Loading...
HomeMy WebLinkAboutWQ0043421_More Information (Received)_20240614Initial Review Reviewer nathaniel.thornburg Is this submittal an application? (Excluding additional information.) * Yes No If not an application what is the submittal type?* Annual Report Residual Annual Report Additional Information Other Permit Number (IR) * W00043421 Applicant/Permittee Shinnville Farms Development Partners, LLC Email Notifications Does this need review by the hydrogeologist? * Yes No Regional Office CO Reviewer Admin Reviewer Submittal Form Project Contact Information Please provide information on the person to be contacted by NDB Staff regarding electronic submittal, confirmation of receipt, and other correspondence. ....................................................................................................................................................................................................................................................................................... ... ... ... ... ... .. ... ... ... ... .. Name* Gary S. MacConnell Email Address* info@macconnellandassoc.com Project Information ......................... Application/Document Type* New (Fee Required) Modification - Major (Fee Required) Renewal with Major Modification (Fee Required) Annual Report Additional Information Other Phone Number* 9194671239 Modification - Minor Renewal GW-59, NDMR, NDMLR, NDAR-1, N DAR-2 Residual Annual Report Change of Ownership We no longer accept these monitoring reports through this portal. Please click on the link below and it will take you to the correct form. https://edoes.deq.nc.gov/Forms/NonDischarge_Monitoring_Report Permit Type:* Wastewater Irrigation High -Rate Infiltration Other Wastewater Reclaimed Water Closed -Loop Recycle Residuals Single -Family Residence Wastewater Other Irrigation Permit Number:* WQ0043421 Has Current Existing permit number Applicant/Permittee Address* PO Box 3965 Facility Name* Shinn Village WWTF Please provide comments/notes on your current submittal below. Informal Additional Information Request Comment Revisions: 1) Noted 2) The required chlorination volume is 14,812 gallons, the chlorine contact tank void volume is 27,713 gallons, and the effective chlorination volume (Dose Enable to Tank Floor) is 17,481 gallons. 3) Four (4) of the pumps are calcite filter pumps and two (2) of the pumps are denitrification pumps. This totals six (6) pumps in this tank. 4) There will be one pump per chlorine drum. This will total two (2) total peristaltic metering pumps. 5) Shinn Village will be served by Iredell Water. At this time, paper copies are no longer required. If you have any questions about what is required, please contact Nathaniel Thornburg at nathaniel.thornburg@ncdenr.gov. Please attach all information required or requested for this submittal to be reviewed here. (Application Form, Engineering Plans, Specifications, Calculations, Etc.) Updated Documents.pdf 598.23KB Upload only 1 PDF document (less than 250 MB). Multiple documents must be combined into one PDF file unless file is larger than upload limit. * By checking this