Loading...
HomeMy WebLinkAbout20160145 Ver 1_More Info Received_20160217Strickland, Bev From: Deborah Shirley <dshirley@sandec.com> Sent: Wednesday, February 17, 2016 3:09 PM To: Strickland, Bev Subject: RE: Sterling Phase 20160145 Attachments: 0902 - Addendum to SIA - 2nd Site Plan Submittal (8-28-09).pdf, 0902 - SIA - 1st Submittal (1-10-09).pdf, ApprovedSitePlan-D0900025 COOO.pdf Soil & Environmental Consultants, PA 919-846-5900 (office) 919-673-8793 (mobile) www `)armd�;( .com THINK I3I'I'ORE YOU P INT From: Strickland, Bev [mailto:bev.strickland@ncdenr.gov] Sent: Wednesday, February 17, 2016 2:51 PM To: Deborah Shirley Subject: Sterling Phase 20160145 Ms. Debbie, Can you please send me an electronic copy of the above project? Thanks Beveimlly Stimiiiclki and L aseimfiiiche Add miioniktimmatoir Division of Water Resources Department of Environmental Quality 919-707-8789 Office Physical: Suite 1219G, 512 N Salisbury, Raleigh, NC 27604 Mailing: Mail Service Center 1617, Raleigh, NC 27699-1617 Bev.:Str.i_ckland. i7cd C?_r.:.gr?v r Email ail rcorresporrdence to and from this ack1ress is , r bled to the North G amfn a Public blic Rcr;ords Law and mmr;r}r be c.lisc/r sed to third partre, . 1 FOUR SEASONS AT RENAISSANCE STORM WATER IMPACT ANALYSIS Four Seasons at Renaissance Subdivision Page Road and Chin Page Road Durham, North Carolina Horvath Associates Project Number: 0597 June 29, 2006 Revised August 16, 2006 Revised February 10, 2009 Prepared for: Builders Ist Choice 6060-B Six Forks Road Raleigh, N.C. 27609 (919) 841-4960 Prepared by: Horvath Associates, P.A. Engineers - Planners - Landscape Architects 16 Consultant Place, Suite 201 Durham, North Carolina 27707 (919)490-4990 STORMWATER IMPACT ANALYSIS NARRATIVE FOUR SEASONS AT RENAISSANCE STORM WATER IMPACT ANALYSIS General Description The Four Seasons at Renaissance project is located at the southwest corner of Page Road and Chin Page Road in Durham, North Carolina. This 122 -acre site will consist of single-family houses, multi -family buildings, community buildings, future commercial area, and the associated roadway, parking, vehicle access, and sidewalk. This site is part of the Neuse River basin, and the site is not located inside a water supply watershed. There is 100 -year floodplain located on the site. Water quality measures are not necessary for this project. This project is subject to study of the 1-, 2-, and 10 -year storm runoff. Revised Analysis The stormwater impact analysis was revised in response to comments by the City of Durham. A summary of the changes follows, and the SIA was updated accordingly. The J -series FEMA map was included with the submittal. The flood lines shown on the plans correspond to the J -series delineation, as well. The stream determination shown remains in effect, based on a letter from DWQ dated January 24, 2001. At the time of the determination, there was no expiration in effect, so the letter remains valid. Drainage Point #813, which was previously identified only on the post - development map, was added to the pre -development analysis. Areas south of Street O, west of Street P, and west of Street U were incorporated into the post - development drainage areas. It was previously assumed that the impervious area of the lots would drain away from the roads; however, the building pads will be set above the road to facilitate proper drainage. The drainage areas have been adjusted accordingly. Hydrologic calculations are included in the SIA. To clarify the status of DA 5 in the post -development condition, the area south of the site will be developed at roughly the same time as the site, so the built -out condition is assumed in the post -development analysis. Initial discussions revealed that the abutting property owner does not plan to discharge runoff across the property line, so a reciprocal arrangement was made for this site. To clarify the status of DP #2 in the post -development condition, the purpose of the 1 -year rainfall analysis is primarily for erosive flows in small channels. There is no buffered stream at DP #2, and the natural draw will be graded out. In the interest of conservative engineering assumptions, the hydrologic calculations assume that Detention Basin #2 outlets at DP U. The outflow from Detention Basin #2 will be piped towards DP #3. The outflow from the detention basin will have no effect on DP #2 because DP #2 will essentially cease to exist, so the logical step is to examine the impact at DP #3. DP #4 shares a similar fate to DP #2. Detention Basin 3 must be outlet near DP #4 to make the elevation work, but the calculations assume the outflow is near DP #3 because the natural draw at DP #4 will cease to exist. In addition, level spreaders were added at all outlets. Final designs will be submitted with construction drawings. 2nd Revision The stormwater analysis was revised for the Site Plan Submittal of Phase II of the Project. The revision included the addition of Level Spreader design information for the outfalls in Phase Il. Please note that the Stormwater Impact Analysis for the entire project has already been approved. The only revision involved with this submission is the addition of the Level Spreader design information. Water Quality Requirements Nutrient mitigation is not necessary for this project. The nitrogen loading rate is below the required maximum. By area, the site is 51 percent single-family land use, 43 percent multi -family land use, and 6 percent commercial land use. Because the required maximum nitrogen loading rates for single family, multi- family, and commercial are different, the composite maximum nitrogen loading is 7.95 pounds per acre per year. The post -development nitrogen loading will be 6.33 lbs/ac/yr. Nutrient mitigation fees are required in the amount of $109,742.18. Supporting calculations are appended to this narrative. Site Hydrology The site generally drains south and southwest: away from Chin Page Road to the north, away from Page Road to the east, towards Stirrup Iron Creek Tributary D to the southwest, and towards Stirrup Iron Creek to the south. Stirrup Iron Creek Tributary D drains into Stirrup Iron Creek, which is part of a flood control basin owned and operated by Wake County. At the mouth of Tributary D, the flood control property is surrounded on three sides by the site. To represent accurately the overall drainage area, the overall analysis point is located outside the property boundary. A total of 334.68 acres drains to the overall drainage point. Several existing channels drain into Tributary D. These channels are significant in the 1 -year rainfall analysis, so the site is divided into sub -basin areas by these smaller watersheds. Nine drainage points (DP) were identified. DPs 1 through 7 drain into Tributary D, while DPs 8, 8B, and 9 drain into Stirrup Iron Creek Tributary C. An on-site stream is shown on the soils map in the northwest corner of the site; however, field delineation by a professional consultant showed that the channel is not a stream, so no stream buffer is required. While not shown on the City of Durham topography, the adjacent site is developed and the natural channel no longer exists. A letter of concurrence from NCDENR Division of Water Quality will be submitted with the site plan package. Soils within the drainage areas are classified as members of Hydrologic Soil Groups B, C, and D. The site includes the following soils: Soil Abbreviation Soil Type Hydrologic Soil Group Cc Cartecay C Ch Chewacla C CrB, CrC Creedmoor C GrB, GrC Granville B HeB, HeC Helena C MfB, MfC, MfD, MfE Mayodan B PfC, PfE Pinkston B WsB, WsC, WsE White Store D The current land use includes agriculture, which is supported by satellite photography. In the TR -20 analysis, the agricultural land is classified as `open" because the perviousness (and curve number) cannot be reliably determined and is subject to change seasonally. The area south of the site will be developed at roughly the same time as the site, so the built -out condition is assumed in the post -development analysis. Initial discussions revealed that the abutting property owner does not plan to discharge runoff across the property line, so a reciprocal arrangement was made for this site. 2- and 10 -Year Rainfall Studv Detention of the 2- and 10 -year rainfalls is not required. There is a 26 percent increase in peak flow during the 2 -year storm event, but the increased peak flow will have no negative impact on the property immediately downstream, which is the Wake County flood control land. The preliminary Flood Insurance Study Report for Durham County, North Carolina and Incorporated Areas, dated May 5, 2005, lists the drainage area to Stirrup Iron Creek at the confluence with Stirrup Iron Creek Tributary D at 6.4 square miles, or approximately 4,100 acres. The effect of the increase during the 2 -year rainfall is not significant, and the flood control area has adequate capacity. There is a 2 percent decrease in peak flow during the 10 -year storm event. The downstream analysis of the 2 -year rainfall and the peak flow decrease of the 10 -year rainfall show that detention of the 2- and 10 -year storm events is not required. The following paragraph will describe the study of the 1 -year rainfall, which requires detention. The net effect of the 1 -year detention on the 2- and 10 -year storm events is to reduce the overall peak flows to below pre -development flows. The post -detention discharges are listed on the appended summary of results. 1 -Year Rainfall Study With the exception of DP 8 and 8B, detention of the runoff from the 1 -year storm event is required because the peak flows increase by more than 10 percent from the pre- to post -development condition. Specific discharges are listed on the appended summary of results. Detention will be provided by four dry detention basins. Detention at DP 8 and 8B for the 1 -year rainfall is not necessary because DP 8 and 8B drain directly into a floodplain, at a point in Stirrup Iron Creek where the contributing drainage area is 4.5 square miles. The on-site storm sewer network will transport water through the drainage area and discharge it at the drainage point, so there is no potential for damage due to erosion. Two level spreader systems, each with a low -flow bypass structure, will discharge the runoff as sheet flow. In addition, the drainage area in the creek is so large that detention would have no significant effect, so detention is not necessary. The effect of the post -development drainage is to divert water away from some drainage points and release it at others. There are two buffered streams among the channels analyzed for the 1 -year rainfall (DPs 1 and 3), and both receive runoff to preserve the natural habitat. DPs 2, 4, 6, and 7 receive insignificant discharge in the post -development condition. DP 5 receives discharge from Detention Basin 4. DP 9 receives less runoff post -development, so detention is not necessary. A level spreader with a low -flow bypass structure, will discharge the 1 inch/hour runoff as sheet flow to a grass filter strip. All runoff in excess of the 1 inch/hour rainfall will bypass the level spreader and discharge into a natural draw, which flows across the property line, and is collected by a 36" - diameter corrugated metal pipe. Downstream analysis is not necessary because the flow across the property line is reduced at DP 9. The specific discharges are listed on the appended summary of results, and TR -20 calculations are appended as well. Level Spreaders Diffuse flow as well as 25% TSS removal and 20% Nitrogen reduction will be provided at each outfall that does not require a detention basin by means of a level spreader system and a grass filter strip. The level spreader systems at DP 8 and DP 9 will be essentially the same design except for the low -flow bypass structure, and level spreader lip and filter strip length. A low -flow bypass structure will convey all runoff up to the 1 inch/hour rainfall to the level spreader by means of a low flow orifice. Any flows exceeding the 1 inch/hour rainfall will overtop a weir wall in the structure and be directed to a natural draw, bypassing the level spreader. The level spreader system at DP 8B will be essentially the same as those at DP 8 and 9 except the low -flow bypass structure will divert the 1 inch/hour rainfall runoff to two separate level spreaders. The overall length required for the level spreader at DP 8B is greater than 130 feet, which is the maximum allowable length for a level spreader according to the NCDENR BMP Manual. Two separate orifices in the bypass structure will divert all flows up to the 1 inch/hour rainfall runoff to level spreaders of different length. The two lengths will total the required length. All flows greater than the 1 inch/hour rainfall runoff will bypass the level spreaders in the same manner as the level spreader systems at DP 8 and 9. The current cover condition of the level spreader filter strips is wooded. Using the level spreader length multiplier for a wooded filter strip the level spreader lengths would be longer than the 130' allowed by DWQ. The filter strips for each level spreader will be cleared of all woody vegetation and reseeded with grass. The filter strips will be maintained in accordance with DWQ policy. Conclusion Water quality measures are not required, because the post -development nitrogen loading rate is less than the required maximum; a mitigation fee will be paid. Detention of the 2- and 10 -year storm events is not required because detention will have no significant effect on the overall drainage area. Detention of the 1 -year storm event is required and will be provided by four dry detention basins. The post -development drainage preserves the onsite buffered streams and mimics the natural drainage pattern. The design is acceptable and sound. Methodolopv Topography and cover conditions are from City of Durham GIS. • Rainfall and runoff amounts are determined using HydroCAD v7.10, which uses the NRCS TR -20 method. Rainfall amounts for the selected storms were taken from the NOAA National Weather Service Precipitation Frequency Data Server. The 1 -Year rainfall was determined using TP -40. • The time of concentration (Tc) is calculated using the NRCS TR -55 segmented approach. Manning's n values for sheet flow are per TR -55. Channel characteristics in the pre -development condition are based upon engineering judgment and topography. A five-minute time of concentration is assumed in all post -development conditions. Curve number (CN) values were selected according to TR -55. • Hydraulic calculations utilize HydroCAD v7.10, using the storage -indication method to rout the hydrographs generated. • Soils information is from USDA Natural Resources Conservation Service "Soil Survey of Durham County, North Carolina." SITE PLAN AND PRELIMINARY PLAT SUBMITTAL CHECKLIST Durham Development Review - Site Plan and Preliminary Plat Requirements and Notes DURHAM City of Durham Public Works Department Stornttvater Services Divisions 101 City Hall Plaza Durham, North Carolina, 27701 1 8 6 9 Telephone (919) 560-4326 citY OF MEDICRE Fax (919) 560-4316 Design Professional's Signature and Seal Stormwater Services Site Plan and Preliminary Plat Submittal Checklist For each review submittal, including re -submittals, the entire study and submittal checklist shall be submitted. Partial study packages will NOT BE REVIEWED and will be returned with NO REVIEW PERFORMED. Contact Stormwater Services regarding redevelopment or expansion projects for modified requirements. L PROJECT INFORMATION Project Name: `d U K S FA d ,1�S A -r R FNiF 1S S fWGE Phase: /117 Previous Project Name, if applicable: (� Planning Case Number: f) D( PIN: 5'r- E g El -'o W Project Comment Contact Person: ,J 0 N� S�hfK U/� �E -- Phone number (glk) 41b' �76 Fax number: (910 4%0-Q 53 Company Name: µo) VA 1/f f}SSoC4ATES PA rla✓S 0718 -04-90 -1566 0757-0/- Orl -•2-355 0747-02-05-4721 075701 -08 -0763 IL REQUIRED ITEMS CHECKLIST 0747 - o i -75 6676 The following checklist outlines submittal requirements. Initial in the space provided to indicate the following submittal requirements have been met and supporting documentation is attached. A. General Requirements Applicant) initials a. Stormwater Impact Analysis (SIA) including narrative report and drainage calculations —%l sealed and signed b nth Carolina Professional Engineer. Neuse Basi (circle one). b. Cape Fear / (If Neuse Basin circled completion of Section D. below is required) c. INSIDE /OUTBID (circle one) Water Supply Watershed Overlay. (If INSIDE Water Supply Watershed completion of Section E. below is required) 49/0 �E- d. Show all City of Durham, Water Supply Watershed and Neuse River Basin Stream Buffers on the plan. Top of bank for the streams have been shown on the plan. Show the I0 -foot no build setback measured from the stream buffer line. Diffuse flow into stream buffers is required for all stream buffers. Page 29 of 35 January, 2009 Durham Development Review - Site Plan and Preliminary Plat Requirements and Notes e. Durham County Soils Survey, including map reference, with site boundary clearly shown and labeled. The map shall clearly show all streams, soil types and soil type boundaries. f USGS 7.5 Minute Quadrangle map, including map reference, with site boundary clearly shown and labeled. The map shall clearly show all streams. =— g. Floodplain located on site: Yes / No (circle one). h. A copy of the effective floodplain map, including panel number and map date, with site —� boundary clearly shown and labeled has been provided regardless if floodplain is located on the site. Show the