HomeMy WebLinkAboutNCC231483_Annual Fee NOD Letter (2024 Fee)_20240616 ROY COOPER
Govemor
ELIZABEIH S.BISER f .
Secretary
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
lnw"Director EnWonmental Quality
6/16/2024
Federal Highway Administration, Eastern Federal Lands
Attn: Kevin Rose
22001 Loudoun County Parkway, Building E-2 Suite 200
Ashburn,VA 20147
Subject: Notice of Deficiency-Failure to Pay Annual Fee
Invoice No. NCC231483-2024
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of$120 for coverage under NPDES General Stormwater Permit
NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee
was billed on 5/1/2024 and was due on 6/1/2024.The annual fee applies to the following construction site:
TN NP GRSM 10N(3), 19(1), 107(1)
Lakeview Dr. E., MP 0.0 to 5.89;and Heintooga Ridge Rd., MP 0.0 to 5.34, near Bryson City, NC
Swain County
Certificate of Coverage No. NCC231483
NC Reference No. NCG01-2023-1483
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Kieu Tran at kieu.tran@deq.nc.gov.
Sincerely,
William E.Vinson,Jr., PE,CPESC,CPM
Interim Director
Division of Energy, Mineral,and Land Resources
D_E Q� Nrnlh Cara7ina Deparlmenl of Cnvroament:J Qwlily Drvisirr ul Cnrryy.Mineral urwl Lancf Frsorrccs
Sl2 Nur R,Salisbury Slrrel I Iol2 Mail Se s,ceCmter Rork iyh.Nurlh Caroline Tiboo I612