HomeMy WebLinkAboutNCG030087 DMR SW (10)..-Semi-annual Stormwater` Discharge Monitoring Report
for'North Carolina Division'of Water Quality General Permit No. ,NCG030000
Date submitted 5-29-15
CERTIFICATE OF COVERAGE NO. NCG030087. SAMPLE COLLECTION YEAR 2015
FACILITY -NAME Kewaunee Scientific' Corporation SAMPLE PERIOD ❑ Jan -June- ❑ July -Dec
COUNTY Iredell or. X Monthly' ,April, .(month)
PERSON COLLECTING SAMPLES _Scott Hager DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
LABORATORY Statesville Analytical Lab Cert. NC -#440 Comments on / ❑Zero -flow [:]Water Supply [_]SA
sample collection or analysis: �)�I Other C
,JUN 0'3 2015 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
Part A: Stormwater Benchmarks and Monitoring Results DWR5EG7iON
INFO RMATION FRMESSJNGUN7
No discharge this period?'
' Non -Polar O&G/
Date Sample 24 hour rainfall p`H, Total Toxi
Outfal[No. 1 Total Suspended:Solids Copper Lead Zmc Total Petroleum
Collected amount, Standard units ,' a Organics;
Inches3 Hydrocarbons k
Benchmarks ->• _ 100 mg/Lor 50 n 6 0`- 9 0 0'007 mg/L 0:03 mg/L'' 0.067 mg/L 15 mg/L 1 n'
NA
NA
NA
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible fora waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals,.or manufacture. cathode ray tubes. For purposes of -this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample. (for metal finishing use the definition as found.in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit.Date: 11/1/2012-10/31/2017 SWU-245, last revised: 10/25/2012 '
Page 1 of 3
Facilities that incorporate a solvent management,plan into the Stormwater.Pollution Prevention Plan may so,certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used "and the oth6r elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the -best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or`areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is: implementing the all the provisions of the -
solvent management plan included in the Stormwater. Pollution Prevention Plan."
Scott Haaer
Name (Print name)
Safety and Environrriental Manager
Title (Print title)
5-29-15
(Signat _ (Date)
G
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar-non-nuinerical
format. When results are below the applicable limits, they must be reported in the format, "<XX-me/L where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal .of new oil per month.
❑ No discharge this period?2
Date Sample 24 hour rainfall
Collected- amount, Non -polar O&G/TPH by,
3 Total Suspended Solids:pH
(mo/dd/yr) inches EPA. 1664 (SGT -HEM)
eenthmdrks = > 15 mg/L ..:.. 100 mg/Lor "50: rrig/L*.' 6 0 '9.0 SU
Footnotes from Part A also apply to this Part B
* See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit -Date: 11/1/2012-10/31/2017 SWU-245, last re0ised 10/25/2012
Page 2 of 3
Note: If you -report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B.
• 2.EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES 0 NO N
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, includina all "No Discharge" reports within 30 days of receipt of the lab results for at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or.supervision'in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted.. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
5/29/2015
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU7245, last -revised 10/25/2012
Page 3 of 3