floodway, 100 -year floodplain and/or future 100 -year floodplain with base flood elevations (if applicable) on the plan. B. Peak Runoff Rate Iner•easesr a. Introduction narrative describing site conditions in pre- and post -development conditions including a description of site improvement changes. -_-�� b. Drainage area maps (one map for pre -development; one snap for post -development) with: _✓Scale and north arrow. '/Sub -basin area(s) delineated with area(s) in acres indicated. �ialysis points clearly identified and labeled. /Segmented TR -55 time of concentration flow paths showing each segment. c. Methodologies and procedures described. AO d. Site plan or grading plan identifying pre- and post -development drainage patterns. e. Pre- and post -development times of concentration calculated by TR -55 segmented approach. Calculations for the pre- and post -development discharges for the 2- and 10 -year, 24-hour T- storm using TR -55, TR -20, HEC -HMS, HEC -1 or Rational Method. g. Summary of Results provided in the following format (see Example below). Pre- Developed BASIN 2 -year NAME dischar a Post- Developed 2 -year % dischar a Increase Pre- Post - Developed Developed Detention 10 year 10 -year % Required dischar a discharge Increast Yes/No Remarks h. Conclusion providing detailed findings. ---��L Stormwater Control Facility (BMP) provided (indicate number of each type of BMP): _Constructed Wetland`Dry Detention Pont _Underground Detention Wet Detention Pond Not required (explanation) BMP benefits: _Control 2- and 10 -year discharge _Other <OArTKo t_ 1'YEAR pKcH r n-�E Downstream Analysis Provided with Findings or _Not required: X I See Design Summaries and NCDENR BMP Manual (latest edition) for details and BMP design requirements. Page 30 of 35 January, 2009 �A Durham Development Review – Site Plan and Preliminary Plat Requirements and Notes 1. Downstream Improvements Proposed with a signed notarized agreement (agreement shall be recorded prior to site plan approval) with downstream property owner(s)Y / N C. City of Durham Stremn Buffers a. All streams, both intermittent and perennial, shown on the Durham County Soil Survey and the USGS 7.5 Minute Quadrangle map have been shown on the plan. Top of bank for the streams has been shown on the plan. Stream buffers shall be shown from the tops of batiks of the streams and a 10 -foot no build setback shall be shown measured from the stream buffer line. Diffuse flow into stream buffers is required. D. Neuse Basin Requirements" Note: If a single family, duplex or recreational development disturbs <_ I acre or a multi -family, office, institutional, commercial or industrial development disturbs 0.5 acres then items b, c, d, and e below are N/A. Additionally, new residential development maybe < exempt from the 1 -year peak runoff control requirement if impervious area does not exceed 15% and swales and other natural stornnvater conveyances are used to maximum extent practicable. ITEMS a. AND f. SHALL BE PROVIDED FOR ALL PROJECTS. a All streams, both intermittent and perennial, shown on the Durham County Soil Survey or USGS 7.5 Minute Quadrangle map require a Neuse River Basin Stream Buffer. The tops of banks for the streams have been shown on the plan. The stream buffer has been measured from the tops of banks and the 10 -foot no build setback is shown from the stream buffer. Diffuse flow into stream buffers is required for all stream buffers. b. Pre- and post -development discharge calculations for the 1 -year 24-hour storm using TR -55, TR -20, HEC -HMS or HEC -1. (1 -year, 24-hour storm rainfall is 3 -inches) c. Summary of Results provided in the following format (see Example below). d Pre- Post - Developed Developed BASIN 1 year 1 year NAME discharge discharge % Increase Detention Required Yes/No emnrks BMP provided (indicate number of each type of BMP for 1 -year detention): 1 N yNAs E _Constructed WetlandDry Detention Pond _Underground Detention Wet Detention Pond _Other Not required a D pp !Jn ISF_cIvAgg,+TrILS (explanation) NoT i�r&Ulf�ev <t i pJip v rtA� BMP provided (indicate number of each type of BMP for nitrogen treatment): Bioretention Area —Constructed Wetlands _Sand Filter _Wet Detention Pond Other XNot required (explanation) ITP^&Ee✓ tokvl�RME 15 8FLat., RE/1UIR> ll MAXtMunn f. Pre- and post -development nitrogen calculations with City of Durham Nitrogen Spreadsheet. z See Section 8.2, Neuse River Basin Performance Standards, for additional details. a See Design Sununaries and NCDENR BMP Manual (latest edition) for details and BMP design requ,renie rts. Page 31 of 35 Durham Development Review — Site Plan and Preliminary Plat Requirements and Notes E. Water upply Watershed Requiremen / b. BMP to the water supply watershed overlatrict(s) the project is located. (Circle all that F/J-A F/J-B E-A E -B M/LR-A M/LR-B pt vided (indicate number of each type of BMP): _Bioretention Area strut Wetlands _Sand Filter _Wet Detention Pond _Other Not required G. Narrative esplainit why a BMP is not provided. d. All runoff from all impervious surface at s are directed into the BMP. e. All streams, both intermittent and perennial, own on the USGS 7.5 Minute Quadrangle map have been shown on the plan. Top of bank for to streams has been shown on the plan. Stream buffets shall be shown from the tops of banks o he streams and a 10 -foot no build setback shall be shown measured from the stream buffet• li Diffuse flow into stream buffers is required for all stream buffers. 4 See Design Summaries and NCDENR BMP Manual (latest edition) for details and BMP design requirements. Page 32 of 35 January, 2009 SUMMARY OF RESULTS 0597 Detention Routing Summary of Results Peak Flows 2 and 10 Year Storm Event Peak Flow Analysis Overall Drainage Area Pre- Post - Storm Event Development Development Discharge Discharge, ._r=; Ben Thayer, EI 8/23/2006 Percent Post -Detention Increase Discharge 2 -Year 196.67 247.37 25.8% 193.97 10 Year -T77470 87 459-91 -2.3% 439.45 1 Year Storm Event Peak Flow Analysis Sub -Drainage Areas Pre Post - Drainage Point Development Development ID Discharge Discharge ._, Percent Post -Detention Increase Discharge 32.53 2 1.50 3 19.60 4 2.50 5 10.47 6 13.21. 7 2.19 g 8.12 gB 1.72 Percent Post -Detention Increase Discharge 1 2 and 10 Year Storm Event Peak Flow Analysis nroinaae Point 9 Storm Event Development Discharge Development Discharge Percent Increase Post -Detention Discharge 1 Year 137.7% 16.21 -11.5% 100.0% n/a F 434.7% 15.48 n/a -100.0% n/a 9.21 158.4% 8.48 0.00 100.0% _ n/a_ 0.00 -100.0% n/a 62.02 663.8%n/a 29.72 1627.9% n/a 1 2 and 10 Year Storm Event Peak Flow Analysis nroinaae Point 9 Storm Event Development Discharge Development Discharge Percent Increase Post -Detention Discharge 1 Year . - 3.85 _ -11.5% n/a 2 -Year 7.01 5.07 -27.7% n/a 10 -Year 17.36 9.21 -46.9% n/a NITROGEN LOADING CALCULATIONS 0597 Durham Nitrogen Loading (Old Method) Ben Thayer, EI 6/27/2006 Pre -development Method A: For Quantifying TN Export from Residential / Industrial / Commercial Developments when Footprints of all Impervious Surfaces are Shown Step 1: Determine area for each type of land use and enter in Column (2). Step 2: Total the areas for each type of land use and enter at the bottom of Column (2) at "Total Area Step 3: Calculate the fraction of the total area that is impervious area and enter in space provided (col 3) Step 4: Using the impervious surface fraction in step 3 as "I", calculate (0.426+7.67 I) and enter in Column (5). Step 5: For each row, multiply columns (2) (4) and (5) and enter in column (6). Step 6: Sum the rows of column (6) and enter at the bottom as total loading. (3). _. (4) I (5) Land Cover Productof Tvne of Land Cover Area Concentrall mr (0.426 + 07.671] (2) (3). and ( is surfaces 0 43 0.00 0.00 2.60 0% open space 0.43' 0.00 0.00 1.36 open space 83.53 1 0.95 1 0.43 33.80 38.45 13.6 0.43 222.76 Total Area = 121.98 Total Loadin (lb/r = 256.57 n_ea i ,... di..r. lnJar/vrl = 2.10 0597 Durham Nitrogen Loading (Old Method) Post -development Method A: For Quantifying TN Export from Residential/ Industrial / Commercial Developments when Footprints of all Impervious Surfaces are Shown Ben Thayer, EI 8/16/2006 Step 1: Determine area for each type of land use and enter in Column (2). Step 2: Total the areas for each type of land use and enter at the bottom of Column (2) at "Total Area Step 3: Calculate the fraction of the total area that is impervious area and enter in space provided (col 3) Step 4: Using the impervious surface fraction in step 3 as "I", calculate (0.426+7.67 I) and enter in Column (5). Step 5: For each row, multiply columns (2) (4) and (5) and enter in column (6). Step 6: Sum the rows of column (6) and enter at the bottom as total loading. (1) (2) (3) (4) (5) 6.33 0% Multi -Family Residential Land Cover (0.426 +7.67 I) Product of Type of Land Cover Area Concentration 7.05 Columns Land Value ($/ac) _ (acres Coefficient xrarimnm Rate tlb/ac/vrl = (2), 3 , and 4) Total Mitigation. Fee = $ 109,742.18 Impervious surfaces 49.60 2.60 3.54 457.06 41% Managed open space 48.77 1.36 3.54 235.10 40% Undisturbed open space 23.61 0.95 3.54 79.51 19% Total Area = 121.98 Total LoadingIb/ r) = 771.68 K22 Unit Loading lb/ac/ r = Composite Maximum Permissible Nitrogen Discharge I Nutrient Discharge Mitigation Fee I Type of Development Single Family Residential Acres 62.38 % of Total 51% Unit Nitrogen Loading (Ib/ac/yr) = Net Nutrient Removal Efficiency = 6.33 0% Multi -Family Residential 52.57 43% Net Nitrogen Loading (Ib/ac/yr) = 6.33 Conmrercial / Industrial 7.05 6% Land Value ($/ac) _ $13,445 xrarimnm Rate tlb/ac/vrl = 7.95 Total Mitigation. Fee = $ 109,742.18 MAPS \ \ a z MAGNETIC 0 0 icqsy 00 �e N u ~ : z O b cC O O � 347 �M Y AlP M _O lb OOd t- Zg i i p d100 N V S o MA $ w , 5 ZO A b N 5 O ....................:: . .. _ ::::::::. GRAPHIC SCALE . . . • DJ�I • . . . . . . . . . . . . . . . 0 250 500 1 ' ..01 . '\.. uwp ... ...: i QfiL: 4.7 o'rzrrr78 :::: �J %:::: ' ::::::::: '� :: ( IN FEET ) • • . • 3y 1 inch = 500 ft. \ ��J Fema Maps 3720074700J, 3720074800J JOB : 0597 3720075700J, & 3720075800J PREPARED BY: BFT R.L HORVATH ASSOCIATES, INC. Chin Page Road Property Date: 28/15/06 DURHAM, NORTH CAROLINA 27707 Chin Po e Road & Pae Road, Durham, NC Scale: 1 =500 r L IF ws., nn.a l .^n ..�........... .'.. . . . ...cl.. ... ..C... . . • . .. • • r..-.-.. •l�'; • • • • • DRAWN BY:• 3' HORVATH Sout! -,,east Durham 1 r ham USG 5 map NECKEDBY. A SS O C I A T E S CHIN PAGE RLQ. REZONING SCALE DATE CHIN CHIN PAGE ROAD IIl26/2005 DURHAM, NORTH CAROLINA PROJECT NO www.horvalhwvodales.com 0597 a kN v 3fA 3Cr; '2^ S.i_F._E: "_ 600 rp, HORVATH {y i) �yt'p ¢Y 41.1un `oilS MO �0 CHECKED BY: ASSOCIATES SCALE py.Tti i� ,��i rt r4 sn. ci IN r7DURHANA, PAGE RD. REZONING I' --60U GATE ;t12Et?oos T CHIN PAGE ROAD PROJECT NO NORTH CAROLINA 0597 Section 5o0 ® Engineering Metb®drD Table 9 -Summary of Discharges Flood Insurance Study Report: Durham County, North Carolina and Incorporated 2006 rens May Page 66 � Drainage Flooding Chance,,' Chance C ance ance Chance Source Location Approximately0.5 mile upstream of Scott mile ) I 2.9 1,120 1,360 1,490 1, 520 1,820 Kin Road Approximately 835 2.6 841 910 958 980 1,050 feet downstream of railroad Approximately 440 feet downstream of 2.3 1,480 1,910 2,170 2,230 2,810 railroad Approximately 570 feet downstream of 1.8 1,390 1,730 1,920 1,990 2,390 Herndon Road Southwest Approximately 170 1.3 939 1,190 1,330 1,390 1,710 Creek feet downstream of (continued) NC 54/I-40 Approximately 80 feet 1.0 806 942 1,190 1,630 1,690 downstream of Monterre Creek Drive Approximately 1,310 feet downstream of 0.8 841 1,030 1,150 1,330 1,430 Lakeshore Drive Approximately 445 0.4 420 621 742 1,060 1,040 feet upstream of Lakeshore Drive Approximately 890 266 409 497 729 726 feet downstream of 0.1 Ebon Road At confluence with 0.2 * 289 Southwest Creek Southwest Approximately 0.5 Creek mile upstream of 0.0 * * 138 Tributary confluence with Southwest Creek At Durham/Wake 8.2 * * 2,770 County boundary Approximately 0.4 * * 2,700 Stirrup Iron mile downstream of 7.9 Creek Page Road At confluence of * * 2,370 Stirrup Iron Creek 6.4 Tributary D Flood Insurance Study Report: Durham County, North Carolina and Incorporated 2006 rens May Page 66 I`'�.�11C?•�.- Table 9 -Summary of Discharges Flood Insurance Study Report: Durham County, North Carolina and Incorporated Areas page 67 May 2, 2006 Drainage ° Area ° Annual 1 Annual (square Annual Annu I Annual Source Location At confluence of * * 1,900 Stirrup Iron Creek 4.5 Tributary C At Chin Page Road 3.7 2,626 3,697 4,243 * 5,843 At confluence of Stirrup Iron Creek 2.8 2,260 3,175 3,643 * 5,013 Stirrup Iron Tributary B Greek (continued) Approximately 925 feet upstream of 2,3 2,290 3,223 3,699 :z 5,093 Transmission Line At confluence of Stirrup Iron Creek 1.4 1,550 2,168 2,483 * 3,403 Tributary A At Lumley Road 0.9 1,166 1,620 1,852 z 2,527* At Chin Page Road 1.82 1,433 2,109 2,459 3,512 Approximately 2,900 feet upstream of Chin 1.14 1,197 1,743 2,024 :z 2,864 Page Road Approximately 133 feet upstream of 0.63 519 874 974 z 1,225 Stirrup Iron Creek Evans Road Tributary Approximately 380 436 743 828 1,045 feet upstream of 0.46 Roche Drive Approximately 101 feet upstream of T.W. 0.12 162 306 349 * 460 Alexander Drive Stirrup Iron At confluence with 0,7 744 1,058 1,219 * 1,694 Creek Stirrup Iron Creek 481 552 * 760 Tributary A At Appling Way 0.2 341 At confluence with * * 317 Stirrup Iron Creek 0.3 Tributary A Stirrup Iron At Lumley Road 0.2 Creek Just upstream of 0.1 * * 252 Tributary A-1 Oleander Drive Approximately 175 * 106 feet upstream of 0.0 * Cherry Blossom Drive Flood Insurance Study Report: Durham County, North Carolina and Incorporated Areas page 67 May 2, 2006 Section s.o - Engineering Methods Table 9—Summary of Discharges . - . Drainage 10/0 Annual Flooding(square Annual Annual Annual Chance Annual Chance Chall,M I Ch Chance Approximately 0.4 mile upstream of 09 * x 795 confluence with Stirrup %ron Creek Approximately 520 * 675 Stirrup Iron feet downstream of 0.7 Creek General Electric Drive Tributary B Approximately 520 * 629 x feet upstream of 0.6 * General Electric Drive Approximately 790 * x 434 feet downstream of 0.3 TW Alexander Drive At confluence with :k 187 's Stirrup Iron Creek 0.1 * Tributary B Approximately 710 feet upstream of * 173 % Stirrup Iron confluence with 0.1 * Creek Stirrup Iron Creek Tributary B-1 Tributary B Approximately 1,197 feet upstream of * * 160 confluence with 0.09 Stirrup Iron Creek Tributary B At confluence with 1.9 * * 1,110 Stirrup Iron Creek At Chin Page Road 1.82 1,433 21109 2,459 * 3,512 Approximately 0.5 mile upstream of Chin 1.14 1,197 1,743 2,024 * 2,864 page Road Stirrup Iron Approximately 133 0.63 519 874 974 * 1,225 Creek feet upstream of Tributary C Evans Road Approximately 380 feet upstream of 0.46 436 743 828 1,045 Roche Drive Approximately 101 feet upstream of TW 0.12 162 306 349 * 460 Alexander Drive Flood Insurance Study Report: Durham County, North Carolina and incorporatedrens May Page 68 c-�etioi-i r�.0 - E:i1e•i�,��ri��:�� Table 9 -Summary of Discharges 10/0 I Annual Annual Annual FloodingDrainage (square al Source Location Stirrup Iron At confluence with 0.5 510 Creek Stirrup Iron Creek Tributary D Approximately 0.3 mile downstream of 1.7 * * 8,230 Sycamore Leesville Road Creek Approximately 0.2 1 040 x mile upstream of 1.0 Leesville Road Approximately 750 feet downstream of 16.4 4,750 6,240 9,420 10,300 13,300 Hope Valley Road/Highway 751 Approximately 700 feet upstream of 14.8 4,700 6,240 9,240 10,400 13,100 confluence of Third Fork Creek Tributary A Approximately 275 feet upstream of the confluence of Third 12.2 4,530 6,750 8,010 8,360 11,300 Fork Creek Tributary D Approximately 1,775 feet upstream of 11.3 4,500 6,660 7,890 8,230 11,100 South Roxboro Street Third Fork Creek Approximately 0.8 mile upstream of 10.9 4,670 6,660 7,920 8,260 11,300 South Roxboro Street Approximately 0.8 mile downstream of 10.5 4,700 6,640 7,900 8,300 11,300 Martin Luther King Jr. Parkway Just downstream of Martin Luther King Jr. 8.5 4,410 6,110 7,140 7,370 10,200 Parkway Approximately 0.5 mile upstream of 7.8 4,480 6,060 7,060 7,280 10,200 Martin Luther King Jr. Parkway Approximately 475 feet downstream of 3.6 2,750 4,150 4,970 5,020 7,020 West Weaver Street Flood Insurance Study Report: Durham County, North Carolina and Incorporated Areas page 69 May 2, 2006 OVERALL SITE HYDROLOGY, 2- AND 10 -YR STORM EVENTS, PRE -DEVELOPMENT COVER CONDITIONS Overall ire -Development Drainage Area oSubca Reach and Link S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Overall Type 1124 -hr 2 -Year Rainfall=3.50" Page 2 Prepared by Horvath Associates, P.A. 4/25/2006 Hvrlrnr;AM 7.10 sin 003736 © 2005 H droCAD Software Solutions LLC Subcatchment EDA: Overall Pre -Development Drainage Area Runoff = 196.67 cfs @ 12.37 hrs, Volume= 24.779 af, Depth> 0.89" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area ac CN Description 15.941 61 >75% Grass cover, Good, HSG B 86.688 74 >75% Grass cover, Good, HSG C 8.662 80 >75% Grass cover, Good, HSG D 102.292 55 Woods, Good, HSG B 70.275 70 Woods, Good, HSG C 30.885 77 Woods, Good, HSG D 2.900 68 1 acre lots, 20% imp, HSG B 5.907 79 1 acre lots, 20% imp, HSG C 0.957 89 Paved roads w/open ditches, HSG B 8.565 92 Paved roads w/open ditches, HSG C 1.609 93 Paved roads w/o en ditches, HSG D 334.681 68 Weighted Average Tc Length Slope Velocity Capacity Description 12.2 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.60" 5.7 451 0.0687 1.3 shallow Concentrated Flow, Woodland Kv= 5.0 fps 3.0 982 0.0224 5.5 71.73 Trap[Vee/Rett Channel Flow, Bot.W=0.50' D=2.00' Z= 3.0'1' Top.W=12.50' n= 0.040 Winding stream, pools & shoals 8.8 2,944 0.0132 5.6 167.94 Trap/Vee/Rett Channel Flow, Bot.W=1.00' D=3.00' Z= 3.0'/' Top.W=19.00' n= 0.040 Winding stream, pools & shoals 7.3 2,239 0.0069 5.1 305.58 Trap/Vee/Rett Channel Flow, Bot.W=3.00' D=4.00' Z= 3.0'1' Top.W=27.00' n= 0.040 Winding stream, 2ools & shoals 37.0 6,691 Total S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Overall Type 1124 -hr 2 -Year Rainfall=3.50" Page 3 Prepared by Horvath Associates, P.A. 4/25/2006 H droCADO 7.10 s/n 003736 @ 2005 H droCAD Software Solutions LLC Subcatchment EDA: Overall Pre -Development Drainage Area Hydrograph _ 220 210;— - - - - - 196.67 efs@12.37hrs 200; - _.