainfall(in) 3.32 Total Runoff(in) 3.09 Peak Runoff(cfs) 3.53 Weighted Curve Number 98 Tame of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 002-Year Page 21 Subbasin:8 Rainfall Intensity Graph 4.8 4.6 1 4.4 4.2 4 3.8 3.6 3.4 3.2 3 2.8 s c 2.6 • - 2.4 c 2.2 Ce 2 , • 1.8 1.6 • • 1.4 1.2 1 , • 0.8 0.6 0.4 0.2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 3.8 3.6 3.4 3.2- 3- 2.8- 2.6 2.4- 2.2 w _ • 2 - 1.8- • 1.6- 1.2 1 0.8 0.6 0.4 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 002-Year Page 22 Channel Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Fait/Bend Additional Initial Flap ID Invert Invert Invert Invert Lop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Channe1-01 389.00 748.00 0.00 743.00 0.00 5.00 1.2900 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 2 Channel-02 1441.00 743.00 0.00 728.00 0.00 15.00 1.0400 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 3 Channel-03 100.00 728.00 0.00 726.00 0.00 2.00 2.0000 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No Post-Development 002-Year Page 23 Channel Results SN Element Peak Time of Design Flow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow Total Time Froude Reported ID Flow PeakFlow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) ($/sec) (min) ($) (min) 1 Channe1-01 77.39 0 12:16 2792.46 0.03 3.23 2.01 0.95 0.24 0.00 2 Channel-02 76.69 0 12:21 2512.98 0.03 3.05 7.87 0.96 0.24 0.00 3 Channel-03 96.80 0 12:22 3483.30 0.03 4.00 0.42 0.94 0.23 0.00 Post-Development 002-Year Page 24 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (It) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (cfs) 1 Culvert 88.35 750.04 0.00 748.99 0.99 1.05 1.1900 Rectangular 48.000 84.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 2 OCS-01-Outfall 100.00 735.50 0.00 728.00 0.00 7.50 7.5000 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 3 Pipe-01 108.46 765.02 0.00 762.81 14.81 2.21 2.0400 CIRCULAR 18.000 18.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 4 Pipe-02 138.00 750.00 1.12 749.62 1.62 0.38 0.2800 CIRCULAR 24.000 24.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 5 Pipe-03 409.00 746.58 0.00 745.71 2.71 0.87 0.2100 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 Post-Development 002-Year Page 25 Pipe Results SN Element Peak Time of DesignFlow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow TotalTune Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) ($) (min) 1 Culvert 64.37 0 12:15 355.14 0.18 5.59 0.26 1.64 0.41 0.00 Calculated 2 OCS-01-Outfall 15.68 0 12:14 97.35 0.16 11.07 0.15 0.83 0.33 0.00 Calculated 3 Pipe-Ol 1.86 0 12:00 13.00 0.14 5.02 0.36 0.39 0.26 0.00 Calculated 4 Pipe-02 5.99 0 12:05 10.29 0.58 3.69 0.62 1.03 0.51 0.00 Calculated 5 Pipe-03 8.82 0 12:04 16.40 0.54 3.74 1.82 1.21 0.48 0.00 Calculated Post-Development 002-Year Page 26 Storage Nodes Storage Node:Pond-01 Input Data Invert Elevation(ft) 735.50 Max(Rim)Elevation(ft) 741.50 Max(Rim)Offset(ft) 6.00 Initial Water Elevation(ft) 735.50 Initial Water Depth(ft) 0.00 Ponded Area(ft5) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (It) (ft) 1 Spillway-Ol Trapezoidal No 740.50 5.00 20.00 1.00 3.33 2 Weir-Ol Rectangular No 738.00 2.50 4.00 2.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (in) (m) (ft) 1 Orifice-01 Side CIRCULAR No 1.00 733.00 0.61 2 Rim-01 Bottom Rectangular No 48.00 48.00 740.50 0.63 Output Summary Results Peak Inflow(cfs) 73.83 Peak Lateral Inflow(cfs) 73.83 PeakOutflow(cfs) 15.68 Peak Ead'iltration Flow Rate(cfm) 0 MaxHGLFevation Attained(ft) 739.11 Max HGLDepth Attained(ft) 3.61 Average HGLElevation Attained(ft) 737.42 Average HGLDepth Attained(ft) 1.92 Time of MaxHGLOccurrence(days hh:mm) 0 12:14 Total Exfiltration Volume(1000-ft3) 0 Total Hooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention lime(sec) 0 Post-Development 002-Year Page 27 Storage Node:Pond-02 Input Data Invert Elevation(ft) 758.00 Max(Rim)Elevation(ft) 762.00 Max(Rim)Offset(ft) 4.00 Initial Water Elevation(ft) 758.00 Initial Water Depth(ft) 0.00 Ponded Area(ft) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-02 Ttapezoidal No 761.00 3.00 20.00 1.00 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (m) (in) (ft) 1 Orifice-02 Side CIRCULAR No 1.00 755.50 0.61 Output Summary Results Peak Inflow(cfs) 3.51 Peak Lateral Inflow(cfs) 3.51 PeakOutflow(cfs) 0.03 Peak Eadiltration Flow Rate(cfm) 0 Max HGLElevation Attained(ft) 759.04 Max HGLDepth Attained(ft) 1.04 Average HGLElevation Attained(ft) 758.6 Average HGLDepth Attained(ft) 0.6 Time of MaxHGLOccurrence(days hh:mm) 1 00:00 Total Exfiltration Volume(1000-00 0 Total Hooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention Time(sec) 0 Post-Development 010-Year Page 1 Project Description File Name 31296.0001-Post.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements Qty Rain Gages 1 Subbasins 8 Nodes 11 Junctions 8 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 2 Links 14 Channels 3 Pipes 5 Pumps 0 Orifices 3 Wens 3 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series 1S-10 Intensity inches North Carolina Rowan 10.00 4.84 SCS Type ll24-hr Post-Development 010-Year Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 1.20 484.00 73.57 4.84 2.20 2.64 4.07 0 00:06:00 2 2 49.28 484.00 81.21 4.84 2.86 141.14 120.25 0 00:31:49 3 3 5.87 484.00 67.09 4.84 1.70 9.97 14.95 0 00:06:00 4 4 5.68 484.00 73.92 4.84 2.23 12.67 19.49 0 00:06:00 5 5 20.06 484.00 74.21 4.84 2.26 45.24 68.46 0 00:06:31 6 6 19.13 484.00 94.00 4.84 4.15 79.39 113.22 0 00:06:00 7 7 10.20 484.00 75.10 4.84 2.33 23.75 22.48 0 00:26:22 8 8 0.84 484.00 98.00 4.84 4.60 3.85 5.18 0 00:06:00 Post-Development 010-Year Page 3 Node Summary SN Element Bement Invert Ground/Rim Initial Surcharge Ponded Peak M3XHGL Max Mn Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (It) (fl) (fl) (It) (IP) (cIt) (It) (It) (It) (days hh:mm) (ac-in) (min) 1 Channell Junction 748.00 999.00 748.00 999.00 1.00 145.15 749.18 0.00 249.82 0 00:00 0.00 0.00 2 Channel2 Junction 743.00 999.00 743.00 999.00 0.00 149.48 744.24 0.00 254.76 0 00:00 0.00 0.00 3 OCS-01 Junction 735.50 741.50 735.50 741.50 0.00 45.53 737.00 0.00 4.50 0 00:00 0.00 0.00 4 SiteOutfall Junction 728.00 999.00 728.00 999.00 1.00 202.51 729.29 0.00 269.71 0 00:00 0.00 0.00 5 Subl Junction 765.02 999.00 765.02 999.00 0.00 3.97 765.64 0.00 233.36 0 00:00 0.00 0.00 6 Sub2 Junction 750.04 999.00 750.04 999.00 0.00 118.66 753.52 0.00 245.48 0 00:00 0.00 0.00 7 Sub3 Junction 748.88 757.17 748.88 999.00 1.00 14.30 752.31 0.00 4.86 0 00:00 0.00 0.00 8 Sub4 Junction 746.58 752.95 746.58 999.00 1.00 18.94 748.95 0.00 4.00 0 00:00 0.00 0.00 9 Out-Ol Outfall 726.00 201.20 727.24 10 Pond-01 Storage Node 735.50 741.50 735.50 1.00 112.48 740.27 0.00 0.00 11 Pond-02 Storage Node 758.00 762.00 758.00 1.00 5.15 759.52 0.00 0.00 Post-Development 010-Year Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow PeakFlow PeakFlow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity DesignFlow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 Culvert Pipe Sub2 Channell 88.35 750.04 748.99 1.1900 48.000 0.0150 118.51 355.14 0.33 6.78 2.49 0.62 0.00 Calculated 2 OCS-01-Outfall Pipe OCS-01 SiteOutfall 100.00 735.50 728.00 7.5000 30.000 0.0150 45.54 97.35 0.47 16.22 1.39 0.56 0.00 Calculated 3 Pipe-01 Pipe Subl Channell 108.46 765.02 762.81 2.0400 18.000 0.0150 3.96 13.00 0.30 6.09 0.59 0.40 0.00 Calculated 4 Pipe-02 Pipe Sub3 Channell 138.00 750.00 749.62 0.2800 24.000 0.0150 14.34 10.29 1.39 5.08 1.68 0.84 0.00>CAPACITY 5 Pipe-03 Pipe Sub4 Channel2 409.00 746.58 745.71 0.2100 30.000 0.0150 18.22 16.40 1.11 4.53 1.88 0.76 0.00>CAPA.CITY 6 Channel-01 Channel Channell Channel2 389.00 748.00 743.00 1.2900 48.240 0.0320 144.62 2792.46 0.05 3.76 1.20 0.30 0.00 7 Channel-02 Channel Channel2 SiteOutfall 1441.00 743.00 728.00 1.0400 48.240 0.0320 145.39 2512.98 0.06 3.50 1.26 0.31 0.00 8 Channel-03 Channel SiteOutfall Out-01 100.00 728.00 726.00 2.0000 48.240 0.0320 201.20 3483.30 0.06 4.80 1.26 0.31 0.00 9 Orifice-01 Orifice Pond-01 OCS-01 735.50 735.50 1.000 0.05 10 Orifice-02 Orifice Pond-02 Channell 758.00 748.00 1.000 0.03 11 Rim-01 Orifice Pond-01 OCS-01 735.50 735.50 48.000 0.00 12 Spillway-0O1 Weir Pond-Ol SiteOutfall 735.50 728.00 0.00 13 Spillway-02 Weir Pond-02 Channell 758.00 748.00 0.00 14 Weir-01 Weir Pond-01 OCS-01 735.50 735.50 45.48 Post-Development 010-Year Page 5 Subbasin Hydrology Subbasin:1 Input Data Area(ac) 1.2 Peak Rate Factor 484 Weighted Curve Number 73.57 Rain Gage ID Rain Gage-01 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 0.52 C 73 >75%grass cover,Good 0.68 C 74 Composite Area&Weighted CN 1.2 73.57 Time ofConcentration TOC Ivkthod:SCS TR 55 Sheet Flow Equation: Tc=(0.007*((n*If)^0.8))/((P^0.5)*(Sf`0.4)) Where: Tc=Time of Concentration(hr) n =Ivlanning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(Sf`0.5)(unpaved surface) V=20.3282*(Sf`0.5)(paved surface) V=15.0*(Sf`0.5)(grassed waterway surface) V=10.0*(Sf`0.5)(nearlybare&untffied surface) V=9.0*(S14.5)(cultivated straight rows surface) V=7.0*(S14.5)(short grass pasture surface) V=5.0*(S14.5)(woodland surface) V=2.5*(Sl"0.5)(forest w/heavy litter surface) Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(SF 0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Rf=Flow Length(It) R=Hydraulic Radius(ft) Pq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Ivhnning's roughness User-Defined'IOC override(minutes):5 Subbasin RunoffResults Total Rainfall(in) 4.84 Total Runoff(in) 2.2 Peak R unoff(cfs) 4.07 Post-Development 010-Year Page 6 Weighted Curve Number 73.57 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 010-Year Page 7 Subbas in:1 Rainfall Intensity Graph 7 6.5 1 6 5.5 5 4.5 t 4 c _ 3.5 • cm Ce 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 4.2 4- 3.8- 3.6 3.4 3.2 3 2.8 2.6- w 2.4- 2.2 c 2_ K 1.8 1.6 1.4 1.2- 1- 0.8 0.6 0.4 0.2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 010-Year Page 8 Subbasin:2 Input Data Area(ac) 49.28 Peak Rate Factor 484 Weighted Curve Number 81.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number pond 5.34 - 99 <50%grass cover,Poor 0.86 B 79 >75%grass cover,Good 16.97 C 74 Pavedparking&roofs 2.16 C 98 Woods,Fair 3.39 C 73 Pasture,grassland,or range,Fair 1.55 D 84 Brush,Fair 3.32 D 77 Paved parking&roofs 0.6 D 98 Woods,Fair 0.54 D 79 >75%grass cover,Good 11.06 D 80 Paved parking&roofs 2.38 C 98 Brush,Fair 1.12 D 77 Composite Area&Weighted CN 49.29 81.21 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flowlength(ft): 100 0 0 Slope(%): 3 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.08 0 0 Computed Flow Time(min): 20.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 712.71 0 0 Slope(%): 3 0 0 Surface Type: Grass pasture Unpaved Unpaved Velocity(ft/sec): 1.21 0 0 Computed Flow Time(min): 9.82 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0 0 Flowlength(ft): 1410 0 0 Channel Slope(%): 2 0 0 Cross Section Area(ft'): tO 0 0 Wetted Perimeter(ft): 2 0 0 Velocity(ft/sec): 20.54 0 0 Computed Flow Time(min): 1.14 0 0 Total TOC(min) 31.83 Subbasin RunoffResults Total Rainfall(in) 4.84 Total Runoff(in) 2.86 Peak Runoff(cfs) 120.25 Weighted Curve Number 81.21 Time of Concentration(days hh:mm:ss) 0 00:31:50 Post-Development 010-Year Page 9 Subbasin:2 Rainfall Intensity Graph 7.5 7- - 6.5 6 5.5 5 4.5 - c 4 m c 3.5 ca 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 125 110 105- 100 95 90 85 80- 75 n 70- 65_ o 60 K 55 50- 45- 40- 35- 30 25 20- 15- 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 010-Year Page 10 Subbasin:3 Input Data Area(ac) 5.87 Peak Rate Factor 484 Weighted Curve Number 67.09 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 1.18 C 74 Paved parking&roofs 0.13 C 98 Woods,Fair 1.43 C 73 Woods,Good 0.1 D 77 Woods,Fair 3.04 B 60 Composite Area&Weighted CN 5.88 67.09 Time ofConcentration User-Defined TOC override(minutes):5.00 Subbasin RunoffRe sults Total Rainfall(in) 4.84 Total Runoff(in) 1.7 Peak Runoff(cfs) 14.95 Weighted Curve Number 67.09 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 010-Year Page 11 Subbasin:3 Rainfall Intensity Graph 7.5 7- - 6.5 6 5.5 5 4.5 - c 4 m c 3.5 m • 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 15.5 15 14.51 4 13.5 13 12.5 12 11.5 11 10.5 10 9.5 9 - w 8.5 8 - O 7.5 c 7 • 6.5 6 5.5 5 4.5 4 - 3.5 - 3 - 2.5 - 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 010-Year Page 12 Subbasin:4 Input Data Area(ac) 5.68 Peak Rate Factor 484 Weighted Curve Number 73.92 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.09 B 60 Woods,Fair 2.3 C 73 Paved parking&roofs 1.29 D 98 Composite Area&Weighted CN 5.68 73.92 Time of Concentration User-Defined TOC override(minutes):5 Subbasin RunoffResults Total Rainfall(in) 4.84 Total Runoff(in) 2.23 PeakRunoff(cfs) 19.49 Weighted Curve Number 73.92 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 010-Year Page 13 Subbas in:4 Rainfall Intensity Graph 7.5 7- — 6.5 6 5.5 5 4.5 - c 4 m c 3.5 m - Ce 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 20 19- 18- 17- 16 15 14 13- 12 w 11- o 10 o . 7 9 8- 7 6- 5- 4 3- 2- 1- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 010-Year Page 14 Subbasin:5 Input Data Area(ac) 20.06 Peak Rate Factor 484 Weighted Curve Number 74.