HomeMy WebLinkAboutNCG020504 DMR SWI ANNUAL SUMMARY DMR - STORMWATER 11
11 SEND TO CENTRAL OFFICE * II
STORMWATER DISCHARGE OUTFALLS (SDO)
GENERAL PERMIT NO. NCG020000
*Report ALL STORMWATER Monitoring Data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH I of each year.
CERTIFICATE OF COVERAGE NO. NCG02 0 5 0 4
FACILITY NAME: Hanson Brick - Gulf Mine 3
PERSON COLLECTING SAMPLES Jack Garvey
CERTIFIED LABORATORY Pace Analytical Lab # WW -067
Lab #
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: _
COUNTY Chatham
PHONE NO. ( 919 ) 380-2746
ADD TO LISTSERVE? YES ❑ NO ❑
2014
EMAIL:
OutfallCollected'
No. _
Date Sample
y O
.
NOF OW R
In Tier 2
Monthly'
Monitoring?
r� ..) (Y/n)
# of Months in
Tier 2
'Sampling
Tot
Total Flow
(MG)"
Total Suspended
Solids, °
(mom)
q . ` .- Total Event
Turbidit Settleable
(NTU') Solids (mUl) Rainfall Duration
(in) .: (minutes) , ..
100
See Footnote'0.117
_313-
No Dischar a 0111/2014
to 06/30/2314
3B -
No Discharge 07/()1/2014
to 12/31/2D14
r-0 vtu
EEB
UtNTSAL r~ILES
-ION
If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here and the Date Range.
2 Per NCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range
3 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit.
a TSS benchmark values are 100 mg/1 except in ORW, HWQ, trout, and PNA waters where they are 50 mg/l.
s The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated
as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO.
Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO.
Permit Date: 1/1/2010-12/31/2014
Last Revised 01-21-11
Page 1 of 2
Part B: Vehicle Maintenance Activitv Monitorine Requirements for facilities using > 55 gal of new motor oil/month on average
Date Sample
P
Outfall Collected'Monthly.
No-
(mo/dd/yr OR
- t
NO FLOW)
In Ties 2
# of Months
n'Tier 2 •
Monitoring.., z
Sampling
(y/n)
New -Motor
.
Oil Usage
(al/month)
Total flow TPH using method
(MG) + 1664A'SGT-HEM
(mg/1)
Total Suspended pH Total Event
Solids'. (Standard, Rainfall Duration
(mg/1) . -` Units) (in) (minutes).
_1`5
• :�
. 1003 _. 6_g3
NA - VE ICLE MAINTEN
NNCE ACTivrrY DOES NO
OCCUR AT
HIS SITE
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES
AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑X
HAVE YOU CONTACTED THE REGION? YES ❑ NO
WHO AT THE REGION HAVE YOU SPOKEN WITH?
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE" & LIMIT
VIOLATIONS) BY MARCH l OF EACH YEAR TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6300
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed
to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
of Permittee)
Permit Date: 1/1/2010-12/31/2014
Z Z o/S
(Date)
Last Revised 01-21-11
Page 2 of 2