- --- - -- 190 Runoff=195.67 cfs_@ 12.37 hrs 180_.__...__._ 170; Type 1124 -hr 2 -Year - 160 Rainfall -=3.50" 140- Runoff Area=334.681 ac 130 Runoff Volume- 24.779 _af- v120- 3 110; Runoff Depth>0.89- - u 100: Flow Length=6,691' - 80< -Tc=37.0 min 70_ CN=68..- so= _ 40: 30 -- - - -- .. -- 20- 10-. p- 1, 12 13 14 10 Time (hours) age S:\@STORMWATER DEP-R@PROJECTS\05\0597 - Four Seasons at Renei 2a h� (Chin P Ro 11 (e ad) 90 6." 0597 Overall Page 4 Prepared by Horvath Associates, P.A. 4/25/2006 I-hutrnr.An(77.10 s/n 003736 @ 2005 H droCAD Software Solutions LLC It i * -rall Pre -Development Drainage Area Runoff = 470.87 cfs @ 12.34 hrs, Volume= 53.770 af, Depth> 1.93" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area ac CN Description 15.941 61 >75% Grass cover, Good, HSG B 86.688 74 >75% Grass cover, Good, HSG C 8.662 80 >75% Grass cover, Good, HSG D 102.292 55 Woods, Good, HSG B 70.275 70 Woods, Good, HSG C 30.885 77 Woods, Good, HSG D 2.900 68 1 acre lots, 20% imp, HSG B 5.907 79 1 acre lots, 20% imp, HSG C 0.957 89 Paved roads w/open ditches, HSG B 8.565 92 Paved roads w/open ditches, HSG C 1.609 93 Paved roads w/o en ditches, HSG D 334.681 68 Weighted Average Tc Length Slope Velocity Capacity Description min feet ft/ftft/sec cfs 12.2 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.60" 5.7 451 0.0687 1.3 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 3.0 982 0.0224 5.5 71.73 TraplVee/Rect Channel Flow, Bot.W=0.50' D=2.00' Z=3.0'/' Top.W=12.50' n= 0.040 Winding stream, pools & shoals 8.8 2,944 0:0132 5.6 167.94 Bo W 1 00' DRect C3.00' ZF13. Y Top.W=19.00' n= 0.040 Winding stream, pools & shoals 7.3 2,239 0.0069 5.1 305.58 Trap[Vee]Rett Channel Flow, Bot.W=3.00' D=4.00' Z= 3.0'/' Top.W=27.00' n= 0.040 Winding stream pools & shoals 37.0 6,691 Total S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Overall Type 1124-hr 10-Year Rainfall=5.10" Page 5 Prepared by Horvath Associates, P.A. H droCAD® 7.10 s/n 003736 @ 2005 H droCAD Software Solutions LLC 4/25/2006 Subcatchment EDA: Overall Pre-Development Drainage Area Hydrograph - --' - -" --" -- —Runoff 470.87 ds 1-"' ---;.--_.- - _.- -.- Runoff--470.87 cfs @ 12.34 hrs - Type II-24-hr 10=Year Rainfall=5.10" Runoff Area=334.681 ac hrs soo- Runoff Volume=' 53.770 of 3 250- Runoff Depth>1.93" LL Flow Length=6,691' 200 Tc=37.0 min _ - CN=68-- 100- ..... - .. .. _ Time (hours) OVERALL SITE HYDROLOGY, 2- AND 10 -YR STORM EVENTS, POST -DEVELOPMENT COVER CONDITION ODA verall DA1 B Post evelopment — Dr inage Area Wass to DP 1 DA1 Drainage Area 1 ODP DA2 Overall Drainage Area 2 Post-Developmen Drainage Point DA3 B Bypass to DP 3 DA3 Drainage Area 3 SUbCa Reach and Link Drainage Diagram for 0597 Overall - no ponds Prepared by Horvath Associates, P.A. 4125/2006 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD SDfh'Mre Solutions LLC S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Overall - no ponds Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by Horvath Associates, P.A. Page 2 H droCAD® 7.10 s/n 003736 0 2005 H droCAD Software Solutions LLC 4/25/2006 Subcatchment DA1: Drainage Area 1 Runoff = 95.04 cfs @ 11.96 hrs, Volume= 4.341 af, Depth> 2.10" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area ac CN Description 0.318 61 >75% Grass cover, Good, HSG B 1.194 74 >75% Grass cover, Good, HSG C 0.044 75 1/4 acre lots, 38% imp, HSG B 0.236 83 1/4 acre lots, 38% imp, HSG C 0.341 85 1/8 acre lots, 65% imp, HSG B 16.745 90 1/8 acre lots, 65% imp, HSG C 2.382 74 Farmsteads, HSG B 3.596 82 Farmsteads, HSG C 24.856 86 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA1 B: Bypass to DP 1 Runoff = 1.86 cfs @ 11.97 hrs, Volume= 0.083 af, Depth> 1.24" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area ac CN Description 0.809 74 >75% Grass cover, Good, HSG C Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA2: Drainage Area 2 Runoff = 33.50 cfs @ 11.96 hrs, Volume= 1.502 af, Depth> 1.71" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type 11 24 -hr 2 -Year Rainfall=3.50" S:\@ST ORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Overall - no ponds Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by Horvath Associates, P.A. Page 3 HvdroCAD® 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 4/25/2006 Area (ac) CN Description 5.465 75 1/4 acre lots, 38% imp, HSG B 2.829 83 1/4 acre lots, 38% imp, HSG C 0.052 85 118 acre lots, 65% imp, HSG B 1.467 90 1/8 acre lots, 65% imp, HSG C 0.026 92 Urban commercial, 85% imp, HSG B 0.725 94 Urban commercial 85% imp HSG C 10.564 81 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA3: Drainage Area 3 Runoff = 95.49 cfs @ 11.96 hrs, Volume= 4.415 af, Depth> 2.27' Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type It 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 3.459 75 1/4 acre lots, 38% imp, HSG B 1.708 83 114 acre lots, 38% imp, HSG C 2.494 85 1/8 acre lots, 65% imp, HSG B 9.385 90 1/8 acre lots, 65% imp, HSG C 0.299 92 Urban commercial, 85% imp, HSG B 6.034 94 Urban commercial 85% imp HSG C 23.379 88 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA3 B: Bypass to DP 3 Runoff = 2.93 cfs @ 11.98 hrs, Volume= 0.144 af, Depth> 0.66" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 1.515 55 Woods, Good, HSG B i 119 75 1/4 acre lots 38% imp HSG B 2.634 63 Weighted Average S:\@STORMWATER DEPII@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Overall - no ponds Type// 24 -hr 2 -Year Rainfall=3.50" Prepared by Horvath Associates, P.A. Page 4 HvrImCADD 7.10 s/n 003736 @ 2005 HydroCAD Software Solutions LLC 4/25/2006 Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment ODA: Overall Post -Development Drainage Area Runoff = 156.56 cfs @ 12.37 hrs, Volume= 19.725 af, Depth> 0.89" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (sf) CN Description 469,882 61 >75% Grass cover, Good, HSG B 2,159,792 74 >75% Grass cover, Good, HSG C 266,805 80 >75% Grass cover, Good, HSG D 3,711,704 55 Woods, Good, HSG B 2,492,677 70 Woods, Good, HSG C 1,036,859 77 Woods, Good, HSG D 126,368 68 1 acre lots, 20% imp, HSG B 237,054 79 1 acre lots, 20% imp, HSG C 41,687 98 Paved roads w/curbs & sewers 373,091 98 Paved roads w/curbs & sewers 70,088 98 Paved roads w/curbs & sewers 126,484 75 1/4 acre lots, 38% imp, HSG B 211,074 83 1/4 acre lots, 38% imp, HSG C 281,894 87 1/4 acre lots, 38% imp, HSG D 11,605,459 68 Weighted Average Tc Length Slope Velocity Capacity Description 12.2 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.60" 5.7 451 0.0687 1.3 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 3.0 982 0.0224 5.5 71.73 Trap/Vee/Rett Channel Flow, Bot.W=0.50' D=2.00' Z=3.0'/' Top.W=12.50' n= 0.040 Winding stream, pools & shoals 8.8 2,944 0.0132 5.6 167.94 Trap/Vee/Rett Channel Flow, Bot.W=1.00' D=3.00' Z= 3.0'/' Top.W=19.00' n= 0.040 Winding stream, pools & shoals 7.3 2,239 0.0069 5.1 305.58 TrapNee/Rett Channel Flow, Bot.W=3.00' D=4.00' Z= 3.0'/' Top.W=27.00' n= 0.040 Winding stream pools & shoals 37.0 6,691 Total S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 overall e no ponds Type 1124 -hr 2 -Year Rainfall=3.50" Page 5 Prepared by Horvath Associates, P.A. 4/25/2006 HvrtrnCADn 7.10 s/n 003736 © 2005 H droCAD Software Solutions LLC Link ODP: Overall Post -Development Drainage Point Inflow Area = 328.667 ac, Inflow Depth > 1.10" for 2 -Year event Inflow = 247.37 cfs @ 247.37 @ 11.97 hrs, Volume= 11.97 hrs, Volume= 30.212 of 30.212 af, Atten= 0%, Lag= 0.0 min Primary = cfs Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs S:\@STORMWATER DEPT1@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Overall - no ponds Type 1124 -hr 2 -Year Rainfall=3.50" Page 1 Prepared by Horvath Associates, P.A. H droCADO 7.10 s/n 003736 © 2005 H droCAD Software Solutions LLC 4/951200 6 Fink ODP: Overall Post -Development Drainage Point Hydrograph - - - FInflow 260: - 247.37 cfs 11.97 hrs - - _ Primary Pnma 240- Inflow Area=328.667 aC Inflow=247.37 cfs @ 11.97 hrs 220= Primary=247.37 cfs @ 11.97 hrs 200: 180.: 160 m 3 140_ O M 120_.- 100- 60- 40 20- 01 11 12 13 14 10 Time (hours) S:\@STORMWATER DEP-R@PROJECTS\05\0597 0597 Overall - no ponds Prepared by Horvath Associates, P.A. HvrirnCAD(R7.10 sfn 003736 © 2005 HydroCAD Softw< - Four Seasons at Renaissance (Chin Page Road)\ Type Il 24 -hr 10 -Year Rainfall=5.10" Page 6 LLC Subcatchment DA1: Drainage Area 1 Runoff = 156.91 cfs @ 11.96 hrs, Volume= 7.367 af, Depth> 3.56" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area ac CN Description 0.318 61 >75% Grass cover, Good, HSG B 1.194 74 >75% Grass cover, Good, HSG C 0.044 75 1/4 acre lots, 38% imp, HSG B 0.236 83 1/4 acre lots, 38% imp, HSG C 0.341 85 1/8 acre lots, 65% imp, HSG B 16.745 90 1/8 acre lots, 65% imp, HSG C 2.382 74 Farmsteads, HSG B 3.596 82 Farmsteads, HSG C 24.856 86 Weighted Average Tc Length Slope Description 5.0 Direct Entry, Subcatchment DA1 B: Bypass to DP 1 Runoff = 3.67 cfs @ 11.96 hrs, Volume= 0.165 af, Depth> 2.44" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type[[ 24 -hr 10 -Year Rainfall=5.10" Area ac CN Description 0.809 74 >75% Grass cover, Good, HSG C Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA2: Drainage Area 2 Runoff = 59.13 cfs @ 11.96 hrs, Volume= 2.703 af, Depth> 3.07" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.10" S:\@STORMWATER DEPT\@PROJECTS\05\0597 0597 Overall - no ponds Prepared by Horvath Associates, P.A. H%drnCAD® 7.10 s/n 003736 © 2005 HydroCAD SofW - Four Seasons at Renaissance (Chin Page Road)\ Type 1124 -hr 10 -Year Rainfall=5.10" Page 7 Area ac CN Descri tion 5.465 75 1/4 acre lots, 38% imp, HSG B 2.829 83 1/4 acre lots, 38% imp, HSG C 0.052 85 1/8 acre lots, 65% imp, HSG B 1.467 90 1/8 acre lots, 65% imp, HSG C 0.026 92 Urban commercial, 85% imp, HSG B 0.725 94 Urban commercial, 85% imp, HSG C 10.564 81 Weighted Average Tc Length Slope Velocity Capacity Description On) (feet) (ft/ft) (f Isec) (cfs) 5.0 Direct Entry, Runoff = 153.78 cfs @ 11.96 hrs, Volume= 7.326 af, Depth> 3.76" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area ac CN Description 3.459 75 1/4 acre lots, 38% imp, HSG B 1.708 83 1/4 acre lots, 38% imp, HSG C 2.494 85 1/8 acre lots, 65% imp, HSG B 9.385 90 118 acre lots, 65% imp, HSG C 0.299 92 Urban commercial, 85% imp, HSG B 6.034 94 Urban commercial, 85% imp, HSG C 23.379 88 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA3 B: Bypass to DP 3 Runoff = 7.62 cfs @ 11.97 hrs, Volume= 0.345 af, Depth> 1.57' Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area ac CN Description 1.515 55 Woods, Good, HSG B 1.119 75 1/4 acre lots, 38% imp, HSG B 2.634 63 Weighted Average S:\@STORMWATER DEPT\@PROJECTS\05\0597 0597 Overall - no ponds Prepared by Horvath Associates, P.A. HvdmCAD® 7.10 s/n 003736 © 2005 HydroCAD Softw< Four Seasons at Renaissance (Chin Page Road)\ Type 1124 -hr 10 -Year Rainfall=5.10" Page 8 Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Runoff = 374.84 cfs @ 12.34 hrs, Volume= 42.804 af, Depth> 1.93" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (sf) CN Description 469,882 61 >75% Grass cover, Good, HSG B 2,159,792 74 >75% Grass cover, Good, HSG C 266,805 80 >75% Grass cover, Good, HSG D 3,711,704 55 Woods, Good, HSG B 2,492,677 70 Woods, Good, HSG C 1,036,859 77 Woods, Good, HSG D 126,368 68 1 acre lots, 20% imp, HSG B 237,054 79 1 acre lots, 20% imp, HSG C 41,687 98 Paved roads w/curbs & sewers 373,091 98 Paved roads w/curbs & sewers 70,088 98 Paved roads w/curbs & sewers 126,484 75 1/4 acre lots, 38% imp, HSG B 211,074 83 1/4 acre lots, 38% imp, HSG C 281,894 87 1/4 acre lots, 38% imp, HSG D 11,605,459 68 Weighted Average Tc Length Slope Velocity Capacity Description 12.2 75 0.0400 0.1 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.60" 5.7 451 0.0687 1.3 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 3.0 982 0.0224 5.5 71.73 TrapNee/Rett Channel Flow, Bot.W=0.50' D=2.00' Z=3.0? Top.W=12.50' n= 0.040 Winding stream, pools & shoals 8.8 2,944 0.0132 5.6 167.94 TrapNee/Rect Channel Flow, Bot.W=1.00' D=3.00' Z=3.0'/' Top -W=19-00' n= 0.040 Winding stream, pools & shoals 7.3 2,239 0.0069 5.1 305.58 TrapNee/Rett Channel Flow, Bot.W=3.00' D=4.00' Z= 3.07' Top.W=27.00' n= 0.040 Winding stream pools & shoals 37.0 6,691 Total S:\@STORMWATER DEPII@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Overall - no ponds Type 1124 -hr 10 -Year Rainfall=5.10" Prepared by Horvath Associates, P.A. Page 9 HydroCAD® 7.10 s/n 003736 @ 2005 H droCAD Software Solutions LLC 4/25/2006 Inflow Area = 328.667 ac, Inflow Depth > 2.22" for 10 -Year event Inflow = 459.91 cfs @ 11.97 hrs, Volume= 60.709 of Primary = 459.91 cfs @ 11.97 hrs, Volume= 60.709 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Overall - no ponds Type 1124 -hr 10 -Year Rainfall=5.10" Page 2 Prepared by Horvath Associates, P.A. H droCADO 7.10 s/n 003736 0 2005 H droCAD Software Solutions LLC 4125/2006 Link ODP: Overall Post -Development Drainage Point Hydrograph 500P - -Inflow 459.91 cts 11.97 hrs primary 450 Inflow Area=328.667 ac 400- o;459.91 cfs @ 11.97 hrs- rim =459.91 cfs @ 11.97 hrs 350_ � 300_ Fi ii 250-. - - - - LL 200 10 11 12 13 10 Time. (hours) ESIC Pre-Dev Stirrup Iron Creek EDA8 sting Drainage Area 8 EDP Pre-Dev Drainage Point 8 PSIC Post-Dev Stirrup Iron Creek Lai Post-Dev Drai age Area oSt- ev Drainage 8A 8B DB5 PDP Post-Dev Detention Pond #5 Post-Dev Drainage Point Subca Reach A Link S:\@STORMWATER DEPT@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Stirrup Iron Creek Type// 24 -hr 2 -Year Ralnfall=3.50" Prepared by Horvath Associates, P.A. Page 2 HvdroCADO 7.10 s/n 003736 @ 2005 HydroCAD Software Solutions LLC 8/24/2006 Time span=0.00-60.00 hrs, dt=0.01 hrs, 6001 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment EDA8: Existing Drainage Area 8 Runoff Area=9.216 ac Runoff Depth=1.06" Flow Length=1,414' Tc=15.5 min CN=71 Runoff=11.86 cfs 0.817 of Subcatchment ESIC: Pre-Dev Stirrup Iron Creek Subcatchment PDA8A: Post-Dev Drainage Area 8A Subcatchment PDA8B: Post-Dev Drainage Area 8B Subcatchment PSIC: Post-Dev Stirrup Iron Creek Runoff Area=2,880.000 ac Runoff Depth=0.75" Tc=220.0 min CN=65 Runoff=359.66 cfs 180.477 of Runoff Area=23.091 ac Runoff Depth=1.86" Tc=5.0 min CN=83 Runoff=79.21 cfs 3.576 of Runoff Area=10.581 ac Runoff Depth=1.94" Tc=5.0 min CN=84 Runoff=37.68 cfs 1.707 of Runoff Area=2,880.000 ac Runoff Depth=0.75" Tc=220.0 min CN=65 Runoff=359.66 cfs 180.477 of Pond PDB5: Post-Dev Detention Pond #5 Peak Elev=327.19' Storage=82,275 cf Inflow=116.90 cfs 5.284 of Primary=17.93 cfs 4.236 of Secondary=55.96 cfs 0.812 of Outflow --73.89 cfs 5.048 of Link EDP: Pre-Dev Drainage Point 8 Link PDP: Post-Dev Drainage Point 8 Inflow --360.24 cfs 181.294 of Primary=360.24 cfs 181.294 of Inflow --363.26 cfs 185.526 of Primary=363.26 cfs 185.526 of S:\@STORMWATER DEPT@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Stirrup Iron Creek Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by Horvath Associates, P.A. Page 3 HvdroCADO 7.10 sin 003736 @ 2005 HydroCAD Software Solutions LLC 8/24/2006 Subcatchment EDA8: Existing Drainage Area 8 Runoff = 11.86 cfs @ 12.09 hrs, Volume= 0.817 af, Depth= 1.06" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 1.072 74 >75% Grass cover, Good, HSG C 0.015 55 Woods, Good, HSG B 7.369 70 Woods, Good, HSG C 0.760 77 Woods, Good, HSG D 9.216 71 Weighted Average Tc Length Slope Velocity Capacity Description 11.5 75 0.0173 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" 3.4 707 0.0471 3.5 Shallow Concentrated Flow, Unpaved Kv=16.1 fps 0.6 632 0.0372 18.3 836.51 Trap/Vee/Rett Channel Flow, Bot.W=0.50' D=1.50' Z= 20.0'1' Top.W=60.50' n= 0.013 15.5 1,414 Total Subcatchment ESIC: Pre-Dev Stirrup Iron Creek Runoff = 359.66 cfs @ 15.15 hrs, Volume= 180.477 af, Depth= 0.75" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description - 2,880.000 65 Brush, Good, HSG C Tc Length Slope Velocity Capacity Description 220.0 Direct Entry, Subcatchment PDA8A: Post-Dev Drainage Area 8A Runoff = 79.21 cfs @ 11.96 hrs, Volume= 3.576 af, Depth= 1.86" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Type 11 24 -hr 2 -Year Rainfall=3.50" S:\@STORMWATER DEPT@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Stirrup Iron Creek Type 1124 -hr 2 -Year Rainfall=3.50" Prepared by Horvath Associates, P.A. Page 4 HydroCAD@ 7.10.. sin 003736 @2005 HydroCAD Software Solutions LLC 8/24/2006 Area (ac) CN Description 1.718 75 1/4 acre lots, 38% imp, HSG B 16.365 83 1/4 acre lots, 38% imp, HSG C 3.747 87 1/4 acre lots, 38% imp, HSG D 0.569 90 1/8 acre lots, 65% imp, HSG C 0.692 92 1/8 acre lots 65% imp HSG D 23.091 83 Weighted Average 1/8 acre lots, Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment PDA86: Post-Dev Drainage Area 86 Runoff = 37.68 cfs @ 11.96 hrs, Volume= 1.707 af, Depth= 1.94" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 3.600 75 1/4 acre lots, 38% imp, HSG B 0.986 83 1/4 acre lots, 38% imp, HSG C 1.056 87 1/4 acre lots, 38% imp, HSG D 0.195 85 1/8 acre lots, 65% imp, HSG B 1.537 90 1/8 acre lots, 65% imp, HSG C 3.207 92 1/8 acre lots 65% imp HSG D 10.581 84 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment PSIC: Post-Dev Stirrup Iron Creek Runoff = 359.66 cfs @ 15.15 hrs, Volume= 180.477 af, Depth= 0.75" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 2,880.000 65 Brush, Good, HSG C Tc Length Slope Velocity Capacity Description 220.0 Direct Entry, S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Stirrup Iron Creek Type// 24 -hr 2 -Year Rainfall=3.50" Prepared by Horvath Associates, P.A. Page 5 HxMm('AIXR) 7.10 s/n 003736 @2005 HydroCAD Software Solutions LLC 8/24/2006 Pond PDBS: Post-Dev Detention Pond #5 Inflow Area = 33.672 ac, Inflow Depth= 1.88" for 2 -Year event Inflow = 116.90 cfs @ 11.96 hrs, Volume= 5.284 of Outflow = 73.89 cfs @ 12.03 hrs, Volume= 5.048 af, Atten= 37%, Lag= 4.0 min Primary = 17.93 cfs @ 12.03 hrs, Volume= 4.236 of Secondary = 55.96 cfs @ 12.03 hrs, Volume= 0.812 of Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Peak Elev= 327.19'@ 12.03 hrs Surf.Area= 29,773 sf Storage= 82,275 cf Plug -Flow detention time= 180.6 min calculated for 5.048 of (96% of inflow) Center -of -Mass det. time= 155.1 min ( 978.8 - 823.7 ) Volume Invert Avail Storage Storage Description #1 324.00' 140,350 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 324.00 21,888 0 0 326.00 26,720 48,608 48,608 328.00 31,843 58,563 107,171 329.00 34,514 33,179 140,350 Device Routing Invert Outlet Devices #1 Primary 322.00' 18.0" x 50.