HomeMy WebLinkAboutWQ0045117_Application (FTSE)_2024061808 April 2024
Mr. Richard Rogers
Director
NCDEQ Division of Water Resources
Raleigh Regional Office
1628 Mail Service Center
Raleigh, NC 27699-1628
Subject: 7 10 N Estes Townhomes
Fast Track Sewer System Extension Cover Letter
Dear Mr. Rogers,
411
LIJ
Ballentine
Associates, PA
Integrity. Service. Results.
710 N Estes Townhomes is a development project located off N Estes Road in Chapel
Hill. The project is a residential development which includes: 40 townhomes, 12 duplexes, I
triplex, 8 quadplexes and 8 interlocking townhomes, which total 107 dwelling units. Existing
gravity sewer mains are located to the southeast of the property. Approximately, 1,393 LF of
new sewer mains will be constructed throughout the development to service all the buildings.
Please don't hesitate to call me should you have any questions or if you require additional
information.
Yours very truly,
BALLENTINE ASSOCIATES, PA
ia&., /, �.4
Dillon W. Smith, P.E.
Director of Engineering
m Due Diligence m Land Planning
m Civil Engineering m Surveying
221 Providence Road Chapel Hill, NC 27514 919.929.0481 ballentineassociates.com
State of North Carolina
DWR
Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION
This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been
certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's
Minimum Design Criteria (Gravity Sewer & Pump Stations/Force Mains) and that plans, specifications and supporting documents
have been prepared in accordance with 15A NCAC 02T, 15A NCAC 02T.0300, Division policies, and good engineering practices.
While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design
documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design
calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These
documents shall be immediately available upon request by the Division.
Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303.
Projects not eligible for review via the fast track process (must be submitted for full technical review):
)0, Projects that do not meet any part of the minimum design criteria (MDC) documents;
)0, Projects that involve more than one variance from the requirements of 15A NCAC 02T;
Pressure sewer systems utilizing simplex septic tank -effluent pumps (STEPs) or simplex grinder pumps;
Simplex STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains);
Vacuum sewer systems.
General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are
submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the
amount of requested additional information. Failure to submit all required items will necessitate additional processing and review
time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of
the application and supporting documentation.
A. One Original and One Copy (second copy may be digital) of Application and Supporting Documents
0 Required unless otherwise noted. Signatures on original must be "wet ink" or secure digital signatures.
Please do not submit engineering design plans with the application unless specifically requested.
B. Cover Letter/Narrative Description (Required for All Application Packages):
0 List all items included in the application package, as well as a brief description of the requested permitting action.
Be specific as to the system type, number of homes served, flow allocation required, etc.
Include the permit number/status of any other required sewer permits (downstream/upstream)
If necessary for clarity, include attachments to the application form.
C. Application Fee (All New and Modification Application Packages):
ED Submit a check or money order in the amount of $600.00, dated no more than 90 days prior to application submittal.
�� Payable to North Carolina Department of Environmental Quality (NCDEQ)
D. Fast Track Application (Required for All Application Packages, Form FTA 10-23):
0 Submit the completed and appropriately executed application.
);� If necessary for clarity or due to space restrictions, attachments to the application may be made.
El If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with the
North Carolina SecretM of State.
El If the Applicant Type in Item 1.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in
the county of business.
• The Project Name in Item 11. 1 shall be consistent with the project name on the flow acceptance letters, agreements, etc.
• The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina
licensed Professional Engineer.
• The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0 106(b). Per
15A NCAC 02T.0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from
a person who meets the criteria in 15A NCAC 02T .0 1 06(b).
INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page I of 3
E. Flow Tracking/Acceptance Form (Form: FTSE 10-23) (If Applicable):
0 Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility.
Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different.
The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year
prior to the application date.
Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a).
)0, Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE.
F. Site Maps (All Application Packages):
[D Submit an 8.5-inch x I 1-inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area,
including the closest surface waters.
General location of the project components (gravity sewer, pump stations, & force main)
Downstream connection points and permit number (if known) for the receiving sewer
Include an aerial location map showing general project area (such as street names or latitude/longitude) so that Division staff
can easily locate it in the field.