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 6.48 D 79 Woods,Fair 7.67 C 73 Woods,Fair 1.38 B 60 Woods&grass combination,Good 0.96 C 72 3.57 - 74.21 Composite Area&Weighted CN 20.06 74.21 Time of Concentration User-Defined TOC override(minutes):6.52 Subbasin RunoffResults Total Rainfall(in) 4.84 Total Runoff(in) 2.26 Peak Runoff(cfs) 68.46 Weighted Curve Number 74.21 Time of Concentration(days hh:mm:ss) 0 00:06:31 Post-Development 010-Year Page 15 Subbasin:5 Rainfall Intensity Graph 7.5 7- - 6.5 6 5.5 5 4.5 - c 4 m c 3.5 m - IX 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 75 70 65 60 55 50 45 w 0 40- c 35 30- 25 20 15 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 010-Year Page 16 Subbasin:6 Input Data Area(ac) 19.13 Peak Rate Factor 484 Weighted Curve Number 94 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Urban commercial,85%imp 19.13 C 94 Composite Area&Weighted CN 19.13 94 Time ofConcentration User-Defined'IOC override(minutes):5.00 Subbasin RunoffRe sults Total Rainfall(in) 4.84 Total Runoff(in) 4.15 Peak Runoff(cfs) 113.22 Weighted Curve Number 94 Tame of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 010-Year Page 17 Subbas in:6 Rainfall Intensity Graph 7.5 • 7- - 6.5 6 5.5 5 4.5 - c 4 m c 3.5 m - IX 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 120 115 110 105 100 95 90 85 80 75 70 w 0 65 60 0 S 55 K 50 45 40 35 25 20 15 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 010-Year Page 18 Subbasin:7 Input Data Area(ac) 10.2 Peak Rate Factor 484 Weighted Curve Number 75.1 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.06 C 73 Woods,Fair 2.65 D 79 >75%grass cover,Good 5.49 C 74 Composite Area&Weighted CN 10.2 75.1 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 Computed Flow Time(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nbnning's Roughness: 0.03 0 0 Flow Length(ft): 459 0 0 Channel Slope(%): 2.396 0 0 Cross Section Area(ft2): 8.3 0 0 Wetted Perimeter(ft): 13.5 0 0 Velocity(ft/sec): 5.56 0 0 Computed Flow Time(min): 1.38 0 0 Total TOC(min) 26.37 Subbasin RunoffRe sults Total Rainfall(in) 4.84 Total Runoff(in) 2.33 Peak l unoff(cfs) 22.48 Weighted Curve Number 75.1 Time of Concentration(days hh:mm:ss) 0 00:26:22 Post-Development 010-Year Page 19 Subbas in:7 Rainfall Intensity Graph 7.5 7- - 6.5 6 5.5 5 4.5 - c 4 m c 3.5 m - IX 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 24 23 22 21 20 19 18 17 16 15 14 m 0 13 12 0 c 11 K 10 9 8 7 6- 5 4 3- 2 1- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 010-Year Page 20 Subbasin:8 Input Data Area(ac) 0.84 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.84 C 98 Composite Area&Weighted CN 0.84 98 Time of Concentration User-Defined'IOC override(minutes):5 Subbasin RunoffResults Total Rainfall(in) 4.84 Total Runoff(in) 4.6 Peak Runoff(cfs) 5.18 Weighted Curve Number 98 Tame of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 010-Year Page 21 Subbas in:8 Rainfall Intensity Graph 7.5 7- - 6.5 6 5.5 5 4.5 - c 4 m c 3.5 m - IX 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 5.4 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 3.2 w 3 2.8 0 2.6 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 010-Year Page 22 Channel Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Fait/Bend Additional Initial Flap ID Invert Invert Invert Invert Lop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Channe1-01 389.00 748.00 0.00 743.00 0.00 5.00 1.2900 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 2 Channel-02 1441.00 743.00 0.00 728.00 0.00 15.00 1.0400 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 3 Channel-03 100.00 728.00 0.00 726.00 0.00 2.00 2.0000 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No Post-Development 010-Year Page 23 Channel Results SN Element Peak Time of Design Flow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow Total Time Froude Reported ID Flow PeakFlow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (mm) (ft) (mm) 1 Channe1-01 144.62 0 12:15 2792.46 0.05 3.76 1.72 1.20 0.30 0.00 2 Channel-02 145.39 0 12:18 2512.98 0.06 3.50 6.86 1.26 0.31 0.00 3 Channel-03 201.20 0 12:12 3483.30 0.06 4.80 0.35 1.26 0.31 0.00 Post-Development 010-Year Page 24 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (It) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (cfs) 1 Culvert 88.35 750.04 0.00 748.99 0.99 1.05 1.1900 Rectangular 48.000 84.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 2 OCS-01-Outfall 100.00 735.50 0.00 728.00 0.00 7.50 7.5000 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 3 Pipe-01 108.46 765.02 0.00 762.81 14.81 2.21 2.0400 CIRCULAR 18.000 18.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 4 Pipe-02 138.00 750.00 1.12 749.62 1.62 0.38 0.2800 CIRCULAR 24.000 24.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 5 Pipe-03 409.00 746.58 0.00 745.71 2.71 0.87 0.2100 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 Post-Development 010-Year Page 25 Pipe Results SN Bement Peak Time of DesignFlow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Culvert 118.51 0 12:15 355.14 0.33 6.78 0.22 2.49 0.62 0.00 Calculated 2 OCS-01-Outfall 45.54 0 12:09 97.35 0.47 16.22 0.10 1.39 0.56 0.00 Calculated 3 Pipe-Ol 3.96 0 12:00 13.00 0.30 6.09 0.30 0.59 0.40 0.00 Calculated 4 Pipe-02 14.34 0 12:00 10.29 1.39 5.08 0.45 1.68 0.84 0.00 >CAPACITY 5 Pipe-03 18.22 0 12:02 16.40 1.11 4.53 1.50 1.88 0.76 0.00 >CAPACITY Post-Development 010-Year Page 26 Storage Nodes Storage Node:Pond-01 Input Data Invert Elevation(ft) 735.50 Max(Rim)Elevation(ft) 741.50 Max(Rim)Offset(ft) 6.00 Initial Water Elevation(ft) 735.50 Initial Water Depth(ft) 0.00 Ponded Area(ft5) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (It) (ft) (It) (ft) 1 Spillway-Ol Trapezoidal No 740.50 5.00 20.00 1.00 3.33 2 Weir-Ol Rectangular No 738.00 2.50 4.00 2.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (in) (m) (ft) 1 Orifice-01 Side CIRCULAR No 1.00 733.00 0.61 2 Rim-01 Bottom Rectangular No 48.00 48.00 740.50 0.63 Output Summary Results Peak Inflow(cfs) 112.48 Peak Lateral Inflow(cfs) 112.48 PeakOutflow(cfs) 45.53 Peak Ead'iltration Flow Rate(cfm) 0 Max HGLFevation Attained(ft) 740.27 MaxHGLLkpth Attained(ft) 4.77 Average HGLElevation Attained(ft) 737.9 Average HGLlkpth Attained(ft) 2.4 Time of MaxHGLOccurrence(days hh:mm) 0 12:09 Total Exfiltration Volume(1000-ft') 0 Total Hooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention lime(sec) 0 Post-Development 010-Year Page 27 Storage Node:Pond-02 Input Data Invert Elevation(ft) 758.00 Max(Rim)Elevation(ft) 762.00 Max(Rim)Offset(ft) 4.00 Initial Water Elevation(ft) 758.00 Initial Water Depth(ft) 0.00 Ponded Area(ft) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (It) (ft) 1 Spillway-02 Ttapezoidal No 761.00 3.00 20.00 1.00 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (m) (m) (ft) 1 Orifice-02 Side CIRCULAR No 1.00 755.50 0.61 Output Summary Results Peak Inflow(cfs) 5.15 Peak Lateral Inflow(cfs) 5.15 PeakOutflow(cfs) 0.03 Peak Eadiltration Flow Rate(cfm) 0 Max HGLElevation Attained(ft) 759.52 Max HGLDepth Attained(ft) 1.52 Average HGLElevation Attained(ft) 758.93 Average HGLDepth Attained(ft) 0.93 Time of MaxHGLOccurrence(days hh:mm) 1 00:00 Total Exfiltration Volume(1000-00 0 Total Hooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention Time(sec) 0 Post-Development 025-Year Page 1 Project Description File Name 31296.0001-Post.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS'IR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Tune Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements Qty Rain Gages 1 Subbasins 8 Nodes 11 Junctions 8 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 2 Links 14 Channels 3 Pipes 5 Pumps 0 Orifices 3 Wens 3 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series 1S-25 Intensity inches North Carolina Rowan 25.00 5.74 SCS Type ll24-hr Post-Development 025-Year Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 1.20 484.00 73.57 5.74 2.93 3.51 5.43 0 00:06:00 2 2 49.28 484.00 81.21 5.74 3.67 180.81 154.18 0 00:31:49 3 3 5.87 484.00 67.09 5.74 2.34 13.75 20.98 0 00:06:00 4 4 5.68 484.00 73.92 5.74 2.96 16.81 25.93 0 00:06:00 5 5 20.06 484.00 74.21 5.74 2.99 59.92 90.99 0 00:06:31 6 6 19.13 484.00 94.00 5.74 5.04 96.39 135.86 0 00:06:00 7 7 10.20 484.00 75.10 5.74 3.07 31.32 29.82 0 00:26:22 8 8 0.84 484.00 98.00 5.74 5.50 4.60 6.15 0 00:06:00 Post-Development 025-Year Page 3 Node Summary SN Element Bement Invert Ground/Rim Initial Surcharge Ponded Peak M3XHGL Max Mn Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (It) (fl) (fl) (It) (IP) (cIt) (It) (It) (It) (days hh:mm) (ac-in) (min) 1 Channell Junction 748.00 999.00 748.00 999.00 1.00 188.01 749.32 0.00 249.68 0 00:00 0.00 0.00 2 Channel2 Junction 743.00 999.00 743.00 999.00 0.00 193.57 744.38 0.00 254.62 0 00:00 0.00 0.00 3 OCS-01 Junction 735.50 741.50 735.50 741.50 0.00 65.12 737.58 0.00 3.92 0 00:00 0.00 0.00 4 SiteOutfall Junction 728.00 999.00 728.00 999.00 1.00 283.21 729.48 0.00 269.52 0 00:00 0.00 0.00 5 Subl Junction 765.02 999.00 765.02 999.00 0.00 5.30 765.76 0.00 233.24 0 00:00 0.00 0.00 6 Sub2 Junction 750.04 999.00 750.04 999.00 0.00 152.75 754.17 0.00 244.83 0 00:00 0.00 0.00 7 Sub3 Junction 748.88 757.17 748.88 999.00 1.00 20.32 753.51 0.00 3.66 0 00:00 0.00 0.00 8 Sub4 Junction 746.58 752.95 746.58 999.00 1.00 25.40 751.30 0.00 1.65 0 00:00 0.00 0.00 9 Out-Ol Outfall 726.00 277.72 727.41 10 Pond-01 Storage Node 735.50 741.50 735.50 1.00 135.14 740.76 0.00 0.00 11 Pond-02 Storage Node 758.00 762.00 758.00 1.00 6.12 759.79 0.00 0.00 Post-Development 025-Year Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow PeakFlow PeakFlow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity DesignFlow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (m) (cfs) (cfs) (ft/sec) (ft) (min) 1 Culvert Pipe Sub2 Channell 88.35 750.04 748.99 1.1900 48.000 0.0150 152.62 355.14 0.43 7.52 2.90 0.72 0.00 Calculated 2 OCS-01-Outfall Pipe OCS-01 SiteOutfall 100.00 735.50 728.00 7.5000 30.000 0.0150 65.13 97.35 0.67 17.52 1.74 0.71 0.00 Calculated 3 Pipe-Ol Pipe Subl Channell 108.46 765.02 762.81 2.0400 18.000 0.0150 5.28 13.00 0.41 6.52 0.69 0.47 0.00 Calculated 4 Pipe-02 Pipe Sub3 Channell 138.00 750.00 749.62 0.2800 24.000 0.0150 20.33 10.29 1.98 6.80 1.81 0.90 0.00>CAPACITY 5 Pipe-03 Pipe Sub4 Channel2 409.00 746.58 745.71 0.2100 30.000 0.0150 25.41 16.40 1.55 5.75 2.11 0.84 0.00>CAPA.CITY 6 Channe1-01 Channel Channell Channel2 389.00 748.00 743.00 1.2900 48.240 0.0320 187.33 2792.46 0.07 3.99 1.34 0.33 0.00 7 Channel-02 Channel Channel2 SiteOutfall 1441.00 743.00 728.00 1.0400 48.240 0.0320 188.63 2512.98 0.08 3.72 1.40 0.35 0.00 8 Channel-03 Channel SiteOutfall Out-01 100.00 728.00 726.00 2.0000 48.240 0.0320 277.72 3483.30 0.08 5.17 1.44 0.36 0.00 9 Orifice-01 Orifice Pond-01 OCS-01 735.50 735.50 1.000 0.05 10 Orifice-02 Orifice Pond-02 Channell 758.00 748.00 1.000 0.04 11 Rim-01 Orifice Pond-01 OCS-01 735.50 735.50 48.000 7.15 12 Spillway-0O1 Weir Pond-Ol SiteOutfall 735.50 728.00 9.24 13 Spillway-02 Weir Pond-02 Channell 758.00 748.00 0.00 14 Weir-01 Weir Pond-01 OCS-01 735.50 735.50 57.92 Post-Development 025-Year Page 5 Subbasin Hydrology Subbasin:1 Input Data Area(ac) 1.2 Peak Rate Factor 484 Weighted Curve Number 73.57 Rain Gage ID Rain Gage-01 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 0.52 C 73 >75%grass cover,Good 0.68 C 74 Composite Area&Weighted CN 1.2 73.57 Time ofConcentration TOC Ivkthod:SCS TR 55 Sheet Flow Equation: Tc=(0.007*((n*If)^0.8))/((P^0.5)*(Sf`0.4)) Where: Tc=Time of Concentration(hr) n =Ivlanning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(Sf`0.5)(unpaved surface) V=20.3282*(Sf`0.5)(paved surface) V=15.0*(Sf`0.5)(grassed waterway surface) V=10.0*(Sf`0.5)(nearlybare&untffied surface) V=9.0*(S14.5)(cultivated straight rows surface) V=7.0*(S14.5)(short grass pasture surface) V=5.0*(S14.5)(woodland surface) V=2.5*(Sl"0.5)(forest w/heavy litter surface) Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(SF 0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Rf=Flow Length(It) R=Hydraulic Radius(ft) Pq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Ivhnning's roughness User-Defined'IOC override(minutes):5 Subbasin RunoffResults Total Rainfall(in) 5.74 Total Runoff(in) 2.93 Peak R unoff(cfs) 5.43 Post-Development 025-Year Page 6 Weighted Curve Number 73.57 Time of Concentration(days hh:mm:ss) 000:05:00 Post-Development 025-Year Page 7 Subbas in:1 Rainfall Intensity Graph 8 7.5 7 6.5 6 5.5 5 t 4.5 c = 4 2 c 'm 3.5 3 2.5 2 1.5 • 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 5.6 5.4 - - 5.2 5 4.8 4.6 4.4 4.2 4 3.8 3.6 3.4 w 3.2 0 3 - w 2.8 0 2.6 K 2.4 2.2 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 f � 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 025-Year Page 8 Subbasin:2 Input Data Area(ac) 49.28 Peak Rate Factor 484 Weighted Curve Number 81.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number pond 5.34 - 99 <50%grass cover,Poor 0.86 B 79 >75%grass cover,Good 16.97 C 74 Pavedparking&roofs 2.16 C 98 Woods,Fair 3.39 C 73 Pasture,grassland,or range,Fair 1.55 D 84 Brush,Fair 3.32 D 77 Paved parking&roofs 0.6 D 98 Woods,Fair 0.54 D 79 >75%grass cover,Good 11.06 D 80 Paved parking&roofs 2.38 C 98 Brush,Fair 1.12 D 77 Composite Area&Weighted CN 49.29 81.21 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flowlength(ft): 100 0 0 Slope(%): 3 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.08 0 0 Computed Flow Time(min): 20.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 712.71 0 0 Slope(%): 3 0 0 Surface Type: Grass pasture Unpaved Unpaved Velocity(ft/sec): 1.21 0 0 Computed Flow Time(min): 9.82 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0 0 Flowlength(ft): 1410 0 0 Channel Slope(%): 2 0 0 Cross Section Area(ft'): tO 0 0 Wetted Perimeter(ft): 2 0 0 Velocity(ft/sec): 20.54 0 0 Computed Flow Time(min): 1.14 0 0 Total TOC(min) 31.83 Subbasin RunoffResults Total Rainfall(in) 5.74 Total Runoff(in) 3.67 Peak Runoff(cfs) 154.18 Weighted Curve Number 81.21 Time of Concentration(days hh:mm:ss) 0 00:31:50 Post-Development 025-Year Page 9 Subbasin:2 Rainfall Intensity Graph 8.5 8 7.5 7 6.5 — 6 5.5 5 4.5 @ 4 c m Ce 3.5 3 2.5 2 1.5 1 0.5 _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 170 160 150- 140 130 120 110 — 100 w - 46 90 80 z 70 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 025-Year Page 10 Subbasin:3 Input Data Area(ac) 5.87 Peak Rate Factor 484 Weighted Curve Number 67.09 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 1.18 C 74 Paved parking&roofs 0.13 C 98 Woods,Fair 1.43 C 73 Woods,Good 0.1 D 77 Woods,Fair 3.04 B 60 Composite Area&Weighted CN 5.88 67.09 Time ofConcentration User-Defined TOC override(minutes):5.00 Subbasin RunoffRe sults Total Rainfall(in) 5.74 Total Runoff(in) 2.34 Peak Runoff(cfs) 20.98 Weighted Curve Number 67.09 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 025-Year Page 11 Subbasin:3 Rainfall Intensity Graph 8.5 8 7.5 7 6.5 - 6 — 5.5 5 4.5 m c m Ce 3.5 3- 2.5 2 1.5 1 0.5 _ _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 22 21- 20- 19 18 17 16 15 14 13 12 o 11 o . o 10 9 8- 7- 6 5- 4- 3 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 025-Year Page 12 Subbasin:4 Input Data Area(ac) 5.68 Peak Rate Factor 484 Weighted Curve Number 73.92 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.09 B 60 Woods,Fair 2.3 C 73 Paved parking&roofs 1.29 D 98 Composite Area&Weighted CN 5.68 73.92 Time of Concentration User-Defined TOC override(minutes):5 Subbasin RunoffRe sults Total Rainfall(in) 5.74 Total Runoff(in) 2.96 PeakRunoff(cfs) 25.93 Weighted Curve Number 73.92 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 025-Year Page 13 Subbas in:4 Rainfall Intensity Graph 8.5 8 7.5 7 6.5 — 6 5.5 5 4.5 @ 4 c m Ce 3.5 3 2.5 2 1.5 1 0.5 _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 27 26 25 24 23 22 21 20 19 18 17 16 m 15 • 14 0 13 • 12 11 10 9 8 7 6 5 4 3 2 T i 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 025-Year Page 14 Subbasin:5 Input Data Area(ac) 20.06 Peak Rate Factor 484 Weighted Curve Number 74.