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 321.50' S= 0.0100'1' Cc= 0.900 n=0.013 #2 Device 1 324.00' 2.0" Vert. Siphon C= 0.600 #3 Device 1 324.75' 1.00' W x 0.50' H Vert. Orifice C=0.600 #4 Device 1 325.25' 48.0" Vert. Riser Crest C= 0.600 #5 Secondary 326.50' 30.0' long (Profile 6) Emergency Spillway Head (feet) 0.49 0.98 1.48 Coef. (English) 3.12 3.41 3.59 Primary OutFlow Max=17.93 cfs @ 12.03 hrs HW=327.19' (Free Discharge) L1=Barrel (Inlet Controls 17.93 cfs @ 10.1 fps) Siphon (Passes < 0.19 cfs potential flow) 3 -Orifice (Passes < 3.56 cfs potential flow) Riser Crest (Passes < 28.69 cfs potential flow) Secondary OutFlow Max=55.85 cfs @ 12.03 hrs HW=327.19' (Free Discharge) t-5=Emergency Spillway (Weir Controls 55.85 cfs @ 2.7 fps) Link EDP: Pre-Dev Drainage Point 8 Inflow Area = 2,889.216 ac, Inflow Depth = 0.75" for 2 -Year event Inflow = 360.24 cfs @ 15.15 hrs, Volume= 181.294 of Primary = 360.24 cfs @ 15.15 hrs, Volume= 181.294 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Stirrup Iron Creek Type 1124 -hr 2 -Year Rainfa11=3.50" Prepared by Horvath Associates, P.A. Page 6 H droCADO 7.10 sin 003736 @ 2005 H droCAD Software Solutions LLC 8/24/2006 Link PDP: Post-Dev Drainage Point 8 Inflow Area = 2,913.672 ac, Inflow Depth > 0.76" for 2 -Year event Inflow = 363.26 cfs @ 15.15 hrs, Volume= 185.526 of Primary = 363.26 cfs @ 15.15 hrs, Volume= 185.526 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Stirrup Iron Creek Type// 24 -hr 10 -Year Ralnfall=5.10" Prepared by Horvath Associates, P.A. Page 7 HydroCAD@ 7.10 s/n 003736 @ 2005 HydroCAD Software Solutions LLC 8/24/2006 Time span=0.00-60.00 hrs, dt=0.01 hrs, 6001 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment EDA8: Existing Drainage Area 8 Runoff Area=9.216 ac Runoff Depth=2.19" Flow Length=1,414' Tc=15.5 min CN=71 Runoff=25.57 cfs 1.684 of Subcatchment ESIC: Pre-Dev Stirrup Iron Creek Subcatchment PDA8A: Post-Dev Drainage Area 8A Subcatchment PDA8B: Post-Dev Drainage Area 8B Subcatchment PSIC: Post-Dev Stirrup Iron Creek Runoff Area=2,880.000 ac Runoff Depth=1.72" Tc=220.0 min CN=65 Runoff=916.75 cfs 412.900 of Runoff Area=23.091 ac Runoff Depth=3.26" Tc=5.0 min CN=83 Runoff=136.01 cfs 6.282 of Runoff Area=10.581 ac Runoff Depth=3.36" Tc=5.0 min CN=84 Runoff=63.84 cfs 2.964 of Runoff Area=2,880.000 ac Runoff Depth=1.72" Tc=220.0 min CN=65 Runoff=916.75 cfs 412.900 of Pond PD135: Post-Dev Detention Pond #5 Peak Elev=327.80' Storage=100,949 cf Inflow --199.86 cfs 9.247 of Primary=19.13 cfs 5.987 of Secondary=157.39 cfs 3.020 of Outflow=176.52 cfs 9.007 of Link EDP: Pre-Dev Drainage Point 8 Link PDP: Post-Dev Drainage Point 8 Inflow --917.83 cfs 414.584 of Primary=917.83 cfs 414.584 of Inflow --922.43 cfs 421.907 of Primary=922.43 cfs 421.907 of S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Stirrup Iron Creek Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by Horvath Associates, P.A. Page 8 HvdroCAD@ 7.10 s/n 003736 02005 HydroCAD Software Solutions LLC 8/24/2006 Subcatchment EDAB: Existing Drainage Area 8 Runoff = 25.57 cfs @ 12.08 hrs, Volume= 1.684 af, Depth= 2.19" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 1.072 74 >75% Grass cover, Good, HSG C 0.015 55 Woods, Good, HSG B 7.369 70 Woods, Good, HSG C 0.760 77 Woods, Good, HSG D 9.216 71 Weighted Average Tc Length Slope Velocity Capacity Description 11.5 75 0.0173 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" 3.4 707 0.0471 3.5 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.6 632 0.0372 18.3 836.51 Trap/Vee/Rett Channel Flow, Bot.W=0.50' D=1.50' Z= 20.0'/' Top.W=60.50' n= 0.013 15.5 1,414 Total Subcatchment ESIC: Pre-Dev Stirrup Iron Creek Runoff = 916.75 cfs @ 14.91 hrs, Volume= 412.900 af, Depth= 1.72" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 2,880.000 65 Brush, Good, HSG C Tc Length Slope Velocity Capacity Description 220.0 Direct Entry, Subcatchment PDA8A: Post-Dev Drainage Area 8A Runoff = 136.01 cfs @ 11.96 hrs, Volume= 6.282 af, Depth= 3.26" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Type 11 24 -hr 10 -Year Rainfall=5.10" S:\@STORMWATER DEPT\@PROJECTS\05\0597 0597 Stirrup Iron Creek Prepared by Horvath Associates, P.A. HvdroCADO 7.10 s/n 003736 © 2005 HydroCAD Softwa - Four Seasons at Renaissance (Chin Page Road)\ Type 11 24 -hr 10 -Year Rainfall=5.10" Page 9 Area ac CN Description 1.718 75 1/4 acre lots, 38% imp, HSG B 16.365 83 1/4 acre lots, 38% imp, HSG C 3.747 87 1/4 acre lots, 38% imp, HSG D 0.569 90 1/8 acre lots, 65% imp, HSG C 0.692 92 1/8 acre lots 65% imp HSG D 23.091 83 Weighted Average To Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment PDA813: Post-Dev Drainage Area 8B Runoff = 63.84 cfs @ 11.96 hrs, Volume= 2.964 af, Depth= 3.36" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area ac CN Description 3.600 75 1/4 acre lots, 38% imp, HSG B 0.986 83 1/4 acre lots, 38% imp, HSG C 1.056 87 1/4 acre lots, 38% imp, HSG D 0.195 85 1/8 acre lots, 65% imp, HSG B 1.537 90 1/8 acre lots, 65% imp, HSG C 3.207 92 1/8 acre lots 65% imp HSG D 10.581 84 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment PSIC: Post-Dev Stirrup Iron Creek Runoff = 916.75 cfs @ 14.91 hrs, Volume= 412.900 af, Depth= 1.72" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 2,880.000 65 Brush, Good, HSG C Tc Length Slope Velocity Capacity Description 220.0 Direct Entry, S:\@STORMWATER DEPT\@PROJECTS\05\0597 0597 Stirrup Iron Creek Prepared by Horvath Associates, P.A. HvdrnCADn 7.10 s/n 003736 @ 2005 HydroCAD Softw Four Seasons at Renaissance (Chin Page Road)\ Type 1124 -hr 10 -Year Rainfall=5.10" Page 10 LLC Pond PDBS: Post-Dev Detention Pond #5 Inflow Area = 33.672 ac, Inflow Depth = 3.30" for 10 -Year event Inflow = 199.86 cfs @ 11.96 hrs, Volume= 9.247 of Outflow = 176.52 cfs @ 11.99 hrs, Volume= 9.007 af, Atten= 12%, Lag= 2.1 min Primary = 19.13 cfs @ 11.99 hrs, Volume= 5.987 of Secondary = 157.39 cfs @ 11.99 hrs, Volume= 3.020 of Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs Peak Elev= 327.80'@ 11.99 hrs Surf.Area= 31,338 sf Storage= 100,949 cf Plug -Flow detention time= 118.4 min calculated for 9.006 of (97% of inflow) Center -of -Mass det. time= 103.1 min ( 910.9 - 807.7 ) Volume Invert Avail Storage Storage Description #1 324.00' 140,350 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area 917.83 cfs @ Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 324.00 21,888 0 0 326.00 26,720 48,608 48,608 328.00 31,843 58,563 107,171 329.00 34,514 33,179 140,350 Device Routing Invert Outlet Devices #1 Primary 322.00' 18.0" x 50.0' long Barrel RCP, square edge headwall, Ke= 0.500 Outlet Invert= 321.50' S=0.0100'/' Cc= 0.900 n=0.013 #2 Device 1 324.00' 2.0" Vert. Siphon C= 0.600 #3 Device 1 324.75' 1.00' W x 0.50'H Vert. Orifice C=0.600 #4 Device 1 325.25' 48.0" Vert. Riser Crest C= 0.600 #5 Secondary 326.50' 30.0' long (Profile 6) Emergency Spillway Head (feet) 0.49 0.98 1.48 Coef. (English) 3.12 3.41 3.59 Primary OutFlow Max=19.12 cfs @ 11.99 hrs HW=327.80' (Free Discharge) t-1=Barrel (Inlet Controls 19.12 cfs @ 10.8 fps) E Siphon (Passes < 0.20 cfs potential flow) -Orifice (Passes < 4.03 cfs potential flow) Riser Crest (Passes < 46.01 cfs potential flow) Secondary OutFlow Max=157.01 cfs @ 11.99 hrs HW=327.80' (Free Discharge) t-s=Emergency Spillway (Weir Controls 157.01 cfs @ 4.0 fps) Link EDP: Pre-Dev Drainage Point 8 Inflow Area = 2,889.216 ac, Inflow Depth = 1.72" for 10 -Year event Inflow = 917.83 cfs @ 14.91 hrs, Volume= 414.584 of Primary = 917.83 cfs @ 14.91 hrs, Volume= 414.584 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Stirrup Iron Creek Type 1124 -hr 10 -Year Rainfall=5.10" Prepared by Horvath Associates, P.A. Page 11 H%Arnr.Ar)c17.10 s/n 003736 @ 2005 HvdroCAD Software Solutions LLC 8/24/2006 Link PDP: Post-Dev Drainage Point 8 Inflow Area = 2,913.672 ac, Inflow Depth = 1.74" for 10 -Year event Inflow = 922.43 cfs @ 14.91 hrs, Volume= 421.907 of Primary = 922.43 cfs @ 14.91 hrs, Volume= 421.907 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-60.00 hrs, dt= 0.01 hrs SUB -BASIN HYDROLOGY, 1 -YEAR STORM EVENT, POST -DEVELOPMENT COVER CONDITIONS SITE SUB-BASIN HYDROLOGY I-YEAR STORM EVENT DEVELOPMENT COVER CONDITIO DP9 o--- DA9 Drainage Point Drainage Area DAB E� Drelnage Area 8 DPII DA8B Drainage Point Drainage Point DA16 Drama Area 6 Area 8B b DA7 DP6 Drainage Aa 7 Drainage Point 6 �OP7 Drainage Point 7 Drair q Reach A [i8 DP1 DA1 Drainage Point Drainage Area 1 DP2 Drainage Point DA2 DP3 Drainage Area 2 Drainage Point 3 DP4 E3 Drainage Poin 4 DA4 Drainage Area 5 Drainage Area 4 Drainage Area 3 S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Pre -Development Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page'? 14 rimr.Ann 7.10 s/n 003736 @ 2005 HydroCAD Software Solutions LLC 8/24/2006 Time span=0.00-24.00 hrs, dt=0.01 hrs, 2401 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment DA1: Drainage Area 1 Runoff Area=24.899 ac Runoff Depth>0.96" Flow Length=1,177' Tc=12.6 min CN=75 Runoff=32.53 cfs 1.985 of Subcatchment DA2: Drainage Area 2 Runoff Area=3.995 ac Runoff Depth>0.40" Flow Length=845' Tc=13.2 min CN=62 Runoff=1.50 cfs 0.132 of Subcatchment DA3: Drainage Area 3 Runoff Area=25.216 ac Runoff Depth>0.62" Flow Length=1,753' Tc=12.3 min CN=68 Runoff=19.60 cfs 1.310 of Subcatchment DA4: Drainage Area 4 Runoff Area=4.134 ac Runoff Depth>0.58" Flow Length=1,333' Tc=16.1 min CN=67 Runoff=2.50 cfs 0.200 of Subcatchment DA5: Drainage Area 5 Runoff Area=13.818 ac Runoff Depth>0.67" Flow Length=1,859' Tc=15.1 min CN=69 Runoff=10.47 cfs 0.766 of Subcatchment DA6: Drainage Area 6 Runoff Area=11.093 ac Runoff Depth>0.90" Flow Length=1,382' Tc=13.3 min CN=74 Runoff=13.21 cfs 0.836 of Subcatchment DA7: Drainage Area 7 Runoff Area=3.625 ac Runoff Depth>0.50" Flow Length=724' Tc=11.2 min CN=65 Runoff=2.19 cfs 0.152 of Subcatchment DAB: Drainage Area 8 Runoff Area=9.216 ac Runoff Depth>0.76" Flow Length=1,414' Tc=15.5 min CN=71 Runoff=8.12 cfs 0.581 of Subcatchment DABB: Drainage Area 8B Runoff Area=66.688 sf Runoff Depth>0.80" Flow Length=635' Tc=11.2 min CN=72 Runoff=1.72 cfs 0.103 of Subcatchment DA9: Drainage Area 9 Runoff Area=7.655 ac Runoff Depth>0.54" Flow Length=1,124' Tc=15.0 min CN=66 Runoff=4.35 cfs 0.345 of Link DPI: Drainage Point 1 Inflow --32.53 cfs 1.985 of Primary=32.53 cfs 1.985 of Link DP2: Drainage Point 2 Inflow=1.50 cfs 0.132 of Primary=1.50 cfs 0.132 of Link DP3: Drainage Point 3 Inflow=19.60 cfs 1.310 of Primary=19.60 cfs 1.310 of Link DP4: Drainage Point 4 Inflow --2.50 cfs 0.200 of Primary=2.50 cfs 0.200 of Link DPS: Drainage Point 5 Inflow --I 0.47 cfs 0.766 of Primary=10.47 cfs 0.766 of S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Pre -Development Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 3 HvdroCAD@ 7.10 s/n 003736 @2005 HydroCAD Software Solutions LLC 8/24/2006 Link DP6: Drainage Point 6 Link DP7: Drainage Point 7 Link DP8: Drainage Point 8 Link DPBB: Drainage Point 8 Link DP9: Drainage Point 9 Inflow -13.21 cfs 0.836 of Primary=13.21 cfs 0.836 of Inflow -2.19 cfs 0.152 of Primary=2.19 cfs 0.152 of Inflow=8.12 cfs 0.581 of Primary=8.12 cfs 0.581 of Inflow --1.72 cfs 0.103 of Primary=1.72 cfs 0.103 of Inflow --4.35 cfs 0.345 of Primary=4.35 cfs 0.345 of S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Pre -Development Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 4 Subcatchment DA1: Drainage Areal Runoff = 32.53 cfs @ 12.05 hrs, Volume= 1.985 af, Depth> 0.96" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.516 61 >75% Grass cover, Good, HSG B 17.853 74 >75% Grass cover, Good, HSG C 0.000 55 Woods, Good, HSG B 0.856 70 Woods, Good, HSG C 2.192 74 Farmsteads, HSG B 3.482 82 Farmsteads, HSG C 24.899 75 Weighted Average Tc Length Slope Velocity Capacity Description 8.2 75 0.0400 0.2 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" 2.8 620 0.0516 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.6 482 0.0415 5.0 29.96 TrapNee/Rett Channel Flow, Bot.W=1.00' D=1.00' Z= 5.07' Top.W=11.00' n= 0.040 Windinq stream, pools & shoals 12.6 1,177 Total Subcatchment DA2: Drainage Area 2 Runoff = 1.50 cfs @ 12.09 hrs, Volume= 0.132 af, Depth> 0.40" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 1.584 61 >75% Grass cover, Good, HSG B 0.331 74 >76% Grass cover, Good, HSG C 1.199 55 Woods, Good, HSG B 0.881 70 Woods, Good, HSG C 3.995 62 Weighted Average S:\@STORMWATER DEPT@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Pre -Development Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 5 HvrIroCAD® 7.10 s/n 003736 @2005 HydroCAD Software Solutions LLC 8/24/2006 Tc Length Slope Velocity Capacity Description 10.8 75 0.0200 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" 1.2 293 0.0631 4.0 Shallow Concentrated Flow, Unpaved Kv=16.1 fps 1.2 477 0.0734 6.4 61.07 TrapNee/Rett Channel Flow, Bot.W=0.50' D=1.00' Z=_9.0'/' Top.W=18.50' n= 0.040 13.2 845 Total Subcatchment DA3: Drainage Area 3 Runoff = 19.60 cfs @ 12.06 hrs, Volume= 1.310 af, Depth> 0.62" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 1.752 61 >75% Grass cover, Good, HSG B 13.439 74 >75% Grass cover, Good, HSG C 5.681 55 Woods, Good, HSG B 4.344 70 Woods, Good, HSG C 25.216 68 Weighted Average Tc Length Slope Velocity Capacity Description 6.8 75 0.0640 0.2 2.4 591 0.0626 4.0 2.1 555 0.0360 4.5 38.31 1.0 532 0.0395 9.2 180.29 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" Shallow Concentrated Flow, Unpaved Kv= 16.1 fps TrapNee/Rett Channel Flow, Bot.W=0.50' D=1.00' Z= 8.07' Top.W=16.50' n= 0.040 TrapNee/Rett Channel Flow, 12.3 1,753 Total Subcatchment DA4: Drainage Area 4 Runoff = 2.50 cfs @ 12.11 hrs, Volume= 0.200 af, Depth> 0.58" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.128 61 >76% Grass cover, Good, HSG B 1.709 74 >75% Grass cover, Good, HSG C 1.334 55 Woods, Good, HSG B 0.963 70 Woods, Good, HSG C 4.134 67 Weighted Average S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Pre -Development Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 6 HvdmCAD® 7.10 s/n 003736 @ 2005 HydroCAD Software Solutions LLC 8/24/2006 Tc Length Slope Velocity Capacity Description 11.1 75 0.0187 0.1 Sheet Flow, >75% Grass cover, Good, HSG B 2.537 74 >75% Grass cover, Good, HSG C Grass: Dense n= 0.240 P2= 3.50" 1.3 233 0.0330 2.9 Shallow Concentrated Flow, 13.818 69 Weighted Average Unpaved Kv= 16.1 fps 3.0 537 0.0149 3.0 34.26 Trap/Vee/Rett Channel Flow, Bot.W=1.50' D=1.00' Z= 10.0'/' Top.W=21.50' n= 0.040 0.7 488 0.0963 12.2 414.34 Trap/Vee/Rett Channel Flow, Bot.W=3.00' D=2.00' Z= 7.0? Top.W=31.00' n= 0.040 16.1 1,333 Total Subcatchment DA5: Drainage Area 5 Runoff = 10.47 cfs @ 12.09 hrs, Volume= 0.766 af, Depth> 0.67" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area ac CN Description 0.714 61 >75% Grass cover, Good, HSG B 2.537 74 >75% Grass cover, Good, HSG C 0.995 55 Woods, Good, HSG B 9.572 70 Woods, Good, HSG C 13.818 69 Weighted Average Tc Length Slope Velocity Capacity Description 8.8 75 0.0333 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" 2.4 382 0.0283 2.