box, I acknowledge that I understand the application will not be accepted for pre -review until the fee (if required) has been received by the Non -Discharge Branch. Application fees must be submitted by check or money order and made payable to the North Carolina Department of Environmental Quality (NCDEQ). I also confirm that the uploaded document is a single PDF with all parts of the application in correct order (as specified by the application). Mail payment to: NCDEQ — Division of Water Resources Attn: Non -Discharge Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Signature e*41s 6r Submission Date 6/14/2024 Response 1: • See Comment A.1. Comment 2: • The wastewater treatment facility summary lists four (4) ultraviolet disinfection units, while the remainder of the application package lists three (3). Please verify and revise. Response 2: • This has been changed to reflect three (3) units. Comment 3: • The wastewater treatment facility summary lists the effective storage volume of the five- day upset pond as 362,056 gallons while the Engineering Calculations list 346,347 gallons. Please verify and revise. Response 3: • This has been changed to reflect 3 46,3 47 -gallons. Comment 4: • Under "Storage Pond Dosing Tank," it states "The tank will house a total of four pumps..." However, based on the list below, the total should be six (6). Please verify and revise. Response 4: • This has been changed to show 6 total pumps in the tank. The name has also been changed to "Field Dosing Tank". Comment 5: • Under "5-Day Upset Pond," this section lists the effective storage volume of the five-day upset pond as 362,056 gallons. See Comment Q.3. 13 SECTION 11904 METERING PUMP SYSTEM PART 1 - GENERAL 1.01 Description of Work: A. The extent of work under this item includes installing a metering pump system to attach at the beginning of the new water lines to continuously pump chlorine into the water. 1.02 Submittals: A. Shop drawings shall include, at a minimum, a complete description of the equipment, system, and process/function, including a list of system components and features, drawings, catalogue information and cuts, and manufacturer's specifications. PART 2 - PRODUCTS 2.01 Metering Pump: A. Contractor shall install metering pumps as shown on the contract drawings. B. Pump shall have dual manual control for stroke length and stroke speed and shall have PVDF or PVC/Tefzel/Ceramic wet end suitable for chlorine. C. Pump shall be able to handle a viscosity up to 300 CPS. D. Discharge tubing shall have a 3/8" connection. E. Pump shall operate at 7.5 GPD. F. Contractor shall supply a repair kit on hand in case of malfunctioning parts. G. Pump shall be Series Chem -Tech Series XP Model XP007 or approved equal by Engineer. H. Provide Manufacturer's stainless steel wall mounting bracket. 2.02 Saddleblock Injector Adapter: A. Contractor shall install a 3" injection adapter to connect the discharge of the metering pump system to the system feed line. Shinnville Farms Development Partners, LLC Metering Pump System Wastewater System MacConnell & Associates, P.C., Project No.: A95803.00 11904-1 B. The adapter shall be constructed of durable PVC with rubber seals that can be mounted with two stainless steel clamps. 