HomeMy WebLinkAboutNCC241859_Site Plan or Location Map_20240618 CAD°m
b , ,) 1 CONSTRUCTION SEQUENCE TEMPORARY SEEDBED PREPARATION TEMPORARY SEEDING SCHEDULE (LBS/AC) 8 Fin ZE
PHASE 1 U ¢ y
- - - -—— 1. A GOOD SEEDBED IS WELL PULVERIZED,LOOSE,AND UNIFORM. GERMAN MILLET 40 OO o
SITE (TO TEMPORARILY STABILIZE DENUDED AREAS THAT WILL
NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF 15 /n °
1. OBTAIN PLAN APPROVALS AND ALL APPLICABLE PERMITS. 2. LIMING-APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF WORKING DAYS) SOIL AMENDMENTS: Co .
2. FLAG LIMITS OF ROUGH GRADING.ESTABLISH GRADE LIMITS AS NEEDED. THE pH(ACIDITY)OF THE SOIL IS NOT KNOWN,AN APPLICATION OF FOLLOW SOIL TESTS OR APPLY: .5 0
/ GROUND AGRICULTURAL LIMESTONE AT THE RATE OF 1-1.5 TONS/ACRE 2,000 LBS/AC LIMESTONE AND
�i= 3. CONTACT LAND QUALITY SECTION AT 910-486-1541 TO SCHEDULE PRE-CONSTRUCTION MEETING WITH ON FINE TEXTURED SOILS AND 2-3 TONS/ACRE ON COARSE TEXTURED 750 LB/AC 10-10-10 FERTILIZER
1 GRADING CONTRACTOR,EROSION CONTROL ADMINISTRATOR,PROJECT ENGINEER AND OWNER.NO SEEDING DATES: DECEMBER 1 THRU APRIL 15
SOILS IS USUALLY SUFFICIENT.APPLY LIMESTONE UNIFORMLY AND
/ - , PERSON MAY INITIATE A LAND DISTURBING ACTIVITY BEFORE NOTIFYING ALL APPROPRIATE INCORPORATE INTO THE TOP 4-6 INCHES OF THE SOIL.SOILS WITH A pH OF SEEDING MIXTURE: SPECIES RATE MULCH:4,000 LBS/AC-ANCHOR STRAW BY TACKING WITH ° d
lig a°no ' AUTHORITIES TO THE DATE OF SAID ACTIVITY. 6 OR HIGHER NEED NOT BE LIMED. (LBS/AC) ASPHALT,NETTING,OF A MULCH ANCHORING TOOL.A :41111111.m in
��.- • "TOw" DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED -o �I"c"w^`14. INSTALL THE PERIMETER SEDIMENT FENCES AS THE FIRST CONSTRUCTION ACTIVITY.CLEAR ENOUGH m. / TO INSTALL SILT FENCE. 3. FERTILIZER-BASE APPLICATION RATES ON SOIL TESTS.WHEN THESE ARERYE(GRAIN) 20AS A MULCH ANCHORING TOOL. a U me vAe NOT POSSIBLE APPLY A 10-10-10 GRADE FERTILIZER AT 700-1000 LB/ACRE. ANNUAL LESPEDEZA(KOBE) 50 ° o z y
,alp,5. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE.
- BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 MAINTENANCE:REFERTILIZE IF GROWTH IS NOT FULLY N m
'I,.. , �, 6. INSTALL TEMPORARY SEDIMENT BASIN,DIVERSION SWALES(WITH LINING),OUTLET STRUCTURE AND INCHES OF SOIL. IF A HYDRAULIC SEEDER IS USED,DO NOT MIX SEED AND OMIT ANNUAL LESPEDEZA WHEN DURATION OF ADEQUATE. RESEED,REFERTILIZE AND MULCH y
'- '.' PIPES. FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. w c
"7. REMOVE,TO APPROVED OFFSITE LOCATION,DEBRIS,TRASH,ETC.,TO THE DESIGNATED AREA. ` d N
8. BEGIN CLEARING AND GRUBBING.STRIP SITE OF TOPSOIL AND STOCKPILE IN THE DESIGNATED AREA. 4. SURFACE ROUGHENING-IF RECENT TILLAGE OPERATIONS HAVE SOIL AMENDMENTS:
RESULTED IN A LOOSE SURFACE,ADDITIONAL ROUGHENING MAY NOT BE FOLLOW SOIL TESTS OR APPLY: SEEDING DATES:AUGUST 15 THRU DECEMBER 15
REMOVE DEBRIS,TRASH,ETC.TO A PREVIOUSLY DESIGNATED AND APPROVED OFF-SITE AREA.' REQUIRED,EXCEPT TO BREAK UP LARGE CLODS.IF RAINFALL CAUSES THE 2,000 LBS/AC LIMESTONE AND
9. TEMPORARY SEED ALL FILL SLOPES. SURFACE TO BECOME SEALED OR CRUSTED,LOOSEN IT JUST PRIOR TO 750 LB/AC 10-10-10 FERTILIZER SEEDING MIXTURE: SPECIES RATE(LBS/AC)
Vicinity Map SCALE: 1'=1000' SEEDING BY DISKING,RAKING,HARROWING,OR OTHER SUITABLE
METHODS.GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE MULCH:4,000 LBS/AC-ANCHOR STRAW BY TACKING WITH RYE(GRAIN) 120
CONTOUR BEFORE SEEDING. SEE OTHER REQUIREMENTS FOR SURFACE ASPHALT,NETTING,OR A MULCH ANCHORING TOOL.A SOIL AMENDMENTS: `
ROUGHENING ON THIS SHEET. DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED ..,�,{1CARp,,,
AS A MULCH ANCHORING TOOL. FOLLOW SOIL TESTS OR APPLY: ,,,•,.....,,,)/�'',,'
2,000 LBS/AC LIMESTONE AND �.�4:�FESS/p;�.,y
NEW STABILIZATION TIMEFRAMES MAINTENANCE:REFERTILIZE IF GROWTH IS NOT FULLY 1000 LB/AC 10-10-10 FERTILIZER - '', SEAL 1-••
ADEQUATE. RESEED,REFERTILIZE AND MULCH - 1 033861 '
IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. MULCH:4,000 LBS/AC-ANCHOR STRAW BY TACKING WITH
SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS ASPHALT,NETTING,OF A MULCH ANCHORING TOOL.A '9T•FNGINE,T:<.'•' ,.��
LIMITS OF DISTURBANCE=23.85 AC PERIMETER DIKES,SWALES,DITCHES,SLOPES IF SLOPES ARE 10'OR LESS IN LENGTH AND ARE / DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED ,i/E' •J•P to
7 DAYS NOT STEEPER THAN 2:1,14 DAYS ARE ALLOWED // I / \ '/ \ \\ SEEDING DATES:APRIL 15-AUGUST 15 AS A MULCH ANCHORING TOOL.
HIGH QUALITY WATER(HOW)ZONES 7 DAYS FOR SLOPES GREATER THAN 50'IN LENGTH / // 1 / \ -- \\ SEEDING MIXTURE: SPECIES RATE MAINTENANCE:REPAIR AND REFERTILIZE DAMAGED
7 DAYS ——— I / \ —___i- \`_ AREAS IMMEDIATELY.TOPDRESS WITH 50 LBS/AC OF
I — - \ NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND
SLOPES STEEPER THAN 3:1 7 DAYS NONE EXCEPT FOR PERIMETER AND HQW ZONES / / / % -
TEMPORARY COVER BEYOND JUNE 15,OVERSEED WITH 50
---�- \-. \\\ LBS/AC KOBE IN LATE FEBRUARY OR EARLY MARCH
SLOPES 3:1 OR FLATTER NONE / - % 4-— \ -` \dFtljn i
la DAYS / �; -',,..„,, 9/
ag,� REVISIONS:
SLOPES FLATTER THAN 4:1 NONE %'.r > / raj fD
. „ 14 DAYS %S— \ `I � 1,G—— ———
ALL OTHER AREAS WITH
\ , Sa Ita Sewer Man H i A �) Invert El vetie L 144.48' / T Q
I I v, To Elevation=152.95' -4♦. ♦ (��'�� / — 1* 11,E \\\ \��/ i /
I� -/ �'� / Invert Elevation=145 N — j—may 7 v v
�. 1 oa I #N qy i /r/c •��/r�v / VA
..
p
r ll��l �Do �/ as.5o Ei v /// OUTLET I I
�L
\� �� • .• -01,7 _. INV ARMOR SLOP-W/35 I. . SB RIP-RAP MT FENCE
I /—. i
ao.
\\ 'I I I �•- '''" .-.�. --,T. y���a..�. —_ -.._ -- - -_ - •T ENTRY POINTS TO \ ..\ .• 'M/� / ��� V.
