Loading...
HomeMy WebLinkAboutNCC200436_NOT Closeout Documents_20240617 I,•+F jinklin FRANKLIN COUNTY I- Lounty SCM ANNUAL INSPECTION REPORT FORM A Research Triangle Region Community Franklin County Planning & Inspections 127 S Bickett Blvd Louisburg, NC 27549 919.496.2909 www.franklincountync.gov This completed form is to be submitted annually by September 30 to the Franklin County Planning Director. Project Information: Project Name: Cedar Crossing Subdivision SCM 1 Property Address: Hawksbill Dr, Franklinton Owner/Developer: Cedar Crossing POA Inc PIN #: 1864-56-1002 Date of Inspection: November 21 , 2023 Project Location: ® Tar-Pamlico River Basin ❑ Falls Lake Watershed SCM Description and Quantity: (identify all that apply) Infiltration System Sand Filter Disconnected Impervious Bioretention Rainwater Harvesting Treatment Swale Wet Pond Green Roof X Dry Pond Stormwater Wetland X Level Spreader-FS Permeable Pavement Other (describe): General Information for all SCMs: Yes No N/A ❑ ® ❑ Has sediment accumulated in the inlet, outlet or forebay? ❑ ® ❑ Are there signs of erosion or any denuded areas? ❑ ® ❑ Is there trash or debris that needs to be removed? (especially at outlet structures) ❑ ® ❑ Are algae, aquatic weeds or invasive plants (particularly cattails) present? ❑ ® ❑ Is there evidence of cracks, separation or alignment problems with pipes? ❑ ® ❑ Are rip-rap dissipator pads damaged, clogged with vegetation or insufficient? ❑ ® ❑ For dry detention ponds, is the basin holding water longer than 5 days after a storm event? ❑ Z ❑ Is there evidence of muskrat or beaver activity? ❑ ® ❑ Are vegetated slopes steeper than 3:1? ❑ Z ❑ Is there evidence of depressions in the soil surface over or around any pipes? ❑ ® ❑ Are records of Operation and Maintenance available for inspections performed quarterly and after every 1" storm event? (include copy) ❑ ❑ ® Other problems not listed above (describe below). SCM ANNUAL INSPECTION REPORT Describe all problems in detail (use additional sheets if necessary): Describe corrective actions needed (use additional sheets if necessary): SCM Condition (check one): ❑ FAILED INSPECTION Has MAJOR deficiencies and must be repaired in order to function properly and operate as designed. A final inspection and certification must be performed and submitted after repair. ❑ CONDITIONAL APPROVAL Has MINOR deficiencies but repair is needed in order to ensure system does not fail. Final Certification can be issued with contingent upon corrective measures being addressed. ® FINAL CERTIFICATION SCM has no deficiencies. Owner/ Representative Certification: I have read and understand the findings of this inspection. I understand that I am responsible for correcting all deficiencie -i en ifed in this report by October 30th of this year. Owner Signature: MI,1) Date: I-- II-�4 Owner of Recor • -reza G-rn Telephone:91 Address: J330_C—, coi 112_ Email: Z�F)tTC()6(2 1"1)(, C,Cg2¢P.fie )V--€ L -kkN, aL z-)CGC51 Inspector's Certification As a duly registered Professional in the State of North Carolina, I hereby certify that the SCM(s) described in this report were inspected under my responsible charge, and this report accurately identifies any deficiencies in the truc ur d function f t SCM(s). Inspector Signatur . ✓e") 2024-01-09 Inspector Name: William Ferrell Telephone: 984-304-7990 Company: Delta Land Design, PA Email: will@deltalanddesign 382 Raleigh St Address: Holly Springs NC 27540 Credentials: PE SCM ANNUAL INSPECTION REPORT 4 Franklin County c«cu/ Stormwater BMP Annual Certification Form ZQ�`�yNaca0�AP 9ry aR•_� Franklin County Planning & Inspections 215 East Nash Street Louisburg, NC 27549 Phone 919.496.2909/Fax 919.496.2637 franklincountync.us This form is to be completed and submitted annually by October 30 to the Franklin County Planning Director. Project Information: Project Name: Cedar Crossing Subdivision SCM 1 Property Address: Hawksbill Dr, Franklinton Owner/Developer: Cedar Crossing POA Inc PIN #: 1864-56-1002 Date of Inspection: November 21, 2023 Project Location: E Tar-Pamlico River Basin ❑ Falls Lake Watershed BMP Certification Type: E CONDITIONAL CERTIFICATION Final Certification will be necessary after repair of system. Submit the following attachments: 1. Stormwater BMP Annual Inspection Report, signed by Owner and Inspector 2. Photographs 3. Description of Problems 4. Description of Corrective Measures ❑ FINAL CERTIFICATION If BMP passed inspection, submit the following: 1. Stormwater BMP Annual Inspection Report, signed by Owner and Inspector 2. Photographs E FINAL CERTIFICATION If BMP was under Conditional Certification, submit the following with the Final Certification: 1. Photographs, clearly showing BMP after repair Certification Statement As a duly registered Professional in the State of North Carolina, I hereby certify that the Stormwater BMP(s) were inspected under my responsible charge, and to the best of my knowledge, the safety and function are in compliance with the intent of the original design and the Franklin County/NCDENR standards and regulations. CAR0 SEAL:\' C).S1'• SEAL • 035789 • Signature: ///,,,,,,,,,00 Date: 2023-12-05 Name (print): William P Ferrell Telephone: 984-304-7990 Address: 382 Raleigh St Fax: 984-304-7990 Holly Springs, NC 27540 Email: will@deltalanddesign.com Stormwater BMP Annual Certification Form Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center,Raleigh,NC 27699 (919) 791-4200 County: Franklin Project: Cedar Crossing Subdivision-Phase 4&River basin: Tar-Pamlico Person financially responsible:GreenHawk Corporation,Inc.-Jeffrey M White, Project#: FRANK-2020-012 Manager Address: 1330 Sunday Drive,Suite 105,Raleigh,NC 27607 1. Project Location: Cedar Creek Road,Franklinton Pictures: No 2. Weather and soil conditions: Sunny,Dry,Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: S. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: March 15,2024 9. Corrective action needed: 10. Comments: Closeout inspection requested.Site is meets requirements for closeout. Some bare areas near Hawksbill and Fontain noted,but are not within LOD of this project. Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Mattie Frazier Others present: Date of inspection: March 14,2024 Time arriving on site: 3:15 PM Time leaving site: 3:50 PM cc: