HomeMy WebLinkAboutSAW-2015-02539 NWP 39 Verification.pdfDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, WILMINGTON DISTRICT WILMINGTON REGULATORY OFFICE 69 DARLINGTON AVENUE WILMINGTON NORTH CAROLINA 28403 June 18, 2024 Regulatory Division SAW-2015-02539 Sent Via email: Michael.borgman@va.gov Michael Borgman United States Department of Veterans Affairs 810 Vermont Avenue NW Washington, D.C. 20571 Dear Mr. Borgman: This letter is in response to the Pre -Construction Notification (PCN) you submitted to the Wilmington District, Charlotte Field Office on April 22, 2024, for a Department of the Army Nationwide permit (NWP) verification. This project has been assigned the file number SAW-2015-02539 and is known as Salisbury National Cemetery Annex Expansion. This file number should be referenced in all correspondence concerning this project. A review of the information provided indicates that the proposed work would include the development of the property for use as a cemetery and include one stream crossing. The project area for this determination includes a 35 acre area which is illustrated on the enclosed site plans/maps. The project/review area is located in the Yadkin Pee Dee basin; at 501 Statesville Boulevard, in Salisbury, Rowan County, North Carolina at Latitude 35.682380 and Longitude-80.494640. We have determined that the proposed work is authorized by Nationwide Permit 39 pursuant to authorities under Section 404 of the Clean Water Act (33 U.S.0 § 1344). The proposed work must be accomplished in strict accordance with the general permit conditions, any regional conditions, the application materials, and the enclosed plans. If the extent of the project area and/or nature of the authorized impacts to waters are modified, a revised PCN must be submitted to this office for written approval before work is initiated. Any violation of permit conditions or deviation from your submitted plans may subject the permittee to enforcement action. This verification is valid until March 14, 2026, unless prior to this date the subject NWP(s) is suspended, revoked, or is modified such that the activity no longer complies with the terms and conditions of this NWP. If you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. This NWP verification does not preclude the necessity to obtain any other Federal, State, or local permits, licenses, and/or certifications, which may be required. If you have any questions related to this verification or have issues accessing documents referenced in this letter, please contact Amber Lipsky, Regulatory Specialist of the Charlotte Field Office at (704)962-6947, by mail at the above address, or by email at amber.1.lipsky@usace.army.mil. Please take a moment to complete our customer satisfaction survey located at https:Hregulatory.ops.usace.army.mil/customer-service- survey/. Sincerely, A4a Amber Lipsky Regulatory Specialist Enclosures Cc (w/enclosures) Joseph Sullican, KCI Associates of North Carolina (via joe.sullican@kci.com) Andrew Pitner, NCDEQ (via andrew.pitner@deq.nc.gov) Compliance Certification Form File Number: SAW-2015-02539 County: Rowan Permittee: United States Department of Veterans Affairs, Michael Borgman Project Name: Salisbury National Cemetery Annex Expansion Date Verification Issued: 6/18/2024 Project Manager: Amber Lipsky Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS Wilmington District Attn: Amber Lipsky Charlotte Field Office 8430 University Executive Park Drive Suite 615 Charlotte, North Carolina 28262 or amber. 1.1ipsky@usace.army.miI Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. hereby certify that the work, and mitigation (if applicable), authorized by the above referenced permit has been completed in accordance with the terms and conditions of the said permit including any general or specific conditions. Date Authorized Work Started: Completed: Describe any deviations from permit (attach drawing(s) depicting the deviations): *Note: The description of any deviations on this form does not constitute approval by the Corps. Signature of Permittee Date 1 2 1 3 1 4 1 5 I 6 I 7 8 1 9 1 10 4 VAU.S. Department of Veterans Affairs C E F 2 In co 0 M 0 0 CV i7 Salisbury National Cemetery SALISBURY NATIONAL CEMETERY ANNEX II PROJECT NUMBER. 876CM3025 100% CONSTRUCTION DOCUMENTS 2024-03-18 OWNER DEPARTMENT OF VETERANS AFFAIRS NATIONAL CEMETERY ADMINISTRATION SHEET INDEX SALISBURY NATIONAL CEMETERY ANNEX II GRAVESITE YIELD SUMMARY S. McCoy Road, Salisbury, NC 28144 CONTRACT BASE BID OPTION 1 COLUMBARIUM NICHES: 3,000 PRE -PLACED CRYPTS (PPC): 2,937 IN -GROUND CREMAINS (IGC): 1,681 MEMORIAL WALL: 200 3,000 0 0 0 5U1 1940 r/a / stcliff a Pd J} \ .�6 r L J solo 1914 2014 _ N �� , ••r�PSYiile /�� �ar`9s�rilt� Z3i L,, , 4 N•r✓ahaleYlAve GavirpQe raze Ave °s . 14 Salisbury � 9/P �P lJ �Pr o" a si AeFC �ootes 15 66 FULTON HEIGHTS l D x n ;. SHEET DWG. SHEET TITLE SHEET DWG. SHEET TITLE SHEET DWG. SHEET TITLE 1. GC-001 COVER SHEET 45. LS-102 SITE PLAN - AREA A 93. LS-703 SIGN DETAILS 137. ES-101 ELECTRICAL - DETAIL SITE PLAN 2. GC-002 GENERAL CONSTRUCTION STAGING AND 46. LS-103 SITE PLAN - AREA B 94. LS-704 SIGN DETAILS 138. ES-102 ELECTRICAL - DETAIL SITE PLAN SEQUENCING PLAN 47. LS-104 SITE PLAN - AREA C 48. LS-105 BURIAL NUMBERING PLAN 95. S-001 GENERAL STRUCTURAL NOTES 139. E-101 COVER SHEET - ELECTRICAL 3. V-101 EXISTING CONDITIONS - OVERALL 96. S-101 COLUMBARIUM FOUNDATIONS 140. E-500 ELECTRICAL DETAILS 4. V-102 EXISTING CONDITIONS - AREA A 49. LS-201 SITE LAYOUT PLAN - OVERALL 97. S-102 SERVICE EMBLEM WALL FOUNDATION AND DETAILS 141. E-501 ELECTRICAL DETAILS 5. V-103 EXISTING CONDITIONS - AREA B 50. LS-202 SITE LAYOUT PLAN - AREA A 98. S-103 FLAG POLE FOUNDATIONS 142. E-600 ELECTRICAL RISER DIAGRAM AND SCHEDULES 6. V-104 EXISTING CONDITIONS - AREA C 51. LS-203 SITE LAYOUT PLAN - AREA B 99. S-104 ENTRANCE WALL FOUNDATION PLAN AND DETAILS 52. LS-204 SITE LAYOUT PLAN - AREA C 100. S-105 STEEL PICKET FENCE FOUNDATIONS 7. B-101 BORING PLAN 53. LS-205 COLUMBARIUM PLAZA ENLARGED SITE LAYOUT PLAN 101. S-106 CHAIN LINK FENCE FOUNDATIONS 8. B-102 BORING LOGS 102. S-107 MEMORIAL WALL FOUNDATION PLAN AND DETAILS 9. B-103 BORING LOGS 54. LG-101 GRADING PLAN - OVERALL 103. S-108 CULVERT FOUNDATION PLAN 10. B-104 BORING LOGS 55. LG-102 GRADING PLAN - AREA A 104. S-109 CULVERT FOUNDATIONS AND RAILING SUPPORT 56. LG-103 GRADING PLAN - AREA B 105. S-201 TYPICAL STRUCTURAL DETAILS 11. CG-101 EROSION AND SEDIMENT CONTROL PLAN - OVERALL 57. LG-104 GRADING PLAN - AREA C 12. CG-102 EROSION AND SEDIMENT CONTROL PLAN - AREA A 106. A-100 ABBREVIATIONS & GENERAL NOTES 13. CG-103 EROSION AND SEDIMENT CONTROL PLAN - AREA B 58. IR001 IRRIGATION NOTES AND LEGEND 107. F-111-PR PUBLIC RESTROOMS - FOUNDATION PLAN 14. CG-104 EROSION AND SEDIMENT CONTROL PLAN - AREA C 59. IR101 IRRIGATION PLAN 108. A-111-PR PUBLIC RESTROOMS - FLOOR PLAN 15. CG-501 EROSION CONTROL PLAN DETAILS 60. IR102 IRRIGATION PLAN 109. A-112-PR PUBLIC RESTROOMS - CEILING PLAN 16. CG-502 EROSION CONTROL PLAN DETAILS 61. IR103 IRRIGATION PLAN 110. A-113-PR PUBLIC RESTROOMS - ROOF PLAN 17. CG-503 EROSION CONTROL PLAN DETAILS 62. IR501 IRRIGATION DETAILS 111. A-211-PR PUBLIC RESTROOMS - ELEVATIONS 63. IR502 IRRIGATION DETAILS 112. A-311-PR PUBLIC RESTROOMS - SECTION 18. CD-101 PRE -DEVELOPMENT STOMWATER PLAN 64. IR503 IRRIGATION DETAILS 113. A-312-PR PUBLIC RESTROOMS - SECTION 19. CD-102 POST -DEVELOPMENT STORMWATER PLAN 65. IR504 IRRIGATION DETAILS 114. A-313-PR PUBLIC RESTROOMS - SECTION 115. A-411-PR PUBLIC RESTROOMS - ENLARGED PLANS 20. CP-101 ROADWAY PLAN AND PROFILE VIEW - OVERALL 66. LP-101 PLANTING PLAN - OVERALL 116. A-511-PR PUBLIC RESTROOMS - DETAILS 21. CP-102 ROADWAY PLAN AND PROFILE VIEW 67. LP-102 PLANTING PLAN - AREA A 117. A-611-PR PUBLIC RESTROOMS - WINDOW, DOOR & HARDWARE 22. CP-103 ROADWAY PLAN AND PROFILE VIEW 68. LP-103 PLANTING PLAN - AREA B SCHEDULE 23. CP-104 ROADWAY PLAN AND PROFILE VIEW 69. LP-104 PLANTING PLAN - AREA C 118. A-612-PR PUBLIC RESTROOMS - ROOM FINISH & EXTERIOR 24. CP-105 ROADWAY PLAN AND PROFILE VIEW 70. LP-501 PLANTING DETAILS FINISH SCHEDULE 25. CP-106 ROADWAY PLAN AND PROFILE VIEW 71. LP-502 PLANTING DETAILS 119. F-111-MV MATERIAL & VEHICLE STORAGE - FOUNDATION PLAN 26. CU-101 UTILITY PLAN - OVERALL 72. LS-501 PAVING DETAILS 120. A-111-MV MATERIAL & VEHICLE STORAGE - FLOOR PLAN 27. CU-102 UTILITY PLAN - AREA A 73. LS-502 CEMETERY ENTRANCE DETAILS 121. A-112-MV MATERIAL & VEHICLE STORAGE - CEILING PLAN 28. CU-103 UTILITY PLAN - AREA B 74. LS-503 ENTRANCE WALL DETAILS 122. A-113-MV MATERIAL & VEHICLE STORAGE - ROOF PLAN 29. CU-104 UTILITY PLAN - AREA C 75. LS-504 FENCE & GATE DETAILS 123. A-211-MV MATERIAL & VEHICLE STORAGE - ELEVATIONS 30. CU-105 PROFILES - STORM SEWER 76. LS-505 FENCE & GATE DETAILS 124. A-311-MV MATERIAL & VEHICLE STORAGE - SECTIONS 31. CU-106 PROFILES - STORM SEWER 77. LS-506 FENCE & GATE DETAILS 125. A-312-MV MATERIAL & VEHICLE STORAGE - WALL SECTIONS 32. CU-107 PROFILES - STORM SEWER 78. LS-507 PRE -PLACED CRYPT & GRAVESITE DETAILS 33. CU-108 PROFILES - STORM SEWER 79. LS-508 GRAVESITE DETAILS 126. A-111-CS COMMITTAL SHELTER- FOUNDATION, FLOOR,CEILING, 34. CU-109 PROFILES - STORM SEWER 80. LS-509 COLUMBARIUM DETAILS ROOF & FRAMING PLAN 35. CU-110 STORNWATER BASIN DETAILS 81. LS-510 COLUMBARIUM DETAILS 127. A-211-CS COMMITTAL SHELTER - ELEVATION 36. CU-501 UTILITY DETAILS 82. LS-511 COLUMBARIUM DETAILS 128. A-311-CS COMMITTAL SHELTER - SECTION 37. CU-502 UTILITY DETAILS 83. LS-512 COLUMBARIUM DETAILS 38. CU-503 CULVERT DETAILS 84. LS-513 MEMORIAL WALL DETAILS 129. P-001 COVER SHEET - PLUMBING 39. CU-504 CULVERT DETAILS 85. LS-514 MEMORIAL WALL DETAILS 130. P-101 SUPPLY & SANITARY - FLOOR PLANS - PLUMBING 86. LS-515 FLAG PLAZA DETAILS 131. P-501 DETAILS & SCHEDULES - PLUMBING 40. LD-101 SITE CONSERVATION AND REMOVALS PLAN - 87. LS-516 FLORAL STATION DETAILS OVERALL 88. LS-517 SERVICE PLAQUE WALL DETAILS 132. M-001 COVER SHEET - MECHANICAL 41. LD-102 SITE CONSERVATION AND REMOVALS PLAN - AREA A 89. LS-518 MISC. SITE DETAILS 133. M-101 FLOOR PLAN - MECHANICAL 42. LD-103 SITE CONSERVATION AND REMOVALS PLAN - AREA B 134. M-501 DETAILS & SCHEDULES - MECHANICAL 43. LD-104 SITE CONSERVATION AND REMOVALS PLAN - AREA C 90. LS-601 SIGN PLAN - OVERALL 91. LS-701 SIGN DETAILS 135. E-001 COVER SHEET - ELECTRICAL 44. LS-101 SITE PLAN - OVERALL 92. LS-702 SIGN DETAILS 136. ES-100 ELECTRICAL - OVERALL SITE PLAN GENERAL NOTES 1. CONTRACTOR IS RESPONSIBLE FOR ALL WORK SHOWN UNLESS SPECIFICALLY INDICATED OTHERWISE. 2. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF APPLICABLE LAWS, ORDINANCES, AND CODES. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY APPLICABLE PERMITS. 3. THE CONTRACTOR SHALL CAREFULLY STUDY AND COMPARE THE INDIVIDUAL CONTRACT DOCUMENTS AND REPORT AT ONCE IN WRITING TO THE CONTRACTING OFFICER'S REPRESENTATIVE ANY DEFICIENCIES. THE CONTRACTOR SHALL REQUIRE EACH SUBCONTRACTOR TO LIKEWISE STUDY THE DOCUMENTS AND IMMEDIATELY REPORT ANY DEFICIENCIES. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND PROPOSED POINT OF CONNECTION (P.O.C.) LOCATIONS AND REPORT ANY DISCREPANCY TO THE CONTRACTING OFFICER'S REPRESENTATIVE IMMEDIATELY. 4. NOTIFY UTILITY LOCATOR SERVICE AT LEAST 3 WORKING DAYS PRIOR TO ANY DIGGING OR EXCAVATION. 5. CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION AND SHALL COORDINATE ALL CONSTRUCTION EFFORTS WITH CONTRACTING OFFICER'S REPRESENTATIVE'S REQUIREMENTS. 6. MATERIALS INDICATED TO BE DEMOLISHED AND WASTE MATERIALS ENCOUNTERED IN THE WORK SHALL BE LEGALLY DISPOSED OF OFF SITE BY CONTRACTOR. 7. PROTECT EXISTING BENCH MARKS, UTILITIES, PAVING AND CURBS FROM EQUIPMENT, VEHICULAR TRAFFIC AND GENERAL CONSTRUCTION ACTIVITIES. DAMAGED ITEMS INTENDED TO REMAIN SHALL BE REPLACED OR REPAIRED AT NO EXPENSE TO THE GOVERNMENT. DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITION. 8. PROTECT ALL EXISTING TREES TO REMAIN OUTSIDE LIMIT OF WORK. 9. CONSTRUCTION NOTES AND TYPICALS MAY APPEAR ONLY ONCE ON DRAWINGS, BUT APPLY TO ALL SIMILAR CONDITIONS WHERE NEW CONSTRUCTION OCCURS TO FULFILL THE INTENT OF THE DRAWINGS. SITE LOCATION MAP NOT TO SCALE Morgantown Cum erland Hagerstown -- 9- , 0 Wilmington r _ Martinsburg , Freder..rk Towson {� Parkersburg Clarksburg \ Vinel Chillicothe - Winchester Towson � \. Baltimore \' Gaithersburg Cincinnati nnnapoGs i West Virginia 0 (l _ Washington �Isville / Cul a er WaldortrHuntington. Harnsonburg P P /per.a CharlestonS li;bury Crty \f°j ° Chesapeake Staunton Fredericksburg Frankfort /< ° Lexington -Virginia Kentuck 1jr �'rk"Iey�'RichmondMown Lynchburg RichmondRoapkeburg Petersburg Newport � 1 News gar - _ suffolk5` Virginia Beach Oae Johnson / - _ a Elizabeth City / / \ \ \ Henderson Roanoke City Cookeville Morristown / � / i� Rapids ) ° Bodne Winston• ! l Oak Ridge / / Salem Green;: Knoxville HWhi-P int \ 1 1- ;,,.i •11 - Rocky i y Xi I I I y Mount r� Asheville I I 1 ' I Greenville Concord Y. dsboro t No rh Corolina - 10 in Chattanooga j' \ / �qy-- / FettevilleU Ic- ' New Bern Greenville / Jack;o 'lie Da ton Simpsonvill- e\ a � Anderson Newberry 'MT,der, - Mullins Sand AGreenwood \� Florence y \r Athens - ' Springs •� /Co umbia Sumtertake City "-tij rtle / Kingotree Beach Atlanta South Carolina - - August - Orangeburg/ \ Goose V Creek h1; Ch�leslon. c -,J -Warner \- Robins VICINITY MAP NOT TO SCALE NORTH \/ \ \ i / I / \ / \ 0 0 01 _J ---, , SALISBURY NATIONAL I- ---� EMETERYANNEX 501 Statesville Blvd. - I Salisbury NC 28144 \ SALISBURY NATIONAL �� CEMETERY ANNEX II S. McCoy Road, - �� �' �\\ioq I ` / Salisbury, NC 28144 / - / - % M ' / /,,/\/T / / / • I I I I� +I / ' . -1 r.O / --✓ aO /,� 1 / �� / / � IX/Z . .- • y © '/ r�t If) f •O r�`Q1'S.v •�i r,� ��� ' I(/1r w, \.,--` ' - I ' ..� \ ' ° r � 1. ��•J �e ��� � _ � � . ':/ _ � \-' // �� \\ � \\[c III '%� - •ICI\ � ................. d, is .