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.6 979 0.0368 4.5 47.75 Trap/Vee/Rett Channel Flow, Bot.W=0.50' D=1.00' Z= 10.0'/' Top.W=20.50' n= 0.040 0.3 423 0.0496 25.2 4,844.97 Trap/Vee/Rett Channel Flow, Bot.W=40.00' D=3.00' Z= 8.0'/' Top.W=88.00' n= 0.022 Earth, clean & straight 15.1 1,859 Total Subcatchment DA6: Drainage Area 6 Runoff = 13.21 cfs @ 12.06 hrs, Volume= 0.836 af, Depth> 0.90" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type 11 24 -hr 1 -Year Rainfall=3.00" S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Pre -Development Type 1124 -hr 1 -Year Rainfall=3.00" Preoared by Horvath Associates, P.A. Page 7 .. _ n/n AlnnnC Area ac CN Description 1.091 74 >75% Grass cover, Good, HSG C 0.545 80 >75% Grass cover, Good, HSG D 4.844 70 Woods, Good, HSG C 4.613 77 Woods, Good, HSG D 11.093 74 Weighted Average Tc Length Slope Velocity Capacity Description 9.7 75 0.0267 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" 2.1 515 0.0645 4.1 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.5 792 0.0505 8.7 209.82 TrapNee/Rett Channel Flow, Bot.W=2.00' D=2.00' Z= 5.0'/' Top.W=22.00' n= 0.040 Winding stream pools &shoals 13.3 1,382 Total Subcatchment DA7: Drainage Area 7 Runoff = 2.19 cfs @ 12.06 hrs, Volume= 0.152 af, Depth> 0.50" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 1.365 55 Woods, Good, HSG B 1.815 70 Woods, Good, HSG C 0.445 77 Woods, Good, HSG D 3.625 65 Weighted Average Tc Length Slope Velocity Capacity Description 9.1 75 0.0307 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" 1.6 368 0.0557 3.8 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.5 281 0.0747 10.3 350.40 Trap/Vee/Rett Channel Flow, Bot.W=1.00' D=2.00' Z= 8.07' Top.W=33.00' n= 0.040 Windinq stream, pools & shoals 11.2 724 Total Subcatchment DA8: Drainage Area 8 Runoff = 8.12 cfs @ 12.09 hrs, Volume= 0.581 af, Depth> 0.76" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type 11 24 -hr 1 -Year Rainfall=3.00" S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Pre -Development Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 8 HvdroCAD® 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 8/24/2006 Area (ac) CN Description 1.072 74 >75% Grass cover, Good, HSG C 0.015 55 Woods, Good, HSG B 7.369 70 Woods, Good, HSG C 0.760 77 Woods, Good, HSG D 9.216 71 Weighted Average Tc Length Slope Velocity Capacity Description 11.5 75 0.0173 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" 3.4 707 0.0471 3.5 Shallow Concentrated Flow, Unpaved Kv=16.1 fps 0.6 632 0.0372 18.3 836.51 Trap/Vee/Rett Channel Flow, Bot.W=0.50' D=1.50' Z= 20.0'/' Top.W=60.50' n= 0.013 15.5 1,414 Total Subcatchment DA813: Drainage Area 8B Runoff = 1.72 cfs @ 12.04 hrs, Volume= 0.103 af, Depth> 0.80" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type[[ 24 -hr 1 -Year Rainfall=3.00" Area (sf) CN Description 16,532 55 Woods, Good, HSG B 50,156 77 Woods, Good, HSG D 66,688 72 Weighted Average Tc Length Slope Velocity Capacity Description 8.7 75 0.0347 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" 2.5 560 0.0536 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 11.2 635 Total Subcatchment DA9: Drainage Area 9 Runoff = 4.35 cfs @ 12.10 hrs, Volume= 0.345 af, Depth> 0.54" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type 11 24 -hr 1 -Year Rainfall=3.00" S:\@STORMWATER DEPT1@PROJECTS\05\0597 0597 Pre -Development Prepared by Horvath Associates, P.A. Hvr1rnCAD(R7.10 s/n 003736 @ 2005 HvdroCAD SoftwE - Four Seasons at Renaissance (Chin Page Road)\ Type 1124 -hr 1 -Year Rainfall=3.00" Page 9 Area (ac) CN Description 1.622 61 >75% Grass cover, Good, HSG B 0.090 74 >75% Grass cover, Good, HSG C 0.875 55 Woods, Good, HSG B 5.068 70 Woods, Good, HSG C 7.655 66 Weighted Average Tc Length Slope Velocity Capacity Description 10.6 75 0.0213 0.1 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" 2.9 641 0.0515 3.7 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 1.5 408 0.0380 4.6 48.52 TrapNee/Rett Channel Flow, Bot.W=0.50' D=1.00' Z= 10.0'P Top.W=20.50' n= 0.040 Windinq stream, pools & shoals 15.0 1,124 Total Link DPI: Drainage Point 1 Inflow Area = 24.899 ac, Inflow Depth > 0.96" for 1 -Year event Inflow = 32.53 cfs @ 12.05 hrs, Volume= 1.985 of Primary = 32.53 cfs @ 12.05 hrs, Volume= 1.985 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DP2: Drainage Point 2 Inflow Area = 3.995 ac, Inflow Depth > 0.40" for 1 -Year event Inflow = 1.50 cfs @ 12.09 hrs, Volume= 0.132 of Primary = 1.50 cfs @ 12.09 hrs, Volume= 0.132 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DPI Drainage Point 3 Inflow Area = 25.216 ac, Inflow Depth > 0.62" for 1 -Year event Inflow = 19.60 cfs @ 12.06 hrs, Volume= 1.310 of Primary = 19.60 cfs @ 12.06 hrs, Volume= 1.310 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DP4: Drainage Point 4 Inflow Area = 4.134 ac, Inflow Depth > 0.58" for 1 -Year event Inflow = 2.50 cfs @ 12.11 hrs, Volume= 0.200 of Primary = 2.50 cfs @ 12.11 hrs, Volume= 0.200 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Pre -Development Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 10 HvdroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 8/24/2006 Link DPS: Drainage Point 5 Inflow Area = 13.818 ac, Inflow Depth > 0.67' for 1 -Year event Inflow = 10.47 cfs @ 12.09 hrs, Volume= 0.766 of Primary = 10.47 cfs @ 12.09 hrs, Volume= 0.766 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DP6: Drainage Point 6 Inflow Area = 11.093 ac, Inflow Depth > 0.90" for 1 -Year event Inflow = 13.21 cfs @ 12.06 hrs, Volume= 0.836 of Primary = 13.21 cfs @ 12.06 hrs, Volume= 0.836 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DP7: Drainage Point 7 Inflow Area = 3.625 ac, Inflow Depth > 0.50" for 1 -Year event Inflow = 2.19 cfs @ 12.06 hrs, Volume= 0.152 of Primary = 2.19 cfs @ 12.06 hrs, Volume= 0.152 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DP8: Drainage Point 8 Inflow Area = 9.216 ac, Inflow Depth > 0.76" for 1 -Year event Inflow = 8.12 cfs @ 12.09 hrs, Volume= 0.581 of Primary = 8.12 cfs @ 12.09 hrs, Volume= 0.581 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DPBB: Drainage Point 8 Inflow Area = 1.531 ac, Inflow Depth > 0.80" for 1 -Year event Inflow = 1.72 cfs @ 12.04 hrs, Volume= 0.103 of Primary = 1.72 cfs @ 12.04 hrs, Volume= 0.103 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DP9: Drainage Point 9 Inflow Area = 7.655 ac, Inflow Depth > 0.54" for 1 -Year event Inflow = 4.35 cfs @ 12.10 hrs, Volume= 0.345 of Primary = 4.35 cfs @ 12.10 hrs, Volume= 0.345 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs SITE SUB-BASIN HYDROLOGY I-YEAR STORM EVENT POST-DEVELOPMENT COVER CONDITIONS Drainage Point 9 Drainage Area 9 DAB ZD,alOage Area BA DP8 DABB Drainage Polnl B DPBB Drainage Area 8B Drainage Point 8B DP5 Q\ Drainage Point 5 DP1 V Bypass to DP 1 Drainage Poinll (DA � 1 P Drainage Area 1 Detention Basin #1 DA2 DP3 etention Basin #2 Drainage olnl3 Drainage Area 2 DA3 B 3P Bypass to DP 3 Detention Basin #3 DA 33 4P q--__DralnageArea 3 O Detention Basin 04 DA4 Drainage Area 4 Su4 Reach A Link S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type II 24 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 2 HvrlrnCADn 7.10 s/n 003736 @ 2005 HvdroCAD Software Solutions LLC 8/24/2006 Time span=0.00-24.00 hrs, dt=0.01 hrs, 2401 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment DA1: Drainage Area 1 Subcatchment DA1 B: Bypass to DP 1 Subcatchment DA2: Drainage Area 2 Subcatchment DA3: Drainage Area 3 Subcatchment DA3 B: Bypass to DP 3 Subcatchment DA4: Drainage Area 4 Subcatchment DASA: Drainage Area 8A Subcatchment DABB: Drainage Area 8B Subcatchment DA9: Drainage Area 9 Pond 1P: Detention Basin #1 Pond 2P: Detention Basin #2 Pond 3P: Detention Basin #3 Pond 4P: Detention Basin #4 Link DP1: Drainage Point 1 Link DP3: Drainage Point 3 Runoff Area=24.856 ac Runoff Depth>1.66" Tc=5.0 min CN=86 Runoff=75.99 cfs 3.439 of Runoff Area=0.809 ac Runoff Depth>0.91" Tc=5.0 min CN=74 Runoff=1.35 cfs 0.061 of Runoff Area=10.564 ac Runoff Depth>1.31" Tc=5.0 min CN=81 Runoff=25.84 cfs 1.155 of Runoff Area=23.379 ac Runoff Depth>1.82" Tc=5.0 min CN=88 Runoff=77.35 cfs 3.538 of Runoff Area=2.634 ac Runoff Depth>0.43" Tc=5.0 min CN=63 Runoff=1.74 cfs 0.095 of Runoff Area=7.878 ac Runoff Depth>1.90" Tc=5.0 min CN=89 Runoff=27.05 cfs 1.246 of Runoff Area=23.091 ac Runoff Depth>1.44" Tc=5.0 min CN=83 Runoff=62.02 cfs 2.780 of Runoff Area=10.581 ac Runoff Depth>1.51" Tc=5.0 min CN=84 Runoff=29.72 cfs 1.335 of Runoff Area=1.738 ac Runoff Depth>1.19" Tc=5.0 min CN=79 Runoff=3.85 cfs 0.172 of Inflow --75.99 cfs 3.439 of Primary=75.99 cfs 3.439 of Inflow --25.84 cfs 1.155 of Primary=25.84 cfs 1.155 of Inflow --77.35 cfs 3.538 of Primary=77.35 cfs 3.538 of Inflow --27.05 cfs 1.246 of Primary=27.05 cfs 1.246 of Inflow --77.33 cfs 3.500 of Primary --77.33 cfs 3.500 of Inflow --104.80 cfs 4.788 of Primary=104.80 cfs 4.788 of S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 3 H droCADO 7.10 s/n 003736 @ 2005 H droCAD Software Solutions LLC 8/24/2006 Link DPS: Drainage Point 5 Link DP8: Drainage Point 8 Link DPBB: Drainage Point 813 Link DP9: Drainage Point 9 Inflow --27.05 cfs 1.246 of Primary=27.05 cfs 1.246 of Inflow --62.02 cfs 2.780 of Primary=62.02 cfs 2.780 of Inflow --29.72 cfs 1.335 of Primary=29.72 cfs 1.335 of Inflow=3.85 cfs 0.172 of Primary=3.85 cfs 0.172 of S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type lI 24 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 4 HydroCAD@ 7.10 s/n 003736 @2005 HydroCAD Software Solutions LLC 8/24/2006 Subcatchment DA1: Drainage Area 1 Runoff = 75.99 cfs @ 11.96 hrs, Volume= 3.439 af, Depth> 1.66" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.318 61 >75% Grass cover, Good, HSG B 1.194 74 >75% Grass cover, Good, HSG C 0.044 75 1/4 acre lots, 38% imp, HSG B 0.236 83 1/4 acre lots, 38% imp, HSG C 0.341 85 1/8 acre lots, 65% imp, HSG B 16.745 90 1/8 acre lots, 65% imp, HSG C 2.382 74 Farmsteads, HSG B 3.596 82 Farmsteads, HSG C 24.856 86 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA1 B: Bypass to DP 1 Runoff = 1.35 cfs @ 11.97 hrs, Volume= 0.061 af, Depth> 0.91" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.809 74 >75% Grass cover, Good, HSG C Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA2: Drainage Area 2 Runoff = 25.84 cfs @ 11.96 hrs, Volume= 1.155 af, Depth> 1.31" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type 11 24 -hr 1 -Year Rainfall=3.00" S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 5 Hvrlrnr.AFYR) 710 s/n 003736 @ 2005 HvdroCAD Software Solutions LLC 8/24/2006 Area (ac) CN Description 5.465 75 1/4 acre lots, 38% imp, HSG B 2.829 83 1/4 acre lots, 38% imp, HSG C 0.052 85 1/8 acre lots, 65% imp, HSG B 1.467 90 1/8 acre lots, 65% imp, HSG C 0.026 92 Urban commercial, 85% imp, HSG B 0.725 94 Urban commercial 85% imp HSG C 10.564 81 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA3: Drainage Area 3 Runoff = 77.35 cfs @ 11.96 hrs, Volume= 3.538 af, Depth> 1.82" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 3.459 75 1/4 acre lots, 38% imp, HSG B 1.708 83 1/4 acre lots, 38% imp, HSG C 2.494 85 1/8 acre lots, 65% imp, HSG B 9.385 90 1/8 acre lots, 65% imp, HSG C 0.299 92 Urban commercial, 85% imp, HSG B 6.034 94 Urban commercial 85% imp HSG C 23.379 88 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA3 B: Bypass to DP 3 Runoff = 1.74 cfs @ 11.98 hrs, Volume= 0.095 af, Depth> 0.43" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 1.515 55 Woods, Good, HSG B 1.119 75 1/4 acre lots 38% imp HSG B — 2.634 63 Weighted Average S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 6 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 8/24/2006 Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA4: Drainage Area 4 Runoff = 27.05 cfs @ 11.96 hrs, Volume= 1.246 af, Depth> 1.90" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 1.598 85 1/8 acre lots, 65% imp, HSG B 6.280 90 1/8 acre lots 65% imp HSG C 7.878 89 Weighted Average To Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA8A: Drainage Area 8A Runoff = 62.02 cfs @ 11.96 hrs, Volume= 2.780 af, Depth> 1.44" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 1.718 75 1/4 acre lots, 38% imp, HSG B 16.365 83 1/4 acre lots, 38% imp, HSG C 3.747 87 1/4 acre lots, 38% imp, HSG D 0.569 90 1/8 acre lots, 65% imp, HSG C 0.692 92 1/8 acre lots, 65% imp, HSG D 23.091 83 Weighted Average To Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA813: Drainage Area 8B Runoff = 29.72 cfs @ 11.96 hrs, Volume= 1.335 af, Depth> 1.51" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type 1124 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 7 HydroCAD@ 710 s/n 003736 @ 2005 HydroCAD Software Solutions LLC 8/24/2006 Area (ac) CN Description 3.600 75 1/4 acre lots, 38% imp, HSG B 0.986 83 1/4 acre lots, 38% imp, HSG C 1.056 87 1/4 acre lots, 38% imp, HSG D 0.195 85 1/8 acre lots, 65% imp, HSG B 1.537 90 1/8 acre lots, 65% imp, HSG C 3.207 92 1/8 acre lots 65% imp HSG D 10.581 84 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Subcatchment DA9: Drainage Area 9 Runoff = 3.85 cfs @ 11.97 hrs, Volume= 0.172 af, Depth> 1.19" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.852 75 1/4 acre lots, 38% imp, HSG B 0.886 83 1/4 acre lots 38% imp HSG C 1.738 79 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Pond 1P: Detention Basin #1 Inflow Area = 24.856 ac, Inflow Depth > 1.66" for 1 -Year event Inflow = 75.99 cfs @ 11.96 hrs, Volume= 3.439 of Primary = 75.99 cfs @ 11.96 hrs, Volume= 3.439 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Pond 2P: Detention Basin #2 Inflow Area = 10.564 ac, Inflow Depth > 1.31" for 1 -Year event Inflow = 25.84 cfs @ 11.96 hrs, Volume= 1.155 of Primary = 25.84 cfs @ 11.96 hrs, Volume= 1.155 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 8 HvdroCAD® 7.10 s/n 003736 @2005 HydroCAD Software Solutions LLC 8/24/2006 Pond 3P: Detention Basin #3 Inflow Area = 23.379 ac, Inflow Depth > 1.82" for 1 -Year event Inflow = 77.35 cfs @ 11.96 hrs, Volume= 3.538 of Primary = 77.35 cfs @ 11.96 hrs, Volume= 3.538 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Pond 4P: Detention Basin #4 Inflow Area = 7.878 ac, Inflow Depth > 1.90" for 1 -Year event Inflow = 27.05 cfs @ 11.96 hrs, Volume= 1.246 of Primary = 27.05 cfs @ 11.96 hrs, Volume= 1.246 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DPI: Drainage Point 1 Inflow Area = 25.665 ac, Inflow Depth > 1.64" for 1 -Year event Inflow = 77.33 cfs @ 11.96 hrs, Volume= 3.500 of Primary = 77.33 cfs @ 11.96 hrs, Volume= 3.500 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DP3: Drainage Point 3 Inflow Area = 36.577 ac, Inflow Depth > 1.57" for 1 -Year event Inflow = 104.80 cfs @ 11.96 hrs, Volume= 4.788 of Primary = 104.80 cfs @ 11.96 hrs, Volume= 4.788 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DP5: Drainage Point 5 Inflow Area = 7.878 ac, Inflow Depth > 1.90" for 1 -Year event Inflow = 27.05 cfs @ 11.96 hrs, Volume= 1.246 of Primary = 27.05 cfs @ 11.96 hrs, Volume= 1.246 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DP8: Drainage Point 8 Inflow Area = 23.091 ac, Inflow Depth > 1.44" for 1 -Year event Inflow = 62.02 cfs @ 11.96 hrs, Volume= 2.780 of Primary = 62.02 cfs @ 11.96 hrs, Volume= 2.780 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type /124 -hr 1 -Year Rainfall=3.00" Prepared by Horvath Associates, P.A. Page 9 HvrlrnCArx7 7.10 s/n 003736 © 2005 HvdroCAD Software Solutions LLC 8/24/2006 Link DP8B: Drainage Point 8B Inflow Area = 10.581 ac, Inflow Depth > 1.51" for 1 -Year event Inflow = 29.72 cfs @ 11.96 hrs, Volume= 1.335 of Primary = 29.72 cfs @ 11.96 hrs, Volume= 1.335 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Link DP9: Drainage Point 9 Inflow Area = 1.738 ac, Inflow Depth > 1.19" for 1 -Year event Inflow = 3.85 cfs @ 11.97 hrs, Volume= 0.172 of Primary = 3.85 cfs @ 11.97 hrs, Volume= 0.172 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs SITE SUB -BASIN HYDROLOGY 2- AND 10 -YEAR STORM EVENTS POST -DEVELOPMENT COVER CONDITIONS DRAINAGE POINT 9 S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type 1124 -hr 2 -Year Rainia11=3.50" Prepared by Horvath Associates, P.A. Page 1 HydroCADO 7.10 s/n 003736 © 2005 HydroCAD Software Solutions LLC 8/24/2006 Time span=0.00-24.00 hrs, dt=0.01 hrs, 2401 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment DA9: Drainage Area 9 Link DP9: Drainage Point 9 Runoff Area=1.738 ac Runoff Depth>1.56" Tc=5.0 min CN=79 Runoff=5.07 cfs 0.226 of Inflow --5.07 cfs 0.226 of Primary=5.07 cfs 0.226 of S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type 11 24 -hr 2 -Year Rainfall=3.50" Prepared by Horvath Associates, P.A. Page 2 HvdroCAD® 7.10 s/n 003736 @ 2005 HydroCAD Software Solutions LLC 8/24/2006 Subcatchment DA9: Drainage Area 9 Runoff = 5.07 cfs @ 11.96 hrs, Volume= 0.226 af, Depth> 1.56" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 2 -Year Rainfall=3.50" Area (ac) CN Description 0.852 75 1/4 acre lots, 38% imp, HSG B 0.886 83 1/4 acre lots 38% imp HSG C 1.738 79 Weighted Average Tc Length Slope Velocity Capacity Description 5.0 Direct Entry, Link DP9: Drainage Point 9 Inflow Area = 1.738 ac, Inflow Depth > 1.56 for 2 -Year event Inflow = 5.07 cfs @ 11.96 hrs, Volume= 0.226 of Primary = 5.07 cfs @ 11.96 hrs, Volume= 0.226 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs S:\@STORMWATER DEPT\@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type 1124 -hr 10 -Year Rainfall=5.10" Prepared by Horvath Associates, P.A. Page 3 HydroCADO 7.10 s/n 003736 @ 2005 HydroCAD Software Solutions LLC 8/24/2006 Time span=0.00-24.00 hrs, dt=0.01 hrs, 2401 points Runoff by SCS TR -20 method, UH=SCS Reach routing by Stor-Ind method - Pond routing by Stor-Ind method Subcatchment DA9: Drainage Area 9 Runoff Area=1.738 ac Runoff Depth>2.88" Tc=5.0 min CN=79 Runoff=9.21 cfs 0.418 of Link DP9: Drainage Point 9 Inflow --9.21 cfs 0.418 of Primary=9.21 cfs 0.418 of S:\@STORMWATER DEPT@PROJECTS\05\0597 - Four Seasons at Renaissance (Chin Page Road)\ 0597 Post -Development - no ponds Type// 24 -hr 10 -Year Rainfall=5.10" Prepared by Horvath Associates, P.A. Page 4 Subcatchment DA9: Drainage Area 9 Runoff = 9.21 cfs @ 11.96 hrs, Volume= 0.418 af, Depth> 2.88" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 10 -Year Rainfall=5.10" Area (ac) CN Description 0.852 75 1/4 acre lots, 38% imp, HSG B 0.886 83 1/4 acre lots 38% imp HSG C 1.738 79 Weighted Average Tc Length 5.0 Description Direct Entry, Link DP9: Drainage Point 9 Inflow Area = 1.738 ac, Inflow Depth > 2.88" for 10 -Year event Inflow = 9.21 cfs @ 11.96 hrs, Volume= 0.418 of Primary = 9.21 cfs @ 11.96 hrs, Volume= 0.418 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs PRELIMINARY LEVEL SPREADER DESIGN INFORMATION MKM m N C O O N O c t( t N O � 0 ri 0 0 E, E 0 0 N o U U ' _ N OP O Q O X X N 00rn o-0 0ol O OD m U CL C P co o O Q v O a e N w 0 U X w ° s b b 3 ° O 0 U q �O o CL M co u. E N a N o n C 2 > a) u co C: C) u1 1 Q N M LO C K 7 N t 0 m w QBE J u O n � c� Z CO N co n N O a E O J Y_ O �n ,O n N �_ Cl a Q. .... d' ^ C ) N o E o— m ol O M co O O � O O t - '=I =I =I F 'C 0 Q 0 ri N U X X — O OD m U C Im O a O C w U X x It d In ch 3 ° O 0 U q �O o d a co u. N a o n C Li > a) u C: w K t O J O c� c� 'C 0 0902 - LS Flow Splitter Calcs.xls LS#8A FLOW SPLITTER CALCS Four Seasons Phase 2 LS #8A Flow Splitter Calculations 1 In/Hr Orifice Sizing 1 In/Hr Rational Flow = 14.38 cfs Bypass Weir Height (h) = 2.80 ft Gravitational Constant (g) = 32.20 ft/s2 Discharge Coefficient (Cd) = 0.60 Low Flow Orifice 1 Diameter = 15.00 in Low Flow Orifice Submerged Area (a)= 1.23 ft2 Low Flow Orifice 2 Diameter = 10.20 in Low Flow Orifice Submerged Area (a)= 0.57 ft2 Orifice Flow = Cd*a*42*g*h Orifice 1 Flow = 9.89 cfs Orifice 2 Flow = 4.57 cfs Total Orifice Flow = 14.46 cfs Matt Jones, EI 2/10/2009 Total Orifice flow is greater than or equal to 1 in/hr flow, therefore design is feasible D-, o 0 N L u� It N K H N v Q Op; -4 (1)o0 co x x O E_ 0 0 0 0 o U O t D U' j N O X u CO O v W V c7 0 co 4 U '4 p G y N Pco N 0 to c0 O Q Mrl II N 7 `C O_ u Z N II 11 C E c 2 p o 2 W o v 'O v Z� m~ O. Q P ^ N 00 N 00 U E O p U 0 >ID > c 0 0 I. N a Ca E U o� N t% V 0 Q Q E N N N O @ d N U O J Y 3 0 W O_ Z N O v a d Cl) N o E w O W V VM Q c04.0a °m C) 0 � a L u� It N K H N co Q O x x O - O C �- O t D j X X u O U 0 co 4 U '4 p 0 0 c0 II N II 11 C L u� It N K H N 0902 - LS Flow Splitter Calcs.xls LS#8B FLOW SPLITTER CALCS Matt Jones, EI 2/10/2009 Four Seasons Phase 2 LS #813 Flow Splitter Calculations 1 In/Hr Orifice Sizing 1 In/Hr Rational Flow= 7.24 cfs Bypass Weir Height (h) = 1.50 ft Gravitational Constant (g) = 32.20 ft/s2 Discharge Coefficient (Cd) = 0.60 Low Flow Orifice Diameter = 15.00 in Low Flow Orifice Submerged Area (a)= 1.23 ft2 Orifice Flow = Cd*a*q2*g*h Orifice Flow = 7.24 cfs Orifice flow is greater than or equal to 1 in/hr flow, therefore design is feasible W PO O 04 C: 0 O 04 +- N 6 W V 7 o CO o , � x x E? 0 0 0 o U — o U" O Lo W M O U Q a O O N x x yLo O Q N M Cl) U o M c o O U Iq '2.