2.03 Non -Metallic Injection Quill (if required): A. Injection quill shall be 1/2" NPT (M) x 1/2" NPT (M) Kynar/Ceramic or 1/2" NPT (M) x 1/2" NPT (M) PVC/Ceramic. (Stock # 61165 or 61166) B. Injection quill shall be a 2 5/8" and have a ceramic check ball to be used with a 4" pipe or can be trimmed so that chemicals can be released towards center of pipe smaller than 411. C. Quill shall be 150 PSI rated with the temperature ranging from 100' F for PVC to 200' F for PDVF. D. Contractor shall install quill with V-notch facing upstream so that flow is against angled face. 2.04 Suction Tubing with Foot Valve: A. Provide suction tubing compatible with chlorine solution and foot valve with screen. 2.05 Spill Containment: A. Provide non-metallic spill containment for two 55-gallon drums with capacity for 55 gallons minimum each. 2.06 Sodium Hypochlorite Solution: A. Provide minimum of 225.5 gallons of 12.5 percent or greater sodium hypo -chloride solution for startup and operation. PART 3 - EXECUTION 3.01 Installation of Injection Adapter (if required): A. Install adapter by drilling an 11/16" hole in the proper location for the injection quill and deburr the edges. B. Place the correct seal and saddle block over the hole and tighten with the two clamps provided. C. Install injector into the adapter to complete the installation. Shinnville Farms Development Partners, LLC Wastewater System MacConnell & Associates, P.C., Project No.: A95803.00 Metering Pump System 11904-2 3.01 Installation of Pump: A. Install pump following manufacturer's instructions. B. Interlock metering pump with flow metering device. Pulses from flow metering device shall control metering pump output. Adjust metering pump for initial dose of 2.5 PPM of Chlorine. END OF SECTION 11904 Shinnville Farms Development Partners, LLC Wastewater System MacConnell & Associates, P.C., Project No.: A95803.00 Metering Pump System 11904-3 MacConnell & Associates, P.C. Project: Shinn Village Project Number: A95803.00 Location: Iredell County, North Carolina Subject: Tank Sizing Date: June 14, 2024 Assumotions And Calculations: 1. Treatment Bow is based on unadiusted Bow. 2. Irrieation Bow is based on reduced Bow 4-Bedroom Number of Single Family Residence (SFR) Bedrooms/SFR Sewage Flow Rate For Design Units Average Daily Flow Per SFR Average Daily Flow Pool Pool Area: Square Feet Per Person Total People Allowed Based on Sq Footage Flow Per Person Average Daily Flow Total DaBv Flow Unadjusted Design Flow: Flow Reduction: Adjusted Flow: STEP TANK DESIGN (Sinele-Fami1y Homes): Minimum Tank Volume Required: Tank(s) Volume Provided: Septic chamber (2/3 Volume) storaee and effective volume calculations: Septic Chamber Total Void Volume = L * W * D: Tank length: Tank W idth: Tank Depth: Total Void Volume: Septic Tank Effective Volume = L * W * Lowest Invert To Tank Bottom: Tank length: Tank W idth: Lowest Invert: Effective Volume: Septic Tank Storage per Bedroom: Septic Tank Storage/Detention: Dosine chamber (113 