G. Existing Permit (Application Packages for Modifications to an Existing Permit):
El Submit a copy of the most recently issued existing permit.
El Include a descriptive and clear narrative identifying the previously permitted items to remain in the permit, items to be
added, and/or items to be modified (the application form itself should include only include items to be added/modified). The
narrative should also include whether any previously permitted items have been certified.
Fl The narrative should clearly identify the requested permitting action and accurately describe the sewers to be listed in
the final permit.
H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station):
E] Per 15A NCAC 02T.0305(h)(1), submit documentation of power reliability for pumping stations.
This alternative is only available for average daily flows less than 15,000 gallons per day
It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with
the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor,
stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances
and personnel are available for distribution and operation of this pump station."
If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations'
storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall
be provided in the case of a multiple station power outage. (Required at time of certification)
1. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities):
E] Per 15A NCAC 02T.01 15(a)(1) provide the Certificate of Public Convenience andNecessity from the North Carolina Utilities
Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer
extension, or
E] Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application
for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval
is expected.
J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold):
El Home/Propenly Owners' Associations
E] Per 15A NCAC 02T.0115(c), submit the properly executed Operational Agreement (FORM: HOA).
E] Per 15ANCAC 02T.0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws.
El Developers of lots to be sold
El Per 15ANCAC 02T.0115(b), submit the properly executed Operational Agreement (FORM: DEV).
For more information, visit the Division's collection systems website
INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page 2 of 3
THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND
MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE:
REGIONAL OFFICE
ADDRESS
COUNTIES SERVED
Asheville Re-gional Office
2090 US Highway 70
Avery, Buncombe, Burke, Caldwell, Cherokee,
Water Quality Section
Swannanoa, North Carolina 28778-8211
Clay, Graham, Haywood, Henderson, Jackson,
(828) 296-4500
Macon, Madison, McDowell, Mitchell, Polk,
(828) 299-7043 Fax
Rutherford, Swain, Transylvania, Yancey
Fayetteville Regional Office
225 Green Street Suite 714
Anson, Bladen, Cumberland, Harnett, Hoke,
Water Quality Section
Fayetteville, North Carolina 28301-5095
Montgomery, Moore, Robeson, Richmond,
(910) 433-3300
Sampson, Scotland
(910) 486-0707 Fax
Mooresville Regional Office
610 E. Center Avenue
Alexander, Cabarrus, Catawba, Cleveland,
Water Quality Section
Mooresville, North Carolina 28115
Gaston, Iredell, Lincoln, Mecklenburg, Rowan,
(704) 663-1699
Stanly, Union
(704) 663-6040 Fax
Raleinh Regional Office
3800 Barrett Drive
Chatham, Durham, Edgecombe, Franklin,
Water Quality Section
Raleigh, North Carolina 27609
Granville, Halifax, Johnston, Lee, Nash,
(919) 791-4200
Northampton, Orange, Person, Vance, Wake,
(919) 571-4718 Fax
Warren, Wilson
Washington Regional Office
943 Washington Square Mall
Beaufort, Bertie, Camden, Chowan, Craven,
Water Quality Section
Washington, North Carolina 27889
Currituck, Dare, Gates, Greene, Hertford, Hyde,
(252) 946-6481
Jones, Lenoir, Martin, Pamlico, Pasquotank,
(252) 975-3716 Fax
Perquimans, Pitt, Tyrrell, Washington, Wayne
Wilmington Regional Office
127 Cardinal Drive Extension
Brunswick, Carteret, Columbus, Duplin, New
Water Quality Section
Wilmington, North Carolina 28405
Hanover, Onslow, Fender
(910) 796-7215
(910) 350-2004 Fax
Winston-Salem Regional Office
450 W. Hanes Mill Road
Alamance, Alleghany, Ashe, Caswell, Davidson,
Water Quality Section
Suite 300
Davie, Forsyth, Guilford, Rockingham, Randolph,
Winston-Salem, North Carolina 27105
Stokes, Surry, Watauga, Wilkes, Yadkin
(336) 776-9800
(336) 776-9797 Fax
INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page 3 of 3
DWR
Division of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
FTA 10-23 & SUPPORTING DOCUMENTATION
Application Number: WQ0045117 (to be completed by DW-R)
