No preview available
HomeMy WebLinkAboutWQ0011119_Monitoring - 03-2024_20240417Monitoring Report Submittal Permit Number#* WQ0011119 Name of Facility:* Town of Colerain Month: * March Year: * 2024 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR img100.pdf 4.43MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * townofcolerain@mediacombb.net Name of Submitter: * Lynne Conner Signature: Date of submittal: 4/17/2024 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* WQ0011119 Is the monitoring report accepted?* Yes No Regional Office* Washington Reviewer: _anonymous Review Date: 6/20/2024 'ORM: NDMR 08-11 NON -DISCHARGE MONITORING REPORT (NDMR) Page [ of Permit No.: VVQ0011119 Facility Name: Colerain WWTP County: Bertie Month: MARCH Year: 2024 PPI: 001 Flow Measuring Point: U Influent 71 No flow generated C7 Effluent 7 Parameter Monitoring Point: ❑ Influent F. Effluent D Groundwater Lowering i Surface Water Parameter Code - 0 50050 00310 00940 50060 31616 00610 00625 00620 00600 00400 00665 70300 00530 o y E c O E UNUL a p o U')U p 2 oU ° vo U Q t Z O H o Z o p o o d N Y°=oQ O n pvU) v -6C VO) a o m nU N 24-hr hrs GPD mg/L mg/L mg/L #/100 mL mg/L mg/L mg/L *N/A Su mg/L mg/L mg/L 1 23,121 2 12:00 1 23,121 3 95,712 4 95,712 5 95,712 6 95,712 7 95,712 8 95,712 9 13:15 1 95,712 10 67,923 0.03 8.0 11 67,923 12 67,923 13 67,923 14 67,923 15 67,923 16 12:00 1 67,923 17 30,867 18 30,867 19 14:30 1 30,867 20 30,867 0.05 7.9 21 30,867 22 30,867 23 12:30 1 30,867 24 95,886 25 95,886 26 95,886 27 95,886 28 95,886 29 95,886 30 13:30 1 95,886 31 66,918 Average: 69,222 0.04 Daily Maximum: 95,886 0.05 1 8.01 Daily Minimum: 23,121 0.03 1 7.90 Sampling Type: Recorder Grab Grab Grab Grab Grab Grab Grab Grab Grab I Grabj Grab Monthly Limit: 75,000 Daily Limit: Sample FreqUency:1 Continuous 4 x Year 3 x Year Per Event 4 x Year 4 x Year 4 x Year 4 x Year Per Event 4 x Year 3 x Year 4 x Year coRM= NDMR 08-11 NON -DISCHARGE MONITORING REPORT (NDMR) Page Z of Sampling Person(s) Certified Laboratories Name: Environment 1, Inc Name: Environment 1, Inc Name: Roger Adams / Hunter Copeland Name: Field Lab Measurements Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? O Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. ❑ Yes O No ****it Was found that the primary lift station was having issues with the floats controlling the pump start and stop. The floats were initially cleaned, but did not resolve the issue. After further monitoring and troubleshooting, Tencarva was contacted to repair the system. System reading should have more reliable readings to calculate flow in April. The flows calculated are show much more sewer going to the lagoon than what was really being pumped. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: R. Hunter Copeland Permittee: Town of Colerain Certification No.: 25016 Signing Official: Lynne Connor Grade: Spray Irrigation Phone Number: 252-714-1792 Signing Official's Title: Town Clerk Has the ORC changed since the previous NDMR? Phone Number: 252-356-2124 Permit Expiration: 4/30/2023 �K I ql_� �_ %-:\ � "3 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information. including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR) Page of L Permit No.: WQ00111 19 Facility Name: Colerain WWTP County: Bertie Month: MARCH Year: 2024 Did irrigation occur at this facility? Yes ❑ NO Field Name: 1 Field Name: Field Name: Field Name: Area (acres): 49.5 Area (acres): Area (acres): Area (acres): Cover Crop: i,l YES ❑ NO Cover Crop: p: ❑ YES C NO Cover Crop: p� ❑ YEs 7- NO Cover Crop: ❑ YES ❑ NO Hourly Rate (in): 1.5 Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): Annual Rate (in): 22.62 Annual Rate (in): Annual Rate (in): Annual Rate (in): Weather Freeboard Field Irrigated? Field Irrigated? Field Irrigated? Field Irrigated? pn Uc a ? m D c •ma a «mrnm mu� a o m N -a M ma _ J E! �E c o Oi- E rn m E ^ J OO CL p i Q rn _ @R D O E T ' XO m O a E d fl- 0 0- E M m O O J E �. E c o c O m •o E °' ad�rn cE Ta �X oM O N S =0 J 71 °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 3.40 2 CL 0.0 3.30 3 63 4.0 3.30 4 3.30 5 3.30 3.30 6 7 3.30 3.30 8 9 C 2.60 236.250 675 0.18 0.02 10 63 4.20 504.000 1440 0.37 0.02 11 4.20 504,000 1440 0.37 0.02 12 4,20 504,000 1440 0.37 0.02 13 0.5 4.20 504,000 1440 0.37 0.02 14 4.20 267,750 765 0.20 0.02 15 4.20 2.60 16 17 48 6.80 18 3.60 19 C 3.90 199,500 570 0.15 0.02 20 0.0 3.60 504.000 1440 0.37 0.02 21 3.60 504,000 1440 0.37 0.02 22 3.60 333,900 954 0.25 0.02 23 C 5.30 24 57 0.3 6.80 25 4.30 4.30 26 27 58 6.80 4.20 28 29 4.20 30 C 3.90 3.02 31 Monthly 4.20 Loading:4,061,400 Ys 0 0.00-'� yy ' 0 _01 0.00 0 0.00 �f 12 Month Floating Total (in): 6.77 FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR) Page of Z Did the application rates exceed the limits in Attachment B of your permit? O Compliant ❑ Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? 0 Compliant LJ Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? n Compliant ❑ Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? El Compliant ❑ Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? O Compliant ❑ Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective arlinn/c) taken Attach arlrlitinnnt chpptc if nacessary ❑ Yes L-1 No Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: R. Hunter Copeland Permittee: Town of Colerain Certification No.: 25016 Signing Official: Lynne Connor Grade: Spray Irrigation Phone Number: 252-714-1792 Signing Official's Title: Town Clerk Has the ORC changed since the previous NDAR-1? Phone Number: 252-356-2124 Permit Exp.: 4130123 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance and evaluated the information submitted. Based on my with a system designed to assure that all qualified personnel properly gathered inquiry of the person or persons who manage the system. or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Town of Colerain Lift Station Monthly Log Month: MARCH Year: 2024 Lift LONGBRANGH Staton: Pump #1 Pump #2 Generator DAY Cycles ReadingCycles Run Time ReadingTime Run Cycles ReadingCycles Run Time ReadingTime Run Hour ReadingHours Total Run Test Run 1 NR 0.00 NR 1.57 2 0 NR 7289.82 0.00 0 NR 8261.6 1.57 963.1 0.5 3 NR 1.29 NR 3.57 4 NR 1.29 NR 3.57 5 NR 1.29 NR 3.57 6 NR 1.29 NR 3.57 7 NR 1.29 NR 3.57 8 NR 1.29 NR 3.57 9 0 NR 7298.88 1.29 0 NR 8286.6 3.57 963.5 0.4 10 NR 0.03 NR 2.71 11 NR 0.03 NR 2.71 12 NR 0.03 NR 2.71 13 NR 0.03 NR 2.71 14 NR 0,03 NR 2.71 15 NR 0.03 NR 2.71 16 0 NR 7299.1 0.03 0 NR 8305.6 2,71 964.0 0.5 17 NR 1.33 NR 1.29 18 NR 1.33 NR 1.29 19 NR 1.33 NR 1.29 20 NR 1.33 NR 1.29 21 NR 1.33 NR 1.29 22 NR 1.33 NR 1.29 23 0 NR 7308.39 1.33 0 NR 8314.6 1.29 1 964.5 0.5 24 NR 3.56 NR 0.09 25 NR 