•' / _ � / �_z - PROJE CT SITE MAP NOT TO SCALE NORTH CONSULTANTS ARCHITECT OF RECORD STAMP Office of Construction and Facilities Management Drawing Title COVER SHEET Phase o 100 /o CONSTRUCTION DOCUMENTS Project Title Salisbury National Cemetery Annex II Project Number 876CM3025 LANDSCAPE ARCHITECT IRRIGATION DESIGNER Pashek+MTR, Ltd. Aqua Engineering, Inc. 412-321-6362 (970) 372-6104 CIVIL/STRUCTURAL ENGINEER KCI Technologies Inc. (302) 731-9176 MEP ENGINEER Arium AE 410-730-2300 ARCHITECTURE gc PLANNING ARCHITURA CORPORATION 9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384 PH: (317) 348-1000 POC: Michael Conly, AIA, NCARB, President PRELIMINARY NOT FOR CONSTRUCTION Building Number Approved: Project Director Location: Salisbury National Cemetery S. McCoy Rd. and Old Wilkesboro Rd. , Salisbury, NC 28144 Drawing Number v Gr`_001 1 of 142 VA U.S. Department of Affairs Veterans Issue Date 2024-03-18 Checked KR Drawn MAS Revisions: Date: A C D E F VA FORM 08 - 6231 1 2 1 3 4 1 5 1 6 1 7 8 1 9 1 10 1 2 3 1 4 1 5 6 7 1 8 1 9 1 10 A F C 0 0- N 0 N N N co E vi c 0 F O U c X W U 0 0 0 c CU 0 L E U Q N 0 M 0 N Cl) (V 0 (V 12 TREE TABLE NUMBER DESCRIPTION 1 21 PIN OAK 2 12 CHERRY 3 19 CEDAR 4 13 CEDAR 5 15 ELM 6 12 POPLAR 7 12 GUM 8 14 MAPLE 9 16 GUM 10 28 GUM 11 20 POPLAR 12 17 POPLAR 13 16 GUM 14 19 GUM 15 24 GUM 16 17 GUM 17 16 GUM 18 15 GUM 19 15 GUM TWICE 20 16 GUM 21 TRIP 12/15/19 GUM 22 17 SYC 23 17 POPLAR 24 25 BERCH 25 35 PIN OAK 26 12 ELM 27 19 GUM 28 13 CHERRY 29 13 GUM 30 26 GUM 31 TWIN 20 GUMS 32 13 ASH 33 15 GUM 34 12 PIN OAK 35 22 GUM TREE TABLE NUMBER DESCRIPTION 36 21 PIN OAK 37 13 ASH 38 12 ASH 39 19 GUM 40 14 PIN OAK 41 15 ASH 42 15 ASH 43 25 PIN OAK 44 23 ELM 45 TWIN 12/13 POPLAR 46 12 PINE 47 12 POPLAR 48 12 POPLAR 49 14 GUM 50 12 GUM 51 13 GUM 52 12 GUM 53 12 POPLAR 54 TWIN 15/17 GUM 55 15 GUM 56 13 GUM 57 13 GUM 58 16 GUM 59 12 GUM 60 12 GUM 61 12 ELM 62 15 GUM 63 33 SYC 64 12 GUM 65 22 ELM 66 14 ASH 67 14 ELM 68 16 GUM 69 70 �j SURVEY NOTE 1. THE SURVEY INFORMATION WAS COMPILED AND PROVIDED BY I KCI ASSOCIATES OF NORTH CAKOLINA, P.A. LOCATED AT 4505 FALLS OF NEUSE ROAD, SUITE 400, RALEIGH, NORTH PHONE NUMBER (91 960763-92 14 2. THE AERIAL TOPOGRAPHIC AND PLANIMETRIC INFORMATION WAS / COMPLETED BY TUCK MAPPING SOLUTIONS ASUB-CONSULTANT TO KCI ASSOCIATES. THE AERIAL MAPPING oo�Y j/� AND TOPOGRAPHY WAS STARTED IN FEBRUARY OF 2023 AND COMPLETED IN MARCH OF 2023. 3. HORIZONTAL DATUM IS NAD-83 (201 1 EPOCH). THE VERTICAL DATUM IS NAVD-88. STATE PLANE COORDINATES ZONE IS NORTH CAROLINA. 4. THE PARCEL BOUNDARY AND EASEMENTS OR SETBACKS AS SHOWN ARE FROM THE ALTA/NSPS LAND TITLE SURVEY PREPARED BY P.B. PHAKK ASSOCIATES, P.A. DATES G- 1 5-201 7 AS PROVIDED TO KCI BY THE NATIONAL CEMETERY ASSOCIATION. THE INFORMATION WAS DRAWN AND FROM SAID ALTA/NSPS >� I SURVEY AND ROTATED AND TRANSLATED TO THE PROJECT NAD-68 COORDINATES. 5. THE UNDERGROUND GAS LINES AND EASEMENTS AS SHOWN ARE ss J �s'�\ / \ `� FROM THE ALTA/NSPS LAND TITLE SURVEY AS PREPARED BY \ PARK * ASSOCIATES, P.A. DATED G- 1 5-20 1 7. THE INFORMATION WAS DRAWN AND ROTATED AND TRANSLATED INTO THE PROJECT COORDINATE SYSTEM. G. THE INDIVIDUAL TREES AS SHOWN ARE FROM A GROUND SURVEY WORK COMPLETED BY KCI ASSOCIATES AS COMPLETED IN JANUARY OF 2024. © \ r -6* i '12� -� \ 1 < / I S I � j � �\ ��\\\� \\ 7. THE UTILITIES AS SHOWN IN SOUTH MC COY ROAD ARE PER KCI \ ( \ s\04� � I I ASSSOCIATES SUE AND GROUND SURVEY WORK COMPLETED BETWEEN JUNE 2023 AND JANUARY 2024. �8. THE FLOOD PLANE DESIGNATIONS ARE PER THE ALTA/NSPS °1. ll �� \1 ( \ l l ( I 1 r SURVEY BY P.B. PHARR * ASSOCIATES DATED G- 15-20 17 THE '� % /;� `� l (l) / 1 1 \ I 1 �110�Y �' DATA ROTATED AND TRANSLATED BY KCI ASSOCIATES TO r-------------- \\ w 100-Y 5- �—� NAD-88 COORDINATES AND NAVD 88 ELEVATIONS. AREA C -- LEGEND ILI c�� �� ✓ 1' 1— /-� / °,�j J/ `'�I I M PROPERTY LINE — — �/� �j f )�' , ( �� r III / • -6 ^- u, -✓- o EaE 1 s� ��� =EM� 1 �' 1 u ' 1 I I _ / EASEMENT LINE — — / ° _ / \ Cl)IIII I( l I � M��� p o / - r l ` ` \ \1 I / 1 EXISTING CONTOUR — —4s� — / /� f 070 46'56"E _ N, 8 79' ? �� �� ��� �� f / /o �,/ o zo I \\� �1 EX. SANITARY SEWER SS o �` `-- �-L \ -- / EX. SANITARY MANHOLE OS fj EX. WATER LINE W ,g . f / �.o�� � � f ,� f�� ✓� � �� � v \ � ) / � ��/ � �. \ `_' � � M (\ 1 � III IIII 1 . _.:':: �'::• J �// �'_11 rn \ EX. FIRE HYDRANT �( c �j= — 1; a ✓� v� o / r l O OVERHEAD UTILITY LINES OHE p �� / - �j� PIN #: 5.7O-01-4G 33 -AP EA: 3AC UTILITY POLE 16 GUM N UNITED 5 5 OF AMERICA D �� i ( \ I oNEp �� \„ f ��� FldQ6lTS SIGNS DEPARTMENT iL2E VF.SE2ANs AFFAIRS / / / r / I` ( n jj \ a `CCV// //� \� \ \ \ \ PETROLEUM LINES 0 16 GUM°N o��6 / 81 vERMOCT AVE NW —� I 0 O J Q J �-�1N.A514�NG'TOId-, DC 20420-0001 ° / °� oti`� I ��/-%� �✓- '/ / \� M u' `1 I \ \\ FO TREE LINE o \ \ cn / --• 1 I I I \\\\ \ ,\\.• \ 100 YEAR FLOOD PLAIN 100-YR l l \ l . \ f l r I I ) \\ \\\\ \ •,,�,,,.•••, ••�\�\ `� 500 YEAR FLOOD PLAIN 500YR o / / I \\\ '• /` FEMA FLOODWAY FW �� I \\�`' — E `77 g84°4Qf 540 / ho° \ f) _� \ \ \ \ \ 1 I Q \ �� w u \ II I I \ o 01 49NLO PIN #: 5750-0zF N J° o / / I / AREA: 30.2 G A C f I \ 1 ✓ l` U' C�` / I I 1 I I lf1 1\QI\p /p° ° UNITED STATES OF RICA AND ITS ASSIGNS DEPAR ENT \ \ `� �t \ \ \ Q S ` \ I I I I I I /^( S� OF VETERANS AFFAIR 1 / // � 81 I VERMONT AVE N J TREE TABLE NUMBER DESCRIPTION 71 13 ELM 72 18 GUM 73 24 GUM 74 16 GUM 75 18 GUM 76 16 POPLAR 77 14 GUM 78 18 GUM 79 24 GUM 80 12 16 18 GUM 81 18 GUM 82 18 GUM 83 18 GUM 84 16 GUM 85 18 GUM 86 16 GUM 87 14 GUM 88 15 ELM 89 15 GUM 90 13 POPLAR 91 13 CEDAR 92 13 ELM 93 16 CEDAR 94 12 CHERRY 95 18 PIN OAK 96 18 GUM 97 13 GUM 98 15 GUM 99 15 GUM 100 TRIP 12 16 24 GUM 101 30 GUM 102 18 ASH 103 48 RED OAK dal 11NGTON, DC 20420 0"� / Z \ III fl ���,III 1 / PIN #: 5750-01F4G{8 3 / r I AREA: 30.2G AC �j N / \ \ \\\ UNITED STATES OF AVEICA / l \ S 0 / a AND ITS ASSIGNS DEPARTMW /I / / J�O / I / fjp ~- ) —\ \\ \ \\ I I �/ ��I / I / OF VETERANS AFFAIR / 1 ` \_ \ \ I \ \ \ 1 �\ I c� 81 1 VERMONT AVEN Q (\ �9 / S WA511NGTON, DC 20A20-0 01� < / /r ff I 1 'D �, I \ ` �� I� ti ( «\ O l l�\t1\1�( \ ��11\� II, "1� C NMJ �y I ��1�•\� \� i `�� \\\\ LLJ ° 69Q— N04°46'44"E- �i.13 _ i r" \ -.i / 266.13''� I d 9 N7W EA `%\ �_AREAA 266.13' \`�^ARB_ ,� \ \ L `I- �_ �� \� _� WAS ESeORO 2 %9 —\J _� / \ 1 • L / --- Iyt --� v _\ 2 �� ML-0.1calk \ _26 ' 1 ` O O rn A A co c' 3y — — — — 1289.29' rIn �� 366.38" o N70°37'53"W I — — — — — — — — N70°37'53"W — — — — — — — — — — — — — + —�— — I I N70°37'53'W Ql� KEY PLAN NOT TO SCALE 80 1 1 1 0 it 160 Scale: 80' CONSULTANTS ARCHITECT OF RECORD STAMP Office of Construction and Facilities Management Drawing Title EXISTING CONDITIONS Phase 100% CONSTRUCTION DOCUMENTS Project Title SALISBURY NATIONAL CEMETERY ANNEX II Project Number 876CM3025 LANDSCAPE ARCHITECT Pashek+MTR, Ltd. 412-321-6362 CIVIL/STRUCTURAL ENGINEER KCI Technologies Inc. (302) 731-9176 MEP ENGINEER Arium AE 410-730-2300 CjIslaa, ARCHITECTURE & PLANNING ARCHITURA CORPORATION 9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384 PH: (317) 348-1000 POC: Michael Conly, AIA, NCARB, President O�� owl � ss,� SQL L-5334 �� P. Building Number Approved: Project Director Location: Salisbury National Cemetery Annex II S. McCoy Rd. and Old Wilkesboro Rd. Drawing Number _ V 101 3 of 142 VA U.S. Department of Veterans Affairs Issue Date 2024-03-18 Checked Drawn Revisions: Date: A W L ILI E F VA FORM 08 - 6231 1 2 3 4 5 6 7 8 9 10 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 A L E F i7 SURVEY NOTE 1 SURVEY INFORMATION WAS PROVIDED BY KCI ASSOCIATES OF NORTH CAROLINA, INC., 4505 FALLS OF NEUSE, FLOOR 4, RALEIGH, NC 27607, 919-783-9214, FROM AERIAL SURVEY FLOWN ON MARCH 8, 2023, AND FIELD WORK CONDUCTED IN APRIL 2023 OCTOBER 2023. I -SRI., / - /�� -✓� /^ �\'� HORIZONTAL DATUM: NAD 83 °'"G °�// VERTICAL DATUM: NAVD 88 _OF, STATE PLANE ZONE: NORTH CAROLINA 0 OG \ _ ✓I ��--_- OE LEGEND ° /� /� �� CONTRACTOR CONSTRUCTION ACCESS ROUTE >� BaLD,NG J °,� \ j ^� - 1 ZONEAE 8' HT TEMPORARY CHAIN LINK XX XX =yam /� 6555 �� CONSTRUCTION FENCE If/ TEMPORARY GRAVEL SURFACE/ROAD o 0 0 MIN 6 AGGREGATE OVER GEOTEXTILE FABRIC o 0 0 ZONE AE y/ [n / N / 665��- �� PHASING NOTES `/ 1. SUBMIT CONSTRUCTION SEQUENCING PLAN AND SCHEDULE TO ss / �/� l% J COR FOR APPROVAL PRIOR TO STARTING WORK. SCHEDULE ­79—ji�� ��� = S SHALL BE UPDATED AND SUBMITTED WITH EACH PAY �r A� Y^"-� s o� �/� -� /_ / S --�� ��/ APPLICATION. 2. OBTAIN WRITTEN PERMISSION FROM EASEMENT HOLDERS FOR ��/fir CONSTRUCTION OPERATIONS WITHIN THE EXISTING UTILITY ZONEAE EASEMENTS. //��+ / /%�� \\ / 3. COORDINATE EXTENSION OF PERMANENT UTILITY °L \ 1_Jy CONNECTIONS (E.G. WATER, ELECTRIC, COMMUNICATIONS) TO ��/ e° ° ° F °" / ✓ �/j j r / / �f/�� �J / \ / / /�/��/( THE SITE WITH THE RESPECTIVE UTILITIES. THE CONTRACTOR l Pam° r r I / SHALL BE RESPONSIBLE FOR PAYING THE CONNECTION FEE TO �/� l � � �' / �/ / CAE/�i /� / � / � � � / I�II�I l °^-'° THE UTILITY. REFER TO THE SITE UTILITY PLANS. o�"/ < p /\ o' "" ���� -� A COORDINATE ANY REQUIRED CLOSURES OR LANE G RESTRICTIONS OF PUBLIC ROADS WITH THE CITY OF SALISBURY. p= r r1 l / / \� // // �\�°^ 1 ��/� / / r % \ PROVIDE TEMPORARY TRAFFIC CONTROL MEASURES FOR SUCH CLOSURES AT NO ADDITIONAL COST TO THE GOVERNMENT. 5. PROTECT EXISTING TREES. REFER TO LD-101 AND EROSION AND �-/ 30' SANITARY / / / �/ // r�� SEWER EASEMENT: p f ( ; i \ l o I SEDIMENTATION CONTROL DRAWINGS. ��.j� �� SALISBURY-ROWAN I f / / / I \ 6. PROVIDE TEMPORARY EROSION AND SEDIMENTATION Q � J� / j /� f�/j/ UTILITIES ZONE CONTROLS. REFER TO EROSION AND SEDIMENTATION CONTROL \\ / �/ i DRAWINGS FOR RELATED SEQUENCE OF CONSTRUCTION AND DO NOT ROUTE CONSTRUCTION I \ >> I a I� o�/+ /� / i 1 / / �/ / f / REQUIRED EROSION AND SEDIMENTATION CONTROLS FOR EACH TRAFFIC THROUGH RESIDENTIAL \ J I ,� /// C /� ZONEAE /✓� \/�j/ /� / / \ , ,� TYPE OF DISTURBANCE. PROVIDE REQUIRED EROSION NEIGHBORHOOD `\ I oo r / / \ J f / /�� / +� f CONTRACT CT I / I � � CONTROLS FOR EACH PHASE OF WORK PRIOR TO ANY EARTH ZONEAE \ DISTURBANCE FOR THAT PHASE. PROVIDE TEMPORARY COLUMBARIUM A \ \ +// / / / �ALLS 13-24 / l BARRICADES, FENCING, TRAFFIC CONTROL AND SIGNAGE AS GU`GNG (( v / / / / / /J / / / \ V °�/�— 3 000 NICHES)NEEDED TO MAINTAIN PUBLIC SAFETY AND SECURE WORK 7 J s �/ (, AREAS DURING CONSTRUCTION. x COLUMBARIUM A \ \ l \ o� �,�� �- N��// �� // WALLS 1-12 ) 7. PROVIDE TEMPORARY GRAVEL CONSTRUCTION ROADWAYS / �° o' ��� %/ .°°/�//�� / // // /� / //� I J / (3,000 NICHES) I / / WITHIN THE LIMIT OF DISTURBANCE TO FACILITATE \ ✓`' / f ^° ✓/�� /��// / / '�/� / \ I J I CONSTRUCTION OPERATIONS. AT CONCLUSION OF PROJECT, /ice ��.j� /i J �/ /*� / /� �� / f 1 \ % REMOVE TEMPORARY ROADWAYS INCLUDING GEOTEXTILE AND � + % �' AGGREGATE AND RESTORE ALL AREAS DISTURBED BY �// ram/ I 5 / \ 1 I FPVEPORNE / ` N0°•521` I / i� / 1F`pO// / V� /�/ / / / / \� \ I % I CONSTRUCTION. �9- i\ / FOR TEMPORARY/ / / /// �� / \ \ \ \ ) v J 'C \ \ 1 / l 8. PROVIDE 8 HEIGHT TEMPORARY FENCING WHERE INDICATED PIPELINE /f / / ^ l \ l �� �� • o x COMMITTALd \ AND AS NEEDED TO SECURE THE CONSTRUCTION SITE AND / /+ CROSSING 8 - �/ // l FSHELTE, /� oo�� l \ PROVIDE FOR PUBLIC SAFETY. PROVIDE GATES AS NEEDED FOR ,6'.,P, CONSTRUCTION // / off- -� f / /�� j �� REFER TO - , p 1 1 �� ' `— \ > / `� ACCESS AT ALL ENTRANCES AND UTILITY EASEMENTS. / 60EOp0. ACCESS ROUTE ho �, / / CG50 2Qe o°/�pYo%��,�� '�� f 4�- _ / f \ J ) I t I '� ���/ f - 9. REFER TO C-DRAWINGS FOR UTILITY PROTECTION DURING / / r \ �r•ooCONSTRUCTION. 20' SANITARY �� /// �f j j I / / / / ) \ �/ �� ��o�I� / L�� SEWER EASEMENT. ��� y r / It�/� / `� �(r ,SALISBURY-ROWAN / +� x � Tl TIES _ /� %� / / \ � \ �0X \X/ I ZONE 1� '\ �` q�`7`a� ICI l �,- \ • - / ��/// ///�� ( // / J/6e5` 1i �- 1 1 \ °HP3FD F PO "\ x STORMWATER / r ) 1 i CEMETERY 1 / I Uh ) 1 \ 1 _ J _ BASIN I f� PUBLIC 1 \°_ 1� RESTROOMS 1 \ \ \ \ / �) ,6 ICI �\ �. ft S \ \ \ 1Irk I l / // \ —� \ 1 l I / �— \ / V /,.,yNGP/ /�� �J , . �-- • Vn� / a �+ /l ( �, j 1 1 l l Lx� —� (�R�� j1�� `� � /I I � `1 1 / // J n �oP`A —� �O e • d a d d / / I \ \ \ ` \ \ ✓ I I I �r \ PRIMARY EE"° Jd CONSTRUCTION a 1 �a� l I 11 ` ( / \ ACCESS ROUTE. 1 I I IIII I PROVIDE TEMPORARY\' GRAVEL ROAD !YP PROTECT EXISTING ti UTILITIES TO REMAIN / ' a ENTRANCE J L • CHAIN LINK CONSTRUCTION FENCE PIPELINE \ 7 L / EASEMENT: A V L- POW l S. FLAGPOLE MATERIAL & / PLANTATION FLAGPOLE (� VEHICLE \ o PIPELINE \ ", \ \\� \ \ �. x \ \ 1 <? aG°M --'STO AGE , / ) �\ r� \ \ ❑ r \ x X=x !x — x� ,�x ft� 'C \G / °°M � � � / r J_ 96/fix w _J— — — — —x= —x= x—�=x/x=x� �f a<—x— �c—x—x—x——x—x= x—ac—x—x = x= x—x—x =x = x—x— �c�^tt—^�-x— mac— x——x—x=_J \'� _— — I 00 ° Nr � � < �ti. J L� `_ �`��� fiSS 13 CONSTRUCTION STAGING AREA -PROVIDE CLEARING, ROUGH GRADING, — — — — — — — — — — — — "° a;5a w „ TEMPORARY GRAVEL SURFACE, ` 1 TEMPORARY JOB TRAILER, TEMPORARY TOILETS, TEMPORARY UTILITY I I CONNECTIONS AND ALL OTHER \ \ REQUIRED SUPPORT FACILITIES DURING KEY PLAN NOT TO SCALE I CONSTRUCTION. 00 \° w Revisions: Date: luau ■ mm ■ uuu � uuuuuuuuuuuuuuum ■uuu■luau■muuuuuuuuuuuuuuu� CONSULTANTS ARCHITECT OF RECORD STAMP Office Drawing Title Phase Project Title Project Number 876CM3025 of GENERAL CONSTRUCTION STAGING o 100 /o CONSTRUCTION Salisbury National Cemetery Annex II LANDSCAPE ARCHITECT IRRIGATION DESIGNER Pashek+MTR, Ltd. Aqua Engineering, Inc. W.1 Construction AND SEQUENCING PLAN DOCUMENTS Building Number 412-321-6362 (970) 372-6104 C a, ARCHITECTURE He PLANNING PRELIMINARY and Facilities Approved: Project Director Location: Salisbury National Cemetery Drawing Number CIVIL/STRUCTURAL ENGINEER KCI Technologies Inc. ARCHITURA CORPORATION NOT FOR Management (302) 731-9176 9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384 CONSTRUCTION S. McCoy Rd. and Old Wilkesboro Rd. , Salisbury, NC 28144 MEP ENGINEER Arium AE PH: (317) 348-1000 U.S. Department VA Issue Date 2024-03-18 Checked KR Drawn AW GC_002 410-730-2300 POC: Michael Conly, AIA, NCARB, President of Veterans Affairs 2 of 142 A W C lug E F VA FORM 08 - 6231 1 2 1 3 4 1 5 1 6 1 7 8 1 9 1 10 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 ROADWAY NOTES U 0 C 0 E N 0 0- c co c F Co n CU 0 U 0 0 0 c co L L E U Q N r- 0 M 0 N Cl) N O N 12 \✓/�� 1 II /_1 j `7 �2 e o / / s / 4o o -1111 Y f EASEME / J � "J /_ NT I � \ i 1. THE CONTRACTOR SHALL COORDINATE WITH THE CITY OF SALISBURY FOR ALL WORK DONE IN THE PUBLIC RIGHT OF WAY. 2. PIPE LENGTH IS A HORIZONTAL MEASUREMENT OF STRUCTURE \ 5 / ✓`//�/��� TO CENTER OF STRUCTURE f 3. CATCH BASIN RIM ELEVATIONS ARE PROVIDED AT THE CENTER OF THE STRUCTURE AT THE BACK OF THE CURB 4. RADI MEASUREMENTS ARE FROM THE BACK OF THE CURB ° LEGEND PROPERTY LINE — — \ _ _ �- `_✓/ �/ ///� EASEMENT LINE -1 EXISTING CONTOUR EX. SANITARY SEWER J 1^� f ^� / / / / EX. SANITARY MANHOLE OS EX. WATER LINE W EX. FIRE HYDRANT y' SS —OHE � / � � J J / OVERHEAD UTILITY LINES V / UTILITY POLE i' / -� ram!