Loading...
HomeMy WebLinkAboutNWP Transfer SAW-2019-01457-Rolesville Crossing_signed.pdf May 2.. 2024 Project ## 13755 To: US Army Corps of Engineers Raleigh h Regulatory latory Field Office ttn: Richard Harmon 1 Heritage Trade Drive, Ste. 10 Wake a Forest, NC, 27587 From: Bill Harrell Hopper Communities 1616 Cleveland Ave, Charlotte, NC, 28203 Fie: Nationwide Permit Verifioat�on Transfer of Role vil le Crossing, I olesvi I I e, Wake count}, NC SAW-2019-01457 n behalf of the permittee for the Rollesville Crossing project, Bill Harrel. of Kop per C ornm nines, e are notifying you that the property is being sold to a new owner. The new owner will be Lennar Corporation- ateigh Divis ion — Eric BIocher •--- Land Entitle meets Tanager located at_1_1.00 Perimeter Park Drive Ste. 112, Morrisville, 27560. As is required by condition number 29 of the Nationwide Permits 18 & 29, we have included the following statement: 41 When the structures or work authorized by this nationwide permit are still in existence at the time the property is transferred, the tents and conditions of this nationwide permit, including any special conditions will continue to be binding on the new owner( of the property. To validate the transfer of this nationwide permit and the associated liabilities associated with compliance with its terns and conditions, have the transferee sign and date below.;e, Transferee Date i Sincerely, i BBill Hart Il Hopper Communities hies Attachments., 404 Verification (AID-, SAW- 01 -014 7) D I , 401 & Buffer Permitting Branch, Attn: Stephanie Goss, 512 N . Salisbury Street, Raleigh,h, NC 27604