HomeMy WebLinkAboutSW6240605_Plansheet - Other_20240618 (2) \\\1111111111111/////
FINAL �N oARo
McDOUGLAS RD
FOR = SEAL
035670
-�o SITE - - _ ` � \ v v v v v v v v \ v I I v /\\ v� - - / �, REVIEW
ctiG pF o �� - - - \ \ \ \ \ \ \ I I \\ \\\ \\ — _ — \ / ONLY = �'�oo ciNE����P;:
u
\ — — — MCCORMICK FARMS — — — _ _ _ _
VICINITY MAP v — — — �z— v LTD PARTNERSHIP — — — — — — ` Z � •Q)
NOT TO SCALE —
�� �� _ _ _ _A v� DB 1133, PF 465 � — — _ / cV M N W
—s e7•� 1��� w
- \V � \ _0
z
U 00
M624.0 ZN Ej)o 00
@ ro N
— —
CONSTRUCTION SEQUENCE & EROSION CONTROL ' I — —�� — �� ` v`�v �`� v� � � ocn
MEASURES - CONSTRUCTION PHASE: PHASE 2 _ — I — — v v -�
— _ _ _ — ALL SWALES AND DITCHES \ \ SFO 18"THICK CLASS B �° I U
_REQUIRE 7-DAY GROUND COVER. — — _ I_ — \� \ -RIP RAP ON FILTER a �P, �\ 2 4 I I _ — — tru Ol
—ZLZ — _I— \ — — — — — — \ \ FABRIC v PPe � � �1 _ . . . _ U c
_ TEMP DIVERSION A SKIMMER �� _>
1. CHECK ALL SILT FENCE AND REPAIR AS NECESSARY. ASSURE ANY ERODED AREA ARE \ \ — — I — _I-7'WIDE NATURAL 'ice �� / I — — pl • • -0 U
� DITCH 3 A — — — I t' DEVICE,TYP OF ALL \ FPS � a) J
STABILIZED WITH TEMPORARY SEEDING AND MULCH OR EROSION CONTROL \ \ ALL SWALES AND DITCHES NAG S75BN LINING_ — I FLOW SPREANUSD AT �� 4 �� _ c
