— Smith Road SR 2237 — — — — — —
= = =:
-464&140040Wili7fte
Construction: Maintenance:
\—T: 1.Clear the entrance and exit area of all vegetatlon,roots,and other objectlonable 1.Per to nai inspect at least once a week and after each 1 inch or
_ mateeal and properly grade it. greater rainfall;make any required repairs event ately.
\ �\� �/� 2.Placetlhe gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in a condition to prevent mud or sediment
VICINITY MAP — _ _ Imdressing rite 2inch stone�i e. his may require periodic
87 3.smooth drainage to carry water to asetliment trap or other suitable outlet toptlressing with 2incM1 atone.
N T.S. \ III
4.Use ge°textile fabrics In ortler to improve stability of the foundation in locations 3.Immediately[sly remove all objectionable materlals spilled,washed or
s / ROADSIDE JJJ subject to seepage or high water table. tracked onto public roadways.
\ III
TZ� _ / DITCH
\ p CONSTRUCTION ENTRANCE/EXIT
36 2 \ '�1 / DATE: wire Fence r—Filter Fabric PAGE:
CONSTRUCTION SCHEDULE \ \ \ 3 4 I I
I.Obtain all necessary pen. d 1 I E a Sediment Control(EWSC)perm and a Certificate of Coverage / 7 / Beal Standard Strength fabric with wire fen. P
(COC)must be obtained before yl ddisturbing A copy of the.SC permit,permit
COC and a bard copy of the 6Max Extra strength taboo afar
play moat be kept on site,preferably' perm b d accessible during inspections ��, Wire Fence Wire Rn ckC trench
44B
e Comp. i —
e �mor°agmy
2 Install gravel construction entrap first,M siltf reinforced siltfence �� 6 I Steel Post
outlets dwad.. =
3 Finish clearing dgrubbingar arY n the lots.they are started. r+
ope
4.Begin. grading d 11 1}
Begin5. with house 1 \ / ,y Plastic
ct es /" M1Xn�6. sit 11 rough grading d h construction.All areas not disturbed for T days needs to have temporary or permanent / \ V-I •
g l installed / 1 F ,E ii ie�C 1 n e• in.
),I 11 dri ys walks ape' '.y
8 Begin f grading of lot l along the renk,wara
9 Final grassing,mulching d eb'1 f lot I h' ill involve the installation of sod on the lot.The silt fence will I a�.tl N ♦ ` �
remain in placeuntil the 1 added grassing'stabilized d ate hold. �' n n
.OTT contractorhall d If' p of Me d d' alien control measures and complete the following
combined If'pe f f d M L b / I • Filter Fabric
http/ deq. g /b d- - s/ rgy I d d sl water/rormwater progaM)ptles-constuction program >> structions
standard strength or extra strength symM1etkfitartaGkx CROSS SECTION VIEW
Twelve months of complete inspection fem.shall be kept on site and available for inspection at all times.It is recommendMa ,� To to rrier.avoid joints.When loints are
27a.. \ irs immediately.
mt site or VXwhen war mano.prt..is u�fiapa a . in.or greater rainfall.Make any Ill
/ 24sdeo. U •G25 Oes I EPMeP8.Place 12ifrom harrier.
nches of fa.bra the hnmom and sideof the trench.
eon the m nse r drag mates tatie imentdep>oss
and g. Iran.
soil pk.over the lifter labdc antl compact.Thorough Prins area
area beento prde operly
sterilize It aPerne contributing
g pacdo of the backfill is red hash prepaystabilized.
10.D°not attach filer fah..existing trees.
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION / 26I / I ..ANC-En Wr nmentel.jpeg
Gravel Construction Entrance-The gavel pad should remain in a condition to prevent mud or sediment from leaving Me construction site. /� / I I I ( SILT FENCE
This may require periodic topdressing with 2-inch stone.Aftereach rainfall,inspect any structure used to trap sediment and clean it out as necessary. / /
Immediately remove all objectionable materials spilled,washed,or tracked onto public roadways. Z 2
Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. / I' DATE: PAGE:
Damaged ordmomposed fabric should be replaced promptly.Any sediment deposits that buildup against the fence should be removed and disposed 10'SRE;nGaJC UTILITY ASEMENT
of properly m insure that the removed sediment aces not wasp back against the fence.Adequate storage volume should be provided for behind Me fence ill UTILI Y ASEMENT —� I W stlt seek/w°tua silt Sock/Wattle
at tau times.rake care ro nor undemtine the fence during Benno p / / / W � �I FLO �I Arent°. 1. Other materials proviWng a.k.a.prole..