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 6.48 D 79 Woods,Fair 7.67 C 73 Woods,Fair 1.38 B 60 Woods&grass combination,Good 0.96 C 72 3.57 - 74.21 Composite Area&Weighted CN 20.06 74.21 Time of Concentration User-Defined TOC override(minutes):6.52 Subbasin RunoffResults Total Rainfall(in) 5.74 Total Runoff(in) 2.99 Peak Runoff(cfs) 90.99 Weighted Curve Number 74.21 Time of Concentration(days hh:mm:ss) 0 00:06:31 Post-Development 025-Year Page 15 Subbasin:5 Rainfall Intensity Graph 8.5 8 7.5 7 6.5 - 6 5.5 5 4.5 @ 4 c m Ce 3.5 3 2.5 2 1.5 1 0.5 _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 95 90 85 80- 75- 70- 65- 60- 55 w _ • 50 c 45- z K 40- 35- 30 25 20 15 10' 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 025-Year Page 16 Subbasin:6 Input Data Area(ac) 19.13 Peak Rate Factor 484 Weighted Curve Number 94 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Urban commercial,85%imp 19.13 C 94 Composite Area&Weighted CN 19.13 94 Time ofConcentration User-Defined'IOC override(minutes):5.00 Subbasin RunoffRe sults Total Rainfall(in) 5.74 Total Runoff(in) 5.04 Peak Runoff(cfs) 135.86 Weighted Curve Number 94 Tame of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 025-Year Page 17 Subbas in:6 Rainfall Intensity Graph 8.5 8 7.5 7 6.5 — 6 5.5 5 4.5 @ 4 c m Ce 3.5 3 2.5 2 1.5 1 0.5 _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 145 140 135 130 125 120 115 110 105 100 95 90 85 w 80 U 75 O 70 c • 65 • 60 55 50 45 40 35 30 25 20 15 10 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 025-Year Page 18 Subbasin:7 Input Data Area(ac) 10.2 Peak Rate Factor 484 Weighted Curve Number 75.1 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.06 C 73 Woods,Fair 2.65 D 79 >75%grass cover,Good 5.49 C 74 Composite Area&Weighted CN 10.2 75.1 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 Computed Flow Time(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nbnning's Roughness: 0.03 0 0 Flow Length(ft): 459 0 0 Channel Slope(%): 2.396 0 0 Cross Section Area(ft2): 8.3 0 0 Wetted Perimeter(ft): 13.5 0 0 Velocity(ft/sec): 5.56 0 0 Computed Flow Time(min): 1.38 0 0 Total TOC(min) 26.37 Subbasin RunoffRe sults Total Rainfall(in) 5.74 Total Runoff(in) 3.07 Peak l unoff(cfs) 29.82 Weighted Curve Number 75.1 Time of Concentration(days hh:mm:ss) 0 00:26:22 Post-Development 025-Year Page 19 Subbas in:7 Rainfall Intensity Graph 8.5 8 7.5 7 6.5 - 6 5.5 5 4.5 @ 4 c m Ce 3.5 3 2.5 2 1.5 1 0.5 _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 31 30 29 28 27 26 25 24 23 22 21 20 19 18 - wU 17 — `-' 16 O 15 c 14 • 13 12 11 10 8 7 6 5 4 3 2 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 025-Year Page 20 Subbasin:8 Input Data Area(ac) 0.84 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.84 C 98 Composite Area&Weighted CN 0.84 98 Time of Concentration User-Defined'IOC override(minutes):5 Subbasin RunoffResults Total Rainfall(in) 5.74 Total Runoff(in) 5.5 Peak Runoff(cfs) 6.15 Weighted Curve Number 98 Tame of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 025-Year Page 21 Subbas in:8 Rainfall Intensity Graph 8.5 8 7.5 7 6.5 - 6 5.5 5 4.5 @ q c m Ce 3.5 3 2.5 2 1.5 1 0.5 _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 7 6.5 6 5.5 5 4.5 0 • 3.5 0 c o o_ 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 025-Year Page 22 Channel Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Fait/Bend Additional Initial Flap ID Invert Invert Invert Invert Lop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Channe1-01 389.00 748.00 0.00 743.00 0.00 5.00 1.2900 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 2 Channel-02 1441.00 743.00 0.00 728.00 0.00 15.00 1.0400 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 3 Channel-03 100.00 728.00 0.00 726.00 0.00 2.00 2.0000 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No Post-Development 025-Year Page 23 Channel Results SN Element Peak Time of Design Flow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow Total Time Froude Reported ID Flow PeakFlow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (mm) (ft) (mm) 1 Channe1-01 187.33 0 12:15 2792.46 0.07 3.99 1.62 1.34 0.33 0.00 2 Channel-02 188.63 0 12:18 2512.98 0.08 3.72 6.46 1.40 0.35 0.00 3 Channel-03 277.72 0 12:09 3483.30 0.08 5.17 0.32 1.44 0.36 0.00 Post-Development 025-Year Page 24 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (It) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (cfs) 1 Culvert 88.35 750.04 0.00 748.99 0.99 1.05 1.1900 Rectangular 48.000 84.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 2 OCS-01-Outfall 100.00 735.50 0.00 728.00 0.00 7.50 7.5000 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 3 Pipe-01 108.46 765.02 0.00 762.81 14.81 2.21 2.0400 CIRCULAR 18.000 18.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 4 Pipe-02 138.00 750.00 1.12 749.62 1.62 0.38 0.2800 CIRCULAR 24.000 24.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 5 Pipe-03 409.00 746.58 0.00 745.71 2.71 0.87 0.2100 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 Post-Development 025-Year Page 25 Pipe Results SN Bement Peak Time of DesignFlow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow TotalTime Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Culvert 152.62 0 12:15 355.14 0.43 7.52 0.20 2.90 0.72 0.00 Calculated 2 OCS-01-Outfall 65.13 0 12:08 97.35 0.67 17.52 0.10 1.74 0.71 0.00 Calculated 3 Pipe-Ol 5.28 0 12:00 13.00 0.41 6.52 0.28 0.69 0.47 0.00 Calculated 4 Pipe-02 20.33 0 12:00 10.29 1.98 6.80 0.34 1.81 0.90 0.00 >CAPACITY 5 Pipe-03 25.41 0 12:00 16.40 1.55 5.75 1.19 2.11 0.84 0.00 >CAPACITY Post-Development 025-Year Page 26 Storage Nodes Storage Node:Pond-01 Input Data Invert Elevation(ft) 735.50 Max(Rim)Elevation(ft) 741.50 Max(Rim)Offset(ft) 6.00 Initial Water Elevation(ft) 735.50 Initial Water Depth(ft) 0.00 Ponded Area(ft5) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (It) (ft) (It) (ft) 1 Spillway-Ol Trapezoidal No 740.50 5.00 20.00 1.00 3.33 2 Weir-Ol Rectangular No 738.00 2.50 4.00 2.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (in) (m) (ft) 1 Orifice-01 Side CIRCULAR No 1.00 733.00 0.61 2 Rim-01 Bottom Rectangular No 48.00 48.00 740.50 0.63 Output Summary Results Peak Inflow(cfs) 135.14 Peak Lateral Inflow(cfs) 135.14 PeakOutflow(cfs) 74.35 Peak Ead'iltration Flow Rate(cfm) 0 Max HGLFevation Attained(ft) 740.76 Max HGLDepth Attained(ft) 5.26 Average HGLElevation Attained(ft) 738.11 Average HGLlkpth Attained(ft) 2.61 Time of MaxHGLOccurrence(days hh:mm) 0 12:08 Total Exfiltration Volume(1000-fl3) 0 Total Hooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention lime(sec) 0 Post-Development 025-Year Page 27 Storage Node:Pond-02 Input Data Invert Elevation(ft) 758.00 Max(Rim)Elevation(ft) 762.00 Max(Rim)Offset(ft) 4.00 Initial Water Elevation(ft) 758.00 Initial Water Depth(ft) 0.00 Ponded Area(ft) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-02 Ttapezoidal No 761.00 3.00 20.00 1.00 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (m) (in) (ft) 1 Orifice-02 Side CIRCULAR No 1.00 755.50 0.61 Output Summary Results Peak Inflow(cfs) 6.12 Peak Lateral Inflow(cfs) 6.12 PeakOutflow(cfs) 0.04 Peak Eadiltration Flow Rate(cfm) 0 Max HGLElevation Attained(ft) 759.79 Max HGLDepth Attained(ft) 1.79 Average HGLElevation Attained(ft) 759.12 Average HGLDepth Attained(ft) 1.12 Time of MaxHGLOccurrence(days hh:mm) 1 00:00 Total Exfiltration Volume(1000-00 0 Total Hooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention Time(sec) 0 Post-Development 050-Year Page 1 Project Description File Name 31296.0001-Post.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Tune Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements Qty Rain Gages 1 Subbasins 8 Nodes 11 Junctions 8 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 2 Links 14 Channels 3 Pipes 5 Pumps 0 Orifices 3 Wens 3 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series 1S-50 Intensity inches North Carolina Rowan 50.00 6.46 SCS Type ll24-hr Post-Development 050-Year Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 1.20 484.00 73.57 6.46 3.53 4.24 6.55 0 00:06:00 2 2 49.28 484.00 81.21 6.46 4.33 213.28 181.09 0 00:31:49 3 3 5.87 484.00 67.09 6.46 2.89 16.97 26.05 0 00:06:00 4 4 5.68 484.00 73.92 6.46 3.57 20.26 31.26 0 00:06:00 5 5 20.06 484.00 74.21 6.46 3.60 72.16 109.47 0 00:06:31 6 6 19.13 484.00 94.00 6.46 5.75 110.03 153.94 0 00:06:00 7 7 10.20 484.00 75.10 6.46 3.69 37.62 35.86 0 00:26:22 8 8 0.84 484.00 98.00 6.46 6.22 5.20 6.93 0 00:06:00 Post-Development 050-Year Page 3 Node Summary SN Element Bement Invert Ground/Rim Initial Surcharge Ponded Peak M3XHGL Max Mn Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (It) (fl) (fl) (It) (IP) (cIt) (It) (It) (It) (days hh:mm) (ac-in) (min) 1 Channell Junction 748.00 999.00 748.00 999.00 1.00 221.57 749.41 0.00 249.59 0 00:00 0.00 0.00 2 Channel2 Junction 743.00 999.00 743.00 999.00 0.00 228.14 744.47 0.00 254.53 0 00:00 0.00 0.00 3 OCS-01 Junction 735.50 741.50 735.50 741.50 0.00 76.25 739.47 0.00 2.03 0 00:00 0.00 0.00 4 SiteOutfall Junction 728.00 999.00 728.00 999.00 1.00 354.09 729.62 0.00 269.38 0 00:00 0.00 0.00 5 Subl Junction 765.02 999.00 765.02 999.00 0.00 6.42 765.85 0.00 233.15 0 00:00 0.00 0.00 6 Sub2 Junction 750.04 999.00 750.04 999.00 0.00 178.95 754.65 0.00 244.35 0 00:00 0.00 0.00 7 Sub3 Junction 748.88 757.17 748.88 999.00 1.00 25.30 754.72 0.00 2.45 0 00:00 0.00 0.00 8 Sub4 Junction 746.58 752.95 746.58 999.00 1.00 30.58 751.55 0.00 1.40 0 00:00 0.00 0.00 9 Out-Ol Outfall 726.00 346.85 727.54 10 Pond-01 Storage Node 735.50 741.50 735.50 1.00 153.14 740.99 0.00 0.00 11 Pond-02 Storage Node 758.00 762.00 758.00 1.00 6.90 760.00 0.00 0.00 Post-Development 050-Year Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow PeakFlow PeakFlow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity DesignFlow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 Culvert Pipe Sub2 Channell 88.35 750.04 748.99 1.1900 48.000 0.0150 178.90 355.14 0.50 8.50 3.00 0.75 0.00 Calculated 2 OCS-01-Outfall Pipe OCS-01 SiteOutfall 100.00 735.50 728.00 7.5000 30.000 0.0150 76.28 97.35 0.78 17.67 2.06 0.82 0.00 Calculated 3 Pipe-Ol Pipe Subl Channell 108.46 765.02 762.81 2.0400 18.000 0.0150 6.39 13.00 0.49 6.80 0.78 0.53 0.00 Calculated 4 Pipe-02 Pipe Sub3 Channell 138.00 750.00 749.62 0.2800 24.000 0.0150 25.30 10.29 2.46 8.24 1.88 0.94 0.00>CAPACITY 5 Pipe-03 Pipe Sub4 Channel2 409.00 746.58 745.71 0.2100 30.000 0.0150 30.58 16.40 1.87 6.70 2.19 0.88 0.00>CAPA.CITY 6 Channe1-01 Channel Channell Channel2 389.00 748.00 743.00 1.2900 48.240 0.0320 220.67 2792.46 0.08 4.15 1.43 0.36 0.00 7 Channel-02 Channel Channel2 SiteOutfall 1441.00 743.00 728.00 1.0400 48.240 0.0320 222.97 2512.98 0.09 3.89 1.51 0.38 0.00 8 Channel-03 Channel SiteOutfall Out-Ol 100.00 728.00 726.00 2.0000 48.240 0.0320 346.85 3483.30 0.10 5.45 1.58 0.39 0.00 9 Orifice-01 Orifice Pond-01 OCS-01 735.50 735.50 1.000 0.05 10 Orifice-02 Orifice Pond-02 Channell 758.00 748.00 1.000 0.04 11 Rim-01 Orifice Pond-01 OCS-01 735.50 735.50 48.000 18.17 12 Spillway-0O1 Weir Pond-Ol SiteOutfall 735.50 728.00 24.07 13 Spillway-02 Weir Pond-02 Channell 758.00 748.00 0.00 14 Weir-01 Weir Pond-01 OCS-01 735.50 735.50 61.04 Post-Development 050-Year Page 5 Subbas in Hydrology Subbasin:1 Input Data Area(ac) 1.2 Peak Rate Factor 484 Weighted Curve Number 73.57 Rain Gage ID Rain Gage-01 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 0.52 C 73 >75%grass cover,Good 0.68 C 74 Composite Area&Weighted CN 1.2 73.57 Time ofConcentration TOC Ivkthod:SCS TR 55 Sheet Flow Equation: Tc=(0.007*((n*If)^0.8))/((P^0.5)*(Sf`0.4)) Where: Tc=Time of Concentration(hr) n =Ivlanning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(Sf`0.5)(unpaved surface) V=20.3282*(Sf`0.5)(paved surface) V=15.0*(Sf`0.5)(grassed waterway surface) V=10.0*(Sf`0.5)(nearlybare&untffied surface) V=9.0*(S14.5)(cultivated straight rows surface) V=7.0*(S14.5)(short grass pasture surface) V=5.0*(S14.5)(woodland surface) V=2.5*(Sl"0.5)(forest w/heavy litter surface) Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(SF 0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Rf=Flow Length(It) R=Hydraulic Radius(ft) Pq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Ivhnning's roughness User-Defined'IOC override(minutes):5 Subbasin RunoffRe sults Total Rainfall(in) 6.46 Total Runoff(in) 3.53 Peak R unoff(cfs) 6.55 Post-Development 050-Year Page 6 Weighted Curve Number 73.57 Time of Concentration(days hh:mm:ss) 000:05:00 Post-Development 050-Year Page 7 Subbas in:1 Rainfall Intensity Graph 9 8.5 8 7.5 7_ 6.5 6 5.5 s 5 c m 4.5 c 4_ 3.5 3 2.5 2 1.5 0.5 i 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 7 6.5 6 5.5 5 4.5 0 3.5 0 c o 0_ 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 050-Year Page 8 Subbasin:2 Input Data Area(ac) 49.28 Peak Rate Factor 484 Weighted Curve Number 81.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number pond 5.34 - 99 <50%grass cover,Poor 0.86 B 79 >75%grass cover,Good 16.97 C 74 Pavedparking&roofs 2.16 C 98 Woods,Fair 3.39 C 73 Pasture,grassland,or range,Fair 1.55 D 84 Brush,Fair 3.32 D 77 Paved parking&roofs 0.6 D 98 Woods,Fair 0.54 D 79 >75%grass cover,Good 11.06 D 80 Paved parking&roofs 2.38 C 98 Brush,Fair 1.12 D 77 Composite Area&Weighted CN 49.29 81.21 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flowlength(ft): 100 0 0 Slope(%): 3 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.08 0 0 Computed Flow Time(min): 20.