Loading...
HomeMy WebLinkAboutNCG030352 DMR SW (3)STORMWATER DI -GE OUTFALL (SDO) MONITOI REPORT GENERAL PERMIT NO. NCG030000 SAMPLES COLLECTED DURING CALENDAR YEAR: CERTIFICATE OF COVERAGE NO. NCG03 _ b 3 S Z. (This monitoring report is due at the Division no later than 30 days from '// the date the facility receives the samlig rests from the laboratory.) FACILITY NAME (,tt,� S� e ✓ o p1�n PERSON COLLECTING SAMP ES s /,' E� COUNTY PHONE NO. (^ �D) �2 71 CERTIFIED LABORATORY i✓G•n -N K Lab # NCD D J� Lab # X11>�' PLEASE SIGN ON THE REVERSE 4 Part A: Specific Monitoring Requirements Outfall Date No: Sample Collected; mo/dd/ r .Benchmark - 'B 00530.... Total Suspended Solids; m 100: 00400. p13, Standard: units. VViEhm ti:0 .- 9.0 .. 01051 Lead, mg/L 0.033. 00556:.., ®il and Grease, m D 70141 Total Toxic.Orga►ucs m/L. . . NnfP.' Tf unn rPn—f 7 o I– i ------ I- t Valu11, Vi uuwiuv quo ucncrunarx.range ror pti, you must unplement Tler 1 or Tier 2 responses. See General Permit text. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes ,no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall Date 00556 00530 40 No: Sample Collected, Oil and: Grease;. Total:Sus ended Solids OOH 0 P New 1Vlotor Oil Usage, pm/dd/ r Ina. .: m P Benchmark nda d_un Sia r its Annual avers' a `aUnto -. Note: If you report a sampled value in excess of the benchmark value, or outside the See General Permit text. benchmark range for pH, you must implement Tier 1 or Tier 2 responses. STORM EVENT CHARACTERISTICS: Mail Original and one copy to: Date �- (first event sampled) � 1� Division of Water Quality Total Event Precipitation (inches): -- Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): CE -N JAN 9. 'iu`�6 SSORN1VJRi"�.R E '"� SWU-245-102107 Total T 1fganics sampling is applicable only for those facilities which perform inishing operations, manufacture semiconductors manufacture e manufa. .e cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility, subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.1 l;.for semiconductor manufacture use the defmition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may request that DWQ waive monitoring of total toxic organics. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities allowed such a waiver, the discharger shall sign the following certification statement: 'Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater (runoff has occurred since filing the last discharge monitoring report: I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Ma rI a 1// / Name (Print name) Title (Print title) Ognatture) (Date) "I[ certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. II am aware that there are significant penalties for submitting false information, including the possil of fines and imprisonment for knowing violations." (Date) SWI1-245-109im