✓ �^_ L �) / ��/� PETROLEUM LINES 0 FIBER OPTIC LINES FO /0 TREE LINE , �g/ YJ STORM/SANITARY MANHOLE OI Os CATCH BASIN/INLET �6, FLARED END SECTION STORM/SANITARY SEWER PIPE f j 1 \ ° STORMWATER / / / I � 1 � STRUCTURE MH1 MH1 C rI SID ELEV678.01 / I // ^ CB14 LP STA 20+13.85 � � �j � / J1 z loo SID " CB15 SD oa A ,�� X CB17 68p � cg12 I ELEV 678.01 � SD \ �, STA 18+78.30 \ 17x SST G S>6�q 8� CB13 V 15� �' SD H5 \ PRC STA 68� 1 I SD FE4 S D FE3 A-1k�� CP MH1 SD CB11 \\\ \� \ ELEV 680.02 \ I I� II v CB10 0 � LP STA 16+40. `` = \ �� P sD A x 3 ST �5 o CB9 l) 1 II II L PRC-- 0� I 11+47.9 Q� LO 15+80.80 U MIDSTA �h�Illi� gp6 29�b � Asx40, CPJ 05 II III \ Roadway Curve DATA CHORD BEARING NO. FROM TO RADIUS TANGENT LENGTH & LENGTH S53°27'41"E C1 1+56.42 2+67.42 063'36'11" 100.00' 62.01' 111.01, 105.40' S71°13'10"E C2 3+91.42 5+64.41 099'07'10" 100.00' 117.33' 173.00' 152.22' S55°48'24"E C3 6+71.63 11+47.90 129°56'41" 210.00' 449.78' 476.27' 380.56' S57°47'30"E C4 11+47.90 15+22.74 133°54'53" 160.37' 377.04' 374.84' 295.16' N19°28'32"E C5 15+22.74 16+38.87 071°33'04" 93.00' 67.01' 116.14' 108.74' N01 °16'31 "W C6 16+38.87 18+49.18 030°02'58" 401.00' 107.63' 210.31' 207.91' N58°05'51"W C7 18+49.18 21+57.66 143°41'38" 123.00' 375.14' 308.48' 233.76' A B C SID / CB7 I___ % 0 74 =_ \ on ����� • N N N N N • D14 C $ �i- �\\\\��\� ✓ /—I l Q `I / o wOM \_ �_ ` GV� I 01 103) \ Go o O O I O O p \\ ♦ \ I I � F I KEY PLAN NOT • SCALE • • 510 100 Scale: 1" .,o��� • � ������������ � ������������ � IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII • CONSULTANTS ARCHITECT OF RECORD STAMP Office of Construction and Facilities Management Drawing Title ROADWAY PLAN AND PROFILE VIEW Phase o 100 /o CONSTRUCTION DOCUMENTS Project Title SALISBURY NATIONAL CEMETERY ANNEX II Project Number 876CM3025 LANDSCAPE ARCHITECT Pashek + MTR, Ltd. 412-321-6362 CIVILISTRUCTURAL ENGINEER KCI Technologies Inc. (302) 731-9176 MEP ENGINEER Arium AE 410-730-2300 �j,ra, ARCHITECTURE He PLANNING ARCHITURA CORPORATION 9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384 PH: (317) 348-1000 POC: Michael Conly, AIA, NCARB, President Building Number Approved: Project Director Location: Salisbury National Cemetery Annex II S. McCoy Rd. and Old Wilkesboro Rd. Drawing Number C P 101 20 of 142 U.S. Department VA of Veterans Affairs Issue Date 2024-03-18 Checked Drawn Revisions: Date: VA FORM 08 - 6231 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 r� C 0- LO 0 o_ Cq N 0 N N N co E F k_ 00F o /// / / \fir /�/ / / 0 OC,3 671 T, �g73 _ / M H 6 _ 674X00 /% s X / \ \SID SD MH3 // }/_J CB2 X QC) 24"RCP �0�� / /%// %/ CB1 ass / \ \ \ / I / / / ELEV 666.30 LP STA 3+34.07 0 7Q DRIVEWAY �y0 \ O/ \ \ \ // // / / / / f` /� �j INTERSECTION NGj \ \ S���y / / / / / / / 671S- y \ \ oo nN 2' \ \ \\ / // / / / / / 672- \� EXISTING / / / \ C)0 J� � DRAINAGE � \ � \ \ � '�/ � / / EASEMENT SD � 1 5kp0 ��e� y�A SD �CB3 675 �00 0 °°• g76 S12 D 617 678 r STA 6+73.83 OFF 0.00 � J RIM ELEV SD SD RIM ELEV SD RINI ELEV 690 666.21 MH4 MH3 669.31 CB4 67 .04 690 STA + +4+92.70 OFFSET 27.81' LT OFFSET 18.95' LT OF SET 12.35' LT INV OUT 660.47 (24" RCP) (N) INV OUT 662.82 (24" RCP) (N) IN IN 666.13 (24" RCP) (S) INV IN 660.97 (18" RCP) (W) INV IN 663.75 (24" RCP) (SE) IN OUT 665.52 (24" RCP) (NW) HIGH POINT ELEV = 674.18' INV IN 660.47 (24" RCP) (S) IN IN 667.48 (12" RCP) (E) HIGH POINT STA = 1+38.49 PVI STA = 1+49.60 PVI STA = 4+91.5 PVI ELEV = 674.54' PVI ELEV 674.7 ' A.D. _ -7.20% A.D. _ .06% Q O K=6.94 K=1 .77 Of e = 0.45 e= >_ 50.00' VC O U U LOW POINT ELEV = 666.30' 680 LOW OINT STA = 3+34.07 ,Lq T80 U v v 'P N PVI ELEV = 664.51' LO CD �� r� A.D.=12.06% LOM LU UU U) (0 K=10.00 - >> >> Uv e=1.82 +� ww m 00 > > w w PROPOSED FINISH GRADE 120.58' VC - v > m w co2.00% LO r- LO o Nco + 0 W - U w w 670 -5.20 % > > m co�g6 ° /° RCP 3.50% 670 87.18 LF 92.47 LF - 24" RCP @ 1.91 % O EXISTING GROUND \ 503% RCP @ -24 , @ 46.73 �F 25.00 LF - 24" RCP @ .50 ° ICI O EXISTING 10" SANITARY SEWER 660 EXISTING GROUND STA 3+95.25 660 TOP ELEV 663.10 PROPOSED FINISH GRADE 656 656 CO M N 00 �,.� N N \ N N N N W N M W co I? CD N M CO co I? co C?V r V N coN M co I� CO (0 (0 CO CO CD°O 1-- ,6 CO LO 6 CO CO � O M 1+00 2+00 3+00 4+00 5+00 I I I ` N I�9 � I I I I I I I I I I I I I I I I I I I I I, N I , 00 I < 00 cc I I I _Z I QC� I N I I ROADWAY NOTES 1. THE CONTRACTOR SHALL COORDINATE WITH THE CITY OF SALISBURY FOR ALL WORK DONE IN THE PUBLIC RIGHT OF WAY. 2. PIPE LENGTH IS A HORIZONTAL MEASUREMENT OF STRUCTURE TO CENTER OF STRUCTURE 3. CATCH BASIN RIM ELEVATIONS ARE PROVIDED AT THE CENTER OF THE STRUCTURE AT THE BACK OF THE CURB 4. RADI MEASUREMENTS ARE FROM THE BACK OF THE CURB LEGEND PROPERTY LINE - - EASEMENT LINE EXISTING CONTOUR - - EX. SANITARY SEWER SS EX. SANITARY MANHOLE OS EX. WATER LINE W EX. FIRE HYDRANT W OVERHEAD UTILITY LINES OHE UTILITY POLE f PETROLEUM LINES FIBER OPTIC LINES FO TREE LINE STORM MANHOLE 0 CATCH BASIN/INLET M FLARED END SECTION STORM/SANITARY SEWER PIPE STORMWATER SD SS STRUCTURE MH1 MH1 Roadway Curve DATA CHORD BEARING NO. FROM TO RADIUS TANGENT LENGTH & LENGTH S53°27'41"E C1 1+56.42 2+67.42 063'36'11" 100.00' 62.01' 111.01' 105.40' S71 °13'10"E C2 3+91.42 5+64.41 099'07'10" 100.00' 117.33' 173.00' 152.22' S55°48'24"E C3 6+71.63 11+47.90 129°56'41" 210.00' 449.78' 476.27' 380.56' S57°47'30"E C4 11+47.90 15+22.74 133°54'53" 160.37' 377.04' 374.84' 295.16' N19°28'32"E C5 15+22.74 16+38.87 071°33'04" 93.00' 67.01' 116.14' 108.74' N01°16'31"W C6 16+38.87 18+49.18 030°02'58" 401.00' 107.63' 210.31' 207.91' N58°05'51"W C7 18+49.18 21+57.66 143°41'38" 123.00' 375.14' 308.48' 233.76' NOT TO SCALE 40 CONSULTANTS ARCHITECT OF RECORD STAMP Office of Construction and Facilities Management Drawing Title ROADWAY PLAN AND PROFILE VIEW Phase 100% CONSTRUCTION DOCUMENTS Project Title SALISBURY NATIONAL CEMETERY ANNEX II Project Number 876CM3025 LANDSCAPE ARCHITECT Pashek+MTR, Ltd. 412-321-6362 CIVIL/STRUCTURAL ENGINEER KCI Technologies Inc. (302) 731-9176 MEP ENGINEER Arium AE 410-730-2300 � Cja, ARCHITECTURE & PLANNING ARCHITURA CORPORATION 9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384 PH: (317) 348-1000 POC: Michael Conly, AIA, NCARB, President Building Number Approved: Project Director Location: Salisbury National Cemetery Annex II S. McCoy Rd. and Old Wilkesboro Rd. Drawing Number C P 102 21 of 142 U.S. Department VA of Veterans Affairs Issue Date 2024-03-18 Checked Drawn Revisions: Date: A B C D E / F =ORM 08 - 6231 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 1 I 2 I 3 I 4 I 5 1 6 I 7 I 8 I 9 I 10 I�11111111111111111111111111 C 0- M CV O C\I O CV CV CV M E F NOTES GENERAL NOTES: SALISBURY CEMETERY 1. THIS BRIDGE HAS BEEN DESIGNED FOR GENERAL SITE CONDITIONS. THE PROJECT ENGINEER SHALL BE RESPONSIBLE FOR THE STRUCTURE'S SUITABILITY TO THE EXISTING SITE CONDITIONS AND FOR THE HYDRAULIC EVALUATION -- INCLUDING SCOUR AND CONFIRMATION OF SOIL CONDITIONS. 2. PRIOR TO CONSTRUCTION, CONTRACTOR MUST VERIFY ALL ELEVATIONS SHOWN ANNEX EXPANSION THROUGH THE ENGINEER. 3. ONLY CONTECH ENGINEERED SOLUTIONS LLC, THE CON/SPAN@ APPROVED PRECASTER IN NORTH CAROLINA MAY PROVIDE THE STRUCTURE DESIGNED IN ACCORDANCE WITH THESE PLANS. 4. THE USE OF ANOTHER PRECAST STRUCTURE WITH THE DESIGN ASSUMPTIONS USED FOR THE CON/SPAN@ STRUCTURE MAY LEAD TO SERIOUS DESIGN ERRORS. SALISBURY NORTH CAROLINA USE OF ANY OTHER PRECAST STRUCTURE WITH THIS DESIGN AND DRAWINGS VOIDS ANY CERTIFICATION OF THIS DESIGN AND WARRANTY. CONTECH 7 ENGINEERED SOLUTIONS LLC ASSUMES NO LIABILITY FOR DESIGN OF ANY ALTERNATE OR SIMILAR TYPE STRUCTURES. 5. ALTERNATE STRUCTURES MAY BE CONSIDERED, PROVIDED THAT DRAWINGS AND CALCULATIONS SIGNED AND SEALED BY A PROFESSIONAL ENGINEER, REGISTERED IN THE STATE OF NORTH CAROLINA, EMPLOYED BY THE PRECAST CONCRETE BRIDGE SUPPLIER, ARE SUBMITTED TO THE ENGINEER 2 WEEKS PRIOR TO THE BID DATE FOR REVIEW AND APPROVAL. 6. ALTERNATE STRUCTURES MAY BE CONSIDERED, PROVIDED THAT THE ALTERNATE DESIGN DOES NOT REDUCE THE HYDRAULIC OPENING OF THE STRUCTURE AS N `T SHOWN ON THE DRAWINGS. AT A MINIMUM THE ALTERNATE STRUCTURE MUST 3: 3: PROVIDE THE SAME OR LARGER SPAN AND RISE AS THE STRUCTURE SHOWN ON J = J = THE DRAWINGS. a N 47'-113/4" Q N 7. THE PRECAST ARCH SUPPLIER MUST ATTEND THE PRE -BID MEETING, IF ONE IS 0 N 6 - (0117) 1IT-0" SPAN x 6'-8%" RISE x 7'-11 Y4' LONG (D ? PRECAST CONCRETE BRIDGE UNITS ? HELD. 3: PLUS 5 JOINTS @ Y4"t PER JOINT 3: 8. SUPPLIER OF PROPOSED ALTERNATES TO A CON/SPAN@ BRIDGE SYSTEM MUST SUBMIT AT LEAST TWO (2) INDEPENDENTLY VERIFIED FULL SCALE LOAD TESTS THAT CONFIRM THE PROPOSED DESIGN METHODOLOGY OF THE THREE SIDED/ARCH STRUCTURE(S). THE PROPOSED ALTERNATE, UPON SATISFACTORY L I CONFIRMATION OF DESIGN METHODOLOGY, MAY BE CONSIDERED AN - - - - - - - - - - - ------ ------ - - - - - - ----- ACCEPTABLE ALTERNATE. E 9. PROPOSED ALTERNATE STRUCTURES MAY BE CONSIDERED, PROVIDED THAT THE PRECAST CONCRETE BRIDGE STRUCTURES ARE PROVIDED BY A SUPPLIER THAT HAS A MINIMUM OF TWO (2) REGISTERED PROFESSIONAL ENGINEERS ON STAFF ,, THAT ARE DEDICATED TO THE DESIGN OF THESE TYPES OF STRUCTURES. FLOW LOW a SUPPLIER MUST PROVIDE THESE NAMES, P.E. LICENSE NUMBERS AND DATES OF �� HIRE AT TIME OF ALTERNATE SUBMITTAL. 5 3 DESIGN DATA I DESIGN LOADING: o BRIDGE UNITS: HL-93 L HEADWALLS: EARTH PRESSURE + LIVE LOAD IMPACT (TL-1) I WINGWALLS: EARTH PRESSURE + LIVE LOAD IMPACT (TL-1) � DESIGN FILL HEIGHT: 2'-0" MIN. TO 3'-0" MAX. FROM TOP OF CROWN TO TOP OF PAVEMENT. F � DESIGN METHOD: LOAD AND RESISTANCE FACTOR DESIGN PER AASHTO LRFD BRIDGE 3 DESIGN SPECIFICATIONS, 9TH EDITION, 2020. '� i MATERIALS J N Q N PRECAST UNITS SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH (DN z N o CON/SPAN@ SPECIFICATIONS. CONCRETE FOR FOOTINGS SHALL HAVE A MINIMUM r COMPRESSIVE STRENGTH OF 4000 PSI. REINFORCING STEEL FOR FOOTINGS SHALL u CONFORM TO ASTM A615 OR A996-GRADE 60. L dl i J i NOTE: HEADWALL AND WINGWALL THICKNESS TBD ONCE FORMLINER SELECTED. PRELIMINARY NOT FOR CONSTRUCTION The design and information shown on this drawing is provided PROJECT No.: SEQ. No.: DATE: Uas a service to the project Owner, engineer and contractor by \\ I // - Contech Arch Engineering, Professional Corporation - � CON SPAN" SALISBURY CEMETERY 777506 010' 2/27/2024 ('Contech'). Neither this drawing, nor any part thereof. may be : ` N T E H S used, reproduced or modified in any manner without the prior ,. DESIGN ED: DRAWN: written consent of Contech. Failure to comply is done at the \��-SERIES_ ANNEX EXPANSION iu users ownrlsk and Contech expressly disclaims any liability or ARCH Q�(� ''PRQFES`SIDNALCQRPQRATiON biP CHECKED: APPROVEDKL responsibility forsuch use. lIf discrepancies between the supplied information upon which thedrewingisbased and actual Feld conditions are enppamaned 9100 Centre Pointe Dr., Suite 400, West Chester, OH 45069 XXX PAC as site work progresses, these tliscrepancies must be repOdetl to Contech immediately for reevaluation of the design. Contech PROPOSAL SHEET NO.: S accepts no liability for designs based on missing, incomplete or 800-338-1122 513-645-7000 513-645-7993 FAX DRAWING SALISBURY, NORTH CAROLINA CT1 °F CT5 «sons information supplied by others. MARK DATE REVISION DESCRIPTION BY TNVINGWALL T/WINGWALL 22'-5" WINGWALL- - 21'-2" HEADWALL 22'-5" WINGWALL ELEV. 672.00 ELEV. 669.80 F0) T/HEADWALL CD T/HEADWALL ELEV. 671.25 ELEV. 670.55 ROADWAY E OF ROADWAY ELEV. 668.45 i ROADWAY BEHIND WALL - - ELEV.666.32 - �_ - - - -T - - - - 1 � � - - - - - - - - - - - - r, I � 1 I-. 1 I- 1 I. ., -ceJ - I LJ L•Jgl! � \ LJ L°J I CV J ao Q `- 0 I \ I I Z Z � O= 1 -) V.663. \ I I O of I I T/FOOTING I I af 0 I I 0 \ ° ELEV. 657.00 1 1 OIr r.r I I I I Ie I .� LJ L•J LJ _ _ 1 1 -- i F- I I I I 1 I I I I I I� 0117 1T-0" SPAN I 1 I ( ) I 1 I \------1 / *NOTE: FOOTING MUST BEAR 6'-0" BELOW GRADE FOR SCOUR PROTECTION. FOOTINGS TO BE UPSTREAM END ELEVATION DESIGNED AT A LATER DATE. 0 2' 4' 8' T/WINGWALL ELEV. 672.00 22'-5" WINGWALL - 21'-2" HEADWALL - 22'-5" WINGWALL T/WINGWALL 0 ELEV. 669.80 T/HEADWALL = ELEV. 671.25 T/HEADWALL 0' ELEV. 670.55 ROADWAY ELEV. 668.45 4 OF ROADWAY BEHIND WALL - - - - ROADWAY - O i - � 2 3 v- ------------ ELEV6663 I � - - - - - - � >Q> i _ ro ,, J V> � i � � I co 1° Q (D / \ <" Z _ 1 I / \ I ~ z O I I / ELEV.663. \ O � 1 I 1 W = 1 I T/FOOTING / FLOW LINE \ ° I I I I ELEV.657.00 I I 1 LI J L� ELEV. 657.00 1 r rh I I I° _- LJ ----=J 1 L-------------I----------- - -T-_____-----�------------ I 1 1 I I I I I I I I I 0117 17'-0" SPAN I I I I I L-------------1 I I 1 I -- ° \\ I I 1 i // \-----------1-------J L-------1----------J DOWNSTREAM END ELEVATION 0 2 4 8 PRELIMINARY NOT FOR CONSTRUCTION 9 The design and information shown on this drawing is provided as service to the project owner, engineer and contractor by Contech Arch Engineering, Professional Corporation (-Contech•). Neither thinafiedin nor I I // , Ci=.//- NTECH CON SPAN" SALISBURY CEMETERY PROJECT No.: 777sos SEQ. No.: 010 DATE 2/27/2024 DESIGNED: DRAWN: 3 annerlthereof,maybe 3 used, reproduced or modified ;n any manners then d Ina prior written consent of Contech. Failure to comply is done at the \��-SERIES. ANNEX EXPANSION users own risk and Contech expressly aisdaimsany liability or ARCH ENGN1�J- PROFESSIONAL CORPORATION i�►� RKL RKL 3 responsibility, for such use. C CHECKED: APPROVED: L If discrepancies between the supplied information upon which thedrawingrs basedandacualr N-o iWnsareencountered - ssite workprogresses, thew discrepanciesmust bereported 9100 Centre Pointe Dr., Suite 400, West Chester, OH 45069 XXX PAC 800-338-112'2. 