Loading...
HomeMy WebLinkAboutNC0024937_Compliance Evaluation Inspection_20240529ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Joseph Lockler, Operations Chief Environmental Management Division Charlotte Water 5100 Brookshire Blvd. Charlotte, NC 28216 SUBJECT: Compliance Evaluation Inspection Sugar Creek WRRF NPDES Permit No. NCO024937 Mecklenburg County Dear Mr. Lockler: NORTH CAROLINA Environmental Quality May 29, 2024 Enclosed is a copy of the Compliance Evaluation Inspection (CEI) Report for the inspection conducted at the subject facility on May 16, 2024, by Mr. Wes Bell of this Office. This Office would like to thank all Water Resources Recovery Facility (WRRF) staff for their cooperation and assistance that was provided throughout this inspection. Please advise the facility's Operator -in -Responsible Charge (ORC) of our findings by forwarding the enclosed report. Should you have any questions concerning this report, please do not hesitate to contact Mr. Bell at (704) 235-2192 or at wes.bell(a,deq.nc. gov. Sincerely, DocuSigned by: A w N P-Lu" F161 FB69A2D84A3... Andrew H. Pitner, P.G. Regional Supervisor Water Quality Regional Operations Section Mooresville Regional Office Division of Water Resources, NCDEQ Enclosure: Inspection Report Cc: NPDES Program Files - Laserfiche el- DEQ�� North Carolina Department of Environmental quality I Divisionof Water Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 704.6631699 United States Environmental Protection Agency Form Approved. EPA Washington, D.C. 20460 OMB No. 2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 IN 1 2 u 3 I NCO024937 111 121 24/05/17 I17 18 LC] I 19 I s I 20L] 21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved ------------------- 67 2.0 701d I 71 I„ I 72 I r., I 71 I 74 79 I I I I I I I80 L—I ty L-1 I I Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 09:20AM 24/05/17 24/03/01 Sugar Creek WRRF 5301 Closeburn Rd Exit Time/Date Permit Expiration Date Charlotte NC 28217 01:26PM 24/05/17 28/08/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data Donna Marie Slachciak/ORC/704-553-2124/ Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Angela D Charles,5100 Brookshire Blvd Charlotte NC 282163371/Director/704-336-5911/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit 0 Flow Measurement Operations & Maintenar Records/Reports Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date Wes Bell signed by: DWR/MRO WQ/704-235-2192/ 5/29/2024 2 re& E�Docu`,','�96D90=437 ... 9"RiOeAReviewer Agency/Office/Phone and Fax Numbers Date Signature of MP7F161FB69A2D84A3.. Andrew Pit'0-4 `' H P WR/MRO WQ/704-663-1699 Ext.2180/ 5/29/2024 . EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# NPDES yr/mo/day Inspection Type NC0024937 I11 12I 24/05/17 117 18 i c i Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) On -site Representatives: The following Charlotte Water staff were in attendance during the inspection: Ms. Donnna Slachciak and Messrs. Darrell DeWitt, Dan Messenger, and Mike Christiansen. Page# Permit: NCO024937 Owner -Facility: Sugar Creek WRRF Inspection Date: 05/17/2024 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new ❑ ❑ ■ ❑ application? Is the facility as described in the permit? ■ ❑ ❑ ❑ # Are there any special conditions for the permit? ■ ❑ ❑ ❑ Is access to the plant site restricted to the general public? ■ ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? ■ ❑ ❑ ❑ Comment: Charlotte Water implements a Division -approved Industrial Pretreatment Program. The last compliance evaluation inspection at this facility was performed by DWR staff on 2/22/22. Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? ■ ❑ ❑ ❑ Is all required information readily available, complete and current? ■ ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? ■ ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? ■ ❑ ❑ ❑ Is the chain -of -custody complete? ■ ❑ ❑ ❑ Dates, times and location of sampling ■ Name of individual performing the sampling ■ Results of analysis and calibration ■ Dates of analysis ■ Name of person performing analyses ■ Transported COCs ■ Are DMRs complete: do they include all permit parameters? ■ ❑ ❑ ❑ Has the facility submitted its annual compliance report to users and DWQ? ■ ❑ ❑ ❑ (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified ■ ❑ ❑ ❑ operator on each shift? Is the ORC visitation log available and current? ■ ❑ ❑ ❑ Is the ORC certified at grade equal to or higher than the facility classification? ■ ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility ■ ❑ ❑ ❑ classification? Is a copy of the current NPDES permit available on site? ■ ❑ ❑ ❑ Facility has copy of previous year's Annual Report on file for review? ■ ❑ ❑ ❑ Page# 3 Permit: NCO024937 Inspection Date: 05/17/2024 Owner -Facility: Sugar Creek WRRF Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE Comment: The records reviewed durinq the inspection were organized and well maintained. In-depth operation and maintenance records including process control measurements were being documented and maintained on -site. Discharge monitoring reports (eDMRs) were reviewed for the period April 2023 through March 2024. No effluent limit and/or monitoring violations were noted. Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? 0 ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? 0 ❑ ❑ ❑ # Is the facility using a contract lab? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 ❑ ❑ ■ ❑ degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? ❑ ❑ 0 ❑ Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑ 0 ❑ Comment: Influent and effluent analyses (including field parameters) are performed by Charlotte Water's Environmental Services Laboratory (Certification #192). Waypointe Analytical, ETT Environmental (chronic toxicity) and Environmental Testing Solutions (chronic toxicity) have all been contracted to provide analytical support. Influent Sampling # Is composite sampling flow proportional? Is sample collected above side streams? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is sampling performed according to the permit? Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ❑ ❑ ❑ Comment: The subject permit requires influent BOD and TSS composite samples. The sampler operation is checked daily by on -site staff and calibrated twice per month. Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 ❑ ❑ ❑ Is sample collected below all treatment units? 0 ❑ ❑ ❑ Is proper volume collected? 0 ❑ ❑ ❑ Is the tubing clean? 0 ❑ ❑ ❑ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 ■ ❑ ❑ ❑ degrees Celsius)? Page# 4 Permit: NCO024937 Inspection Date: 05/17/2024 Owner -Facility: Sugar Creek WRRF Inspection Type: Compliance Evaluation Effluent Sampling Yes No NA NE Is the facility sampling performed as required by the permit (frequency, sampling type 0 ❑ ❑ ❑ representative)? Comment: The subject permit requires composite and grab effluent samples. The sampler operation is checked daily by on -site staff and calibrated twice per month. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable 0 ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: The wastewater treatment facility appeared to be properly operated and well maintained. The operations staff incorporate a comprehensive process control program. The facility is equipped with a SCADA system that is accessible at eleven (11) locations throughout the plant site. Odor control systems are connected to the influent pump station/screening & grit removal facilities and primary clarifiers. Bar Screens Yes No NA NE Type of bar screen a.Manual ❑ b.Mechanical Are the bars adequately screening debris? 0 ❑ ❑ ❑ Is the screen free of excessive debris? ■ ❑ ❑ ❑ Is disposal of screening in compliance? 0 ❑ ❑ ❑ Is the unit in good condition? 0 ❑ ❑ ❑ Comment: Grit Removal Yes No NA NE Type of grit removal a.Manual ❑ b.Mechanical Is the grit free of excessive organic matter? 0 ❑ ❑ ❑ Is the grit free of excessive odor? 0 ❑ ❑ ❑ # Is disposal of grit in compliance? 0 ❑ ❑ ❑ Comment: Screenings and grit are disposed at the CMS Landfill located in Concord, N.C. by Republic Services. Page# 5 Permit: NCO024937 Inspection Date: 05/17/2024 Owner -Facility: Sugar Creek WRRF Inspection Type: Compliance Evaluation Pump Station - Influent Yes No NA NE Is the pump wet well free of bypass lines or structures? 0 ❑ ❑ ❑ Is the wet well free of excessive grease? 0 ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? 0 ❑ ❑ ❑ Are float controls operable? 0 ❑ ❑ ❑ Is SCADA telemetry available and operational? 0 ❑ ❑ ❑ Is audible and visual alarm available and operational? ❑ ❑ ■ ❑ Comment: Equalization Basins Yes No NA NE Is the basin aerated? ❑ ❑ ■ ❑ Is the basin free of bypass lines or structures to the natural environment? 0 ❑ ❑ ❑ Is the basin free of excessive grease? 0 ❑ ❑ ❑ Are all pumps present? 0 ❑ ❑ ❑ Are all pumps operable? ■ ❑ ❑ ❑ Are float controls operable? 0 ❑ ❑ ❑ Are audible and visual alarms operable? ❑ ❑ 0 ❑ # Is basin size/volume adequate? 0 ❑ ❑ ❑ Comment: The facility is equipped with two twenty (20) million gallon equalization basins (East and West). The West EQ basin flow is returned back to the head of the plant while the East EQ basin flow is diverted into the outfall line to Charlotte Water's McAlpline Creek wastewater treatment facility. Primary Clarifier Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the sludge blanket level acceptable? Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page# 6 Permit: NCO024937 Inspection Date: 05/17/2024 Owner -Facility: Sugar Creek WRRF Inspection Type: Compliance Evaluation Primary Clarifier Yes No NA NE Comment: All four primary clarifiers were operational; however, only two were in service. Chemical Feed Yes No NA NE Is containment adequate? 0 ❑ ❑ ❑ Is storage adequate? 