Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8070834_Historical File_20071019
WATT � RQG Michael F.Easley,Governor William G.Ross Jr.,Secretary j r North Carolina Department of Environment and Natural Resources "WiediliedZili&Y Coleen H.Sullins,Director k ° `3' Division of Water Quality October 19, 2007 Nathan D. Benson, Manager Sandler at Shallotte, LLC 448 Viking Drive — Suite 220 Virginia Beach, VA 23452 Subject: Stormwater Permit No. SW8 070834 San Rio (Phase 2A & 3) High Density Subdivision Project Brunswick County Dear Mr. Benson: The Wilmington Regional Office received a complete Stormwater Management Permit Application for San Rio (Phase 2A & 3) on October 18, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 070834, dated October 19, 2007, for the construction of the project, San Rio (Phase 2A & 3). This permit shall be effective from the date of issuance until October 19, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact C ris Baker, or me at (910) 796-7215. Sinc ely, a/" Edward Beck Regional Supervisor Surface Water Protection Section ENB/csb: S:\WQS\STORMWATER\PERM IT\070834.oct07 cc: Johnathan P. Eakins, P.E., The John McAdams Company, inc. Brunswick County Inspections Chris Baker Wilmington Regional Office Central Files None Caro ina ,Naturally North North Carolina Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 Phone(919)733-7015 Customer Service Internet: www.ncwaterqualitv.org Location: N.512 Salisbury St. Raleigh,NC 27604 Fax (919)733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper • State Stormwater Management Systems Permit No. SW8 070834 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Nathan D. Benson and Sandler at Shallotte, LLC San Rio (Phase 2A & 3) Permit Grey Bridge Road, Brunswick County FOR THE construction, operation and maintenance of 3 wet detention ponds in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until October 19, 2017 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.4 on page 3 of this permit. The subdivision is permitted for 108 lots, each allowed a maximum of(see attachment) square feet of built-upon area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Pans 9 of Q State Stormwater Management Systems Permit No. SW8 070834 4. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. Design Criteria Pond #1 Pond #2 Pond #3 a. Drainage Area, 4.29 3.45 24.39 acres Onsite, ft2 186,908 150,315 1,062,298 Offsite, ft2 None None None b. Total Impervious 92,366 90,432 578,350 Surfaces, ft2 (1) Buildings 32,224 33,517 258,865 (2) Roads/Parking 28,102 29,093 253,720 (3) Sidewalks 21,150 16,932 54,875 (4) Other 10,890 10,890 10,890 c. Design Storm, 1 1 1 inches d. Pond Depth, feet 7 6 6 e. TSS removal 90 90 90 efficiency f. Permanent Pool 15 15 8 Elev., FMSL g. Perm. Pool 19,553 19,560 54,811 Surface Area, ft2 h. Permitted Storage Volume, 122,573 122,675 431,326 ft3 i. Temporary Storage Elev., 18 18.2 11.8 FMSL j. Controlling 2 1.5 3 Orifice, "0 pipe k. Permitted Forebay Volume, 10,406 14,638 51,005 ft3 I. Receiving Shallotte River/Lumber Stream/River Basin m. Stream Index 15-25-2-(10) Number n. Classification of SC;HQW Water Body o. Max. fountain 1/3 1/3 1 horsepower II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built-upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built-upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built-upon area limit is transferred to the individual property owner. Panes 1 of A State Stormwater Management Systems Permit No. SW8 070834 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built-upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 7. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 8. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Dana A of Q State Stormwater Management Systems Permit No. SW8 070834 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 14. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 15. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 16. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 070834, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. c. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built-upon area per lot is (see attachment) square feet. This allotted amount includes any built-upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. h. Built-upon area in excess of the permitted amount will require a permit modification. Pon= of Q State Stormwater Management Systems Permit No. SW8 070834 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 18. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 19. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in pond #1 and #2 is 1/3 with pond #3 allowed 1 horsepower. 20. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS 1 . This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Pane= of Q State Stormwater Management Systems Permit No. SW8 070834 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 19th day of October, 2007. NOR CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION -i.af./a/itQl6Ge/L--- for oleen . Su Tr ins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 070834 Ponta 7nfQ State Stormwater Management Systems Permit No. SW8 070834 San Rio (Phase 2A &3) Page 1 of 2 Stormwater Permit No. SW8 070834 Brusnwick County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Pano A of Q State Stormwater Management Systems Permit No. SW8 070834 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections Ponta Q of Q OFFICE USE ONLY Date Received Fee Paid Permit Number eg by $Too 0 itst6 Sw i07oiO4 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name(specify the name of the corporation, individual,etc.who owns the project): Sandler at Shallotte,LLC 2. Print Owner/Signing Official's name and title(person legally responsible for facility and compliance): Nathan D.Benson-Manager 3. Mailing Address for person listed in item 2 above: 448 Viking Drive-Suite 220 City: Virginia Beach State: VA Zip: 23452 Telephone Number: (757) 463-5000 4. Project Name (subdivision, facility, or establishment name — should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): San Rio 5. Location of Project(street address): Located off of Gray Bridge Road/Tar Landing Road City: Shallotte County: Brunswick 6. Directions to project(from nearest major intersection): From intersection of US 17 and NC 130, go east on NC 130.Turn right onto Gray Bridge Road.The project entrance will be on the right(before the intersection with Tar Landing Road) 7. Latitude: 33 58'00"N Longitude: 78 21120"W of project. 8. Contact person who can answer questions about this project: Name: Mr.Jim Wiseman/Mr.Jim Green Telephone Number: (910) 575-4300 IL PERMIT INFORMATION 1. Specify whether project is(check one): El New El Renewal ® Modification Form SWU-101 Version 3.99 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW8 070202 and its issue date(in known) 2/15/2007 3. Specify the type of project(check one): ® Low Density ❑ High Density ❑ Redevelop ❑ General Permit ❑ Other 4. Additional Project Requirements(check applicable blanks): ❑ CAMA Major /1 Sedimentation/Erosion Control ❑ 404/401 Permit ❑ NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623- 6748 III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages)describing stormwater management for the project. The project is proposed as a low-density project with high-density pockets. Runoff from the proposed roadway/ sidewalk areas in the low-density portions will be treated with curb-outlet systems.Runoff from the impervious areas within the high-density pockets will be treated with wet detention ponds/infiltration devices. 2. Stormwater runoff from this project drains to the Lumber River basin. 3. Total Project Area: SA- 112.80 ac. 4. Project Built Upon Area: 25(SA)/30(SC) % SC-570.85 ac. 5. How many drainage areas does the project have? 15 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name See Attachment A See Attachment A Receiving Stream Class Drainage Area Existing Impervious * Area Proposed Impervious * Area % Impervious * Area(total) Impervious * Surface Area Drainage Area 1 Drainage Area 2 On-Site Buildings See Attachment A See Attachment A On-Site Streets On-Site Parking On-Site Sidewalks Other On-Site Off-site Total: See Attachment A Total: See Attachment A *Impervious area is defined as the built upon area including, but not limited to, buildings, roads,parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off-site impervious area listed above derived? N/A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and allowable built-upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number N/A as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than Attachment A square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or water surface of swimming pools. 3. Swales shall not be filled in,piped, or altered except as necessary to provide driveway crossings. 4. Built-upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. S. All permitted runo :rom outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the State,and that they will be recorded prior to the sale of any lot. V. SUPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off-site System Supplement Form SWi_J-1.07 lJn.derground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form QR� • One copy of the applicable Supplement Form(s)for each BMP oft • Permit application processing fee.of$420(payable to-NCDENR) g IZf • Detailed narrative description of stormwater treatment/management gpf • Two copies of plans and specifications,including: sec -Development/Project name -Engineer and firm -Legend -North arrow -Scale -Revision number&date -Mean high water line -Dimensioned property/project boundary -Location map with named streets or NCSR numbers -Original contours,proposed contours,spot elevations,finished floor elevations -Details of roads,drainage features,collection systems,and stormwater control measures -Wetlands delineated,or a note on plans that none exist -Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations -Drainage areas delineated -Vegetated buffers(where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf,please complete this section. Designated agent(individual or firm): The John R. McAdams Company, Inc. Mailing Address: 2905 Meridian Parkway City: Durham State: NC Zip: 27713 Phone: (919) 361-5000 Fax: (919) 361-2269 VIII. APPLICANT'S CERTIFICATION I,(print or type name of person listed in General Information, item 2) :Nathan D.Benson ,certify that the information included on this permit application form is,to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded,and that proposed project complies with the requirements of 15A NCAC 2H.1000. Signature: Date: 80AG..1 S 'aO04-1 Form SW 01 Version 3.99 Page 4 of 4 SAN R10 ATTACHMENT eAe aS.FINCH,PE WDL07000 9202007 Phan IA Bade Information To SW21F N1 Bemaloio8Area Told ToAwdlyPend Remdu8BArea Total To SWMP RI To BWMP 82 To SWMFN3 RmatahgArea Total Pb...2B Phan3 Phase 4A Phase 4B Pb...SA Phase SB Phase6A Phase 6B Phan 7A Phase 7B Phase8A Phase 80 Readvig38'.. Nmws Sha➢oSe RiverSh ShaOaoe River. Bhallotte River, Shellotte River ellode River Shollotte Ricer Shalotte Ries Sha0otte River ShelloSe River Shanode River Sha11ote Rio S1WIoaever River 5he8o�R�• Shallotte River Shallatte River ShAOotte River SMllotte River Shaooae River Sharron Creek Sharron Creek Sharron Creek Sharron Creek Sharron Creek Sharron Credo Sharron Creek Sharron Creek Raaduinb...00w(2aarawiwr SC-HQW SC;HQW SC;HQW ";•el.,A.P1!' s. ip• y.•a„ Y •• i. ioI.' 0 a.••5 t:L,Ie" _ vy•e„ . .•e1:w gi[yn' _ S..H•W SC-HOW SC-HQW SC;HQW SC;HQW SC;HQW-C;SwJ'1QW SCLHQW-C;Sw310W SC;HQW-C;Sw;HQW SC;HQW-C;Sw,HQW -Ara 11,586 SF 3,225 178 SF 3 6 764 SF 179,903 SF 31,466 SF 211 69 SF 186,908 SF 1 '315 SF 1,062,298 SF 984,844 SF 2,384,365 SF 805,768 SF 141 672 SF 5,041,470 SF 79,938 SF 2,235,862 SF 1_122,015 SF 2,736,279 SF 1671,523 SF 4,948,709 SF 75,658 SF 3,920,292 SF 380,328 SF Anew 0SF 0S9 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF 0SF Pretend Imperroiem Area 8,527 SF 871,616 SF 883,938 SF 77 730 SF 7,841 SF 85,571 SF_ 92366 SF 90,432 SF 578350 SF 5,411 SF 766 559 SF 216,750 SF 602,330 SF 1,191,366 SF 37,026 SF 733,637 SF 424,318 SF 895,768 SF 261 717 SF 1340,450 SF 43,670 SF. 1,063,250 SF 149.050 SF !CwgerekrwAma(VW 73.6% 27.0% 27.3% 26.9% 28.1% 23.6% 46.3% 32.8% 37.8% 32.7% 39.0% 27.1% 57.7% 27.1% 392% Phase IA Pb...IB Phan2A Impervious Surface Area To SWMFNI Remaining Area Total To Amenity Pond Raoutal.BAro Total To SWhiF 01 To SWMF#2 To SWMF 63 BemaWo3Area Total Phase 2B Phase 3 Pb...4A Pb...433 Phase SA Phase SB Pb...6A Phase6B Phase 7A Phase 7B Phase BA Phase BB Onsirdeb 0 SF 573,000 SF 573,000 SF 0 SF 0 SF 0 SF 0 SF 0 SF 0 SF 0 SF 0 SF On-slisBrSArgr 0 SF 0 SF 0 SF 12,136 SF 0 SF 12,136 SF 32,224 SF 33,517 SF 258,865 SF 0 SF 324,606 SF TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD OaeileSlseb 7,918 SF 260,234 SF 268,152 SF 35,489 SF 3,002 SF 38p91 SF_ 28,102 SF 29,093 SF 253.720 SF 0 SF 310,915 SF TBD 1BD TBD TBD TBD TBD TBD TBD TBD TBD TED TED On ripe B 0 SF 0 SF 0 SF 10,285 SF 0 SF 10,285 SF 0 SF 0 SF 0 SF 0 SF 0 SF TBD TBD TED TBD TBD TED TBD TBD TBD TBD TBD I TED Of sSidewedke 609 SF 38,382 SF 38,991 SF 11,372 SF 701 SF 12,073 SF 21,150 SF 16,932 SF 54,875 SF 5,411 SF 98,368 SF TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD Other 06-the _- _ 0 SF 0 SF 0 SF 8,448 SF 4,138 SF 12,586 SF 10,890 SF 10,890 SF 10,890 SF 0 SF 32.670 SF 113D TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD _ Offvie 0 SF 0 SF 0 SF 0 SF 0 SF 0 SF u 0 SF 0 SF 0 SF 0 SF 0 SF TBD TBD TBD TBD TBD TBD TBD 13D TBD TED TBD TED Trask 8,527 SF 871,616 SF 880,143 SF 77,730 SF 7,841 SF 85,571 SF 92366 SF 90,432 SF 578350 SF 5,411 SF 766,559 SF 216,750 SF 602,330 SF 1,191,366 SF 37,026 SF 733,637 SF' ' 42A,318 SF 895,768 SF 261,717 SF 1,340,450 SF 43,670 SF 1,063,250 SF 149,050 SF oPond Bmamaq Bad Iwfirmatlus To SWMF NI To SWMPN2 ToSWMP 03 ToAousB7Pond Total ReathiiSim .Noes Shallotte River ShallntteRiver SMllotte River Shallotte River Shrilled°River ReodubgSimmrs Closaffestion SC_HQW SC;HQW SC;HQW SC HQW SC;HQW Dro6rodeAres 198,494 SF 150315 SF 1,062,298 SF 179,903 SF 1,591,010 SF EdwOglmpmvi us Ana 0 SF 0 SF 0 SF 0 SF 0 SF Aoporsdlmpervis=Aro 100.893 SF 90,432 SF 578,350 SF 77,730 SF 847,405 SF 14&cavimbAn.