- n b` O` O N V 10 '° O d E 3 _a _ aZv n m no co N O W . v� j q Q Q } N V E N C 7 O L r \Q. O O O c O c O co N a LO M co E 0 J Y_ a a y O _ Lo co o rl N 4 Co E a 0 N Q O O O Q M co M LO 1� H ul of H NIw InI El x x 0 — o c O L o s j x x U a U o M O U Iq p O 0 `a } � N C c ul of H NIw InI El 0902 - LS Flow Splitter Calcs.xls LS#9 FLOW SPLITTER CALCS Matt Jones, EI 2/10/2009 Four Seasons Phase 2 LS #813 Flow Splitter Calculations 1 In/Hr Orifice Sizing 1 In/Hr Rational Flow= 1.10 cfs Bypass Weir Height (h) = 1.40 ft Gravitational Constant (g) = 32.20 ft/s2 Discharge Coefficient (Cd) = 0.60 Low Flow Orifice Diameter = 6.00 in Low Flow Orifice Submerged Area (a)= 0.20 ft2 Orifice Flow = Cd*a*42*g*h Orifice Flow = 1.12 cfs Orifice flow is greater than or equal to 1 in/hr flow, therefore design is feasible TTf7 __j TiNnn'To PATH* 408' *Nunn CHANNEL , P of & -FLOW T ------ a ---- - -- To PATH­641'-- cTPATH; 75. SHEET NCENTRATED FLOW' 000, 4000 ,000o -,:DRAINAGE.,- /SHEq/fLQW', EXISTING, - -:A A,-,9--, P 75'� To zATH- 36'9 CMP 66TTAC 41f z *N 75' To PATH 515' SHEET fl. To PATH./ YDRANAGE z �el CONQENTRA T�,TED', oj� 00\ DRAINAGE FLOW' \AREA AREA 8 '9. 22 c 09, AC-: �0 T-:DRAI NAGE -0 + CHANNEL, 'To PATH�76 "ToPTATH:792' c 3.91 A 'FLO Know DR' AINAG 7 c N ENTRATED DRAINAGE AREA - to, PATH: 7G. NT,� CO A7 AM -4,77 T,DRAINAGE BOUNDARY (TYP;) FLOW + HANNEL --- ---- -ARE A' 4�' ON TFLOW! Tc PA'TH:_482! 4v ovallml /,- \ , - 24- 9 I 41V .0e CI HANNE' A -G 4 + AV T PATH�'632' 0 -6 c INT,# ANNEL CH FLOW To I CONCENTRATE p" 46/ TFLO'W�' + DRAINAGE To PATH: 75, Er FLOW �SHE 4W POINT # '560' To PATH "T PATH ATH CON tEWRZED 04 NAGE_ FLOW' '293 TcTPATH- 6W To PATH RAINAGE, ZT, D D ENTRATED- CENTRATED AREA- -7,-- "a CON CONQ .0 DRAI Tc­PATH�75-- FLOW POINT # 3 63_AC­T, all **jp, / FLO W L 01% 8 SHEET FLOW-- - lFa T�POINT` 4, -MANAw- -4 + IRA ... ..... . . T'p 0, LO! Oil nD ZA DRA-INAG < DRAINAGE. #4--' T 'PATH:,5321 F,�.JINT #813 'POINT STREAM FLOW'-' 'BUFFER PP) �SHEET-F �-DPAI -- -'' I --'---*--CHANNEL DO AGE AlK FLOW AREA,8B 77--palnNaN 1.53 AC' I z Own To PATH: 423'� MINES T, "t HAINEL 59 STREAM BUFFER FLOW\ A, T, - ---- - TcIPATH: 97?' \,,C A H_NNEL. 'T FLOW IT, R 'All NAGE,, 14 T NN* T, �i 11 N# PQSTING-30.-�SANITARY POIN Ti#5 T' SEWER EASEME T ***To ffammas ManuelN* 'PR PERTYLINE/Z11 'T NOTES: I OP-YEA\R 1. EXISTING TOPOGRAPHIC INFORMATION IS FROM FLOODPLAIN,\ CITY OF DURHAM GIS DATA. 2. EXISTING TREELINE IS FROM DIGITAL DRAINAGE ORTHOPHOTOS TAKEN IN 2D05. ARE 1 ,5 T i 'I; ", " / � z A, 3. ]OD -YEAR BASE FLOOD ELEVATION IS 323% S 1'8,. 2AC if 11 T TI I IT A @COPYRIGI4T 2005 THIS DOCUMENT AND THE DESIGN ARE THE PROPERTY OF HORVATH ASSOCIATES, PA ANY REPRODUCTION wrrHouT PRIOR WRITTEN CONSENT IS PROHMITED In a 0 In a a a 0 In 0 HORVATH A S S 0 C I A T E S 16 CONSULTANT PLACE- SUITE 2DI DURHAM, NORTH CAROLINA 27707 P 919.490.4990 IF 919.490.8953 537 MARKET STREET, SUITE LL20 CHATTANOOGA, TENNESSEE 37402 P 423,266.4990 F 423.26&5700 www.horvath,�,socimes�com . "z wg _q z A nile" 9 N i� ,y v ne < cyl4i all �K 0 z Ur ad =2 s- f -,,. g__ Ldtvt LJ OTTif,, LJK_ Z-' gkq f& ir inill q^%,,YrZ 't - yl�� M& 4M t ^LF PRELIMINARY NOTFOR CONSTRUCTION DRAVVNI BY* CHECKED BY: BFT JES DATE JUNE29,2006 SCALE PROJEM NO. 0597 SHEEr NO. swi -A... A- n IN n /E �DRAINAP AREA 1.74 AC DRAIN 1AGE 'T �POIW#9 ---- ------ Typ c� ZONE AE 100 -YR F OD LO PLAIN D AINAGE' 13YPASS -DRAINAGE INT -#I: �Po 10-Dp I lBUFFER /'-rUINT # /0.81 AC OR IAG DRAINAGE AR BOUNDARY (TYP.) /'AREA,2--- r (;A ER, Iin-INA G _,PHINGE8S,PLACi _DR -A :)R Iksl�A -BASIN DETEN'TION -- --- - DRAINAGE \,A - - ---- 1A A K 8B/, -6.58 46 -4 - DETEN o 'BASIN #a fl 01 *77 /17 tp DRAINAG 4t -HOUSE POINT #8 t% /DEVELOPM NT E TR/ R, 1z //DRAJNAGE rING LEAR LANE m AREA,3,-,' '23 40 AC-;' 7 L [STING V SANItA Y' - - - - -- - - ---- - - EX 0 _W�OMII -0 - SEWER EASEME T 0 0 24 -0. 34 -MAPLE '20 2�'.'OAK 0 BAS 0 IN #4 A 0 ,�APLZ NOTES: ---AREA,4 R 0 -7- -DEVELOPMENT DRAINAGE MAP (FOR CLARITY): ZONE' -100-YR FLOODPLAIN ----- - I THE FOLLOWING DRAINAGE POINTS ARE NOT SHOWN ON THE POST AE MAY NOT CORR ESPONDTO 0 DRANINAGE POINT REASON ACTUAL'ELEVATIONS) DP #2 SIGNIFICANTLY REDUCED TRIBUTARY AREA DP #4 SIGNIFICANTLY REDUCED TRIBUTARY AREA DP #6 SIGNIFICANTLY REDUCED TRIBUTARY AREA DP #7 SIGNIFICANTLY REDUCED TRIBUTARY AREA 2. ALL POST -DEVELOPMENT TIMES OF CONCENTRATION ARE ASSUMED TO BE 5 MINUTES. -0 DRAINAGE MAP 3. THE POST -DEVELOPMENT DRAINAGE AREA DELINEATION SW2 SCALE: r ASSUMES A BUILT -OUT CONDITION ON THE ABUTTING . .. .... PROPERTY TO THE SOUTH, AND NO STORMWATER WILL BE DIVERTED BY EITHER OWNER ACROSS THE COMMON PROPERTY UNE. 4. THE 100 -YEAR BASE FLOOD ELEVATION IS 323% IN CCOPYRIGHT 2005 THIS DOCUMENT AND THE DESIGN ARE T14E PROPERTY OF HORVATH ASSOCIATES. PA ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIBITED HORVATH A S S 0 C I A T E S 16 CONSULTANT PLACE SUfTE 201 DURHAM, NORTH CAROLINA 27707 F 919.490.4990 F 919.490�8953 537 MARKET STREET, SUITE LL20 CHATTANOOGA, TENNESSEE 37402 P 423.266,4990 F 423.266.5700 www-horvathassociates,com m^ -,I, r Cj So I r- gg, 'I NJ G E PRELIMINARY NOTFOR CONSTRUCTION DRAWN BY. CHECKED BY: BFT JES DATE JUNE 29,2006 SCAM 1"= 1w PROJECT NO. 0597 SHEET NO. SW2 Kvp - _101 k"j- z ,V" dl�l -7 IL 00 La n LLJ % j eto z z u M m^ -,I, r Cj So I r- gg, 'I NJ G E PRELIMINARY NOTFOR CONSTRUCTION DRAWN BY. CHECKED BY: BFT JES DATE JUNE 29,2006 SCAM 1"= 1w PROJECT NO. 0597 SHEET NO. SW2 IIIIIk-l' III----------- --------------- ------------ IIII------------------- II- -------- --- -------------- -- IIIIIIII IIIIIIIIIIIIIIIII----------------------- IIIIII----------- IIIIIII------ ------ I�1-1 --- ------- II----------- - ----- IIIIIII I- ---------- --- -------- - -- - - --------------------- III0 II----- ------ II------------ -- ------- --- IIIIIIIIIIIIIIII--------- I II---- ------ IIIIIIII 11, IIIIIIIIIII -- -------- IIIIIIIIIIIIIIIIIIIIIIIIIII;t IIIIIIIIIIIII m IIIIllIIIIIIIIII I0 IIIII-- 11, IIIIIIIIIII -- -------- IIIIIIIIIIIIIIIIIIIIIIIIIII;t IIIIIIIIIIIII m I0 -- -------- IIIIIIIIIIIIIIIIIIIIIIIIIII;t IIIIIIIIIIIII m CITY OF DURHAM GIS DATA. 2. EGSTING TREELINE 3 FROM DIGITAL ORIHOPHOTOS TAKEN IN 2DO5. & IOD -YEAR 11ASE FLOOD ELEVATION IS 3W. IIIIIIIIIIlIIlIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIZ. IIIIIIIIIIII--- -------------------- IIIII--- -- ----- II40M IHORVATH IIIIIII< - ----- -- --- IIIIA A S S 0 C I A T E S IIIIm k 04 16 CONSULTANT PLACE SUITE 201 III---------- DURHAK NORTH CAROLINA V707 IIIIIIIIP 919.490.4990 F 919.490.8953 IINoar I II0, -------------- ICHATTANOOGA, TENNESSEE 37402 III537 MARKET STREET, SUITE LL20 II---------- ------- P 423.26i5.4990 F 423.266.5700 II---- ----- -- IIIIIIIIII- --- ---- www.hofvafhassoclates.com IIIIIII- - - --------- IIII-- ------------- - IIII- --------- III- -------------------------------- IIIIIIIII.......... IIIlIIIIII----------- IIIIIIII','S ......... IIIIII---------- III1c PATK IIl------------ -- - IIII.L.1 I4�OWCENTW ED� IIIIllIIII------------- I---- ------ I--------------- IIu IIIIIIIIIz IlIIIIII.. .... ........ 0 < 6+4 IIQVt RA` L II0 < IA AV% Iu ... -------- -- II------- ---------- I- -------------- ---- --- I---------- DRAINAGE-' I< V) iIIIIIIIILLJ < III< 0 IIIw .1 IIIW, a- IIIlIIIz IIII--33 4-7-:A, Iz IIZ IIIIIIIIIIIi IILU < II- ---- ----- II--------- ----- I----- -------- I3 41jj� IIIIIIIIIIIIIIIIIIIIII--------- - IIIIIIIIIII0 IIIIIIIIIIIIIIIIlIIIIIIIIIIIIIIIIIIII IIV LM^LL IIIIIIIIII----------- IIIIDRAINAGE ---------- IlXAA0 ------- --- IIIIIIlII-- ---------- II01 I- ------- --- IIII--- — ---- ---- llIIIIIIIIII-- --------- IIIII----------- IIIIIIIIIllr rx r- L I M 1 1'4,'\ K T ----------- I10 ------- ---- ---------- - ----------- - -- IINOTFOR IlIMoodie.,, IICONSTRUCTION IIIIIIIIIIII----------- IIIIII)0 ------------ --- III------- ------- IIIIII- --------- I'll IIIIIIIII:7 IIIIII- ----- - ------ IIIOVERALL IIIIIIllIIllA "INAG ---- --- II--------- III----------- Il---- ------- ...IIIIIIIIIIIIIllIIllIIIIIIIII------- ------- - -------- II------- ----- IIIIIIIIIIllIIIIIIIIII----- ----- IIIIII-- ---------------- ------- IIII--------- - - --- - ----------- - --------- I---------------- IIIIII ------------------ IIIDRAWN &Y* CHsCXED By* IIIIIllIIJES BFT II -7 IIIIDATE I--------------------- IIAPRIL 27, 2006 IIIIIIDRAINAGE MAP - ---- -- ------ - I----- -- ---------------- ----- IIIISCAIE III=3W IIISW3 scALE-. r -3w IIIIPROJECT NO. ------------------- IIII0597 III----------- 0 75 150 300 a SHEET NO. IIIISCALE: III= I W ISW3 III)ROHIBITED I0 IIIII-- - ------------ -- II CITY OF DURHAM GIS DATA. 2. EGSTING TREELINE 3 FROM DIGITAL ORIHOPHOTOS TAKEN IN 2DO5. & IOD -YEAR 11ASE FLOOD ELEVATION IS 3W. IIIIIIIIIIlIIlIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIZ. IIIIIIIIIIII--- -------------------- IIIII--- -- ----- II40M IHORVATH IIIIIII< - ----- -- --- IIIIA A S S 0 C I A T E S IIIIm k 04 16 CONSULTANT PLACE SUITE 201 III---------- DURHAK NORTH CAROLINA V707 IIIIIIIIP 919.490.4990 F 919.490.8953 IINoar I II0, -------------- ICHATTANOOGA, TENNESSEE 37402 III537 MARKET STREET, SUITE LL20 II---------- ------- P 423.26i5.4990 F 423.266.5700 II---- ----- -- IIIIIIIIII- --- ---- www.hofvafhassoclates.com IIIIIII- - - --------- IIII-- ------------- - IIII- --------- III- -------------------------------- IIIIIIIII.......... IIIlIIIIII----------- IIIIIIII','S ......... IIIIII---------- III1c PATK IIl------------ -- - IIII.L.1 I4�OWCENTW ED� IIIIllIIII------------- I---- ------ I--------------- IIu IIIIIIIIIz IlIIIIII.. .... ........ 0 < 6+4 IIQVt RA` L II0 < IA AV% Iu ... -------- -- II------- ---------- I- -------------- ---- --- I---------- DRAINAGE-' I< V) iIIIIIIIILLJ < III< 0 IIIw .1 IIIW, a- IIIlIIIz IIII--33 4-7-:A, Iz IIZ IIIIIIIIIIIi IILU < II- ---- ----- II--------- ----- I----- -------- I3 41jj� IIIIIIIIIIIIIIIIIIIIII--------- - IIIIIIIIIII0 IIIIIIIIIIIIIIIIlIIIIIIIIIIIIIIIIIIII IIV LM^LL IIIIIIIIII----------- IIIIDRAINAGE ---------- IlXAA0 ------- --- IIIIIIlII-- ---------- II01 I- ------- --- IIII--- — ---- ---- llIIIIIIIIII-- --------- IIIII----------- IIIIIIIIIllr rx r- L I M 1 1'4,'\ K T ----------- I10 ------- ---- ---------- - ----------- - -- IINOTFOR IlIMoodie.,, IICONSTRUCTION IIIIIIIIIIII----------- IIIIII)0 ------------ --- III------- ------- IIIIII- --------- I'll IIIIIIIII:7 IIIIII- ----- - ------ IIIOVERALL IIIIIIllIIllA "INAG ---- --- II--------- III----------- Il---- ------- ...IIIIIIIIIIIIIllIIllIIIIIIIII------- ------- - -------- II------- ----- IIIIIIIIIIllIIIIIIIIII----- ----- IIIIII-- ---------------- ------- IIII--------- - - --- - ----------- - --------- I---------------- IIIIII ------------------ IIIDRAWN &Y* CHsCXED By* IIIIIllIIJES BFT II -7 IIIIDATE I--------------------- IIAPRIL 27, 2006 IIIIIIDRAINAGE MAP - ---- -- ------ - I----- -- ---------------- ----- IIIISCAIE III=3W IIISW3 scALE-. r -3w IIIIPROJECT NO. ------------------- IIII0597 III----------- 0 75 150 300 a SHEET NO. IIIISCALE: III= I W ISW3 III)ROHIBITED IIIIIIIIIIIIIIIIIIIIIIIIIIIIIZ. IIIIIIIIIIII--- -------------------- IIIII--- -- ----- II40M IHORVATH IIIIIII< - ----- -- --- IIIIA A S S 0 C I A T E S IIIIm k 04 16 CONSULTANT PLACE SUITE 201 III---------- DURHAK NORTH CAROLINA V707 IIIIIIIIP 919.490.4990 F 919.490.8953 IINoar I II0, -------------- ICHATTANOOGA, TENNESSEE 37402 III537 MARKET STREET, SUITE LL20 II---------- ------- P 423.26i5.4990 F 423.266.5700 II---- ----- -- IIIIIIIIII- --- ---- www.hofvafhassoclates.com IIIIIII- - - --------- IIII-- ------------- - IIII- --------- III- -------------------------------- IIIIIIIII.......... IIIlIIIIII----------- IIIIIIII','S ......... IIIIII---------- III1c PATK IIl------------ -- - IIII.L.1 I4�OWCENTW ED� IIIIllIIII------------- I---- ------ I--------------- IIu IIIIIIIIIz IlIIIIII.. .... ........ 0 < 6+4 IIQVt RA` L II0 < IA AV% Iu ... -------- -- II------- ---------- I- -------------- ---- --- I---------- DRAINAGE-' I< V) iIIIIIIIILLJ < III< 0 IIIw .1 IIIW, a- IIIlIIIz IIII--33 4-7-:A, Iz IIZ IIIIIIIIIIIi IILU < II- ---- ----- II--------- ----- I----- -------- I3 41jj� IIIIIIIIIIIIIIIIIIIIII--------- - IIIIIIIIIII0 IIIIIIIIIIIIIIIIlIIIIIIIIIIIIIIIIIIII IIV LM^LL IIIIIIIIII----------- IIIIDRAINAGE ---------- IlXAA0 ------- --- IIIIIIlII-- ---------- II01 I- ------- --- IIII--- — ---- ---- llIIIIIIIIII-- --------- IIIII----------- IIIIIIIIIllr rx r- L I M 1 1'4,'\ K T ----------- I10 ------- ---- ---------- - ----------- - -- IINOTFOR IlIMoodie.,, IICONSTRUCTION IIIIIIIIIIII----------- IIIIII)0 ------------ --- III------- ------- IIIIII- --------- I'll IIIIIIIII:7 IIIIII- ----- - ------ IIIOVERALL IIIIIIllIIllA "INAG ---- --- II--------- III----------- Il---- ------- ...IIIIIIIIIIIIIllIIllIIIIIIIII------- ------- - -------- II------- ----- IIIIIIIIIIllIIIIIIIIII----- ----- IIIIII-- ---------------- ------- IIII--------- - - --- - ----------- - --------- I---------------- IIIIII ------------------ IIIDRAWN &Y* CHsCXED By* IIIIIllIIJES BFT II -7 IIIIDATE I--------------------- IIAPRIL 27, 2006 IIIIIIDRAINAGE MAP - ---- -- ------ - I----- -- ---------------- ----- IIIISCAIE III=3W IIISW3 scALE-. r -3w IIIIPROJECT NO. ------------------- IIII0597 III----------- 0 75 150 300 a SHEET NO. IIIISCALE: III= I W ISW3 III)ROHIBITED FOUR SEASONS AT RENAISSANCE ADDENDUM TO STORM WATER IMPACT ANALYSIS Four Seasons at Renaissance Subdivision Page Road and Chin Page Road Durham, North Carolina Horvath Associates Project Number: 0597 August 27, 2009 Prepared for: Builders 1 st Choice 6060-B Six Forks Road Raleigh, N.C. 27609 (919) 841-4960 Prepared by: Horvath Associates, P.A. Engineers - Planners - Landscape Architects 16 Consultant Place, Suite 201 Durham, North Carolina 27707 (919) 490-4990 FOUR SEASONS AT RENAISSANCE ADDENDUM TO STORM WATER IMPACT ANALYSIS Revision to Original Stormwater Impact Analysis This addendum was added to the original stormwater impact analysis to address comments by the City of Durham. The revisions to the original stormwater impact analysis include a 1 -Year post -development peak flow analysis for Drainage Point # 6 and the addition of a Bioretention Cell near the Michelangelo Place cul-de-sac. 1 -Year Peak Flow Analysis at DP#6 A post -development peak flow analysis was not performed for the drainage point labeled DP#6 for the original SIA because almost all the runoff that went to the drainage point in pre -development was directed elsewhere in the post - development condition. At the request of the City of Durham DP#6 was analyzed to ensure the peak flow during the 1 -Year rainfall event did not increase by more than 10% from pre- to post -development. The results of the analysis showed that the post -development peak flow rate decreased at DP#6 by approximately 650, therefore no detention is required at DP#6. A level spreader is not necessary to diffuse the concentrated flow across the stream buffer in the post -development condition because all the runoff will be conveyed by a natural draw all the way though the stream buffer to the top of bank of the receiving stream. This natural draw already conveys concentrated flow through the buffer in the pre -development condition and the peak flow in the channel will be lower in the post -development condition. Bioretention Cell A bioretention cell was added to the plan to bring the project into compliance with Committed Element #7 which states, "Provide storm water wetlands and/or other bio -retention methods and/or other storm water Best Management Practices (BMP's) that would be in excess of current standards by minimizing the use of buy downs and committing to provide that concentrated flow discharges are modified to diffuse flow." The Bioretention cell is located at the intersection of Michelangelo Place and Mona Lisa Lane. It receives runoff that was previously directed to Level Spreader #9. Level Spreader #9 was not re -analyzed because the flow directed to it will be lower than when it was first designed. This means the level spreader will function as previously designed, and the original design is conservative. The bioretention cell will have a ponding depth of 6" during the 1 " Rainfall Event. All runoff in excess of the water quality volume will bypass the bioretention cell by means of an overflow drain whose rim invert will be set at an elevation 6" higher than the bottom elevation of the bioretention cell. This overflow drain will be tied into the storm system. The bioretention cell will reduce the nitrogen export from the site in the post - development condition and will help minimize the use of buy downs and provide that concentrated flow discharges are modified to diffuse flow. Conclusion The peak flow at DP#6 during the 1 -Year rainfall event will decrease from pre- to post -development therefore no detention is required. A level spreader is not necessary to diffuse this flow across the stream buffer because the concentrated flow is conveyed by a natural draw through the stream buffer to the top of bank of the receiving stream. A bioretention cell was added to the plan to bring the project into compliance with Committed Element #7. The bioretention cell will function as required by the guidelines set forth in the City of Durham's Reference Guide for Development. 