HomeMy WebLinkAboutNCG020511 DMR SW (2)ANNUAL SUMMARY DMR - STORMWATER
II SEND TO CENTRAL OFFICE * II
STORMWA TER DISCHARGE OUTFALLS (SDO)
GENERAL PERMIT NO. NCG020000
*Report ALL STORMWA TER Monitoring Data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH I of each year.
CERTIFICATE OF COVERAGE NO. NCG020511 SAMPLE COLLECTION YEAR: 2014
FACILITY NAME: Vulcan Construction Materials, LP/Spruce Pine Ouarry COUNTY Mitchell
PERSON COLLECTING SAMPLES: Gary McMahan PHONE NO.8( 28) 688-4200
CERTIFIED LABORATORY: Research & Analytical Labs Lab #34 ADD TO LISTSERVE7 YES ❑ NO ❑ EMAIL:
Lab #
Part A: Stormwater Monitorine Requirements
Date Sample In Tier Z
Outfall Collected Monthly
�
No. (mo/dd/yr OR Monitoring.
NO FLOW) (y/n)
# of Months in Total Suspended
Tier 2 Total Flow Turbidity
Sampling= (MC) Solids (NTU)
(mg/�
Total
Settleable
Solids (ml/1)Rainfall
(in)
Event
Duration
(minutes)
- - -
- - 1001.4 See Footnote?'5
0.1
003 No flow for 2014
004 No flow for 2014
005 No flow for 2014
006 No flow for 2014
007 No flow for 2014
If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here and the Date Range.
Per NCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range
' If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit.
° TSS benchmark values are 100 mg/I except in ORW, HWQ, trout, and PNA waters where they are 50 mg/l.
'The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated
as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO.
Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO.
Permit Date: 1/.1/2010-12/31/2014 Last Revised 02-02-11
Page 1 of 2
Part B: Vehicle Maintenance Activitv Monitoring Requirements for facilities using > 55 gal of new motor oil/month on average
Outfall
No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW )t
In Tier 2
Monthly
Monitoring
?
/n)
# of Months New Motor
in Tier 2 Oil Usage
Sampling2 aVmonth
-
Total Flow
(MG)
TPH using method
1664A SCT -HEM
m
Total Suspended pH
Solids (Standard
m Units
Total Event
Rainfall Duration
in minutes
-
15'
1003.4 6-9
002
No flow for 2014
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES
AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO X
HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑
WHO AT THE REGION HAVE YOU SPOKEN WITH?
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE" & LIMIT
VIOLATIONS) BY MARCH 1 OF EACH YEAR TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6300
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed
to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete I a7417
4 e that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."Z� /�
ure of Permittee)
Date: 1/1/2010-12/31/2014
January 21, 2015
(Date)
Last Revised 02-02-11
Page 2 of 2