(amp 50.8% 60.2% 54.4% 43.2% 53.3% Impuvieu Barbee Area To SWMF NI To SWM11/2 To Whir R4 To Amenity Pond Total thralls Lob 0SF 0SF 0SF 0SF 0SF Ora..thillatir 32,224 SF 33,517 SF 258,865 SF 12,136 SF 336,742 SF Ow-sits&mu 36,020 SF 29,093 SF 253,720 SF 35,489 SF 354,322 SF OnsitsPakig 0 SF 0 SF 0 SF 10,285 SF 10,285 SF Ow slrSldewa&a 21,759 SF 16,932 SF 54,875 SF 11372 SF 104,938 SF Other Owate 10,890 SF 10,890 SF 10,890 SF 8,448 SF 41,118 SF Offth, 0 SF 0 SF 0 SF 0 SF 0 SF nark 100,893 SF 90,432 SF 5711,350 SF 77,730 SF 847,405 SF TIE JOHN R McADAMS COMPANY, INC. LETTER OF TRANSMITTAL To: Mr. Chris Baker Date: October 12, 2007 Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 ** FEDERAL EXPRESS** (910) 796-7215 Re: San Rio Job No.: WDL-07020 SW Application #SW8070843 I am sending you the following item(s): COPIES DATE NO. DESCRIPTION 1 Original Response to Comments Letter 2 PD-1A 2 PD-1 F These are transmitted as checked below: ❑ As requested ® For your use ® For approval ❑ ❑ For review and comment ❑ Remarks: Copy to: Signed: Brandon R. Fin , PE Sr. Stormwater Project Manager FOR INTERNAL USE ONLY ❑ Copy Letter of Transmittal Only to File ® Copy Entire Document to File CIVIL ENGINEERING • LAND PLANNING • SURVEYING PO Box 14005 • Research Triangle Park,NC 27709 • (919)361-5000 • fax(919)361-2269 www.johnrmcadams.com Since 1979 IJ]i]i THE JOHN R. McADAMS COMPANY, INC. October 12, 2007 Mr. Chris Baker North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Re: San Rio—Phase 2A and 3 Response to Comments dated October 12, 2007 Stormwater Application No. SW8070843 WDL-07020 Dear Mr. Baker: Below please find our comments regarding your request for information for the Stormwater Management Permit Application on the above referenced project. Comment 1: Stormwater Pond #1, a pipe has been added that enters the main body of the pond and drains the adjacent wetland. Please remove pipe. Response 1: This pipe is used to pass flow from the adjacent wetland area you mentioned in the comment; it is not used to drain the adjacent wetland. A low area is formed when the proposed sidewalk crosses over the natural draw, just downstream of the wetland area, and the sidewalk is elevated such that existing drainage from the wetland area does not cross over it during every rainfall occurrence. The invert of the proposed pipe is placed at the existing ground elevation such that it will mimic the current drainage patterns. The invert of the pipe is not placed below the invert of the natural drainage pattern. Therefore, it is not expected that this pipe will drain the adjacent wetland. It will only pass the overflow Research Triangle Park,NC from the wetland area under the sidewalk. For this reason, Post Office Box 14005 the pipe has not been removed in the current submittal. Research Triangle Park, North Carolina 27709 Comment 2: The permanent pool elevation of Pond #1 is 15 feet with the 2905 Meridian Parkway Durham,North Carolina 27713 upstream wetland ground elevation at 20 feet. When the 800-733-5646 permanent pool elevation is lower than the surrounding wetlands 919-361-5000 a liner must be used in the pond to prevent groundwater 919-361-2269 Fax drawdown of the wetlands, please revise. Shown to be 4" diameter on the plans (sheets PD-3B, PD-3F)please correct. Charlotte,NC 5311 Seventy-Seven Center Drive, Suite 66 Charlotte,North Carolina 28217 800-733-5646 704-527-0800 704-527-2003 Fax Comprehensive Land Development Design Services www.johnrmcadams.com We help our clients succeed. Since 1979 THE JOHN R. McADAMS COMPANY INC. Mr. Chris Baker San Rio—Phase 2A and 3 Stormwater Application No. SW8070843 October 12, 2007 WDL-07020 Page 2 Response 2: Per your review comment, the cross-section shown on Sheet PD-1F has been edited to show a liner a minimum of 1-ft below the proposed grade, if it is needed. As shown on General Note #5 in the previous submittal, a clay liner is to be installed if infiltration rates greater than 0.01 inches per hour are expected at the bottom of the basin. The liner type (if needed) has also been specified in this note. On a side note, existing ground elevations within the adjacent wetland area and the location of the borings indicating the seasonal high water table in the proposed facility have been added to the plan view. As noted, the seasonal high water table elevations are approx. EL. 12.5 and the proposed normal pool elevation is EL. 15.0. Consideration of this response is greatly appreciated. If you should have any questions or require additional information, please do not hesitate to contact me at(919) 361-5000. Sincerely, THE JOHN R. MCADAMS COMPANY,INC. x•ovie00 Brandon R. Finch, PE Senior Project Manager Stormwater and Environmental Department Enclosures 2,1'Y.JATk•19p Michael F.Easley,Governor William G.Ross Jr.,Secretary • r North Carolina Department of Environment and Natural Resources ED' `C Coleen H.Sullins,Director Division of Water Quality October 5,2007 Nathan D. Benson,Manager Sandler at Shallotte,LLC 448 Viking Drive—Suite 220 Virginia Beach, VA 23452 Subject: Request for Additional Information Stormwater Project No.SW8 070843 San Rio-Phase 2A and 3 Brunswick County Dear Mr. Benson: The Wilmington Regional Office received a Stormwater Management Permit Application revision for San Rio-Phase 2A and 3 on September 21,2007. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Stormwater Pond#1,a pipe has been added that enters the main body of the pond and drains the adjacent wetland. Please remove pipe. 2. The permanent pool elevation of Pond#1 is 15 feet with the upstream wetland ground elevation at 20 feet. When the permanent pool elevation is lower than the surrounding wetlands a liner must be used in the pond to prevent groundwater drawdown of the wetlands,please revise. shown to be 4"diameter on the plans(sheets PD-3B,Pll-3F) please correct. Please note that this request for additional information is in response to a partial,preliminary review. The requested information should be received by this Office prior to October 12,2007,or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items,including the application fee. If you need additional time to submit the information,please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter.The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces,other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent.All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at(910)796-7301. Sincerely, C_ NA- ice' -. Chris Baker Environmental Engineer II ENB/csb: S:\WQS\STORMWATER\ADDINFO\2007\070843.sep07 cc: Brandon Finch,P.E.,The John McAdams Company,Inc. Chris Baker No Carolina aturally North Carolina Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 Phone(919)733-7015 Customer Service Internet: www.ncwaterquality.org Location: N.512 Salisbury St. Raleigh,NC 27604 Fax (919)733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper 09-24-07;04:09AM;Pa rker&Assoc i ates NCDENR - Wi m ngto; # 1/ 8 FXD PARKER & ASSOCIATES, INC. 513aPingH _. Consulting Engineers •Land Surveyors -Land Planners 306 Now Bridge Street + P.O.BOx 976 - • 7.P? Jacksonville, NC 28541-0976 ; f. . ryes (910) 455-2414 • Fax: (910) 455.3441 •` �' ':`•rY' sf�r: y3•`?�`;:; FACSIMIILE.TRANSMISSIONCOV R SHEET FAX#(910))4455-3441 TO: Pram 1.4"t COMPANY: C. .., •FAX# : DATE: FROM: . RE. - V le d REMARKS: L-r.nn,ps#o J 1.'i . . . . . .. .T - • NUMBER OF PAGES (ELUDING THIS SHEET): U ORIGINAL TO FOLLOW BY MAIL: YES: NO: V WE REQUEST THAT YOU CONFIRM RECEIPT: YES: The Information contained In this facsimile is privileged and cen en T drltend d only thrMe use ofthe addressee.If the readerls notthe intended recipient,you are hereby notifledthat,ny use iv*tootlyprohibited.If you have received thls facsimile in error,please immediately notify the sender by telephone and return the original to the sender at the above address. Thank you. C1.FORMS.PARKER.FAX.a2 ENVIRONMENTAL ENGINEERING * STORM WATER MANAGEMENT • WATER AND WASTEWATER SYSTEMS bE:rELOPittENT CONSULTING 4. WARIgILITY REPORT o COMPUTER AIDED DESIGN a CONSTRUCTION PLANS 09-24-07;04:09AM;Parker&Associates NCDENR - Wiin ngto; # 2/ 8 Pre,-rip 1 i unr o" _' A T F M.�L't; ' v C . n _ : G � � aro na Department o Environment and Natural Resources —` 127 Cardinal Drive,Wilmington NC 28405 (910)796-7307 FAX(910)350-2004 Request for Express Permit Review oc�. FILL-iN all information below and CHECK required Permit(s). FAX or email to Camerop.WeavertbncmalLnet along with a narrative and vicinity mag of the project location. Projects must be submitted by 9:00 A.M. of the review date,unless prior arrangements are made, APPLICANT Name Michael G.Tuton Company Carolina Forest Developers LLC Address P.O.Box 1066 City/State JACKSONVILLE Zip 28541 County ONSLOW _ Phone(910)577-1441 (91015717319 Email NIA PROJECT Name The Village at Carolina Forest Phase V.,iviy_Glenn at Carolina Forest,Carriage Run Section V at Carolina Forest. PROJECT SYSTEM(S)TRIBUTARY TO HALF MOON CREEK(STREAM NAME) WHITE OAK RIVER BASIN ENGINEER/CONSULTANT M.J.KLINKER,P.E. Company PARKER&ASSOCIATES.INC, n`J W; n1 ' 6,2..cw-• r e. c o+� Address P.O.BOX 976 City/State JACKSONVILLE Zip 28541 County ONSLOW Phone(910)455-2414 Fax (910)455-3441 Email paltexteltbizac.rr,com State or National Environmental Policy Act(SEPA,NEPA)—EA or EIS Required❑Yes El No ❑ STREAM ORIGIN Determination; #of stream calls; Stream Name ❑ STORMWATER ❑Low Density ®High Density-Detention Pond ❑High Density-Other Wetlands MUST be addressed below Low Density-Curb&Gutter ❑High Density-Infiltration ❑Off Site ------------------------ ❑ COASTAL ❑ Excavation&Fill ❑Bridges&Culverts 0 Structures information�� MANAGEMENT El Upland Development ❑ Marina Development ❑Urban Waterfront ❑ LAND QUALITY ❑ Erosion and Sedimentation Control Plan with acres to be disturbed. WETLANDS(401) Wetlands on Property CI Yes❑No Isolated Wetlands on Property El yes®No Check all that apply Wetlands Will Be Impacted Yea❑No Wetland Impacts:0.1 Acre(s) Wetlands Delineation has been completed i►e4 Yes❑No ❑ Buffers impacted: Acre(s) USACOE Approval of Delineation completed® Yes❑No 404 Application in process w/USACOE®Yes[]No!Permit received from USACE ►Zi Yes❑No 401 Application required['Yes®No If Yes,❑Regular❑Express Additional fees,not to exceed 50%of the original Express Review permit application fee,may be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only SUBMITTAL DATES: Fee Split for multiple permits: E C E I V E SW — $ D AMA- $ SEP 2 4.2007 401 $ Total Fee Amount $ iswQ PROJ# 09-24-07;04:09AM;Parker&Associates NCDENR - WiImingto; # 3/ 8 Project Name The Village at Carolina Forest. Phase V Carriage Run Section V at Carolina Forest Ivy Glenn at Carolina Forest Stormwater Express Questionnaire 1. Where Is the project located? County ONSI,OW Nearest Town/City JACKSONVILLE (Attach a detailed vicinity map with both local street names and SR, NC, US or Interstate highway numbers, plus other relevant information such as town or city names, directions to, eta Show the nearest intersection of two major roads on the vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway) If the project is located in Brunswick, Onslow or New Hanover Counties, NPDES Phase li Post- Construction rules will apply. 2. What is the name of the receiving stream? UT TO HALF MOON CREEK What River Basin Is It located In? WHITE OAK What is the classification of the receiving stream? C; NSW For SA or SR waters, a separate scaled topographic map will be required. The project must be accurately located on the map and the 1,4 mile radius from the property corner closest to the SA or SR receiving stream must be drawn on the map. a If the project is high density.what type of stormwater management BMP's are being proposed? (i.e.,wet detention, infiltration, bioretention,sand filter—list all that apply) THE VILLAGE SECTJQN V AT CAROLINAMOREST IS A HIGH DENSITY AREA WITH A PROPOSED WET DETENTION BASIN, How many separate BMP's are being proposed? 1 4. Is there offsite runoff from theproject adjacent properties r publht-of way that will drain into any of the proposed BMP's on the ro ect and is not beingdiverted? Yes /'� No 5. is an access road across other properly required to access the project? ❑Yes ® No 8. Is there any existing development or pre-1988 existing BUA located on the pro arty? (Please provide documentation &delineate and identify on the plans.) Yes IJ No 7. For high density projects, has all of the proposed BUA been collected? ®Yes ❑ No (if not, attach a separate explanation sheet) 8. What Is the applicant's full legal name? MICHAEL a TUTON 11 If a corporation, LLC or Partnership is involved,what is that name? CAROLINA FOREST DEVELOPERS LW If it's an LLC, is it manager-managed or member-managed? MANAGER-MANAGED What Is the applicant's title within the corporation, LLC or partnership? MANAGER Will an agent be signing the application? ❑Yes El No If Yes,what is the agent's name and title? ❑Please note the application signature requirements are listed in NCAC 2H.1003(e). In summery, only the sole proprietor of a sole proprietorship, the designated manager, member- manager,president or vice president of a corporation or LLC, the general partner of a partnership, or a ranking official of a municipality may sign permit applications and supplements. The signature of the engineer or other agent can be accepted only if accompanied by a signed letter of authorization from one of the aforementioned inividuals. Corporations, LLC's and Partnerships must be registered with the NC Secretary of State's O ,end&tctiye.'71e Page 1 of 2 D SEP 2 4.2007 DWQ PROJ# 09-24-07;04:09AM;Parker&Associates NGDENR - WiImingto; # 4/ 8 Project Name The Village at Carolina Forest, Phase V Carriage Run Section V at Carolina Forest Ivy Glenn at Carolina Forest note that spelling, capitalization, and punctuation are extremely important. Please provide the entity name exactly as on file with the NC Secretary of State. 9. Will the project involve the subdivision and sale of property? ® Yes ❑ No Is the subdivision g residential or❑commercial? Deed restrictions are required for all subdivision projects, residential or commercial, low density or high density. Specific language for the various types of subdivisions is available from DENR. 10. For ail projects, have the wetlands been delineated? 0 Yes ❑ No (Either a signed wetlands delineation map must be submitted with the application or a wetland report must be provided. Only a trained professional may provide Information regarding the presence or absence of wetlands.) 11. Are wet detention ponds or other engineered controls proposed to be located agjacent wetlands? DA Yes No (!f,yes, the SHWT must be provided to demonstrate that the permanent pool of the pond is above the SHWT and will not dewater the wetlands over time, Where possible, all ponds and swales should outlet Into the wetlands to keep them hydrated.) 12. For Infiltration projects, has a site visit been completed with the DENR soils scientist to verify the soil type, water table and infiltration rate provided In the soils report? NiA ❑Yes ❑ No If yes,what was the date of the site visit? include a copy of the consultant's soil report with the application. 13, Does the project show Level Spreaders located at the outlet of all engineered 22ntrols and swales prior to entering surface waters or wetlands? Yes El No (The purpose of the level spreader is to reduce the energy of the Incoming runoff and to promote diffuse sheet flow to prevent erosion and scour into the receiving waters or wetlands.) 14. Is this project part of a larger subdivision, or is it a lot that will be treated by a previously permitted stormwater system? Yes ❑ No If yes,what is the name of the permitted facility? =i• I i_ •V- -. = 1- What Is the permit number of the permitted facility? ilY/S.11 I!I 1 is the permitted facility in compliance with its permit? lam+ 'es No Have the deed restrictions been recorded? ►I Yes No Have the deed restrictions been submitted? ■ Yes No Has the Designer's Certification been submitted? ■ Yes No 15. Do the plans reflect all Information as listed in 15A NCAC 2H.1003 (g)? ®Yes ❑ No 16. Have all of the design requirements of each proposed BMP been met? ®Yes El No (If not, attach a separate explanation sheet) 17. For each BMP in all high density projects,and low density curb outlet Swale projects, has a drainage area delineation map been provided? 01 Yes ❑ No 18. Any revisions made to the application as a result of this review may cause changes to the other documentation. Plans,calculations, application,and supplements should be reviewed for any necessary changes. For example, changing the orifice size will require a modification to the calculations,the pond details on the plans,and page 1 of the supplement. RECEIVED Page2of2 SEP 2 4.2007 Dwo PROJ # 09-24-07;04:09AM;Parker&Associates NCDENR - W !mingto; # 5/ 8 The Village at Carolina Forest,Phase V Ivy Glen at Carolina Forest Carriage Run Section V at Carolina Forest Amendment#3 to the Carolina Forest Master Plan SW8-051061. The Village at Carolina Forest,Phase V is a high density area in Carolina forest. According to the master permit the arca is allocated 506,515 SF of Impervious. The stormwater will be treated in a wet detention basin. Wetlands are on site but will not be impacted. The project will consist of either town homes or apartments. Ivy Glen at Carolina Forest is a proposed,68 lot,low density subdivision with curb and gutter streets.5:1 curb outlet swales are proposed. The master permit allows 274,296 SF of BUA and 2147 SF/lot There is one wetlands crossing which has permit#200301016. The impacts will be 0.07 acres of riparian wetland impacts,0.03 acres of temporary wetland impacts,and 85 LF of stream impacts. 