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 712.71 0 0 Slope(%): 3 0 0 Surface Type: Grass pasture Unpaved Unpaved Velocity(ft/sec): 1.21 0 0 Computed Flow Time(min): 9.82 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0 0 Flowlength(ft): 1410 0 0 Channel Slope(%): 2 0 0 Cross Section Area(ft'): tO 0 0 Wetted Perimeter(ft): 2 0 0 Velocity(ft/sec): 20.54 0 0 Computed Flow Time(min): 1.14 0 0 Total TOC(min) 31.83 Subbasin RunoffResults Total Rainfall(in) 6.46 Total Runoff(in) 4.33 Peak Runoff(cfs) 181.09 Weighted Curve Number 81.21 Time of Concentration(days hh:mm:ss) 0 00:31:50 Post-Development 050-Year Page 9 Subbasin:2 Rainfall Intensity Graph 9.5 9- 8.5 8 7.5 7 6.5 - 6- 5.5 5 4.5 c 4 3.5 3 2.5 2 1.5 0.5 L r 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 190 180 - 170 160- 150- 140- 130- 120- CI) 100 - - c 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 050-Year Page 10 Subbasin:3 Input Data Area(ac) 5.87 Peak Rate Factor 484 Weighted Curve Number 67.09 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 1.18 C 74 Paved parking&roofs 0.13 C 98 Woods,Fair 1.43 C 73 Woods,Good 0.1 D 77 Woods,Fair 3.04 B 60 Composite Area&Weighted CN 5.88 67.09 Time of Concentration User-Defined TOC override(minutes):5.00 Subbasin RunoffRe sults Total Rainfall(in) 6.46 Total Runoff(in) 2.89 Peak Runoff(cfs) 26.05 Weighted Curve Number 67.09 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 050-Year Page 11 Subbasin:3 Rainfall Intensity Graph 9.5 9- 8.5 8 7.5 7 6.5 - 6- • 5.5 5 • 4.5 c 4 3.5 3 2.5 2 1.5 0.5 I, 7— I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 27 26 25 24 23 22 21 20 19 18 17 16 5 15 14 O 13 • 12 11 10 9 8 7 6 5 4 3 2 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 050-Year Page 12 Subbasin:4 Input Data Area(ac) 5.68 Peak Rate Factor 484 Weighted Curve Number 73.92 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.09 B 60 Woods,Fair 2.3 C 73 Paved parking&roofs 1.29 D 98 Composite Area&Weighted CN 5.68 73.92 Time of Concentration User-Defined TOC override(minutes):5 Subbasin RunoffRe sults Total Rainfall(in) 6.46 Total Runoff(in) 3.57 PeakRunoff(cfs) 31.26 Weighted Curve Number 73.92 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 050-Year Page 13 Subbasin:4 Rainfall Intensity Graph 9.5 9- 8.5 8 7.5 7 6.5 - 6- 5.5 • 5 • 4.5 c 4 3.5 -J 3 2.5 2 1.5 1111\- • 0.5 L 7- I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 34 32- 30_ 28 26 24 22 • 20 m • 18 c 16 • 14 12 10 8 6 4 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 050-Year Page 14 Subbasin:5 Input Data Area(ac) 20.06 Peak Rate Factor 484 Weighted Curve Number 74.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 6.48 D 79 Woods,Fair 7.67 C 73 Woods,Fair 1.38 B 60 Woods&grass combination,Good 0.96 C 72 3.57 - 74.21 Composite Area&Weighted CN 20.06 74.21 Time of Concentration User-Defined TOC override(minutes):6.52 Subbasin RunoffResults Total Rainfall(in) 6.46 Total Runoff(in) 3.6 Peak Runoff(cfs) 109.47 Weighted Curve Number 74.21 Time of Concentration(days hh:mm:ss) 0 00:06:31 Post-Development 050-Year Page 15 Subbasin:5 Rainfall Intensity Graph 9.5 9- 8.5 8 7.5 7 6.5 - 6- 5.5 5 4.5 c 4 3.5 3 2.5 2 1.5 7— I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 115 110 105: 100 95- 90 85 80: 75 70 m 65- 60 4g 55 K 50 45 40- 35 30 25- 20- 15- 10- 5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 050-Year Page 16 Subbasin:6 Input Data Area(ac) 19.13 Peak Rate Factor 484 Weighted Curve Number 94 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Urban commercial,85%imp 19.13 C 94 Composite Area&Weighted CN 19.13 94 Time ofConcentration User-Defined'IOC override(minutes):5.00 Subbasin RunoffRe sults Total Rainfall(in) 6.46 Total Runoff(in) 5.75 Peak Runoff(cfs) 153.94 Weighted Curve Number 94 Tame of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 050-Year Page 17 Subbasin:6 Rainfall Intensity Graph 9.5 9- 8.5 8 7.5 7 6.5 - 6- 5.5 5 4.5 c 4 3.5 -J 3 2.5 2 1.5 0.5 -L I 7- I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 170 160 150- 140 130 120 110 100 w - 0 90 c 80 70 60 50 40 30 20 10 • ITT 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 050-Year Page 18 Subbasin:7 Input Data Area(ac) 10.2 Peak Rate Factor 484 Weighted Curve Number 75.1 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.06 C 73 Woods,Fair 2.65 D 79 >75%grass cover,Good 5.49 C 74 Composite Area&Weighted CN 10.2 75.1 Time of Concentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 Computed Flow Time(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nbnning's Roughness: 0.03 0 0 Flow Length(ft): 459 0 0 Channel Slope(%): 2.396 0 0 Cross Section Area(ft2): 8.3 0 0 Wetted Perimeter(ft): 13.5 0 0 Velocity(ft/sec): 5.56 0 0 Computed Flow Time(min): 1.38 0 0 Total TOC(min) 26.37 Subbasin RunoffRe sults Total Rainfall(in) 6.46 Total Runoff(in) 3.69 Peak l unoff(cfs) 35.86 Weighted Curve Number 75.1 Time of Concentration(days hh:mm:ss) 0 00:26:22 Post-Development 050-Year Page 19 Subbasin:7 Rainfall Intensity Graph 9.5 9- 8.5 8 7.5 7 6.5 - 6- 5.5 5 4.5 c 4 3.5 3 2.5 2 1.5 0.5 L 7— I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 38 36 34 32- 30- 28- 26- 24- 22 w 20 c 18- c . 12 10 8 6 4 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 050-Year Page 20 Subbasin:8 Input Data Area(ac) 0.84 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.84 C 98 Composite Area&Weighted CN 0.84 98 Time ofConcentration User-Defined'IOC override(minutes):5 Subbasin RunoffRe sults Total Rainfall(in) 6.46 Total Runoff(in) 6.22 Peak Runoff(cfs) 6.93 Weighted Curve Number 98 Tame of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 050-Year Page 21 Subbasin:8 Rainfall Intensity Graph 9.5 9- 8.5 8 7.5 7 6.5 - 6- 5.5 5 4.5 c 4 3.5 3 2.5 2 1.5 0.5 L 7— I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 7.5 7 6.5 6 5.5 5 4.5 w - 4 c 3.5 3_ 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 050-Year Page 22 Channel Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Fait/Bend Additional Initial Flap ID Invert Invert Invert Invert Lop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Channe1-01 389.00 748.00 0.00 743.00 0.00 5.00 1.2900 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 2 Channel-02 1441.00 743.00 0.00 728.00 0.00 15.00 1.0400 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 3 Channel-03 100.00 728.00 0.00 726.00 0.00 2.00 2.0000 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No Post-Development 050-Year Page 23 Channel Results SN Element Peak Time of Design Flow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow Total Time Froude Reported ID Flow PeakFlow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Channe1-01 220.67 0 12:15 2792.46 0.08 4.15 1.56 1.43 0.36 0.00 2 Channel-02 222.97 0 12:17 2512.98 0.09 3.89 6.17 1.51 0.38 0.00 3 Channel-03 346.85 0 12:09 3483.30 0.10 5.45 0.31 1.58 0.39 0.00 Post-Development 050-Year Page 24 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (It) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (cfs) 1 Culvert 88.35 750.04 0.00 748.99 0.99 1.05 1.1900 Rectangular 48.000 84.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 2 OCS-01-Outfall 100.00 735.50 0.00 728.00 0.00 7.50 7.5000 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 3 Pipe-01 108.46 765.02 0.00 762.81 14.81 2.21 2.0400 CIRCULAR 18.000 18.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 4 Pipe-02 138.00 750.00 1.12 749.62 1.62 0.38 0.2800 CIRCULAR 24.000 24.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 5 Pipe-03 409.00 746.58 0.00 745.71 2.71 0.87 0.2100 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 Post-Development 050-Year Page 25 Pipe Results SN Bement Peak Time of DesignFlow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Culvert 178.90 0 12:15 355.14 0.50 8.50 0.17 3.00 0.75 0.00 Calculated 2 OCS-01-Outfall 76.28 0 12:07 97.35 0.78 17.67 0.09 2.06 0.82 0.00 Calculated 3 Pipe-Ol 6.39 0 12:00 13.00 0.49 6.80 0.27 0.78 0.53 0.00 Calculated 4 Pipe-02 25.30 0 12:00 10.29 2.46 8.24 0.28 1.88 0.94 0.00 >CAPACITY 5 Pipe-03 30.58 0 12:00 16.40 1.87 6.70 1.02 2.19 0.88 0.00 >CAPACITY Post-Development 050-Year Page 26 Storage Nodes Storage Node:Pond-01 Input Data Invert Elevation(ft) 735.50 Max(Rim)Elevation(ft) 741.50 Max(Rim)Offset(ft) 6.00 Initial Water Elevation(ft) 735.50 Initial Water Depth(ft) 0.00 Ponded Area(ft5) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (It) (ft) 1 Spillway-Ol Trapezoidal No 740.50 5.00 20.00 1.00 3.33 2 Weir-Ol Rectangular No 738.00 2.50 4.00 2.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (in) (m) (ft) 1 Orifice-01 Side CIRCULAR No 1.00 733.00 0.61 2 Rim-01 Bottom Rectangular No 48.00 48.00 740.50 0.63 Output Summary Results Peak Inflow(cfs) 153.14 Peak Lateral Inflow(cfs) 153.14 PeakOutflow(cfs) 100.32 Peak Ead'iltration Flow Rate(cfm) 0 Max HGLFevation Attained(ft) 740.99 Max HGLDepth Attained(ft) 5.49 Average HGLElevation Attained(ft) 738.23 Average HGLDepth Attained(ft) 2.73 Time of MaxHGLOccurrence(days hh:mm) 0 12:06 Total Exfiltration Volume(1000-ft3) 0 Total Hooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention lime(sec) 0 Post-Development 050-Year Page 27 Storage Node:Pond-02 Input Data Invert Elevation(ft) 758.00 Max(Rim)Elevation(ft) 762.00 Max(Rim)Offset(ft) 4.00 Initial Water Elevation(ft) 758.00 Initial Water Depth(ft) 0.00 Ponded Area(ft) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (ft) (ft) 1 Spillway-02 Ttapezoidal No 761.00 3.00 20.00 1.00 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (m) (in) (ft) 1 Orifice-02 Side CIRCULAR No 1.00 755.50 0.61 Output Summary Results Peak Inflow(cfs) 6.9 Peak Lateral Inflow(cfs) 6.9 PeakOutflow(cfs) 0.04 Peak Eadiltration Flow Rate(cfm) 0 Max HGLElevation Attained(ft) 760 Max HGLDepth Attained(ft) 2 Average HGLElevation Attained(ft) 759.26 Average HGLDepth Attained(ft) 1.26 Time of MaxHGLOccurrence(days hh:mm) 1 00:00 Total Exfiltration Volume(1000-00 0 Total Hooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention Time(sec) 0 Post-Development 100-Year Page 1 Project Description File Name 31296.0001-Post.SPF Project Options Flow Units CFS Elevation Type Elevation HydrologyMethod SCS TR 55 Time of Concentration('IOC)Ivvthod SCS TR 55 link Routing Ivlthod Hydrodynamic Enable OwrflowPonding at Nodes YES Skip Steady State Analysis Time Periods NO Analysis Options Start Analysis On 00:00:00 0:00:00 End Analysis On 00:00:00 0:00:00 Start Reporting On 00:00:00 0:00:00 Antecedent DryDays 0 days Runoff(Dry Weather)Time Step 0 01:00:00 days hh:mm:ss Runoff(Wet Weather)Tune Step 0 00:05:00 days hh:mm:ss Reporting lime Step 0 00:05:00 days hh:mm:ss Routing Time Step 30 seconds Number of Elements Qty Rain Gages 1 Subbasins 8 Nodes 11 Junctions 8 Outfalls 1 Flow Diversions 0 Inlets 0 Storage Nodes 2 Links 14 Channels 3 Pipes 5 Pumps 0 Orifices 3 Wens 3 Outlets 0 Pollutants 0 Land Uses 0 Rainfall Details SN Rain Gage Data Data Source Rainfall Rain State County Return Rainfall Rainfall ID Source ID Type Units Period Depth Distribution (years) (inches) 49 Time Series 1S-100 Intensity inches North Carolina Rowan 100.00 7.20 SCS Type II24-hr Post-Development 100-Year Page 2 Subbasin Summary SN Subbasin Area PeakRate Weighted Total Total Total Peak Time of ID Factor Curve Rainfall Runoff Runoff Runoff Concentration Number Volume (ac) (in) (in) (ac-in) (cfs) (days hh:mm:ss) 1 1 1.20 484.00 73.57 7.20 4.17 5.00 7.72 0 00:06:00 2 2 49.28 484.00 81.21 7.20 5.02 247.14 208.95 0 00:31:49 3 3 5.87 484.00 67.09 7.20 3.48 20.41 31.42 0 00:06:00 4 4 5.68 484.00 73.92 7.20 4.21 23.90 36.80 0 00:06:00 5 5 20.06 484.00 74.21 7.20 4.24 85.06 128.79 0 00:06:31 6 6 19.13 484.00 94.00 7.20 6.49 124.09 172.59 0 00:06:00 7 7 10.20 484.00 75.10 7.20 4.34 44.24 42.18 0 00:26:22 8 8 0.84 484.00 98.00 7.20 6.96 5.82 7.73 0 00:06:00 Post-Development 100-Year Page 3 Node Summary SN Element Bement Invert Ground/Rim Initial Surcharge Ponded Peak M3XHGL Max Mn Time of Total Total Time ID Type Elevation (Max) Water Elevation Area Inflow Elevation Surcharge Freeboard Peak Flooded Flooded Elevation Elevation Attained Depth Attained Flooding Volume Attained Occurrence (It) (fl) (fl) (It) (IP) (cIt) (It) (It) (It) (days hh:mm) (ac-in) (min) 1 Channell Junction 748.00 999.00 748.00 999.00 1.00 256.82 749.50 0.00 249.50 0 00:00 0.00 0.00 2 Channel2 Junction 743.00 999.00 743.00 999.00 0.00 264.58 744.57 0.00 254.43 0 00:00 0.00 0.00 3 OCS-01 Junction 735.50 741.50 735.50 741.50 0.00 79.61 740.09 0.00 1.41 0 00:00 0.00 0.00 4 SiteOutfall Junction 728.00 999.00 728.00 999.00 1.00 420.35 729.75 0.00 269.25 0 00:00 0.00 0.00 5 Subl Junction 765.02 999.00 765.02 999.00 0.00 7.59 765.95 0.00 233.05 0 00:00 0.00 0.00 6 Sub2 Junction 750.04 999.00 750.04 999.00 0.00 206.58 755.16 0.00 243.84 0 00:00 0.00 0.00 7 Sub3 Junction 748.88 757.17 748.88 999.00 1.00 30.64 756.31 0.00 0.86 0 00:00 0.00 0.00 8 Sub4 Junction 746.58 752.95 746.58 999.00 1.00 36.20 752.94 0.00 0.01 0 00:00 0.00 0.00 9 Out-Ol Outfall 726.00 411.90 727.66 10 Pond-01 Storage Node 735.50 741.50 735.50 1.00 171.68 741.19 0.00 0.00 11 Pond-02 Storage Node 758.00 762.00 758.00 1.00 7.69 760.20 0.00 0.00 Post-Development 100-Year Page 4 link Summary SNElement Element From To(Outlet) Length Inlet Outlet Average Diameter or Manning's Peak Design Flow Peak Flow/ Peak Flow PeakFlow PeakFlow Total Time Reported ID Type (Inlet) Node Invert Invert Slope Height Roughness Flow Capacity DesignFlow Velocity Depth Depth/ Surcharged Condition Node Elevation Elevation Ratio Total Depth Ratio (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/sec) (ft) (min) 1 Culvert Pipe Sub2 Channell 88.35 750.04 748.99 1.1900 48.000 0.0150 206.58 355.14 0.58 9.48 3.11 0.78 0.00 Calculated 2 OCS-01-Outfall Pipe OCS-01 SiteOutfall 100.00 735.50 728.00 7.5000 30.000 0.0150 79.64 97.35 0.82 17.97 2.12 0.85 0.00 Calculated 3 Pipe-01 Pipe Subl Channell 108.46 765.02 762.81 2.0400 18.000 0.0150 7.56 13.00 0.58 7.04 0.87 0.59 0.00 Calculated 4 Pipe-02 Pipe Sub3 Channell 138.00 750.00 749.62 0.2800 24.000 0.0150 30.63 10.29 2.98 9.85 1.93 0.97 0.00>CAPACITY 5 Pipe-03 Pipe Sub4 Channel2 409.00 746.58 745.71 0.2100 30.000 0.0150 36.20 16.40 2.21 7.73 2.27 0.91 0.00>CAPA.CITY 6 Channe1-01 Channel Channell Channel2 389.00 748.00 743.00 1.2900 48.240 0.0320 255.80 2792.46 0.09 4.30 1.53 0.38 0.00 7 Channel-02 Channel Channel2 SiteOutfall 1441.00 743.00 728.00 1.0400 48.240 0.0320 259.24 2512.98 0.10 4.05 1.62 0.40 0.00 8 Channel-03 Channel SiteOutfall Out-01 100.00 728.00 726.00 2.0000 48.240 0.0320 411.90 3483.30 0.12 5.66 1.70 0.42 0.00 9 Orifice-01 Orifice Pond-01 OCS-01 735.50 735.50 1.000 0.05 10 Orifice-02 Orifice Pond-02 Channell 758.00 748.00 1.000 0.04 11 Rim-01 Orifice Pond-01 OCS-01 735.50 735.50 48.000 30.24 12 Spillway-0O1 Weir Pond-Ol SiteOutfall 735.50 728.00 40.93 13 Spillway-02 Weir Pond-02 Channell 758.00 748.00 0.00 14 Weir-01 Weir Pond-01 OCS-01 735.50 735.50 61.30 Post-Development 100-Year Page 5 Subbasin Hydrology Subbasin:1 Input Data Area(ac) 1.2 Peak Rate Factor 484 Weighted Curve Number 73.57 Rain Gage ID Rain Gage-01 Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 0.52 C 73 >75%grass cover,Good 0.68 C 74 Composite Area&Weighted CN 1.2 73.57 Time ofConcentration TOC Ivkthod:SCS TR 55 Sheet Flow Equation: Tc=(0.007*((n*If)^0.8))/((P^0.5)*(Sf`0.4)) Where: Tc=Time of Concentration(hr) n =Ivlanning's roughness Lf=Flow Length(ft) P =2 yr,24 hr Rainfall(inches) Sf=Slope(ft/ft) Shallow Concentrated Flow Equation: V=16.1345*(Sf`0.5)(unpaved surface) V=20.3282*(Sf`0.5)(paved surface) V=15.0*(Sf`0.5)(grassed waterway surface) V=10.0*(Sf`0.5)(nearlybare&untffied surface) V=9.0*(S14.5)(cultivated straight rows surface) V=7.0*(S14.5)(short grass pasture surface) V=5.0*(S14.5)(woodland surface) V=2.5*(Sl"0.5)(forest w/heavy litter surface) Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Lf=Flow Length(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) Channel Flow Equation: V=(1.49*(R^(2/3))*(SF 0.5))/n R=Aq/Wp Tc=(If/V)/(3600 sec/hr) Where: Tc=Time of Concentration(hr) Rf=Flow Length(It) R=Hydraulic Radius(ft) Pq=Flow Area(ft') Wp=Wetted Perimeter(ft) V=Velocity(ft/sec) Sf=Slope(ft/ft) n=Ivhnning's roughness User-Defined'IOC override(minutes):5 Subbasin RunoffResults Total Rainfall(in) 7.2 Total Runoff(in) 4.17 Peak R unoff(cfs) 7.72 Post-Development 100-Year Page 6 Weighted Curve Number 73.57 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 100-Year Page 7 Subbas in:1 Rainfall Intensity Graph 10 9.5 9 8.5 8 7.5 7 6.5 6 1-2 • 5.5 5 m 4.5 • 4 3.5 3 2.5 2 1.5 1 0.5 - L J • I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 8.5 8- 7.5- 7 6.5 6 5.5 • w - 4.5 c 4 z 3.5 3 2.5 2 1.5 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 100-Year Page 8 Subbasin:2 Input Data Area(ac) 49.28 Peak Rate Factor 484 Weighted Curve Number 81.