Loading...
HomeMy WebLinkAboutNCG020437 DMR SWJ ANNUAL SUMMARY DMR STORMWATER II SEND TO CENTRAL OFFICE * II STORMWATER DISCHARGE OUTFALLS (SDO) GENERAL PERMIT NO. NCG020000 *Report ALL STORMWATER Monitoring Data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH 1 of each year. CERTIFICATE OF COVERAGE NO. NCG02 0 4 3 7 SAMPLE COLLECTION YEAR: 2014 FACILITY NAME: Hanson Brick,.- Sampson II Mine COUNTY Sampson PERSON COLLECTING SAMPLES Martin Brown PHONE NO. ( 910 ) 525-4128 CERTIFIED LABORATORY K&W Laboratories Lab # NC 559 ADD TO LISTSERVE? YES ❑ NO ❑ EMAIL: Lab # Part A: Stormwater Monitoring Reauirements Outfall No.. Date Sample Collected' ('mo/dd/yr OR NOFLOW)t In Tier'2', # of Months in Monthly, �. Tier 2 Monitoring? Z (y/n) Sampling• Total Suspended Totafflow — Solids` �,(MG) (m>) a " Turbidit y (NTU) Total Event Settleable Rainfall . Duration Solids(rril/1)- (in) 1003' 4 ,. te3 See Footno'0.13 S-003 No Discharge 1/01/2014 to 06/30/2014 S-003 No Dischar e 7/01/2014 to 12/31/2014 ul:�FRAL F1 ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here and the Date Range. 2 Per NCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range 3 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. 4 TSS benchmark values are 100 mg/1 except in ORW, HWQ, trout, and PNA waters where they are 50 mg/1. 5 The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO. Permit Date: 1/1/2010-12/31/2014 Last Revised 01-21-11 Page 1 of 2 Part B: Vehicle Maintenance Activitv Monitoring Requirements for facilities usine > 55 gal of new motor oil/month on average Date Sample ' In Tier 2 ' P Outfall Col ected� #•of Months Monthly ' m Tier 2' No. a Sampling . (ino/ddlyr OR ..Monitoring. 1 p g� :.. FLgW ) ,New Motor Oil Usa g e' gw) � � (aUnionth) ...._. Total Flow;_ TPH.using method G 1664A SGT=" (m HEM Total Suspended' Solids ' (m ) pH Total E 'Event.._; (Standard Rainfall, Duration-.: • - Units) (in) (mu es) ` nut ° -100 s: 6-9 S-003 01/01/2014 to 0 /30/2014 - No Dischar a <55 S-003 07/01/2014 to 12/31/2014 - No Discharge <55 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑X HAVE YOU CONTACTED THE REGION? YES ❑ NO WHO AT THE REGION HAVE YOU SPOKEN WITH? MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE" & LIMIT VIOLATIONS) BY MARCH 1 OF EACH YEAR TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6300 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.." /1 • 1 �--- Z 9 LD S (Signat, •e of Permittee) (datef Permit Date: 1/1/2010-12/31/2014 Last Revised 01-21-11 Page 2 of 2