513-645-7000 513-645-7993 FAX SHEET NO.: u to Contech immediately for reevaluation of the design. Contech L accepts no liability for aesignsbawdonmissing,incomplete or PROPOSAL DRAWING SALISBURY, NORTH CAROLINA MAR DATE REVISION DESCRIPTION BY cc aa;nromauonanppliedbyothers. CT3 °F CT5 PRECAST BRIDGE UNIT SECTION A 0 2' 4' 8' CT2 GROUT TO TOP INSIDE FACE OF OF KEYWAY PRECAST BRIDGE UNIT _\ GROUT UNDER L UNIT LEG NOTE: FILL ENTIRE KEYWAY INCLUDING NOMINAL 1" VOID BETWEEN BOTTOM OF KEYWAY AND BOTTOM OF PRECAST BRIDGE UNIT LEG WITH GROUT. TYPICAL BRIDGE UNIT GROUT DETAIL NOT TO SCALE *NOTE: FOOTING MUST BEAR 6'-0" BELOW GRADE FOR SCOUR PROTECTION. FOOTINGS TO BE DESIGNED AT A LATER DATE. WINGWALL WINGWALL ANCHOR Oz IY 2E c (0 � �aaaaaaaa t WINGWALL GROUT FOOTING BACKSIDE OF FOOTING NOTES: all, MINIMUM 1" GROUT UNDER WINGWALL LEG & ANCHOR STEM. is AREA BETWEEN WINGWALL FOOTING AND WINGWALL ANCHOR SHALL BE GROUTED SOLID BEFORE BACKFILL. • FORM BACKSIDE OF FOOTING TO DIMENSIONS SHOWN ON FOUNDATION PLAN. TYPICAL WINGWALL GROUT DETAIL NOT TO SCALE SECTION B 0 1, 2 4 CT2 I I PRELIMINARY NOT FOR CONSTRUCTION WINGWALL ANCHOR BACKFILL PER CON/SPAN@ SPECIFICATIONS EE TYPICAL WINGWALL ROUT DETAIL ON THIS SHEET - Tne design and inrormation shown on this drawing is proviaea 0 as a service to the project owner, ener co gineand ntractor by - Contech Arch Engineering, Professional Corporation . ` /I- C N T E C H CON SPAN" SALISBURY CEMETERY PROJECT No.: 777506 SEQ. No.: 010 DATE: 2/27/2024 i I"Contech•). Neither this drawing. nor any part thereof. may be used, reproduced or modified in any manner without the prior =.►• DESIGNED: DRAWN: written of Failuretocomplysdoneatthe \��-SERIES.. ANNEX EXPANSION nComech. r,risk u users own risk and comecn expressly disclaims any liability or i responsibility for such use. ARCH ENCdNEERNCn PROFESSIONAL CORPORATION I�►� RKL RKL CHECKED: APPROVED: l If discrepancies between the supplied information upon which g the drawing is based and actual Feld conditions are encountered 9100 Centre Pointe Dr., Suite 400, West Chester, OH 45069 XXX PAC as site work progresses, these discrepancies must be reported uto Contech immediately for reevaluation of the design. Contech PROPOSAL SALISBURY NORTH CAROLINA R O L I N A 800-338-1122 513-645-7000 SHEET NO.: MARK DATE REVISION DESCRIPTION BY S accepts no liability for designs based on missing, incomplete or 513-645-7993 FAX DRAWING , CT2 QP CT5 - ccurateinformation supplied byother. SPECIFICATIONS FOR MANUFACTURE AND INSTALLATION OF CON/SPAN® O-SERIES BRIDGE SYSTEMS 1. DESCRIPTION CONCRETE ACCESSORIES, MIAMISBURG, OHIO, (800) MAY BE TACK WELDED TOGETHER FOR ASSEMBLY FOLLOWING TESTS ARE PERFORMED IN ASTM C42 SPECIFICATION. 1.1. TYPE -THIS WORK SHALL CONSIST OF FURNISHING AND 745-3700. COIL RODS AND NUTS USED IN HEADWALL PURPOSES. FOR SMOOTH WELDED WIRE FABRIC, THE ACCORDANCE WITH THE ASTM STANDARDS 6.1.3.ACCEPTABILITY OF CYLINDER TESTS - WHEN THE AVERAGE CONSTRUCTING A CON/SPAN® O-SERIES BRIDGE SYSTEM IN CONNECTIONS SHALL BE AISI TYPE 304 STAINLESS STEEL. OVERLAP SHALL MEET THE REQUIREMENTS OF AASHTO INDICATED. TESTS SHALL BE PERFORMED AS COMPRESSIVE STRENGTH OF ALL CYLINDERS TESTED IS ACCORDANCE WITH THESE SPECIFICATIONS AND IN WASHERS USED IN HEADWALL CONNECTIONS SHALL BE 5.11.2.5.2 AND 5.11.6.2. FOR DEFORMED WELDED WIRE INDICATED IN SECTION 6 OF THESE EQUAL TO OR GREATER THAN THE DESIGN COMPRESSIVE REASONABLY CLOSE CONFORMITY WITH THE LINES, GRADES, EITHER AISI TYPE 304 STAINLESS STEEL PLATE WASHERS FABRIC, THE OVERLAP SHALL MEET THE REQUIREMENTS OF SPECIFICATIONS. STRENGTH, AND NOT MORE THAN 10% OF THE CYLINDERS DESIGN AND DIMENSIONS SHOWN ON THE PLANS OR AS OR AASHTO M270 (ASTM A709) GRADE 36 PLATE WASHERS AASHTO 5.11.2.5.1 AND 5.11.6.1. THE OVERLAP OF WELDED 4.6.2.2.1. AIR CONTENT: C231 OR C173 TESTED HAVE A COMPRESSIVE STRENGTH LESS THAN THE ESTABLISHED BY THE ENGINEER. IN SITUATIONS WHERE TWO OR HOT DIP GALVANIZED AS PER AASHTO M111 (ASTM A123). WIRE FABRIC SHALL BE MEASURED BETWEEN THE 4.6.2.2.2. COMPRESSIVE STRENGTH: C31,C39,C497 DESIGN CONCRETE STRENGTH, AND NO CYLINDER TESTED MORE SPECIFICATIONS APPLY TO THIS WORK, THE MOST 3.3.7.MECHANICAL SPLICES OF REINFORCING BARS SHALL BE OUTER -MOST LONGITUDINAL WIRES OF EACH FABRIC 4.6.2.3. THE PRECASTER SHALL PROVIDE DOCUMENTATION HAS A COMPRESSIVE STRENGTH LESS THAN 90% OF THE STRINGENT REQUIREMENTS SHALL GOVERN. MADE USING THE DOWEL BAR SPLICER SYSTEM AS SHEET. FOR DEFORMED BILLET -STEEL BARS, THE OVERLAP DEMONSTRATING COMPLIANCE WITH THIS SECTION REQUIRED CONCRETE STRENGTH, THEN THE ELEMENT 1.2. DESIGNATION - PRECAST REINFORCED CONCRETE CON/SPAN® MANUFACTURED BY DAYTON SUPERIOR CONCRETE SHALL MEET THE REQUIREMENTS OF AASHTO 5.11.2.1 FOR TO CONTECHO ENGINEERED SOLUTIONS AT SHALL BE ACCEPTED. WHEN THE COMPRESSIVE STRENGTH O-SERIES BRIDGE UNITS MANUFACTURED IN ACCORDANCE WITH ACCESSORIES MIAMISBURG OHIO 800 745-3700 AND SPLICES OTHER THAN TENSION SPLICES THE OVERLAP REGULAR INTERVALS OR UPON REQUEST. OF THE CYLINDERS TESTED DOES NOT CONFORM TO THESE THIS SPECIFICATION SHALL BE DESIGNATED BY SPAN AND RISE. SHALL CONSIST OF THE DBDI SPLICE SYSTEM (DOWEL BAR SHALL BE A MINIMUM OF V-0" FOR WELDED WIRE FABRIC OR 4.6.2.4. THE OWNER MAY PLACE AN INSPECTOR IN THE ACCEPTANCE CRITERIA, THE ACCEPTABILITY OF THE PRECAST REINFORCED CONCRETE WINGWALLS AND HEADWALLS SPLICER AND DOWEL -IN OR AS MANUFACTURED BY DEFORMED BILLET -STEEL BARS. THE SPACING CENTER TO PLANT WHEN THE PRODUCTS COVERED BY THIS ELEMENT MAY BE DETERMINED AS DESCRIBED IN SECTION MANUFACTURED IN ACCORDANCE WITH THIS SPECIFICATION BARSPLICE PRODUCTS NC, DAYTON, OHIO, (937)-275-8700, CENTER OF THE CIRCUMFERENTIAL WIRES IN A WIRE SPECIFICATION ARE BEING MANUFACTURED. 6.1.4, BELOW. SHALL BE DESIGNATED BY LENGTH, HEIGHT, AND DEFLECTION AND SHALL CONSIST OF BARSPLICER XP TYPE 2 SYSTEM. FABRIC SHEET SHALL BE NOT LESS THAN 2" NOR MORE 4.6.3. DOCUMENTATION - THE PRECASTER SHALL SUBMIT 6.1.4. ACCEPTABILITY OF CORE TESTS - THE COMPRESSIVE ANGLE. PRECAST REINFORCED CONCRETE EXPRESSTM THAN 4". THE SPACING CENTER TO CENTER OF THE PRECAST PRODUCTION REPORTS TO CONTECHO STRENGTH OF THE CONCRETE IN A BRIDGE ELEMENT IS FOUNDATION UNITS MANUFACTURED IN ACCORDANCE WITH THIS 4. MANUFACTURE OF PRECAST ELEMENTS - SUBJECT TO THE LONGITUDINAL WIRES SHALL NOT BE MORE THAN 8". THE ENGINEERED SOLUTIONS AS REQUIRED. ACCEPTABLE WHEN EACH CORE TEST STRENGTH IS EQUAL SPECIFICATION SHALL BE DESIGNATED BY LENGTH, HEIGHT AND PROVISIONS OF SECTION 5, BELOW, THE PRECAST ELEMENT SPACING CENTER TO CENTER OF THE LONGITUDINAL 5. PERMISSIBLE VARIATIONS TO OR GREATER THAN THE DESIGN CONCRETE STRENGTH. WIDTH. DIMENSION AND REINFORCEMENT DETAILS SHALL BE AS PRESCRIBED DISTRIBUTION STEEL FOR EITHER LINE OF REINFORCING IN 5.1. BRIDGE UNITS WHEN THE COMPRESSIVE STRENGTH OF A CORE TESTED IS IN THE PLAN AND SHOP DRAWINGS PROVIDED BY THE THE TOP SLAB SHALL BE NOT MORE THAN 1'4". 5.1.1.INTERNAL DIMENSIONS - THE INTERNAL DIMENSION SHALL LESS THAN THE DESIGN CONCRETE STRENGTH THE 2. DESIGN MANUFACTURER. 4.3.2.LAPS, WELDS, AND SPACING FOR PRECAST WINGWALLS, VARY NOT MORE THAN 1 % FROM THE DESIGN DIMENSIONS PRECAST ELEMENT FROM WHICH THAT CORE WAS TAKEN 2.1. SPECIFICATIONS - THE PRECAST ELEMENTS ARE DESIGNED IN 4.1. FORMS - THE FORMS USED IN MANUFACTURE SHALL BE HEADWALLS AND FOUNDATIONS - SPLICES IN THE NOR MORE THAN 1}2" WHICHEVER IS LESS. MAY BE RE -CORED. WHEN THE COMPRESSIVE STRENGTH ACCORDANCE WITH THE "STANDARD SPECIFICATIONS FOR SUFFICIENTLY RIGID AND ACCURATE TO MAINTAIN THE REINFORCEMENT SHALL BE MADE BY LAPPING. LAPS MAY - 5.1.2.SLA6 AND WALL THICKNESS THE SLAB AND WALL OF THE RE -CORE IS EQUAL TO OR GREATER THAN THE Q HIGHWAY BRIDGES" 17TH EDITION, ADOPTED BY THE AMERICAN REQUIRED PRECAST ELEMENT DIMENSIONS WITHIN THE BE TACK WELDED TOGETHER FOR ASSEMBLY PURPOSES. THICKNESS SHALL NOT BE LESS THAN THAT SHOWN IN THE DESIGN CONCRETE STRENGTH, THE COMPRESSIVE ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION PERMISSIBLE VARIATIONS GIVEN IN SECTION 5 OF THESE FOR SMOOTH WELDED WIRE FABRIC, THE OVERLAP SHALL DESIGN BY MORE THANY4". A THICKNESS MORE THAN THAT STRENGTH OF THE CONCRETE IN THAT BRIDGE ELEMENT IS OFFICIALS, 2002. A MINIMUM OF ONE FOOT OF COVER ABOVE THE SPECIFICATIONS. ALL CASTING SURFACES SHALL BE OF A MEET THE REQUIREMENTS OF AASHTO 5.11.2.5.2 AND REQUIRED IN THE DESIGN SHALL NOT BE CAUSE FOR ACCEPTABLE. CROWN OF THE BRIDGE UNITS IS REQUIRED IN THE INSTALLED SMOOTH MATERIAL. 5.11.6.2. FOR DEFORMED WELDED WIRE FABRIC THE REJECTION. 6.1.4.1. WHEN THE COMPRESSIVE STRENGTH OF ANY CONDITION. UNLESS NOTED OTHERWISE ON THE SHOP ( 4.2. PLACEMENT OF REINFORCEMENT OVERLAP SHALL MEET THE REQUIREMENTS OF AASHTO F 5.1.3.LENGTH OF OPPOSITE SURFACES -VARIATIONS IN LAYING RECORE IS LESS THAN THE DESIGN CONCRETE DRAWINGS AND DESIGNED ACCORDINGLY.) 4.2.1.PLACEMENT OF REINFORCEMENT IN PRECAST BRIDGE 5.11.2.5.1 AND 5.11.6.1. FOR DEFORMED BILLET -STEEL BARS, LENGTHS OF TWO OPPOSITE SURFACES OF THE BRIDGE STRENGTH, THE PRECAST ELEMENT FROM WHICH UNITS - THE COVER OF CONCRETE OVER THE OUTSIDE THE OVERLAP SHALL MEET THE REQUIREMENTS OF UNIT SHALL NOT BE MORE THAN )t2" IN ANY SECTION, THAT CORE WAS TAKEN SHALL BE REJECTED. 3. MATERIALS CIRCUMFERENTIAL REINFORCEMENT SHALL BE 2" MINIMUM. C UAASHTO .11..1 T SPACING F THE 5 2 HE S AC G O EXCEPT WHERE BEVELED ENDS FOR LAYING OF CURVES 1.4 P N E - H E H SHALL 6. .2. PLUGGING CORE HOLES THE CORE HOLES 3.1. CONCRETE - THE CONCRETE FOR THE PRECAST ELEMENTS THE COVER OF CONCRETE OVER THE INSIDE WIRES IN A WIRE FABRIC SHEET SHALL BE NOT LESS THAN ARE SPECIFIED BY THE PURCHASER. BE PLUGGED AND SEALED BY THE MANUFACTURER SHALL BE AIR -ENTRAINED WHEN INSTALLED IN AREAS SUBJECT CIRCUMFERENTIAL REINFORCEMENT SHALL BE 1)�" 2" NOR MORE THAN 8". 5.1.4.LENGTH OF SECTION -THE UNDERRUN IN LENGTH OF A IN A MANNER SUCH THAT THE ELEMENTS WILL TO FREEZE -THAW CONDITIONS, COMPOSED OF PORTLAND MINIMUM, UNLESS OTHERWISE NOTED ON THE SHOP 4.4. CURING - THE PRECAST CONCRETE ELEMENTS SHALL BE CURED SECTION SHALL NOT BE MORE THAN )1" IN ANY BRIDGE UNIT. MEET ALL OF THE TEST REQUIREMENTS OF THIS CEMENT, FINE AND COARSE AGGREGATES, ADMIXTURES AND DRAWINGS. THE CLEAR DISTANCE OF THE END FOR A SUFFICIENT LENGTH OF TIME SO THAT THE CONCRETE 5.1.5.POSITION OF REINFORCEMENT - THE MAXIMUM VARIATION SPECIFICATION. PRECAST ELEMENTS SO SEALED WATER. AIR -ENTRAINED CONCRETE SHALL CONTAIN 6 is 2 CIRCUMFERENTIAL WIRES SHALL NOT BE LESS THAN 1" NOR WILL DEVELOP THE SPECIFIED COMPRESSIVE STRENGTH IN 28 IN POSITION OF THE REINFORCEMENT SHALL BE dIN NO SHALL BE CONSIDERED SATISFACTORY FOR USE. PERCENT AIR. THE AIR- ENTRAINING ADMIXTURE SHALL MORE THAN 2" FROM THE ENDS OF EACH SECTION. DAYS OR LESS. ANY ONE OF THE FOLLOWING METHODS OF CASE SHALL THE COVER OVER THE REINFORCEMENEN T BE 6.1.4.3. TEST EQUIPMENT -EVERY MANUFACTURER CONFORM TO AASHTO M154. THE MINIMUM CONCRETE REINFORCEMENT SHALL BE ASSEMBLED UTILIZING SINGLE CURING OR COMBINATIONS THERE OF SHALL BE USED: LESS THAN 1)1" FOR THE OUTSIDE CIRCUMFERENTIAL STEEL FURNISHING PRECAST ELEMENTS UNDER THIS COMPRESSIVE STRENGTH SHALL BE AS SHOWN ON THE SHOP OR MULTIPLE LAYERS OF WELDED WIRE FABRIC (NOT TO 4.4.1.STEAM CURING - THE PRECAST ELEMENTS MAY BE OR BE LESS THAN 1" FOR THE INSIDE CIRCUMFERENTIAL SPECIFICATION SHALL FURNISH ALL FACILITIES AND DRAWINGS. EXCEED 3 LAYERS), SUPPLEMENTED WITH A SINGLE LAYER LOW-PRESSURE STEAM CURED BY A SYSTEM THAT WILL STEEL AS MEASURED TO THE EXTERNAL OR INTERNAL PERSONNEL NECESSARY TO CARRY OUT THE TEST 3.1.1. PORTLAND CEMENT - SHALL CONFORM TO THE OF DEFORMED BILLET -STEEL BARS, WHEN NECESSARY. MAINTAIN A MOIST ATMOSPHERE. SURFACE OF THE BRIDGE. THESE TOLERANCES OR COVER REQUIRED. REQUIREMENTS OF ASTM SPECIFICATIONS C150-TYPE WELDED WIRE FABRIC SHALL BE COMPOSED OF 4.4.2. WATER CURING - THE PRECAST ELEMENTS MAY BE WATER REQUIREMENTS DO NOT APPLY TO MATING SURFACES OF 6.2. INSPECTION - THE QUALITY OF MATERIALS, THE PROCESS OF I, TYPE IL, TYPE II, OR TYPE III CEMENT. CIRCUMFERENTIAL AND LONGITUDINAL WIRES MEETING CURED BY ANY METHOD THAT WILL KEEP THE SECTIONS THE JOINTS. MANUFACTURE, AND THE FINISHED PRECAST ELEMENTS SHALL 3.1.2. AGGREGATE - SHALL CONSIST OF STONE HAVING A THE SPACING REQUIREMENTS OF 4.3, BELOW, AND SHALL MOIST. 5.1.6. AREA OF REINFORCEMENT - THE AREAS OF STEEL BE SUBJECT TO INSPECTION BY THE PURCHASER. MAXIMUM SIZE OF 1 INCH. AGGREGATE SHALL MEET CONTAIN SUFFICIENT LONGITUDINAL WIRES EXTENDING 4.4.3.MEMBRANE CURING - A SEALING MEMBRANE CONFORMING REINFORCEMENT SHALL BE THE DESIGN STEEL AREAS AS 7. JOINTS REQUIREMENTS FOR ASTM C33. THROUGH THE BRIDGE UNIT TO MAINTAIN THE SHAPE AND TO THE REQUIREMENTS OF ASTM SPECIFICATION C309 MAY SHOWN IN THE MANUFACTURER'S SHOP DRAWINGS. STEEL THE BRIDGE UNITS SHALL BE PRODUCED WITH FLAT BUTT ENDS. 3.1.3. WATER REDUCING ADMIXTURE - THE MANUFACTURER MAY POSITION OF THE REINFORCEMENT. LONGITUDINAL BE APPLIED AND SHALL BE LEFT INTACT UNTIL THE AREAS GREATER THAN THOSE REQUIRED SHALL NOT BE THE ENDS OF THE BRIDGE UNITS SHALL BE SUCH THAT WHEN THE SUBMIT, FOR APPROVAL BY THE ENGINEER, A DISTRIBUTION REINFORCEMENT MAY BE WELDED WIRE REQUIRED CONCRETE COMPRESSIVE STRENGTH IS CAUSE FOR REJECTION. THE PERMISSIBLE VARIATION IN SECTIONS ARE LAID TOGETHER THEY WILL MAKE A CONTINUOUS WATER -REDUCING ADMIXTURE FOR THE PURPOSE OF FABRIC OR DEFORMED BILLET -STEEL BARS AND SHALL ATTAINED. THE CONCRETE TEMPERATURE AT THE TIME OF DIAMETER OF ANY REINFORCEMENT SHALL CONFORM TO LINE WITH A SMOOTH INTERIOR FREE OF APPRECIABLE INCREASING WORKABILITY AND REDUCING THE WATER MEET THE SPACING REQUIREMENTS OF 4.3, BELOW. THE APPLICATION SHALL BE WITHIN +/- 10 DEGREES F OF THE THE TOLERANCES PRESCRIBED IN THE ASTM IRREGULARITIES, ALL COMPATIBLE WITH THE PERMISSIBLE REQUIREMENT FOR THE CONCRETE. ENDS OF THE LONGITUDINAL DISTRIBUTION ATMOSPHERIC TEMPERATURE. ALL SURFACES SHALL BE SPECIFICATION FOR THAT TYPE OF REINFORCEMENT. VARIATIONS IN SECTION 5, ABOVE. THE JOINT WIDTH BETWEEN 3.1.4. CALCIUM CHLORIDE - THE ADDITION TO THE MIX OF REINFORCEMENT SHALL BE NOT MORE THAN 3" AND NOT KEPT MOIST PRIOR TO THE APPLICATION OF THE 5.2. WINGWALLS & HEADWALLS ADJACENT PRECAST UNITS SHALL NOT EXCEED %". CALCIUM CHLORIDE OR ADMIXTURES CONTAINING LESS THAN 1Y2" FROM THE ENDS OF THE BRIDGE UNIT. COMPOUNDS AND SHALL BE DAMP WHEN THE COMPOUND 5.2.1. WALL THICKNESS -THE WALL THICKNESS SHALL NOT VARY 8. WORKMANSHIP/ FINISH CALCIUM CHLORIDE WILL NOT BE PERMITTED. 