All items must be completed or the application will be returned
1. APPLICANT INFORMATION:
1. Applicant's name: Orange Water & Sewer Authori (company, municipality, HOA, utility, etc.)
2. Applicant type: El Individual E] Corporation E] General Partnership El Privately -Owned Public Utility
E] Federal E] State/County E] Municipal Other
3. Signature authority's name: Todd Tqylor, P.E. per 15A NCAC 02T.0106(b)
Title: Executive Director
4. Applicant's mailing address: 400 Jones Ferry Ro
City: Caffboro State: NC Zip: 27510
5. Applicant's contact information:
Phone number: (919) 537-4201 Email Address: ttaylorkowasa.org
11. PROJECT INFORMATION:
1. Project name: 710 N Estes Townhomes
2. Application/Project status: E Proposed (New Permit) 0 Existing Permit/Project
If a modification, provide the existing permit number: WQOO_ and issued date: _,
For modifications, also attach a detailed narrative description as described in Item G of the checklist.
If new construction, but part of a master plan, provide the existing permit number: WQOO_
3. County where project is located: Orange
4. Approximate Coordinates (Decimal Degrees): Latitude: 35.93611 V Longitude: -79.051389'
5. Parcel ID (if applicable): 9789-45-5646 (or Parcel ID to closest downstream sewer)
111. CONSULTANT INFORMATION:
1. Professional Engineer: Dillon W. Smith License Number: 042542
Firm: Ballentine Associates, PA
Mailing address: 221 Providence Road
City: ChNel Hill State: NC Zip: 27514
Phone number: (219) 929-0481 Email Address: dillons(&ballentineassociates.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Mason Farm Wastewater Treatment Plant Permit Number: NC 0025241
Owner Name: Oranae Water & Sewer Authori1y
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s): WQ0043748
2. Downstream (Receiving) Sewer Information: 8 inch M Gravity El Force Main
3. System Wide Collection System Permit Number(s) (if applicable): WQCS00031
Owner Name(s): Orange Water & Sewer Authoj Lity
FORM: FTA 10-23 Page I of 5
V1. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
EJYes EJ No E N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached?
0 Yes 0 No E N/A
3. If the Applicant is a Home/Property Owners'Association, has an HOA/POA Operational Agreement (FORM: HOA) and
supplementary documentation as required by 15A NCAC 02T.01 15(c) been attached?
0 Yes 0 No E N/A
4. Origin of wastewater: (check all that apply):
Residential (Individually Owned) 0 Retail (stores, centers, malls) 0 Car Wash
Residential (Leased) 0 Retail with food preparation/service 0 Hotel and/or Motels
School / preschool / day care 0 Medical / dental / veterinary facilities 0 Swimming Pool/Clubhouse
Food and drink facilities Church 0 Swimming Pool/Filter Backwash
F Businesses / offices / factories Nursing Home 0 Other (Explain in Attachment)
5. Nature of wastewater: 100 %Domestic % Commercial %Industrial (See 15A NCAC 02T .0 103(20))
If Industrial, is there a Pretreatment Program in effect? 0 Yes F No
6. Hasa flow reduction been approved under 15A NCAC 02T.01 14(f)? DYes ENo
�, If yes, provide a copy of flow reduction approval letter with this appliKation
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f))
Daily Design Flow ,b
No. of Units
Flow
2 Bedroom Dwelling Units (single service)
240 gal/day
12
2880 GPD
3 Bedroom Dwelling Units (single service)
360 gal/day
28
10080 GPD
I Bedroom Dwelling Units (shared service)
75 gal/day
17
1275 GPD
2 Bedroom Dwelling Units (shared service)
150 gal/day
18
2700 GPD
3 Bedroom Dwelling Units (shared service)
225 gal/day
32
7200 GPD
gal/
Total T
24135 GPD
a See 15A NCAC 02T .01 14(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e. proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4).