0 ❑ ❑ ❑ Are backup pumps available? 0 ❑ ❑ ❑ Is the site free of excessive leaking? ■ ❑ ❑ ❑ Comment: Nutrient Removal Yes No NA NE # Is total nitrogen removal required? 0 ❑ ❑ ❑ # Is total phosphorous removal required? 0 ❑ ❑ ❑ Type Biological # Is chemical feed required to sustain process? 0 ❑ ❑ ❑ Is nutrient removal process operating properly? 0 ❑ ❑ ❑ Comment: Each aeration basin is equipped with an anoxic zone (with mixinq) and oxic recvcle system to reduce nutrient levels. Alum can also be added to the secondary clarifier influent for the reduction of the phosphorus levels. Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Diffused Is the basin free of dead spots? 0 ❑ ❑ ❑ Are surface aerators and mixers operational? 0 ❑ ❑ ❑ Are the diffusers operational? 0 ❑ ❑ ❑ Is the foam the proper color for the treatment process? 0 ❑ ❑ ❑ Does the foam cover less than 25% of the basin's surface? ❑ ■ ❑ ❑ Is the DO level acceptable? 0 ❑ ❑ ❑ Is the DO level acceptable?(1.0 to 3.0 mg/1) ■ ❑ ❑ ❑ Comment: All six (6) aeration basins were in service. Magnesium hydroxide is added to maintain appropriate alkalinity/pH levels. Foam covered more than 25% of the basins: however, minimal foam carryover was observed in the secondaries. Secondary Clarifier Is the clarifier free of black and odorous wastewater? Yes No NA NE ■ ❑ ❑ ❑ Page# 7 Permit: NCO024937 Inspection Date: 05/17/2024 Owner -Facility: Sugar Creek WRRF Inspection Type: Compliance Evaluation Secondary Clarifier Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately'/4 of the sidewall depth) Comment: All six (6) secondary clarifiers were in service. Pumps-RAS-WAS Are pumps in place? Are pumps operational? Are there adequate spare parts and supplies on site? Comment: Filtration (High Rate Tertiary) Type of operation: Is the filter media present? Is the filter surface free of clogging? Is the filter free of growth? Is the air scour operational? Is the scouring acceptable? Is the clear well free of excessive solids and filter media? Comment: All ten (10) tertiary filters were in service. Disinfection - UV Are extra UV bulbs available on site? Are UV bulbs clean? Is UV intensity adequate? Is transmittance at or above designed level? Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NE Down flow ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ ❑ ❑ ■ Yes No NA NE ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Page# 8 Permit: NCO024937 Inspection Date: 05/17/2024 Owner -Facility: Sugar Creek WRRF Inspection Type: Compliance Evaluation Disinfection - UV Yes No NA NE Is there a backup system on site? 0 ❑ ❑ ❑ Is effluent clear and free of solids? 0 ❑ ❑ ❑ Comment: Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? 0 ❑ ❑ ❑ Is flow meter calibrated annually? 0 ❑ ❑ ❑ Is the flow meter operational? 0 ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ 0 ❑ Comment: The flow meter is calibrated twice per year and was last calibrated on 1/17/24 by CITI LLC. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? ❑ ❑ 0 ❑ Are the receiving water free of foam other than trace amounts and other debris? ■ ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ ■ ❑ Comment: The effluent appeared clear with no floatable solids and foam (entrained air). The foam typically dissipates less than fifty (50) yards downstream of the discharge outfall. The receiving stream did not appear to be negatively impacted. Solids Handling Equipment Is the equipment operational? Is the chemical feed equipment operational? Is storage adequate? Is the site free of high level of solids in filtrate from filter presses or vacuum filters? Is the site free of sludge buildup on belts and/or rollers of filter press? Is the site free of excessive moisture in belt filter press sludge cake? The facility has an approved sludge management plan? Yes No NA NE ■ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑ Comment: Primary sludge and waste activated sludge are pumped separately to Charlotte Water's McAlpine Creek wastewater treatment facility for continued treatment and disposal. Dewatered bio-solids are land applied by Synagro under the authority of Permit No. WQ0000057. Standby Power Yes No NA NE Is automatically activated standby power available? 0 ❑ ❑ ❑ Is the generator tested by interrupting primary power source? 0 ❑ ❑ ❑ Page# 9 Permit: NC0024937 Owner -Facility: Sugar Creek WRRF Inspection Date: 05/17/2024 Inspection Type: Compliance Evaluation Standby Power Yes No NA NE Is the generator tested under load? 0 ❑ ❑ ❑ Was generator tested & operational during the inspection? ❑ ❑ ❑ ■ Do the generator(s) have adequate capacity to operate the entire wastewater site? 0 ❑ ❑ ❑ Is there an emergency agreement with a fuel vendor for extended run on back-up 0 ❑ ❑ ❑ power? Is the generator fuel level monitored? 0 ❑ ❑ ❑ Comment: The facility is equipped with three generators that are serviced quarterly by Carolina CAT. Page# 10