5:1 curb outlet swales will be used. Carriage Run Section V at Carolina Forest is a proposed,58 lot,low density subdivision with curb and gutter streets. 5:1 outlet swales are proposed. The master permit allocates 236575 SF for this project and 2200 SF per lot Wetlands are on site,but arc not impacted. These three projects are all under the Carolina Forest Master permit. A souping meeting is desired to discuss if and how the new niles and BMP"s. Specifically the separation of the SHWT and the pond permanent pool/5:1 swale bottom,and"average pond depth"are of concern. 'Sht/J` -- 5 v r bc1at.Aj .rsg•\-4 cook — to - i W I l reck es -r f�c� e a r.ca, Ole-044 C. rc in $►►� P 3 ' c^.; r� try RE CEi SEP ? 4 2007 PA®d# ®►ry�C 09-24-07;04:09AM;Parker&Assoc i ates NCDENR - WiImingto; # 6/ 8 Road Site outs ard Co,�o11nA NCSR 14 • Fa Z Blvd. dooksonvilla p Commons /911-16 • ?144)1: Vicinity Sketch Not to Scale -r E 1/ 06 kr CALc•c.t4va Yoe;Cs7 Pke.ye RECEIVEn SEP 2 4.2007 DWQ PROJ# 09-24-07;04:09AM;Parker&Assoc1ates NCDENR - WI 'mingto; # 7/ 8 Mvs fait n w. (o.ro'inq Fo reC T s��, (- - --- R /3:424 c ouNA '---„ ._ _7) Western S1J81 l V I G OW �3oulavard Ext. Carolina 1 NCSR 147, Forest Blvd. Jacksonville \\\ , ,„,,..AS,-- 4 . Commons .$,„,. „ Jo_ .‘ \„ ,, ,,„ , , _isigkirtrte,<:, .0),-- --%, atbA \ s' s �_ -- . VICINITY SKETCH CH Not to scale • , - - - - - . . ___ � .... ...._ -A._ _.__._ 09-24-07;04:09AM;Parker&Associates NCDENR - WIImIngto: C�sp.e*cee E S to,v V t'T C..I►CDLI 4 coals ST --- -' _ 1.- . . _ ,.,, (\m ev":11(1 R*424 __ CAROLINA Western • PODS' S JEND V!SiGH \\ Boulevard Ext. Ccrollne NCSR IV* Forest Blvd. ,w Jacksonville Commons 4 N. ,44,4 1 � 1 4 <i w ', ti � 7 -.....,..„ , VICINITY SKETCH iwot to mate .L................ .... .......r011r�grMrMgr�M��11/ -- �.......... .. .. .. ...— — T _. .. ..�— .� �.�.�... ..�.........__l_._..._.wwin,r .__...... - ._. J1LLI THE JOHN R. McADAMS COMPANY, INC. LETTER OF TRANSMITTAL To: Mr. Chris Baker Date: September 20, 2007 Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 ** FEDERAL EXPRESS ** (910)796-7215 Re: San Rio Job No.: WDL-07020 I am sending you the following item(s): COPIES DATE NO. DESCRIPTION 1 Response to comments letter 1 SW Management Permit Application 2 SW Management Plan Design Caics revised 9/20/07) These are transmitted as checked below: ❑ As requested // For your use ® For approval ❑ ❑ For review and comment ❑ Remarks: Chris: The SW Master Plans are coming in a separate package Copy to: Signed: L :40.4v/ Brandon . Finch, -461<,,s Sr. Stormwater Project Manager FOR INTERNAL USE ONLY • Copy Letter of Transmittal Only to File ® Copy Entire Document to File CIVIL ENGINEERING • LAND PLANNING • SURVEYING PO Box 14005 • Research Triangle Park,NC 27709 • (919)361-5000 • fax(919)361-2269 www.johnrmcadams.com I1 Since 1979 ..... THE JOHN R. McADAMS COMPANY, INC. September 20, 2007 Mr. Chris Baker North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, North Carolina 28405 Re: San Rio—Phase 2A and 3 Response to Comments dated September 14, 2007 Stormwater Application No. SW8070834 WDL-07020 Dear Mr. Baker: Below please find our comments regarding your request for information for the Stormwater Management Permit Application on the above referenced project. Comment 1: Stormwater pond labeled Pond#2 in plan view and Pond#1 in title block sheet PD— 1A,please correct. Response 1: Per your request, this label has been corrected. Comment 2: Please locate the pond/swales in a recorded access/drainage easement. Response 2: Maintenance access easements were shown on the plan view for each pond in the previous submittal (Sheets PD-1A, PD- 2A, and PD-3A). Also, it was noted on the overall site plan that the drainage swales were to be located in drainage easements. However, to help address this comment, please note that the pond / swale easements have been shown on the overall site Research Triangle Park,NC plan and subsequent sheets, which have been included within Post Office Box 14005 this submittal for your review. Research Triangle Park, North Carolina 27709 Comment 3: Maximum spacing for bars on racks is 5.5"with a minimum 290 Meridian Parkway spacing of 2" please correct. Durham,North Carolina 27713 P g 800-733-5646 919-361-5000 Response 3: Per your request, the trash racks for Ponds 1 through 3 were 919-361-2269 Fax changed to reflect a maximum spacing between the #4 rebar of 5.5 inches. The edited detail sheets have been included in Charlotte,NC this submittal for your review. 5311 Seventy-Seven Center Drive, Suite 66 Charlotte,North Carolina 28217 800-733-5646 704-527-0800 704-527-2003 Fax Comprehensive Land Development Design Services www.johnrmcadams.com We help our clients succeed. I—I Since 1979 THE JOHN R. McADAMS COMPANY, INC. Mr. Chris Baker San Rio—Phase 2A and 3 Stormwater Application No. SW8070834 September 20, 2007 WDL-07020 Page 2 Comment 4: Bottom of pond elevation (Pond#2—sheet PD— 1F) on the section view is 9' but is reported to be 8' on the supplement, please correct. Response 4: Per your request, this label has been corrected. Comment 5: Pond#3 shows stormwater drainage system entering the main pool. All stormwater must enter the forbay. Response 5: Per your request, the alignment of this pipe as been adjusted to enter into the forebay. Comment 6: Section II item 3 on the application should be marked high density or other(low density wihigh density pockets) because of the pockets of high density associated with this permit application, please correct. Response 6: Per your request, this label has been corrected. This revised sheet has been included for your review. Comment 7: A high density fee is $4,000. Please submit the $2,000 balance for the high density review. Response 7: As discussed, you are holding a $4,000 check that was submitted as part of the previous submittal. This check addresses both the additional $2,000 fee for the high-density review and the additional $2,000 for the re-review. Comment 8: Pond#2 orifice is reported to be 1.5"diameter on the supplement but shown to be 2"diameter on the plans (sheets PD-2B, PD-2F), please correct. Response 8: Per your request, this label has been corrected to show a 1.5" diameter PVC siphon on the detail sheets. Comment 9: Pond#3 orifice is reported to be 3" diameter on the supplement but show to be 4" diameter on the plans (sheets PD-3B, PD-3F), please correct. oLd Since 1979 THE JOHN R. McADAMS COMPANY INC. Mr. Chris Baker San Rio—Phase 2A and 3 Stormwater Application No. SW8070834 September 20, 2007 WDL-07020 Page 3 Response 9: Per your request, this label has been corrected to show a 3" diameter PVC siphon on the detail sheets. Comment 10: Please add note to plans stating that all roof drains to be direct to stormwater treatment system. Response 10: Per your request, this note has been added to Phase 2A sheets C-2 through C-5. Comment 11: Please provide wetlands calculation. Response 11: Per our discussion, this comment has been addressed. Comment 12: Please provide lot built-upon—area calculation. Response 12: Per our discussion, this average built-upon area per lot has been computed and shown on a revised Attachment B. This was computed using the overall total impervious for all of the lots (using the maximum allowable shown on the deed restrictions) and the total number of lots. Comment 13: Each drainage area to be treated must be defined for each individual treatment system with the drainage area and the built- upon-area as shown on page 2 of the application. Note: detention ponds cannot be evaluated without this information. Response 13: Per our discussion, Attachments 'A' and `B' have been modified to show the additional detail you requested (Phase 1A— To SWMF#1, Phase 2A—To SWMF#1, Phase 2A—To SWMF #2, and Phase 2A — To SWMF #3). These have been included within this submittal. Comment 14: Provide map/plan delineating the SA/SC section of this permit. Response 14: As discussed, this map is contained within the original submittal package. However, for your convenience, another copy if enclosed within this submittal package. RIM Since 1979 — THE JOHN R. McADAMS COMPANY, INC. Mr. Chris Baker San Rio—Phase 2A and 3 Stormwater Application No. SW8070834 September 20, 2007 WDL-07020 Page 4 Consideration of this response is greatly appreciated. If you should have any questions or require additional information, please do not hesitate to contact me at (919) 361-5000. Sincerely, THE JOHN R. MCADAMS COMPANY, INC. ,e4tt'st•Z Brandon R. Finch, PE Senior Project Manager Stormwater and Environmental Department Enclosures SAN RIO - PHASES 1B & 2A Shal I otte, North Carol ina PHASE 2A STDRMWATER MANAGEMENT PLAN DESIGN CALCULATIONS AND REVISION OF PHASE 1 B AMENITY POND WDL-07020 Jon A. Aldridge, El Jason C. Spicer, El Associate Project Associate Project Engineer Brandon R. Finch, PE Engineer Senior Stormwater Project Manager Original Submittal: August 21, 2007 Revised: September 20, 2007 _ ,. ,,,- W r A- , ititri , p, ...g. 7 • ti rer.gip^=''--- .' .- • •' 1e. �r i . _ 4-- -061 1�II1 .,_�- THE JOHN R. McADAMS COMPANY, INC. RESEARCH TR1A ( LL PARK e-C'IJARLOTTE P.0.Box 14005 Research Triangle Park,NC 27709 919.-361-5000 FAX 919-361-2269 wvdwjohnrmcadams.com ? !1 6$ ILjjJjj Since 1979 .. THE JOHN R. McADAMS COMPANY INC. SAN RIO - PHASES 1B & 2A SHALLOTTE, NORTH CAROLINA WDL-07020 oa 1 * ,. . . , 4 DAW2`a"y Research Triangle Park,NC Post Office Box 14005 QE VrSE.O 9 f 2°/Zeo7 Research Triangle Park, North Carolina 27709 2905 Meridian Parkway Durham,North Carolina 27713 800-733-5646 919-361-5000 919-361-2269 Fax Charlotte,NC Brandon R. Finch, PE 5311 Seventy-Seven Center Drive, Sr. Stormwater Project Manager n.o..a8 ,North Carolina 28217 CAA....,3-5646 704-527-0800. 704-527-2003 Fax Comprehensive Land Development Design Services www.johnrmcadams.com We help our clients succeed. SAN RIO—PHASES 1B &2A Stormwater Management Narrative General Description Located off of Gray Bridge Road, at the intersection with Tar Landing Road in Shallotte, North Carolina, is the proposed residential development currently known as San Rio. Proposed development on this site will consist of the construction of both single and multi-family residential areas, along with associated streets, parking, utilities, and other infrastructure. Phase 2A of the development is approximately 78.74-acres and will consist of the construction of 304 multi-family townhome condominium units, three (3) stormwater management facilities, along with the associated utility/roadway infrastructure. San Rio is located within the Lumber River basin with stormwater runoff from Phase 2A draining to the Shallotte River. According to the N.C. Division of Water Quality Basin Wide Information Management System (BIMS), this drainage feature is classified as SC- HQW. For this reason, development on this site must meet the requirements of 15A NCAC 02H.1005 and 15A NCAC 02H.1006. These regulations are listed below under "Applicable Stormwater Management Regulations". The Phase 1B amenity pond serves as both a water quality and water quantity facility. The design was previously submitted and approved by NCDWQ in June, 2007. A minor grading modification has resulted in an increase in the pond design volume. Otherwise, there is no deviation from the approved design. Phase 1B is also located in a subbasin that is hydraulically linked to the analysis of the Phase 2A facilities. This report serves as a final design for the Phase 2A stormwater management facilities, as well as an update for the Phase 1B amenity pond. This report supersedes the San Rio — Phase 1 design report, dated June 6, 2007,with respect to the amenity pond design only. Applicable Stormwater Management Regulations: I. Per 15A NCAC 02H.1005: All development activities within the coastal counties which require a stormwater management permit in accordance with Rule .1003 of this Section shall manage stormwater runoff as follows: (1) development activities within the coastal counties draining to Outstanding Resource Waters (ORW) shall meet requirements contained in Rule.1007 of this Section; (2) [This section does not apply to this Phase of San Rio] (3) development activities within the coastal counties except those areas defined in Items (1) and(2) of this Paragraph: (a) Low Density Option: Development shall be permitted pursuant to Rule .1003(d)(1) of this Section if the development has: (i) Built-upon area of 30 percent or less; or proposes development of single family residences on lots with one-third of an acre or greater with a built-upon area of 30 percent or less; (ii) Stormwater runoff transported primarily by vegetated conveyances; conveyance system shall not include a discrete stormwater collection system as defined in Rule .1002 of this Section; (iii) A 30 foot wide vegetative buffer. (b) High Density Option: Higher density developments shall be permitted pursuant to Rule .1003(d)(2) of this Section if stormwater control systems meet the following criteria: (i) Control systems must be infiltration systems, wet detention ponds or alternative stormwater management systems designed in accordance with Rule.1008 of this Section; (ii) Control systems must be designed to control runoff from all surfaces generated by one inch of rainfall. II. Per 15A NCAC 0211.1006: All development activities which require a stormwater management permit under Rule .1003 of this Section and are within one mile of and draining to waters classified as High Quality Waters (HQW) shall manage stormwater runoff in accordance with the provisions outlined in this Rule. More stringent stormwater management measures may be required on a case-by-case basis where it is determined that additional measures are required to protect water quality and maintain existing and anticipated uses of these waters. (1) All waters classified as WS-I or WS-II (15A NCAC 2B .0212 and .0214) and all waters located in the coastal counties (Rule .1005 of this Section) are excluded from the requirements of this Rule since they already have requirements for stormwater management. III. Per Section 1.2.1 of the "Town of Shallotte-Storm Water Management Manual": 1.2.1 Protecting and Enhancing Riparian Areas The Town of Shallotte Storm Water Quality Management and Discharge Control Ordinance (Town of Shallotte Storm Water Ordinance) requires that the Town protect riparian buffers on new developments. The Program will ensure that a 30- foot riparian buffer will be maintained on all sides of intermittent and perennial streams and other water bodies within the Town's jurisdiction during future development. The Program will also seek restoration and enhancement of impaired buffers within the Town's jurisdiction. The Town seeks to cooperate with other communities and with the North Carolina Wetlands Restoration Program (NCWRP) and others to ensure that available funds are best used to protect water quality and provide attractive green space. IV. Per Section 1.2.2 of the "Town of Shallotte-Storm Water Management Manual": 1.2.2 Controlling Peak Storm Water Discharges Controlling the peak discharge rate of water leaving a developed area is one of the key factors in managing the impact of new development on the property of downstream landowners, on the Town's roads, buildings, and storm water facilities, and on local streams and other natural water bodies. The Program sets a goal of no net increase in runoff occurring from permitted development. It requires that all developments obtaining a Stormwater Permit control water runoff so that there is no more than a 5 percent net increase in the peak discharge from the predevelopment conditions for the 10-year, 24-hour storm as defined in this Town of Shallotte Storm Water Management Manual (Manual). Where this restriction places an undue hardship upon a property owner, a variance may be granted by the Storm Water Administrator to developments that meet the following requirements: • The proposed new development appropriately uses the parcel's total remaining pervious area, to the extent practical, to convey and control the storm water runoff, and it is demonstrated to the satisfaction of the Storm Water Administrator that no damage to public or private properties will be caused by granting of the variance, including damage to the Town's storm water facilities and to the quality of the public waters. The Program also requires that all new permitted development control storm water runoff so that there is no net increase in the peak discharge from the predevelopment conditions for the 1-year, 24-hour storm as defined in this Manual. Where this requirement places an undue hardship upon a property owner, variances from the requirement may be granted by the Storm Water Administrator to developments that meet one or both of the following requirements: • The development will control the impacts of development on the quantity and quality of storm water runoff to the Maximum Extent Practicable. The increase in peak flow for pre- to post-development conditions does not exceed 5 percent and it is demonstrated to the satisfaction of the Storm Water Administrator that no damage to public or private properties will be caused by granting of the variance, including damage to the Town's storm water facilities and to the quality of the public waters. • The proposed new development does not cause the development parcel's total impervious area to exceed 15 percent, the remaining pervious portions of the site are utilized to the Maximum Extent Practical to convey and control the storm water runoff, and it is demonstrated to the satisfaction of the Storm Water Administrator that no damage to public or private properties will be caused by granting of the variance, including damage to the Town's storm water facilities and to the quality of the public waters. V. Per Section 1.2.3 of the "Town of Shallotte-Storm Water Management Manual": 1.2.3 Controlling Export of Pollutants Owners and developers of all new non-residential developments and residential developments that will ultimately disturb an area of less than one acre or more must obtain a Storm Water Permit before any land disturbing activities occur. Criteria and methodologies are established in this Manual for the documentation of expected export of specific pollutants (nutrients, spec f cally total nitrogen and total phosphorus; suspended sediments; and fecal coliforms). All applications for a Storm Water Permit must include calculations of the nutrient, suspended solids, and fecal conform exports from the proposed disturbance or development consistent with the methods specified in this Manual. Overall Management and Treatment of Stormwater Runoff from San Rio San Rio is proposed to be permitted as a low-density project with high density pockets. The site will be designed such that the total built upon area (BUA) for the single-family areas (low-density areas) combined with the multi-family / amenity areas (high-density pockets) will meet the overall low-density criteria (30% impervious) for development draining to SC waters. The portions of the project that drain to SA waters will be limited to 25%impervious to meet the low-density criteria. With regards to stormwater treatment in the low-density areas, the roadways serving the single-family lots will have curb-and-gutter with curb outlet systems discharging into vegetated stormwater swales. Each swale will terminate at an engineered level spreader device. In the high density areas, such as Phases 1B and 2A, of the project, the stormwater management features will be designed to comply with DWQ standards (per section 15A NCAC 02H.1008). Since the site drains to SC and SA waters, the high- density pockets will be treated with infiltration systems, wet detention ponds, or other approved management systems. Phases 1B and 2A of San Rio drain to an SC water. As a result, the proposed stormwater management facilities for these phases of the project are wet detention ponds discharging to preformed scour hole/level spreader outlets. With regards to the Town of Shallotte detention requirements, the design engineer recognizes there are increases in the peak flowrates from pre- to post-development for stormwater runoff exiting Phase 2A of San Rio. The increase in the peak flowrate from pre- to post-development in the 1-year storm is 3 cfs in both subbasins. The increase in the peak flowrate from pre- to post-development in the 10-year storm is less than 10 cfs (no increase in subbasin#1 and an 8 cfs increase in subbasin #2). While it is recognized that this is an increase, it is assumed to be allowable since the hydrographs for both subbasins #1 and #2, upon exiting the site, combine with the overall hydrograph for the Shallotte River approximately 1900-ft downstream from where subbasins #1 and #2 exit the property line. Also, the vast majority of the stormwater runoff from the development within Phase 2A of San Rio (i.e. the multi-family portion) is intercepted and diverted to a stormwater management facility, where the bulk of the 1- and 10-year storm events are detained. Conclusively, since the area immediately downstream of Phase 2A is floodplain for the Shallotte River and there is no existing or proposed development between the site property line and the Shallotte River, it was assumed by the design engineer that, while there is a proposed increase, the impacts associated with these increases would be minimal. Calculation Methodology 1. Rainfall data for the Shallotte,NC region is from the following sources: i. The 1-year/24-hour and 10-year/24-hour rainfall data is taken from the "Town of Shallotte - Storm Water Management Manual." The 1-year rainfall depth is 3.7 inches and the 10-year storm depth is 7.0 inches. Both of these storms are modeled within HEC-HMS assuming a SCS Type III rainfall distribution. ii. The 25-year/24-hour and 100-year/24-hour storm rainfall data is from NOAA Atlas 14. The 25-year rainfall depth is 8.88 inches and the 100-year rainfall depth is 12.19. Please reference the precipitation data section within this report for additional information. 2. Using maps contained within the Brunswick County Soil Surveys the on- and off- site soils were determined to range from hydrologic soil group (HSG) 'A' soils to HSG `D' soils. Since the method chosen to compute both pre- and post- development peak flow rates and runoff volumes is dependent upon the soil type, care was taken when selecting the appropriate Soil Conservation Service Curve Number(SCS CN). Within each studied sub-basin, a proportion of each soil group was determined using NRCS Soil Survey Maps. Once a proportion was determined, a composite SCS CN was computed for each cover condition. For example, the pre- development condition of Sub-basin#2A consists of approximately 41%HSG 'A' soils, 29% HSG 'B' soils, 30% HSG 'C' soils, and 0.04% HSG `D' soils. Therefore, for the open area cover condition, the composite SCS CN is computed as follows(assuming good condition): Composite Open SCS CN=(0.41*39)+(0.29*61) +(0.30*74) +(0.0004*80)=56 This type of calculation was done for each of the studied sub-basins in the pre- and post-development condition in an effort to accurately account for the difference in runoff between HSG 'A' soils and HSG `D' soils. 3. The post-development times of concentration to the proposed stormwater management facilities are assumed to be 5 minutes in the post-development condition. This is a conservative assumption. 4. The on- and off-site topography used in the analysis is from two different sources. They are as follows: a. The on-site topography is from information provided to The John R. McAdams Company, Inc. by Jim Blanchard Associates, PC. b. The off-site topography was generated by The John R. McAdams Company, Inc. (JRM) using bare earth (LIDAR) data available from the N.C. Floodplain Mapping Program. The two sets of data mentioned above were "spliced" together to construct the existing topography used in the analysis. Please refer to the pre- and post- development watershed maps for more information. 5. HEC-HMS Version 2.2.2, by the U.S. Army Corps of Engineers, is used to generate pre- and post-development peak flow rates and model the proposed stormwater management facilities. 6. To guard against dam failure due to the buoyant forces caused by the riser-barrel outlet structures, anti-flotation calculations were performed. These calculations consisted of determining the amount of concrete that is required to anchor the outlet structure down and prevent it from floating. In addition, the pre-cast riser sections are to be tied together to prevent separation caused by buoyant forces. 7. Velocity dissipaters are provided at the principal spillway outlets to prevent erosion and scour in these areas. The dissipaters are constructed using rip rap, underlain with a woven geotextile filter fabric. The filter fabric is used to minimize the loss of soil particles beneath the rip rap apron. The dissipaters are sized for the 10-year storm event using the NYDOT method. They are a permanent feature of the outlet structure. 8. Pondpack Version 8.0, by Haestad Methods, is used to generate the stage- discharge rating curves for the proposed stormwater management facilities. The rating curves are then input into HEC-HMS for routing calculations. 9. The stage-discharge rating curves, stage-storage rating curves, and stage-storage function for the proposed stormwater management facilities were all generated outside of HEC-HMS and then input into HEC-HMS for routing calculations. 10. Water quality sizing calculations were performed in accordance with the N.C. Stormwater Best Management Practices manual (NCDENR July 2007). The normal pool surface area of each wet pond facility was sized using the computed average depth and the appropriate SA/DA ratio. A temporary storage pool for runoff resulting from the 1.0" storm is provided in each facility,to be drawn down in 2 to 5 days using an inverted siphon. 11. The downstream tailwater elevations for wet detention ponds #2 and #3 were modeled during the 100-year storm assuming a tailwater elevation of 11.0 (a conservative assumption). This elevation corresponds to the 100-year floodplain elevation for the Shallotte River. 12. For 100-year storm routing calculations, a"worst case condition"was modeled in order to insure the proposed facilities would safely pass the 100-year storm event. The assumptions used in this scenario are as follows: 1. The starting water surface elevation in each facility,just prior to the 100- year storm event, is at the top of riser elevation. This scenario could occur as a result of a clogged siphon or a rainfall event that lingers for several days. This could also occur as a result of several rainfall events in a series, before the inverted siphon has an opportunity to draw down the storage pool between NWSE and the riser crest elevation. 2. A minimum of approximately 1.0-ft of freeboard was provided between the peak elevation during the "worst case" scenario and the top of the dam for each facility. 1 SUMMARY OF RESULTS MISCELLANEOUS SITE DATA 3 PRECIPITATION DATA 4 WATERSHED SOIL DATA 5 PRE-DEVELOPMENT HYDROLOGIC CALCULATIONS 6 POST-DEVELOPMENT HYDROLOGIC CALCULATIONS 7 SWMF #1 - FINAL DESIGN 8 SWMF #2 - FINAL DESIGN 9 SWMF #3 - FINAL DESIGN 1 O PHASE 1B AMENITY POND - REVISED DESIGN 11 100-YEAR STORM ROUTING 12 STATE STORMWATER MANAGEMENT PERMIT APPLICATION 13 GEOTECHNICAL REPORT SUMMARY OF RESULTS SAN RIO-PHASES 1B&2A WDL-07020 SAN RIO-PHASE 2 SUMMARY OF RESULTS B.R.FINCH,PE WDL-07020 9/20/2007 RELEASE RATE MANAGEMENT RESULTS SUB-BASIN#1 Return Period Pre-Development Post-Development %Increase [cfs] [cfs] [%] 1-Year 3 6 100% 10-Year I 41 41 0% SUB-BASIN#2 Return Period Pre-Development Post-Development %Increase [cfs] [cfs] [%] 1-Year 7 10 43% 10-Year 159 167 5% ROUTING RESULTS (Pond#1 Top of Dam= 20.00 Return Period Inflow Outflow Max.WSE Freeboard [cfs] [cfs] [ft] [ft] 1-Year 9 0.1 16.21 3.79 10-Year 23 0.3 18.01 1.99 25-Year 38 2 18.09 1.91 100-Year-Worst Case 48 29 18.82 1.18 Pond#2 Top of Dam= 20.00 Return Period Inflow Outflow Max.WSE Freeboard [cfs] [cfs] [ft] [ft] 1-Year 8 0.1 16.16 3.84 10-Year 19 0.1 17.68 2.32 25-Year 31 1 18.22 1.78 100-Year-Worst Case 38 26 18.86 1.14 Pond#3 Top of Dam= 14.50 Return Period Inflow Outflow Max.WSE Freeboard [cfs] [cfs] [ft] [ft] 1-Year 40 0.3 10.04 4.46 10-Year ' 112 7 12.00 2.50 25-Year 191 37 12.35 2.15 100-Year-Worst Case 245 171 13.27 1.23 Phase iB Amenity Pond Top of Dam= 25.50 Return Period Inflow Outflow Max.WSE Freeboard [cfs] [cfs] [ft] [ft] 1-Year 11 0.1 23.10 2.40 10-Year 24 0.3 23.80 1.70 25-Year 38 2 23.90 1.60 100-Year-Worst Case 45 19 24.40 1.10 1 OF 3 SAN RIO-PHASE 2 SUMMARY OF RESULTS B.R.FINCH,PE WDL-07020 9/20/2007 SWMF#1 SUMMARY Design Drainage Area= 4.56 acres Design Impervious Area= 2.32 acres %Impervious= 50.9% Top of Dam= 20.00 ft NWSE= 15.00 ft WQ Storm Depth= 1.00 inches WQ Volume= 8407 cf WQ Volume Elevation= 15.45 ft Surface Area at NWSE= 19553 sf Required Surface Area at NWSE= 10140 sf Siphon Diameter= 2.0 inches Riser Size= 4'x 4' ft Riser Crest= 18.00 ft Barrel Diameter= 24 inches #of Barrels= 1 Invert In= 14 feet Invert Out= 13.5 feet Length= 44 feet Slope= 0.0114 ft/ft SWMF#2 SUMMARY Design Drainage Area= 3.45 acres Design Impervious Area= 2.08 acres %Impervious= 60.3% Top of Dam= 20.00 ft NWSE= 15.00 ft WQ Storm Depth= 1.00 inches WQ Volume= 7422 cf WQ Volume Elevation= 15.40 ft Surface Area at NWSE= 19560 sf Required Surface Area at NWSE= 10568 sf Siphon Diameter= 1.5 inches Riser Size= 4'x 4' ft Riser Crest= 18.20 ft Barrel Diameter= 24 inches #of Barrels= 1 Invert In= 10.5 feet Invert Out= 10 feet Length= 77 feet Slope= 0.0065 ft/ft 2 OF 3 SAN RIO-PHASE 2 SUMMARY OF RESULTS B.R.FINCH,PE WDL-07020 9/20/2007 SWMF#3 SUMMARY Design Drainage Area= 24.39 acres Design Impervious Area= 13.28 acres %impervious— 54.4% Top of Dam= 14.50 ft NWSE= 8.00 ft WQ Storm Depth= 1.00 inches WQ Volume= 47813 cf WQ Volume Elevation= 8.87 ft Surface Area at NWSE= 54811 sf Required Surface Area at NWSE= 49366 sf Siphon Diameter= 3.0 inches Riser Size= 6'x 6' ft Riser Crest= 11.80 ft Barrel Diameter= 36 inches #of Barrels= 1 Invert In= 7 feet Invert Out= 6.5 feet Length= 46 feet Slope= 0.0109 ft/ft Emergency Spillway Crest= 12.2 ft Emergency Spillway Lenth= 30.0 ft PHASE 113 AMENITY POND SUMMARY Design Drainage Area 4.13 acres Design Impervious Area= 1.78 acres %Impervious= 43.1% Top of Dam= 25.50 ft NWSE= 22.50 ft WQ Storm Depth= 1.00 inches WQ Volume= 6579 cf WQ Volume Elevation= 22.62 ft Surface Area at NWSE= 52138 sf Required Surface Area at NWSE= 7581 sf Siphon Diameter= 2.5 inches Riser Size= 4'x 4' ft Riser Crest= 23.80 ft Barrel Diameter= 15 inches #of Barrels= 1 Invert In= 21.2 feet Invert Out= 21 feet Length= 36 feet Slope= 0.0056 ft/ft Emergency Spillway Crest= 24.0 ft Emergency Spillway Lenth= 15.0 ft 3 OF 3 MISCELLANEOUS SITE DATA SAN RIO-PHASES 1B&2A WDL-07020 PRECIPITATION DATA SAN RIO-PHASES 1B&2A WDL-07020 Precipitation Frequency Data Server Page 1 of 4 POINT PRECIPITATION caF • '• - a FREQUENCY ESTIMATES k J FROM NOAA ATLAS 14 North Carolina 33.9667 N 78.3556 W 22 feet from"Precipitation-Frequency Atlas of the United States"NOAA Atlas 14,Volume 2,Version 3 G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland,2004 Extracted:The May 29 2007 f Confidence Limits ..J( Seasonality 1 .Location Maps ( Other Info. ! GIS data I Maps Help Docs U.S.Map Precipitation Frequency Estimates(inches) ARI* 5 10 15 30 60 120 3 6 12 24 48 4 7 10 20 30 45 60 (years) min min miss min min min hr hr hr hr hr day day ,„clay day day I day day 1 0.5210.82111.03 1.41 1.76 2.10 2.26 2.79 3.27 3.79 114.40 114.90 5.61 16.32 18.47 10.52 13.08 15.70, 2 10.61 0.9818160 1.70®12.56 2.75 3.39 113.98 4.60 115.33 115.91 6.76 7.57 1110.10[12.49 15.45 18.49 5 10.71 ® 1.43i 2.04 2.61 13.2213.47 4.29 5.08 5.95 116.83 117.48 8.49 19.36 112.29114.96 18.26 21.58. 