4.2.2.BENDING OF REINFORCEMENT FOR PRECAST BRIDGE UNITS IS APPLIED. FROM THAT SHOWN IN THE DESIGN BY MORE THAWS". THE BRIDGE UNITS, WINGWALLS, HEADWALLS AND FOUNDATION 3.1.5. MIXTURE - THE AGGREGATES, CEMENT AND WATER SHALL - THE OUTSIDE AND INSIDE CIRCUMFERENTIAL 4.5. STORAGE, HANDLING & DELIVERY 5.2.2.LENGTH/HEIGHT OF WALL SECTIONS - THE LENGTH AND UNITS SHALL BE SUBSTANTIALLY FREE OF FRACTURES. THE ENDS OF BE PROPORTIONED AND MIXED IN A BATCH MIXER TO REINFORCING STEEL FOR THE CORNERS OF THE BRIDGE 4.5.1. STORAGE - PRECAST CONCRETE BRIDGE ELEMENTS SHALL HEIGHT OF THE WALL SHALL NOT VARY FROM THAT SHOWN THE BRIDGE UNITS SHALL BE NORMAL TO THE WALLS AND s PRODUCE A HOMOGENEOUS CONCRETE MEETING THE SHALL BE BENT TO SUCH AN ANGLE THAT IS BE LIFTED AND STORED IN "AS -CAST" POSITION. PRECAST IN THE DESIGN BY MORE THAN Y2". CENTERLINE OF THE BRIDGE SECTION, WITHIN THE LIMITS OF THE r STRENGTH REQUIREMENTS OF THIS SPECIFICATION. THE APPROXIMATELY EQUAL TO THE CONFIGURATION OF THE CONCRETE HEADWALL AND WINGWALL UNITS ARE CAST, 5.2.3.POSITION OF REINFORCEMENT- THE MAXIMUM VARIATION VARIATIONS GIVEN IN SECTION 5, ABOVE, EXCEPT WHERE BEVELED PROPORTION OF PORTLAND CEMENT IN THE MIXTURE BRIDGE'S OUTSIDE CORNER. STORED AND SHIPPED IN A FLAT POSITION. THE PRECAST IN THE POSITION OF THE REINFORCEMENT SHALL BE is Yz". ENDS ARE SPECIFIED. THE FACES OF THE WINGWALLS AND a SHALL NOT BE LESS THAN 564 POUNDS (6 SACKS) PER 4.2.3.PLACEMENT OF REINFORCEMENT FOR PRECAST ELEMENTS SHALL BE STORED IN SUCH A MANNER TO IN NO CASE SHALL THE COVER OVER THE REINFORCEMENT HEADWALLS SHALL BE PARALLEL TO EACH OTHER, WITHIN THE LIMITS CUBIC YARD OF CONCRETE. WINGWALLS AND HEADWALLS - THE COVER OF CONCRETE PREVENT CRACKING OR DAMAGE. STORE ELEMENTS USING BE LESS THAN 1)�". OF VARIATIONS GIVEN IN SECTION 5, ABOVE. THE SURFACE OF THE v 3.2. STEEL REINFORCEMENT OVER THE LONGITUDINAL AND TRANSVERSE TIMBER SUPPORTS AS APPROPRIATE. THE UNITS SHALL 5.2.4. SIZE REINFORCEMENT -THE PERMISSIBLE VARIATION IN PRECAST ELEMENTS SHALL BE A SMOOTH STEEL FORM OR 3.2.1. THE MINIMUM STEEL YIELD STRENGTH SHALL BE 60,000 PSI , REINFORCEMENT SHALL BE 2" MINIMUM. THE CLEAR NOT BE MOVED UNTIL THE CONCRETE COMPRESSIVE O O CO O ET DIAMETER OF ANY REINFORCING SHALL CONFORM TO THE TROWELED SURFACE. TRAPPED AIR POCKETS CAUSING SURFACE UNLESS OTHERWISE NOTED ON THE SHOP DRAWINGS. DISTANCE FROM THE END OF EACH PRECAST ELEMENT TO STRENGTH HAS REACHED A MINIMUM OF 2500 PSI (3000 PSI TOLERANCES PRESCRIBED IN THE ASTM SPECIFICATION DEFECTS SHALL BE CONSIDERED AS PART OF A SMOOTH, STEEL 5 3.2.2. ALL REINFORCING STEEL FOR THE PRECAST ELEMENTS THE END OF REINFORCING STEEL SHALL NOT BE LESS THAN FOR SPANS >48 FEET), AND THEY SHALL NOT BE STORED IN FOR THAT TYPE OF REINFORCING. STEEL AREA GREATER FORM FINISH. 6 SHALL BE FABRICATED AND PLACED IN ACCORDANCE WITH 11/a" NOR MORE THAN 3". REINFORCEMENT SHALL BE AN UPRIGHT POSITION. THAN THAT REQUIRED SHALL NOT BE CAUSE FOR 9. REPAIRS _ THE DETAILED SHOP DRAWINGS SUBMITTED BY THE ASSEMBLED UTILIZING A SINGLE LAYER OF WELDED WIRE 4.5.2.HANDLING -HANDLING DEVICES SHALL BE PERMITTED IN REJECTION. PRECAST ELEMENTS MAY BE REPAIRED, IF NECESSARY, BECAUSE OF ' MANUFACTURER. FABRIC, OR A SINGLE LAYER OF DEFORMED BILLET -STEEL EACH PRECAST ELEMENT FOR THE PURPOSE OF HANDLING 5.3. FOUNDATION UNITS IMPERFECTIONS IN MANUFACTURE OR HANDLING DAMAGE AND WILL I 3.2.3. REINFORCEMENT SHALL CONSIST OF WELDED WIRE BARS. WELDED WIRE FABRIC SHALL BE COMPOSED OF AND SETTING. SPREADER BEAMS MAY BE REQUIRED FOR 5.3.1. WALL THICKNESS - THE WALL THICKNESS SHALL NOT VARY BE ACCEPTABLE IF, IN THE OPINION OF THE PURCHASER, THE REINFORCING CONFORMING TO ASTM SPECIFICATION A L TRANSVERSE AND LONGITUDINAL WIRES MEETING THE THE LIFTING OF PRECAST CONCRETE BRIDGE ELEMENTS TO FROM THAT SHOWN IN THE DESIGN BY MORE THAN }l" REPAIRS ARE SOUND, PROPERLY FINISHED AND CURED, AND THE e 1064, OR DEFORMED STEEL BARS CONFORMING TO ASTM SPACING REQUIREMENTS OF 4.3, BELOW, AND SHALL PRECLUDE DAMAGE FROM BENDING OR TORSION FORCES. 5.3.2.LENGTH/ HEIGHT/WIDTH OF FOUNDATION SECTIONS - THE REPAIRED SECTION CONFORMS TO THE REQUIREMENTS OF THIS L SPECIFICATION A 615 GRADE 60. LONGITUDINAL CONTAIN SUFFICIENT LONGITUDINAL WIRES EXTENDING 4.5.3. DELIVERY -PRECAST CONCRETE ELEMENTS MUST NOT BE LENGTH, HEIGHT AND WIDTH OF THE FOUNDATION UNITS SPECIFICATION. 3 DISTRIBUTION REINFORCEMENT MAY CONSIST OF WELDED e THROUGH THE ELEMENT TO MAINTAIN THE SHAPE AND SHIPPED UNTIL THE CONCRETE HAS ATTAINED THE SHALL NOT VARY FROM THAT SHOWN IN THE DESIGN BY 10.REJECTION L WIRE FABRIC OR DEFORMED BILLET -STEEL BARS. POSITION OF THE REINFORCEMENT. LONGITUDINAL SPECIFIED DESIGN COMPRESSIVE STRENGTH, OR AS MORE THAN i2". THE PRECAST ELEMENTS SHALL BE SUBJECT TO REJECTION ON 3.3. STEEL HARDWARE REINFORCEMENT MAY BE WELDED WIRE FABRIC OR DIRECTED BY THE DESIGN ENGINEER. PRECAST CONCRETE 5.3.3.POSITION OF REINFORCEMENT- THE MAXIMUM VARIATION ACCOUNT OF ANY OF THE SPECIFICATION REQUIREMENTS. 3.3.1.BOLTS AND THREADED RODS FOR WINGWALL DEFORMED BILLET -STEEL BARS AND SHALL MEET THE ELEMENTS MAY BE UNLOADED AND PLACED ON THE THE POSITION THE REINFORCEMENT SHALL BE t IN INDIVIDUAL PRECAST ELEMENTS MAY BE REJECTED BECAUSE OF CONNECTIONS SHALL CONFORM TO ASTM A 307. NUTS SPACING REQUIREMENTS OF 4.3, BELOW. GROUND AT THE SITE UNTIL INSTALLED. STORE ELEMENTS N H T NO CASE SHALL THE COVER OVER THE REINFORCEMENT BE ANY OF THE FOLLOWING: L SHALL CONFORM TO AASHTO M292 (ASTM A194) GRADE 2H. 4.2.4.PLACEMENT OF REINFORCMENT FOR PRECAST USING TIMBER SUPPORTS AS APPROPRIATE. LESS THAN 1)¢". 10.1.FRACTURES OR CRACKS PASSING THROUGH THE WALL, d ALL BOLTS, THREADED RODS AND NUTS USED IN FOUNDATION UNITS - THE COVER OF CONCRETE OVER THE 4.6. QUALITY ASSURANCE - THE PRECASTER SHALL DEMONSTRATE 5.3.4.SIZE OF REINFORCEMENT - THE PERMISSIBLE VARIATION IN EXCEPT FOR A SINGLE END CRACK THAT DOES NOT EXCEED ONE 3 WINGWALL CONNECTIONS SHALL BE MECHANICALLY ZINC BOTTOM REINFORCEMENT SHALL BE 3 INCHES MINIMUM. ADHERENCE TO THE STANDARDS SET FORTH IN THE NPCA DIAMETER OF ANY REINFORCING SHALL CONFORM TO THE HALF THE THICKNESS OF THE WALL. e COATED IN ACCORDANCE WITH ASTM B695 CLASS O 50. L THE COVER CONCRETE FOR ALL OTHER QUALITY CONTROL MANUAL. THE PRECASTER SHALL MEET TOLERANCES PRESCRIBED IN THE ASTM SPECIFICATION 1 THAT INDICATE PR P TI PROPORTIONING, MIXING, AN 0.2.MOLDING TO OR O G, X G, D 3.3.2. STRUCTURAL STEEL FOR WINGWALL CONNECTION PLATES E REINFORCEMENT SHALL BE 2 INCHES MINIMUM. THE CLEAR EITHER SECTION 4.6.1 OR 4.6.2 FOR THAT TYPE OF REINFORCING. STEEL AREA GREATER MOLDING NOT IN COMPLIANCE WITH SECTION 4 OF THESE AND PLATE WASHERS SHALL CONFORM TO AASHTO M 270 DISTANCE FROM THE END OF EACH PRECAST ELEMENT TO 4.6.1.CERTIFICATION -THE PRECASTER SHALL BE CERTIFIED BY THAN THAT REQUIRED SHALL NOT BE CAUSE FOR SPECIFICATIONS. (ASTM A 709) GRADE 36 AND SHALL BE HOT DIP GALVANIZED THE END OF REINFORCING STEEL SHALL NOT BE LESS THAN THE PRECAST/PRESTRESSED CONCRETE INSTITUTE PLANT REJECTION. 10.3.HONEYCOMBED OR OPEN TEXTURE. � AS PER AASHTO M111 (ASTM A123). 2 INCHES NOR MORE THAN 3 INCHES. REINFORCEMENT CERTIFICATION PROGRAM OR THE NATIONAL PRECAST 6. TESTING/ INSPECTION 10.4.DAMAGED ENDS, WHERE SUCH DAMAGE WOULD PREVENT 3.3.3.INSERTS FOR WINGWALLS SHALL BE " DIAMETER n 1 SHALL BE ASSEMBLED UTILIZING A SINGLE LAYER OF CONCRETE ASSOCIATION'S PLANT CERTIFICATION 6.1. TESTING MAKING A SATISFACTORY JOINT. u TWO -BOLT PRESET WINGWALL ANCHORS AS WELDED WIRE FABRIC OR A SINGLE LAYER OF DEFORMED PROGRAM PRIOR TO AND DURING PRODUCTION OF THE 6.1.1. TYPE OF TEST SPECIMEN - CONCRETE COMPRESSIVE u MANUFACTURED BY DAYTON SUPERIOR CONCRETE BILLET -STEEL BARS. WELDED WIRE FABRIC SHALL BE PRODUCTS COVERED BY THIS SPECIFICATION. STRENGTH SHALL BE DETERMINED FROM COMPRESSION ACCESSORIES, MIAMISBURG, OHIO, (800) 745-3700 AND j COMPOSED OF TRANSVERSE AND LONGITUDINAL WIRES 4.6.2.QUALIFICATIONS, TESTING AND INSPECTION TESTS MADE ON CYLINDERS OR CORES. FOR CYLINDER SHALL BE ELECTRO GALVANIZED IN ACCORDANCE WITH MEETING THE SPACING REQUIREMENTS OF 4.3, BELOW, AND 4.6.2.1. THE PRECASTER SHALL HAVE BEEN IN THE TESTING, A MINIMUM OF 4 CYLINDERS SHALL BE TAKEN FOR ASTM B633 SC-1. `of SHALL CONTAIN SUFFICIENT LONGITUDINAL WIRES BUSINESS OF PRODUCING PRECAST CONCRETE EACH BRIDGE ELEMENT. FOR CORE TESTING, A MINIMUM OF 3.3.4. FERRULE LOOP INSERTS SHALL BE F-64 FERRULE LOOP EXTENDING THROUGH THE ELEMENT TO MAINTAIN THE PRODUCTS SIMILAR TO THOSE SPECIFIED FOR A 2 CORES SHALL BE TAKEN FOR EACH BRIDGE ELEMENT. INSERTS AS MANUFACTURED BY DAYTON SUPERIOR SHAPE AND POSITION OF THE REINFORCEMENT. MINIMUM OF THREE YEARS. HE SHALL MAINTAIN A EACH ELEMENT SHALL BE CONSIDERED SEPARATELY FOR CONCRETE ACCESSORIES, MIAMISBURG, OHIO, (800) LONGITUDINAL REINFORCEMENT MAY BE WELDED WIRE PERMANENT QUALITY CONTROL DEPARTMENT OR THE PURPOSE OF TESTING AND ACCEPTANCE. - 745-3700 AND SHALL BE ELECTRO GALVANIZED. FABRIC OR DEFORMED BILLET -STEEL BARS AND SHALL RETAIN AN INDEPENDENT TESTING AGENCY ON A 6.1.2. COMPRESSION TESTING -CYLINDERS SHALL BE MADE AND 3 3.3.5. HOOK BOLTS USED IN ATTACHED HEADWALL CONNECTIONS ,��, MEET THE SPACING REQUIREMENTS OF 4.3, BELOW. CONTINUING BASIS. THE AGENCY SHALL ISSUE A TESTED PRESCRIBED BY THE ASTM C39 SPECIFICATION. SHALL BE ASTM A307. 4.3. LAPS, WELDS, SPACING REPORT, CERTIFIED BY A LICENSED ENGINEER, CYLINDERS SHALL BE CURED IN THE SAME ENVIRONMENT 3.3.6.INSERTS FOR DETACHED HEADWALL CONNECTIONS SHALL 4.3.1.LAPS, WELDS, AND SPACING FOR PRECAST BRIDGE UNITS - DETAILING THE ABILITY OF THE PRECASTER TO AS THE BRIDGE ELEMENTS. CORES SHALL BE OBTAINED ; n BE AISI TYPE 304 STAINLESS STEEL, EXPANDED COIL TENSION SPLICES IN THE CIRCUMFERENTIAL PRODUCE QUALITY PRODUCTS CONSISTENT WITH AND TESTED FOR COMPRESSIVE STRENGTH FROM EACH PRELIMINARY INSERTS AS MANUFACTURED BY DAYTON SUPERIOR REINFORCEMENT SHALL BE MADE BY LAPPING. LAPS INDUSTRY STANDARDS. ELEMENT IN ACCORDANCE WITH THE PROVISIONS OF THE NOT FOR CONSTRUCTION - 4.6.2.2. THE PRECASTER SHALL SHOW THAT THE R The design and information shown on this drawing H proviaea u as a service to the protect owner, engineer and contractor by Contech Arch Engineering, Professional Corporation i Needier this drawing, nor any thereof, maybe ``1 ';.1, N T E H CON SPAN" SALISBURY CEMETERY PROJECT No.: 777506 SEQ. No.: 010 DATE: 2/27/2024 DESIGNED: DRAWN: uContech'). pad used reproduced or modified ;n any manner without the prior written consent of Contech. Failure to comply is done at the '\I/�-SERIES.. ANNEX EXPANSION u users own risk and Comach-pressly aisdai... ny liability n, ARCH ENGNB3agG, PROFESSIONAL CORPORATION ;�►� RKL RKL 3 responsibilityforsuchuse. C CHECKED: APPROVED: L If discrepancies between the supplietl information upon which E Il,das a ing5b ,sandacwalneldeonaigonsareencounlerea dewo prpgreaeee,mesadiacrepand;eemeatberePorted 9100 Centre Pointe Dr., Suite 400, West Chester, OH 45069 XXX PAC 800-338-1122 513-645-7000 513-645-7993 FAX SHEET NO.: u to Contech immediately forreevaluation of the design. Comech L accephnotiaNlityforaesig teswdonmissing,incompleteor PROPOSAL DRAWING SALISBURY, NORTH CAROLINA MARK DATE REVISION DESCRIPTION BY ccame;nromauonanppliedbyothers. CT4 °F CT5 CONSULTANTS ARCHITECT OF RECORD STAMP Office of ' Construction and FacilitiesCIVILISTRUCTURAL Management Drawing Title CULVERT DETAILS Phase 100% CONSTRUCTION DOCUMENTS Project Title SALISBURY NATIONAL CEMETERY ANNEX II Project Number 876CM3025 LANDSCAPE ARCHITECT Pashek+MTR, Ltd.1AV9RCH111I 412-321-6362 ENGINEERApproved: KCI Technologies Inc. (302) 731-9176 MEP ENGINEER Arium AE 410-730-2300 �a, TECTURE $c PLANNING ARCHITURA CORPORATION 9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384 PH: (317) 348-1000 POC: Michael Conly, AIA, NCARB, President PRELIMINARY NOT FOR CONSTRUCTION 11 Building Number Project Director Location: Salisbury National Cemetery Annex II S. McCoy Rd. and Old Wilkesboro Rd. Drawing Number g C U 503 38 of 142 U.S. Department I VA of Veterans Affairs Issue Date 2024-03-18 Checked Drawn Revisions: Date: A C D E F FORM 08 - 6231 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 2 3 I 4 I 5 I 6 7 I 8 I 9 I 10 10 9 C C 0_ N IT O N O N N N M E F SPECIFICATIONS FOR MANUFACTURE AND INSTALLATION OF CON/SPAN® O-SERIES BRIDGE SYSTEMS (CONT'D; 11. MARKING VERTICAL LEGS OR THE BOTTOM OF THE WINGWALL. ALSO, A WEATHER. EACH BRIDGE UNIT SHALL BE CLEARLY MARKED BY WATERPROOF SUPPLY OFY4",Y2" AND Ye" THICK HARDBOARD OR PLASTIC SHIMS 13.8.21 NO BACKFILL SHALL BE PLACED AGAINST ANY STRUCTURAL ACCEPTABLE SOILS FOR USE IN ZONE B BACKFILL PAINT. THE FOLLOWING SHALL BE SHOWN ON THE INSIDE OF THE FOR VARIOUS SHIMMING PURPOSES SHALL BE ON SITE. ELEMENTS UNTIL THEY HAVE BEEN APPROVED BY THE ENGINEER. VERTICAL LEG OF THE BRIDGE SECTION: 13.3. PLACEMENT OF BRIDGE UNITS - THE BRIDGE UNITS SHALL BE 13.8.3. BACKFILL SHALL BE CONSIDERED AS ALL REPLACED BRIDGE SPAN x BRIDGE RISE PLACED AS SHOWN ON THE ENGINEER'S PLAN DRAWINGS. EXCAVATION AND NEW EMBANKMENT ADJACENT TO THE PRECAST DATE OF MANUFACTURE SPECIAL CARE SHALL BE TAKEN IN SETTING THE ELEMENTS TO CONCRETE ELEMENTS. THE PROJECT CONSTRUCTION AND NAME OR TRADEMARK OF THE MANUFACTURER THE TRUE LINE AND GRADE. THE JOINT WIDTH BETWEEN MATERIAL SPECIFICATIONS, WHICH INCLUDE THE SPECIFICATIONS 12. INSTALLATION PREPARATION ADJACENT PRECAST UNITS SHALL NOT EXCEED %a". FOR EXCAVATION FOR STRUCTURES AND ROADWAY EXCAVATION TO ENSURE CORRECT INSTALLATION OF THE PRECAST CONCRETE AND EMBANKMENT CONSTRUCTION, SHALL APPLY EXCEPT AS BRIDGE SYSTEM, CARE AND CAUTION MUST BE EXERCISED IN 13.4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THE MODIFIED IN THIS SECTION. FORMING THE SUPPORT AREAS FOR BRIDGE UNITS, HEADWALL, AND STRUCTURE SPAN DURING ALL PHASES OF INSTALLATION. DUE TO 13.8.4. BACKFILL ZONES: WINGWALL ELEMENTS. EXERCISING SPECIAL CARE WILL FACILITATE THE ARCH SHAPE, BRIDGE ELEMENTS WILL TEND TO SPREAD • IN -SITU SOIL THE RAPID INSTALLATION OF THE PRECAST COMPONENTS. UNDER SELF -WEIGHT. IT IS IMPERATIVE THAT ANY LATERAL • ZONE A: CONSTRUCTED EMBANKMENT OR OVERFILL. 