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number pond 5.34 - 99 <50%grass cover,Poor 0.86 B 79 >75%grass cover,Good 16.97 C 74 Pavedparking&roofs 2.16 C 98 Woods,Fair 3.39 C 73 Pasture,grassland,or range,Fair 1.55 D 84 Brush,Fair 3.32 D 77 Paved parking&roofs 0.6 D 98 Woods,Fair 0.54 D 79 >75%grass cover,Good 11.06 D 80 Paved parking&roofs 2.38 C 98 Brush,Fair 1.12 D 77 Composite Area&Weighted CN 49.29 81.21 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flowlength(ft): 100 0 0 Slope(%): 3 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.08 0 0 Computed Flow Time(min): 20.87 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow length(ft): 712.71 0 0 Slope(%): 3 0 0 Surface Type: Grass pasture Unpaved Unpaved Velocity(ft/sec): 1.21 0 0 Computed Flow Time(min): 9.82 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Manning's Roughness: 0.03 0 0 Flowlength(ft): 1410 0 0 Channel Slope(%): 2 0 0 Cross Section Area(ft'): tO 0 0 Wetted Perimeter(ft): 2 0 0 Velocity(ft/sec): 20.54 0 0 Computed Flow Time(min): 1.14 0 0 Total TOC(min) 31.83 Subbasin RunoffResults Total Rainfall(in) 7.2 Total Runoff(in) 5.02 Peak Runoff(cfs) 208.95 Weighted Curve Number 81.21 Time of Concentration(days hh:mm:ss) 0 00:31:50 Post-Development 100-Year Page 9 Subbasin:2 Rainfall Intensity Graph 10.5 10 9.5 9 8.5 8 7.5 7 6.5 t 6 c 5.5 m 5 c 4.5 4 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 220 210: 200- 190 180 170 160 150 140 130 120 o 110 0 S 100 90 80- 70 60 50- 40- 30 20 10- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 100-Year Page 10 Subbasin:3 Input Data Area(ac) 5.87 Peak Rate Factor 484 Weighted Curve Number 67.09 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number >75%grass cover,Good 1.18 C 74 Paved parking&roofs 0.13 C 98 Woods,Fair 1.43 C 73 Woods,Good 0.1 D 77 Woods,Fair 3.04 B 60 Composite Area&Weighted CN 5.88 67.09 Time ofConcentration User-Defined TOC override(minutes):5.00 Subbasin RunoffRe sults Total Rainfall(in) 7.2 Total Runoff(in) 3.48 Peak Runoff(cfs) 31.42 Weighted Curve Number 67.09 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 100-Year Page 11 Subbasin:3 Rainfall Intensity Graph 10.5 10 9.5 9 8.5 8 7.5 7 6.5 t 6 c 5.5 m 5 c 4.5 4 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 34 32- 30- 28 26 24 22 • 20 m 18 c 16 14 12 10 8 6 4 2 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 100-Year Page 12 Subbasin:4 Input Data Area(ac) 5.68 Peak Rate Factor 484 Weighted Curve Number 73.92 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.09 B 60 Woods,Fair 2.3 C 73 Paved parking&roofs 1.29 D 98 Composite Area&Weighted CN 5.68 73.92 Time of Concentration User-Defined TOC override(minutes):5 Subbasin RunoffResults Total Rainfall(in) 7.2 TotalRunoff(in) 4.21 PeakRunoff(cfs) 36.8 Weighted Curve Number 73.92 Time of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 100-Year Page 13 Subbasin:4 Rainfall Intensity Graph 10.5 10 9.5 9 8.5 8 7.5 7 6.5 t 6 c 5.5 2 5 c 4.5 4 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 40 38- 36- 34- 32 30 28 26- 24 22- o 20 o o 18 16- — 14 12- 10- 8 6- 4_ 2- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 100-Year Page 14 Subbasin:5 Input Data Area(ac) 20.06 Peak Rate Factor 484 Weighted Curve Number 74.21 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 6.48 D 79 Woods,Fair 7.67 C 73 Woods,Fair 1.38 B 60 Woods&grass combination,Good 0.96 C 72 3.57 - 74.21 Composite Area&Weighted CN 20.06 74.21 Time of Concentration User-Defined TOC override(minutes):6.52 Subbasin RunoffResults Total Rainfall(in) 7.2 Total Runoff(in) 4.24 Peak Runoff(cfs) 128.79 Weighted Curve Number 74.21 Time of Concentration(days hh:mm:ss) 0 00:06:31 Post-Development 100-Year Page 15 Subbasin:5 Rainfall Intensity Graph 10.5 10 9.5 9 8.5 8 7.5 7 6.5 t 6 c 5.5 m 5 - 4.5 4 3.5 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 130 125 120 115 110 105 100 95 90 85 80 75 w 0 70 65 0 S 60 K 55 50 45 40 35 30 25 20 15 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 100-Year Page 16 Subbasin:6 Input Data Area(ac) 19.13 Peak Rate Factor 484 Weighted Curve Number 94 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Urban commercial,85%imp 19.13 C 94 Composite Area&Weighted CN 19.13 94 Time ofConcentration User-Defined'IOC override(minutes):5.00 Subbasin RunoffRe sults Total Rainfall(in) 7.2 Total Runoff(in) 6.49 Peak Runoff(cfs) 172.59 Weighted Curve Number 94 lime of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 100-Year Page 17 Subbasin:6 Rainfall Intensity Graph 10.5 10 9.5 9 8.5 8 7.5 7 6.5 t 6 c 5.5 m 5 c - 4 3.5 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 190 180 - 170 160- 150- 140- 130- 120- CI) 100 - - c 90 - K 80_ 70- 60 50 40 30 20 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 100-Year Page 18 Subbasin:7 Input Data Area(ac) 10.2 Peak Rate Factor 484 Weighted Curve Number 75.1 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Woods,Fair 2.06 C 73 Woods,Fair 2.65 D 79 >75%grass cover,Good 5.49 C 74 Composite Area&Weighted CN 10.2 75.1 Time ofConcentration Subarea Subarea Subarea Sheet Flow Computations A B C Manning's Roughness: 0.5 0 0 Flow Length(ft): 100 0 0 Slope(%): 5.25 0 0 2 yr,24 hr Rainfall(in): 3.5 0 0 Velocity(ft/sec): 0.1 0 0 Computed Flow Time(min): 16.69 0 0 Subarea Subarea Subarea Shallow Concentrated Flow Computations A B C Flow Length(ft): 374 0 0 Slope(%): 2.27 0 0 Surface Type: Woodland Unpaved Unpaved Velocity(ft/sec): 0.75 0 0 Computed Flow Time(min): 8.31 0 0 Subarea Subarea Subarea Channel Flow Computations A B C Nbnning's Roughness: 0.03 0 0 Flow Length(ft): 459 0 0 Channel Slope(%): 2.396 0 0 Cross Section Area(ft2): 8.3 0 0 Wetted Perimeter(ft): 13.5 0 0 Velocity(ft/sec): 5.56 0 0 Computed Flow lime(min): 1.38 0 0 Total TOC(min) 26.37 Subbasin RunoffRe sults Total Rainfall(in) 7.2 Total Runoff(in) 4.34 Peak l unoff(cfs) 42.18 Weighted Curve Number 75.1 Time of Concentration(days hh:mm:ss) 0 00:26:22 Post-Development 100-Year Page 19 Subbasin:7 Rainfall Intensity Graph 10.5 10 9.5 9 8.5 8 7.5 7 6.5 t 6 c 5.5 m 5 c - 4.5 4 3.5 . 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 44 42: 40- 38 36 34 32 30 28 26 U 24 22 o 7 20 18 16- 14 12 10- 8- 6 4 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 100-Year Page 20 Subbasin:8 Input Data Area(ac) 0.84 Peak Rate Factor 484 Weighted Curve Number 98 Rain Gage ID Rain Gage-Ol Composite Curve Number 32 Area Soil Curve Soil/Surface Description (acres) Group Number Paved parking&roofs 0.84 C 98 Composite Area&Weighted CN 0.84 98 Time of Concentration User-Defined'IOC override(minutes):5 Subbasin RunoffResults Total Rainfall(in) 7.2 Total Runoff(in) 6.96 Peak Runoff(cfs) 7.73 Weighted Curve Number 98 lime of Concentration(days hh:mm:ss) 0 00:05:00 Post-Development 100-Year Page 21 Subbasin:8 Rainfall Intensity Graph 10.5 10 9.5 9 8.5 8 7.5 7 6.5 t 6 c 5.5 2 5 c - 4.5 4 3 2.5 2 1.5 1 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Runoff Hydrograph 8.5 8- 7.5- 7 6.5 6 5.5 • 46 C 4.5 c 4 3.5 3 2.5 2 1.5 0.5 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Time(hrs) Post-Development 100-Year Page 22 Channel Input SN Element Length Inlet Inlet Outlet Outlet Total Average Shape Height Width Manning's Entrance Fait/Bend Additional Initial Flap ID Invert Invert Invert Invert Lop Slope Roughness Losses Losses Losses Flow Gate Elevation Offset Elevation Offset (ft) (ft) (ft) (ft) (ft) (ft) (%) (ft) (ft) (cfs) 1 Channe1-01 389.00 748.00 0.00 743.00 0.00 5.00 1.2900 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 2 Channel-02 1441.00 743.00 0.00 728.00 0.00 15.00 1.0400 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No 3 Channel-03 100.00 728.00 0.00 726.00 0.00 2.00 2.0000 User-Defined 4.020 165.160 0.0320 0.5000 0.5000 0.0000 0.00 No Post-Development 100-Year Page 23 Channel Results SN Element Peak Time of Design Flow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow Total Time Froude Reported ID Flow PeakFlow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (mm) (ft) (mm) 1 Channe1-01 255.80 0 12:15 2792.46 0.09 4.30 1.51 1.53 0.38 0.00 2 Channel-02 259.24 0 12:17 2512.98 0.10 4.05 5.93 1.62 0.40 0.00 3 Channel-03 411.90 0 12:08 3483.30 0.12 5.66 0.29 1.70 0.42 0.00 Post-Development 100-Year Page 24 Pipe Input SN Element Length Inlet Inlet Outlet Outlet Total Average Pipe Pipe Pipe Manning's Entrance Exit/Bend Additional Initial Flap No.of ID Invert Invert Invert Invert Drop Slope Shape Diameteror Width Roughness Losses Losses Losses Flow Gate Barrels Elevation Offset Elevation Offset Height (It) (ft) (ft) (ft) (ft) (ft) (%) (in) (m) (cfs) 1 Culvert 88.35 750.04 0.00 748.99 0.99 1.05 1.1900 Rectangular 48.000 84.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 2 OCS-01-Outfall 100.00 735.50 0.00 728.00 0.00 7.50 7.5000 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 3 Pipe-01 108.46 765.02 0.00 762.81 14.81 2.21 2.0400 CIRCULAR 18.000 18.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 4 Pipe-02 138.00 750.00 1.12 749.62 1.62 0.38 0.2800 CIRCULAR 24.000 24.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 5 Pipe-03 409.00 746.58 0.00 745.71 2.71 0.87 0.2100 CIRCULAR 30.000 30.000 0.0150 0.5000 0.5000 0.0000 0.00 No 1 Post-Development 100-Year Page 25 Pipe Results SN Bement Peak Time of DesignFlow PeakFlow/ PeakFlow Travel PeakFlow PeakFlow Total Time Froude Reported ID Flow Peak Flow Capacity Design Flow Velocity Time Depth Depth/ Surcharged Number Condition Occurrence Ratio Total Depth Ratio (cfs) (days hh:mm) (cfs) (ft/sec) (min) (ft) (min) 1 Culvert 206.58 0 12:15 355.14 0.58 9.48 0.16 3.11 0.78 0.00 Calculated 2 OCS-01-Outfall 79.64 0 12:06 97.35 0.82 17.97 0.09 2.12 0.85 0.00 Calculated 3 Pipe-Ol 7.56 0 12:00 13.00 0.58 7.04 0.26 0.87 0.59 0.00 Calculated 4 Pipe-02 30.63 0 12:00 10.29 2.98 9.85 0.23 1.93 0.97 0.00 >CAPACITY 5 Pipe-03 36.20 0 12:00 16.40 2.21 7.73 0.88 2.27 0.91 0.00 >CAPACITY Post-Development 100-Year Page 26 Storage Nodes Storage Node:Pond-01 Input Data Invert Elevation(ft) 735.50 Max(Rim)Elevation(ft) 741.50 Max(Rim)Offset(ft) 6.00 Initial Water Elevation(ft) 735.50 Initial Water Depth(ft) 0.00 Ponded Area(ft5) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (It) (ft) 1 Spillway-Ol Trapezoidal No 740.50 5.00 20.00 1.00 3.33 2 Weir-Ol Rectangular No 738.00 2.50 4.00 2.50 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (in) (m) (ft) 1 Orifice-01 Side CIRCULAR No 1.00 733.00 0.61 2 Rim-01 Bottom Rectangular No 48.00 48.00 740.50 0.63 Output Summary Results Peak Inflow(cfs) 171.68 Peak Lateral Inflow(cfs) 171.68 PeakOutflow(cfs) 120.54 Peak Ead'iltration Flow Rate(cfm) 0 Max HGLFevation Attained(ft) 741.19 Max HGLDepth Attained(ft) 5.69 Average HGLElevation Attained(ft) 738.34 Average HGLDepth Attained(ft) 2.84 Time of MaxHGLOccurrence(days hh:mm) 0 12:06 Total Exfiltration Volume(1000-ft3) 0 Total Flooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention lime(sec) 0 Post-Development 100-Year Page 27 Storage Node:Pond-02 Input Data Invert Elevation(ft) 758.00 Max(Rim)Elevation(ft) 762.00 Max(Rim)Offset(ft) 4.00 Initial Water Elevation(ft) 758.00 Initial Water Depth(ft) 0.00 Ponded Area(ft) 1.00 Evaporation Loss 0.00 Outflow Weirs SN Element Weir Flap Crest Crest Length Weir Total Discharge ID Type Gate Elevation Offset Height Coefficient (ft) (ft) (It) (ft) 1 Spillway-02 Ttapezoidal No 761.00 3.00 20.00 1.00 3.33 Outflow Orifices SN Element Orifice Orifice Flap Circular Rectangular Rectangular Orifice Orifice ID Type Shape Gate Orifice Orifice Orifice Invert Coefficient Diameter Height Width Elevation (m) (m) (m) (ft) 1 Orifice-02 Side CIRCULAR No 1.00 755.50 0.61 Output Summary Results Peak Inflow(cfs) 7.69 Peak Lateral Inflow(cfs) 7.69 PeakOutflow(cfs) 0.04 Peak Eadiltration Flow Rate(cfm) 0 Max HGLElevation Attained(ft) 760.2 Max HGLDepth Attained(ft) 2.2 Average HGLElevation Attained(ft) 759.4 Average HGLDepth Attained(ft) 1.4 Time of MaxHGLOccurrence(days hh:mm) 1 00:00 Total Exfiltration Volume(1000-00 0 Total Hooded Volume(ac-in) 0 Total lime Flooded(min) 0 Total Retention Time(sec) 0 HT THOMAS & HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Appendix D Sand Filter Design Calculations J - 3129 6.0001 April 2024 Thomason dhutton.com Post-Construction Water Quality Design -Sand Filter PROJECT: Grace Church-Pond 1 JOB NO.: 31296.0001 CLIENT: SJP Properties DATE: 3/8/2024 REVISED: 3/14/2024 I. DETERMINE SAND FILTER WATER QUALITY VOLUME *METHOD ADAPTED FROM NCDEQ STORMWATER MANUAL Drainage Area 19.13 Ac. %Impervious 90% Design Rainfall 1 in df 1.5 ft Rv 0.86 WQV design 59720 ft3 WQV actual 44790 ft3 k 3.5 ft/day 1.66 day hmax filter(ft) WQV adj(ff3) As+Af(ff2) 0.5 44790 89,580.05 1 44790 44,790.03 1.5 44790 29,860.02 2 44790 22,395.01 3 44790 14,930.01 4 44790 11,197.51 5 44790 8,958.01 6 44790 7,465.00 hmax selected ft ha 1.25 ft As(min) 3948 ft2 Af(min) 5607 ft2 As ft2 Af ft2 good Water Quality Protection Volume(WQ,(= 44,790 cf Filter Bed Depth id))= 1.5 feet Coef.Of Permeability of Filter Media(k)= 3.50 ft/day Avg.Ht.of Water above Filter Bed(h))= 1.25 feet Design Filter Bed Drain Time(t))= 24 hours Surface Area Calculation: from above: Surface Area(AO= 5,606.64 sf Proposed Surface Area(Aral)= 9,000.00 sf Sediment Forebay Volume Calculation: Min.Rq'd.Sediment Forebay Vol.