b Per 15A NCAC 02T.01 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 24135 GPD (per 15A NCAC 02T .0114 and G.S. 143-215. 1)
);�- Do not include future flows or previously permitted allocations
If permitted flow is zero, please indicate why:
F Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
F� Flow has already been allocated in Permit Number: Issuance Date:
F-1 Rehabilitation or replacement of existing sewers with no new flow expected
0 Other (Explain):
FORM: FTA 10-23 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T.0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
8 1393 DI
Section 11 & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
Section III contains information related to minimum slopes for gravity sewer(s)
Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
Vill. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T.0305 & MDC (Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: 0 Longitude: - 0
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day (firm capacity)
)0, This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s) per pump(s): — gallons per minute (GPM) at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
if any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per
MDCPSFM Section 2.01 C. Lb. E] Grinder Pump Ej Mechanical Bar Screen F] Other (please specify) —
6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1):
F1 Standby power source or 0 Standby pump
Must have automatic activation and telemetry - 15ANCAC 02T.0305(h)(1)(B):
Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
F Portable power source with manual activation, quick -connection receptacle and telemetry -
or
El Portable pumping unit with plugged emergency pump connection and telemetry:
Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 10-23 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B.0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(f) & W? Z Yes El No
15A NCAC 02T.0305(f) contains minimum separations that shall be provided for s wer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
18 inches
2 Water mains (vertical - water over sewer preferred, including in benched trenches)
18 inches
2 Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
"Any private or public water supply source, including any wells, WS-1 waters of Class I or
Class 11 impounded reservoirs used as a source of drinking water, and associated wetlands.
100 feet
"Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands associated with these waters (see item IX.2)
50 feet
"Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches, as well as wetlands associated with these waters or classified as WL.
10 feet
Any building foundation (horizontal)
5 feet
Any basement (horizontal)
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
)0, If noncompliance with 02T.0305(f) or (g), see Section X. I of this application
*I 5A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check "yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
2. Does this project comply with the minimum separation requirements for water mains? Eyes E]No EIN/A
If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? Z Yes E] No E] N/A
Please provide supplementary information identifying the areas of non-conformance.
See the Division's draft separation requirements for situations where separation cannot be met.
)0, No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? E Yes Basin name: Cape Fe [_1 No
If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? E Yes El No
)0, This includes Trout Buffered Streams per 15A NCAC 213.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ID Yes E No
or 401 Water Quality Certifications?
)�, Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15ANCAC 02T.0105(c)(6) (additional perinits/certifications)? E Yes E] No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications must be being prepared,
have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion
and sedimentation control plans, stormwater management plans, etc.).
7. Does this project include any sewer collection lines that are deemed "high -priority?" El Yes E No
Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters,
siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
);, If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and
inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit.
FORM: FTA 10-23 Page 4 of 5
X. CERTIFICATIONS:
Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting.of PumR Stations
and Force mains (latest ver—s-io-ah and the Gravity Sewer.Minimuin Design Criteria (latest version) as applicable?
0 Yes F1 No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC. 10-14) and supporting documents for review to the Central Office. A,pproval of the request wil] be issued
concurrently with the aperoval of the permit, and projects reguiring a variance approval may be subject to longer
review times. For pr9jects reguiring two or more variances or where tHe variance is determined by the Division to be a
significant portion of the I)yoiect, the full technical review is reguired.
2. Professional Engineer's Certification:
1, Dillon W. Smith, PE _, attest that this application for
(Professional Engineer's narne from Application Item 111. 1.),
710 N Estes Townhomes
(Project Name frorn Application Item 11-1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with tile applicable regulations,
Minimum Design Criteria for Gravi1y Sewers (latest version), and the Minimum Design Criteria for the Fast-Track.Permittin
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application
information, including failure to disclose any design non-cornpliance with tile applicable Rules and design criteria, illay subject
the. Nni-th Carolina -licensed Professional Engineer to referral to the licensing board. (2 1 NCAC 56.070 1)
North Carolina Professional Engineer's sea[, signature, and date:
3, Applicant's Certification per 15ANCAC 02T.0106(b):
............