1 10 0.79 1.26 1.60 42.32 3.0213.79 4.13 5.11 16.08 7.12 18.12 18.81 9.92 110.841114.07116.93 20.50 24.00 1 25 10.89 1.42 1.80 2.67 3.55 4.59 5.05 6.28 17.52 8.88 10.05 10.76 11.99 12.95 16.59119.63123.55 27.22 50 0.97 OM 1.96 2.95 OM 5.27,5.87 7.32 8.82 10.44 11.74112.43 13.71 (14.711118.64 21.78 25.95 29.711 100 1.05 1.6712.11 3.23 4.4415.99 6.75 8.45 10.24 12.19113.621114.26 15.58 16.581120.79123.98128.38 32.181 200 ®ME® 3.51 4.92 6-77 7.72 9.70 11.84 14.18 15.731116.27 17.60 18.58 23.06 26.25 30.86 34.651 500 ® 1.94 2.44 3.89 5.58 7.90 9.17 11.571114.25 17.22118.931119.34 20.53 MED 26.27 29.38 34.24 37.921 1000 ®2.07 2.60 4.20 6.13 8.88 10.44113.25116.43 19.90 21.72121.99 23.00 23.88128.89131.84 36.88140.42 Text version of table 1'These precipitation frequency estimates are based on a partial duration series ARI i the Average Recurrence Interval. Please refer to the aoeulttlue ,... for more information.NOTE:Formatting forces estimates near zero to appear as zero. Partial duration based Point Precipitation Frequency Estimates Version: 3 33.9667 1i 78.3556 W 22 ft 42 40 -_ ,._. __. - 38 Fes.. 34 y� 34 30 - '�J 28 n 26 �.." mor 24 22 • 18 16 ( . e t F L• 12 am_ EL 10 = _ _ 6 _._�..- ire 0 I I I 1-1-n 1 I 1 I 1 I ill P I E ! t 1 I r I r r 1 2 3 S 5 6 78910 20 30 40 50 80100 140 200 388 500 7001000 Average Recurrence Interval (years) Tue May 29 11:25:30 2007 Duration 5-min - 48-hr -et- 30-day 10-ruin -a- 3-:ir 4-day �- 15-min 7-day -e- iv--tuy 38-min -a-- le-hr -I-- 1:3--day -- 24-hr -- 29-day -a- http://hdsc.nws.noaa.gov/cgi-bin/hdsc/buildout.perl?type=pf&series=pd&units=us&statena... 5/29/2007 Precipitation Frequency Data Server Page 2 of 4 Partial duration based Point Precipitation Frequency Estimates Version: 3 33.9667 ft 78.3556 1.1 22 ft 42 t r 1 r 1 1 it f [ t r F it t t l t t r r 1 t 40 �A 36 34 2 32 1.5 se {' 26 to2422 - - ° 20 .__._ _._... .. r 4, 18 16 F v e 14 ._.._ -» - - - - -2 �� e'. f • r 1 1 1 1 1 F 1 I 1 Y i t C CC C C £ E i L L i S_ L i L L 3> S 7r ? ? 3• a 3 1 .0 .0 .0 C -C S .C .0 ni of 4 N A AI in a S E .E a E 0 1 I I I 1a C. tit t t I I -3 -G a s -a 13 -ai is -0 -ct 1 I I 1 I 1 at! t7 V a all ftt W V .a ce ! tilt f I tit t ID CD In . SD CO aJ .. 2(.6 M V M V Y7 n 2 In IP5 m t7 `a 0% Duration 2et m Tue May 29 11:25:29 2007 Average Recurrence Interval (years) 2 -4-- 100 - 2-}'J - 18 -au- S86 -[- 25 •tee- 1000 -*- Confidence Limits- *Upper bound of the 90%confidence interval Precipitation Frequency Estimates(inches) ARI** 5 10 15 30 60 120 3 6 12 24 48 4 7 10 20 30 45 60 (years) mint min min min min min hr hr hr hr hr day day day day day day day 1 0.56 0.89 1.11 1.52 1.90 2.29 2.49 3.08 3.65 .l 9 4.86_5_34 16.07_[6_,81d 9.07 11.20 013.87 16.57 2 0.66 1.06 1.33 1.83 2.30 2.80 3.03 3.75 14.44 5.09 5.88 6.45 7.33 8.15 10.81 113.29 116.40 19.53 5 0.7611.22 1.55 2.20 2.82 3.51 3.82 4.74 5.66-1 6.57 7.54 18.16 9.20 10.09 13.15 15.92 19.38 22.80 10 0.85 1.37 1.73 2.50 3.26 4.14[4.55 5.64 6.77 7.85 8.96 119.61 110.74 11.69 15.05118.02 21.75 25.35 25 0.96 1.53 1.94 2.88 3.83 5.00 5.55 6.92 8.36 9.79 11.101111.75 12.99 13.96 17.74 20.90 25.00 28.77 50 1.0511.67 2.11 3.18 4.30 5.74 6.45 8.06 19.78 11.50 12.971113.59 14.87115.87 19.97 23.25 27.57 31.44 100 1.13 1.80 2.27 3.48 4.79 6.53 7.41 9.29 11.35 113.45 15.101115.62 16.9317.93 22.34 25.65 30.22 34.13 . 200 1.221 1.93 2.43 3.78 5.3017.38 8.46 10.66113.11 15.66 17.50r 17.90 19.19 20.18 24.88 28.17[32.98 36.84 500 1.33 2.10 2.64 4.20 6.03 8.62 10.06 12.74,15.80 19.11 21.18 21.42 22.55 23.48 28.55131.71 36.80 40.53 1000 1.4212.24 2.8114.55 6.65 9.71 11.48 14.61 118.19 22.23 24.45 24.54 25.43 26.30 31.57 34.55 39.85 43.42 •The upper bound of the confidence interval at 90%confidence level is the value which 5%of the simulated quantile values for a given frequency are greater than. "These precipitation frequency estimates are based on a partial duration series.ARI is the Average Recurrence Interval. Please refer to the documentation for more information.NOTE:Formatting prevents estimates near zero to appear as zero. *Lower bound of the 90%confidence interval Precipitation Frequency Estimates(inches) SARI** 5 I10 n 30 60 120 3 ' 6 II 12 24 48 4 7 10 20 30 45 pi)((years) min lmin lminl min min min hr hr ! hr sir hr day day day day day day ay 1 0.48 0.76 0.95 1.31 11.63 11.94 2.07 2.55 2.97 3.46 4.03 Fn 5.21 5.89 7.95 9.90 112.35 14.87 2 0.57 0.91 1.14 1.57 1.97 2.35 2.52 3.10 3.60 4.20 4.88 5.45 .6.28 7.05 9.47 11.76.114.60 17.51 5 0.65 1.05 1.33 1.8812.42 2.96 3.17 3.91 4.58 15.42 16.24 6.89 7.87 8.70 11.50114.06117.22120.421 10 0.73 1.17 1.48 2.141 2.79 3.48 3.76 4.64 _5.46 F4T117.3911F8.0119.16 10.05 13.14 15.87119.29.22.68 25 10.8211.30 1.65112.45 3.26 4.18 4.58 5.67 6.70 8.00 9.06 9.80 11.00 11.95 15.41 118.33 122.08 25.64 http://hdsc.nws.noaa.gov/cgi-binlhdsc/buildout.perl?type=pf&user_es=pd&_units=us&statena... 5/29/2007 Precipitation Frequency Data Server Page 3 of 4 50 �0.89l 1.41(f 1.79112.70113.65I14.78115.28116.55 117.80 119.31 if 10.49IL 1.231112.501113.471117.231120.251124.221127.891 100 J 0.95 affiti.92 2.93 n 5.40 6.03117.50 8.98 10.75 12.04 12.76 14.08 15.07 19.08 22.18 26.36 30.09 200 111.02(11.61112.04 3.17 4.44 6.06 6.83 8.53 10.27 12.341 13.73,14.40 15.74 16.74 21.00 24.13 28.50 32.23 500 (11.1011.74 12.19 3.48 4.99 7.00 8.01 10.04[12.18 14.68 16.22.16.83 18.09 19.08,23.62.26.73 31.33 35.01 1000 1.161[1.83 r2.30® 5.44 7.80 9.02 111.36[13.851 16.67 18.32 18.85 20.01 20.95 25.68 33.49 37.10 'The lower bound of the confidence Interval at 90%confidence level is the value which 5%of the simulated quantie values for a given frequency are less than. "These precipitation frequency estimates are based on a partial duration maxima series.ARI is the Average Recurrence Interval. Please refer to the ..,aeon for more information.NOTE:Formatting prevents estimates near zero to appear as zero. Maps - z 2 L. C _ .... 'kocat1on _2 C 17414 114"b1 1 oew gO"'w Rtel'w 70°w = These maps were produced using a direct map request from the { ' 71srYanSarr -- .' -am _.. ii q Z Please read dijdoinerfor more ii jonrmrion. a - LEGEND _ O - Y 1 flb .4,.,:,,,,, County sY l.t CG.CI� .G [rY�£Ean f? t GZe I Itar3.- -ea - -_ ,� 662`� fora[ Iy [4Z r _ p s :, &I:C6[2Gt4Yffi�L2t1 + Ee. a LiIgIf`GS ay 0 2 Czalt76 Bet :-, date saCl-r p; Scale 3:22BLL€a:l t t22 rd' � 6 8 130 KmI ��., `" *averave--true scale depends on monitor resolution 7R-ri'"w 7R-4"'w 7R.:q'"W Other Maps/Photographs- View USGS digjjlal orthophoto quadrangle(DOQ)covering this location from TerraServer;USGS Aerial Photograph may also be available from this site.A DOQ is a computer-generated image of an aerial photograph in which image displacement caused by terrain relief and camera tilts has been removed.It combines the image characteristics of a photograph with the geometric qualities of a map.Visit the USGS for more information. Watershed/Stream Flow Information- Find the Watershed for this location using the U.S.Environmental Protection Agency's site. Climate Data Sources - Precipitation frequency results are based on data from a variety of sources,but largely NCDC. The following links provide general information about observing sites in the area,regardless'of if their data was used in this study.For detailed information about the stations used in this study, http://hdsc.nws.noaa.gov/cgi-bin/hdsc/buildout.perl?type=pf&series=pd&units=useestatena... 5/29/2007 Precipitation Frequency Data Server Page 4 of 4 please refer to our documentation. Using the National Chaotic Data Caster's(INCDC)station search engine,locate other climate stations within: +/-30 minutes ,..OR,., +/-1 degree of this location(33.9667/-78.3556).Digital ASCII data can be obtained directly from NCDC. Hydrometeorological Design Studies Center DOC/NOAA/National Weather Service 1325 East-West Highway Silver Spring,MD 20910 (301)713-1669 Questions?: Ilia http://hdsc.nws.noaa.gov/ccgi-bin/hdsc/buildout.perl?type=pf&series=pd&units=us&statena... 5/29/2007 facilities and to the quality of the public waters, will be caused by granting of the variance. 5.2 The 1-year, 24-hour Design Storm The 1-year, 24-hour storm is defined to deliver a total volume of precipitation equal to 3.7 inches in 24 hours and having a temporal distribution of precipitation given by an SCS Type Ill distribution (SCS, 1985). Figure 5.1 on page 5-2 presents the cumulative precipitation distribution for the SCS Type Ill distribution. Table 5.1 includes the ratio for accumulated to total precipitation in 24 hours for 0.2-hour (12-minute) time intervals. For purposes of peak discharge calculations, average antecedent moisture conditions are to be assumed. 5.3 The 10-year, 24-hour Design Storm The 10-year, 24-hour storm is defined to deliver a total volume of precipitation equal to 7.0 inches in 24 hours and having a temporal distribution of precipitation given by an SCS Type Ill distribution (SCS, 1985). Figure 5.1 on page 5-2 presents the cumulative precipitation distribution for the SCS Type III distribution. Table 5.1 on page 5-3 includes the ratio for accumulated to total precipitation in 24-hours for 0.2-hour (12-minute) time intervals. For purposes of peak discharge calculations, average antecedent moisture conditions are to be assumed. Source: Town of Shallotte Storm Water Management Manual WATERSHED SOIL DATA SAN RIO-PHASES 1B&2A WDL-07020 _ ` • �_ -_ -. 7-- - 1,f �, £ r _ a' `� am' r,3,' - •ve- �.Aiiiiti ., £ .. sT xF'7''--"3 - ��: F.,, `ice ... -�x,. y- .suer ice J y �, i ( w fret' • '-z k �,_ 9 k us C9 � hi p G r o z 0 r- - .. r er. ms' '�kt4 r 0, '::-1-f.--'-`'-'.. -'70 . .1",t,III ..,;,,,.':-' li,----4,-.4',.:.,..- - --71'-f---- ,*.:,., 0 :T.,1 - .- .!.4.f. a, .,..:„....:.. „.. . , ,...„,... . -;:i=e._,:._-: ..) _ • . . :,..3,::,_4i.v..,..,.5.., im".i, „_.1.,,e,4,,:._,.1 .:.4.-.. •.-_.,,7_, .- . -, ,14 1 -1.' ,L:z.i.. "f''L.-' `.7,'' nal : : go :=-,-;-.4, --.„-- ---- "td-- 1-'''''• : ';";°'4.....'. -:::7'-':'c7:1':::;:a::: • T g 1 . ___,0 _,.....0.1,6i„ . :^'� g AL irk . ,,,,, _ . i y , .VI .. . . . ..,___ tivii — —:„.___„.„-- .4, fk* ''' ' -'" D2 so= -,IV";''':=0:.....'. 2 /yam�' rc - S . 3 J --„r a �{t, - �p•. MKS } 41011 1,:,=.,::,-:.,;,':,..,. ...,..;-,_-/-iWr,•-.1 -..:-,..‘,'..11.%:;;;;Kt-,-;71f-X..,„.. ,t4;-,,,,, . -.7:- '-_,;:ig-,-',„:„. ----:4 .. : cg t: ,,!.,-..,-, .,'-=,: oy...,,,:-/:- - ;..-- . 44 IV- : _.:If-- ,, g,„. Iiiir 11 ...rpf,....„4:-..-,Vi',..'=--= r ' HS 1 k S lr m h�,. 1 -:�� } ,,X^- ( .: --,. .ram -. i,:fi * - s- '-;y x . { ,y� k -:i ?^ .# — --a '� ' -:11 . -,,rite r�. �'d F . • p a V _ t `e �Y-yam '.fe - _ 'up.: _� - 'x's -`:\ r ,„Ittsk;In ) Y ., ,.'. ` it..- 'r . • � ' sq: : '�-' t :., m ^L_ t F 'mac ?�° �i - , D z- �•�r - aq }.''''''" :*4-1-:''-ci; . . - ---.-;-'-'-' . .7. ,..-.'--,-',.-e--'3,:, -,r-c.'•-* ,,-. ' '-'-' 7 _-',%,--e.--,-, :-_, :',.-fif,z,„:44i r___4'.:°C.:t,‘,,,-;!„:"--,i,. ' s':,'.0'7.4"-;7•4,,,[9).„•,-:„ =-.."—- -- ` 0II413• "�F soor r ,,e� o y .s r =Y"• '•" � •� r s -.,------:...g.L..; r '' --f.--1-'4r.j V.-: 7-'' .'"?:.' ji'Rt ., O,c .a,:111 ,g. t m v ,t .c - - R m • ,7 • L ,. t fi O 4'm ''�•'.'-'1. 7 : . fix- ems/ ° l\ 9 x •- fl �'. " _ om "- .Cr'•-41Ito T tea. {,V 1m- y+ ram m ,�'' r z j , m � T$ # o' wy m R .. - Z "�. ...�..-+ter+ ,K `„ 4 p f y m� Pre Development SAN RIO-PHASE 2 WDL-07020 SUBBASIN #2B - < let,/(/ TO PHASE 1 B AMENITY POND . r� U SUBBASIN #1 % • z z a r / . / //7 `� . SUBBASIN z a P. :'/` /�//// •j j / N /%`/ / O � w� all o l • �j /.%� `'�' %.; ` � / .:. �/ j //= %' M g a boo '.',... %,./.." '- „."'- .4,.--?..;., '. ....),J /..//yz . . / '/' - . / , ..:.:y,/.:-./7/ -,,-,/-•.,,,,,.. ..., ; / . .,..../,- , / ../,,,:. . "),--.,/ , .,,, ///,.:4/ / 0 ../ ., • . I .,, ,_;:„ IQ das z 4-.. .,., , ,..../ „..,y '...,./ :',4: ti//77 , 7 /4.,....e.,,a:'•;;(.4,1r.:,/r+ ..?„ty. k.riW:A.,0,.•.1.7.7•. •:•,'..'/:yfr. *.r/.,,..,././"../.7:...::,,,‘ ..;:,./),:;././. x,,/,,,,;.e,r.r• ../''r7,„..4‘1,111•:,: .,.p.;0:;. ;•.7:..,..e..<, :.;‘.:r,r,r://.2- /`... ./'</.. ../,, /.. /,. . ,,,, ,..;3:::::. . ./..,?. .,..'",::',',.•,0,..,Y, z.;.'2.7 ,.;,•,•• ,/,.• - , i • 7/ '••57/,•• ' f• "• •••"' ,,,-". -,"/C //,/, 7 7 " ,•''4,,//// r /..// / • / r. ,i.,,,,,,,..;e/ ' . • .. ..,,,„!7,1%.....7:r.k.*'..,":",/ ,,,,,,, .. , • / / %4. �i, • / -- / ..' • / 7 A / ae w - -r/ ,.. ...,,,,; .. r.a,aP:...i.: SUBBASIN #2B ,,..;/v.of,..;;‹,,/'',7;-'`,''.'...,1,7.-.%2, ..jai, ` ..„,,,-:,r..„,A.•.•..,;-•.-.;Ar...../?•-- 4 / % �i %/ � '.." ,ram%.'////./,,.,„';..4-/,.:, 5-.7w../: i /.ice4*H" ted N. /ems • '/ / f ;/ • /":, r, isaN ',I N. SCS �' F; f`/�:<i;' :/F jr i/,F F •r.`'<,. rf.• :• , os /7/./- TYPE 'A' SOILS / ,r ;, ///i ,- r r,�/ //%i%'% ,'% ''r • /,, ram- . „,/,// .,///.4 / ,/ • / /J/ ! . / • ` //,,./. //I/ . N /„, /"., , • ::: :: : ::: %4., z ` %, � /„,, / � ��. , ,. /7'. -'7 •.,', / / ,. IS f . •- %% ' ./ >�r/ . �'" % //, /, SUBBASIN #2C o 3. SCS TYPED SOILS CNI o _� N 00 z d G w P t a r`� ran oF way:m , -I. SAN RIO-PHASE 2 PRE-DEVELOPMENT WATERSHED J.ALDRIDGE,El WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 2A Soils Information Symbol Name Hydrologic Soil Group BaB Baymeade fine sand A BnB Blanton fine sand A KrB Kureb fine sand A Lo Leon fine sand B/D* Mk Muckalee loam D To Torhunta mucky fine sandy loam C *As a conservative measure, 'B/D'soils were modeled as HSG'B'. References: 1. SOIL SURVEY:BRUNSWICK COUNTY,NORTH CAROLINA.UNITED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT SECTION),SHEET 16. 2. SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE.SOIL CONSERVATION SERVICE.1986. %HSGA= 41% %HSG B= 29% %HSG C= 30% %HSGD= 0.04% Conclusion Watershed soils are from'HSG A', 'HSG B', 'HSG CT,&'HSG D'. The relative percentage of each HSG was calculated These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Open 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 56 (Assume Good Condition) Wooded 49 (Assume Good Condition) SAN RIO-PHASE 2 PRE-DEVELOPMENT WATERSHED J.ALDRIDGE,EI WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 2A Soils Information Symbol Name Hydrologic Soil Group BaB Baymeade fine sand A BnB Blanton fine sand A KrB Kureb fine sand A Lo Leon fine sand B/D* Mk Muckalee loam D To Torhunta mucky fine sandy loam C *As a conservative measure, 'B/D'soils were modeled as HSG'B'. References: 1. SOIL SURVEY:BRUNSWICK COUNTY.NORTH CAROLINA.UNITED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT SECTION),SHEET 16. 2. SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE.SOIL CONSERVATION SERVICE. 1986. %HSG A= 41% %HSG B= 29% %HSGC= 30% %HSG D= 0.04% Conclusion Watershed soils are from'HSG A', 'HSG B', 'HSG C',&'HSG D'. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Open 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 56 (Assume Good Condition) Wooded 49 (Assume Good Condition) SAN RIO-PHASE 2 PRE-DEVELOPMENT WATERSHED B.R.FINCH,PE WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 2B-To Phase 1B Amenity Pond Site soils from the Brunswick County Soil Survey Symbol Name Soil Classification BaB Baymeade fine sand A BnB Blanton fine sand A KrB Kureb fine sand A Lo Leonfinesand B/D Ma Mandarin fine sand C Mk Muckalee loam D Mu Murville mucky fine sand A/D On Onslow fine sandy loam B To Torhunta mucky fine sandy loam C References: 1 SOIL SURVEY:BRUNSWICK COUNTY,NORTH CAROLINA.UNITED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT STATION).MAP#16 2 SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE.SOIL CONSERVATION SERVICE.1986. °%HSG A= 983% %HSGB= 0.7% %HSG C= 0.0% %HSGD= 1.0% -�Conclusion Watershed soils are from'HSG A', 'HSG B',&'HSG D'. The relative percentage of each HSG was calculated These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Open 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 40 (Assume Good Condition) Wooded 31 (Assume Good Condition) SAN RIO-PHASE 2 PRE-DEVELOPMENT WATERSHED J.ALDRIDGE,EI WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 2B-Amenity Pond Bypass =>Soils Information Symbol Name Hydrologic Soil Group BaB Baymeade fine sand A BnB Blanton fine sand A Lo Leon fine sand B/D* Mk Muckalee loam D *As a conservative measure, 'B/D'soils were modeled as HSG'B'. References: 1. SOIL SURVEY:BRUNSWICK COUNTY,NORTH CAROLINA.UNITED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT SECTION),SHEET 16. 2. SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE.SOIL CONSERVATION SERVICE. 1986. %HSGA= 78% %HSGB= 3% %HSGC= 0% %HSG D= 18% =>Conclusion Watershed soils are from 'HSG A; 'HSG B',& 'HSG D'. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition _ SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Open 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 47 (Assume Good Condition) Wooded 39 (Assume Good Condition) SAN RIO-PHASE 2 PRE-DEVELOPMENT WATERSHED J.ALDRIDGE,EI WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 2C _>Soils Information Symbol Name Hydrologic Soil Group BaB Baymeade fine sand A Br_B Blanton fine sand A KrB Kureb fine sand A Lo Leon fine sand B/D* Ma Mandarin fine sand C Mk Muckslee loam D On Onslow fine sandy loam B *As a conservative measure, 'B/D'soils were modeled as HSG'B'. References: 1. SOIL SURVEY:BRUNSWICK COUNTY.NORTH CAROLINA.UNITED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT SECTION),SHEET 16. 2. SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE.SOIL CONSERVATION SERVICE.1986. %HSG A= 49% %.HSG B= 43% %HSGC= 0.3% %HSGD= 8% =>Conclusion Watershed soils are from'HSG A', 'HSG B', 'HSG C,&'HSG D'. The relative percentage of each HSG was calculated These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Open 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 52 (Assume Good Condition) Wooded 45 (Assume Good Condition) Post-Development SAN RIO-PHASE 2 WDL-07020 li A d SUBBASIN #1 - BYPASS-- azWz E 1B AMENI'I Y POND x z a N r Q <4 W Nm W rT, d S 8 SUBBASIN #2A : H W g x w ... z ' —.ii z N d m �adF4 f/ F ;-: r SUBBASIN #1 - TO POND #2 �� N . P SUBBASIN #2B - TO POND #3__� O c° 1 ' / /0 C:L4 ; co ;://::7 ' / , col- 0 / .• //' N. O a /; SCS TYPE 'A' / 'Ø" :. • .1 y,,,, .„,/, , . i y r SCS TYPE B . a c g 2 . SCS TYPE 'C' € BASIN #2C . o �' 9O N N. J 00 O N. I f7/ASCSTYPE 'D' o a tMcADAMS X SAN RIO-PHASE 2 POST-DEVELOPMENT WATERSHED J.ALDRIDGE,EI WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 1 -To Pond 2 =>Soils Information Symbol Name Hydrologic Soil Group BaB Baymeade fine sand A BnB Blanton fine sand A Lo Leon fine sand B/D* *As a conservative measure, 'B/D'soils were modeled as HSG'B'. References: 1. SOIL SURVEY:BRUNSWICK COUNTY.NORTH CAROLINA.UNITED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT SECTION),SHEET 16. 2. SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE.SOIL CONSERVATION SERVICE. 1986. %HSG A= 85% %HSG B= 15% %HSG C= 0% %HSGD= 0% =>Conclusion Watershed soils are from'HSG A'& 'HSG B'. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Open 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 42 (Assume Good Condition) Woodcd 34 (Assume Good Condition) SAN RIO-PHASE 2 POST-DEVELOPMENT WATERSHED J.ALDRIDGE,EI WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 1-Bypass Soils Information Symbol Name Hydrologic Soil Group BaB Baymeade fine sand A BnB Blanton fine sand A Lo Leon fine sand B/D* *As a conservative measure, 'B/D'soils were modeled as HSG'B'. References: 1. SOIL SURVEY:BRUNSWICK COUNTY,NORTH CAROLINA.UNITED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT SECTION),SHEET 16. 2. SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE.SOIL CONSERVATION SERVICE. 1986. %HSGA= 72% %HSGB= 28% %HSGC= 0% %HSGD= 0% =>Conclusion Watershed soils are from 'HSG A'&'HSG B'. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Open 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 45 (Assume Good Condition) Wooded 37 (Assume Good Condition) SAN RIO-PHASE 2 POST-DEVELOPMENT WATERSHED J.ALDRIDGE,El WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 2A Soils Information Symbol Name Hydrologic Soil Group BaB Baymeade fine sand A BnB Blanton fine sand A KrB Kureb fine sand A Lo Leon fine sand B/D* Mk Muckslee loam D To Torhunta mucky fine sandy loam C *As a conservative measure, 'BID'soils were modeled as HSG'B'. References: 1. SOIL SURVEY:BRUNSWICK COUNTY.NORTH CAROLINA.UNITED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT SECTION),SHEET 16. 2. SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE.SOIL CONSERVATION SERVICE. 1986. %HSGA= 41% %HSGB= 29% %HSG C= 30% %HSGD= 0.04% Conclusion Watershed soils are from'HSG A, 'HSG B; 'HSG C,&'HSG D'. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Olen 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 56 (Assume Good Condition) Wooded 49 (Assume Good Condition) SAN RIO-PHASE 2 POST-DEVELOPMENT WATERSHED J.ALDRIDGE,EI WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 2B-To Pond 3 _>Soils Information Symbol Name Hydrologic Soil Group BaB Baymeade fine sand A BnB Blanton fine sand A Mk Muckalee loam D References: 1. SOIL SURVEY:BRUNSWICK COUNTY.NORTH CAROLINA.UNITED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT SECTION),SHEET 16. 2. SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE. SOIL CONSERVATION SERVICE. 1986. %HSG A= 90% %HSG B= 0% %HSG C= 0% %HSGD= 10% =>Conclusion Watershed soils are from 'HSG A'& 'HSG D'. The relative percentage of each HSG was calculated These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Open 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 43 (Assume Good Condition) Wooded 35 (Assume Good Condition) SAN RIO-PHASE 2 POST-DEVELOPMENT WATERSHED B.R.FINCH,PE WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 2B-To Phase 1B Amenity Pond =>Site soils from the Brunswick County Soil Survey Symbol Name Soil Classification BaB Baymeade fine sand A FsnB Blanton fine sand A KrB Kureb fine sand A Lo Leon fme sand B/D Ma Mandarin fme sand C Mk Muckalee loam D Mu Murville mucky fine sand A/D On Onslow fine sandy loam B To Torhunta mucky fine sandy loam C References: 1 SOIL SURVEY:BRUNSWICK COUNTY.NORTH CAROLINA.UNITED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT STATION).MAP#16 2 SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE.SOIL CONSERVATION SERVICE.1986. %IISGA= 983% %HSGB= 0.7% %HSGC= 0.0% %HSGD= 1.0% Conclusion Watershed soils are from'HSG A', 'HSG B',&'HSG D'. The relative percentage of each HSG was calculated. These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Open 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 40 (Assume Good Condition) Wooded 31 (Assume Good Condition) SAN RIO-PHASE 2 POST-DEVELOPMENT WATERSHED J.ALDRIDGE,EI WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 2B-Bypass Soils Information Symbol Name Hydrologic Soil Group BnB Blanton fine sand A Lo Leon fine sand B/D* Mk Muckalee loam D *As a conservative measure, 'B/D'soils were modeled as HSG'B'. References: 1. SOIL SURVEY:BRUNSWICK COUNTY,NORTH CAROLINA.UNITED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT SECTION),SHEET 16. 2. SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE.SOIL CONSERVATION SERVICE. 1986. %HSGA= 73% %HSGB= 5% %HSGC= 0% %HSG D= 22% Conclusion Watershed soils are from 'HSGA 'HSG B'&'HSG D'. The relative percentage qf each HSG was calculated. These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Open 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 49 (Assume Good Condition) Wooded 42 (Assume Good Condition) SAN RIO-PHASE 2 POST-DEVELOPMENT WATERSHED J.ALDRIDGE,El WDL-07020 SOIL INFORMATION 9/20/2007 Subbasin 2C Soils Information Symbol Name Hydrologic Soil Group BaB Baymeade fine sand A Blanton fine sand A KrB Kureb fine sand A Lo Leon fine sand B/D* Ma Mandarin fine sand C Mk Muckalee loam D On Onslow fine sandy loam B *As a conservative measure, 'B/D'soils were modeled as HSG'B'. References: 1. SOIL SURVEY:BRUNSWICK COUNTY,NORTH CAROLINA.UNTIED STATES DEPARTMENT OF AGRICULTURE:SOIL CONSERVATION SERVICE(IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT SECTION),SHEET 16. 2. SCS TR-55.UNITED STATES DEPARTMENT OF AGRICULTURE.SOIL CONSERVATION SERVICE.1986. %HSG A= 49% %HSGB= 43% %HSGC= 0.3% %MSG D= 8% Conclusion Watershed soils are from'HSG A', 'HSG B', 'HSG C,&'HSG D'. The relative percentage of each HSG was calculated These percentages were then used in the computation of the composite curve number. Cover Condition SCS CN-HSG A Impervious 98 Open 39 (Assume Good Condition) Wooded 30 (Assume Good Condition) Cover Condition SCS CN-HSG B Impervious 98 Open 61 (Assume Good Condition) Wooded 55 (Assume Good Condition) Cover Condition SCS CN-HSG C Impervious 98 Open 74 (Assume Good Condition) Wooded 70 (Assume Good Condition) Cover Condition SCS CN-HSG D Impervious 98 Open 80 (Assume Good Condition) Wooded 77 (Assume Good Condition) Cover Condition COMPOSITE SCS CN Impervious 98 Open 52 (Assume Good Condition) Wooded 45 (Assume Good Condition) PRE-DEVELOPMENT HYDROLOGIC CALCULATIONS SAN RIO-PHASES 1B&2A WDL-07020 SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS J.ALDRIDGE,El WDL-07020 Pre-Development-Subbasin 1 8/20/2007 L SCS CURVE NUMBERS Cover Condition SCS CN Comments Impervious 98 - Open 46 Assume good condition Wooded 38 Assume good condition II. PRE-DEVELOPMENT Subbasin#1 A. Watershed Breakdown b Impervious Area Breakdown San Rio-Phase 1 Lot Impervious= 3.28 acres Roadway Impervious= 1.81 acres Sidewalk Impervious= 0.25 acres Total= 5.34 acres Contributing Area SCS CN Area[acres] Comments Onsite impervious 98 5.34 - Onsite open 46 8.30 Assume good condition Onsite wooded 38 13.47 Assume good condition Onsite pond 100 0.00 - Offsite impervious 98 0.00 - Offsite open 46 0.00 Assume good condition Offsite wooded 38 0.00 Assume good condition Offsite pond 100 0.00 - Total area= 27.11 acres 0.0424 sq.mi. Composite SCS CN= 52 %Impervious= 19.7% B. Time of Concentration Information Time of concentration is calculated using SCS TR-55. Segment 1:Overland Flow Segment 2:Channel Now Length= 60 ft Length= 489 ft Height= 2 ft Height= 8.75 ft Slope= 0.0333 ft/ft Slope= 0.0179 ft/ft Manning's n= 0.24 Dense grasses Manning's n= 0.045 Natural Channel P(2-year/24-hour)= 4.6 inches(Shallotte) Flow Area= 11.25 sf(Assume 1.5'-deep 5:1 Channel) Wetted Perimeter= 15.29 ft(Assume 1.5'-deep 5:1 Channel) Segment Time= 6.45 minutes Channel Velocity= 3.61 ft/sec Segment Time= Z 26 minutes Segment 3:Channel Flow Segment 4:Channel Flow Length= 80 ft Length= 320 ft Height= 0.8 ft Height= 3.45 ft Slope= 0.0100 ft/ft Slope= 0.0108 ft/ft Manning's n= 0.013 RCP Manning's n= 0.045 Natural Channel Flow Area= 2.01 sf(Mini Box Culvert) Flow Area= 11.25 sf(Assume 1.5'-deep 5:1 Channel) Wetted Perimeter= 6.50 ft(Mini Box Culvert) Wetted Perimeter= 15.29 ft(Assume 1.5'-deep 5:1 Channel) Channel Velocity= 5.25 ft/sec Channel Velocity= 2.80 ft/sec Segment'lime= 0.25 minutes Segment Time= 1.90 minutes SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS J.ALDRIDGE,EI WDL-07020 Pre-Development-Subbasin 1 8/20/2007 Segment 5:Channel Flow Length= 1205 ft Height= 18 ft Slope= 0.0149 ft/ft Manning's n= 0.045 Natural Channel Flow Area= 25.00 sf(Assume 5 x 5 Channel) Wetted Perimeter= 15.00 ft(Assume 5 x 5 Channel) Channel Velocity= 5.69 ftlsec Segment Time= 3.53 minutes Time of Concentration= 14.39 minutes SCS Lag Time= 8.64 minutes(SCS Lag=0.6*Tc) = 0.1439 hours Time Increment= 2.50 minutes(=0.29*SCS Lag) SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS J.ALDRIDGE,El WDL-07020 Pre-Development-Subbasin 2A 8/20/2007 L SCS CURVE NUMBERS Cover Condition SCS CN Comments Impervious 98 - Open 56 Assume good condition Wooded 49 Assume good condition IL PRE-DEVELOPMENT Subbasin#2A A. Watershed Breakdown San Rio-Phase 1 Roadway Impervious= 0.10 acres Contributing Area SCS CN Area[acres] Comments Onsite impervious 98 0.10 - Onsite open 56 0.01 Assume good condition Onsite wooded 49 86.13 Assume good condition Onsite pond 100 0.00 - Offsite impervious 98 1.47 - Offsite open 56 1.87 Assume good condition Offsite wooded 49 7.07 Assume good condition Offsite pond 100 0.00 Total area= 96.65 acres 0.1510 sq.mi. Composite SCS CN= 50 %Impervious= 1.6% B. Time of Concentration Information Time of concentration is calculated using SCS TR-55. Segment 1:Overland Flow Segment 2:Concentrated Flow Length= 100 ft Length= 1422 ft Height= 2 ft Height= 9.6 ft Slope= 0.0200 ft/ft Slope= 0.0068 ft/ft Manning's n= 0.40 Woods-light underbrush Paved?= No P(2-year/24-hour)= 4.6 inches(Shallotte) Velocity= 1.33 ft/sec Segment Time= 17.91 minutes Segment Time= 1Z88 minutes Segment 3:Channel Flow . Length= 2552 ft Height= 16.9 ft Slope= 0.0066 ft/ft Manning's n= 0.045 Natural Channel Flow Area= 25.00 sf(Assume 5'x 5'Channel) Wetted Perimeter= 15.00 ft(Assume 5'x 5'Channel) Channel Velocity= 3.79 ft/sec Segment Time= 11.23 minutes Time of Concentration= 47.02 minutes SCS Lag Time= 28.21 minutes(SCS Lag=0.6*Tc) 0.4702 hours Time Increment= 8.18 minutes(=0.29*SCS Lag) SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS J.ALDRIDGE,EI WDL 07020 Pre-Development-Subbasin 2A 8/20/2007 =-->Reach#2A Channel Flow Length= 2540 ft Height= 16.5 ft Slope= 0.0065 ft/ft Manning's n= 0.04.5 Natural Channel Flow Area= 25.00 sf(Assume 5'x 5'Channel) Wetted Perimeter= 15.00 ft(Assume 5'x 5'Channel) Channel Velocity= 3.75 ft/sec Segment TFme.