(VF.)= 8,958.01 cf Proposed Sediment Forebay Volume(As,d)= 11,250.00 cf Stage-Discharge for Sand Filter Calculations: Elevation Height(hf)above Discharge sand bed(feet) (cfs) -36 0.0 0.0000 _ 737 1.0 0.6076 738 2.0 0.8507 739 3.0 1.0938 740 4.0 1.3368 741 5.0 1.5799 Underdrain Minimum Drawdown Flow Calculation: Minimum Drawdown Flow(O w)= I 0.021600 cfs Underdrain Perforated Pipe System Calculations: Enter#Holes per LF pipe= 20 holes/LF Linear Feet of Pipe= 100.0 feet Total#Holes= 2000 holes 50%Open#Holes= 1000 holes Dia.of Perforations= 0.375 in. Area of Single Hole(A)= 0.000767 sf Orifice Equation= Qo=C*A*(2*g*h)C Coefficient(C)= 0.62 Area of Single Hole(A)= 0.000767 sf Total Area of Perforations(Ar,r)= 0.767 sf Gravity(g)= 32.2 Head(h)= 2.25 ft Underdrain Pipe Flow Capacity(Qo)= 5.72 cfs Post-Construction Water Quality Design -Sand Filter PROJECT: Grace Church-Pond 2 JOB NO.: 31296.0001 CLIENT: SJP Properties DATE: 3/8/2024 REVISED: 3/14/2024 I. DETERMINE SAND FILTER WATER QUALITY VOLUME *METHOD ADAPTED FROM NCDEQ STORMWATER MANUAL Drainage Area 0.84 Ac. %Impervious 90% Design Rainfall 1 in df 1.5 ft Rv 0.86 WQV design 2622 ft3 WQV actual 1967 ft3 k 3.5 ft/day 1.66 day hmax filter(ft) WQV adj(ft3) AnnAF(/t2) 0.5 1967 3,933.47 1 1967 1,966.73 1.5 1967 1,311.16 2 1967 983.37 3 1967 655.58 4 1967 491.68 5 1967 393.35 6 1967 327.79 hmax selected ft ha 1 ft As(min) 173 ft2 Af(min) 271 ft2 As ft2 Af ft2 good Water Quality Protection Volume(WQ,)= 1,967 cf Filter Bed Depth id))= 1.5 feet Coef.Of Permeability of Filter Media(k)= 3.50 ft/day Avg.Ht.of Water above Filter Bed(h))= 1.00 feet Design Filter Bed Drain Time(t))= 24 hours Surface Area Calculation: from above: Surface Area(A,)= 270.81 sf Proposed Surface Area(Aral)= 800.00 sf Sediment Forebay Volume Calculation: Min.Rq'd.Sediment Forebay Vol.(VF.)= 393.35 cf Proposed Sediment Forebay Volume(As,d)= 200.00 cf Stage-Discharge for Sand Filter Calculations: Elevation Height(hf)above Discharge sand bed(feet) (cfs) 758 0.0 0.0000 759 1.0 0.0540 760 2.0 0.0756 761 3.0 0.0972 762 4.0 0.1188 Underdrain Minimum Drawdown Flow Calculation: Minimum Drawdown Flow)G.,(= 0.000948 cfs Underdrain Perforated Pipe System Calculations: Enter#Holes per LF pipe= 20 holes/LF Linear Feet of Pipe= 100.0 feet Total#Holes= 2000 holes 50%Open#Holes= 1000 holes Dia.of Perforations= 0.375 in. Area of Single Hole(A)= 0.000767 sf Orifice Equation= Qo=C*A*(2*g*h)C Coefficient(C)= 0.62 Area of Single Hole(A)= 0.000767 sf Total Area of Perforations(Ar,r)= 0.767 sf Gravity(g)= 32.2 Head(h)= 2.00 ft Underdrain Pipe Flow Capacity(Qo)= 5.40 cfs 1 HT THOMAS & HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Appendix E Riprap Outlet Protection J - 31296.0001 April 2024 Thomason dhutton.com Rip Rap Apron Design Project Name: 31296.0001 - Grace Church-Pipe-Ol Drainage Specialist: Maris Barden Date: March 27, 2024 Checked By: Ryo Yamamoto Date: March 28, 2024 Step 1. Determine the tailwater depth from the channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter, it is classifies as minimum tailwater conditions. If the tailwater is greater than half the pipe diameter, it is classified as maximum tailwater conditions. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations show otherwise. Rational Method for Flow Total Drainage Area(Acres): 1.2 Outlet pipe diameter,Do(in.) 18 Tailwater depth(Feet) 0.6 Tailwater Method To Be Used Min TW(Fig.8.06a) Discharge(cfs) 4.0 Velocity(ft./s) 6.1 Step 2. Based on the tailwater conditions determined in Step 1, enter Figure 8.06a or Figure 8.06b and determine the d50 rip rap size and minimum apron length(La). The d50 size is the median stone size in a well-graded rip rap apron. Step 3. Determine the apron width at the pipe outlet,the apron shape, and the apron width at the outlet end from the same figure used in Step 2. Minimum TW Maximum TW Riprap d50, (ft.) 0.5 Minimum apron length, La(ft.) ** 10 Apron width at pipe outlet(ft.) 5 Apron shape W=Do+La Apron width at outlet end(ft.) 12 **-Minimum Apron Length Is 10 Feet per CLDS 20.23 Step 4. Determine the maximum Stone Diameter. D.= 1.5 X d50 Determine the Apron Thickness,Ta= 1.5 X d,nax Minimum TW Maximum TW Max Stone Diameter, dmax(Inches): 9 71= Apron Thickness (Inches): 14 **-Minimum Apron Thickness Is 10 Inches per CLDS 20.23 Step 5. Fit the rip rap apron to the site by making it level for the minimum length La. Extend the apron farther downstream and along the channel banks until stability is assured. Keep apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of the rip rap where protection of the channel side slopes is necessary. Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<0.5 diameter) ` 43u�% 1 : _ I 3 Outlet , w = p� * -a I . pipe �` b� diameter (Do) �� . r, } La —IA AL) ; - - )11 �_. . - _ �ilwa'er 0.500 : . , IV I. _R • ,,�a _ # NPotOc . .. 41111111011II! ill.,:ia d f eY ! •� b III Nil „' - v� 50 in I :5 N i _ . `,t,‘C` I 4 • • v ; 4� ' ,i 1 iuiimnIlirnJiiIII _� _ i • , ! .. ::. D.i . I ./� 3. .... . : . INhIHIl :: 11lII CHII Mil s : -- .• j 110F III 4.:, : : _ -- .. f� N III 0 II II IN +' M I 20 11°I N I I !1! . . ;7 .. :ail ., no 11111 ' .. 'AI...I.. ;06, e1 SSA a � . 1. r. •lI piplimilimpliwy,:i.i.----iiii. : : Ar, At: 1."1"' .„��nu 1 nnnnnnnninul _._ 1 .. v ' .'�' -- !lIIIIIIIIIIIII IIIIIIIIIIIIIIIII o- - ' Milli :'" m I lunuln ppI ■ 11111 IllllltIII IIIIII�1111111�111 � �� � • ,� l b. N 0 Aiiw i ics III I III 111ggI : III + . 7.4. ' : . ;Ali�rlN'J "• IIR 2 u I"I"!ix I I I ; ' I , f! ",I";. p• P 11R cm I1o111[1 1111IIlIl1MI 1�� I. piii r Ii;:� .1� a 1'�0 iiii; �i r� ,� "Ill. . . ._ .. .�fj d. _ ig A 111111 Iq"IIN Q 11IIIIIIIIII I t . . . ..„i ,' �. /, z di 11 �� • - ti' V = p • �� %� 1111 111111111111111613 - .C....w.minow- 41111111-alla Mill 3 5 10 20 51 100 200 500 1000 Discharge (ft3/sec) Rip Rap Apron Design Project Name: 31296.0001 - Grace Church-Al Drainage Specialist: Ryo Yamamoto Date: March 29, 2024 Checked By: Nestor Hernandez Date: March 29, 2024 Step 1. Determine the tailwater depth from the channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter, it is classifies as minimum tailwater conditions. If the tailwater is greater than half the pipe diameter, it is classified as maximum tailwater conditions. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations show otherwise. Rational Method for Flow Total Drainage Area(Acres): 7.3 Outlet pipe diameter,Do(in.) 48 Tailwater depth(Feet) 3.5 Tailwater Method To Be Used Max TW(Fig.8.06b) Discharge(cfs) 39.0 Velocity(ft./s) 8.1 Step 2. Based on the tailwater conditions determined in Step 1, enter Figure 8.06a or Figure 8.06b and determine the d50 rip rap size and minimum apron length(La). The d50 size is the median stone size in a well-graded rip rap apron. Step 3. Determine the apron width at the pipe outlet,the apron shape, and the apron width at the outlet end from the same figure used in Step 2. Minimum TW Maximum TW Riprap d50, (ft.) 0.5 Minimum apron length, La(ft.) ** .0 17 Apron width at pipe outlet(ft.) 12 Apron shape W=Do+ .4La Apron width at outlet end(ft.) 11 **-Minimum Apron Length Is 10 Feet per CLDS 20.23 Step 4. Determine the maximum Stone Diameter. D.= 1.5 X d50 Determine the Apron Thickness,Ta= 1.5 X d,,, Minimum TW Maximum TW Max Stone Diameter, dmax(Inches): 9 9 Apron Thickness (Inches): 14 **-Minimum Apron Thickness Is 10 Inches per CLDS 20.23 Step 5. Fit the rip rap apron to the site by making it level for the minimum length La. Extend the apron farther downstream and along the channel banks until stability is assured. Keep apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of the rip rap where protection of the channel side slopes is necessary. Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. Figure 8.06b: Design of outlet protection from a round pipe flowing full, maximum tailwater condition (Tw>=0.5 diameter) T .-;utii.t W = Do + 0.4La 120 �— - - pipe I I . dint-IPlPf Doi . _ La 110 --.., ..� r. Q Tai1wa fl (1,.500 1 .. .. ... ...: . ; ' : : ' ' j':, ::.: : ,.. :.' '': :::: :::: . ... . . Pr ' lipl:::::, A o a I .u,...:.1 i.:-..:....i.„...: .1� me ...60_ .. •r,, • • � ► .01/4 ,jrwgvjpj'j .. ,.. . 7 ., II. s • • . • J �� il � . 40 1111111311111 ..,q .. i. : 50 . . . . .. 1.. .. ii 1 `111111 tl, 3 }} unnna"T�i'11k= • r . irr•.,," illiii:..::,)„.:. . i:: 1 • • ��, :_: Ft .:. . Grp ,I��M�I�M111 20 . ..._T_� 44 co p .•- ssr attest � ism, v .. r �rai��...rsi m .. . ,,,, ,,,,,ire o, ... . . . . , :. ._ - v. 7.25,ilivr b.4 id ird i 0 rflir rk-4 ii--0,:ell 0 sy , ‘c),AISOrdiffilifirld!"111191#Arr preirillIWPOr . VP'Ir. rj .-7..::. 1:3 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Rip Rap Apron Design Project Name: 31296.0001 - Grace Church-B1 Drainage Specialist: Ryo Yamamoto Date: March 29, 2024 Checked By: Nestor Hernandez Date: March 29, 2024 Step 1. Determine the tailwater depth from the channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter, it is classifies as minimum tailwater conditions. If the tailwater is greater than half the pipe diameter, it is classified as maximum tailwater conditions. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations show otherwise. Rational Method for Flow Total Drainage Area(Acres): 10.2 Outlet pipe diameter,Do(in.) 48 Tailwater depth(Feet) 4.8 Tailwater Method To Be Used Max TW(Fig.8.06b) Discharge(cfs) 52.7 Velocity(ft./s) 8.2 Step 2. Based on the tailwater conditions determined in Step 1, enter Figure 8.06a or Figure 8.06b and determine the d50 rip rap size and minimum apron length(La). The d50 size is the median stone size in a well-graded rip rap apron. Step 3. Determine the apron width at the pipe outlet,the apron shape, and the apron width at the outlet end from the same figure used in Step 2. Minimum TW Maximum TW Riprap d50, (ft.) 0.5 Minimum apron length, La(ft.) ** .0 17 Apron width at pipe outlet(ft.) 12 Apron shape W=Do+ .4La Apron width at outlet end(ft.) 11 **-Minimum Apron Length Is 10 Feet per CLDS 20.23 Step 4. Determine the maximum Stone Diameter. D.= 1.5 X d50 Determine the Apron Thickness,Ta= 1.5 X d,,, Minimum TW Maximum TW Max Stone Diameter, dmax(Inches): 9 9 Apron Thickness (Inches): 14 **-Minimum Apron Thickness Is 10 Inches per CLDS 20.23 Step 5. Fit the rip rap apron to the site by making it level for the minimum length La. Extend the apron farther downstream and along the channel banks until stability is assured. Keep apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of the rip rap where protection of the channel side slopes is necessary. Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. Figure 8.06b: Design of outlet protection from a round pipe flowing full, maximum tailwater condition (Tw>=0.5 diameter) T .2.utlE•1 W = Do + 0.4La 120 — J - - pipe r`— III . .11 �i . filar iator I� 1 — L }- .. ... .. . ... ... .. . d a 110 ._ .. ':r,. ' Q �Tallwa er .5Dp i "'1 pi .f..... :. i. -..:...-, . .. . .. ... ... . .... IMI 1001 .. .., : ...i: . , :, . :iiirryir :, : 1.: ::: 411 ' 40 ii L'Il-• I ��r 60 _ r gaNtemml - - ' J ifirpti'l 1 „ . . .. . . . .: „A- I lii1iij�inI1i w111 ••i I'• 6IIIlir I rIqi • ,-,. ' 1111111111�III IIIIUI.,„ 4D ( I 1 1 1 111111 13 ful1i �11 '. 01411.:.:A . 1. 30 7 .. .,.1 F r A •1: • M.N�A,,M�IIIIIIIIIM E 20 AIME MP' AsRls!'AISG�IIe ism ; -4 .�orir�ioriiim �r m 'f:=-:t r -... ; : 1(i� • : :::•: :. ... .. .... .. . i .o,: iriA.Zi �*1 in J. 10 ' _ .I. , .li ( J o '; •. • •..• 1 : :: .II _b. ,, .si ArVirrir .' .11.i't 1 iS _III0P011111101111WalligEr0011 . . i 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Rip Rap Apron Design Project Name: 31296.0001 - Grace Church- Cl Drainage Specialist: Ryo Yamamoto Date: March 29, 2024 Checked By: Nestor Hernandez Date: March 29, 2024 Step 1. Determine the tailwater depth from the channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter, it is classifies as minimum tailwater conditions. If the tailwater is greater than half the pipe diameter, it is classified as maximum tailwater conditions. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations show otherwise. Rational Method for Flow Total Drainage Area(Acres): 0.8 Outlet pipe diameter,Do(in.) 30 Tailwater depth(Feet) 1.8 Tailwater Method To Be Used Max TW(Fig.8.06b) Discharge(cfs) 4.4 Velocity(ft./s) 4.3 Step 2. Based on the tailwater conditions determined in Step 1, enter Figure 8.06a or Figure 8.06b and determine the d50 rip rap size and minimum apron length(La). The d50 size is the median stone size in a well-graded rip rap apron. Step 3. Determine the apron width at the pipe outlet,the apron shape, and the apron width at the outlet end from the same figure used in Step 2. Minimum TW Maximum TW Riprap d50, (ft.) 1 0.5 Minimum apron length, La(ft.) ** III .0 11 Apron width at pipe outlet(ft.) 8 Apron shape W=Do+ .4La Apron width at outlet end(ft.) 7 **-Minimum Apron Length Is 10 Feet per CLDS 20.23 Step 4. Determine the maximum Stone Diameter. D.= 1.5 X d50 Determine the Apron Thickness,Ta= 1.5 X d,nax Minimum TW Maximum TW Max Stone Diameter, dmax(Inches): 9 Apron Thickness (Inches): 14 **-Minimum Apron Thickness Is 10 Inches per CLDS 20.23 Step 5. Fit the rip rap apron to the site by making it level for the minimum length La. Extend the apron farther downstream and along the channel banks until stability is assured. Keep apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of the rip rap where protection of the channel side slopes is necessary. Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. Figure 8.06b: Design of outlet protection from a round pipe flowing full, maximum tailwater condition (Tw>=0.5 diameter) T .-;utii.t t W = Do + 0.4La 120 1- - pipe `` 1 I' La �i 110 ._ r, ' • Q TailwaAer Q.5D0 I A ...1 .1 , :, : ,„ fl 4411 80 �� pp IMIM f 70: .. .. .:1_ .:. . . ...;.. . .. ... ... . $iiil ,:::.....-1 _ ill II me 6. hHH1. : � 1110 ‘1�50 �_ r,.. pti `� I 1 MMI 1111111111111AIll • • � 1 W16II I l Mill 340 , nnrnanunnnNi r , + . .. i � � 1 1 nnu Fri ir.N . • b.::i .... ir Mir ME 30 ....:,•• # �20 .._. it. �1 {{rl��ll�•� . . . .� M.NArr�,,r�1I111it IN 2drialipr : : :Ann tv I . . . . 0. r �1' iorderdiri • - 64,00,SreadrAirdrAM5111" ', .11.i't 0 in .... ..: :::. . . ' '''. ' ' 2.v = 15 l' I plIFOroliOr worry. Pr r.- r ‘dr...:1.. " _ : . i. 1 , ! 