HomeMy WebLinkAboutNCG020251 DMR SWANNUAL SUMMARY DMR - STORMiWAT1ER
II SEND TO CENTRAL OFFICE * II
STORMWA TER DISCHARGE OUTFALLS (SDO)
GENERAL PERMIT NO. NCG020000
*Report ALL STORMWATER Monitoring Data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH 1 of each year.
CERTIFICATE OF COVERAGE No. NCG020251 SAMPLE COLLECTION YEAR: 2014
FACILITY NAME: Vulcan Construction Materials, LP/Boone Quarry COUNTY Watauga
PERSON COLLECTING SAMPLES: Michael Haaaman PHONE NO. (828) 963-7100
CERTIFIED LABORATORY: Research & Analytical Labs Lab #34 ADD TO LISTSERVE? YES ❑ NO ❑ EMAIL:
Lab #
Part A: Stormwater Monitoring Requirements
Outfall
No.
Date Sample
Collected
(mo/dd/yr.OR
NO FLOV1
In Tier 2
Monthly
Monitoring.
# of Months in
Tier 2
Sampling?
Total Flow
(MG)
Total Suspended
(mg/1)
Turbidity
(NTU) (NTU)
. Settleable
Solids (ml/1)Rainfall
;.:.
Total
(in).'
Event
Duration
.: (minutes)
-
-
-
-10
.
See Footnote"'
0.1
002
03/25/14
0.009
2.0
3.24
<0.1
0.13
420
003
03/25/14
0.026
1.5
1.99
<0.1
0.13
420
002
11/06/14
0.007
5.4
9.22
<0.1
0.10
60
003
No flow 07/01/14-
12/31/14
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here and the Date Range.
Per NCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range
3 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier I or Tier 2 responses in the General Permit.
4 TSS benchmark values are 100 mg/I except in ORW, HWQ, trout, and PNA waters where they are 50 mg/I.
S The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated
as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO.
Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO.
Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11
Page 1 of 2
Part B: Vehicle Maintenance Activitv Monitoring Reouirements for facilities using > 55 Sal of new motor oil/month on average
Outfall
No.
Date Sample In Tier 2
Collected Month
= Y
(mo/dd/yr OR Momtormg?
NO FLOW) (y/n)
# of Months
in, Tier 2
Sampling2
New Motor
Oil Usage
al/month
Total Flow
-:(MG)---
. TPH using method
1664A SGT --HEM
(mg/1)
Total Suspended pH Total Event
Solids (Standard Rainfall � 'Duration
m Umtsin minutes
_
_
153.
100. 6=
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES
AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)?
HAVE YOU CONTACTED THE REGION?
WHO AT THE REGION HAVE YOU SPOKEN WITH?
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6300
YES ❑ NO X
YES ❑ NO ❑
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed
to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and completfl.#m aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
Permittee)
Date: 111/2010-12/31/2014
January 21, 2015
(Date)
Last Revised 02-02-11
Page 2 of 2