12.1. FOOTINGS SPREADING OF THE BRIDGE ELEMENTS BE AVOIDED DURING AND • ZONE B: FILL THAT IS DIRECTLY ASSOCIATED WITH PRECAST DO NOT OVER EXCAVATE FOUNDATIONS UNLESS DIRECTED BY AFTER THEIR PLACEMENT. GENERALLY, HORIZONTAL CABLE TIES CONCRETE BRIDGE INSTALLATION. SITE SOIL ENGINEER TO REMOVE UNSUITABLE SOIL. OR TIE RODS ARE SHIPPED IN THE LARGER BRIDGE ELEMENTS TO • ZONE C: ROAD STRUCTURE. ASSIST IN PREVENTING THIS SPREADING. CABLE TIES/TIE RODS 13.8.5. REQUIRED BACKFILL PROPERTIES THE SITE SOILS ENGINEER SHALL CERTIFY THAT THE BEARING SHALL NOT BE REMOVED UNTILL BRIDGE UNITS ARE GROUTED 13.8.5.1. IN -SITU SOIL - NATURAL GROUND IS TO BE SUFFICIENTLY CAPACITY MEETS OR EXCEEDS THE FOOTING DESIGN AND GROUT HAS CURED. IT IS RECOMMENDED THAT TEMPORARY STABLE TO ALLOW EFFECTIVE SUPPORT TO THE PRECAST REQUIREMENTS, PRIOR TO THE CONTRACTOR POURING OF THE HARDWOOD BLOCKS BE USED IN CONJUNCTION WITH THE CABLE CONCRETE BRIDGE UNITS. AS A GUIDE, THE EXISTING FOOTINGS. TIES/TIE RODS TO MAINTAIN SPAN. IF, HOWEVER, DUE TO SITE NATURAL GROUND SHOULD BE OF SIMILAR QUALITY AND RESTRICTIONS, THESE CABLE TIES/TIE RODS MUST BE REMOVED DENSITY TO ZONE B MATERIAL FOR MINIMUM LATERAL THE BRIDGE UNITS AND WINGWALLS SHALL BE INSTALLED ON PRIOR TO PLACEMENT OF THE BRIDGE ELEMENTS, THE DIMENSION OF ONE BRIDGE SPAN OUTSIDE OF THE BRIDGE EITHER PRECAST OR CAST -IN -PLACE CONCRETE FOOTINGS. THE SIZE AND ELEVATION OF THE FOOTINGS SHALL BE AS DESIGNED CONTRACTOR MUST NOTIFY CONTECH (MANUFACTURER) AND REQUEST A SUGGESTED INSTALLATION PROCEDURE FOOTING. 13852 ZONE A- ZONE A REQUIRES FILL MATERIAL WITH PERCENT PASSING CHARACTER OF FRACTION TYPICAL AASHTO AASHTO US SIEVE NO. PASSING NO. SIEVE USCS MATERIALS GROUP SUBGROUP SOIL DESRIPTION #10 #40 #200 LIQUID PLASTICITY LIMIT INDEX GW, GP, SP A-1a 50 MAX 30 MAX 15 MAX 6 MAX LARGELY GRAVEL BUT CAN INCLUDE SAND AND FINES GM, SW, At GRAVELLY SAND OR GRADED SP, SM A-1 b 50 MAX 25 MAX 6 MAX SAND, MAY INCLUDE FINES GM, SM, ML, A-2-4 35 MAX 40 MAX 10 MAX SANDS, GRAVELS WITH LOW- SP, GP AZ PLASTICITY SILT FINES SC, GC, GM A-2-5 35 MAX 41 MIN 10 MAX SANDS, GRAVELS WITH PLASTIC SILT FINES SP, SM, SW A3 51 MIN 10 MAX NOW FINE SANDS PLASTIC ML, SM, SC A4 36 MIN 40 MAX 10 MAX LOW-COMPRESSIBILTY SILTS BY THE ENGINEER. A KEYWAY SHALL BE FORMED IN THE TOP SPECIFICATIONS AND COMPACTING PROCEDURES EQUAL TO SURFACE OF THE BRIDGE FOOTING AS SPECIFIED ON THE PLANS. IN ADDITION, IF THE CABLE TIES/TIE RODS MUST BE REMOVED THAT FOR NORMAL ROAD EMBANKMENTS. NO KEYWAY IS REQUIRED IN THE WINGWALL FOOTINGS, UNLESS PRIOR TO SETTING ARCH UNITS, THE FOLLOWING QUALITY 13.8.5.3. ZONE B - GENERALLY, SOILS SHALL BE REASONABLY FREE OTHERWISE SPECIFIED ON THE PLANS. CONTROL PROCEDURE MUST BE FOLLOWED: OF ORGANIC MATTER, AND, NEAR CONCRETE SURFACES, 1) FIND "MEASURED SPAN" UPON ARCH UNIT'S DELIVERY TO FREE OF STONES LARGER THAN 3" IN DIAMETER SEE CHARTS THE FOOTINGS SHALL BE GIVEN A SMOOTH FLOAT FINISH AND SITE, PRIOR TO LIFTING FROM TRUCK AND REMOVING CABLE FOR DETAILED DESCRIPTIONS OF ACCEPTABLE SOILS. SHALL REACH A COMPRESSIVE STRENGTH OF 2,000 PSI BEFORE TIES/TIE RODS. "MEASURED SPAN" SHALL BE THE AVERAGE OF 13.8.5.4. ZONE C - ZONE C IS THE ROAD SECTION OF GRAVEL, FINISHED PLACEMENT OF THE BRIDGE AND WINGWALL ELEMENTS. (3) SPAN MEASUREMENTS ALONG THE LAY LENGTH OF THE ASPHALT OR CONCRETE BUILT IN COMPLIANCE WITH LOCAL GRADE BACKFILLING SHALL NOT BEGIN UNTIL THE FOOTING HAS REACHED ARCH UNIT. ENGINEERING PRACTICES. THE FULL DESIGN COMPRESSIVE STRENGTH. 2) AFTER SETTING OF BRIDGE UNIT ON THE FOUNDATION, 13.8.5.5. GEOTECHNICAL ENGINEER SHALL REVIEW GRADATIONS OF C VERIFY THE SPAN. THIS "INSTALLED SPAN MEASUREMENT" ALL INTERFACING MATERIALS AND, IF NECESSARY, THE FOOTING SURFACE SHALL BE CONSTRUCTED IN ACCORDANCE SHALL NOT EXCEED THE MAXIMUM OF: RECOMMEND GEOTEXTILE FILTER FABRIC (PROVIDED BY WITH GRADES SHOWN ON THE PLANS. WHEN TESTED WITH A 10'-0" A) THE NOMINAL SPAN +y2" OR CONTRACTOR) STRAIGHT EDGE, THE SURFACE SHALL NOT VARY MORE THAN y" IN B) THE "MEASURED SPAN" LL W 10'-0". IF THE "INSTALLED SPAN MEASUREMENT" EXCEEDS THIS AMOUNT, 13.8.6. PLACING AND COMPACTING BACKFILL oqg x a°troo THE ARCH UNIT SHALL BE LIFTED AND RE -SET UNTIL THE DUMPING FOR BACKFILLING IS NOT ALLOWED ANY NEARER THAN IF A PRECAST CONCRETE FOOTING IS USED, THE CONTRACTOR "INSTALLED SPAN MEASUREMENT" MEETS THE LIMITS. X-0" FROM THE BRIDGE LEG. A SHALL PREPARE A 4" THICK BASE LAYER OF COMPACTED GRANULAR MATERIAL THE FULL WIDTH OF THE FOOTING PRIOR TO 13.5. PLACEMENT OF WINGWALLS, HEADWALLS AND FOUNDATION UNITS THE FILL MUST BE PLACED AND COMPACTED IN LAYERS NOT B PLACING THE PRECAST FOOTING. - THE WINGWALLS, HEADWALLS AND FOUNDATIONS SHALL BE EXCEEDING 8". THE MAXIMUM DIFFERENCE IN THE SURFACE �_ TO ROADWAY PLACED AS SHOWN ON THE PLAN DRAWINGS. SPECIAL CARE LEVELS OF THE FILL ON OPPOSITE SIDES OF THE BRIDGE MUST �_ BASE/ FINISH THE FOUNDATIONS FOR PRECAST CONCRETE BRIDGE ELEMENTS AND WINGWALLS MUST BE CONNECTED BY REINFORCEMENT TO SHALL BE TAKEN IN SETTING THE ELEMENTS TO THE TRUE LINE AND GRADE. NOT EXCEED Z-0". �,�— 8a GRADE OR 2'-0" MIN. FORM ONE MONOLITHIC BODY. EXPANSION JOINTS SHALL NOT BE 13.6. JOINT PROTECTION AND SUBSURFACE DRAINAGE THE FILL BEHIND WINGWALLS MUST BE PLACED AT THE SAME TIME USED. 13.6.1. EXTERNAL PROTECTION OF JOINTS -THE BUTT JOINT MADE BY AS THAT OF THE BRIDGE FILL. IT MUST BE PLACED IN IN -SITU TWO ADJOINING BRIDGE UNITS SHALL BE COVERED WITH A %" x PROGRESSIVELY PLACED HORIZONTAL LAYERS NOT EXCEEDING 8" SOIL THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE 1%" PREFORMED BITUMINOUS JOINT SEALANT AND A MINIMUM OF PER LAYER. gq g CONSTRUCTION OF THE FOUNDATIONS PER THE PLANS AND A 9" WIDE JOINT WRAP. THE SURFACE SHALL BE FREE OF DIRT — SPECIFICATIONS. BEFORE APPLYING THE JOINT MATERIAL. A PRIMER COMPATIBLE THE BACKFILL OF ZONE B SHALL BE COMPACTED TO A MINIMUM WITH THE JOINT WRAP TO BE USED SHALL BE APPLIED FOR A DENSITY OF 95 % OF THE STANDARD PROCTOR, AS REQUIRED BY 13. INSTALLATION MINIMUM WIDTH OF 9" ON EACH SIDE OF THE JOINT THE EXTERNAL AASHTO T-99. 13.1. GENERAL -THE INSTALLATION OF THE PRECAST CONCRETE WRAP SHALL BE CS212 BY CONCRETE SEALANTS INC., EZ-WRAP ELEMENTS SHALL BE AS EXPLAINED IN THE PUBLICATION RUBBER BY PRESS -SEAL GASKET CORPORATION, SEAL WRAP BY SOIL WITHIN V-0" OF CONCRETE SURFACES SHALL BE CON/SPAN BRIDGE SYSTEMS INSTALLATION HANDBOOK. MAR MAC MANUFACTURING CO. INC. OR APPROVED EQUAL. THE HAND -COMPACTED. ELSEWHERE, USE OF ROLLERS IS 13.1.1. LIFTING -IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO JOINT SHALL BE COVERED CONTINUOUSLY FROM THE BOTTOM OF ACCEPTABLE. IF VIBRATING ROLLER -COMPACTORS ARE USED, ENSURE THAT A CRANE OF THE CORRECT LIFTING CAPACITY IS ONE BRIDGE SECTION LEG, ACROSS THE TOP OF THE BRIDGE AND THEY SHALL NOT BE STARTED OR STOPPED WITHIN ZONE B AND AVAILABLE TO HANDLE THE PRECAST CONCRETE UNITS. THIS CAN TO THE OPPOSITE BRIDGE SECTION LEG. ANY LAPS THAT RESULT THE VIBRATION FREQUENCY SHOULD BE AT LEAST 30 BE ACCOMPLISHED BY USING THE WEIGHTS GIVEN FOR THE REVOLUTIONS PER SECOND SPAN FILL HEIGHT ACCEPTABLE MATERIAL INSIDE ZONE B 5 24'-0" t 12'-0" At, A3 5 24'-0" < 12'-0" At, A2, A3, A4 I > 24'-0" ALL Al, A3 C LIMITS OF CRITICAL BACKFILL ZONE B 8&�a A lllr B —I ova AA — 83 l IN -SITU SOIL IN THE JOINT WRAP SHALL BE A MINIMUM OF 6 LONG WITH THE PRECAST CONCRETE COMPONENTS AND BY DETERMINING THE OVERLAP RUNNING DOWNHILL. LIFTING REACH FOR EACH CRANE UNIT. SITE CONDITIONS MUST BE 13.6.2. IN ADDITION TO THE JOINTS BETWEEN BRIDGE UNITS, THE THE BACKFILL MATERIAL AND COMPACTING BEHIND WINGWALLS BACKFILL REQUIREMENTS CHECKED WELL IN ADVANCE OF SHIPPING TO ENSURE PROPER JOINT BETWEEN THE END BRIDGE UNIT AND THE HEADWALL SHALL SHALL SATISFY THE CRITERIA FOR THE BRIDGE BACKFILL, ZONE B. CRANE LOCATION AND TO AVOID ANY LIFTING RESTRICTIONS. THE ALSO BE SEALED AS DESCRIBED ABOVE. IF PRECAST WINGWALLS LIFT ANCHORS OR HOLES PROVIDED IN EACH UNIT ARE THE ONLY ARE USED, THE JOINT BETWEEN THE END BRIDGE UNIT AND THE BACKFILL AGAINST A WATERPROOFED SURFACE SHALL BE PLACED VARIES BY MEANS TO BE USED TO LIFT THE ELEMENTS. THE PRECAST WINGWALL SHALL BE SEALED WITH A Z-O" STRIP OF FILTER FABRIC. CAREFULLY TO AVOID DAMAGE TO THE WATERPROOFING ANCHOR TYPE CONCRETE ELEMENTS MUST NOT BE SUPPORTED OR RAISED BY ALSO, IF LIFT HOLES ARE FORMED IN THE BRIDGE UNITS, THEY MATERIAL. A= 3'-2" OTHER MEANS THAN THOSE GIVEN IN THE MANUALS AND SHALL BE PRIMED AND COVERED WITH A 9" x 9" SQUARE OF JOINT 13.8.7. BRIDGE UNITS B= 4' 1" DRAWINGS WITHOUT WRITTEN APPROVAL FROM CONTECHO WRAP, FOR FILL HEIGHTS OVER 12 FEET (AS MEASURED FROM TOP LIMITS OF ENGINEERED SOLUTIONS. 13.6.3. DURING THE BACKFILLING OPERATION, CARE SHALL BE TAKEN CROWN OF BRIDGE TO FINISHED GRADE), NO BACKFILLING MAY C= 5'-1" EXCAVATION 13.1.2. CONSTRUCTION EQUIPMENT WEIGHT RESTRICTIONS -IN NO TO KEEP THE JOINT WRAP IN ITS PROPER LOCATION OVER THE BEGIN UNTIL A BACKFILL COMPACTION TESTING PLAN HAS BEEN FINISHED GRADE D= 6'-1" CASE SHALL EQUIPMENT OPERATING IN EXCESS OF THE DESIGN JOINT. COORDINATED WITH AND APPROVED BY CONTECHO ENGINEERED COMPACTED MATERIAL MIN. LOAD (HS20 OR HS25) BE PERMITTED OVER THE BRIDGE UNITS 13.6.4. SUBSOIL DRAINAGE SHALL BE AS DIRECTED BY THE SOLUTIONS. (SAME AS UNIT BACKFILL) ZONE A UNLESS APPROVED BY CONTECHO ENGINEERED SOLUTIONS. ENGINEER. 13.8.8. WINGWALLS 13.1.2.1. IN THE IMMEDIATE AREA OF THE BRIDGE UNITS, THE BACKFILL IN FRONT OF WINGWALLS SHALL BE CARRIED TO FOLLOWING RESTRICTIONS FOR THE USE OF HEAVY 13.7. GROUTING GROUND LINES SHOWN IN THE PLANS. CONSTRUCTION MACHINERY DURING BACKFILLING 13.7.1. GROUTING SHALL NOT BE PERFORMED WHEN TEMPERATURES 13.8.9. MONITORING OPERATIONS APPLY: ARE EXPECTED TO GO BELOW 35' FOR A PERIOD OF 72 HOURS. THE CONTRACTOR SHALL CHECK SETTLEMENTS AND HORIZONTAL • NO CONSTRUCTION EQUIPMENT SHALL CROSS THE BARE GROUTING SHOULD BE COMPLETED AS SOON AS PRACTICAL DISPLACEMENT OF FOUNDATION TO ENSURE THAT THEY ARE o 000� PRECAST CONCRETE BRIDGE UNIT. AFTER PRECAST ARCHES HAVE BEEN INSTALLED. FILL THE WITHIN THE ALLOWABLE LIMIT PROVIDED BY THE ENGINEER.go •O 9�0. 9go • 9�0 •Q • AFTER THE COMPACTED FILL LEVEL HAS REACHED A MINIMUM OF BRIDGE -FOUNDATION KEYWAY WITH CEMENT GROUT (PORTLAND THESE MEASUREMENTS SHOULD GIVE AN INDICATION OF THE — ooa° oo e oow° 00% 4" OVER THE CROWN OF THE BRIDGE, CONSTRUCTION EQUIPMENT CEMENT AND WATER OR CEMENT MORTAR COMPOSED OF SETTLEMENTS AND DEFORMATIONS ALONG THE LENGTH OF THE PRECAST oo�� �� g�o� 9bodo WITH A WEIGHT OF LESS THAN 10 TONS MAY CROSS THE BRIDGE. PORTLAND CEMENT, SAND AND WATER) WITH A MINIMUM 28-DAY FOUNDATIONS. WINGWALL c�9bo ^ erjo ^ 9bo •Q LIMITS OF CRITICAL • AFTER THE COMPACTED FILL LEVEL HAS REACHED A MINIMUM OF COMPRESSIVE STRENGTH OF 3000 PSI. VIBRATE AS REQUIRED TO �� oo°° oow° ooc° BACKFILL ZONE (C.B.Z.) V-0" OVER THE CROWN OF THE BRIDGE, CONSTRUCTION ENSURE THAT THE ENTIRE KEY AROUND THE BRIDGE ELEMENT IS THE FIRST MEASUREMENT SHOULD TAKE PLACE AFTER THE EQUIPMENT WITH A WEIGHT OF LESS THAN 30 TONS MAY CROSS COMPLETELY FILLED. IF BRIDGE ELEMENTS HAVE BEEN SET WITH ERECTION OF ALL PRECAST BRIDGE SYSTEM ELEMENTS, A Sao°gyp THE BRIDGE. TEMPORARY TIES (CABLES, BARS, ETC.) GROUT MUST ATTAIN A SECOND AFTER COMPLETION OF BACKFILLING, AND A THIRD • AFTER THE COMPACTED FILL LEVEL HAS REACHED THE DESIGN MINIMUM COMPRESSIVE STRENGTH OF 1500 PSI BEFORE TIES MAY BEFORE OPENING OF THE BRIDGE TO TRAFFIC. FURTHER Obo� o COVER, OR 2'-0- MINIMUM, OVER THE CROWN OF THE PRECAST BE REMOVED. MEASUREMENTS MAY BE MADE ACCORDING TO LOCAL CONCRETE BRIDGE, CONSTRUCTION EQUIPMENT WITHIN THE 13.7.2. ALL GROUT SHALL HAVE A MAXIMUM AGGREGATE SIZE OF'/.". CONDITIONS. DESIGN LOAD LIMITS FOR THE ROAD MAY CROSS THE PRECAST 13.7.3. LIFTING AND ERECTION ANCHOR RECESSES SHALL BE FILLED CONCRETE BRIDGE. WITH GROUT. - IN -SITU 13.2. LEVELING PAD/SHIMS - THE BRIDGE UNITS AND WINGWALLS SHALL 13.7.4. AFTER GROUT HAS REACHED ITS DESIGN STRENGTH THE SOIL BE SET ON HARDBOARD SHIMS CONFORMING TO ASTM D1037 OR TEMPORARY HARDWOOD WEDGES SHALL BE REMOVED AND THEIR GROUT PLASTIC SHIMS (DAYTON SUPERIOR P-80, P-81 OR APPROVED HOLES FILLED WITH GROUT. EQUAL) MEASURING 5" x 5", MINIMUM, UNLESS SHOWN OTHERWISE 13.8. BACKFILL PRELIMINARY ON THE PLANS. AMINIMUM GAP OF)¢"SHALL BEPROVIDED 13.8.1. DO NOT PERFORM BACKFILLING DURING WET OR FREEZING WALL BACKFILL RFOUIRFMFNTS unTt=nracn—T..I . BETWEEN THE FOOTING AND THE BOTTOM OF THE BRIDGE'S The design and information shown on this drawing is provided as a service to the project owner, engineer and contractor by Contech Arch Engineering, Professional Corporation ('Contech'). Neither this drawing, nor any part thereof. may be used, reproduced or modified in any manner without the prior written consent of Contech. Failure to comply is done at the users own risk and Contech expressly disclaims any liability or responsibility for such use. If discrepancies between the supplied information upon which the drawing is based and actual Feld conditions are encountered s site work progresses, these discrepancies must be reported to Contech immediately for reevaluation of the design. Contech accepts no liability for designs based on missing, incomplete or «urateinformationsuppliedbyomare. MARK DATE REVISION DESCRIPTION Ov.o.