ALL SWALES AND DITCHES TERMINUS L; SEE SCHEDULE THIS / j / _ (�
REQUIRE 7-DAY GROUND COVER. (SEE LEGENDS FOR DITCH �— \ S SHEET. ALL SWALES AND DITCHES wa _ — O — U
MATTING AS INDICATED ON THE PLANS. \ REQUIRE7-DAVGRouNDcovER. ��� _� — G — — K-U �/ _ ____ _ _ , X
LINING TYP OF ALL) — y\ �._s_,' REQUIRE 7-DAY GROUND COVER. \� — Z
TEMP DIVERSION \ _� _ — / — aJ O •-
2. ROUGH GRADE ROADWAY RIGHT OF WAY AREA. e \ \ — — — — — z
LOD — — — — — — — — — — WITH RIPRAP LINING
_ S \ � � � - - m
_ _ ___ K. _ _ = o
3. INSTALL WATER SYSTEMS AS SHOWN ON THE PLANS. N �\ — 5[z I —
\ SK SK
4. INSTALL INLET/OUTLET BMP S WHERE REQUIRED.
TD
_ _ TD — _ N _ _ TSD � — �. — — _� — m
5. GRADE AND PREPARE SUBGRADE FOR PAVEMENT AREA. —I — — — — — — — 6(� I `(� — I N — — — — �rsz \ \ �\ _ _ � __ 139�_ �Z j_
�// —J �8'WIDE NATURAL TEMP DIVERSION
6. PLACE COMPACTED G.A.B.0 FOR ASPHALT CONSTRUCTION. — — — F — — _ k k _k I z I FLOW SPREAD AT\ \' m TSD \ _DITCH 1-C M — _— — — _ —
1 k k £8z — — TERMINUS — V << . �zrz
7. FINISH FINE GRADING THE ROAD RIGHT OF WAYS AND COMMON AREAS. l k k k k kk k k — — — — _ {I
ram^ k k k k I < I f \I \ \ \ —/ � /— / / ' —z
"'"� k APPROx 2zs cv I �+ A V A A / ���
k kk k kk ] STORAGE —IZ_i_— — C 8 \ \ (� / � /7 ' / /
8. IMMEDIATELY STABILIZED ALL DISTURBED GROUND WITHIN ROAD RIGHT OF WAY CONCRETE WASHOUT k k k k r SIDE SLOPES 5 I + — A,PROX.z2sCY J 1\ \ K \I <'e - . _ _
WITH PERMANENT GROUND COVER. MAINTAIN 50'FROM k k k TALL 11.21 I ST°RA6E(21 \ 6 — — —\
I \ �APPROX.225 C�' '
SIDE SLOPES 5 \ —
EROSION DEVICES AND WA k k FLATTOP) , I- TaLL 11.2s , I I J SKIMMER BASIN WITH \I \� \ STG — — _TEMP DIVERSION
k O FLATTOP) + _I— — — BAFFLES.TYP OF ALL \ \ \ SIDESLOPEs,s ALL SWALES AND DITCHES
SURFACE WATER. — k �� P I I \ I \ LiL,ll.zs _ DITCH_1-B
k k C ��T I APPROX. LOCATION RECP I \ \ \ I \ FATTi3P) _REQUIRE 7 DAY GROUND COVER. \
OF RAIN GAUGE OVERFLOW DITCH
_ INSTALL S75BN \ 7 J _ — — -vyZ
_ ___ +C,O�PG�k I\ I MATTING I TEMPORARY STOCKPILE —
SYMBOL PRACTICE DESCRIPTION _ _ - - - k k k k k I ALL SWALES I I I — — — —9—{ — I AREA WITH SILT FENCE I y I \
AND DITCHES COIR WATTLE_ RECP I — — — _ (AS NEEDED) \— _ h ROADWAY
OVERFLOW W
WATTLE/ROLLED — — — — t= (TYP.)_ J MAINTAIN MINIMUM I \ ; \ \ -COIR WATTLE SWALE —
EROSION — — — — — — — RECP —REQUIRE 7-DAY — — 50,FROM ALL SEDIMENT \ V A \ f z z Q
PROTECTIVE LINING TO PREVENT SOIL EROSIONS DUE TO EXCESSIVE _ 8 _I \ \ / / (PERMANENT) I o o s
RECP CONTROL PRODUCT --—- — — — 80.0 ' 8 GROUND COVER. _ RECP — _ J— I DEVICES AND SWALES. \ — — \ \I \ —�5 O_
STORMWATER VELOCITIES THAT PROHIBITS VEGETATIVE LININGS. _ _ _ _ _ _ _ — — \ \
FOR SLOPES ��� TYP OF ALL) / ;
ALL SWALES "^CP — RECP L I\ — — RECP RECP IMMEDIATELY STABILIZED' z \
TEMPORARY FACILITY PROVIDED ONSITE FOR CONCRETE TRUCKS TO \ \ a a J \
CONCRETE WASHOUT WASHOUT PRIOR TO LEAVING CONSTRUCTION SITE, CONTRACTOR MAY — — -- _ PINE STA WAY o CE =50 AND DITCHES — — RECP L — _ I � \ 82 / WITH NAG S756N o
CWA _ REQUIRE 7-DAY _� \ 82 \ / _ MATTING. \
AREA RELOCATE ONSITEAS DEEMED NECESSARY THROUGH-OUT �� PUB--R-/ ttT o GROUND COVER. _ pI
CONSTRUCTION o o — w ALL SWALES (50 WE VISTA U/Ay _ RECP J 1h RECP \ \ \
iPl IR o _ i
SAND DITCHES _W ALL SWALES
"� — � 8 1• V � \ � � A
REQUIRE 7-DAY _ AND DITCHES ALL SWALES
— ROADWAY— — GROUND COVER. REQUIRE 7-DAY ECIAND DITCHES -
- � _ w REQUIRE 7-DAY ALL SWALES \ ALL SWALES ALL SWALES
OVERFLOW _ GROUND COVER. — AND DITCHES AND DITCHES TD
SWALE I _ _ GROUND COVER. ALL SWALES AND DITCHES ALL SWALES \ `
RECP REQUIRE 7-DAY — \ REQUIRE 7-DAY
_ _ I IMMEDIATLEY STABILIZE ROAD (PERMANENT) I I O — I� — — — _ REQUND_COVER. AND DITCHES � REQUIRE 7-DAY GROUND COVER. AND DITCHES \ \
GROUND STABILIZATION REQUIREMENTS _ _ ' - DITCH WITH PERMANENT _____� — — — — I I — —� REQUIRE ALL SWALES ROUND COVER. REQUIRE 7-DAY \
ECP GROUND COVER. AND DITCHES GROUND COVER.