F'• - •r� - _ TD-1 I A � v ( sEDx�BAs �a - � / v I� z
AI S / I 13so-LFp(1% — --�_ dr j�// / 1 I v--- I O
(II'/ I CONCRETE WASHOUT \ 3:1 SIDESLOPE \ // (� // ., Er SKIMMER WITH 6'ORIFICE `' @p,32°A/ II// EXOLEBIOR / I I I — —> /\ d
PIT WITH SIGN 11 i�LBAE WITH STRAW NE'F i ROFK'CHECK DAM I .,� 15"RCP 232'' II
( 1 / > — / p' / OUTLET '////' WATnEr C P)-— V / / 1 ¢
I I / '_ \ // �— �150^' 146.00 `4' �` //I / \ / co
20'X50' .� AA{{� r A9� INV.144.25' I// / I \ ( 1 Q
I k TEMPORARY -- \ ,eb+' l , !/ / 4� INV IIII / I \ \
IlI / CONSTRUCTION / ,t/ / V OUTLET STRUCTURE \ I /
III rip ' ENTRANCE ��I TD 1=11.00 AC I j111•� _ \ \ \ / I
I / INS.144.80(-OUT I / \ /
II II a•!y�,7 / I / / '7//' \--_ I /� TSB=2.15 AC $ •m�_ 1/-0R / \ \\ I ---- // I
I "''" �r / TEMPORARY , / \ / COIR FIBRE: FFLES I (I II.\ \\ \ \ \\\ // II
I I I "Vial / STOCKPILE/ ��• II // ) EME CY 9PLLWAY \i 1\ \\ \ ` \ \ / — O
h Y/(11 �.35 u / u. FILL IN DITCH J / (TYP) \ I \ /
I /4 N\ / 1 Av LINE WrtH \ III u 1 \ \ I. \ / 2
I I 1 / _ a`j1 (
// /� \ /ifI SROLANkiA70 frvP) \ II I \ \ -- �, \N/ \
•. 14930 00 E I .p \ \\--
TB
Y/► AN '\ , BAS N T TEMPORARY SEDIMENT BLENGTH=325 WIDTH-215' \• 1so— 411,,, TOP 150'SPILL 749I / _ \'II;;
^ i BOT=146'DEPTH 3' I IIIIIII \ L/ / / r\ \ \
VII
_ •. .�`-.T / I I /� 8:1 SLOPE I / II \ / \ I \ I —J / \ O J
/;'�' \\ l �� \ �\ FILL IN DITCH ._/� — .J IC IIIII / \ \>. \ Imo/ //
vP pIC / •:/" (IIIII \ / > M O
.. 1 II \ / NSA /// YE 51 II ��.. $ �� 51i - - — �y d. \//'-OVA\ W
F / /\
J II . -.,\ c�.,7,- lif �j _— \ a I ----� \m�f /i \ � \\ 1 /I i V O
Nc Zso s
II y \ ��\ 1, // \N. j\ �\.. .cHE a TD2=25.00AC/ / --- �I 1 /C
- r cc
0.1
I
I I I ! 1/ ) \ \ O \ / \ / / r � \ 1550.CF_ / / Al
II I () \\ ` ll//—_— \\ — —//'/ �n 1IX CL . \_ .SIDE gLOPEED SLOPE (IIII / // 1 W J
\ N IIII _ / / Q
/ I !��
I \ II III I
O
\I II I Ir\\, — l \I\ /_--_—_ /� ///`\/^I I\\ ��. �... \ ROCK CHECK DAM I III w \ �\\ \\ \ / \ W '+ W
yI I v rI Li
`IT I I {ice moo hi lls' N
( 1jI �vv ' A vim/ / / I/II �/ ,_- lJ —� vo / AI \ Q R1 54 w // I1sz / v A7.� ----- • 1so RAiNV AV �� / \ \ /IIIA� // �� / —/ B / , / , / I / W N Q
�// /
II I / CI
/\ �1 / / j /
�— /\\ \ LEGENDw ILI
L / I / / / \ X151.25 TOOFBANK& I I \ — — I \ � / TB TEMP SWALE
— ^----/ l / n \/
J
II // \\ /� j\� / -- //1 ,/ \ \\\ XI 25 INVERT NV EL IL
C III / / I\ i I /'/ / ————— — ///,// \ \ \ DITCH CENTERLINE O
— I // // /I \\ I /J/ J \ //'�� --- / / /// '/�/ I ----�\` \ \ XEXCL INVERT
'\ \ \ / /
5 // / / //v 'sue �N vI I/ / vv / //////i/ I I v
S / / / / I ___
_� /
\ \ c\J./ I\
a / )
• jj l I I zz
/
DATE:
v \ / JANUARY 16,2023
/
/ ---- ' --.,\ \ \ -- / DESIGNEDB: DE
i II IY
// -- I �_/� �\ \ \ I ' DRAWN BY: DE
- II I v \
II I -� \ --- \ \ CHECKED BY: MP
n I J OVERALL EROSION CONTROL PLAN PROJECT No. 2022069
1 II
_ \ \\ DRAWING No. W-4057
• II —' �' r\ 1 100' 0 50' 100'
SCALE: AS NOTED
II --- / \ I SHEET No.
II I NSA—— I \
;L ICI I1 ---_ _---_—_--- \ /\\I
8 ^ --------- SCALE 1 inch= 100 ft C3.011
�/