-NTECHO ARCH ENGINEERNG, PROFESSpNAL CORPORATION 9100 Centre Pointe Dr., Suite 400, West Chester, OH 45069 800-338-1122 513-645-7000 513-645-7993 FAX CON SPAN" i5,W_-SERIES_ PROPOSAL DRAWING SALISBURY CEMETERY ANNEX EXPANSION SALISBURY, NORTH CAROLINA VARIES SEE FABRICATION DRAWINGS PROJECT No.: SEQ. No.: DATE: 777506 010 2/27/2024 DESIGNED: DRAWN: RKL RKL CHECKED: APPROVED: I XXX PAC OF CONSULTANTS ARCHITECT OF RECORD STAMP Office of Construction and FacilitiesCIVILISTRUCTURAL Management Drawing Title CULVERT DETAILS Phase 100% CONSTRUCTION DOCUMENTS Project Title SALISBURY NATIONAL CEMETERY ANNEX II Project Number 876CM3025 LANDSCAPE ARCHITECT Pashek+MTR, Ltd. 412-321-6362 ENGINEERApproved: KCI Technologies Inc. (302) 731-9176 MEP ENGINEER Arium AE 410-730-2300 tv9RCHITECTURE& PLANNING ARCHITURA CORPORATION 9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384 PH: (317) 348-1000 POC: Michael Conly, AIA, NCARB, President PRELIMINARY NOT FOR CONSTRUCTION Building Number Project Director Location: Salisbury National Cemetery Annex II S. McCoy Rd. and Old Wilkesboro Rd. Drawing Number g C U 504 39 of 142 U.S. Department VA of Veterans Affairs Issue Date 2024-03-18 Checked Drawn Revisions: Date: A Ifl C L11 E F ✓A FORM 08 - 6231 1 2 3 4 5 6 7 8 9 10 1 2 3 I 4 5 1 6 7 8 1 9 1 10 A B C D E F 12" STRUCT WIDTH 0 O z Q 0 U Q w w 0 �w L.L ry z (D 75 _ ao-17 N PEDESTRIAN RAI LI N 1 j lot = 1'—On ry 7) 0 U o ry 0 H z 5 O w_ > • REFER TO ARCH. DRAWINGS FOR INFORMATION AND REQUIREMENTS AT PEDESTRIAN RAILINGS AND REFER TO RAILING MANUF. DRAWINGS FOR ATTACHMENT OF POST TO BASE PLATE PROVIDE 8"x8"x3/4" BASE PLATE WITH (4)-1/2"0 (x 8" EMBED.) ANCHOR BOLTS INTO TOP OF CONCRETE WALL - PLATE TO BE CENTERED IN WALL WIDTH 0 0 00 0 0 8" HIGH GRADE - SEE GRADING • REFER TO CONTECH DRAWINGS FOR WALL DIMENSIONS AND REINFORCING G AT TOP OF CULVERT HEADWALL 12" STRUCT. WIDTH LOW GRADE - SEE GRADING IY 0 U 0� I? 0 ;t H 75 z 0 (fl (D z C.0� �0 0 LL co Z) 0 COM 2 1 If = 1'-011 • REFER TO GEOTECHNICAL REPORT AND CONTECH DRAWINGS FOR WALL BACKFILL REQUIREMENTS • REFER TO CONTECH DRAWINGS FOR WALL DIMENSIONS AND REINFORCING • REFER TO DETAIL 1 ON S-108 FOR PED. RAIL CONNECTION TO WALL • SEE PLAN ON S-107 FOR ELEVATION TOP OF FOOTING #6 @ 12" O.C. T&B SHORT WITH STANDARD HOOKS IY U (D #6 @ 12 O.C. T&B CONT. z G ° ° ° (.0O v O 4 I L° 12" STRUCT. U 4'-0" WIDTH .40 co TYPICAL FOUNDATION AT C 3 LL r'nKICI II TAKITQ Revisions: Date: WALL ANCHOR - REFER TO CONTECH DRAWINGS 2'-0" CONT. 2'-0" CONT. PEDESTAL PEDESTAL 1'-0" WALL Illo. -Ill 15'-0" WALL 1'-0" 21'-0" WIDE FOOTING BINED FOUNDATION (BASE SLAB) AT CULVERT A � GROUT -SEE v CONTECH DRAWINGS FOR INFO 9'-0" WIDE FOOTING ULVERT HEADWA Pashek + MTR, Ltd. 412-321-6362 CIVIL/STRUCTURAL ENGINEER KCI Technologies Inc. (302) 731-9176 MEP ENGINEER Arium AE 410-730-2300 Z) 0 ry O 0 0l 0 U_ z 0 w tY > 0 0 0- J Q J Q 0 M N c0 • REFER TO CONTECH DRAWINGS FOR WALL DIMENSIONS AND REINFORCING �LOW GRADE - SEE GRADING • REFER TO DETAIL 1 ON S-108 FOR PED. RAIL CONNECTION TO WALL • SEE PLAN ON S-107 FOR ELEVATION TOP OF FOOTING #6 @ 12" O.C. T&B SHORT D WITH STANDARD HOOKS 0 j (D #6@ 12"O.C. N T&B CONT. a 4 ° J U 3'-6" CIO TYPICAL F 4 1,, = 1'-0,, ARCHITECT OF RECORD %r qARCHITECTUREtura He PLANNING ARCHITURA CORPORATION 9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384 PH: (317) 348-1000 POC: Michael Conly, AIA, NCARB, President 12" 6" STRUCT. WIDTH 2'_0" PEDESTAL WALL )'-0" WIDE FOOTING WALL ANCHOR - REFER TO CONTECH DRAWINGS 1 GROUT - SEE CONTECH DRAWINGS FOR INFO #6 @ 12" O.C. CONT. #8 @ 12" O.C. WITH STANDARD HOOKS 3'-6" OUNDATION AT CULVERT HEADWALL AT PEDESTAL WALL Office of Construction and Facilities Management VA U.S. Department of Veterans Affairs 5)jYPICAL STEPPED FOOTING , 11 - 1 ,-011 Drawing Title Phase Project Title 100% CONSTRUCTION SALISBURY NATIONAL CEMETERY CULVERT FOUNDATIONS AND RAILING SUPPORT DOCUMENTS ANNEX II Approved: Project Director Location: Salisbury National Cemetery S. McCoy Rd. and Old Wilkesboro Rd. 1. NORTH Project Number 876CM3025 Building Number Drawing Number S-109 104 of 142 A B C D E F -ORM 08 - 6231 1 2 3 4 5 6 7 8 9 10 1 I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 I 10 3 NORTH A C 0 0 N O N N N LO E F Z STA. 0+00 T/FTG = 657.00 T/FTG = 654.75 3 S-109 � \\ 4 \ S-109//) T/FTG = 652.50 657 HEADWALL #2 STA. 0+66,0 S-109 l f PEDESTAL WALL CO j i 2 i S-1091 4 S-109 T/FTG = 654.75 —' CULVERT AND HEADWALL FOUNDATIONS 311 = 1'-01 1 T/FTG = 657.00 T/FTG = 654.75 T/FTG = 652.50 - 657 HEADWALL fil T/FTG 4 S-109 = 654.7 '3 (Z ina off CULVERT - SE` 1� CONTECH DWGS. STA. 0+00 T/FTG = 657.00 PEDESTAL WALL FOUNDATION (TYP) T/FTG = 657.00 STA. 0+66,0 PLAN NOTES: 1. PER THE GEOTECHNICAL REPORT PREPARED BY SUMMIT ENGINEERING, LABORATORY & TESTING, INC. (SUMMIT)., DATED AUGUST 25, 2023, NET ALLOWABLE BEARING CAPACITY = 2000 PSF. 2. ALLOWABLE SOIL BEARING PRESSURES SHALL BE CONFIRMED BY GEOTECHNICAL ENGINEER. 3. REFER TO GENERAL NOTES FOR INFORMATION AND REQUIREMENTS ON FOUNDATION SUBGRADE PREPARATION. 4. REFER TO GEOTECHNICAL REPORT AND CONTECH DRAWINGS FOR WALL BACKFILL REQUIREMENTS. 5. WALL SHALL NOT BE BACKFILLED UNTIL LOW GRADE HAS BEEN COMPLETED AS PER GRADING ENGINEER'S GRADING PLAN. 6. FOOTING IS SHOWN ON PLAN AS DASHED LINE. 7. FOOTING SHALL EXTEND 1'-0" BEYOND END OF PRE -CAST WALL AS SHOWN GRAPHICALLY ON PLAN. 8. REFER TO DETAIL 5 ON S-109 FOR STEPPED WALL FOOTING CONSULTANTS ARCHITECT OF RECORD STAMP Office of Construction and Facilities Management Drawing Title CULVERT FOUNDATIONS PLAN Phase BID REVIEW SET Project Title SALISBURY NATIONAL CEMETERY ANNEX II Project Number 876CM3025 LANDSCAPE ARCHITECT Pashek + MTR, Ltd. 412-321-6362 CIVIL/STRUCTURAL ENGINEER KCI Technologies Inc. (302) 731-9176 MEP ENGINEER Arium AE 410-730-2300 chltura, I%IARCHITECTURE 8c PLANNING ARCHITURA CORPORATION 9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384 PH: (317) 348-1000 POC: Michael Conly, AIA, NCARB, President Building Number Approved: Project Director Location: Salisbury National Cemetery S. McCoy Rd. and Old Wilkesboro Rd. Drawing Number Q S-1 OU VA U.S. Department of Veterans Affairs Issue Date 2024-05-16 Checked PDB Drawn CRS Revisions: Date: A .:M C D E F k FORM 08 - 6231 1 2 3 4 5 6 7 8 9 10 1 2 3 1 4 1 5 1 6 1 7 1 8 1 9 10 STORMWATER GENERAL NOTES 1. SEE SHEET CD101 FOR PRE DEVELOPED DRAINAGE AREA MAP. A r� C E M M N O N N N E F STORMWATER NARATIVE THIS SITE IS COMPRISES THREE DRAINAGE AREAS. AREA 3 IS NORTH OF THE UNNAME STREAM AND DRAINS TO THE SOUTH TO THE UNNAMED STREAM. AREA 2 IS BETWEEN THE RAILROAD TRACKS AND THE UNAMED STREAM AND DRAINS TO THE NORTH TO THE STREAM. AREA 1 IS BETWEEN THE RAILROAD TRACKS AND THE UNAMED STREAM BUT DRAINS TO THE EAST. STORMWATER CALCULATIONS WERE DONE FOR EACH AREA AND THEN THEY WERE ROUTED TO THE COMMON ANALYSIS POINT WHERE THEY ALL MEET TOGETHER. IT IS AT THIS POINT THAT THE PRE DEVELOPED FLOW RATES ARE COMPARED TO THE POST DEVELOPED FLOW RATES. A STORMWATER BASIN WAS DESIGNED TO DETAIN THE STORMWATER RUNOFF RESULTING FROM DEVELOPMENT SO THAT THE STORMWATER RUNOFF RATES IS EQUAL TO OR LESS THAN THE PRE DEVELOPED RATE AT THE COMMON ANALYSIS POINT. Revisions: Date: W W------- 11"�" COMMON ANALYSIS POINT LEGEND PROPERTY LINE EASEMENT LINE A W EXISTING CONTOUR - 675 — PROPOSED CONTOUR 680 TREE LINE — SANITARY SEWER SANITARY MANHOLE O WATER LINE W FIRE HYDRANT Y OVERHEAD UTILITY LINES —OHE UTILITY POLE - C UNDERGROUND ELECTRIC E PETROLEUM LINES G FIBER OPTIC LINES FO STORM SEWER PIPE CATCH BASIN/INLET lia 000 STORM MANHOLE UNDERDRAIN UD — STORM COLLECTOR SD CLEAN OUT STORMWATER SD STRUCTURE CB11 KEY PLAN NOT TO SCALE 80 0 80 160 NCR�N Scale: 1 = 80, CONSULTANTS ARCHITECT OF RECORD STAMP Office Drawing Title Phase Project Title Project Number 876CM3025 of POST DEVOPMENT 100% CONSTRUCTION SALISBURY NATIONAL CEMETERY Building Number LANDSCAPE ARCHITECT Pashek+MTR, Ltd. Construction STORMWATER PLAN DOCUMENTS ANNEX II 412-321-6362 ALwa and Facilities CIVIL/STRUCTURAL ENGINEER KCI Technologies Inc. ARCHITECTURE Sc PLANNING ARCHITURA CORPORATION Management Approved: Project Director Location: Salisbury National Cemetery Annex II Drawing Number (302) 731-9176 9880 Westpoint Drive, Suite #400 S. McCoy Rd. and Old Wilkesboro Rd. MEP ENGINEER Arium AE Indianapolis, IN 46256-3384 PH: (317) 348-1000 C D 102 U.S. Department VA Issue Date 2024-03-18 Checked Drawn 410-730-2300 POC: Michael Conly, AIA, NCARB, President of Veterans Affairs 19 of 142 W E F VA FORM 08 - 6231 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 U 0 C E F 0- 0 O 0 CU 0 L E U Q N r- 0 M 0 N Cl) N O N 12 0 UTILITY NOTES 13 \ r l I i / ��'0 / / / I �/+ 1. THE CONTRACTOR SHALL COORDINATE WATER AND SEWER WORK WITH THE CITY OF SALISBURY/ROWAN COUNTY UTILITIES. ALL WORK DONE IN THIS AREA /�� 4" SANITARY SERVICE / +/ / G5o SHALL BE COORDINATED WITH I 2. CITY OF SALISBURY/ROWAN COUNTY UTILITIES (SRU) WILL MAKE o i / / �� / / J PLANTATION PIPELINE THE WATER LINE TAPS FOR DOMESTIC AND IRRIGATION AND -0 TAP BY SALISBURY / j / / SAN SEWE�IGIH g11 I EXTEND THE LINES TO THE RIGHT OF WAY. SRU WILL PROVIDE _ ROWAN UTILITIES / +IM-672. 5 61$ AND SET THE METER AND EXTEND LINE 2 FEET PAST THE 10" INV. 662.99 / � I 10"VC�UT N)-6 662.79 � 679 N �, / / / / � % / //// / / (� METER. SITE CONTRACTOR WILL CONNECT TO THE LINE AND / / / / INSTALL BACKFLOW PREVENTER AND HEATED ENCLOSURE AND 1" ELECTRICAL CONDUIT & /// / 4 SANITARY / {/ / / / EXTEND THE WATER LINES INTO THE PROPERTY AS PER PLAN. f \ / CONDUIT TO KE AD /� p CLEAN OUT "DATA CON� / °Z BY SALISBURY / CLASS B F ID / Q 3. CITY OF SALISBURY/ROWAN COUNTY UTILITIES WILL MAKE THE ROWAN UTILITES� / cDOT RIP RAP zzi SANITARY SEWER TAP AND EXTEND THE SANITARY SEWER x 101x 1.5'D 2 �o I LATERAL TO THE EASEMENT LINE AND INSTALL A CLEANOUT AT CU5 THE EASEMENT LINE. THE SITE CONTRACTOR WILL EXTEND THE / 672 6�� s�o / �` %/� / /�j/ / / / / / // / 158 4„ PVC ,\co sD SANITARY SEWER LATERAL TO THE RESTROOM BUILDING AS @ 2.0%MIN. / cg6 .,, co co PER PLAN. `�� J 4. SEE MAINTENANCE AND VECHILE STORAGE BUILDING / I FOUNDATION PLANS FOR UNDERDRAIN LOCATION. \ E w � �/ / / / /�� � / j � � KEYPA 5. SEE ARCHITECTURAL &MEP PLANS FOR ELECTRIC, WATER, AND / / /�/ EXISTING SANITARY // �/ E SEWER CONNECTIONS TO THE RESTROOM BUILDING. E D E STAL - _ _______- / / / / / / /� 10 DIP @ 0.24 /o / +r �'�`L �� /// �,� �� / � I 6. SEE SHEET CU502 FOR CLEAN OUT SCHEDULE. N \_ ELECTRICAL / \ 6 j HAND HOLE 4 w o / / // // / - i 6 _ 1 co / / /� // �' /r / / 67g sD 5 / \ --- PRECAST CON RET l / ✓/ _ 10-*"/— \ N I\\ E f CULVERT HE WALL01 o \ / / NCDOT CLASS 1 /r D- / / > / % 1" ELECTRICAL (ONDUI�-LEGEND RIP RAP / / / ' / /11 TO FLAGPOLE ND SHELTER r �� 61 ATE CO TROLLE 6'W x 101 x 2'D SD6'Ov WATER/IRRIGATION LINE W N ��� F /� FE / �P��+r 67$ �� / �� 5� UNDERGROUND ELECTRIC E EL TRI AL DUIT 669 illTA ON ITT AT $ %///v sD r� N f STORM MANHOLE00 OI MH4 / / / �� / / /� 00 v N I \\ � N SAN SEWEK-W / / / �+ / o CATCH BASIN/INLET 000 10"VCP IN SW)-662.98 / /r / O /�oQ 666 / �T(NE)-662.�2' FLARED END SECTION 10"VCP I / SD I \ \ RIP RAP 10'W x 20'L x 3'D �� cg / I � / c� / UNDERDRAIN UD cn I TYP. SIDES OF CULVERT / + / / � � QGe �" � % � 677 � I STORM COLLECTOR SD 20' 4" HDPE CLEAN OUT O CO 16 ( \ 48 L.F. CONTEC SD / + / I > / 17 x 6-8 CULVERT / / �R/ PROPERTY LINE — — 0 3 (1� I I / l 6� 66 SD S�/ G0,�6 Oq3 22' " D E EASEMENT LINE EXISTING CONTOUR - �88 ELECTRICAL CONDUIT & 1" DATA CONDUIT FROM BUILDING TO / / + Q COND I EX. SANITARY SEWER SS KIt �G ly F GO 45 GATE & MAINTENANCE PANEL / / EX. SANITARY MANHOLE S 676 21' 4' HDP SD 1" EL CTRICAL CONDUIT & 1" DATA / 0 O on o I O / / 6�� 66�� y> D15 CON�SUIT TO RESTROOM BUILDING / j / EX. WATER LINE W EX. FIRE HYDRANT /x z OVERHEAD UTILITY LINES —OHE SID = UTILITY POLE CB � SD I PETROLEUM LINES CB3 S � I / G SD% FIBER OPTIC LINES FO EXISTING DRAINAGE o / Q EASEMENT / / / / ._ 6,J? \ 1 / E E J/ram_—ems, �_ D 15^ RCP �O I 1" TY E K COPPER W ER SERVICE LINE �N ��� 675 LECTRICAL 5 I r DI2 HAND HOLE 676 6 SANS ER H 6�3E 673 8 CU50 � RIM- 1.80 � — � / I I 40"VCP IN(SW -663 \ OUT(�E)-6 .43 677 D13 1 / ( W� I I \ �� // / / 1" DATA CONDUIT CONODUIT & I � 1 1 I I I u' \ / v �� ��� / RESTROOM BUILDING / E _ IL / / 1 L� 1" ELECTRICAL CONDUIT X 678 I I 1 TO BACKFLOW ENCLOSURES BA•rl IRRIGATION \ 1C 6 \ �\ _ Q' Q' / PREVENTER BY CONTACTOR CU50 \ L //�' -�� 674 \ / PSMPRK�R / Ill ELECTRICAL CONDUIT N / TO SUB PANEL & CONTROLER CO I I I WATER METER BY 3 w x ALISBURY ROWAN UTILITIE U 0 G50 \ / E /LECTRICAL SUB PANEL 679 / CONTROLLER \Qco10----��RRIGATIONSD � � I � IEK SEE IRRIGATION PLANS X DI4 1"WATER TA \ E co � coco SAN SEWER MH BY SALISBURY ---SEE IRRI6`ATION PLANS OWAN UTILITIES -o RIM-675.48 l w FOR CON�fINUATION " 680 8"VCP IN(N)-665.39 I • • • • • • • • • • • • / \ I O / \ \ I /`\ = _ I _ I i / 11 7 r , \ 1CIN(SW)-663.55 10"VCP OUT(NE)-663.53 \ 6 IRRIGATION BACKFLOW a J 2" IRRIGATIO \ py CU50 PREVENTER BY CONTACTOR TAP Y SALISBURY \\ \ MATERIAL & VEHICLE r _ I I l STORAGE BUILDING \ / / ,�� J I / 5 4 RO AN UTILITIES IRRIGATION METER BY / / \ G50 CU50 SALISBURY ROWAN UTILITIES 177 LF 4" UNDERDRAIN ctzo f / l @ 0.50% MIN. \ / I EXISTI G 6" WATER MAI I \\\ ' \ \ \ 675 _ o / co EXISTING OVERHEAD o � o / 1 I 1 \ F UTILITY LINES 44 LF a HDPE / / I / �' D UD D SD LID SD LID@ 1.00 /o MIN. Fx—x—x—x—X—x—xx co- x—x x—x—x —x—X =x cox—x—x—x�—� ✓ \ / J I o � 85 LF 4 HDPE PR6PdSED WATER @ 1.00%MIN. ASEMENT W� -W�� W / `►N — W — — — — I— — — _ — — — — — _ — Jx x�x—x�x—x—x—x—x—x—x—x—x— x—x—x = x= x—x—x =x — x x x— =x�x x x—I x�—x—x—x—x�—x= x—x--� x = x= x—x—x = EXISTING 6" WATER MAI \- / /J � / / NX\ _ - / / \� — / / I \ ✓ / I / \ a W UJ co Qz / \ V — I a / ° / I KEY PLAN NOT TO SCALE OL O V/ILKERp\ VENj K� G� QBOGFPN / /I ZO O ZO 4OS _iNCsR#_ JVV CONSULTANTS ARCHITECT OF RECORD STAMP Office of Construction and Facilities Management Drawing Title UTILITY PLAN Phase o 100 /O CONSTRUCTION DOCUMENTS Project Title SALISBURY NATIONAL CEMETERY ANNEX II Project Number 876CM3025 LANDSCAPE ARCHITECT Pashek + MTR, Ltd. 412-321-6362 CIVILISTRUCTURAL ENGINEER KCI Technologies Inc. (302) 731-9176 MEP ENGINEER Arium AE 410-730-2300 �► ARCHITECTURE He PLANNING ARCHITURA CORPORATION 9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384 PH: (317) 348-1000 POC: Michael Conly, AIA, NCARB, President Building Number Approved: Project Director Location: Salisbury National Cemetery Annex II S. McCoy Rd. and Old Wilkesboro Rd. Drawing Number r C U 1 02 27 of 142 VA U.S. Department of Veterans Affairs Issue Date 2024-03-18 Checked Drawn Revisions: Date: A B MEN E F VA FORM 08 - 6231 1 2 3 4 5 6 7 8 9 10 1 2 3 4 I 5 6 7 I 8 I 9 10 A P C C LP 0 CN N 0 N N N M E c in 0 F U c 0 0 L W 0 U 0 0 0 r cm 0 E U L .N a N l 0 M 0 N M N 0 N E s SEQUENCE OF CONSTRUCTION: ° 1. CONDUCT A PRE CONSTRUCTION MEETING WITH NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY PRIOR TO BEGING WORK. THE MOORESVILLE REGIONAL OFFICE PHONE NUMBER IS 704-235-2100. �G 2. INSTALL STABILIZED CONSTRUCTION ENTRANCE AT THE LOCATIONS SHOWN ON THE PLANS. �0Z 3. INSTALL TREE PROTECTION FENCE AND PERIMETER CONTROLS, CLEAR ONLY THE AREA NEEDED TO INSTALL EROSION CONTROL MEASURES. I L ---- -� 4. CONSTRUCT TEMPORARY SEDIMENT SKIMMER BASINS AND DIVERSION DITCHES THAT DRAIN TO THEM. r-------------------------- -- -----� --� 'OW 1 5. CONTACT NC DEQ FOR AN INSPECTION ONCE EROSION CONTROL DEVICES HAVE BEEN INSTALLED. I \ •� 5 1/�j 6. CLEAR AND GRUB THE REMAINING AREA REMOVING TREES, BRUSH, AND VEGETATION. STRIP AND STOCKPILE TOPSOIL IN THE I �� LOCATION SHOWN ON THE PLANS. SURROUND THE STOCKPILE WITH SILT FENCE AND TEMPORARY SEED THE STOCKPILE. o 7. CONSTRUCT TEMPORARY GAS PIPE LINE CONSTRUCTION CROSSING AS SHOWN ON THE PLANS. CONTACT PLANTATION PIPELINE \ /\� l/ STAFF PRIOR TO DOING WORK FOR THE CROSSING. CONTRACTOR SHALL FOLLOW THE CONDITIONS SET FORTH IN THE i _ \ \ / f -� J� �✓ ` ZONEAE - // / / / / / I SITE ANALYSIS: % ENCROACMENT AGREEMENT FOR THE PIPELINE CROSSING. /� a��=y ✓� f / \ J oo� ✓ o=,gig�� TOTAL AREA OF SITE 30.26 ACRES 8. BEGIN MASS GRADING THE SITE INCLUDING EXCAVATION AND COMPACTION FOR THE RESTROOM AND MAINTENANCE BUILDING, THE pp' / =a ��� �- �' J AREA DISTURBED AREA TBE ROOFED OR PAVED 10. 