CA&0
N
IS/
SEAL k
42542
MAY z
ON \N
Todd Taylor, PE —, attest that this application for 710 N Estes Townhomes
(Signature Awhority Name from Application Item 1.3.) (Project Namc rrom Application Item IL 1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this perillit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-215. and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which inay
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature: Date:
Page 5 of 5
FORM: FTA 10-23
Forgot to have them correct this to reflect the lower flow allocation of
24,135 GPD for the project. Will notify them via email.
S Wilson/DWR
I I
& W11
Division of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-23)
Entity Requesting Allocation: Orange Water and Sewer Authority
Project Name for which flow is being requested: 710 N Estes Townhomes
More than one FTSE may be requiredfor a single project if the owner of the WWTP is not responsiblefor al1pump
stations along the route of theproposed wastewaterflow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Mason Farm Wastewater Treatment Plant
b. WWTP Facility Permit #: NC 0025241
AlIflows are in MGD
c. WWTP facility's permitted flow 14.5
d. Estimated obligated flow not yet tributary to the WWTP 0.539
e. WWTP facility's actual avg. flow 7.651
f. Total flow for this specific request 0.038 (37,680 gpd) 1 should be 24,135 GPD]
g. Total actual and obligated flows to the facility 8.23
h. Percent of permitted flow used 56.8
Il. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Obligated,
Pump
Pump
Average
Approx.
Not Yet
Total Current
Station
Station
Firm
Daily Flow"
Current
Tributary
Flow Plus
(Name or
Permit
Capacity,
(Firm / pf),
Avg. Daily
Daily Flow,
Obligated
Available
Number)
No.
MGD
MGD
Flow, MGD
MGD
Flow
Capacity***
Rogerson
n-
18.5
7.4
5.30
0.32
5.62
1.78
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be
achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not
less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located between the
project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): OWASA
Downstream Permit Number: WQCS00031
Page I of 6
FTSE 10-23
111. Certification Statement:
I Todd Taylor, P.E. certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and 11 plus all attached planning assessment addendums for which I
am the responsible party. Signature of this fonn certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
1/30/2024
(�Ia Signink Official Sighature Date
Executive Director
Title of Signing Official
Page 2 of 6
FTSE 10-23
PLANNING ASSESSMENT ADDENDUM (PAA)
Submit a planning assessment addendum for each pump station listed in Section 11 where Available Capacity is < 0.
Pump Station (Name or Number):
Given that:
a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for
% and MGD of the Available Capacity (E) in Pump Station
; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
is in design or under construction with
planned completion in and/or
d. The following applies:
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over -allocating capacity in the system
infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal
system.
Signing Official Signature
Date
Page 3 of 6
FTSE 10-23
Instructions for Flow Tracking form (FTSE) and Planning Assessment Addendum (PAA)
Section I
a. WWTP Facility Name: Enter the name of the WWTP that will receive the wastewater flow.
b. WWTP Facility Permit #: Enter the NPDES or Non -Discharge number for the WWTP receiving the
wastewater flow.
c. WWTP facilfty's permitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit.
d. Estimated obligated flow not yet tributary to the WWTP, MGD: This includes flows allocated to other
construction projects not yet contributing flow to the collection system. Flows allocated through interlocal
agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs
that implement a pretreatment program, include flows allocated to industrial users who may not be using all of
their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary
to your WWTP.
As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and
reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and
is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the
reporting entity.
e. WWTP facility's actual aviz. flow, MGD: Previous 12 month average.
f. Total flow for this specific request, MGD: Enter the requested flow volume.
g. Total actual and obligated flows to the facili , MGD Equals [d + e +
h. Percent of permitted flow used: Equals [(g/c)*100]
For example:
On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5
MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. There is a
proposed flow expansion of 0.015 MGD.