Volume) storaee and effective volume calculations: Dosing Chamber Total Void Volume = L * W * D: Tank length: Tank W idth: Tank Depth: Total Void Volume: Dosing Tank Effective Volume = L * W * Lowest Invert To Tank Bottom: Tank length: Tank W idth: Lowest Invert: Lowest Invert To Pump Off: Effective Volume: Gallon/Inch: Pump Off 18" Pump On 8" Highwater Alarm 6" Dosing Chamber Emergency Storage 21" Freeboard (Both Chambers) 10" STEP Tank Storage above highwater alarm: STEP Tank Storage above Pump On: 141.0 SIR 4.0 Bedrooms/SFR 120 GPD/Bedroom 15A NCAC 02T .0114 480 GPD/SIR 67,680 GPD 2085.0 Sq ft 15.0 Sq ft/person 139 Allowable People 10 GPD/person 1,390 GPD 69,070 GPD 25 % Only Applied to Single -Family Homes 52,150 GPD 1,500 Gallons 15A NCAC 18A .1900 (per 15A NCAC 02T .0505(s)) 1,500 Gallons 6.4 foot 4.8 foot 5.3 foot 1,217.9 Gallons 6.4 foot 4.8 foot 4.4 foot 1,024.6 Gallons 256.1 Gallons 2.1 Days Effective Volume / ADF 3.1 foot 4.8 foot 5.3 foot 585.2 Gallons 3.1 foot 4.8 foot 4.4 foot 2.92 foot 325.1 Gallons 9.3 Gavin. 167.2 Gallons 74.3 Gallons per Dose 55.7 Gallons 195.1 Gallons 286.2 Gallons (28.62 Gavin) 481.3 Gallons > 480 GPD (24hr emergency storage) 537.0 Gallons STEP TANK DESIGN (Pool): Minimum Tank Volume Required: 2,475 Gallons 15A NCAC 18A .1900 (per 15A NCAC 02T .0505(s)) Tank(s) Volume Provided: 3,500 Gallons Seotic chamber (2/3 Volume) storaee and effective volume calculations Septic Chamber Total Void Volume = L * W * D: Tank length: 8.0 foot Tank Width: 6.0 foot Tank Depth: 8.0 foot Total Void Volume: 2,872.3 Gallons Septic Tank Effective Volume = L * W * Lowest Invert To Tank Bottom: Tank length: 8.0 foot Tank Width: 6.0 foot Lowest Invert: 7.2 foot Effective Volume: 2,573.1 Gallons Septic Tank Storage/Detention: 1.9 Days Effective Volume / ADF Dosine chamber (113 Volume) storaee and effective volume calculations Dosing Chamber Total Void Volume = L * W * D: Tank length: 3.8 foot Tank Width: 6.0 foot Tank Depth: 8.0 foot Total Void Volume: 1,346.4 Gallons Dosing Tank Effective Volume = L * W * Lowest Invert To Tank Bottom: Tank length: 3.8 foot Tank Width: 6.0 foot Lowest Invert: 7.2 foot Lowest Invert To Pump Off: 5.67 foot Effective Volume: 953.7 Gallons Gallon/Inch: 14.0 Gavin. Pump Off 18" 252.5 Gallons Pump On 3.5" 49.1 Gallons per Dose Hgghwater Alarm 4" 56.1 Gallons Dosing Chamber Emergency Storage 60.5" 848.5 Gallons Freeboard (Both Chambers) 10" 439.5 Gallons (43.95 Gavin) STEP Tank Storage above highwater alarm in tank: 1,288.0 Gallons STEP Tank Storage above Pump On in tank: 1,344.1 Gallons STEP TANK RISER DESIGN (Pooh: Volume Needed in Risers: 102.0 Gallons Number of 20" Risers: 2.0 Number of 24" Risers: 3.0 Diameter of 20" Risers: 1.7 B Diameter of 24" Risers: 2.0 B Total Area of Risers: 7.5 Sq. B Minimum Height of Risers Required Below FIFE: 1.8 B Height of Risers Below FIFE (Assumed): 1.8 B Assumed Volume in Risers: 101.0 Gallons STEP TANK INLET PIPE DESIGN (Pool): Diameter of Pipe: 0.3 B Wall Thickness: 0.0198 B Inner Diameter of Pipe: 0.294 B Inner Pipe Area: 0.068 Sq. B Assumed Provided Length of Pipe: 5 B Assumed Volume in Provided Pipe: 