IIII
41)
•
Soddng Thed should be properly mmnminedminsme that thegrass ate holds in die areas being secured The sod should be watered as necessary J \ (/\ ,`/, ��] ay(/ j.l.l �111fLL- use in silt socks es wattles
eke
to maintain deq store m Me mot zone and prevent dormancy fit d.The sod Mould not be mowed to close,since this could inhibit adequate ,1Ylandevilla'V�'ay / ' I>uj )
1°'I ea II ft.x 2.,l. to the d.ired length such that logs do l 1 N
m.
gro h d stabilization of the root bad.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations whensoo. -nantad ireeredlem
and if possible. / / I Q eoleco
SECTION SECTION fee(s)located below
Grassing and MulehMg-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparafion. \ 10'UTILITY EASEMENT
? site-�aftti>"KKI`ware'a erne sag.of
Once the gassing has been placed,die arca should be maintained as needed to insure that an areas are germinating properly.Any bate areas should be repaired, 10'SREMC UTILITY 1\ �— kMenlN)scuts ends
coed sNn
and reseeded ss soon ss possible.If the time of year does not permit me establishment of a permanent gr.s,then a temporary grassing should be used until the / EASEMENT T / slightly ofthe
growing season comfits the use of a permanent grass. \ / �- i 1 O I 0 / �o NMu. a.pnor. I 4 iaw.MMprevent .co,a one eon e
Diversion Berms-Diversion beans shall be inspected weekly m after eacM1 runoff producing rainfall to ivsure that Mey are operating as designed and that Mere stakes with a 2
Mould be dd.
have been no breaches in the berm.Berms Mall no exceed 18"in height,and shall be placed in locations that will no interfere with home construction act / / N other durable York,ciumsthroughthe wren
Once the houseconstruction is completed and the lot ready to sod,then the ben)shell be removed and the material incorporated into the graded lot areacod`'�
xiartm'interval
and covered immediately wile sod.All proper care shall be taken (insure that Me barns are installed aaofding to Me applicable detail with Me barn material \ / / Ifeet n aW to a 4 h
compacted sufficiently to insure that Me berm remains in place during the course of the construction activities. / / o w° Mulch°r oar Trencnd a4 Mm �ea,mso vre placed in me
General-All measures will be inspected and corrections made aria runoff producing rainfalls,or at least once per wok minimum.The builds will insure that the 22 / / 2 / 20 / / .?-:2
m uNTRENOHEO INSTALLATION t of ENTRENCHED INSTALLATION. concrete blocks shall be used behind the silt
logs g 5. socktrwattles are umd on when
pavement)
lie.
any Particular lot do not adversely affect any of the installed erosion control measures.Blot construction dictates,measures will be relocated / I ro' +wowiunoaw.,mesuamm.m.weo<.sw:uen.«.0
on the lot' insure that Me potential sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintainedw suggested 'A/ / / q.Z ISOMETRIC VIEW
sool.atre to pia it in plane rag on events.
m the erosion control manual.Sodding,seeding and mulching will be maintained a insure proper ground stabilizing cover. / I 2 ore xm/u Dow an25 1. Insp.silt sock/wattle at least weekly and ens oiler
each 1 aft or greater rainfall.Remove
Mulch or
The tl l // J MUntremhee gooks mteoetl g<man gamete CO..612 fn(300^m "` 2 attle moat Pacae llclm ad or
GROUND STABILIZATION a ° I „L �/ / �'' ti0/ She kw� f''I "aTaae p tsa , ..0 Is,a m, °'On 3. If ponding becomes excessive p;e, a
w t soak/Mt rat'^m(QR arm
,era)IzzaFm;
Work Area ! Wattle
(eosst) 15sr) (seen m) ed or-beams
�aaat<n°. g,.;ft pift 'milt a2min g"/ Reinstall If pm na
SITE AREA STABILIZATION EXCEPTIONS "" "� v °m a• / / // '�"a"` tee (�4, tree i2ai Mar
EXCEPTIONS a
DESCRIPTION TIME FRAME / / .ern) earn) An/m) /rate,,) inn) ...re has been.rnanentY stabilized.