9ACRES ACRES PRECAST BURIAL CRYPTS, AND FILLING FOR THE ROAD AND COLUMBARIUM CONSTRUCTION. STABILIZE WITH TEMPORARY SEEDING. AREA TO BE VEGETATIVELY STABILIZED 9.16 ACRES 9. PLACE STONE AGGREGATE BASE AND UNDERDRAIN SYSTEM FOR THE BURIAL SECTION. INSTALL PRECAST BURIAL VAULTS. E:J�j I, �°O ,� (l� / l C ���j 1/ f / f �%%" V /��%I p /!o / / // /� LONGITUDE: 80° 29' 36.38" W 10. CONSTRUCT CATCH BASINS, MANHOLES, AND STORM SEWER PIPING. // / 500�j U / r / J/ J / / /^/� i` ' '/� �/ I // / r� �j �' LATITUDE: 35° 41' 01.05" N 11. INSTALL STREAM BULKHEAD AND BYPASS PUMP AROUND FOR CULVERT FOUNDATION CONSTRUCTION. PLACE PRECAST CULVERT / YO� / J yor '� / �� ZONEAE ,� �� RECEIVING WATER: GRANTS CREEK, PART OF THE YADKIN RIVER WATERSHED. SECTIONS AND HEADWALL AND END WALL SEGMENTS. BACK FILL AROUND CULVERT. REMOVE BULKHEAD AND BYPASS PUMPING / //� O� ! X 6�`0 / r /� �" / /�- -�� �" / EQUIPMENT ONCE THE CULVERT IS IN PLACE. -/ -� -�R / � � I / � f �)� I � ) �-� i� p� r � � � � �- � � � � � r� � f J �� � � NO WETLANDS WILL BE IMPACTED BY THIS PROJECT. 12. INSTALL WATER SERVICE TO RESTROOM BUILDING AND IRRIGATION SERVICE TO MAINTENANCE BUILDING. r� ( i� //- I / ( / / / / C / / ' / -' -f /�' / / ,/-� / f - i" - - - I SOILS ON SITE INCLUDE: 13. INSTALL SANITARY SEWER SERVICE TO RESTROOM BUILDING. T // /�j / ( /// i��j~-/ /�����_ - `- r �_��'- / J /� /-� // / �� 1 CeB2 - CECIL SANDY CLAY LOAM, 2 - 8% SLOPES 14. PLACE STONE AGGREGATE BASE AND CONCRETE CURB AND GUTTER FOR ROAD. mil/ CeC2 - CECIL SANDY CLAY LOAM, 8 - 15% SLOPES / / / _ - - v J 1 JCfB - CECIL-URBAN LAND COMPLEX, 2 - 8% SLOPES 15. BEGIN CONSTRUCTION FOR THE COLUMBARIUM, RESTROOM BUILDING AND MAINTENANCE BUILDING. % // I �� �� / 20� //2�01 -� �! ����__ _^s I / J� ChA - CHEWACLA LOAM, 0 - 2% SLOPES 16. ONCE THE SITE HAS REACHED 75%GROUND COVER CONTACT NC DEQ FOR FINAL INSPECTION. AFTER APPROVAL REMOVE THE / i� �/- 2Tk�U0 o� f ) I / / /�= HeB - HELENA SANDY LOAM, 1 - 6% SLOPES % / / '�//� Ud - UDORTHENTS, LOAMY REMAINING SEDIMENT AND EROSION CONTROL DEVICES AND STABILIZE THE DISTRUBED AREAS WITH TOPSOIL, SOD, OR l ( / y� l L� V ���/ ✓ / /J -�, NPDRO!�T�I ^�1 / / / -�`�/ �''- / �' /- _'0'Wx3L.2D -\ / / / ZONE Uf - URBAN LAND WaA WARNE LOAM, 0 - 2% SLOPES PERMANENT SEEDING. (/ o / I/ / /�� I /�j�� 17. REMOVE ACCUMULATED SEDIMENT FROM THE SEDIMENT BASINS AND REGRADE TEMPORARY SEDIMENT SKIMMER BASINS AND �l/r �j / / / 0 TEMPORARY DIVERSION DITCHES ONCE THE SITE IS STABILIZED. CONVERT THE TEMPORARY SEDIMENT BASIN TO A PERMANENT STORMWATER BASIN. I 5 18. INSTALL ASPHALT BASE COURSE FOR ROAD AND CONCRETE SIDEWALKS. 19. FINE GRADE THE SITE AND PREPARE IT FOR FINAL LANDSCAPING. �-l� / I ✓ ,-��� / / �j , ���� /j / - // I j If I I 20. INSTALL PERIMETER FENCING, GATES AND ENTRANCE MONUMENT SIGN. 9� / 21. REMOVE REMAINING EROSION CONTROL DEVICES ONCE THE SITE HAS REACHED FINAL STABILIZATION. 22. INSTALL TOP COAT OF ASPHALT PAVEMENT AND PAVEMENT STRIPING. •l �, )r / l / ill / f ,� % j ) ` \ SEER EVUTAS qRY 4'EN 30 SAN TARY ,SEWER EASEMENT: / SALISBURY-R--�I 'JUTILITIE / 5:5 (I I ° / I i ,� \ a �'% /✓'� / AE o p PT I 1: G� / / l ooi �� / .�7`- �/ �� ' / W L SBARIUMA (I i /7-12 2% GROUND STABILIZATION TABLE SITE AREA DESCRIPTION STABILIZATION TIME STABILIZATION TIME FRAME EXCEPTIONS FRAME PERIMETER DIKES, SWALES, DITCHES, AND 7 DAYS NONE SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE 3:1 7 DAYS NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. 7 DAYS FOR SLOPES GREATER THAN 50 FEET IN SLOPES 3:1 OR FLATTER 14 DAYS LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 14 DAYS NONE (EXCEPT FOR PERIMETERS AND HQW ZONES) 4:1 �ONEAE�� NICHES) � � EROSION CONTROL NOTES 1. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE PROVISIONS OF THE NORTH BARIUM A' J I / WA S 1-6 / > CAROLINA SEDIMENTATION CONTROL ACT OF 1973. moo°�I _ 6 3,0 NICHES) ( J / V � �p < I 1 2. ALL WORK MUST MEET OR EXCEED THE STANDARDS FOUND IN THE NORTH CAROLINA EROSION AND V J t� �O �j �� /' �/ / 8 / \ / SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (MAY 2013). /O/ / 83 I 3. ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSPECTED AT LEAST WEEKLY AND J �// / y / IX / I AFTER EACH 0.5" RAIN EVENT. CORRECTIVE MEASURES SHALL BE TAKEN IMMEDIATELY, INSPECTION / ppc, g��/ / / 84 "z RECORDS AND RAIN GAUGE SHALL BE KEPT ON SITE. J l�� �i,� -! AREA C ? \ \ I 4. PER NCGS 11 3A-54.1 CONTRACTORS CONDUCTING LAND -DISTURBING ACTIVITIES LARGER THAN ONE ----- --- -T-- -per -- -- -�� -- --- �- -- - - -\ ACRE MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE ° INSPECTION IN WRITING. THE REQUIREMENT APPLIES TO ALL PROJECTS. THE PHASES ARE: 1) / / / � � � � / O� /� o� / / / � � ..� � 6 � ■ � � I \ INSTALLATION OF PERIMETER E&S CONTROL MEASURES. 2) CLEARING AND GRUBBING OF EXISTING OM ITTAL I )/ / GROUND COVER. 3) COMPLETION OF ANY PHASE OF GRADING OF SLOPE OR FILLS. 4) INSTALLATION / H OF STORM DRAINAGE FACILITIES. 5 COMPLETION OF CONSTRUCTION. 6 ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. ) ' r�r�INGDE 1L %111 r 5 < 5. CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING THE SELF INSPECTION AND MAINTAIN THE -r / / �� � MONITORING RECORDS FOR LAND DISTURBING ACTIVITIES UNDER THE STORMWATER GENERAL / -\ PERMIT NCGO100000 IN ACCORDANCE TO G.S. 113A-54.1. / D TCLASS2 20' SANITARY RIP RAP 20'Lz3=\ / / \ \ 6. A COPY OF THE APPROVED PLAN, CERTIFICATE OF APPROVAL AND LETTER OF APPROVAL, NPDES f\SEWER EASEMENT: /// / / ® \ \ l O / II 1 \ / PERMIT AND A MINIMUM OF 30 DAYS SELF INSPECTION REPORTS SHALL BE KEPT ON SITE AND BE b� 7SALISBURY-ROWAN / q, 1 / \ \ \, /� 1 \ t / Q I MADE AVAILABLE UPON REQUEST. / jTl LITI ES 7. ALL BARE SOILS ARE TO BE STABILIZED UNDER THE CONDITIONS IN THE CURRENT NPDES PERMIT OR IF IN A CRITICAL AREA BY THE END OF THE DAY. ��j V L 8. ALL SEDIMENT THAT ENTERS TRAVEL WAYS MUST BE CLEANED USING DRY METHODS. NO WASHING n c� A ZONEAE OR HOSING OFF SEDIMENT INTO STORM DRAINS. IF POWERWASHING FOR ANY PORTION OF THE , l 1 PROJECT IS REQUIRED ONLY PLAIN WATER IS ALLOWED AND MUST BE COLLECTED AND TREATED IN • ✓/� / �// / / / `� / rppJ r \ ( I I WA 1 \ , APPROVED WATER COLLECTION DEVISES. r RPDO�TCLASS 2 / ����2`�- l I` �J 1 \ \ 9. ANY DE -WATERING OF THE SITE IS TO BE PUMPED INTO SEDIMENT BAGS TO ALLOW FOR INFILTRATION INTO THE EXISTING GROUND. DE -WATERING INTO EXISTING STORM SEWER OR SANITARY SEWER RIP R) / / J 69 ( \ \ \ \ s �\ I f �,\ ✓ SYSTEM IS NOT ALLOWED. DO NOT PLACE SEDIMENT BAGS OVER STORM DRAIN INLETS. �, • 6' ) / 10. ALL SOIL BROUGHT OR STORED ON TO THE SITE AND NOT IMMEDIATELY SPREAD AND COMPACTED RP�AP 1 / J^ 1 F \ \ \ ( \ SHALL BE COVERED EACH NIGHT TO PREVENT SATURATION, WIND BLOW, AND RUNOFF. 11. RECYCLING ITEMS AND GARBAGE ARE TO BE COLLECTED DAILY AND DISPOSED OF PROPERLY �� OFFSITE. SPILLS ARE TO BE CLEANED UP IMMEDIATELY. CP \ / I f 12. UTILITY TRENCHES SHOULD BE PHASED TO DECREASE THE AMOUNT OF GROUND DISTURBANCE TO 69 ` \ �� THE MINIMUM AMOUNT PRACTICAL EXCAVATION SHOULD BE LIMITED TO THE AMOUNT OF WORK THAT \ \ \ I I II II \ CAN BE COMPLETED IN A DAY OR TWO. BERMS SHALL BE CONSTRUCTED TO PREVENT WATER FROM RUNNING INTO EXCAVATIONS. AS SECTIONS OF CONSTRUCTION AND UTILITIES ARE INSTALLED OR \ \ 24'Wx12lP�P I REMOVED TEMPORARY COVER SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS DOCUMENT. 13. ALL E&S MEASURES MUST BE MAINTAINED DURING THE ENTIRETY OF THE PROJECT DURATION AND IF ADDITIONAL MEASURES ARE DEEMED TO BE NEEDED OR REQUIRED SUCH MEASURES ARE TO BE J1 \\\\` J INSTALLED. r f yl III 00 �10� LV '3 � I SF IIII �r «/ . . « \ o �� PIPELINE I \ °'`� (�L \ rn \ �I \�\ M IA ^ L EASEMENT: I \ POW S. FLAGPO I PLANTATION I FLAGPO / III I 1 O E PIPELINEMLK Mill I VP om AREA A �� 6 °3, R� _ ^ ^ ��� �- / i I AREA B i `\� �� -� =�___ �� `-� _, ,\ L------= ��1- �- "� - --�- L-=--- -v =-- ---�- ---------------_--__- _- -_cam -� - _/�_ =_ ^ �8" _�� ��, �- 6 ram. �1. ^� .�1-�i-\�--�\ .� �i W O I O O O2 I I Revisions: Date: KEY PLAN NOT TO SCALE 50 0 50 100 N�R�N Scale: 1" = 50' CONSULTANTS ARCHITECT OF RECORD STAMP Office Drawing Title Phase Project Title Project Number 876CM3025 of EROSION CONTROL PLAN 100% CONSTRUCTION SALISBURY NATIONAL CEMETERY Building Number LANDSCAPE ARCHITECT Pashek+MTR, Ltd. Construction DOCUMENTS ANNEX II 412-321-6362 Ci11�a. and Facilities 1 11 11 CIVIL/STRUCTURAL ENGINEER IV Technologies Inc. KCI ARCHITECTURE SL PLANNING ARCHITURA CORPORATION Management Approved: Project Director Location: Salisbury National Cemetery Annex II Drawing Number (302) 731-9176 9880 Westpoint Drive, Suite #400 S. McCoy Rd. and Old Wilkesboro Rd. MEP ENGINEER Arium AE Indianapolis, IN 46256-3384 PH: (317) 348-1000 CG 101 U.S. Department VA Issue Date 2024-03-18 Checked Drawn 410-730-2300 POC: Michael Conly, AIA, NCARB, President of Veterans Affairs 11 of 142 A W C OLD E F VA FORM 08 - 6231 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 A B C A N_ flo 0 co CD N co N M, E 0 F o 0 0 w 0 U 0 0 0 E Q) U L a N rl- M 0 N M N O N E a PROTECT EXISTING CG50 TREES TO REMAIN ✓ 0 \ / / / / / / / // / / / G5o PR ECT EXISTING' \ pD I / � '( _/ / � / TFS TO REMAIN (Ty G50 P.) / / / \ , / / o`' / / // / / 10 / 78 o 6 / 09 J � cG . / 8 / EXIOST G TREE / / � � �-oo1 ��//// J -�� / // � //� � / cG5 CG50 / TO REMAIN 6 LOD C 550 ' / \ SF / UNDISTURBED /�?'' I / s SFMP�TTING DETAIL AREA / \ /� ///� °0, ✓ °oC' I \ / NCDOT CLASS 2 ~\ / �/ s / / // L / 7 9°- 6' / / / / / / rot / co --- / 9' / boo RIP RAP ,o��/ rrr/ °°s°° / / / / o / IP/ / } s / r 5 10 w X 20 �r \ _ �� \�» rirr \, r /,° l 6�� ro CG50 / �/ / / //// / ° / / v / 7Q I \ \ i / ✓ % / //// / - - // / i / IP JOD 20 SANITARY SEWER 14 / / / � / SALISBURY-ROWAN 6 s / UTILITIES c9 G50 I / <j� / 7� NCDOT CLASS 2 .�P ��' / / / 678 / ILL V1'ORK o NE I / RIP RAP 669 II / �QS� T EASEMEN SHAD' 10'W X 20 L,X�D // �� �Q-/ / / / 3 / BE CO'ORDINA D WITH �JANTATIO PIPELINE NCDOT CLASS 1 / g� RIP RAP 20'W X-T4'L x 2 \ I 5F /NCDOT CLASS 2 / // / \P / / r \ RIP RAP 101W x 20'L x 3'D MATTING C)DETAIL / J / o �Q� 677 � � ' / o / N PROTECT /s6�CG50 ♦ �/ 2� I o OTE,CT XEXISTING TREE � OISTING l�� (P TO -REMAIN 7MAI /A ��ASS 2 -A I\ // j/ / /�//// / RIP RAP / \ -o \ o /// G / //10'Wx20Lx3D / / / / / IP o 00, 6 I � 1 \ '0 PROTECT EXISTING TREE / C3 TO REMAIN / \37 �' / /i�/ / /-ate 6 Ci UNDiSTUREiED / / / / / %j / / J/JA U // w goo / 675 P 676 Ur ISTURBED AREA � 677 \ I o� 3 CG50 �p / k,F � � / � / ' / � C / PROTECT E ISTING�• 678 TREE TO�REMAIN I ,� / / I / o / \ 679 ❑ � � , COI ors I�� I l I I 0cQ �Q 50' PIPELINE �, I -� / % / N EASEMENT: / ION 680 PIPELINE \ I \ / I PROTECT, 0 . . . . . . Y Y Y Y Y EXISTO REMAITING N UN ISTURB AREA / 675 1 � \ J °yF ``r I ❑ D D ❑ / / EXISTING DRAINAGE ALL WORK9ONE IN THE EASEMENT J \ / / ( DIT H SHAL'L BE COORDINATED WITH 1 / LOD� I / > UNDISTURBED PLANTATION PIPELINE I , UNDISTURBED _/0� / I---AREAr I /� \i / AREA �"D 68� LOD LOQ LOD \�c�i� \ /' / i I L\D LOD LOD FOD FOD r W W / / ( I L LOD LQ� LOD LOD / W W �-- W — — — — — — — WW — W — — W — — W I ) II hJ SFSF SF SF SF F SSF SFSF S 0LOD LOD LOD LOD- —L D LOD �OD LOD LEow I o� KEY PLAN KE703)0 Sg LEGEND — — PROPERTY LINE — —b• EXIST. CONTOUR A 680 PROP. CONTOUR LIMIT OF DISTURBANCE LOD SILT FENCE SF TREE PROTECTION FENCE DID TEMPORARY DIVERSION DITCH —No— CD CLEAN WATER DIVERSION DITCH CONSTRUCTION ENTRANCE IP INLET PROTECTION ® CHECK DAM SOIL STABILIZATION MATTING \ NOT TO SCALE • 1 1 1 0 210 -0 ��\� �IIIIIIIIIIIIIIII�IIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII ,,����`�• IIIIIIIIIIIIIII�IIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII CONSULTANTS ARCHITECT OF RECORD STAMP Office of Construction and Facilities Management Drawing Title EROSION CONTROL PLAN Phase o 100 /o CONSTRUCTION DOCUMENTS Project Title SALISBURY NATIONAL CEMETERY ANNEX II Project Number 876CM3025 LANDSCAPE ARCHITECT Pashek+MTR, Ltd. 412-321-6362 CIVIL/STRUCTURAL ENGINEER KCI Technologies Inc. (302) 731-9176 MEP ENGINEER Arium AE 410-730-2300 C111a. ARCHITECTURE He PLANNING ARCHITURA CORPORATION 9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384 PH: (317) 348-1000 POC: Michael Conly, AIA, NCARB, President Building Number Approved: Project Director Location: Salisbury National Cemetery Annex II S. McCoy Rd. and Old Wilkesboro Rd. Drawing Number I CG 1 02 VA U.S. Department of Veterans Affairs Issue Date 2024-03-18 Checked Drawn Revisions: Date: B C E F VA FORM 08 - 6231 1 2 3 4 5 6 7 8 9 10