0902 - DP#6 Summary of Results.xls LS#8A FLOW SPLITTER CALCS Four Seasons Phase 2 DP#6 Summary of Results Matt Jones, EI 8/27/2009 Basin Name Pre -Developed 1 -Year Discharge* Post -Developed 1 -Year Discharge % Increase Detention Required (Yes/No) DP#6 13.21 1 4.61 -65.10% No * Pre -Developed 1 -Year discharge taken from approved SIA for overall Four Seasons Development DA6 DP#6 S4 Reach on Link 0902 DP#6 Post -Development Type// 24 -hr 1 -Year Rainfall=3.00" Prepared by {enter your company name here} Page 2 HydroCADO 7.10 s/n 003899 © 2005 HydroCAD Software Solutions LLC 8/27/2009 Subcatchment DA6: DP#6 Runoff = 4.61 cfs @ 11.96 hrs, Volume= 0.208 af, Depth> 1.56" Runoff by SCS TR -20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24 -hr 1 -Year Rainfall=3.00" Area (ac) CN Description 0.620 98.0 Townhouse Impervious 0.630 74.0 >75% Grass cover, Good, HSG C 0.350 80.0 >75% Grass cover, Good, HSG D 1.600 84.6 Weighted Average Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DA6: DP#6 Hydrograph ❑ Runoff 4.61 cfs Type II 24 -hr 1 -Year 4 Rainfall=3.00" Runoff Area=1.600 ac Runoff Volume=0.208 of 3- Runoff Depth>1.56" 3 LL T -c=5.0 min 2 CN=84.6 1 0 10 11 12 13 14 Time (hours) 0902 - PRELIMINARY BIORETENTION CELL DESIGN.xIs Surface Area 0902 - Four Seasons Phase II Bioretenion Cell Surface Area Design Runoff Volume Simple Method Drainage Area (A) _ Impervious Area = Impervious Fraction (IA) _ Rainfall Depth (RD) _ Rv _ 0.66 Acres 0.32 Acres 0.48 1.00 Inch 0.49 (Rv = 0.05+0.9*IA) Runoff Volume (V) = 1165 cf (V = 3630*Rp*Rv*A) Maximum Ponding Depth = 6.00 inches Biortention Cell Surface Area Required = 2330 square feet Biortention Cell Surface Area Provided = 2340 square feet Matt Jones, EI 8/27/2009 37644 r� �i� I i �� 37A ) I • ) � 1 � // +4d f " / 37Z • • / 44.- al 9$ 76 366a C4 \ � ♦♦ .� / / / / R P / I �\ ♦♦♦ — /// // // / / �4' I 1 \ \ may\ \ �♦ ////// // // / X56 � I 1 \ ��\ i �`_�� / // // // / \ �► ? 364 ♦ / / / / r�I / 1 \ ti,\ \ —/ / 111,01 1/111, .0e / k� \ \ \ / �/ 1.1 ♦ / / / \ �s / I — \ \ ♦ DRAIN�i�AREK / / / / 10, // \ 4 // / I i I \ . \ \ ♦.'� 356 \ - BOUNDARY 4.YFj'� I I //I loe \ ♦ ♦♦ — ——Sb'STI�EAAF1 BIiFFElt �� ,a-� / � `` J /�\ \�\ �l� ♦♦1♦ r�A�—_,—_—� i -- --_ _moi �// //' / • _ � / '� /� � ♦ � ����—��— —/� I —moi` i i TUR�,DRAW DP#6 // 0 50 loo 200 SCALE: 1" = 100' N .............................................................................. DRAWN BY HORVATH mu DP#6 POST -DEV DRAINAGE MAP CWECIEDBr 16COML17AM PIAMsurFE7o1 SCALE °?M"'""°'°"`"R°"953 ' FOUR SEASONS PHASE II L P 3" 3.�9u!9i�7 F 9"9.190L'i3PS3 .53'\I-AN0SkA,-ININELLD1 CHIN PAGE ROAD 53- ARKl-J: EE-, W -I '�U2 8-2409 P'23.z5s.li'�O F-21a.zess'o, PROJECT NO www.harvalhassacides.aam DURHAM, NORTH CAROLINA 0902 I \ 389 \ 390\ 391 _ IN■■■■■■ ■:L NGELOPLA E \ IORETENTIO \ 427 CELLNO I \ ,� ■ BIOREMNITION CELL 4rd c OVERFLOW DRAIN ■ / / ■ ` s X385 I / 42 ■ DRAINAGE AREA■ BOUNDARY PP) ■ TO BIORETENTIO CELL ■ ■ REA _0.66 ACRES 366 ■ l ■ J _ i �— Ing ■ U/ ■a■ Nauman ■ 383 4 0 20 40 80 SCALE: I"= 40' qN .............................................................................. DRAWN BY HORVATH BIORETENTION CELL DRAINAGE MAP CHECKEDBr 16 COMLJL7AM PLACE, SUr1E 201 SCALE DMAF? ?.''?-0.1 °"`"R°0"953 ' FOUR SEASONS PHASE II 7 P 3" 3.�9L'!9i�7 F 9"9.'9L'i3P53 1"=40' 53' MAR --AN sea .INN X1 CHIN PAGE ROAD pq .)HA-ANUa:]A.-CNNGSCC3'�+02 PL4-09 P F 123.155.51DJ PROJECT NO www.harvathass aclales.aam DURHAM, NORTH CAROLINA 0902 ZIP "TT 21 LD PAGE cmO b, L.L.C. OLD PAGE ROAD, LLC 1728 SHARNBROOK CT. RALEIGH, NC 27614 P: (919) 841-4960 F: (919) 841-4996 HOkVATH ASSOCIATES, P 16 CONSULTANT PLACE, SUITE 201 DURHAM, N.C. 27707 P: (919) 490-4990 F: (919) 490-8953 e-mail: kelly.elliott@horvathassociates.com R. FRONT ACCESS NOT TO SCALE NOTE: IN ORDER TO PROVIDE VISUAL DIVERSITY, NO MORETHAN FOUR CONTIGUOUS TOWNHOUSE UNITS SHALL BE ALLO'vJED WITH THE SAME SETBACK AND THE SAME FACADE TRE ,R AENT. VARIATIONS 114 SEI BACK SHALL BEAT LEAST 3 FEET. INDEX OF DRAWINGS: C000 COVER SHEET C001 OVERALL EXISTING CONDITIONS C002 EXISTING CONDITIONS/TREE SURVEY -PHASE 11 C100 OVERALL SITE PLAN/PRELIMINARY PLAT C101 OVERALL SITE PLAN -PHASE 11 C102 PARTIAL SiTE PLAN -PHASE 11 C1103 PARTIAL SITE PLAN -PHASE 11 C104 OVERALL SITE PLAN OPEN SPACE LAYOUT C200 STREET TREE/TREE COVERAGE REQUIREMENTS C201 LANDSCAPE DETAIL SHEET C300 OVERALL UTILITY PLAN C301 PARTIAL UTILITY PLAN C302 PARTIAL UTILITY PLAN C400 OVERALL GRADING/DRAINAGE PLAN C401 PARTIAL GRADING/DRAINAGE PLAN C402 PARTIAL GRADING/DRAINAGE PLAN C800 DETAILS C801 DETAILS C804 LINKS TO NODE RATIO DIAGRAM C900 ELEVATIONS C901 ELEVATIONS C902 ELEVATIONS C903 ELEVATIONS (per P02-20 1. 605 RESIDENTIAL UNITS MAXIMUM ON. THE ENTIRE DEVELOPMENT. 2, TWO COLLECTOR .TYPE STREETS TO BE. PROVIDED AND TWO POINTS OF ACCESS FROM EXISTING PUBLIC STREETS WILL BE PROVIDED. 3. A UNIFORM' SET OF SIGN CRITERIA' GUIDELINES FOR INDIVIDUAL TRACT DEVELOPM 4. A MINIMUM OF 9,56 AC. OF OPEN SPACE WILL BE PROVIDED. 5. CONSTRUCTION OF TRAFFIC IMPROVEMENTS. - 6. THE MAXIMUM BUILDING AREA OF THE NON-RESIDENTIAL PORTIONS WITHIN THE DEVELOPMENT TO DE 255,000 -SF. Lia?raxL®jrlTiliiqrImid IMM ILIamAJUTHviI'I®0.-1.'��1."�iYlL11)ti (per Z06-06) L 1. A maximum of 105 residential units: 2. A minimum of 29.42% open sace and a 25ft wide opens ace strip along Chin Page Road. 3. A landscape buffer with a minimum width of 40ft will be provided along the western property line adjacent to the IL(D) district, 4. A children's play area after the 61st Certificate of Occupancy (CO), The Developer will contribute $5000.00 to the HOA if the play area has not been constructed by the 61 t C.O. (To be verified/approvedby the Planning Department's site inspector). 5. A 5f2 mulch walking trail as shown on the development plan prior to the second CO in the multi -family section of the development. (To be verified/approved by the Planning Department's site inspector). 6. Provide erosion and sedimentation controls during construction that are consistent with the practices proposed for the updated N.C. State Design manual using baffles and/or skimrners to increase sediment trapping efficiency. 7. Provide storm water wetlands and/or other bio -retention methods and/or other storm water Best Management Practices (BMP's) that would be in excess of current standards by minimizing the Use ofbuy downs and committing to provide that concentrated flow discharges are modified to diffuse flow. 8. A collector street to Chin Page Road shall be provided through the site. 9. Provide connection of at least two street accesses before issuance of the 61th CO. 10. The following roadway improvements shall be constructed: a. Constr'uctiarof a westbound left -turn lane on Chin Page Road at Hie site entrance. b. Construction of an eastbound right -turn lane on Chin Pa e road at the site ent" nee. g C. Construction of an exclusive northbound left -turn lane on the site entrance at Chin Page Road. d, Construction of an exclusive northbound right -turn lane on the site entrance at Chin Page Road. �'►1 \ ►I►1An, ► I SITE SUMMARY GROSS LAND AREA: -SS SS SS SS _-SS-SS- -w �V Q W -f oW WATER METER N N PUBLIC STREET RO.V. r-- SEVER ---1--35 FT. MIN -1-- SERVICE LOT WIDTH AGRICULTURAL USES MIEN, STREET YARD - 20' MIN. MIN. REAR YARD - 25' MIN. m S,Q[][) SF to MIN. SIDE YARD - 6' MIN. z MIN. it MIN. TOTAL SIDE YARD -15' MIN, E �O 25' MIN. SETBACK z J NOT TOSCALE 5/8' WATER METER RO WICLIN �R PRIVATE 5' SIDEWALK NP. 4" Dl0. SEWER SERVICE ( ) (TYP). STREET EASEMENT O _ CZ U W W =- F- Ll_1 < =QO °- °- z Z = U Q WO S0. PT. ' NIH. E B T ACK TDO SQ.FT. SIR, Cl NOV PRIVATE OPEN PRIVATE OPEN INE'NC O R FRI O FTE SPACE TYPICA 10` SPACE TYPICAL RREET EAS NE NT TYPIChL TYPICAL MIN' TYPICAL ul II I, BUILDING 'TYPICAL BUILDING BUILDING SETBACK FL'Oi PRINT mutt DING FOOTPRINT FOOTPRINT IP RELT IS FOOTPRINT YON-CULLECiUR TYPE. (20' BLDG F COLLECT SETBACK GARAGE R STREET GARAGE GARAGE OR GREATER) GARAGE DRIVEWAY= 1/ ` sQ ; j tiw ti YP. PUBLIC ALLEY GLUIL MIN. STREET YARD - 5' MIN. W/ REAR ALLEY ACCESS <5" ON SIDE STREET IF NON -COLLECTOR) KIN. REAR YARD - 20' MIN. MIN. SIDE YARD - NONE BUILDING SEPARATION -10' MIN. REAR ACCESS FROM ALLEY NOT TO SCALE 5/8'4fATER MLTER 4' DIA SEWER SERVICE LINE OR PRIVATE 5' SIDLIWALK (TYP.) (IY'P.) STREET EASEMENT I f I � - 1- 4 i DRIVEWAY- T�lP. I 12' BL➢ - St TRACK_ 10, BF SSTREET IS MIN, JON -COLLECTOR TYPE. <2U' BLDG. SETBACKTYPICAL TYPICAL TYPICAL BUILDINGLLECTOk F COLLECTOR BUILDING STREET BUILDING BUILDING .FOOTPRINT DR GREATER) FOOTPRINT FOOTPRINT FOOTPRINT SV, LINE OR PRIVATE 100 SOFT. 100 SBFT. PRIVATE OPEN PRIVATE OPEN SPACE TYPICAL SPACE TYPICAL MIN. STREET YARD - 20' MIK W/ GARAGES <12' ON SIDE STREET IF NON -COLLECTOR) MIN. REAR YARD - 20' PIN. MIN, SIDE YARD - NONE BUILDING SEPARATIUN -10' MIN. FRONT ACCESS NOT TO SCALE NOTE: IN ORDER TO PROVIDE VISUAL DIVERSITY, NO MORETHAN FOUR CONTIGUOUS TOWNHOUSE UNITS SHALL BE ALLO'vJED WITH THE SAME SETBACK AND THE SAME FACADE TRE ,R AENT. VARIATIONS 114 SEI BACK SHALL BEAT LEAST 3 FEET. INDEX OF DRAWINGS: C000 COVER SHEET C001 OVERALL EXISTING CONDITIONS C002 EXISTING CONDITIONS/TREE SURVEY -PHASE 11 C100 OVERALL SITE PLAN/PRELIMINARY PLAT C101 OVERALL SITE PLAN -PHASE 11 C102 PARTIAL SiTE PLAN -PHASE 11 C1103 PARTIAL SITE PLAN -PHASE 11 C104 OVERALL SITE PLAN OPEN SPACE LAYOUT C200 STREET TREE/TREE COVERAGE REQUIREMENTS C201 LANDSCAPE DETAIL SHEET C300 OVERALL UTILITY PLAN C301 PARTIAL UTILITY PLAN C302 PARTIAL UTILITY PLAN C400 OVERALL GRADING/DRAINAGE PLAN C401 PARTIAL GRADING/DRAINAGE PLAN C402 PARTIAL GRADING/DRAINAGE PLAN C800 DETAILS C801 DETAILS C804 LINKS TO NODE RATIO DIAGRAM C900 ELEVATIONS C901 ELEVATIONS C902 ELEVATIONS C903 ELEVATIONS (per P02-20 1. 605 RESIDENTIAL UNITS MAXIMUM ON. THE ENTIRE DEVELOPMENT. 2, TWO COLLECTOR .TYPE STREETS TO BE. PROVIDED AND TWO POINTS OF ACCESS FROM EXISTING PUBLIC STREETS WILL BE PROVIDED. 3. A UNIFORM' SET OF SIGN CRITERIA' GUIDELINES FOR INDIVIDUAL TRACT DEVELOPM 4. A MINIMUM OF 9,56 AC. OF OPEN SPACE WILL BE PROVIDED. 5. CONSTRUCTION OF TRAFFIC IMPROVEMENTS. - 6. THE MAXIMUM BUILDING AREA OF THE NON-RESIDENTIAL PORTIONS WITHIN THE DEVELOPMENT TO DE 255,000 -SF. Lia?raxL®jrlTiliiqrImid IMM ILIamAJUTHviI'I®0.-1.'��1."�iYlL11)ti (per Z06-06) L 1. A maximum of 105 residential units: 2. A minimum of 29.42% open sace and a 25ft wide opens ace strip along Chin Page Road. 3. A landscape buffer with a minimum width of 40ft will be provided along the western property line adjacent to the IL(D) district, 4. A children's play area after the 61st Certificate of Occupancy (CO), The Developer will contribute $5000.00 to the HOA if the play area has not been constructed by the 61 t C.O. (To be verified/approvedby the Planning Department's site inspector). 5. A 5f2 mulch walking trail as shown on the development plan prior to the second CO in the multi -family section of the development. (To be verified/approved by the Planning Department's site inspector). 6. Provide erosion and sedimentation controls during construction that are consistent with the practices proposed for the updated N.C. State Design manual using baffles and/or skimrners to increase sediment trapping efficiency. 7. Provide storm water wetlands and/or other bio -retention methods and/or other storm water Best Management Practices (BMP's) that would be in excess of current standards by minimizing the Use ofbuy downs and committing to provide that concentrated flow discharges are modified to diffuse flow. 8. A collector street to Chin Page Road shall be provided through the site. 9. Provide connection of at least two street accesses before issuance of the 61th CO. 10. The following roadway improvements shall be constructed: a. Constr'uctiarof a westbound left -turn lane on Chin Page Road at Hie site entrance. b. Construction of an eastbound right -turn lane on Chin Pa e road at the site ent" nee. g C. Construction of an exclusive northbound left -turn lane on the site entrance at Chin Page Road. d, Construction of an exclusive northbound right -turn lane on the site entrance at Chin Page Road. �'►1 \ ►I►1An, ► I SITE SUMMARY GROSS LAND AREA: 122.0 AC (ENTIRE DEVELOPMENT) EXISTING ZONING: RS-M(D), RU -5(D), OI(D),CG(D) WATERSHED: NONE RIVER BASIN: NEUSE EXISTING USE: AGRICULTURAL USES CITY LIMIT ®INSIDE ❑OUTSIDE URBAN GROWTH AREA ®INSIDE ❑OUTSIDE TIER: SUBURBAN PROPOSED TOTAL UNITS = 204 UNITS IN PHASE 2 PROPOSED USES: SINGLE FAMILY/MULTI-FAMILY RESIDENTIAL TOTAL AREA = 122.OAC. (3,176,395.20 SF) MAXIMUM ALLOWABLE IMPERVIOUS AREA = NO LIMIT PROPOSED IMPERVIOUS SURFACE AREA ROADS/SIDEWALKS= 846,686 SF (15.937) RECREATION AREA 63,102 SF(1-19%) TOWNHOUSE UNITS = 631,800 SF N 1.897) IMPERVIOUS AREA FOR S.F. LOTS = 618,800 SF (11.64%) TOTAL = 2,160,388 SF = 49,60 AC. (40.65%) THE FOLLOWING GENERAL CONDITIONS APPLY TO THE SITE: 1, SITE PLAN REMAINS VALID AFTER 4 YEARS ONLY FOR THOSE PORTIONS OF THE SITE THAT HAS ACTIVE PERMITS OR HAS ALREADY RECEIVED CERTIFICATES OF COMPLIANCE. 2. THE DEVELOPER IS RESPONSIBLE FOR FABRICATION AND INSTALLATION OF ALL REQUIRED SIGNS AND PAVEMENT MARKINGS WITHIN THE PUBLIC RIGHT-OF-WAY. THE DEVELOPER SHALL SUBMIT A SIGNING AND MARKINGS PLAN TO THE CITY AT CONSTRUCTION PLAN STAGE FOR REVIEW AND APPROVAL ALL SIGNS AND PAVEMENT MARKINGS, SHOWN ON THE CONSTRUCTION PLANS; MUST BE IN PLACE PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY AND/OR STREET ACCEPTANCE, AS DETERMINED BY THE CITY. I i REQUIRED. 3. IF A HYDRANT IS PROPOSED, AFIRE FLOW ANALYSIS S ED. WATERLINE SIZE MAY CHANGE WITH FIRE R Q R FLOW ANALYSIS. CONTACT CITY ENGINEERING @ 220-4750 TO SCHEDULE FLOW TEST OR TO OBTAIN CURRENT SYSTEM DATA. 4. A COMPLETED STORMWATER FACILITY MAINTENANCE AND OPERATIONAL PERMIT AGREEMENT WITH APPROPRIATE FEES, CALCULATIONS AND DETAILS MUST BE SUBMITTED AT TIME OF CONSTRUCTION PLAN REVIEW, PLANS WILL NOT BE REVIEWED WITHOUT THESE ITEMS. CONTACT STORMWATER SERVICES @ 560-4326 FOR INFORMATION. 5. THE LOCATION OF THE SIDEWALKS SHOWN ON THIS PLAN IS SCHEMATIC. A CITY OF DURHAM ANDIOR NCDOT ENCROACHMENT PERMIT IS REQUIRED PRIOR TO ANY CONSTRUCTION. AFTER OBTAINING THE REQUIRED PERMITS, PLEASE CONTACT THE CITY OF DURHAM ENGINEERING CONSTRUCTION INSPECTION OFFICE @ 560-4326 FOR A PRE -CONSTRUCTION CONFERENCE AND FIELD VISIT PRIOR TO ANY WORK ON THE PROPOSED SIDEWALK, 6. a. STATE DRIVEWAY: A NCDOT DRIVEWAY PERMIT IS REQUIRED PRIOR TO ANY DRIVEWAY CONSTRUCTION. CONTACT NCDOT @ 560-6854 IS. CITY DRIVEWAY: A CITY OF DURHAM DRIVEWAY PERMIT IS REQUIRED PRIOR TO ANY DRIVEWAY CONSTRUCTION. SUBMIT PLANS FOR. DRIVEWAY PERMIT APPROVAL TO CITY ENGINEERING DEVELOPMENT REVIEW. AFTER OBTAINING THE PERMIT, PLEASE CALL CITY CONSTRUCTION INSPECTOR PRIOR TO START OF CONSTRUCTION @ 560-4326 7, TOWN HOME DEVELOPMENTS MAY BE DESIGNED AND CONSTRUCTED WITH PARKING AREAS ON BOTH SIDES OF THE TRAVEL LANES. THIS CONFIGURATION IS NOT TO BE CONSIDERED A STREET. IF THIS OPTION Is USED, THE TRAVEL AND PARKING AREAS SHALL BE NOTED AS "PRIVATE ACCESS AND COMMON AREAS'. AS SUCH, THE DEVELOPER SHALL ACKNOWLEDGE AND MAKE PROSPECTIVE BUYERS AWARE THAT THESE AREAS WILL NOT BE ASSIGNED A STREET NAME, NOR WILL THEY EVER BE ELIGIBLE FOR MAINTENANCE BY THE CITY OF DURHAM. THE DEVELOPER WILL ENSURE THAT ALL OF THE ACCESS AND COMMON AREA PROPERTY IS DESCRIBED IN THE F COVENANTS AND THAT RESPONSIBLE THE HOME OWNER ASSOCIATION IS OR THE MAINTENANCE OF THIS P AREA. THE FOLLOWING NOTE SHALL BE ADDED TO ALL SITE PLANS AND LATS ASSOCIATED WITH THE DEVELOPMENT: THE DRIVING AND PARKING AREAS SHOWN ON THIS DRAWING NOTED AS "PRIVATE ACCESS AND COMMON AREAS" DO NOT MEET CITY OF DURHAM STREET STANDARDS. THE FEATURES WITHIN THIS AREAS ARE PRIVATE AND WILL NEVER BE ELIGIBLE FOR. PUBLIC MAINTENANCE. 8. CENTERLINE OF 20 FOOT WIDE PUBLIC STORM WATER DRAINAGE EASEMENT, OWNERSHIP OF, AND RESPONSIBILITY FOR IMPROVEMENT AND MAINTENANCE OF STORM WATER FA-'ILITIES IN THIS EASEMENT W O BECOMES A PART OF THE CITY THE CURRENT OWNER. IF THE PROPERTY IS (THIN R REMAINS WITH THE CU T MS A RESTRICTIONS EASEMENT AND ACCESS POINTS TO THE EASEMENT ARE SUBJECT 70 THE TERMS AND R S RICTIONS STATED IN THE "REVISED DECLARATION OF RIGHTS AND PRIVILEGES OF THE CITY OF DURHAM IN STORM WATER MANAGEMENTTY EASEMENTS" RECORDED 1 EA E N REAL TATE BOOK 2298 PAGE 208 WHICH DOCUMENT IS .FACILI S E D DECLARATION DO':L LOT HEREIN: THIS EASEMENT AND THE RI VSE C 1 CREATE THE OBLIGATION TO INCORPORATED PROVIDE PUBLIC MAINTENANCE. NO BUILDING,. STRUCTURES,. FILLS, EMBANKMENTS OR OBSTRUCTIONS PERMITTED. WITHIN THE EASEMENT EXCEPT ACCORDING TO THOSE TERMS. 