The first Form FTSE submitted after January 15, 2008 may have numbers like this:
c. = 6.0 MGD
d. = 0.5 MGD
e. = 2.7 MGD
f. = 0.015 MGD
g. = 3.215 MGD
h. = 53.6 %
The next Form FTSE may be updated like this with a proposed flow expansion of 0. 102 MGD:
c. = 6.0 MGD
d. = 0. 515 MGD
e . = 2.73 MGD
f. = 0. 102 MGD
g. = 3.349 MGD
h. = 55.8 %
Each subsequent FTSE form will be updated in the same manner.
Page 4 of 6
FTSE 10-23
Section 11
List the pump station name or number and approximate pump station firm capacity, approximate design average
daily flow (A) approximate current average daily flow (B), and the obligated, not yet tributary flow through the
pump station (C) for each pump station that will be impacted by the proposed sewer extension project. Calculate
the total current flow plus obligated flow (D=B+C) and the available capacity (E=A-D). Include the proposed flow
for this project with other obligated flows that have been approved for the pump station but are not yet tributary
(C).
Finn capacity is the maximum pumped flow that can be achieved with the largest pump out of service as per the
Minimum Design Criteria.
Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) of not less than
2.5.
If the available capacity (E) for any pump station is < 0, then prepare a planning assessment for that pump station
if the system has future specific plans related to capacity that should be considered in the permitting process.
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Obligated,
Design
Approx.
Not Yet
Total Current
Finn
Average
Current Avg.
Tributary
Flow Plus
Pump Station
Capacity
Daily Flow
Daily Flow,
Daily Flow,
Obligated
Available
(Name or Number)
MGD
(Firm / pf)
MGD
MGD
Flow
Capacity*
Kaw Creek PS
0.800
0.320
0.252
0.080
0.332
-0.012
Valley Road PS
1.895
0.758
0.472
0.135
0.607
0.151
Page 5 of 6
FTSE 10-23
Plannin2 Assessment Addendum Instructions
Submit a planning assessment addendum for each pump station listed in Section 11 where available capacity is < 0.
A planning assessment for Kaw Creek PS (see example data above) may be performed to evaluate whether there is
significant likelihood that needed improvements or reductions in obligated flows will be in place prior to activating
the flows from the proposed sewer extension project.
If the system decides to accept the flow based on a planning assessment addendum, it is responsible to manage the
flow without capacity related sanitary overflows and must take all steps necessary to complete the project or control
the rate of flow to prevent sanitary sewer overflows.
The planning assessment may identify a funded project currently in design or construction, or a planned project in
the future not yet funded but in a formal plan adopted by the system. The system should carefully weigh the
certainty of successful timely project completion for any expansion, flow management diversion or infiltration and
inflow elimination projects that are the foundation of a planned solution to capacity tracking and acceptance
compliance.
For example:
Given that:
a. The proportion and amount of obligated, not yet tributary flow accounts for 24 % and 0.080 MGD of the
committed flow in Pump Station Kaw Creek; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately Q. 0 1 MGD
per year; and that
c. A funded capital project that will provide the required planned capacity, namely
is in design or under construction with planned
completion in and/or
d. The following applies:
The master plan and ten year capital plan contain recommended scope and funding for a capital project entitled
Kaw Creek Pump Station upgrade with funding planned in July 2014. This project is planned to add 0.100 MGD
to the firm cqpacity of the pgmp station by October 2015. Inclusion of this proposed cgpital project as a condition
of this Flow Tracking/Acceptance for Sewer Extension Permit Application elevates this project's priority fo
funding and construction to be implemented ahead of the activation of obligated, not yet tributau flows in amounts
that exceed the firm pump station cgpacities identified in Section 11 above.
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow
to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure.
Page 6 of 6
FTSE 10-23
U.S. DEPARTME�T OFT E INTEMOR CHAPEL HILL QUAD
MUSGS U.S. ar%p'a __:NGLE
7�_ 73 71 71 71 71 111
"'6
, /'LlO
4'
X)
Project Site
71
17
v
.............
� &7, �7-
Ali
l: DURH"
M71-1,
7�
71
71 11 11
0- (D-- z
....... .... . .... . ..... ..... .. ..