2.536 Gallons STEP Tank Storage above highwater alarm inside and outside of tank: 1,392 Gallons SURGE TANK DESIGN: Minimum Septic Tank Volume Required: 34,535 Gallons Per E-Z Treat Septic Tank(s) Volume Provided: 36,000 Gallons (Two 18,000-gal. Septic Tanks -in -Series) 18.000-Gallon Seotic Tank storaee and effective volume calculations: Septic Tank Total Void Volume = L * W * D: Tank length: 19.5 foot Tank Width: 10.0 foot Tank Depth: 14.9 foot Total Void Volume: 21,727.1 Gallons Septic Tank Effective Volume = L * W * Lowest Invert To Tank Bottom: Tank length: 19.5 foot Tank Width: 10.0 foot Lowest Invert: 13.5 foot Effective Volume: 19,691.1 Gallons Storage (Freeboard): 2,036.0 Gallons per Tank FLOW EOUALIZATION TANK DESIGN: Minimum Volume Required: 34,535 Gallons Pump Tank(s) Volume Provided: 36,000 Gallons Flow Eaualization Tank storage and effective volume calculations: Flow Equalization Tank Total Void Volume= L * W * D: Tank length: 19.5 foot Tank Width: 10.0 foot Tank Depth: 12.6 foot Total Void Volume: 18,414.8 Gallons Flow Equalization Tank Effective Volume To Tank Bottom= L * W * Lowest Invert To Tan! Bottom: Tanklength: 19.5 foot Tank Width: 10.0 foot Lowest Invert To Tank Bottom: 12.5 foot Effective Volume: 18,171.7 Gallons Flow Equalization Tank Effective Volume To Pump Off = L * W *Lowest Invert To Pump Off: Tank length: 19.5 foot Tank Width: 10.0 foot Lowest Invert To Pump Off: 11.0 foot Effective Volume: 15,983.8 Gallons Storage (Effective Volume and Freeboard): 16,226.9 Gallons per Tank E-Z TREAT DESIGN: Please See Process Calculations RECIRCULATION TANK DESIGN: Minimum Recirculation Tank Volume Required: Recirculation Tank(s) Volume Provided: Recirculation Tank Total Void Volume = L * W * D: Tank length: Tank W idth: Tank Depth: Total Void Volume: Recirculation Tank Effective Volume = L * W * Lowest Invert To Tank Bottom: Tank length: Tank W idth: Lowest Invert To Tank Bottom: Effective Volume: Storage (Freeboard): FIELD DOSING DOSING TANK DESIGN: Minimum Pump Tank Volume Required: Pump Tank(s) Volume Provided: Storage Pond Dosing Tank Total Void Volume= L * W * D: Tank length: Tank W idth: Tank Depth: Total Void Volume: Per E-Z Treat (Two 18,000-gal. Pump Tanks -in -Series) 69,070 Gallons Per Tank Per E-Z Treat 72,000 Gallons Per Tank (Six 12,000-gal. Pump Tanks -in -Series) 19.5 foot 10.0 foot 8.4 foot 12,215.8 Gallons 19.5 foot 10.0 foot 8.0 foot 11,717.4 Gallons 498.4 Gallons per Tank N/A Gallons 18,000 Gallons 19.5 foot 10.0 foot 12.6 foot 18,414.8 Gallons Storage Pond Dosing Tank Effective Volume To Tank Bottom = L * W * Lowest Invert To Tank Bottom: Tank length: 19.5 foot Tank Width: 10.0 foot Lowest Invert To Tank Bottom: 12.5 foot Effective Volume: 18171.7 Gallons Storage Pond Dosing Tank Effective Volume To Pump Off = L * W * Lowest Invert To Pump Off: Tank length: 19.5 foot Tank Width: 10.0 foot Lowest Invert To Pump Off: 11.0 foot Effective Volume: 15,983.8 Gallons Days of Field Dosing Storage (Void Volume/ADF): 16,226.9 Gallons per Tank Total Treatment System Emergency Storage (Freeboard and Effective Volumes) CHLORINE DOSING TANK DESIGN: Minimum Chlorine Dosing Tank Volume Required: Chlorine Dosing Tank(s) Volume Provided: Chlorine Dosing Tank Total Void Volume= L * W * D: Tank length: Tank W idth: Tank Depth: Total Void Volume: 55,742.8 Gallons 14,397 Gallons (See Chlorine Dosing Calculations) 30,000 Gallons 19.0 foot 10.0 foot 21.7 foot 30,792.7 Gallons Chlorine Dosing Tank Effective Volume To Tank Bottom = L * W * Lowest Invert To Tank Bottom: Tank length: 19.0 foot Tank Width: 10.0 foot Lowest Invert To Tank Bottom: 19.5 foot Effective Volume: 27713.4 Gallons Chlorine Dosing Tank Effective Volume To Pump Off = L * W * Lowest Invert To Pump Off: Tank length: 19.0 foot Tank Width: 10.0 foot Dose Enable to Tank Bottom: 123 foot Effective Treatment Volume: 17,480.8 Gallons MacConnell & Associates, P.C. Project: Shinn Village Project Number: A95803.00 Location: Iredell County, North Carolina Subject: Chlorine Dosing Calculations Date: June 14, 2024 Given: Total Flow Rate (Q) (Highest Flowrate - Zone 2) Pipe Length (Shortest Path - Zone 3) Pipe Diameter Contact Time Required Contact Time in Supply Line (to Spray Fields) Contact Time in Dosing Tank —Dosing is sized based on remaining contact time needed in dosing tank Baffling Factor Required Dosing Tank Effective Volume Dosing Tank Provided (Void Volume) Dosing Tank Provided (Effective Volume) Design of Chlorine Feed Pump Sizing: Recommended Dosing Rate Total Chlorine dosing required Assume 12.5% Chlorine Solution Chlorine Feed Pump Rate: (Pump Rate x Required Dosage x 1440/Solution Strength) 261 GPM 663 ft 0.33 ft 30 mins 1.62 mires 28.38 mires 0.5 14,812 Gallons 30,793 Gallons 17,481 Gallons* *see tank sizing calcs. 2.5 ppm 125000 ppm 7.5 GPD 30 Day Storage for Chlorine 225.5 Gallons E Cz rn v 6" or 8" TYP. _ 14'-8" FOR CMU BUILDING 14'-4" FOR WOOD FRAMED BUILDING THRU—WALL HVAC UNIT I I F I _ MIN. 3'-0" _ - , _ MIN. 3'-0" 4" SCH. 80 PVC CLR I -- 4" 45- ELBOW (TYP.) I CLR FROM PUMPS M U z �l ___________ _-------------------------------- 1 4„ r -------------------------------------------- C) 11 °I I I MINI—CLIK RAIN SENSOR. PROVIDE----_ PIPE SUPPORT BRACKET TO EXTEND 1' FROM CP (TYP. OF 2) BUILDING. SEE DETAIL 7, D-106. 4" SCH. 80 PVC TRUE UNION BALL VALVE z 0 z� om J_ D U-1 m II Q n� 00 1 TELECTRICAL UNITS. 0 00 SEE E-103 u-3 '0 I I 't 4" ONE PIECE FLANGE (TYP. OF 2) 4" 4" I I ` I ()� 4 TO IRRIGATION FIELD -4" TEE (TYP. OF 2) 4" ENDRESS + HAUSER ELECTROMAGNETIC FLOW METER PROLINE PROMAG 53W 55—GALLON CHLORINE DRUMS WITH PROMAG WALL MOUNTED METERING PUMPS MOUNTED ABOVE CONTROLLER ® 4' A.F.F. (TYP. OF 2) 4'Wx4"Hx2'D SPILLPAL FLEXIBLE WORKSTATION FOR _ CHLORINE SOLUTION STORAGE OR APPROVED EQUAL CHLORINE FEED LINE TO CHLORINE DOSING TANK NOTE: 1. CHLORINE FEED LINE WILL CHANGE TO 1-1 /2" SCH. 40 PVC AFTER LEAVING BUILDING. 2. CHLORINE FEED LINE WILL NEED TO BE WINTERIZED UNTIL 1.5FT. OF BURY. 6'-8" CENTERED i ALUMINUM THRESHOLD 1 CHLORINE/METERING BUILDING D-110 NTS YFLOOR DRAIN 8'—O" TOP VIEW A. .I. MODEL D-021 COMBINATION AIR VALVE (TYP. OF 2) 4" THREADED 4" RED VALVE SERIES 48 THREADED PVC NIPPLE PRESSURE SENSOR AND GAUGE BALL VALVE (TYP.) WITH 316 S.S. FLANGES OR APPROVED EQUAL (TYP. OF 2) _ 4" 4" FOR ALL PIPE PENETRATIONS USE MECHANICAL PIPE SUPPORTO SEE TYPICAL SEALS SLAB SECTION a F.F.E.=t815.00' 9/S-101 a CONCRETE SLAB 2" FLOOR DRAIN WITH BALL (JOSAM SERIES 38250A) — FROM CHORINE CONTACT/PUMP TANK�/\—► 2" 90' ELBOW SECTION VIEW 24" X 48" FIXED FRAME WINDOW MOUNT SELF CONTAINED GRAVITY FED EYEWASH 42" A.F.F. (COMPLY WITH ANSI Z358.1-2009) 8' X 4' X 4" THICK CONCRETE LANDING PAD WITH 6x6 — WWF 4" SCH. 80 PVC TRUE UNION BALL VALVE 4" ENDRESS + HAUSER ELECTROMAGNETIC FLOW METER PROLINE PROMAG r53W -4" 45' ELBOW (TYP. ) 4" 4" �10" \-4pp TEE IN. (TYP.) to -H a a 2" 72�2-1/2- BEND = z Cy 4 4" 0 pVC DRAIN TO CHLORINE TO IRRIGATION CONTACT PUMP TANK 4" 90' ELBOW SEE SITE PLAN FOR ORIENTATION (MIN. 2% SLOPE). INVERT SHALL BE 24 INCHES BELOW INSIDE ROOF OF TANK. 2 ELECTROMAGNETIC FLOW METER D-110 NTS ADJ. PIPE SADDLE ADJUSTABLE SUPPORT W/ YOKE SADDLE LZ 1. SIZE STAND TO ADEQUATELY SUPPORT LOAD. THREADED BASE STAND 2, FOR FLOOR SUPPORT OF HORIZONTAL PIPE WHERE VERTICAL ADJUSTMENT IS REQUIRED. 3. USE EPDXY ANCHOR TO SECURE BASE TO FLOOR. 4. LEVEL BASE AND GROUT BETWEEN GROUT FLOOR AND BOTTOM OF BASE. \j\j\j\j\j\j\j� \V�\\i\\\//�A/jAAjjAA� jAA//AA/��A�AV�\V��� NOTE: INSTALL BACKFLOW PREVENTOR ON YARD HYDRANT SERVICE LINE X Q to I z 2'-0" x 2'-0" x 1'-6" :I CONCRETE ANCHOR ,N cO WITH 1/2" CHAMFER EXISTING GRADE to xxxx 2'-0" x 2'-0" 1 CF No. 5 i i m 3 ADJUSTABLE PIPE SADDLE D NTS 1'-4 3/4" _ — 1 /4" I - WASHED STONE I 1�42E: I_ _ I N 1. HOSE REEL SHALL BE CAPABLE OF STORING 50' OF HOSE. REEL SHALL BE 0 o I ®II — ---------T CONSTRUCTED OF S.S. AND BE MODEL TSHL—N—S100 BY COXREELS O/E HANNEY OR ®II x REELCRAFT. 0 0 ------------ 1 " DIA. SCH. 40 PVC 2. MOUNT ON TWO(2) 4"x4" SALT TREATED POSTS W/ CROSS BRACING 4' A.F.F. OR ABOVE — I TO COMPRESSION FITTING GRADE WHERE INDICATED OR AS NOTED. _ 1 "_0•• AT HYDRANT 3. PROVIDE 3/4" GATE VALVE 2'-6" A.F.F. W/ REINFORCED -Y4" HOSE TO REEL. 4. PROVIDE W/ 50' OF REINFORCED HOSE W/ S.S. OR BRASS HAND SPRAY NOZZLE. 5. PROVIDE 10"x14" FIBERGLASS SIGN. NOTICE "NON —POTABLE WATER". MOUNT ON POST ABOVE REEL. 4 YARD HYDRANT D-110 NTS STEEL ENCASEMENT PIPI HEAVY DUTY STEEL SKIDS (4) CARRIER PIPE (SPIDER SIZE DETERMINED BY SIZE OF STEEL CASING AND INNER PIPE) PLAN VIEW STEEL ENCASEMENT PIPE SPIDER i CARRIER PIPE s SPIDER DETAIL D-110 NTS SECTION VIEW TO PIPE BY MFG. OR APPROVED EQUAL NOTES 1. SEE SHEET D-101 FOR GENERAL NOTES. REVISIONS NO. DATE DESCRIPTION 1 05/09/24 PER DEQ COMMENTS PROJECT MANAGER GSM DRAWN BY: JDH PROJECT ENGINEER: AVF/JCT CHECKED BY: GSM DATE: MAY 9, 2024 N N O N Q H c� 0 U 0'�r• 17069 G' MacCONNELL & Associates, P. C. 501 CASCADE POINTE LANE, SUITE 103 N CARY, NORTH CAROLINA 27513 N P.O. BOX 129 w LICENSE MORRISVILLE, NORTH CAROLINA 27560 Q No. C-1039 TEL: (919) 467-1239 FAX: (919) 319-6510 w .Q SHINNVILLE FARMS w c� DEVELOPMENT PARTNERS, > LLC Z z x V) SHINN VILLAGE J V) WASTEWATER SYSTEMui IREDELL COUNTY, NC 0 J • >W W (n DETAILS -10OF 12 w J_ Z Z_ 2 (n A95803.00 — SHINNVILLE FARMS DEVELOPMENT PARTNERS, LLC — SHINN VILLAGE — WASTEWATER SYSTEM PROJECT NUMBER DRAWING NUMBER o A95803.00 D-110 LO