9. PERMIT REQUIRED PRIOR TO CONSTRUCTION OF STORM DRAINAGE FACILITIES- PERMIT TO BE OBTAINED FROM CITY OF DURHAM ENGINEERING WITH A COPY OF THE APPROVED PLANS. APPLY FOR PERMIT WITHIN 30 DAYS OF'STARTING -WORK. PRIOR TO ANY: CONSTRUCTION, CONTACT ENGINEERING CONSTRUCTION INSPECTION OFFICE @ 560-4326 A MINIMUM OF 48 HOURS AHEAD OF TIME TO COORDINATE INSPECTION PRIOR TO ACTUAL. CONSTRUCTION. 10. ALL DEVELOPMENT WITHIN THE FLOODWAY AND FLOODWAY FRINGE,INCLUDING FILL, NEW CONSTRUCTION, SUBSTANTIAL IMPROVEMENTS, MANUFACTURED HOUSING, STORAGE OF MATERIALS AND STORAGE OF TOXIC OR FLAMMABLE SUBSTANCES, IS PROHIBITED EXCEPT AS PROVIDED BY APPLICABLE FLOOD HAZARD REGULATIONS. FLOODPLAIN ELEVATION(S) 325,0-332.0 FLOODPLAIN ZONE "X" AND"'AE' FEMA MAP NUMBER 3720074700J/3720075700J FEMA MAP DATE MAY 2, 2006 11. STREAM BUFFERS: 50 FOOT WIDE UNDISTURBED DURHAM STREAM BUFFER, MEASURED FROM. TOP OF BANK EACH SIDE OF STREAM. NO CLEARING OR GRADING OTHER THAN SELECTIVE THINNING AND ORDINARY TION PERMITTED. b MAINTENANCEF EXISTING VEGETA 12. NEUSE RIVER BASIN STREAM BUFFERS: 50 FOOT WIDE NEUSE RIVER BASIN STREAM BUFFERS, MEASURED. FROM TOP OF BANK EACH SIDE STREAM: GRADING MAY BE ALLOWED WITHIN THE FIRST 20 FEET AS LONG AS SHEET O FLOW IS MAINTAINED (UNLESSA DURHAM STREAM BUFFER IS ALSO REQUIRED ON THE SAME STREAM SEGMENT, IN WHICH CASE THE STRICTER STREAM BUFFER WIDTH WOULD APPLY.) 13. WETLANDS: STATE AND FEDERAL PERMIT AUTHORIZATION MAY BE REQUIRED FROM THE DEHNR AND THE U.S. CORPS OF ENGINEERS PRIOR TO THE COMMENCEMENT OF ANY LAND DISTURBING ACTIVITIES IN OR NEAR A LAKE, STREAM, CREEK, TRIBUTARY OR ANY UNNAMED BODY OF WATER AND ITS ADJACENT WETLANDS. 14. UNDISTURBED LANDSCAPE BUFFERS: 25 FOOT WIDE UNDISTURBED LANDSCAPE BUFFER (WHERE INDICATED ON. THE PLAN). NONCLEARING OR. GRADING OTHER THAN SELECTIVE THINNING AND ORDINARY MAINTENANCE OF EXISTING VEGETATION PERMITTED. 15. PROTECTION OF EXISTING VEGETATION: AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL,A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA AT THE SAME TIME AS OTHER EROSION CONI[k3A MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. NO STORAGE OF MATERIALS, FILL OR EQUIPMENT AND NOT TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. 16. THE SITE WILL BE MASS GRADED. 17. AN AUTOMATED SOLID WASTE COLLECTION VEHICLE HAS A TURNING RADIUS OF 45 FEET WALL-TO-WALL AND 43 FEET CURB -TO -CURB. THE DEPARTMENT OF SOLID WASTE MANAGEMENT RESERVES THE RIGHT TO MODIFY COLLECTION OF GARBAGE AND RECYCLABLES FOR ANY ROAD WAY OR CUL-DE-SAC NOT CONSTRUCTED TO ACCOMMODATE THOSE SPECIFICATIONS. 18. PAYMENT IN LIEU OF OPEN SPACE DEDICATION TO BE MADE PRIOR TO APPROVAL OF THE FIRST FINAL PLAT. 19. AN EXECUTED STORMWATER FACILITY OPERATIONAND MAINTENANCE PERMIT AGREEMENT (PREPARED BY STORMWATER SERVICES, CITY OF DURHAM), PAYMENT OF A STORMWATER FACILITY PERMIT FEE ($2,000 PER DETENTION/WATERQUALITY DEVICE) AND PERPETUAL SURETY FOR THE CONTINUED OPERATION AND MAINTENANCE OF THE FACILITY IS REQUIRED PRIOR TO CONSTRUCTION PLAN APPROVAL. 20. A COMPLETED CITY OF DURHAM DESIGN SUMMARY IS REQUIRED (FOR EACH DETENTION/WATER QUALITY DEVICE) NO LATER THAN AT THE FIRST CONSTRUCTION DRAWING SUBMITTAL. 21. STORMWATER BMP DESIGNS AND CALCULATIONS WILL NOT BE REVIEWED/APPROVED WITH THE SITE PLAN. ALL DESIGNS TO BE REVIEWED. AND APPROVED AT THE CONSTRUCTION DRAWING STAGE. 22. WHERE STREETS TERMINATE (EXAMPLE PHASE LINES) THE FOLLOWING WILL BE INSTALLED: 1) ASPHALT HEADER, 2) RIPRAP OR CONCRETE APRON FOR STORM WATER TO DISSIPATE, 3) UTILITIES TO EXTEND A MINIMUM OF 5' BEYOND THE EDGE OF PAVEMENT, 4) NCDOT TYPE III BARRICADE. 23. BY REFERENCING. ROADWAY IMPROVEMENTS ON THE PLAN, THE APPLICANT AGREES TO CONSTRUCT SAID IMPROVEMENTS PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY IN A MANNER THAT WILL ALLOW THEM TO. FUNCTION AS NOTED ON THE PLAN AND IN ACCORDANCE WITH NCDOT AND CITY OF DURHAM STANDARDS AND. POLICIES. THIS INCLUDES ( WHERE APPROPRIATE) BUT ISNOT LIMITED TO: ADEQUATE TRANSITION TAPERS, ALIGNMENT OF LANES THROUGH INTERSECTIONS, ASSOCIATED SIGNAL MODIFICATIONS, PAVEMENT MARKINGS, ASSOCIATED SIGNAGE, CURB AND GUTTER, COORDINATION WITH OTHER PROPOSED ROADWAY. IMPROVEMENTS AND BIKE. LANES. THE APPLICANT ALSO ACCEPTS THE FINANCIAL RESPONSIBILITY OF ANY ADDITIONAL RIGHT-OF-WAY NECESSARY TO ACCOMMODATE THESE IMPROVEMENTS AND ANY REQUIRED: SIDEWALK CONSTRUCTION. r;.............. 25. THIS PROJECT FULLY COMPLIES WITH THE PROVISIONS Of THE UNIFIED DEVELOPMENT ORDINANCE, EFFECTIVE JANUARY 1, 2006. 26. BE ADVISED THAT THE PROVISION OF APPENDIX If OF THE FEDERAL FAIR HOUSING REGULATIONS (ACCESSIBILITY GUIDELINES -24 CFR, CH. 1, SUBCH. A, APP 11) EFFECTIVE MARCH 6, 1991 ARE REQUIRED ON THIS PROJECT. IT IS THE RESPONSIBILITY OF THE OWNER/DEVELOPER/BUILDER TO COMPLY WITH THESE REGULATIONS. ALSO BE AWARE THAT THESE REQUIREMENTS. ARE BEYOND THE SCOPE OF VOLUME I -C (HANDICAP ACCESSIBILITY) OF THE NO STATE BUILDING CODE AND AS SUCH THE BURDEN OF COMPLIANCE IS BORNE BY THE OWNER/DEVELOPER/BUILDER. THE FOLLOWING MUST BE DONE PRIOR TO ISSUANCE OF A ZONING 27. EROSION CONTROL PLAN TO BE SUBMITTED TO THE PLANNING DEPARTMENT FOR VERIFICATION PRIOR TO ISSUANCE OF A ZONING COMPLIANCE FORM. 3 THE FOLLOWING MUST BE DONE PRIOR TO ISSUANCE OF LAND DISTURBANCE PERMIT 28. TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE OR ISSUANCE OF A GRADING PERMIT AND SHALL INCLUDE WARNING SIGNS POSTED IN BOTH ENGLISH AND SPANISH, AS FOLLOWS:"NO TRESPASSING/TREE. PROTECTION AREA/PROHIBIDO ENTRARJZONA PROTECTORA LOS ARBOLES" 29. ROOT ZONE PROTECTION AREA EQUALS ONE FOOT OF RADIUS FOR EVERY INCH OF DIAMETER OF EXISTING TREES, OR SIX FOOT RADIUS, WHICHEVER IS GREATER. NO DISTURBANCE ALLOWED WITHIN THIS AREA. AREA MUST BE PROTECTED WITH BOTH TREE PROTECTION FENCING AND WARNING SIGNS. SO A SEWER PERMIT MUST BE APPROVED BY THE. DURHAM COUNTY UTILITY DIVISION. OF 31. ALL LANDSCAPING MUST BE IN PLACE PRIOR TO REQUEST FOR A CERTIFICATE OF COMPLIANCE. 32. EACH LANDSCAPING COMPLIANCE INSPECTION AFTER THE INITIAL INSPECTION WILL INCUR.A RE -INSPECTION FEE, STARTING AT $100+4% TECHNOLOGY SURCHARGE. EACH SUBSEQUENT RE -INSPECTION WILL INCREASE BY $100+47. (EXAMPLE IST - $104, 2ND - $208, 3RD - $312, ETC.) PAYMENT MUST BE RECEIVED BY THE DURHAM CITY COUNTY PLANNING DEPARTMENT PRIOR TO RE -INSPECTION. A CERTIFICATE OF OCCUPANCY: ONGOING OR AS -NEEDED PROVISIONS OF ANY CITY SOLID WASTES R 33. TO RECEIVE SERVICE INCLUDING DEBRIS CLEANUP OR COLLECTION OF GARBAGE, RECYCLABLES, YARD WASTE OR. BULKY ITEMS ON2NY PRIVATE ROAD OR OTHER PRIVATE. PROPERTY, A RESIDENTIAL WAIVER OF LIABILITY MUST BE EXECUTED BY THE APPROPRIATE LEGAL ENTITY (e.g., HOMEOWNER'S ASSOCIATION), FORM TO BE PROVIDED BY THE DEPARTMENT OF SOLID WASTE MANAGEMENT, PRIOR. TO ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY. SEE THE SWM WEB SITE AT W MNCG V DEPARTMENTS SOLID. WW .DURHA O l 1 34. TO RECEIVE ONGOING OR AS -NEEDED PROVISIONS OF ANY CITY SOLD, WASTE SERVICE INCLUDING DEBRIS CLEANUP OR COLLECTION OF GARBAGE, RECYCLABLES, YARD WASTE OR BULKY ITEMS ON ANY PORTION OF ROAD WHICH TERMINATES, TEMPORARILY OR PERMANENTLY, WITHOUT PROVISION OF TURN AROUND AREA THAT CONFORMS TO PERMANENT CITY CUL-DE-SAC AND ROAD CONSTRUCTION SPECIFICATIONS THE COMMUNITY MUST SUBMIT A PLAN DETAILING AN ALTERNATIVE TO. AND OBTAIN WRITTEN APPROVAL FROM; THE DIRECTOR OF SOLID WASTE MANAGEMENT OR THE DIRECTOR'S DESIGNEE. PRIOR TO ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY ON SUCH PORTION OF:RAD. CONTACT SWM .AT 560-4186. 35.: AS -BUILT DRAWINGS SHALL BE APPROVED PRIOR TO WATER METER' AND SANITARY SEWER SERVICE CONNECTION INSTALLATIONS AND PRIOR ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 36. MEASURES SHALL BE PROVIDED TO PREVENT LIGHT SPILLOVER ONTO ADJACENT PROPERTIES AND GLARE TOWARD MOTOR VEHICLE OPERATORS. EXTERIOR LIGHTS SHALL BE SHIELDED SO THAT THEY DO NOT CAST DIRECT LIGHT BEYOND. THE PROPERTY LINE. IN ACCORDANCE WITH THESE STANDARDS: - a. THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY LINE ADJACENT TO RESIDENTIAL ZONING IS 1/2 FOOT CANDLES. b.. THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY. LINE ADJACENT TO NONRESIDENTIAL ZONING IS 5FOOT CANDLES. c. THE MAXIMUM ILLUMINATION AT THE EDGE OF THE PROPERTY LINE ADJACENT TO A STREET IS 5 FOOT CANDLES. THE LEVEL OF ILLUMINATION AS MEASURED IN FOOT CANDLES AT ANY ONE POINT SHALL MEET THE STANDARDS IN THE TABLE IN SECTION 7.4.3.3A WITH MINIMUM AND MAXIMUM LEVELS MEASURED ON THE PAVEMENT WITHIN THE LIGHTED AREA AND AVERAGE LEVEL MEASURED AS NOT -TO -EXCEED VALUE CALCULATED USING ONLY THE AREA OF THE SITE INTENDED TO RECEIVE ILLUMINATION. THE MAXIMUM HEIGHT FOR DIRECTIONAL LIGHTING FIXTURES, WHICH ARE DEFINED AS FIXTURES'DESIGNED TO INSURE THAT NO LIGHT IS EMITTED ABOVE A HORIZONTAL LINE PARALLEL TO THE GROUND, SHALL BE 30 FEE(. THE MAXIMUM HEIGHT FOR NON -DIRECTIONAL LIGHTING FIXTURES, WHICH ARE DEFINED AS FIXTURES DESIGNED TO. ALLOW LIGHT TO BE EMITTED ABOVE A HORIZONTAL LINE PARALLEL TO THE GROUND, SHALL BE 15 FEET, THIS MUST BE VERIFIED BY FIELD SURVEY (BY USE OF PHOTOMETRIC SURVEY) PRIOR TO THE CERTIFICATE OF COMPLIANCE BEING ISSUED. METHODS TO. ACCOMPLISH THIS MAY INCLUDE, BUT NOT. BE LIMITED TO, HORIZONTAL LAMPS, SHIELDING OF LAMPS, REDUCTION IN THE NUMBER OF FIXTURES. REDUCTION OF WATTAGE OF BULBS, ETC. ALL OF THIS: INFORMATION;. INCLUDING DETAILS, WILL BE REQUIRED ON BUILDING PLANS PRIOR TO ISSUANCE OF BUILDING PERMIT. SPECIAL CONDITIONS 9. THE FINAL PLAT DEDICATING THE OPEN SPACE SHALL BE RECORDED PRIOR TO ISSUANCE OF A BUILDING PERMIT. 2. ALL SIZES, MATERIALS; SLOPES, LOCATIONS, EXTENSIONS AND DEPTHS FOR ALL PROPOSED UTILITIES (WATERLINES, SANITARY SEWER AND STORM DRAINAGE CONVEYANCE SYSTEMS)SHALL BE DESIGNED TO THE SPECIFICATIONS SET FORTH IN THE DESIGN CRITERIA AND STANDARDS OF THE PUBLIC WORKS DEPARTMENT AND BE SUBJECT TO REVIEW. AND APPROVAL BY THE PUBLIC WORKS DEPARTMENT AT CONSTRUCTION DRAWING SUBMITTAL. 3. THE DESIGNING PROFESSIONAL (A NCPE, NCPLS OR NCRLA- AS REQUIRED) WILL SUBMIT 3 SES OF CONSTRUCTION DRAWINGS TO. CITY ENGINEERING FOR REVIEW AND APPROVAL BEFORE STARTING CONSTRUCTION (SEE CONSTRUCTION PLAN APPROVAL. PROCESS). NOTE: THE APPROVAL OF CONSTRUCTION DRAWINGS 15 SEPARATE FROM SITE PLAN APPROVAL, 4. WATER AND SEWER PERMITS ARE REQUIRED FOR THIS PROJECT. SEWER PERMIT REQUIRED. SEWER PERMIT FROM DURHAM COUNTY REQUIRED. CONTACT DURHAM COUNTY UTILITY DIVISION AT 560-7993. 5. BACK FLOW PERMIT REQUIRED WITH THIS PROJECT.. CONTACT CONTACT DEPARTMENT OF WATER MANAGEMENT AT 560-4194 TO OBTAIN BACKFLOW PREVENTER PERMIT AND INSTALLATION REQUIREMENTS 6. THE FOLLOWING ITEMS ARE NOT REQUIRED FOR SITE PLAN APPROVAL BUT ARE ITEMS THAT ARE REQUIRED BEFORE CONSTRUCTION OF WATER,. SEWER, STORM DRAINAGE AND STREETS CAN BEGIN. DEVELOPER IS ULTIMATELY RESPONSIBLE TO MAKE CERTAIN THAT THESE ITEMS ARE COMPLETE AND APPROVED. a. CONSTRUCTION DRAWINGS REQUIRED. THE DESIGN ENGINEER I(A NCPE) WILL SUBMIT 3 SETS OF CONSTRUCTION DRAWINGS (PLAN AND PROFILE IF REQUIRED) TO CITY ENGINEERING FOR REVIEW AND APPROVAL BEFORE STARTING CONSTRUCTION. THIS SUBMITTAL MUST BE DONE. PRIOR TO APPLYING FOR A. BUILDING PERMIT, THE APPROVAL OF CONSTRUCTION DRAWINGS IS SEPARATE FROM SITE PLAN APPROVAL. IS. FIRE. FLOW ANALYSIS REQUIRED, FIRE FLOW ANALYSIS REQUIRED. WATERLINE SIZES MAY CHANGE BASED ON ACCEPTABLE FIRE FLOW ANALYSIS. CONTACT CITY ENGINEERING@ 560-4326 TO SCHEDULE FLOW TEST OR To OBTAIN CURRENT SYSTEM DATA. c. WATER PERMIT REQUIRED. SEWER PERMIT REQUIRED. CONTACT CITY ENGINEERING @ 560-4326 7. DRIVEWAY LENGTHS SHALL BE NO. LESS THAN 20' MEASURED FROM THE RIGHT OF WAY LINE OR STREET EASEMENT LINE AS APPLICABLE FOR RESIDENTIAL PROJECTS, 8. AN "AS -BUILT' CERTIFICATION WILL BE REQUIRED TO DEMONSTRATE. THAT ALL FAIR HOUSING ADA HANDICAP CODE REQUIREMENTS HAVE BEEN MET (SUCH AS PROPER SLOPES ON THE SIDEWALKS, ETC.). 9. WHEN THE POOL IS ADJACENT TO OFFSITE RESIDENCES, THE PLAYING OF MUSIC DETECTABLE OFF-SITE ON A PUBLIC ADDRESS SYSTEM IS PROHIBITIVE. INFORMATIONAL ANNOUNCEMENTS SHALL BE PERMITTED. THIS REQUIREMENT MAY BE WAIVED IF A PERMIT HAS BEEN ISSUED FOR A SPECIAL EVENT. 10. TRASH COLLECTION: A WAIVER FOR COLLECTION ON THE PRIVATE ROAD WILL BE COMPLETED AND NOTARIZED PRIOR TO ANY COLLECTION TAKING PLACE. TRASH COLLECTION FOR THE DUMPSTER ON THE PRIVATE ROAD WILL OCCUR TWICE A WEEK. FAI IN Z o cytN aq(e Rp ` Ro SITE AD PHASE H PHASE t ,oq �F �o uDp.O CO hTD. m P PGE r x� VICINITY MAP as NO SCALE N SPECIAL CONDITIONS (continued) THE FOLLOWING MUST BE DONE PRIOR TO THE ISSUANCE OF BUILDING PERMIT: 11. DEDICATE RIGHT-OF-WAY FROM THE FRONTAGE OF THE SITE ALONG CHIN PAGE ROAD TO PROVIDE A MINIMUM OF 10' RIGHT-OF-WAY FROM THE BACK OF THE PROPOSED CURB. A COPY OF THE RECORDED PLAT 12. NO FILL OR DEVELOPMENT SHALL ENCROACH INTO THE FLOODWAY FRINGE. H OODWAY FRINGE LOCATION TC BE FIELD -SURVEYED AT THE CONSTRUCTION DRAWING STAGE TO CONFIRM THIS PRIOR TO CD APPROVAL. THE FOLLOWING IS REQUIRED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY: 13. SUMMARY Of REQUIRED IMPROVEMENTS (PHASE 11) SR 1969 (CHIN PAGE ROAD) SITE ENTRANCE 1. CONSTRUCT AN EXCLUSIVE EASTBOUND RIGHT -TURN LANE ON CHIN PAGE ROAD. 2. CONSTRUCTION OF AN EXCLUSIVE WESTBOUND LEFT -TURN LANE ON SR 1969 (CHIN PAGE ROAD); 3. CONSTRUCTION OF AN EXCLUSIVE NORTHBOUND LEFT -TURN LANE ON THE SITE ENTRANCE; AND 4. CONSTRUCTION OF AN EXCLUSIVE NORTHBOUND RIGHT -TURN LANE ON THE SITE ENTRANCE. 5R 1973 (PAGE ROAD) 11969 (CH N PAGE ROAD) 1. CONSTRUCTION OF AN EXCLUSIVE SOUTHBOUND RIGHT -TURN LANE ON THE SITE ENTRANCE. (COMPLETED BY OTHERS) SR 1973 (PAGE ROAD) / SITE ENTRANCE (PHASE 11) 1. CONSTRUCTION OF AN EXCLUSIVE SOUTHBOUND RIGHT -TURN LANE ON SR 1973 (PAGE ROAD T ( G ). 2. CONSTRUCTION OF AN EXCLUSIVE NORTHBOUND LEFT -TURN LANE ON SR 1973 (PAGE ROAD): 3. CONSTRUCTION OF AN EXCLUSIVE EASTBOUND LEFT -TURN LANE ON THE SHE ENTRANCE' AND 4. CONSTRUCTION OF AN EXCLUSIVE EASTBOUND RIGHT -TURN LANE ON THE SITE ENTRANCE. 5. CONSTRUCTION OF AN ADDITIONAL EXCLUSIVE SOUTHBOUND THROUGH LANE ALONG THE SITE FRONTAGE ON SR 1973 (PAGE ROAD). SUMMARY OF IMPROVEMENTS COMMITTED BY OTHERS (REQUIRED BY THIS DEVELOPMENT) SR 1973 (PAGE ROAD) / 440 WESTBOUND RAMP (PHASE 11} 1, CONSTRUCTION OF AN EXCLUSIVES SOUTHBOUND RIGHT -TURN LANE N SR 1973 PAGE ROAD), O O t 2 CONSTRUCT AN ADDITIONAL EASTBOUND LEFT -TURN LANE ON 1-40 WESTBOUND OFF -RAMP (CONSTRUCTION Of TMS IMPROVEMENT WILL ALSO REQUIRE THE WIDENING OF NORTHBOUND PALL ROAD TO ACCEPT THE DUAL L FT -T RNS . E U 3. CONSTRUCTION Of AN ADDITIONAL EASTBOUND RIGHT -TURN LANE ON I-40 WESTBOUND RAMP. (COMPLETED BY OTHERS) SUMMARY OF RECOMMENDED IMPROVEMENTS SR 1969 (CHIN PAGE ROAD) / SITE ENTRANCE 1. CONSTRUCTION OF AN EXCLUSIVE EASTBOUND RIGHT -TURN LANE ON SR 1969 (CHIN PAGE ROAD). SR: 1973 PAGE ROAD SR 1969 CHIN PAGE ROAD) 1. PERFORM A SIGNAL WARRANTS ANALYSIS AT THIS LOCATION. IF WARRANTS ARE MET, THIS INTERSECTION SHOULD BE SIGNALIZED. INSTALLATION OF THE SIGNAL WILL BE THE OF E DEVELOPER OPER WITH APPROVAL FROM THE CITY OF DURHAM AND NCDOT TRAFFIC ENGINEERS. SR 1973 (PAGE ROAD) / SITE ENTRANCE 1. PERFORM A SIGNAL WARRANTS ANALYSIS AT THIS LOCATION. IF WARRANTS ARE MET, THIS INTERSECTION SHOULD BE SIGNALIZED. INSTALLATION OF THE SIGNAL WILL BE THE RESPONSIBILITY OF THE DEVELOPER WITH APPROVAL FROM THE CITY OF DURHAM AND NCDOT TRAFFIC ENGINEERS. IN ADDITION TO IMPROVEMENTS MENTIONED ABOVE, IMPROVEMENTS TO BE DONE BY OTHER DEVELOPMENTS AS REFERENCED IN THE TIA MUST BE COMPLETED PRIOR TO COMPLETION OF THE CHIN PAGE ROAD DEVELOPMENT PROJECT IN ORDER TO PROVIDE ACCEPTABLE LEVELS OF SERVICE. THEREFORE, CONSTRUCTION OF ALL PORTIONS OF THE CHIN PAGE ROAD DEVELOPMENT PROJECT WILL BE DEPENDENT ON THE - COMPLETION OF THESE IMPROVEMENTS. 13. 14. A MAXIMUM OF 60 UNIT Y RECEIVE S MA R CE VE A CERTIFICATE OF OCCUPANCY PRIOR TO THE COMPLETION OF A SECOND POINT OF ACCESS TO A PUBLIC STREET. 14.. FOR LOTS 266-268 AND 304-328:. A NO-RISECERTIFICATION OR CLOMR IS REQUIRED AS PART OF irtOSE> APPLICATIONS AND MUST BE APPROVED PRIOR TO APPROVAL OF CONSTRUCTION DRAWINGS AND BUILDING . PERMITS. INSTALLATION, FOR THE TREE REPLACEMENT AREA WITHIN THE DUKE ENERGY TRANSMISSION LINE EASEMENT BE PROVIDED IN THE NAME OF THE HOME OWNER'S ASSOCIATION, IN CONJUNCTION WITH THE FIRST FINAL ;�T, f� `! - � ♦ ! " SiTE PLAN & PRELIMINARY PIAT APPROVED BY THE DURHAM DEVELOPMENT REVIEW BOARD ON: 20 1 zo l-0 Clet`ItJDevelopment Rgy(ew Board Null and void after e -.20- For -For portions without a recorded final plat, an active building permit or Certificates of Compliance REFERENCE: ZONING CASE # P02-29, Z06-06 REFERENCE: DRB APPROVAL FOR PHASE 1, CASE # D07-377 nqs\09\0902 09u; SIBET OOCOPYRIGHT 2010 THIS DOCUMENT AND THE DESIGN ARE THE -PROPERTY OF HORVATH ASSOCIATES, P.A. ANY REPRODUCTION WITHOUT PRIOR WRITTEN CONSENT IS PROHIE A S S O C I A T E S 16 CONSULTANT PLACE, SUITE 201 DURHAM, NORTH CAROLINA 27707 P 919.490.4990 F 919.490.8953 537 MARKET STREET, SUITE LL20 CHATTANOOGA, TENNESSEE 37402 P 423.266.4990 F 423.266.5700 www.horvothassociates.com 1--n- z J Q O _ CZ U W W =- F- Ll_1 < =QO °- °- z Z = U Q Lj COVER SHEET nr>..Ont.....`ar ,\q CARO CARO/ ., C, $•i 'SEA =, -3'2T 32 PER CITY COMMENTS i � 1S"T REVIEW I FS 3/11109 PER CITY COMMENTS 2 1 2ND REVIEW FS 01/28110 PER CITY COMMENTS 3 ' 3RD REVIEW ' MJ 06/03/10 I I DRAWN BY: CHECKED BY: LRS 02/12/09 SCALE: NTS PROJECT NO: 0902 MEET NO: SITE PLAN