Loading...
HomeMy WebLinkAbout820097_Routine Inspection_20240613Type of Visit: Compliance Inspection O Operation Review O Structure Evaluation p Technical Assistance Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access n Date of Visit: Arrival Time:, Departure Time: /UUl Countyo Region: F(eo Farm Name: 4 Owner Email: Owner Name: �]�-6 Phone: Mailing Address: Physical Address: Facility Contact: k �Title: Onsite Representative: " Certified Operator: / Jcr xL/ Deze_t+ Back-up Operator: Location of Farm: Latitude: Phone: Integrator: o� Certification Number: Certification Number: Longitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes j;a No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? [—]Yes ❑ No ❑ NA ❑ NE ❑ Yes J210 ❑ NA ❑ NE ❑ Yes42NNo ❑ NA ❑ NE Page I of 3 511212020 Continued Facili Number. — Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes J:]-No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): �. 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Q-No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a [—]Yes &No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes _E� No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [� No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ,&No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes _Q-No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes b No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area I lAAin 12. Crop Type(s): , bi t'l- Qa't �j��J�R�✓G 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes -4frNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes .Z7 fVo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes -❑ No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑/ "No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes Ej"No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [ o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes [2/No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ,eNo ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes &No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes EZ No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facili Number: Date of Inspection: !� 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check Yes ❑ No ❑ NA ❑ NE the appropriate box(es) below. W°ailure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes _E[ No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes _:No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ,,4D No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWW? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? I ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes -O'No ❑ NA ❑ NE ❑ Yes ffNo ❑ NA ❑ NE ❑ Yes M—No ❑ NA ❑ NE ❑ Yes 4allo ❑ NA ❑ NE ❑ Yes _[2-No ❑ NA ❑ NE Reviewer/Inspector Name: / iJ, i" 177 fl,14$o /J Phone: g/d/��� Reviewer/Inspector Signature: eiar Date: _ l0`/�2 /ay Page 3 of 3 511212020 racmty No. b Time In Time Out Farm Namei Owner Integrate^ — t:. Operator Site Re Back-up No. No. HOC Circle: General or NPDES FREE$OAMU. design Observed Crop Yield Rain Gauge Soil Test �j Wettable Acres Weekly Freeboard Daily Rainfall Spray/Freeboar, Drop Weather Codes 120 min inspections Waste Analysis: Date Nitrogen (N) Y y Date Sludge Survey. Calibration/GPM o&�� Waste Transfers Rain Breaker PLAT 1-in Inspections _— Date Nitrogen (N)