Loading...
HomeMy WebLinkAboutNCC241876_ESC Approval Submitted_20240619 southern PinesNORTH CAROLINA Date: 5/09/2024 LETTER OF EROSION APPROVAL Southeast Quality Auto, LLC ATTN: Matt McKeown 4224 Princeton Avenue Greensboro, NC 27407 RE: Project Name: Valvoline Southern Pines Acres Approved: 0.88 Project ID: ZP-17-23 County: Moore Permit#: 23-1745 City: Southern Pines Address: 1715 US HWY 1 River Basin: Lumber Stream Classification: C Submitted By: Gant Derrick, Bowman Engineering Date Received by TOSP: 5/07/2024 Date Fee Received By TOSP: 10/09/2023 Plan Type: Commercial Dear Southeast Quality Auto LLC., This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the appropriate annual permit fee. After the fee is received,you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program Staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Letter of Approval Southeast Quality Auto, LLC 5/09/2024 Page 2 of 2 Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. The NPDES NCG01 Construction Stormwater permit must be acquired from NCDEQ and a Preconstruction Conference must be held with Town Staff prior to start of any land disturbing activity. The NCG01 permit must be obtained prior to scheduling the Preconstruction Conference. Once the NCG01 is obtained, please notify David Byrd, the Town's Engineering Technician, dbyrdPsouthernpines.net or at 910-691-7111 to schedule the Preconstruction Conference. Pre-Cons will be scheduled for Wednesday afternoons at 2:00 p.m. Your cooperation is appreciated. Sincerely, ames Michel, PE Town Engineer Town of Southern Pines Enclosures: NCG01 Fact Sheet DEMLR Monitoring Form Rev July-1-2020 ec: Gant Derrick, Bowman Engineering