3.56 NR 0.09 26 NR 3.56 NR 0.09 27 NR 3.56 NR 0.09 28 NR 3.56 NR 0.09 29 NR 3.66 NR 0.09 30 0 NR 7333.31 3.56 0 NR 8315.2 0.09 965.0 0.5 31 NR 2.10 NR 0.00 Comments: Town of Colerain Lift Station Monthly Log Lift Month: FEBRUARY Year: 2024 MAIN Staton: Pump #1 Pump #2 Generator DAY Cycles Cycles Run Time Time Run Cycles Cycles Run Time Time Run Total Volume Hour Total Test Run Reading Reading Reading Reading Pumped Reading Hours Run 19.86 1.83 19.86 1.56 23121 1 564385 19.86 8397.4 1.83 299123 19.66 7314.6 1.56 23121 613.91 0.42 2 52.57 7.43 52.71 7.14 96712 3 62.57 7.43 52.71 7.14 96712 4 52.57 7.43 52.71 7.14 95712 5 52.57 7.43 52.71 7.14 95712 6 52.57 7.43 52.71 7.14 95712 7 52.57 7.43 52.71 7.14 95712 8 564753 52.57 8449.4 7.43 299492 52.71 7364.8 7.14 95712 614.34 0.43 9 51.86 5.31 52.00 4.99 67923 10 51.86 5.31 52.00 4.99 67923 11 51.86 5.31 52.00 4.99 67923 12 51.86 5.31 52.00 4.99 67923 13 51.86 5.31 52.00 4.99 67923 14 51.86 5.31 62.00 4.99 67923 15 1 565116 51.86 8486.6 5.31 299856 52.00 7399.7 4.99 67923 614.76 0.42 16 12.57 0.96 46.57 3.07 30867 17 12.57 0.96 46.57 3.07 30867 16 12.57 0.96 46.57 3.07 30667 19 12.57 0.96 46.57 3.07 30867 20 12.57 0.96 46.57 3.07 30867 21 12.57 0.96 46.57 3.07 30867 565204 12.57 8493.3 0.96 300182 46.57 7421.2 3.07 30867 615.18 0.42 r24 0.29 1.30 80.00 824 95886 0.29 1.30 80.00 8.24 95886 0.29 1.30 80.00 8.24 95886 26 0.29 1.30 80.00 8.24 95886 27 0.29 1.30 80.00 8.24 95886 28 0.29 1.30 80.00 8.24 95886 29 565206 0.29 8502.4 1.30 300742 80.00 7476.9 8.24 95886 615.60 0.42 30 0.00 0.00 79.71 5.87 66918 31 Comments: Pump 1 =18798 qph ****It was found that the primary lift station was having issues with the floats controlling the pump start and stop. The floats were initially cleaned, but did not resolve the issue. After further monitoring and troubleshooting, Tencarva was contacted to repair the system. System reading should have more reliable readings to calculate flow in April. The flows calculated are show much more sewer going to the lagoon Comments: Pump 2 = 17862 g h than what was really being pumped. "'Town is working on getting better flow estimate with Clearwater and Raco aleve the issue of counting flow based on run time. This will greatly increase the accuracy of flow determination. A new totalizing meter is ordered and will be installed at the inlet to the lagoon. Pump 1 revised flow rate based on assessment = 11,100 9ph Pump 2 revised flow rate based on assessment = 11,400 gph Pump 1 and 2 revised flow rate based on assessment = 12,900 gQh Town of Colerain Irrigation Report Month: MARCH Year: 2024 DAY Pump # Start Hours End Hours Total Minutes Gallons Pumped Rain Inches Pond Level Reading Freeboard Weather Conditions 1 0 0 3.4 2 2 5323.3 5323.3 0 0 3.5 3.3 CL 3 4.0 3.3 4 3.3 5 3.3 6 3.3 7 3.3 8 3.3 9 2 5323.3 5334.6 675 236250 4.2 2.6 C 10 5334.6 5358.6 1440 504000 0.5 4.2 11 5358.6 5382.6 1440 504000 4.2 12 5382.6 5406.6 1440 504000 4.2 13 5406.6 5430.6 1440 504000 4.2 14 5430.6 5443.3 765 267750 4.2 15 4.2 16 4.2 17 0.0 6.8 18 3.6 19 2 5443.3 5452.8 570 199500 2.9 3.9 C 20 5452.8 5476.8 1440 504000 3.6 21 5476.8 5500.8 1440 504000 3.6 22 5500.8 5516.7 954 333900 3.6 23 2 5516.7 5516.7 0 0 1.5 5.3 C 24 0.3 6.8 25 4.3 26 4.3 27 6.8 28 4.2 29 4.2 30 2 5516.7 5516.7 0 0 2.9 3.9 C 31 4.2 Comments: Pump 1 350 gpm = 21000 Pump 2 393 gpm = 23580