1 ' d0 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Rip Rap Apron Design Project Name: 31296.0001 - Grace Church-El Drainage Specialist: Maris Barden Date: March 27, 2024 Checked By: Ryo Yamamoto Date: March 28, 2024 Step 1. Determine the tailwater depth from the channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter, it is classifies as minimum tailwater conditions. If the tailwater is greater than half the pipe diameter, it is classified as maximum tailwater conditions. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations show otherwise. Rational Method for Flow Total Drainage Area(Acres): 5.7 Outlet pipe diameter,Do(in.) 30 Tailwater depth(Feet) 1.9 Tailwater Method To Be Used Max TW(Fig.8.06b) Discharge(cfs) 18.2 Velocity(ft./s) 4.5 Step 2. Based on the tailwater conditions determined in Step 1, enter Figure 8.06a or Figure 8.06b and determine the d50 rip rap size and minimum apron length(La). The d50 size is the median stone size in a well-graded rip rap apron. Step 3. Determine the apron width at the pipe outlet,the apron shape, and the apron width at the outlet end from the same figure used in Step 2. Minimum TW Maximum TW Riprap d50, (ft.) 1 0.5 Minimum apron length, La(ft.) ** 1III Apron width at pipe outlet(ft.) 8 Apron shape W=Do+ .4La Apron width at outlet end(ft.) 7 **-Minimum Apron Length Is 10 Feet per CLDS 20.23 Step 4. Determine the maximum Stone Diameter. D.= 1.5 X d50 Determine the Apron Thickness,Ta= 1.5 X d,nax Minimum TW Maximum TW Max Stone Diameter, dmax(Inches): 9 Apron Thickness (Inches): 14 **-Minimum Apron Thickness Is 10 Inches per CLDS 20.23 Step 5. Fit the rip rap apron to the site by making it level for the minimum length La. Extend the apron farther downstream and along the channel banks until stability is assured. Keep apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of the rip rap where protection of the channel side slopes is necessary. Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. Figure 8.06b: Design of outlet protection from a round pipe flowing full, maximum tailwater condition (Tw>=0.5 diameter) 300 fi Outlet W = 00 + 0.41a 120 f pipe Tt I I V . :'11. diamPtar ( ;.__. — La-01 110 - • + . . — _� Tailwater_o Q.500 .: :I:: f mieloiliesweelir 100 IiiiI ' , . . ... , , r.=, . 1 . .. . rar': :1 i : J;:."..E._:.,-....,':: , 4 . , . . .. . . . . 019 7°, . .... ....--:.!-- -7 - --- * Mg: 'V A - ** 'T.. 0 . a a . j : .11:: A ,t,a 1 IN t::-•.,,1. iii .. ,i, 40 .,\:;I::: • , ' ' . .. r , i 1 , ,. , 1.,.I.,... lJ,i11l ritliltr.1 "ilillnUn 3 I• VA 4.4: r:. , . -:,::1I F,, r. PPP 1111 is ..111 wipti -.E- 1 : . .,...r. a...iitigaii....,, _. 2 — AirAP211rAtri , . . 4. r i v) . ... 0. , O , i ..1, v ermet .J� a .A .1 d 1 Q I: : : . . , v =�— s v��� R' I" ail in v' . io 6_,....m-apriiiticir.- -1,gredgirr . _ iiiiiiiiiiii . I 1 , 1 ,0 3 5 10 20 50 100 200 500 1000 Discharge(ft3lsec) Rip Rap Apron Design Project Name: 31296.0001 - Grace Church-Fl Drainage Specialist: Maris Barden Date: March 27, 2024 Checked By: Ryo Yamamoto Date: March 28, 2024 Step 1. Determine the tailwater depth from the channel characteristics below the pipe outlet for the design capacity of the pipe. If the tailwater depth is less than half the outlet pipe diameter, it is classifies as minimum tailwater conditions. If the tailwater is greater than half the pipe diameter, it is classified as maximum tailwater conditions. Pipes that outlet onto wide flat areas with no defined channel are assumed to have a minimum tailwater condition unless reliable flood stage elevations show otherwise. Rational Method for Flow Total Drainage Area(Acres): 5.9 Outlet pipe diameter,Do(in.) 24 Tailwater depth(Feet) 1.7 Tailwater Method To Be Used Max TW(Fig.8.06b) Discharge(cfs) 14.4 Velocity(ft./s) 5.1 Step 2. Based on the tailwater conditions determined in Step 1, enter Figure 8.06a or Figure 8.06b and determine the d50 rip rap size and minimum apron length(La). The d50 size is the median stone size in a well-graded rip rap apron. Step 3. Determine the apron width at the pipe outlet,the apron shape, and the apron width at the outlet end from the same figure used in Step 2. Minimum TW Maximum TW Riprap d50, (ft.) 1 0.5 Minimum apron length, La(ft.) ** 10 III Apron width at pipe outlet(ft.) 6 Apron shape W=Do+ .4La Apron width at outlet end(ft.) 6 **-Minimum Apron Length Is 10 Feet per CLDS 20.23 Step 4. Determine the maximum Stone Diameter. D.= 1.5 X d50 Determine the Apron Thickness,Ta= 1.5 X d,nax Minimum TW Maximum TW Max Stone Diameter, dmax(Inches): 9 Apron Thickness (Inches): 14 **-Minimum Apron Thickness Is 10 Inches per CLDS 20.23 Step 5. Fit the rip rap apron to the site by making it level for the minimum length La. Extend the apron farther downstream and along the channel banks until stability is assured. Keep apron as straight as possible and align it with the flow of the receiving stream. Make any necessary alignment bends near the pipe outlet so that the entrance into the receiving stream is straight. Some locations may require lining of the entire channel cross section to assure stability. It may be necessary to increase the size of the rip rap where protection of the channel side slopes is necessary. Where overfalls exist at pipe outlets or flows are excessive, a plunge pool should be considered. Figure 8.06b: Design of outlet protection from a round pipe flowing full, maximum tailwater condition (Tw>=0.5 diameter) 300 fi Outlet W = D0 + 0.4La 120 f r pipe �t A II V . 'i . r I diame1Pr (00);r — La .I 110 —__ , r i1watAer_ , 3;5D0 .1.:' ". f ' 100 : . r r �r NII ,,,-\ 80 -- • • ! • :-. .,- Fir ' 1 ..A. sO :.:: :.. W _ _ " j .. j ii -- :s• A A - .1 ;:: AN : S/15: I •' . 7 `IA LT. 11,111,111 40 : .: : 1 I I�'Nr :i..i.. ,;.: : ' - • ..'A . : + 1' ..: Ii,ii iiil 3 aD 4 !9 " ', • .a..1;. : . � � I N11111111 3 0 1 ,;I.• • I i ---j-ill � ' rW • ...:H: 1 . p.. . . r ia'Alrlitfr.a r•" ,■n u. ... ., , , , , I . .4vt....,limpporAy,Altrofir Akirr•:,“ 1 et • lirdWrgliihr I i 2" = is 4 Ardar 4-, ii:::t ..„2 .�� r .r. v - 10ss . I r 1 1 /�� � . i . i . , a0 _ 3 5 10 20 50 100 200 500 1000 Discharge(ft3lsec) 3/29/24, 11:00 AM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Culvert Name Culvert Discharge 118.51 Channel Slope 0.0138 Channel Bottom Width 7 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Bunch Type Vegetation Density Fair 50-64% Soil Type Sandy Loam(GM) S200 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern 5200 Straight 118.51 cfs 6.54 ft/s 1.73 ft 0.031 2.3 lbs/ft2 1.49 lbs/ft2 1.55 STABLE E Unvegetated Underlying Straight 118.51 cfs 6.54 ft/s 1.73 ft 0.031 2.18 lbs/ft2 1.06 lbs/ft2 2.06 STABLE E Substrate S200 Reinforced Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 10 lbs/ft2 1.79 lbs/ft2 5.59 STABLE E Vegetation Underlying Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 2.3 lbs/ft2 1.23 lbs/ft2 1.88 STABLE E Substrate W3000 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern W3000 Straight 118.51 cfs 6.27 ft/s 1.79 ft 0.033 2.3 lbs/ft2 1.54 lbs/ft2 1.49 STABLE E Unvegetated Underlying Straight 118.51 cfs 6.27 ft/s 1.79 ft 0.033 2.18 lbs/ft2 1.09 lbs/ft2 2.01 STABLE E Substrate W3000 Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 14 lbs/ft2 1.79 lbs/ft2 7.83 STABLE E Reinforced Vegetation Underlying Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 2.75 lbs/ft2 1.23 lbs/ft2 2.25 STABLE E Substrate D50 of Riprap(in): Rock Riprap 9 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern Rock Riprap Straight 118.51 cfs 2.78 ft/s 3.19 ft 0.1 3 lbs/ft2 1.73 lbs/ft2 1.74 STABLE -- Unvegetated SC250 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern SC250 Straight 118.51 cfs 6.05 ft/s 1.83 ft 0.034 3 lbs/ft2 1.58 lbs/ft2 1.9 STABLE E Unvegetated Underlying Straight 118.51 cfs 6.05 ft/s 1.83 ft 0.034 2.84 lbs/ft2 1.11 lbs/ft2 2.56 STABLE E Substrate https://ecmds.com/project/160234/channel-analysis/262756/show 1/2 3/29/24, 11:00 AM ECMDS 7.0 SC250 Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 10 lbs/ft2 1.79 lbs/ft2 5.59 STABLE E Reinforced Vegetation Underlying Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 3 lbs/ft2 1.23 lbs/ft2 2.45 STABLE E Substrate C350 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern C350 Straight 118.51 cfs 6.02 ft/s 1.84 ft 0.034 3.2 lbs/ft2 1.58 lbs/ft2 2.02 STABLE E Unvegetated Underlying Straight 118.51 cfs 6.02 ft/s 1.84 ft 0.034 3.03 lbs/ft2 1.11 lbs/ft2 2.73 STABLE E Substrate C350 Reinforced Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 12 lbs/ft2 1.79 lbs/ft2 6.71 STABLE E Vegetation Underlying Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 3.2 lbs/ft2 1.23 lbs/ft2 2.61 STABLE E Substrate P550 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern P550 Straight 118.51 cfs 6.29 ft/s 1.78 ft 0.032 3.3 lbs/ft2 1.53 lbs/ft2 2.15 STABLE E Unvegetated Underlying Straight 118.51 cfs 6.29 ft/s 1.78 ft 0.032 3.12 lbs/ft2 1.08 lbs/ft2 2.89 STABLE E Substrate P550 Reinforced Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 14 lbs/ft2 1.79 lbs/ft2 7.83 STABLE E Vegetation Underlying Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 3.3 lbs/ft2 1.23 lbs/ft2 2.69 STABLE E Substrate P300 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern P300 Straight 118.51 cfs 5.96 ft/s 1.86 ft 0.035 2.8 lbs/ft2 1.6 lbs/ft2 1.75 STABLE E Unvegetated Underlying Straight 118.51 cfs 5.96 ft/s 1.86 ft 0.035 2.65 lbs/ft2 1.12 lbs/ft2 2.37 STABLE E Substrate P300 Reinforced Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 12 lbs/ft2 1.79 lbs/ft2 6.71 STABLE E Vegetation Underlying Straight 118.51 cfs 5.11 ft/s 2.08 ft 0.043 2.8 lbs/ft2 1.23 lbs/ft2 2.29 STABLE E Substrate https://ecmds.com/project/160234/channel-analysis/262756/show 2/2 HT THOMAS & HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Appendix F Spillway Calculations J - 31296.0001 April 2024 Thomason dhutton.com 3/27/24,5:14 PM ECMDS 7.0 NORTH North American Green AMERICAN 5401 St. Wendel-Cynthiana Rd. Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS >>>Spillway 1 Name Spillway 1 Discharge 35.31 Channel Slope 0.33 Channel Bottom Width 20 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class E<2 in Vegetation Type Mix(Sod and Bunch) Vegetation Density Good 65-79% Soil Type Sandy Loam(GM) S200 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern 5200 Straight 35.31 cfs 10.81 ft/s 0.16 ft 0.023 2.3 lbs/ft2 3.27 lbs/ft2 0.7 UNSTABLE E Unvegetated Underlying Straight 35.31 cfs 10.81 ft/s 0.16 ft 0.023 2.18 lbs/ft2 3.19 lbs/ft2 0.68 UNSTABLE E Substrate S200 Reinforced Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 10 lbs/ft2 2.44 lbs/ft2 4.09 STABLE E Vegetation Underlying Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 2.3 lbs/ft2 2.4 lbs/ft2 0.96 UNSTABLE E Substrate TMax3k Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern TMax3k Straight 35.31 cfs 9.8 ft/s 0.18 ft 0.027 2.3 lbs/ft2 3.61 lbs/ft2 0.64 UNSTABLE E Unvegetated Underlying Straight 35.31 cfs 9.8 ft/s 0.18 ft 0.027 2.18 lbs/ft2 3.51 lbs/ft2 0.62 UNSTABLE E Substrate TMax3k Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 14 lbs/ft2 2.44 lbs/ft2 5.73 STABLE E Reinforced Vegetation Underlying Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 2.3 lbs/ft2 2.4 lbs/ft2 0.96 UNSTABLE E Substrate TMax Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern TMax Straight 35.31 cfs 10.78 ft/s 0.16 ft 0.023 2.3 lbs/ft2 3.3 lbs/ft2 0.7 UNSTABLE E Unvegetated Underlying Straight 35.31 cfs 10.78 ft/s 0.16 ft 0.023 2.18 lbs/ft2 3.21 lbs/ft2 0.68 UNSTABLE E Substrate TMax Reinforced Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 16 lbs/ft2 2.44 lbs/ft2 6.55 STABLE E Vegetation Underlying Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 2.3 lbs/ft2 2.4 lbs/ft2 0.96 UNSTABLE E Substrate W3000 https://ecmds.com/project/160234/channel-analysis/262696/show 1/3 3/27/24,5:14 PM ECMDS 7.0 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern W3000 Straight 35.31 cfs 9.92 ft/s 0.17 ft 0.026 2.3 lbs/ft2 3.57 Ibs/ft2 0.64 UNSTABLE E Unvegetated Underlying Straight 35.31 cfs 9.92 ft/s 0.17 ft 0.026 2.18 lbs/ft2 3.47 lbs/ft2 0.63 UNSTABLE E Substrate W3000 Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 14 lbs/ft2 2.44 lbs/ft2 5.73 STABLE E Reinforced Vegetation Underlying Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 2.3 lbs/ft2 2.4 lbs/ft2 0.96 UNSTABLE E Substrate Rock Riprap Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Rock Riprap Straight 35.31 cfs 8.77 ft/s 0.19 ft 0.032 4 lbs/ft2 3.88 lbs/ft2 1.03 STABLE -- Unvegetated SC250 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern SC250 Straight 35.31 cfs 10.03 ft/s 0.17 ft 0.026 3 lbs/ft2 3.53 lbs/ft2 0.85 UNSTABLE E Unvegetated Underlying Straight 35.31 cfs 10.03 ft/s 0.17 ft 0.026 2.84 lbs/ft2 3.44 lbs/ft2 0.83 UNSTABLE E Substrate SC250 Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 10 lbs/ft2 2.44 lbs/ft2 4.09 STABLE E Reinforced Vegetation Underlying Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 3 lbs/ft2 2.4 lbs/ft2 1.25 STABLE E Substrate C350 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Remarks Depth Mannings N Shear Stress Shear Stress Factor Pattern C350 Straight 35.31 cfs 9.55 ft/s 0.18 ft 0.028 3.2 lbs/ft2 3.69 lbs/ft2 0.87 UNSTABLE E Unvegetated Underlying Straight 35.31 cfs 9.55 ft/s 0.18 ft 0.028 3.03 lbs/ft2 3.59 lbs/ft2 0.84 UNSTABLE E Substrate C350 Reinforced Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 12 lbs/ft2 2.44 lbs/ft2 4.91 STABLE E Vegetation Underlying Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 3.2 lbs/ft2 2.4 lbs/ft2 1.33 STABLE E Substrate P550 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern P550 Straight 35.31 cfs 10.52 ft/s 0.16 ft 0.024 3.3 lbs/ft2 3.38 lbs/ft2 0.98 UNSTABLE E Unvegetated Underlying Straight 35.31 cfs 10.52 ft/s 0.16 ft 0.024 3.12 lbs/ft2 3.29 lbs/ft2 0.95 UNSTABLE E Substrate P550 Reinforced Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 14 lbs/ft2 2.44 lbs/ft2 5.73 STABLE E Vegetation Underlying Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 3.3 lbs/ft2 2.4 lbs/ft2 1.38 STABLE E Substrate P300 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern P300 Straight 35.31 cfs 10.05 ft/s 0.17 ft 0.026 2.8 lbs/ft2 3.53 lbs/ft2 0.79 UNSTABLE E Unvegetated Underlying Straight 35.31 cfs 10.05 ft/s 0.17 ft 0.026 2.65 lbs/ft2 3.43 lbs/ft2 0.77 UNSTABLE E Substrate https://ecmds.com/project/160234/channel-analysis/262696/show 2/3 3/27/24,5:14 PM ECMDS 7.0 P300 Reinforced Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 12 Ibs/ft2 2.44 Ibs/ft2 