HomeMy WebLinkAboutNCG200460_Renewal Issuance Notification Letter (FEES OWED)_20240619ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
WILLIAM E. TOBY VINSON, JR.
Interim Director
Stephen Foss
Foss Recycling Inc
11476 NC Hwy 903
Halifax NC 27839
Subject
Dear NPDES Permittee:
�,HEsAre�
>
�QVAM VlO�x
NORTH CAROLINA
Environmental Quality
June 19, 2024
NPDES Industrial Stormwater General Permit Renewal
and Electronic Reporting — FEES OWED
Foss Recycling, Inc
COC No. NCG200460
NOT RENEWED (Last issuance 81112019)
Halifax County
N.C. DEMLR Stormwater Program has renewed the General Permit under which this facility is covered. Our
Program posted the draft General Permit for public comment during April 15-May 15, 2024. The new General
Permit was issued on May 291h and became effective on June 1, 2024. Certificates of Coverage (COCs) for
permittees who did not owe fees were renewed automatically.
Please read the important information below about what to do:
1. Fees Owed for this Permit: If your permit had outstanding fees last month, then your Certificate of
Coverage (COC) has not been renewed. It is crucial that you visit the Stormwater ePayment website
(deg.nc.gov/SW-ePayments) and pay your permit fees as soon as possible so the Stormwater Program
can renew your COC, and you can avoid enforcement actions.
2. Review and Update Contact Information: Please review the permit contact information in our database.
You can link to a Stormwater Permit Contact Summary Report under the "How to Update Permit Data"
section of this website: deg.nc.gov/SW-industrial
3. New General Permit: Familiarize yourself with the new permit by entering https://deg.nc.gov/SW into
your web browser and selecting "NPDES Industrial Program" and then "General Permits" on the lower
right side of the screen. The renewed General Permit went into effect on June 1, 2023, and you are
responsible for paying any owed fees and complying with any new permit requirements on that date.
4. Register for eDMR: Soon your facility must use the electronic Data Monitoring Report (eDMR) system to
report monitoring data. Please find the instructions on how to register here: https://deg.nc.gov/SW-
eDMR
5. Renewal COC: Permits with no outstanding fees were automatically renewed. You can find updated
guidance for permittees and obtain your new renewal COC from the NPDES Industrial Stormwater
D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
-
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH CAROLJNA
oaP.mmamm�mmio�au� � 919.707.9200
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
WILLIAM E. TOBY VINSON, JR.
Interim Director
�,HEsAre�
>
�QVAM VlO�x
NORTH CAROLINA
Environmental Quality
website (deg.nc.gov/SW-industrial). You can also use this website to request a copy of your Renewal
COC: https://edocs.deg.nc.gov/Forms/SW-COC-Renewal NOTE: Once you have paid outstanding
annual fees, you can use this form to request a Renewal COC.
If you have questions, please contact Brittany Cook, General Permits Coordinator at brittany.cook@deq.nc.gov
or Joyce Sanford, Stormwater Administrative Assistant at loyce.sanford@deg.nc.�ov.
Sincerely,
Michael Lawyer, Stormwater Program Supervisor
Division of Energy, Mineral, and Land Resources
cc: Laserfiche Permit File
D E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH CAROLJNA -
oaP.mmammEm�minitaiQuality �� 919.707.9200