_ GROUND COVER. I _-- I I COIR WATTLE _ — REQUIRE 7-DAY
CONTRACTOR SHALL BE REQUIRED TO ESTABLISH GROUND --- I (TYP.) I I --_ I COIR WATTLE- — — _ _
r GROUND COVER.
STABILIZATION AS PER FOLLOWING CHART. \ INSTALL DITCHES WITH I I — — �— — — — —
\I (TYP.) I I TEMP DIVERSION
NAG S7BN MATTING IMMEDIATELY STABILIZED _ _ _ j A �I V DITCH 1-A �� Ln \ \
SITE AREA STABILIZATION STABILIZATION TIME APPLICABLE \ ti WITH NAG S75BN- \
DESCRIPTION TIME FRAME FRAME EXCEPTIONS THIS PROJECT I \ MATTING. \ A I I ____ \ LOD A \
PERIMETER DIKES, 7 DAYS NONE LOD / I _ I — i \ \
3 9 40 v i 4� 44 1 RECP v v
SWALES, DITCHES AND YES l \ / �� I
� 1 / � TEMPORARYST�CKPILE�� � � � �� � \
HIGH QUALITY WATER 7 DAYS NONE �v \ v 45 AREA WITH SILT FENCE
(HQW) ZONES NO / / / SF / v I \ �� I 4I (AS NEEDED) \ \
SF I I I \ \ MAINTAIN MINIMUM �\ 49 s
FLATTER THAN 4:1 l v �
/50'FROM ALL SEDIMENT
SLOPES STEEPER 7 DAYS IF SLOPES ARE 10 OR LESS — — vI MENv \ V DEVICES AND SWALES.
THAN 3:1 IN LENGTH AND ARE NOT NO I , � I \ / (TYP OF ALL)
STEEPER THAN 2:1 14 DAYS / V SF \ \ I / ALLSWALEs
ARE ALLOWED / A \ SF
\ AND DITCHES r� ALL SWALES AND DITCHES
N I V ALL SWALES V / I \ REQUIRE 7-DAY REQUIRE 7-DAY GROUND COVER.
l / � \ SFO I AND DITCHES \
SLOPES 3:1 OR 14 DAYS 7 DAYS FOR SLOPES GREATER N \ � . V ALLSWALES 47 V GROUND COVE W
THAN 50 FEET IN LENGTH YES SFO REQUIRE 7-DAY ,qND DITCHES SFO \ LOD SF I / ��
GROUND COVER. /
ALL SWALES REQUIRE 7-DAY \ �� O
ALL OTHER AREAS 14 DAYS NONE / / / Ir'' I "AND DITCHES �� GROUND COVER.