CHAPEL HLL, MC
I
C/)
9p
CD LYI
0)
>
U)
0
0)
0
mmaz
8,
M,
0--0
cn m X
OD
:�4
z
Q 0
m
m
K-- i
m
. �n
0
z
zoo
—4
:u m
-4
CGJ .
Z. 9 c
C) 51 Z
0
Z'
Ol
z.9
z
, o 2�
0
3
3
;� -13
0
0
"S�
0
z
V;
J>
7
V
1%
9 o�
'N"
01
Z
C-) V
CD
V-1
0
CD
Curtm O�
x
A Rd
6N
Rl
<
u� 611
-0 §
.117
("'0
le.
0
:=;'IWFOfdhamlBfV.d
0
x
<
Df
�6."]
IC,
10
rl
AA
0
(D
CD
(n
T.
h
0
a)
r-q-
0
:3
cn
IIIIIII
IIIIIIIIIIN
111MI
1111111111M !
11111111111H
MINES
0000111100M
rn
IE
116.2
OR -9-M o�
�Iiidili iiii i!
1z
P I ','A U
ilu 9' im Eg
w
RHI
0- !i �PM i,
a
8 is;
4! -5
H,
15
2A
710 N ESTES TOWNHOMES
__ HILL, OR—E CO—Y, — —
............ . 11 u 111
-X!I- Ballentine
Associates, PA
Ch.p-11,NC27514
F.11— Ballentine
LIJ Associates, PA
11 June 2024
Ms. Susan Wilson
Environmental Engineer NCDEQ
3800 Barrett Drive
Raleigh, NC 27609
Subject: Permit No.: WQ0045117
710 N. Estes Townhomes
710 N Estes Drive, Chapel Hill, NC 27451
Response to NCDEQ Submittal #1 Review Comments
BA Project #122012.00
Dear Ms. Wilson,
This letter is written to provide a point -by -point response to NCDEQ Submittal #1 Review
Comments, which we received following the staff's first review for the above referenced
project. Below are the comments we received on April 3rd, 2024, each followed by our
response in bold type.
1. DWR needs Todd Taylor's email address on the application as he has signed the
permit (nparker@owasa.org can be in addition to Todd's email, but not in place of).
Ref Part 1.3. of the application. DWR has to make sure the person who signs the
application is copied on any correspondence.
Response: Email address updated.
2. Regarding Part VI.2.- although you indicate that this is older infrastructure - is the
size of the gravity sewer that this project will connect to not known?
Response: Size of the gravity sewer added to application.
1 1 don't think for this public piece that Part VI.2. should be checked regarding
the Developer's Oper Agreement (as this is necessary and covered in the
private entity and this will be a public gravity line). At least this is my
understanding from what you have submitted.
Response: Agree and this has been corrected.
4. Part VI.6 should be checked yes or no.
Response: Application corrected.
5. Part VI.7 - flow can be updated to use 75 GPD/bedroom for new build (based
on recently passed legislation 10/23). Related to this - you have included flow
in both the public and private portions. Either the private permit or the public
Due Diligence m Land Planning m Civil Engineering m Surveying
221 Providence Road Chapel Hill, NC 27514 919.929.0481 ballentineassociates.com
710 N Estes Townhomes
NCDEQ Submittal #2
08 Apr 2024
Page 2 of 2
F11 Ballentine
RIJ Associates, PA
permit must indicate the receiving flow - not both (as that would double
count what the actual flow going to the treatment facility is).
Response: Flow updated.
6. Part V1.8. this needs to reflect the project flow (0 GPD if this will be counted
in the private portion; or the full flow if this will be counted in this public
portion). Just make sure this is explained in the narrative.
Response: Full flow has been added to the application.
7. There appears to be a stream through the site - please reconfirm that this
project (and the private portion) will comply with the Jordan Lake buffer rules
(and reconfirm that a 401/404 is not needed.
Response: The proposed work is outside buffers and will comply with
Jordan Lake Buffer rules. No 401/404 permits required.
8. I'm not sure if the narrative matches what is described in Part V1.7.
Response: The total units (107) and linear footage (1,393 LF) match on
narrative and application.
