Loading...
HomeMy WebLinkAboutNCG160193_COC Not Renewed Notification Email (FEES OWED)_20240620 Georgoulias, Bethany From: lase rfiche.ncdenr.gov@mccicloud.io Sent: Thursday, June 20, 2024 4:48 PM To: andrew.norton@fredsmithcompany.net; tim.perry@rosebrotherspaving.com; tim.perry@rosebrotherspaving.com; tim.perry@rosebrotherspaving.com; tim.perry@rosebrotherspaving.com; tim.perry@rosebrotherspaving.com; tim.perry@rosebrotherspaving.com; Bailey.watkins@fredsmithcom pany.net; Bailey.watkins@fredsmithcom pany.net; Bailey.watkins@fredsmithcom pany.net; Bailey.watkins@fredsmithcom pany.net; Bailey.watkins@fredsmithcom pany.net; Bailey.watkins@fredsmithcompany.net Cc: Georgoulias, Bethany Subject: [External] Stormwater General Permit Renewal Info - NCG160193 (FEES OWED) Attachments: NCG160193_Renewal Issuance Notification Letter (FEES OWED)_20240619.pdf Importance: High CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Dear NPDES Permittee: N.C. DEMLR Stormwater Program has renewed the General Permit under which this facility is covered. Our Program posted the draft General Permit for public comment during April 15 - May 15, 2024. The new General Permit was issued on May 29th and became effective on June 1, 2024. Because this permit had outstanding fees in the month prior to renewal,the Certificate of Coverage (COC)was not renewed on June 1. Please see the important letter attached, which is being mailed out by hard copy to the Responsible Official associated with the Owner Entity.With this email, we are also reaching out to permit and facility contacts in our system as of 6/10/2024 so that the information gets to all the right people. If you have questions about the owed fees, please contact our Stormwater Billing Specialist at tev.holloman@deq.nc.gov. If owed fees have already been resolved,you can go to the Renewal COC Request form (https://edocs.deq.nc.gov/Forms/SW-COC-Renewal) and select the option "the COC is still expired, but owed fees have been paid". Permit COC No.: NCG160193 Permittee: Fsc II LLC Facility Name: FSC II LLC - Gold Rock Asphalt Plant Facility Location: 7379 N Halifax Rd, Battleboro, NC County: Nash More information can be found on our website here: https://www.deq.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/npdes-industrial-program/general-industrial-permits 1 Sincerely, The NC DEMLR Stormwater Program This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored. 2