WITH SLOPES (EXCEPT FOR PERIMETER YES l / / \ �I REQUIRE 7 DAv �� A ` 1i
ALL SWALES
FLATTER THAN 4:1 AND HQW ZONES l /� / / GROUND COVER. �, \ �
`�cP W AND DITCHES p (,+ W APPROX.22c / /
NJ JI / 00 STORARA
( GE(21
/ I v po '� 09 A p \ REQUIRE 7-DAY R\y �� to sIDESLOPEs,s ALL SWALES
TYPICAL GROUND COVER STABILIZATION TYPES - GRASS / V / N \ GROUND COVER. Y ^' w ' 1 ti� ` TAL`=',P; "sue AND DITCHES /
AND OR SOD, WHEAT STRAW, MULCH, BIODEGRADABLE / c° �� \ — \ N VBALL SWALES vREQUIRE 7-DAY /
/ /AND DITCHES
STRAW MATTING, SYNTHETIC MATTING, ETC. l I / \ �\ \ \ \ / \ / REQUIRE 7-DAY � GROUND COVER. ' 1010 z
GROUND COVER. L
X ALL SWALES I ALL SWALES
O
AND DITCHES
AND DITCHES TEMP DIVERSION 7
` ` 1
` ��� ` ` N ` REQUIRE 7-DAY I REQUIRE 7-DAY DITCH 2 �
l ` / A> OVER. I AGROUND COVER.
SFO GROUND C / (2) u
SFO / SKIMMER BASIN WITH _ \
/ / \ � V �
�� I ALL SWALES SFO V V BAFFLES.TYP OF ALL \\ — \ Z)
j AND DITCHES\ � � � � � � � � � ALL SWALES / � 11� � � / L1
i tpI IMMEDIATELY STABILIZED REQUIRE 7-DAY AND DITCHES / ALL SWALES AND DITCHES —
\ GROUND COVER. ✓
SFO REQUIRE 7 DAY GROUND COVER--
WITH NAG S75BN \ REQUIRE 7-DAY
MATTING. \ I GROUND COVER. i � _ V)
— m 9 9 c \ ` IX / I �� SK 7'WIDE NATURALS �
V / 18'THICK CLASS B/ '� FLOW SPREAD AT � z
RIP RAP ON FILTER �0 TERM US
\ 0 Lu
FABRIC I ` i �2'� V) Q
3 An. S Z_
/ I I _ _ z o
ALL RE � � I� � � � � � � � � � � � � � � � � � � � � � � � SKIMMER- .y SFO — � �
\ - \ I I I — — — —DEVICE,TYP OF ALL Z�� 2 O LL U
SEE SCHEDULE THIS
I I� j I I — \ I I ti�ti SHEET. N 176.83� — 50 ACCESS N _
MATTING MUST � , � � � � � � � � � � � � � � � � � � _ _ —�� - -z$3 — a EASEMENT _
w �� �c�1� 177.08'/ / / \ _ — — C�
\ Q 9 9 9 9 '� \� 5 07°57130" E 88 .44' Jr a \ /
J
4 \ 177.01' � � \` /- - / - - -� 6121 z m Z
BE INSTALLED a 4' — — 6087 PIN -9588-64-6048.000o ��I _ o
o 176.8 \ — — — — PIN -9588-64-6215.000 FLACK TIMOTHY MARSHALL& F_
4 � N � 9 a _ U
/ � � 176.68' _ — 6061 \ CAMPBELL GERALD JT W/ROS & \ FLACK TIFFANY MARIE � Z
IMMEDIATELY / a � _ — — PIN - 9588-64-5492.000 CAMPBELL CHELSEA JT W/ROS �
5995 z
\ / / 6027 PORTA JEFFERY A & \ / / u
/ \ PIN -9588-64-5757.000 PIN - IS SA ANTH & PORTA DEBORAH S / O
/ F WHEELER MICHAEL JT CHAVIS SAMANTHA& ` / ` F_
/ / W/ROS & HARRIS-SMITH CHAVIS ADAM i / ` \ w
UPON GRADING OLE JT W ROS o Q z
w om z
H1aoN Know what's below DESIGNED BY.'
JEH
0 50 10 ' Call before you dig. DRAWN BY.- JLF
Q Dial 811
H O RZ. Or Call 800-632-4949
SCALE FEET APPROVED BY.- JEH
SHEET
NO. REVISION DESCRIPTION: DATE:
1 C3 .02
2 CIVIL