Loading...
HomeMy WebLinkAboutNCG020082 DMR SW (2)ANNUAL SUMMARY DMR - STORMIWATER 11 SEND TO CENTRAL OFFICE * 11 STORMWA TER DISCHARGE OUTFALLS (SDO) GENERAL PERMIT NO. NCG020000 *Report ALL STORMWA TER Monitoring Data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH 1 of each year. CERTIFICATE OF COVERAGE NO. NCG020082 SAMPLE COLLECTION YEAR: 2014 FACILITY NAME: Vulcan Construction Materials, LP/North Quarry COUNTY Forsylh PERSON COLLECTING SAMPLES Landon Means PHONE NO.3( 36) 767-0911 CERTIFIED LABORATORY:Research & Analytical Labs Lab #34 ADD TO LISTSERVE? YES ❑ NO ❑ EMAIL: Lab # Part A: Stormwater Monitorine Requirements Date Sample Outfall Collected No. (mo/dd/yr OR NO FLOW)(y/n) In Tier 2 # of Months in Monthly Tier 2 Monitoring? Sampling2 Total Flow TurbiditySettleable Total Suspended (MG) Solids (NTLI) (mg/1) Solids (ml/1)Rainfall Total (in) Event Duration (minutes) - I - - - - 1063.4 See Footnote • 0.1 003 No Flow in 2014 004 No Flow In 2014 005 No Flow in 2014 006 No Flow in 2014 007 No Flow in 2014 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here and the Date Range. Per NCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range ' If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. TSS benchmark values are 100 mg/1 except in ORW,.HWQ, trout, and PNA waters where they are 50 mg/I. 5 The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO. Altematively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO. Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-11 Pagel of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month on average Date Sample Outfall Collected No. (mo/dd/yr OR NO FLOW) In Tier 2 Monthly # of Months Monitorin in Tier 2 g? Sampline /n) New Motor Oil Usage al/month - Total Flow TPH using method (MG) 1664A SGT -HEM m Total Suspended Solids m I pH Total Event (Standard , Rainfall Duration Units in minutes - 15J 100-1-1 64 002 No Flow in 2014 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO X HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ WHO AT THE REGION HAVE YOU SPOKEN WITH? MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE" & LIMIT VIOLATION) BY MARCH I OF EACH YEAR TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6300 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. l am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing :ure of Permittee) Date: 1/ 1 /2010- l 2/31 /20 l 4 January 21, 2015 (Date) Last Revised 02-02-11 Page 2 of 2