9. Please provide a basic sewer flow diagram (similar to that attached). It should
indicate the public portion, the private portion and where this ties into the
existing downstream sewer.
Response: We highlighted our Utility Overview showing the public portions
of the project shown in green.
Please don't hesitate to call me should you have any questions or if you require additional
information.
Yours very truly,
BALLENTINE ASSOCIATES, PA
i),R" W ��
Dillon W. Smith, P.E.
Director of Engineering
State of North Carolina
Department of Environmental Quality
DWR ( I). Division of Water Resources
FAST TRACK SEWER SVSTEM EXTENSION APPLICATION
Division of Water Resources FTA 10-23 & SUPPORTING DOCUMENTATION
,,,,,,9pIi.catiqft Number: f to be comple:ed by DWR)
All items must be comMeted or the apOication will be returned
1. APPLICANT INFORMATION:
1. Applicant's name; Orange Water & Sewer Authoriq (company, municipality, HOA, utility, etc.)
2. Applicant type: E] Individual corporation E] General Partnership Cl Privately -Owned Public t:tilily
[] Federal State/County Ll Municipal Other
3. Signature authority's name: Todd Taylor, P.E. per 15A NCAC 02T .0106(b)
Title: Executive Director
.11tal oua�:ty
4. Applicant's mailing address: 400 Jones Ferfy Road NC 1)ept of EVIft
City: Carrboro State: NC Zip: 275 10-
5. Applicant's contact information: VD3 --I Zt'Z4
Phone number: (919)537-420). Email Address: nparker@owasa.orp,
If. PROJECT INFORMATION:
Rev
L Project name: 710 N Est�s Townhomes
2. App[ication/Project status: [D Proposed (New Permit) LJ Existing Permit/Project
If a modification, provide the existing permit number; WQOO and issued date� -
For modifications, also attach a detailed narrative description as described in Item G of the checklist,
If new construction, but part of a master plan, provide the existing permit number- WQOO
3. County where project is located: Orange
4, Approximate Coordinates (Decimal Degrces)� Latitude: 35.936111 Longitude: -79.051389
5, Parcel ID (if applicable): 9789-45-5646 (or Parcel ID to closest downstream sewer)
111111. CONSULTANT INFORMATION*
1. Professional Engineer: Dillon W. Smith Licensc Number: 042542
Lock 7 DevelOPMent, LLC
202-249-8033
TO THE�0�1+^�C
ER OF
'0�
!71'0' � %( 1A kty% A V
I Ito
BANK OF AMERICAp NA
15-120/W
sc 6viym WW.)d-.z I
bicorco
0"s I $
V)
4685
400. Do
— DOLLARS
TRANSMITTAL
DATE: 31 Jan 24
TO: Richard Rogers
COMPANY: DEQ Raleigh Regional
Off ice
3800 Barrett Drive
Raleigh, NC 27609
PHONE:
FROM: Frank Emery, El
PROJECT: 710 N Estes
Townhomes
PROJECT#: 122018.00
Please find:
r—] For Review and Comment
"x For Approval
F—] For Your use
As Requested
For Your Signature
The following items:
'4
Nr ru, Wty
-1r)l Offizz
'�C-
r1l
Eli
Ballentine
Associates, PA
Integrity. Service. Results,
Transmitted via:
FedEx: F—� Standard (5 pm) F—] Express (10:30 am)
U.S. Mail: F-1 First Class F-1 Priority (confirmitrack)
Delivery: 71 courier � Hand Delivered
Pick Up: E-1 At BA Office F-1 Other
Copies
Date
Description
1
31 Jan 24
$600.00 Check
1
31 Jan 24
Cover Letter
1
31 Jan 24
Fast Track Sewer Application and supporting documents (mains)
1
24 Jan 24
Construction Drawings
1
N/A
Digital Record
Remarks:
a Due Diligence m Land Planning m Civil Engineering m Surveying
221 Providence Road Chapel Hill, NC 27514 919.929.0481 ballentlneas5cciatescom