4.91 STABLE E Vegetation Underlying Straight 35.31 cfs 14.58 ft/s 0.12 ft 0.014 2.8 Ibs/ft2 2.4 Ibs/ft2 1.17 STABLE E Substrate https://ecmds.com/project/160234/channel-analysis/262696/show 3/3 HT THOMAS & HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Appendix G HEC-22 Report J - 31296.0001 April 2024 Thomason dhutton.com HEC-22 Energy Grade Line Computations Struct. Q EGLo HGLo Total Pipe EGLi HGLi Ea EGLa Surface Elev. ID (cfs) (ft) (ft) Loss (ft) (ft) (ft) (ft) (ft) (ft) Al I 740.27 740.27 _ 740.92 A2 39.3 741.45 741.29 _ _ 741.45 740.43 4.7 741.45 747.63 A3 35.1 741.53 741.32 0.12 741.65 741.44 3.8 741.70 747.64 A4 30.9 741.82 741.52 0.21 742.03 741.73 3.2 742.17 747.63 A5 25.0 742.25 742.05 0.17 742.42 742.22 2.8 742.51 749.47 A6 _ 24.4 742.58 742.39 742.91 742.10 2.5 743.16 754.75 A7 24.2 743.36 742.85 744.37 743.58 2.7 744.68 754.75 A8 23.4 744.82 744.47 0.49 745.31 744.96 3.0 745.82 754.75 A9 22.7 745.95 745.62 0.44 746.40 746.06 2.9 746.93 754.35 A10 18.2 747.01 746.80 0.29 747.30 747.09 2.3 747.46 754.75_ All 15.3 747.63 747.21 748.55 747.78 2.4 748.90 754.75_ Al2 12.3 748.99 748.75 0.30 749.29 749.05 2.1 749.37 754.75_ A13 9.3 749.42 749.29 0.17 749.59 749.46 1.8 749.64 754.75_ A14 6.5 749.67 749.60 749.73 749.31 1.3 749.80 754.75 A15 3.3 749.87 749.70 750.53 750.24 1.1 750.66 754.75 B1 740.27 740.27 739.92 B2 52.7 740.54 740.27 0.07 740.61 740.34 5.1 740.84 747.63 B3 _ 48.7 740.93 740.70 0.11 741.05 740.81 4.8 741.10 747.63 B4 44.6 741.18 740.98 0.10 741.27 741.08 4.6 741.32 747.63 B5 40.2 741.38 741.22 0.05 741.43 741.27 4.5 741.50 747.63 B6 35.3 741.58 741.38 0.23 741.81 741.60 3.4 741.89 754.23 B7 33.0 741.96 741.78 742.46 741.64 2.6 742.60 755.06 B8 33.2 742.71 742.43 743.19 742.37 2.9 743.63 753.06 B9 31.7 743.71 743.50 743.71 742.91 2.9 743.71 753.09 B10 10.1 743.84 743.53 744.42 743.90 1.9 744.67 754.35 B11 9.8 747.75 747.25 0.41 748.16 747.66 2.2 748.71 754.35 B12 8.6 748.79 748.59 0.21 749.00 748.80 2.2 749.08 754.35 B13 7.2 749.14 749.00 0.18 749.32 749.18 2.0 749.39 754.35 B14 3.6 749.41 749.35 0.08 749.49 749.43 1.5 749.55 754.35 B23 2.3 743.72 743.71 744.44 743.84 0.9 744.44 753.30 B15 16.6 743.79 743.60 744.23 743.65 2.4 744.70 756.00 B16 10.1 749.39 748.94 0.45 749.84 749.39 1.8 750.07 756.00 B17 7.8 750.14 749.96 0.45 750.59 750.20 1.8 750.75 756.00 B18 5.4 750.80 750.66 0.24 751.04 750.90 1.5 751.12 756.00 B19 2.9 751.14 751.09 0.45 751.59 751.34 1.7 751.77 756.00 B20 2.7 750.19 749.81 752.69 752.30 0.9 752.69 760.33 B21 2.3 752.71 752.65 753.19 752.83 0.8 753.19 759.45 B22 1.1 753.19 753.17 753.24 753.00 0.6 753.24 759.45 B24 3.3 749.34 748.91 749.72 749.28 1.4 750.01 755.19 Cl 759.52 759.52 760.79 C2 4.4 759.83 759.80 759.83 759.55 1.6 759.83 764.61 C3 3.8 759.86 759.79 759.86 759.59 1.0 759.86 764.61 C4 3.2 759.89 759.82 760.28 760.03 0.9 760.28 766.52 C5 2.2 760.80 760.34 763.87 763.42 0.9 763.87 770.70 C6 1.2 763.88 763.86 764.11 763.78 0.7 764.11 770.70 C7 0.6 761.07 760.97 0.16 761.23 761.13 0.5 761.33 766.52 El 748.00 748.00 748.38 E2 30.7 748.61 748.00 0.71 749.32 748.71 3.5 749.57 754.03 E3 31.2 749.83 749.20 0.76 750.59 749.96 4.2 750.95 757.27 E4 31.8 751.21 750.56 0.95 752.16 751.51 5.1 752.63 752.95 E5 23.4 752.77 752.42 0.34 753.11 752.76 5.1 753.21 754.60 E6 22.5 753.53 752.73 1.85 755.38 754.58 6.9 755.90 757.13 E7 13.6 756.02 755.73 0.80 756.81 756.52 6.7 756.88 757.24 Fl 751.17 751.17 751.42 F2 6.8 751.24 751.17 0.13 751.37 751.30 1.5 751.42 757.17 F3 6.3 751.79 751.45 0.92 752.71 752.36 1.8 753.11 766.17 N THOMAS& HUTTON T:\AutoCADlReports\HEC-221HEC-22 Reporting HEC-22 Energy Grade Line Computations Struct. Q EGLo HGLo Total Pipe EGLi HGLi Ea EGLa Surface Elev. ID (cfs) (ft) (ft) Loss (ft) (ft) (ft) (ft) (ft) (ft) F4 6.4 753.19, 752.99 0.26 753.45 753.25 2.0 753.60I 757.24, Ili T HOM AS& H U T T O N T:\AutoCADlReports\HEC-221HEC-22 Reporting HEC-22 Storm Drain Computations Structure ID Length Drainage Runoff Tc Rain"I" Runoff Known Q Total Q Pipe Full Q Velocity Velocity Invert Elevation Slope (ft) Area Coeff"C" (min) (in/hr) "Q" (cfs) (cfs) Dia. (cfs) Full Design From To (ac) (cfs) (in) (ft/s) (ft/s) U/S D/S A2 Al 49 0.80 0.94 9 5.96 39.3 39.3 48 111.4 8.86_ 8.09 736.79 736.50 0.60% A3 A2 100_ 0.80 0.94 9 6.01 35.1 35.1 42 78.0 8.11 7.89 737.89 737.29 0.60% A4 A3 97_ 1.08 0.94 8 6.07 30.9 _ 30.9 36 51.7 7.32 7.63 738.97 738.39 0.60% A5 A4 120_ 0.22 0.70 8 6.15 25.0 25.0 36 51.7 7.32 7.25 739.70 738.97 0.60% A6 A5 158- 0.10 0.81 8 6.26 24.4 24.4 36 51.7 7.32 7.21 740.65 739.70 0.60% A7 A6 133_ 0.22 0.81 7 6.34 24.2 24.2 30 31.8 6.48 7.13 741.95 741.15 0.60% A8 A7 151_ 0.20 0.78 7 6.44 23.4 _ 23.4 30 31.8 6.48 7.08 742.85 741.95 0.60% A9 A8 145_ 0.79 0.91 7 6.53 22.7 22.7 30 36.7 7.48 7.87 744.01 742.85 0.80% A10 A9 146_ 0.51 0.91 6 6.62 18.2 18.2 30 36.7 7.48 7.46 745.17 744.01 0.80% All A10 100_ 0.51 0.91 6 6.69 15.3 _ 15.3 24 20.3 6.45 7.08 746.47 745.67 0.80% Al2 All 100_ 0.51 0.91 6 6.76 12.3 12.3 24 20.3 6.45 6.76 747.27 746.47 0.80% A13 Al2 100_ 0.51 0.83 6 6.84 9.3 9.3 24 17.5 5.58 5.66 747.87 747.27 0.60% A14 A13 100_ 0.51 0.91 5 6.93 6.5 _ 6.5 24 17.5 5.58 5.15 748.47 747.87 0.60% A15 A14 100 0.51 0.91 5 7.04 3.3 3.3 18 8.1 4.61 4.35 749.57 748.97 0.60% B2 B1 52_ 0.80 0.94 9 5.95 52.7 _ 52.7 48 101.7 8.09 8.16 735.76 735.50 0.50% B3 B2 100_ 0.80 0.94 9 6.01 48.7 _ 48.7 48 101.7 8.09 8.00 736.26 735.76 0.50% B4 B3 100_ 0.80 0.94 8 6.07 44.6 _ 44.6 48 101.7 8.09 7.82 736.76 736.26 0.50% B5 B4 59_ 1.00 0.91 8 6.11 40.2 40.2 48 101.7 8.09 7.61 737.05 736.76 0.50% B6 B5 185_ 0.08 0.83 8 6.23 35.3 35.3 42 71.2 7.40 7.38 738.48 737.55 0.50% B7 B6 296 0.06 0.83 7 6.42 33.0 33.0 42 71.2 7.40 7.26 739.96 738.48 0.50% B8 B7 146 0.28 0.83 7 6.51 33.2 33.2 42 71.2 7.40 7.27 740.69 739.96 0.50% B9 B8 34 0.87 0.63 7 6.54 31.7 31.7 42 71.2 7.40 7.18 740.87 740.69 0.50% B10 B9 75 0.07 0.83 6 6.77 10.1 10.1 24 17.5 5.58 5.78 742.81 742.37 0.60% B11 B10 69 0.30 0.63 6 6.83 9.8 9.8 21 12.3 5.11 5.67 746.48 746.06 0.60% B12 B11 70 0.26 0.82 6 6.89 8.6 8.6 21 12.3 5.11 5.52 746.90 746.48 0.60% B13 B12 87 0.61 0.86 5 6.97 7.2 7.2 21 12.3 5.11 5.31 747.42 746.90 0.60% B14 B13 69 0.55 0.90 5 7.04 3.6 3.6 18 8.1 4.61 4.45 748.08 _ 747.67 0.60% B23 B9 66 0.44 0.74 5 7.04 2.3 2.3 30 64.9 13.23 6.24 743.51 _ 741.87 2.50% B15 B9 184 0.67 0.89 6 6.68 16.6 16.6 30 29.0 5.91 6.11 742.29 _ 741.37 0.50% B16 B15 90 0.38 0.92 6 6.76 10.1 10.1 24 16.0 5.10 5.39 748.24 747.79 0.50% B17 B16 90 0.39 0.92 6 6.84 7.8 7.8 21 11.2 4.66 5.03 748.94 748.49 0.50% B18 B17 90 0.41 0.89 5 6.93 5.4 5.4 18 7.4 4.21 4.59 749.64 749.19 0.50% B19 B18 90 0.48 0.85 5 7.04 2.9 2.9 18 7.4 4.21 3.94 750.09 749.64 0.50% B20 B15 250 0.07 0.80 5 6.95 2.7 2.7 18 10.5 5.95 4.97 751.79 749.29 1.00% B21 B20 57 0.20 0.83 5 7.00 2.3 2.3 18 10.5 5.95 4.75 752.36 _ 751.79 1.00% B22 B21 31 0.19 0.83 5 7.04 1.1 1.1 18 10.5 5.95 3.89 752.67 _ 752.36 1.00% B24 B6 37 0.52 0.89 5 7.04 3.3 3.3 15 6.5 5.27 5.28 748.66 748.28 1.00% C2 C1 47 0.11 0.83 6 6.67 4.4 4.4 30 29.0 5.91 4.26 758.23 758.00 0.50% C3 C2 31 0.11 0.83 6 6.70 3.8 3.8 24 16.0 5.10 4.17 758.89 758.73 0.50% C4 C3 108 0.10 0.83 6 6.83 3.2 3.2 24 16.0 5.10 3.98 759.43 758.89 0.50% I C5 C4 205 0.15 0.89 5 7.01 2.2 2.2 18 12.9 7.29 5.41 763.00 759.93 1.50% Ili T H OM AS& H U T T O N T:\AutoCADiReports\HEC-22 HEC-22 Reporting HEC-22 Storm Drain Computations Structure ID Length Drainage Runoff Tc Rain"I" Runoff Known Q Total Q Pipe Full Q Velocity Velocity Invert Elevation Slope (ft) Area Coeff"C" (min) (in/hr) "Q" (cfs) (cfs) Dia. (cfs) Full Design From l To _ (ac) (cfs) (in) (ft/s) (ft/s) U/S D/S C6 C5 31 0.19 0.91 5 7.04 _ 1.21 1.2 18 12.9 7.29 4.61 763.47 763.00 1.50% C7 C4 31 0.09 0.83 5 7.04 0.6 0.6 15 4.6 3.73 2.52 760.84 760.68 0.50% E2 El 126_ 7 7.10 30.7 _ 30.7 30 29.0 5.91 6.67 746.13 745.50 0.50% E3 E2 132_ 7 7.21 31.2 31.2 30 29.0 5.91 6.36 746.79 746.13 0.50% E4 E3 158- 2.60 0.45 6 7.34 31.8 31.8 30 29.0 5.91 6.47 747.58 746.79 0.50% E5 E4 104_ 0.37 0.45 6 7.42 23.4 _ 23.4 30 29.4 6.00 6.65 748.11 747.58 0.51% E6 ES 187_ 2.71 0.45 6 7.56 22.5 22.5 24 16.0 5.10 7.17 749.04 748.11 0.50% E7 E6 220 3.86 0.45 5 7.76 13.6 13.6 24 16.0 5.10 5.72 750.15 749.04 0.50% F2 Fl 142_ 0.19 0.45 6 7.48 6.8 _ 6.8 24 16.0 5.10 4.89 749.88 749.17 0.50% F3 F2 183_ 5 7.68 6.3 6.3 18 7.4 4.21 4.72 751.30 750.38 0.50% F4 F3 70 1.82 0.45 5 7.76 6.4 6.4 18 7.4 4.21 4.73 751.65 751.30 0.50% Ili T H OM AS& H U T T O N T:\AutoCADiReports\HEC-22 HEC-22 Reporting HEC-22 Inlet Capacity Results Structure Q=CIA/Kc Known Longitudinal Cross Cross Prey. Total Depth Gutter Spread Inlet Type Grate Grate Curb Curb Intercept Bypass Bypass Remark (cfs) Q Slope Slope Slope Bypass Gutter d Width T Length Width Opening Opening Flow Flow Structure (cfs) SL Sx Sw Flow Flow (ft) (ft) (ft) (in) (in) Length Height Qi Qb (ft/ft) (ft/ft) (ft/ft) (cfs) (cfs) (in) (in) (cfs) (cfs) A15 3.3 -1.00 0.02 0.08 3.3 0.3 1.0 9.8 Combination 35.5 23.6 35.5 4.2 3.31 A14 3.3 -1.00 0.02 0.081 3.3 0.3 1.0 9.8 Combination 35.5 23.6 35.5 4.2 3.3 A13 3.0 -1.00 0.02 0.08 3.0 0.2 1.0 9.1 Combination 35.5 23.6 35.5 4.2 3.0 Al2 3.3 -1.00 0.02 0.08 3.3 0.3 1.0 9.8 Combination 35.5 23.6 35.5 4.2 3.3 All 3.3 -1.00 0.02 0.081 3.3 0.3 1.0 9.8 Combination 35.5 23.6 35.5 4.2 3.3 A10 3.3 -1.00 0.02 0.08 3.3 0.3 1.0 9.8 Combination 35.5 23.6 35.5 4.2 3.3 A9 5.1 -1.00 0.02 0.08 5.1 0.4 1.0 14.8 Combination 35.5 23.6 35.5 4.2 5.1 A8 1.1 -1.00 0.02 0.08 1.1 0.2 1.0 5.6 Combination 35.5 23.6 35.5 4.2 1.1 A7 1.3 -1.00 0.02 0.08 1.3 0.2 1.0 6.5 Combination 35.5 23.6 35.5 4.2 1.3 A6 0.6 0.01 0.02 0.08 0.6 0.2 1.0 5.0 Combination 35.5 23.6 35.5 4.2 0.4 0.2 A5 A5 1.1 0.05 0.02 0.08 0.2 1.2 0.2 1.0 4.9 Combination 35.5 23.6 35.5 4.2 0.8 0.5 A4 A4 7.2 -1.00 0.02 0.08 0.5 7.7 0.5 1.0 21.0 Combination 35.5 23.6 35.5 4.2 7.7 A3 5.3 -1.00 0.02 0.08 5.3 0.4 1.0 15.4 Combination 35.5 23.6 35.5 4.2 5.3 A2 5.3 -1.00 0.02 0.08 5.3 0.4 1.0 15.4 Combination 35.5 23.6 35.5 4.2 5.3 1 B14 3.6 -1.00 0.02 0.08 3.6 0.3 1.0 10.6 Combination 35.5 23.6 35.5 4.2 3.6 B13 3.7 -1.00 0.02 0.08 3.7 0.3 1.0 11.1 Combination 35.5 23.6 35.5 4.2 3.7 B12 1.5 0.02 0.02 0.08 1.5 0.2 1.0 6.4 Combination 35.5 23.6 35.5 4.2 0.8 0.7 B11 B11 1.3 -1.00 0.02 0.08 0.8 2.1 0.2 1.0 6.7 Combination 35.5 23.6 35.5 4.2 2.1 B10 0.4 0.02 0.02 0.08 0.4 0.1 1.0 3.5 Combination 35.5 23.6 35.5 4.2 0.3 0.1 B11 B9 3.8 -1.00 0.02 0.08 1.7 5.6 0.4 1.0 16.0 Combination 35.5 23.6 35.5 4.2 5.6 B8 1.7 -1.00 0.02 0.08 0.5 2.2 0.2 1.0 6.7 Combination 35.5 23.6 35.5 4.2 2.2 B7 0.4 0.02 0.02 0.08 0.4 0.1 1.0 3.3 Combination 35.5 23.6 35.5 4.2 0.3 0.1 B8 B6 0.5 0.05 0.02 0.08 0.5 0.1 1.0 2.9 Combination 35.5 23.6 35.5 4.2 0.4 0.1 B5 B5 6.4 -1.00 0.02 0.08 1.9 8.4 0.5 1.0 22.5 Combination 35.5 23.6 35.5 4.2 8.4 B4 5.3 -1.00 0.02 0.08 5.3 0.4 1.0 15.4 Combination 35.5 23.6 35.5 4.2 5.3 B3 5.3 -1.00 0.02 0.08 5.3 0.4 1.0 15.4 Combination 35.5 23.6 35.5 4.2 5.3 B2 5.3 -1.00 0.02 0.08 5.3 0.4 1.0 15.4 Combination 35.5 23.6 35.5 4.2 5.3 B23 2.3 0.01 0.02 0.08 2.3 0.2 1.0 8.9 Combination 35.5 23.6 35.5 4.2 1.1 1.2 B9 B19 2.9 -1.00 0.02 0.08 2.9 0.2 1.0 8.6 Combination 35.5 23.6 35.5 4.2 2.9 B18 2.6 -1.00 0.02 0.08 2.6 0.2 1.0 7.0 Combination 35.5 23.6 35.5 4.2 2.6 B17 2.5 -1.00 0.02 0.08 2.5 0.2 1.0 6.8 Combination 35.5 23.6 35.5 4.2 2.5 B16 2.5 -1.00 0.02 0.08 2.5 0.2 1.0 6.8 Combination 35.5 23.6 35.5 4.2 2.5 B15 4.2 -1.00 0.02 0.08 4.2 0.3 1.0 12.5 Combination 35.5 23.6 35.5 4.2 4.2 B20 0.4 -1.00 0.02 0.08 0.4 0.1 1.0 1.2 Combination 35.5 23.6 35.5 4.2 0.4 B22 1.1 0.02 0.02 0.08 1.1 0.2 1.0 6.0 Combination 35.5 23.6 35.5 4.2 0.7 0.5 B8 B21 1.2 0.02 0.02 0.08 1.2 0.2 1.0 6.1 Combination 35.5 23.6 35.5 4.2 0.7 0.5 B9 B24 3.3 0.04 0.02 0.08 3.3 0.2 1.0 7.7 Combination 35.5 23.6 35.5 4.2 1.4 1.8 B5 Ili T HOM AS& H U T T O N T:\AutoCADlReports\HEC-221HEC-22 Reporting HEC-22 Inlet Capacity Results Structure Q=CIA/Kc Known Longitudinal Cross Cross Prey. Total Depth Gutter Spread Inlet Type Grate Grate Curb Curb Intercept Bypass Bypass Remark (cfs) Q Slope Slope Slope Bypass Gutter d Width T Length Width Opening Opening Flow Flow Structure (cfs) SL Sx Sw Flow Flow (ft) (ft) (ft) (in) (in) Length Height Qi Qb (ft/ft) (ft/ft) (ft/ft) (cfs) (cfs) (in) (in) (cfs) (cfs) J 1_ C6 1.2 0.02 0.02 0.08 1.2 0.2 1.0 5.8 Combination 35.5 23.6 35.5 4.2 0.71_ 0.5 C7 C5 0.9 0.02 0.02 0.081 0.9 0.2 1.0 5.1 Combination 35.5 23.6 35.5 4.2 0.6 0.3 C4 C4 0.6 0.02 0.02 0.08 0.3 0.9 0.2 1.0 5.1 Combination 35.5 23.6 35.5 4.2 0.6 0.3 C3 C3 0.7 -1.00 0.02 0.08 0.3 1.0 0.2 1.0 4.9 Combination 35.5 23.6 35.5 4.2 1.0 C7 0.6 0.02 0.02 0.08 0.5 1.1 0.2 1.0 5.5 Combination 35.5 23.6 35.5 4.2 0.7 0.4 C2 C2 0.7 -1.00 0.02 0.08 0.4 1.1 0.2 1.0 5.5 Combination 35.5 23.6 35.5 4.2 1.1 E4 9.2 -1.00 0.33 0.33 9.2 0.8 3.0 2.4 Grate inlet 47.5 23.8 9.2 E5 1.3 -1.00 0.33 0.33 1.3 0.1 3.0 0.8 Grate inlet 47.5 23.8 1.3 E6 9.5 -1.00 0.33 0.33 9.5 0.8 3.0 2.4 Grate inlet 47.5 23.8 9.5 E7 13.6 -1.00 0.33 0.33 13.6 0.9 3.0 2.8 Grate inlet 47.5 23.8 13.6 F4 6.4 -1.00 0.33 0.33 6.4 0.7 3.0 2.1 Grate inlet 47.5 23.8 6.4 F2 0.7 -1.00 0.33 0.33 0.7 0.0 3.0 0.5 Grate inlet 47.5 23.8 0.7 Ili T HOM AS& H U T T O N T:\AutoCADlReports\HEC-221HEC-22 Reporting HT THOMAS & HUTTON Stormwater Management Report Grace Church Road Industrial Salisbury, Rowan County, North Carolina Appendix H Channel Protection Analysis J - 31296.0001 April 2024 Thomason dhutton.com Hydrology Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Apr 1 2024 Grace Church - S Offsite Bypass Swale Hydrograph type = Rational Peak discharge (cfs) = 19.19 Storm frequency (yrs) = 25 Time interval (min) = 1 Drainage area (ac) = 4.500 Runoff coeff. (C) = 0.55 Rainfall Inten (in/hr) = 7.753 Tc by User (min) = 5 IDF Curve = 31296.0001 - Grace Church IDF fR n M ti'a L = 1.00 Hydrograph Volume=5,757(cuft);0.132(acft) Runoff Hydrograph Q (cfs) 25-yr frequency Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 5 10 Time (min) Runoff Hyd -Qp = 19.19 (cfs) Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Monday,Apr 1 2024 Grace Church - S Bypass Swale Trapezoidal Highlighted Bottom Width (ft) = 5.00 Depth (ft) = 0.86 Side Slopes (z:1) = 5.00, 5.00 Q (cfs) = 19.19 Total Depth (ft) = 1.00 Area (sqft) = 8.00 Invert Elev (ft) = 757.00 Velocity (ft/s) = 2.40 Slope (%) = 0.50 Wetted Perim (ft) = 13.77 N-Value = 0.030 Crit Depth, Yc (ft) = 0.63 Top Width (ft) = 13.60 Calculations EGL (ft) = 0.95 Compute by: Known Q Known Q (cfs) = 19.19 Elev (ft) Section Depth (ft) 759.00 2.00 758.50 1.50 • 758.00 1.00 v - 757.50 0.50 • 757.00 0.00 756.50 -0.50 0 2 4 6 8 10 12 14 16 18 20 Reach (ft)