= 11.28 minutes SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS J.ALDRIDGE,El WDL-07020 Pre-Development-SB 2B-To Existing Amenity Pond 9/20/2007 L SCS CURVE NUMBERS Cover Condition SCS CN Comments Impervious 98 - Open 40 Assume good condition Wooded 31 Assume good condition IL PRE-DEVELOPMENT Subbasln#2B-To Existing AmeniOr Pond A. Watershed Breakdown Impervious Area Breakdown San Rio-Phase 1 Building Impervious= 12136 sf Roadway Impervious= 35489 sf Parking Area Impervious= 10285 sf Sidewalk Impervious= 11372 sf Extra= 8448 Total= 77730 sf 1.78 acres Contributing Area SCS CN Area[acres] Comments Onsite impervious 98 1.78 - Onsite open 40 0.79 Assume good condition Onsite wooded 31 0.00 Assume good condition Onsite pond 100 1.56 - Offsite impervious 98 0.00 - Offsite open 40 0.00 Assume good condition Offsite wooded 31 0.00 Assume good condition Offsite pond 100 0.00 - Total area= 4.13 acres 0.0065 sq.mi. Composite SCS CN= 88 %Impervious= 43.2% B. Time of Concentration Information Assume the time of concentration is equal to 5 minutes Time of Concentration= 5.00 minutes SCS Lag Time= 3.00 minutes(SCS Lag=0.6*Tc) = 0.0500 hours Time Increment= 0.87 minutes(=0.29*SCS Lag) C. Reach Information Assume the stream reach flows at a velocity of 5 fl/sec. Reach Length= 2465.00 ft Assumed Stream Velocity= 5.00 ft/sec Lag Time= 8.22 minutes SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS J.ALDRIDGE,EI WDL-07020 Pre-Development-Subbasin 2B-Bypass 8/20/2007 I.SCS CURVE NUMBERS Cover Condition j SCS CN `n �=Comments �z Impervious 98 6 ��--'� � Open 47 Assume good condition Wooded 39 Assume good condition II. PRE-DEVELOPMENT Subbasin#2B-Bypass A. Watershed Breakdown =>Impervious Area Breakdown San Rio-Phase 1 Lot Impervious= 1.10 acres Roadway Impervious= 1.09 acres Sidewalk Impervious= 0.15 acres Total = 2.34 acres __. _ __- Contributing Area SCS CN Area[acres] Comments Onsite impervious 98 2.34 - Onsite open 47 6.23 - Assume good condition Onsite wooded 39 34.86 Assume good condition Onsite pond 100 0.00 - Offsite impervious 98 0.60 - Offsite open 47 0.22 Assume good condition Offsite wooded 39 0.09 Assume good condition _ Offsitmond 100 0.00 Total area= 44.34 acres 0.0693 sq.mi. Composite SCS CN= 44 %Impervious= 6.6% B. Time of Concentration Information Time of concentration is calculated using SCS TR-55. Segment l:Overland Flow Segment 2:Concentrated Flow Length= 100 ft Length= 15 ft Height= 2.6 ft Height= 0.65 ft Slope= 0.0260 ft/fl Slope= 0.0433 ft/ft Manning's n= 0.24 Dense grasses Paved?= No P(2-year/24-hour)= 4.6 inches(Shallotte) Velocity= 3.36 ft/sec Segment Time= 10.72 minutes Segment nine= 0.07 minutes Segment 3:Channel Flow Segment 4:Channel Flow Length= 290 ft Length= 146 ft Height= 5 ft Height= 3.2 ft Slope= 0.0172 ft/ft Slope= 0.0219 ft/ft Manning's n= 0.035 Grass Manning's n= 0.045 Natural Channel Flow Area= 2.00 sf(Assume 2'x l'Channel) Flow Area= 9.00 sf(Assume 3'x 3'Channel) Wetted Perimeter= 4.00 ft(Assume 2'x 1'Channel) Wetted Perimeter= 9.00 ft(Assume 3'x 3'Channel) Channel Velocity= 3.52 ft/sec Channel Velocity= 4.90 ft/sec Segment Time= 1.37 minutes Segment Time= 0.50 minutes SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS J.ALDRIDGE,EI WDL-07020 Pre Development-Subbasin 2B-Bypass 8/20/2007 Segment 5:Channel Flow Segment 6:Channel Flow Length= 1266 ft Length= 406 ft Height= 12.9 ft Height= 5.6 ft Slope= 0.0102 ft/ft Slope= 0.0138 ft/ft Manning's n= 0.045 Natural Channel Manning's n= 0.045 Natural Channel Flow Area= 16.00 sf(Assume 4'x 4'Channel) Flow Area= 16.00 sf(Assume 4'x 4'Channel) Wetted Perimeter= 12.00 ft(Assume 4'x 4'Channel) Wetted Perimeter= 12.00 ft(Assume 44'x 4'Channel) Channel Velocity= 4.05 ft/sec Channel Velocity= 4.71 ft/sec Segment Time= 5.21 minutes Segment lime= 1.44 minutes Segment 7:Channel Flow Length= 682 ft Height= 0.8 ft Slope= 0.0012 ft/ft Manning's n= 0.045 Natural Channel Flow Area= 25.00 sf(Assume 5'x 5'Channel) Wetted Perimeter= 15.00 ft(Assume 5'x 5'Channel) Channel Velocity= 1.59 ft/sec Segment Time= Z13 minutes Time of Concentration= 26.44 minutes SCS Lag Time= 15.86 minutes(SCS Lag=0.6*Tc) = 0.2644 hours Time Increment= 4.60 minutes(=0.29*SCS Lag) SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS J.ALDRIDGE,EI WDL-07020 Pre-Development-Subbasin 2C 8/20/2007 I.SCS CURVE NUMBERS Cover Condition SCS CN Comments Impervious 98 _ .. Open 52 Assume good condition Wooded 45 Assume good condition IL PRE-DEVELOPMENT Subbasin#2C A. Watershed Breakdown Contributing Area SCS CN Area[acres] Comments Onsite impervious 98 0.00 - Onsite open 52 0.01 Assume good condition Onsite wooded 45 119.85 Assume good condition Onsite pond 100 0.00 - Offsite impervious 98 0.80 - Offsite open 52 1.45 Assume good condition Offsite wooded 45 0.20 Assume good condition Offsite pond 100 0.00 - Total area= 122.31 acres 0.1911 sq.mi. Composite SCS CN= 45 %Impervious= 0.7% B. Time of Concentration Information Time of concentration is calculated using SCS TR-55. Segment 1:Overland Flow Segment 2:Concentrated Flow Length= 100 ft Length= 711 ft Height= 1.25 ft Height= 12.95 ft Slope= 0.0125 ft/ft Slope= 0.0182 ft/ft Manning's n= 0.40 Woods-light underbrush Paved?= No P(2-year/24-hour)= 4.6 inches(Shallotte) Velocity= 2.18 ft/sec Segment lime= 21.61 minutes Segment Time= 5.44 minutes Segment 3:Channel Flow Segment 4:Channel Flow Length= 901 ft Length= 1713 ft height= 11.6 ft Height= 15 ft Slope= 0.0129 ft/ft Slope= 0.0088 ft/ft Manning's n= 0.045 Natural Channel Manning's n= 0.045 Natural Channel Flow Area= 20.00 sf(Assume 5'x 4'Channel) Flow Area= 25.00 sf(Assume 5'x 5'Channel) Wetted Perimeter= 13.00 ft(Assume 5'x 4'Channel) Wetted Perimeter= 15.00 ft(Assume 5'x 5'Channel) Channel Velocity= 5.01 ft/sec Channel Velocity= 4.36 ft/sec Segment Time= 3.00 minutes Segment Time= 6.55 minutes Segment 5:Channel Flow Length= 1260 ft Height= 2.5 ft Slope= 0.0020 ft/ft Manning's n= 0.045 Natural Channel Flow Area= 25.00 sf(Assume 5 x 5 Channel) Wetted Perimeter= 15.00 ft(Assume 5 x 5 Channel) Channel Velocity= 2.07 ft/sec Segment Time= 10.13 minutes Time of Concentration= 46.74 minutes SCS Lag Time= 28.04 minutes(SCS Lag=0.6*Tc) = 0.4674 hours Time Increment= 8.13 minutes(=0.29*SCS Lag) HEC-RMS Project: 2007-08-23 WDL-07020 Basin Model: Pre ;:u�hasui�E: = Sldnaar?4 1 F.$ci Amty Pd Ph 1 Nnanty Pd Subbasin 1 .)11 pae�h i7A. Read Subbaain f2 HITS * Summary of Results Project : 2007-08-23 WDL-07020 Run Name : Pre - Q1 Start of Run : 01Jan01 0100 Basin Model : Pre End of Run : 02Jan01 0100 Met. Model : 1-Year Execution Time : 24Aug07 0939 Control Specs : 1-min dT Hydrologic Discharge Time of Volume Drainage Element Peak Peak (ac Area (cfs) ft) (sq mi) Subbasin 1 3.3714 01 Jan 01 1325 0.69693 0.042 Subbasin 2A 5.3097 01 Jan 01 1354 1.9457 0.151 Reach #2A 5.3097 01 Jan 01 1405 1.9322 0.151 SB 2B-To Phi Amty Pd 10.965 01 Jan 01 1304 0.84922 0.006 Ph 1 Amenity Pd 0.11156 02 Jan 01 0100 0.10469 0.006 Reach 0.11156 02 Jan 01 0100 0.10346 0.006 Subbasin 2B - Bypass 0.56868 01 Jan 01 1552 0.34838 0.069 Subbasin 2C 1.9256 01 Jan 01 1534 1.1561 0.191 Subbasin #2 7.0073 01 Jan 01 1410 3.5402 0.418 HMS * Summary of Results Project : 2007-08-23 WDL-07020 Run Name : Pre - Q10 Start of Run : 01Jan01 0100 Basin Model : Pre End of Run : 02Jan01 0100 Met. Model : 10-Year Execution Time : 24Aug07 0943 Control Specs : 1-min dT 1 Hydrologic Discharge Time of Volume Drainage Element Peak Peak (ac Area (cfs) ft) (sq mi) Subbasin 1 40.975 01 Jan 01 1312 4.1605 0.042 Subbasin 2A 78.184 01 Jan 01 1337 13.252 0.151 Reach #2A 78.184 01 Jan 01 1348 13.199 0.151 SB 2B-To Phl Amty Pd 24.090 01 Jan 01 1304 1.9376 0.006 Ph 1 Amenity Pd 0.31414 01 Jan 01 2259 0.21316 0.006 Reach 0.31414 01 Jan 01 2307 0.21020 0.006 Subbasin 2B - Bypass 27.538 01 Jan 01 1324 4.2334 0.069 Subbasin 2C 65.551 01 Jan 01 1339 12.426 0.191 Subbasin #2 158.84 01 Jan 01 1342 30.068 0.418 SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS B.R.FINCH,PE WDL-07020 Post-Development-SBI-To SWMF#1 9/18/2007 7 SCS C1JRVE 1tii 11► 3 5.. Cover Condition SCS CN Comments Impervious 98 - Open 51 Assume good condition Wooded 43 Assume good condition Sub-basin#1-To SWMF#1 A. Watershed Breakdown Impervious Area Breakdown San Rio-Phase 1A Roadway Impervious 7918 sf Sidewalk Impervious 609 sf Total Impervious From Phase 1A= 8527 sf 0.20 acres San Rio-Phase 2A Building Impervious 32224 sf Roadway Impervious 28102 sf Sidewalk Impervious= 21150 sf Extra= 10890 Total Impervious From Phase 2A= 92366 sf 2.12 acres Contributing Area SCS CN Area[acres] Comments On-site open 51 1.79 Assume good condition On-site impervious 98 2.32 - On-site wooded 43 0.00 Assume good condition On-site pond 100 0.45 - Off-site open 51 0.00 Assume good condition Off-site impervious 98 0.00 - Off-site wooded 43 0.00 Assume good condition Off-site Pond 100 0.00 - Total area= 4.56 acres 0.0071 sq.mi. Composite SCS CN= 80 %Impervious= 50.8% B. Time of Concentration Information Due to the small size of the sub-basin,and/or the high impervious percentage,the time of concentration was assumed to be 5-minutes. Time of Concentration= 5.00 minutes SCS Lag Time= 3.00 minutes(SCS Lag=0.6*Tc) = 0.0500 hours Time Increment= 0.87 minutes(=0.29*SCS Lag) SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS B.R.FINCH,PE WDL-07020 Post-Development-01-To SWMF#2 9/18/2007 I-SCS CURVE NI.X.417b1S. Cover Condition SCS CN Comments Impervious 98 - Open 42 Assume good condition Wooded 34 Assume good condition POST-DEVELOPMi NT• -•'- - -_ Sub-basin#1-To WAIF#2 A. Watershed Breakdown Impervious Area Breakdown San Rio-Phase 2A Building Impervious= 33517 sf Roadway Impervious= 29093 sf Sidewalk Impervious= 16932 sf Extra= 10890 Total= 90432 sf 2.08 acres Contributing Area SCS CN Area[acres] Comments On-site open 42 0.90 Assume good condition On-site impervious 98 2.08 - On-site wooded 34 0.00 Assume good condition On-site pond 100 0.47 - Off-site open 42 0.00 Assume good condition Off-site impervious 98 0.00 - Off-site wooded 34 0.00 Assume good condition Off-site Pond 100 0.00 - Total area= 3.45 acres 0.0054 sq.mi. Composite SCS CN= 84 %Impervious= 60.2% B. Time of Concentration Information Due to the small size of the sub-basin,and/or the high impervious percentage,the time of concentration was assumed to be 5-minutes. Time of Concentration= 5.00 minutes SCS Lag Time= 3.00 minutes(SCS Lag=0.6*Tc) = 0.0500 hours Time Increment= 0.87 minutes(=0.29*SCS Lag) SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS B.R.FINCH,PE WDL-07020 Post-Development-SBI-Bypass 8/20/2007 I.SCS Ctig4 NLAIBEItS Cover Condition SCS CN Comments Impervious 98 - .Open 45 Assume good condition Wooded 37 Assume good condition R. POS'P-DEVELOI MEN'd'. Sub-basin#1-Bypass A. Watershed Breakdown Contributing Area SCS CN Area[acres] Comments On-site open 45 10.75 Assume good condition On-site impervious 98 5.43 On-site wooded 37 3.40 Assume good condition On-site pond 100 0.00 - Off-site open 45 0.00 Assume good condition Off-site impervious 98 0.00 Off-site wooded 37 0.00 Assume good condition Off-site Pond 100 0.00 - Total area= 19.58 acres 0.0306 sq.mi. Composite SCS CN= 58 %Impervious= 27.7% B. Time of Concentration Information Tc is assumed to be equal to the pre-development. Time of Concentration= 14.39 minutes SCS Lag Time= 8.63 minutes(SCS Lag=0.6*Tc) 0.1439 hours Time Increment= 2.50 minutes(=0.29*SCS Lag) SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS B.R.FINCH,PE WDL-07020 Post-Development-Subbasin#2A 8/20/2007 L SCS CURVE NUMBERS Cover Condition SCS CN Comments Impervious 98 - Open 56 Assume good condition Wooded 49 Assume good condition IL PQS `-DEVELOPMENT Subbasin#2A A. Watershed Breakdown San Rio-Phase 1 Roadway Impervious= 0.10 acres Contributing Area SCS CN Area[acres] Comments Onsite impervious 98 0.10 - Onsite open 56 0.01 Assume good condition Onsite wooded 49 86.13 Assume good condition Onsite pond 100 0.00 - Offsite impervious 98 1.47 - Offsite open 56 1.87 Assume good condition Offsite wooded 49 7.07 Assume good condition Offsite pond 100 0.00 - Total area= 96.65 acres 0.1510 sq.mi. Composite SCS CN= 50 %Impervious= 1.6% B. Time of Concentration Information Time of concentration is calculated using SCS TR-55. Segment 1:Overland Flow Segment 2:Concentrated Flow Length= 100 ft Length= 1422 ft Height= 2 ft Height= 9.6 ft Slope= 0.0200 ft/ft Slope= 0.0068 ft/ft Manning's n= 0.40 Woods-light underbrush Paved 7= No P(2-year/24-hour)= 4.6 inches(Shallotte) Velocity= 1.33 ft/sec Segment Time= IZ9I minutes Segment Time= 1Z88 minutes Segment 3:Channel Flow - Length= 2552 ft Height= 16.9 ft Slope= 0.0066 ft/ft Manning's n= 0.045 Natural Channel Flow Area= 25.00 sf(Assume 5'x 5'Channel) Wetted Perimeter= 15.00 ft(Assume 5'x 5'Channel) Channel Velocity= 3.79 ft/sec Segment Time= 11.23 minutes Time of Concentration= 47.02 minutes SCS Lag Time= 28.21 minutes(SCS Lag=0.6*Tc) 0.4702 hours Time Increment= 8.18 minutes(=0.29*SCS Lag) Reach#2A Channel Flow Length= 2540 ft Height= 16.5 ft Slope= 0.0065 ft/ft Manning's n= 0.045 Natural Charnel Flow Area= 25.00 sf(Assume 5'x 5'Channel) Wetted Perimeter= 15.00 ft(Assume 5'x 5'Channel) Channel Velocity= 3.75 ft/sec Segment Time= 11.28 minutes SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS B.R.FINCH,PE WDL-07020 Post-Development-SB2B-To SWMF#3 9/18/2007 L SCS'CURVE Cover Condition SCS CN Comments Impervious 98 - Open 43 Assume good condition Wooded 35 Assume good condition Lti POST-D-WaOPMEN7 Sub-basin#28 -To SWMF#3 A. Watershed Breakdown Impervious Area Breakdown San Rio-Phase 2A Building Impervious= 258865 sf Roadway Impervious= 253720 sf Sidewalk Impervious= 54875 sf Extra= 10890 Total = 578350 sf 13.28 acres Contributing Area SCS CN Area[acres] Comments On-site open 43 9.36 Assume good condition On-site impervious 98 13.28 - On-site wooded 35 0.49 Assume good condition On-site pond 100 1.26 - Off-site open 43 0.00 Assume good condition Off site impervious 98 0.00 - Off-site wooded 35 0.00 Assume good condition Off-site Pond , 100 , 0.00 , - Total area= 24.39 acres 0.0381 sq.mi. Composite SCS CN= 76 %Impervious= 54.4% B. Time of Concentration Information Due to the small size of the sub-basin,and/or the high impervious percentage,the time of concentration was assumed to be 5-minutes. Time of Concentration 5.00 minutes SCS Lag Time= 3.00 minutes(SCS Lag=0.6*Tc) 0.0500 hours Time Increment= 0.87 minutes(=0.29*SCS Lag) SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS BR FINCH,PE WDL-07020 Post-Devt-SB2B-To Ph 1 B Amenity Pond 9/20/2007 L SCS C'IIRVI!NUMBERS. Cover Condition SCS CN Comments Impervious 98 Open 40 Assume good condition Wooded 31 Assume good condition II..POST4ii1,;VELOP>II TI`. ' Subbasin#2B-To Amenity Pond A. Watershed Breakdown Impervious Area Breakdown San Rio-Phase 1B Building Impervious= 12136 sf Roadway Impervious= 35489 sf Parking Area Impervious= 10285 sf Sidewalk Impervious= 11372 sf Extra= 8448 Total = 77730 sf = 1.78 acres Contributing Area SCS CN Area[acres] Comments Onsite impervious 98 1.78 - Onsite open 40 0.79 Assume good condition Onsite wooded 31 0.00 Assume good condition Onsite pond 100 1.56 - Offsite impervious 98 0.00 - Offsite open 40 0.00 Assume good condition Offsite wooded 31 0.00 Assume good condition Offsite pond 100 0.00 - Total area= 4.13 acres 0.0065 sq.mi. Composite SCS CN= 88 %Impervious= 43.2% B. Time of Concentration Information Assume the time of concentration is equal to 5 minutes Time of Concentration— 5.00 minutes SCS Lag Time= 3.00 minutes(SCS Lag=0.6*Tc) = 0.0500 hours Time Increment= 0.87 minutes(=0.29*SCS Lag) C. Reach Information Assume the stream reach flows at a velocity of ft/sec. Reach Length= 2465.00 ft Assumed Stream Velocity= 5.00 ft/sec Lag Time= 8.22 minutes SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS B.R.FINCH,PE WDL-07020 Post-Development-SB2B-Bypass 8/20/2007 L SCS CURVE N ERS Cover Condition SCS CN Comments Impervious 98 - Open 49 Assume good condition Wooded 42 Assume good condition IL POs DEVELOPMENT Sub-basin#2-Bypass A. Watershed Breakdown Contributing Area SCS CN Area[acres] Comments On-site open 49 13.29 Assume good condition On-site impervious 98 2.44 - On-site wooded 42 7.52 Assume good condition On-site pond 100 1.26 - Off-site open 49 0.22 Assume good condition Off-site impervious 98 0.60 - Off-site wooded 42 0.09 Assume good condition Off-site Pond 100 0.00 - Total area= 25.42 acres 0.0397 sq.mi. Composite SCS CN= 55 Impervious= 12.0% B. Time of Concentration Information Tc is assumed to be equal to the pre-development. Time of Concentration= 26.44 minutes SCS Lag Time= 15.86 minutes(SCS Lag=0.6*Tc) 0.2644 hours Time Increment= 4.60 minutes(=0.29*SCS Lag) SAN RIO-PHASE 2 HYDROLOGIC CALCULATIONS B.R.FINCH,PE WDL-07020 Post-Development-Subbasin#2C 8/24/2007 L SCS CI3RyE NIIA'IBERS Cover Condition SCS CN Comments Impervious 98 - Open 52 Assume good condition Wooded 45 Assume good condition IL POST DEVELOPMENT L Subbasin#2C A. Watershed Breakdown Contributing Area SCS CN Area[acres] Comments Onsite impervious 98 0.00 - Onsite open 52 11.37 Assume good condition Onsite wooded 45 108.49 Assume good condition Onsite pond 100 0.00 - Offsite impervious 98 0.80 - Offsite open 52 1.45 Assume good condition Offsite wooded 45 0.20 Assume good condition Offsite 22nd 100 0.00 Total area= 122.31 acres 0.1911 sq.mi. Composite SCS CN= 46 Impervious= 0.7% B. Time of Concentration Information Time of concentration is calculated using SCS TR-55. Segment 1:Overland Flow Segment 2:Concentrated Flow Length= 100 ft Length= 711 ft Height= 1.25 ft Height= 12.95 ft Slope= 0.0125 ft/ft Slope= 0.0182 ft/ft Manning's n= 0.40 Woods-light underbrush Paved?