HomeMy WebLinkAboutNWP Transfer SAW-2019-01457-Rolesville Crossing_signed.pdf May 2.. 2024
Project ## 13755
To: US Army Corps of Engineers
Raleigh h Regulatory latory Field Office
ttn: Richard Harmon
1 Heritage Trade Drive, Ste. 10
Wake a Forest, NC, 27587
From: Bill Harrell
Hopper Communities
1616 Cleveland Ave,
Charlotte, NC, 28203
Fie: Nationwide Permit Verifioat�on Transfer of
Role vil le Crossing, I olesvi I I e, Wake count}, NC
SAW-2019-01457
n behalf of the permittee for the Rollesville Crossing project, Bill Harrel. of Kop per C ornm nines,
e are notifying you that the property is being sold to a new owner. The new owner will be
Lennar Corporation- ateigh Divis ion — Eric BIocher •--- Land Entitle meets Tanager located at_1_1.00
Perimeter Park Drive Ste. 112, Morrisville, 27560. As is required by condition number 29 of
the Nationwide Permits 18 & 29, we have included the following statement:
41 When the structures or work authorized by this nationwide permit are still in existence at the time
the property is transferred, the tents and conditions of this nationwide permit, including any
special conditions will continue to be binding on the new owner( of the property. To validate the
transfer of this nationwide permit and the associated liabilities associated with compliance with its
terns and conditions, have the transferee sign and date below.;e,
Transferee Date
i
Sincerely,
i
BBill Hart Il
Hopper Communities
hies
Attachments.,
404 Verification (AID-, SAW- 01 -014 7)
D I , 401 & Buffer Permitting Branch, Attn: Stephanie Goss, 512 N . Salisbury Street,
Raleigh,h, NC 27604