PERIMETER DIKES, 7 DAYS NONE -= •(
SWALES, DITCHES I — r // / 19 _ /� SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION
&SLOPES „".I."n / / ,,TN" p9 ��'�
HIGH QUALITY 7 DAYS NONE iHii, i
WATER ZONES 7II .r<.re�r°r,)u. / / 'k\��\�p•' tr
(HOW) ➢ .w.�.e,�.. .,..�
/ 18 G' �C A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY
/ G NCGS 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR
SLOPES STEEPER 7 DAYS IF SLOPES ARE Ili II •
.m�...... " .vie a� / /� COMPLETED AS AN EXCEL SPREADSHEET.
THAN 3:1 10'OR LESS IN ill w.m..wdio1 CD2< * / j o S�' l'' / AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED
LENGTH AND ARE �,.�..,".��,. EROSION AND
NOT STEEPER m. % / / 'C/ SEDIMENTATON CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A
]'S�' (.�\� 13 NCAC 04B.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY
THAN 2:1, 14 ///(((,aa�6,, t ( INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE
DAYS ARE "'""°� / / /`1' PS - APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING,
ALLOWED �c°..m ` m",..b. �' I - DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE,
SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SVSH .-�� J�<(\V\ ` PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION
FLATTER SLOPES GREATER I� �� a.- /� •
/ l3`j CONTROL PLAN.'
THAN 50'IN _•• a�b DI;IIU / �iGF. al /I
.R. rH ,,LENGTH '� ill / j Lot Plan
NONE
RIMETPT nwp f11l°nI .._d <i,„.m""..o, / / "Darr&ttGmi ♦ _ ,
WITH SLOPES FOR OME NES II IPI �w _ PAGE 1 of 2
ALL OTHER AREAS 14 DAYSI II
II
FLATTER THAN 4:1 AND HOW ZONES
SODDING Lot
Plan
N. LOT EROSION CONTROL PLAN
"G" N / FOR LOS 14 & 15
Earrem' Burry.SIMMS CONSTRUCTION / TOTAL DISTURBED ACREAGE: 0.93 ACRES
= - = w.
TOOL FOR TUCKING w.wNOWM..PW S. — — — MORNING GLORY
eIlk `°n�`n e 3 -7— ` PHASE TWO
Pursuant to G.S.113A(3),provisions for permanent ground cover \ \
sufficient to restrain erosion must be accomplished for all i \ FOR
disturbed areas within 14 working days or 90 calendar days \
(whichever is shorter)following completion of construction.
"Or�j KIMASH HOMES, LLC.
" pIuallr � "� MOWWHEN GRAYS CREEK TOWNSHIP CUMBERLAND COUNTY
W.'..aon o m Sr SOD" TEE SOO IS
EE iorC MOWER General Erosion Control Notes / \ \\ NORTH CAROLINA SCALE: 1"= 60' APRIL 2024
APPEARANCE OF GOOD SOD 1.Only the areas shown shall be disturbed. / •
2.All disturbed areas shall be grassed and mulched as soon as / GRAPHIC SCALE
I I ran..aaa,wn eta possible and maintained until permanent cover Is established. / �2 - \ eo - 3� 120 240
II
1 )
sicili\ijkl,011_± .._ -.ri, ,da,,e narro v 1 ENGINEERSR ( IN FEET)
\ IVI"\t\ 7 / / SURVEYORS MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C.
/ MOORMAN,KIZER&REITZEL,INC. PHONE (910) 484-5191 FAX (910) 484-0388 License#: F-0106