HomeMy WebLinkAboutNCC241784_ESC Approval Submitted_20240617 Carlos Banegas
From: Aden Stoltzfus
Sent: Thursday, May 30, 2024 3:44 PM
To: Carlos Banegas
Subject: FW: NC DEMLR - FROF Application Approval with Modifications Needed CRM:0197083
Attachments: Application Report - Thursday, May 30, 2024 331 PM.pdf; FORSY-2024-0122 Marble
Granite World.pdf
Aden R. Stoltzfus, PE
Rill
Stoltzfus Engineering, Inc.
Civil Engineering Consultants
683 Gralin Street
Kernersville, NC 27284
Office:(336)904-0207
Cell: (336)908-1371
adenPseiengineering.com
From: SVC_DoNotReply-DEQPermits<DoNotReply-DEQPermits@deq.nc.gov>
Sent:Thursday, May 30, 2024 3:40 PM
To:ZUZU INVESTMENT PROPERTIES LLC<joel@marblegraniteworld.com>;Aden Stoltzfus<aden@seiengineering.com>
Subject: NC DEMLR- FROF Application Approval with Modifications Needed CRM:0197083
1-7 ' iy Jr 41,,_ iiik'3'
I:15 1 Ity :, 4"-leNsr-cz.
t:,
9/+R/(12. T a
lYtie
111C
FSSE QUAM V1D.\. ,
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
1
05-30-2024
ZUZU INVESTMENT PROPERTIES LLC
317 East Bodenhamer Street
Kernersville, NC 27284
RE: Project Name: MARBLE GRANITE WORLD
Acres Approved: 2.05
Application ID: PA-004849
Permit Number: FORSY-2024-0122
Address: Route NC-66
City: Kernersville
County: Forsyth
River Basin:Cape Fear
Stream Classification: NSW: Nutrient Sensitive Waters;WS-II:Water Supply II
Plan Type: New Plan
Dear ZUZU INVESTMENT PROPERTIES LLC,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are
listed below.The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years
following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B
.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI)
form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is
reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After
the fee is processed, you will receive the COC via email.As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form
may be accessed atdeq.nc.gov/NCG01. Please directquestions about the eNOlform totheStormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a
new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
2
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee.In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
Modifications Required for Approval:
1. Please note that the conversion from skimmer basin to sand filter cannot occur until approval for the removal
of the skimmer basin is granted from the NC DEQ Land Quality Inspector and transition to a post-construction
stormwater facility is appropriate for site.
2. Please provide a detail for temporary seeding.
3. Please provide storm drainage easement from Pelham Place Properties, LLC and verify that the sand filter outlet
will not lead to an increase in flooding downstream.
4. Verify that post-construction permitting has been applied for or approved by jurisdictional authority. If
your project is subject to state stormwater permitting requirements,you must have the post-construction
stormwater permit prior to construction. Any construction of any impervious surface will be a violation
of state stormwater permitting regulations without the post-construction stormwater permit, if
required. The post-construction stormwater permit application is reviewed for final conditions, but not
the erosion control during installation,therefore the erosion control during conversion and construction
should also be clearly addressed in the erosion control plans and sequencing.
5. Please provide a temporary construction entrance if construction traffic will also use the entrance on
Bodenhamer Street.
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
2. Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and asking to
speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC DEQ DEMLR prior
to the removal of any ESC measures. [GS 113A-51, 15A NCAC 4B .0120]
3. Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a
site regulated under the Mining Act of 1971,or a landfill regulated by the Division of Solid Waste Management. Trash/debris
from demolition activities or generated by any activities on site must be disposed of at a facility regulated by the Division
of Solid Waste Management or per Division of Solid Waste Management or Division of Water Resources rules and
regulations. [15A NCAC 4B .0110]
3
4. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the approved
erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to
stop sediment from leaving this site. [15A NCAC 4B .0115]
5.The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCG01 fee
payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of
Termination (NOT) to terminate NCG01 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures, including
basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and removal of
measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure
inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General
Comment]
Your cooperation is appreciated.
Sincerely,
Ashley Vikara, El - Assistant Regional Engineer I
Winston-Salem Regional Office -336-776-9800
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Enclosures: Certificate of Approval
Application Report
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land7
DE
Resources
Q�jC, Winston-Salem Regional Office I 450 West Hanes Mill Road, Suite 300 I Winston-Salem NC,
dl 27105
a:: .:Mh.:.....10W.,\
336-776-9800
I
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
4
CERTIFICATE OF PLAN APPROVAL
,;; STATE
Y
%i,. MpY ID.177s `YO1,
/147 1
i J 'S'
110' o;
> h• ;
III,\<St Q�,�,A2n iz 1r� 444
``, '";QUAM VW
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begins and until establishment of
permanent groundcover as required by North Carolina Administrative Code, Title 15A,
Chapter 4B.0127 (b).
MARBLE GRANITE WORLD
Route NC-66 Kernersville, NORTH CAROLINA 27284
5/30/2024 FORSY-2024-0122
Date of Plan Approval DEQ Project Identifier
Certificate of Coverage Number: