HomeMy WebLinkAbout20071806 Ver 1_More Info Received_20071211Shotwell 401 Certification
Subject: Shotwe11401 Certification
From: "Phil May" <phil.may@carolinaeco.com>
Date: Tue, 11 Dec 2007 21:27:18 -0500
To: "'Ian McMillan"' <ian.mcmillan@ncmail.net>
Ian,
A couple of questions regarding your certification for the Shotwell Landfill (DWQ#19970893):
Condition 2: Diffuse flow - it sounds like a plan needs to be submitted to your office showing how diffuse flow &
nitrogen reduction are achieved. All that information was included in Attachment 6 of the permit application. Do
you need any additional information besides that or is this condition just standard wording?
Condition 8: The buffer mitigation numbers are taken from the EEP approval, which was based on preliminary
numbers we sent them as the design was still being finalized. Our final impacts are less than the request and
therefore your buffer mitigation requirement is at a higher than 3:1 or 1.5:1 ratio. Can we revise this to the
numbers in the attached impact summary that I sent the other week (176,418 Zone 1, 83,112 Zone 2)?
Please give me a call at your convenience to discuss or clarify.
Thanks
Phil
Phil May
CAROLINA ECOSYSTEMS, fNC.
8208 Brian Court
Garner, NC 27529
(919) 606-1065 Cell
(919) 341-4474 Fax
www.carolinaeco.com
'~ Content-Type: application/pdf
Shotwell impact revised.pdf !,
Content-Encoding: base64
1 of 1 12/12/2007 11:57 AM
Shotwell C&D Landfill Expansion
404/401 Individual Permit Application
Impact Summary
Revised 11/29/07
Site Number Wetlands (acres)
Perm. Temp. Streams (linear ft)
Perm. Temp. Open Water (acres)
Perm. Temp. Buffers
Zone 1 Zone 2
1 1.09 0 467 0 0.55 0 89,733 59,677
2 0 0 0 50 0 0 1,500 1,000
Total 1.09 0 467 50 0.55 0 91,233 60,677
Wetland Impact Details
ite Number Type Purpose Impact Floodplain Area
1 Forested Landfill Liner Fill No 1.09
2 n/a n/a n/a n/a 0
Total 1.09
Stream Impact Details
ite Num er ame Purpose Impact Per/ nt ength
1 UT -Marks Cr. Landfill Liner Fill Int 467
2 UT -Marks Cr. Temp Crossin Fill & Culvert Per 50
Total 517
Open Water Impact Details
ite Number mpact Type rea
1 Drain/Fill Pond 0.55
2 n/a n/a 0
Total 0.55
Buffer Impact Details
Site 1
Zone 1 Zone 2 Total Site 2
Zone 1 Zone 2 Total Project
Total
Impact 89,733 59,677 149,410 1,500 1,000 2,500 151,910
Wetlands in buffer 30,927 4,269 35,196 0 0 0 35,196
Net Buffer 58,806 55,408 114,214 1,500 1,000 2,500 116,714
Required Mitigation' 176,418 83,112 259,530 0 0 0 259,530
cone i x s; cone t x i.o