= No P(2-year/24-hour)= 4.6 inches(Shallotte) Velocity= 2.18 ft/sec Segment Time= 21.61 minutes Segment Time= 5.44 minutes Segment 3:Channel Flow Segment 4:Channel Flow Length= 901 ft Length= 1713 ft Height= 11.6 ft Height= 15 ft Slope= 0.0129 ft/ft Slope= 0.0088 ft/ft Manning's n= 0.045 Natural Channel Manning's n= 0.045 Natural Channel Flow Area= 20.00 sf(Assume 5'x 4'Channel) Flow Area= 25.00 sf(Assume 5'x 5'Channel) Wetted Perimeter= 13.00 ft(Assume 5'x 4'Channel) Wetted Perimeter= 15.00 ft(Assume 5'x 5'Channel) Channel Velocity= 5.01 ft/sec Channel Velocity= 4.36 ft/sec Segment Time= 3.00 minutes Segment Time= 6.55 minutes Segment 5:Channel Flow Length= 1260 ft Height= 2.5 ft Slope= 0.0020 ft/ft Manning's n= 0.045 Natural Channel Flow Area= 25.00 sf(Assume 5 x 5 Channel) Wetted Perimeter= 15.00 ft(Assume 5 x 5 Channel) Channel Velocity= 2.07 ft/sec Segment Time= 10.13 minutes Time of Concentration= 46.74 minutes SCS Lag Time= 28.04 minutes(SCS Lag=0.6*Tc) = 0.4674 hours Time Increment= 8.13 minutes(=0.29°SCS Lag) IEEC-IIMS Project: 2007-08-23 WDL-07020 Basin Model: Post 8137-To S WMF#1 a Pn13 Amenity Pd A Pond#1 0,1111 Sal..-Sypasa _ c2: Panda 3ubbasir2A Sub6aan#i Reach. /91 Subbasin-28-•i,; .`e ' Reach#2A ''' Subbnsin'. % SS2-To Pond#„ Pand#3 Subbaain#2 HMS * Summary of Results Project : 2007-08-23 WDL-07020 Run Name : Post - Ql Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 1-Year Execution Time : 18Sep07 1814 Control Specs : 1-min dT Hydrologic Discharge Time of Volume Drainage • Element Peak Peak (ac Area (cfs) ft) (sq mi) SB1 - To SWMF #1 8.9004 01 Jan 01 1305 0.67957 0.007 Pond #1 0.11049 02 Jan 01 0100 0.10639 0.007 SB1 - To SWMF #2 7.9310 01 Jan 01 1305 0.60677 0.005 Pond #2 0.060000 01 Jan 01 1615 0.059343 0.005 SB1 - Bypass 6.3456 01 Jan 01 1314 0.66753 0.031 Subbasin #1 6.4670 01 Jan 01 1314 1.0333 0.043 SB2 - To Pond #3 39.834 01 Jan 01 1305 3.0693 0.038 Pond #3 0.32404 02 Jan 01 0100 0.30274 0.038 SB 2B - To Ph1B Pond 10.965 01 Jan 01 1304 0.84922 0.006 Ph1B Amenity Pd 0.11156 02 Jan 01 0100 0.10469 0.006 Reach 0.11156 02 Jan 01 0100 0.10346 0.006 Subbasin 2A 5.3097 01 Jan 01 1354 1.9457 0.151 Reach #2A 5.3097 01 Jan 01 1405 1.9322 0.151 -•tbbasin-2B - Bypass 4.5053 01 Jan 01 1329 0.87157 0.040 .bbasin 2C 2.4002 01 Jan 01 1503 1.3837 0.191 Subbasin #2 9.7799 01 Jan 01 1403 4.5937 0.426 HMS * Summary of Results Project : 2007-08-23 WDL-07020 Run Name : Post - Q10 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 10-Year Execution Time : 18Sep07 1804 Control Specs : 1-min dT Hydrologic Discharge Time of Volume Drainage Element Peak Peak (ac Area (cfs) ft) (sq mi) SB1 - To SWMF #1 22.901 01 Jan 01 1304 1.7761 0.007 Pond #1 0.30727 01 Jan 01 2329 0.20393 0.007 SB1 - To SWMF #2 18.796 01 Jan 01 1304 1.4791 0.005 Pond #2 0.093739 02 Jan 01 0100 0.095497 0.005 SB1 - Bypass 40.995 01 Jan 01 1311 3.9192 0.031 Subbasin #1 41.196 01 Jan 01 1311 4.2186 0.043 SB2 - To Pond #3 112.49 01 Jan 01 1305 8.6431 0.038 Pond #3 7.3922 01 Jan 01 1500 3.1622 0.038 SB 2B - To Ph1B Pond 24.090 01 Jan 01 1304 1.9376 0.006 Ph1B Amenity Pd 0.31414 01 Jan 01 2259 0.21316 0.006 Reach 0.31414 01 Jan 01 2307 0.21020 0.006 Subbasin 2A 78.184 01 Jan 01 1337 13.252 0.151 Reach #2A 78.184 01 Jan 01 1348 13.199 0.151 'bbasin-2B - Bypass 36.435 01 Jan 01 1320 4.4686 0.040 bbasin 2C 72.031 01 Jan 01 1339 13.270 0.191 Subbasin #2 166.79 01 Jan 01 1341 34.309 0.426 HITS * Summary of Results Project : 2007-08-23 WDL-07020 Run Name : Post - Q25 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 25-Year Execution Time : 18Sep07 1809 Control Specs : 1-min dT Hydrologic Discharge Time of Volume Drainage Element Peak Peak (ac Area (cfs) ft) (sq mi) SB1 - To SWMF #1 37.960 01 Jan 01 1304 2.4411 0.007 Pond #1 2.1930 01 Jan 01 1409 0.86531 0.007 SB1 - To SWMF #2 30.531 01 Jan 01 1304 1.9973 0.005 Pond #2 0.58169 01 Jan 01 1835 0.30461 0.005 SB1 - Bypass 70.674 01 Jan 01 1310 6.1193 0.031 Subbasin #1 70.905 01 Jan 01 1310 7.2893 0.043 SB2 - To Pond #3 190.54 01 Jan 01 1304 12.105 0.038 Pond #3 36.658 01 Jan 01 1328 6.5902 0.038 SB 2B - To Ph1B Pond 38.444 01 Jan 01 1304 2.5730 0.006 Ph1B Amenity Pd 1.7797 01 Jan 01 1504 0.84083 0.006 Reach 1.7797 01 Jan 01 1512 0.83654 0.006 Subbasin 2A 142.15 01 Jan 01 1334 22.281 0.151 Reach #2A. 142.15 01 Jan 01 1345 2.2_193 0.151 -,bbasin-2B - Bypass 63.234 01 Jan 01 1319 7.1516 0.040 obasin 2C 143.22 01 Jan 01 1335 23.458 0.191 Subbasin #2 343.36 01 Jan 01 1338 60.229 0.426 POST-DEVELOPMENT HYDROLOGIC CALCULATIONS SAN RIO-PHASES 1B&2A WDL-07020 SWMF #1 - FINAL DESIGN SAN RIO-PHASES 1B&2A WDL-07020 — _1, f . I /:ask [ I fit" • v � s f_ s _ 1 .. --`,;: E-:ai. "'. '�'`a "°s S a,f,s, ffi _ - f ram „_ _ 4. . I .,'....4.'.i..t/14;;„. i.0 a•-•11,.,f, --r•-:--2,•..'r1.Z,-s'--.:----e-„.:...'.:-'ir:.'_,! '° ss 6 e-.--, {2, •;r'•/ $..` h r j* _ 1 st. G _ J f, 1 7 j _ 7�,� r, ri m 1:,'. i f- ,y1 +' - _ 4- 6`11[© —P _. __ yam. ._ _-.3/ F 55„ ,_..j„-=7....,..,.,,:7,",e,..-.1.,-..._„-H--.,,-r. . -�.,+, L _ • _ - E�® _ E ILA ! e : i 3 Lip- .. X '•�1-�7. {"' �a� 11111111 - _ _ \�~~' •' • _ ; -�, • _ —PHASE 1B 1- -! r`iv :. le' — `f SAN RIO—PHASE 2A a .� :. ''' o SA' ,. �2y/ ••. yl+em • s r, +� f a V. c,Nar e r ..." °' x?� - -�i _ &. - -x7i_ -:sue •� _ d .F • �_ _9 '-e-liko, -. -- .,-- t -.-_,-- ---. -7-- -„,..-_ - Ailickt, . . ...,,sc. ------i ..:_-of. fp:,L,..._ . _ 3 d Ir' _� a a, ;:0:0101,.•::_,. .,,,fA,...-_.4#72,..- Cis +�- r . -- �y� -- "I''..- - _ l+ i SSS 31 ; { J Op { - - r ; _ _ xy 1,s-" L . # ?�` -- ._ CoDvvight iC)1998,Maptech,Inc. "'STORMY/AMER MEER a[TAi11Y POl®OOICIlON 1 02 GENERAL.NOIB CON3IRUCIION SOQUEN r ,�f /� 7', ��=� '• %`t L TO A ONNIrI00011,M DIME -Eli®l NFL YOIIT M MAIM OF I. MR A 9r WIER EMI A Op1NNi PIM MN / • / 1 •. •• 1 R� �N� I�1� M NQOM MOO AMAITIL Fa UNL N MOM HEEL oar.. 411.111 otionw r nue MAW a NIi 1.ORrt \ -• • j / \ • \ '�` g • L M.IIFdIL MOM MM M tw aEFOON A0 NMfOrI AMA V // / \ \ � 9►' _ 1 __ �� • �KL �p� gyp{ _*„. -.• • RMEM►OR NM MOM 11111M-M.E1K�MOL F M CO MM=COMM NW z ML�tOOJ NO EOOIOM OEIInL.Ni1NOrR!E M AMROYm N4NIR. \ ` _` i - C' ` •`-��f. \ `s '4 . DNENR u.M Ma A.OIKML MI M Im1MIN1 MIL E MEWED 0011111E RNLoOMIONR aEl WRNEN ML MrbYFB AIM.MIEE __ •_ X - r� / - _--' 1 42 I L X U NO VIMATM WME: WARM MEE M�11111.M EWL ]Yl + -L •R�gqOI��L•fENF COMM M IEEE J -,`-' 1 , ' \` \ `- --- R 1' 1 - • t L ...cm.IIIWIa AWE A M-IA111M1 NM"IE.M.IaMMIR Mono /I6R'MM,PER A Mr nap ♦ . .i 1 y 1/'c�� RNuN7EMAZ.WEIR NOW 11W NO I�Rlawoo•OF MM ARE ME NNEM E 111 _� / .21` ,� •♦♦ \ `!" •-c N ._ I-Yi F�MNI - NR:RER AM oEIKOMrOri MOW. L.Cl/Mt NW ROE AiMa WW1 M OM OF M.MMFpM.MN IEEE ono • / .' . AEIRREI SON MEW WM E.RWOYm RION MM. s \ ll/ ' % \ ` \ - -� •�" 11 •4. ENEO NM SE M OF p�IR M WM MO WF E M A. rot alms IHARRlk.M M OW=MRS NNL E A: /,,/ / . _ - / 1��y MSIMI ION Is COMM Q IINFON3 F t0. IMPS E NNL M s10IKr1E0 A A NR/1 WIMINNOMIL M WINION M11 Er: IR WHIM • NW • >{ l / / - / - -♦�- --\-- ' _\ ^_^ \ O�•I . mom 000 7A-E N p I E LL 7p NNIIOIs NI lK `\♦ \--.r / ' 1'ii!"/- /' \ %, ``` /- ,. W A As 00111WIROR WRIL1EEIR1¢F M ORM RIORIMINVEI IR WM M UM% IM.RIE11101M Ms MMNNol14:W M&ova it FUNW mama.o11 a Mr -. - 7.- / /� _ { . . ► _ > \/� _- . • ., t. - F7./ ail �� n:.s" fir W7�I,y�I AAR& ''"''lItFE011I..CFwoIN ,' t�..," T..W-- -.G:- - s' / " _ oi6Ra M'RMd1 E1�WRE RuRrrlliRED oft-no aEM10°N°s�I NNE R�� ' 1 - t �[ r ., e r 001E1tIt L RIINIE1s Fa M AM Ra REI1Af mlan M Manna Oa M NONI@ MY / ^, ♦ I _nag- Ruooto r.wall ow.EMIR A WOW OF 5-ET saga pW� NO MIL - 7/\ ;\..._%L_ 4 EERIE. a NFp1MfRMOAEII MMR MOL.K CONr01M A M MMWOR w M EwIMEA 11 150E Or 1R 1�MILR if RNVIL A NIMBI. i / i / -- r, . s 7-1,. t • • •po 0I LI- ovoMNR u�N e0L ONaRONR DICCON W)NAM M ® i f • --- F 1. •• p p V RMIM NW 1NM M WM All CV E/. M v .. - - - -a Ea It 1Rsria MINI r. AWE ARE EEdI MO1mIE qpp� 4`}' ' ' A1r11WE M1101Nt OF M NL�i1F 11N OMOM®OR NWL MMOY[M ROR i!`" ' OO ANf .' 'ts - / J f ' TpIFORIJMn� N iI�NyRpNNaaFaoc rML IIN:"NEOR. • ' 'I 1. WNW f Qor MEI COM aL IC-MOS MOM SW Mir N a ono mow OF Worn ONNl71F.or now.M..orriNMa1.Nva E carom ° -' :. 1 4 1 / f 1�1 MI Igl...... A WE UM 11M s 111.1p INIEW1 In1b"min .As 1TMACI III �' ✓ - ; ,' `� I / :I �I ,`.^ I a ono M r ONIm Er NE NL MINI.coo WNW MONO.M �T IE IMAs!'MNL EOIm/R M lREfGfOOE lEle{M TIF -- ••//""" _ -• y:. 1 r ., ► . "� ,t 1K• ••••,,,♦' aINMMIDRRL OErEL7 ilk RImROR MOM OIIOM[ON no MOZL �° I / �'-'- .. s L OIESM owes E-0EFIO _n R�BRILL NOW M.OF1R)i67O1 L F10R A MNO M 1E. \ - NoMIW LLT MIRMEE.01 OFMOgINOM PND MIa1 M , , /� \ I /' f, r �� '? K • RN pFNROO��G� Nsl F - _ - FF • M ENEI11N1 MME narrowing InIRAON IIgCA•Al1.AOrME2 MOW OW iMNLAT M IRIO.. RMFE OS. ` .• I SEAL - R OWNRIN IM�OINEE A M IINOIN0 NI-Nicain OF RAM MILE Eo01RIEl1E Mips TIN:MEWLS E" MEW "C/7 l \� �i17' i 3 Or M ENRMOIE'0.�rs on DIO LLM WOEOM!aWL E 1lPI - - �. • Y �� 0 97470 i MMRMY' M4 UM OMIEL a no1Et MLA:ORE1m E / • • • P. cots M vs M-tor OA10.Y4. tt common ono oat M E-ME�MIB70 .ice. ,/� %- l } \ ♦♦ \ // ` f �• - / .4 1'lyl^�"f M MN nowt mom MNM O17E tallions NNI FOR lls L N.NNW WA Nor./wawa 1 E am MOM=MOH RNEOINNN LOE.TO.DM. j \ •{� ---,I.40 \ // /• ,�i el, %=/ ^'•...... `•. • S07SY MMORI.NIQROE.Mtn RiMEM KMIISM mar me E POSH r W7WIE IM / Y� �c y r , ,r�. ^a , 1, •• a MIRR pp�p�OF AE. M; OMIpN�IF NWL RIMMR A ts11E1 TMi A r we mot /10 Wd•.t Fniii NE.M N WWW W M'.EM i IEMYM ! REI kralli FE M NFIMIYm F r MNMVM,Wm* rMErE M NW Hg7Nl../00 \ \ �. NW r \ 1 r ��.� l WM rOO FIAMEr rlNl 4FMYEsCAM moot tM itOFE�R�Y.rrirrSli1 M /r i.• \\ ---- `♦ i ij • ° l t 0. F 11EESNMEIMIOEI OENIMRMLOM 001 IRRr WWMN'A RfMW10MNE RaRM E EMMRm AM JNN R WAMYONOODrot ROIEN: / (/\ ♦ ` _'_,/* \ ' �, . OtEINEEI1 IMII A-IMN OF 1-War _war"1501 E T MOT mBill a MM ONMIRENNI•M nor B•M,IOENL•nu.moos MNL E two N wow /,r/ \ \\;\` `\` • �� � a< i • M PROM MINION M M NET MIL WWII Minns MORSEL E r 4NN PM H�1°�NE7®OIIIDrNi N NI-NIR \ �j, �• R A ENIMI11iR IOE r OIEML M IMEt NINE ECNNNWE G Er�'I'100 � til MK M AtlEI��' pll INMfI OF ML F Y;\ //I Q \\ \�\\ I X-•-. __._+.. • ��� L j `` E ARRfIWE RgNME1T F s E MSMSOa NHS MN ..JJ.J �� .")71 ti • a M mos�gNI�Oi*or on F(N-mg NM®'OMOta i M OEW NIL IAIHR M M a NMEMrNE OF M • NOYO�.pR��E EL E 1Eo�R��ryIE MWL W \ \ 1� • t. a/k)t \ }• ► - MOM ORORMgRR: 7[ I 1WS 0ollrEO NRgEs KA. mE�MMEANL AMR WF ONNIIMOIm'IMMI pE W M 101IOOM IEMoa \- .4 t` \ y INEIHM[. MR MIRE ONO POWIN a M OEIEM%fE ♦ CEINR 1laM6M .y�'J, _ wax amour IEM DIMONraoni aria AEa NNh1Y Poo M'NNRRL AIM. a rMp®MM -M K \ `1 ,, t I. Cyr AAE:NMME ML1Np1'A71M ONU hMOT M RWW:7IMR EM OOMCM7[ TLL E- y� IF \ �� \ ` ` e"E ` ^L WINES awnr;ROE.AEA A 1E MZ7M'IMEN 1ErrR01Et NRauRm A M�NaOE Mi As \ .\ ♦ S f A 7m�yp� �F� . .t' '� IAI10I CN-mL WW1 WM1tommar oMWI MR E11E Woman MEINIO Fa M ER EMOMFIEMN•OAtMps1E1114p�(RF• a 101111.{ OF sV , ) 1 ~w4•r.. .ti Q RROr� MEMO ELIVi 0En1001 f 7.1 N A!MOIOm \�(_`-• - -a� �_ - - 1 e `. .. • . N�. 7. AIM MOS O woo.WAIL E 108 1E.N-RRMIM r. cm OM MY EACIE1 WIL •M'. '� F / " -m=..- 1. • ware 01112111.EIOQ Qy ON M O�tpp µ�MIL 1N1.EMMMID - I I _ / I. ■NI ONN1EIm MT. A17prIOL'SIWIE OM 1fE OAMMALIE NNE. oMIMY M M L M MEMO 0�� ALL IS.Nor NM®K M NNNONC 1001111 - •\ / • �' t t 4?/ AN o0al e " • It 70F.1.-3": M M OM.=A mmatromm OF As o 1M`M COMM) � EIMI/o 11111.PWOR 1 OONSIWW W M tENI1RNL-ML,rMIONMriF.M •♦ �- j / _ e t. - • �• RN.M 10 I NNIF NOIL NM RIM Y-d'h11IO Nlll'RENRONNT. if INN A Ovum E s:yp��E 1 0G0Rr Oyf.Alr/ .. .i;,, r/ i _ ,{ ,a NI .NHN/■OILEOOIINI 1m.rMI.M lIW11Nm 4 .d" / /, .• - iI "'11 E�� _ ,• .-._. ___._ '::ne.unnTir:Ai OWL Nt AA AW-w1ti tielefioulLE �' .. - #13 .e.�. arML ioMiAIQ"rE:��oAE1ANI>aA0 j MMAIE. 7(OE.M:OOtEI Ol M EN'#A01NL NE K111 OMEF MO,M M INK •ONO O NW ao ram rr + / I -rIOHom.IMLL E rRMAMF A!alinixe ONION NM NL MNi71rL'AMLB 'r, / ,fiOO 1 • �,elq,Al.MOLL NMINN FLAW WON M.OEROS OHM E OM FA•1a t 14 RIEMPOI NW WM ' '*` • F 1 - / ��r� •,��* 1 - - -1 -`'' `�lNE CA �, NMI AND 90L" tIIQN-orwlcl(&1V IW u OiENOCT IWiI N rMle MMeI6pUS Mtn O1 As M115 m1m.WI AIM NR • ♦ +�j •�; - L M IL..HROR S A E:1N1E REM.p1I�'OEEOER WM E IEEE.AMO1 comaxmor r*WOKI!lLL WOERILNNIS or. 11�OKtlAKO WM M I ♦ f .. ,. - - _ a':. `V 4�� � - IIR MINIOAL E WM A1I11 R0L NO 001NAC'OON MRCEIOEgNL':Rk1YNr OONEIMI NN. ... - 1 �� , „•" 1 r I`- - - - I--1-�y �HpWp�N;OYRBIM M�Ep pOIpFiNW��F�pp� err*NMpRIEgM7L�1� RMMBOIRL•F worm"A-NNMrE MOM HIM M.WONML- / r - 1App..."..--......- - `/ J �'^+.. i f I pWO�MyOpNE�ApiM 7�NL� NEq,,r 1psp F�M.F00ML 7ME10L1OYi0 m E OMNRNEfOrM MAMM N 1lROOpR�OA�1o1M�OCEA�FMLFIi. Nn. * . r' - - 1 ,` _��" _\..' - X4 NNMMs fA M NE[OAIEJNO N fl110EM RMRINMNII rasa E WORM Wan WOW LETS NO"K M MHs•OOI/ypOE yM ErNM ��I�. 1y�jW�� V' / �� R'+ , / N `4.MIIEM-NWT ROrO1fMi NrMROBR.MLNQMh47RN7110 IrE1NFAIMIODINE NCCMM:NE M OMCIm N r / ii ItAr OH•tr..*O.*RO rro NW M alai i YDE NM KR OMMAOIMMI `/_^'-, a' 13 ��� ^. :xj. L M.MEW NM s[ON®:A tloEON1T MT RAOF OR OWL E WOAWMIL'. `;' .' ` °� ~� \ ,' `_ OSNN�NI�r R Kalamai Isom or!mam a E ma ma M EMFldAM la K al ai WERE NNL E M OOD NM M>ANIVIE PRIMLY ,Y •�0 CV 1HH I M EMOI;PE:WP�SEIM NO MM MN RENNET POI • - , e i d a a ML COL IWO NW N I n OMROEF IOW Anal.OOMIMI IC0 MIL E 001WCIE 14 MOM A MEL ASAIMININCOON NO MOM MIME MH M MOW M / NmOT > \ \ } ---- • I A INION[as Or M smarm mama moo/Er M!u ion AF11.1 NIMMIOM WEND E MNIDnb AMEN CI 10 01117E A 1111M TO + { \ ea.N A 11a 'E t ", \ J r,;: .0 gm K CNEMOIm•a A moms maw. F E®.�q CNMIY MOUND r IMAM-NW OSROIN-0a DOMINEER NOR RN�MO W l 1 / I �' / warm ODINNER gNmmaoo 00M131Oo 1M1 MILE ry . .1r OIL ON-EWE®I®OEen EOMIIFO.A MEESIOWIS11N1.OF M 110L ANION*MI na 1 INN OMR NMI mama ram IR . W WL.11 .-• • i �.MI_ _�' .\ \F' `.'.. \ 4 _� F�7 EI WEAL MOLD E p'lNfi�aOr®Y M A An/worm ma a.N OM I A YOO OS111 O E NAlIM NSW M ONONW O Iowa,100E ME: NO MIR r 'i `> •`l;,_�a.r'...• .�,,,te•r"1 1a1C� •^ �.\ II { t^. \\ ` 441 • -. _I ' ', �� rRNOE ONER 'M NO NISM EN mummer W WL CODE NM M[MR 70 1E 1M �� • MOW OOYM W. MONISM EFL ,/' �,.�` • _ 1 . 1 fS - F {- � • ft R1101 oEi"F70R �AloovwNm mriEIDao iLE �IfI�ET S MATERIAL. 'KIIOI�S +n1ew . w ' t>� \\ �T \ E .y•, �, o • MOtim NI.ARIo M llo-O[M fMAIC[OMMO.FA i1NRrIMt IATtId -T "F..--� r � / 71EROIL R WMLCOWYEM7IMEE McRENr if ODDRONIOR mD1eCEnt iQ1N0 1: M Mw R?NIIIQ A110EL eau E 61YE■ HmENR EL AJ.o sEL HENr IA E - .i/ "�P. ,'^ -rr j. \\ d�y ) - .A.DINS/ AAR N11MOIX SIMION, �Np�IE OF wo-IMRM an ma NME ONMOE/O-Mr INER W WST 1. r �` / a AMINO OF M MUM NWL.E NRROWD A:1�Y WIT ME NO101RSINm- WNW IEfNo MOf ii{!-FM�O M ME.ONIO IINL E EPIC M. _ • \ - ! ( ` -1 ,`\ 1_ : -� MILL a 110 I I wan ONMM16NN1..pMpI 01E.mMM M T MAL L WMNLL_t lLIM MEI MMt ogef- N 10111. •11113..... R 1AI - � • / \••., \>•ti4 . ! �7,6+ ` >N - ':� -, "r IV sy- ,E em W li 1a .IJRIIK�Tam.AMII MI MEr IAT 01 FLL Warn OI M a6WlE alifo 6EHi IN Ni o773.101a, - -a lit �I�nns�RO�LE WOEED M RM1/0-IR110 OENIsI/M8 eA.A MUM Os OMman • / • t / ; ,';xf-- � f f !":+' ./�///'� I:" �. O�Ro01LME��Fa VMIMMA MCT N'A4 On AS MOM N M EAR 3 77��E M t MI MEI'MELIHE MEL E POCIMm MMI MO{A WLO WES. /• �` / \ \ • • - {_ + w/ �y� O�Ma� �� WM E!WM E1 MINIM�{L O!AIE:EIR RN4 IMPS> E"N ANNON= \\ 1" I I 1 � '� , ' , L \ . 1. I .iMntcNAr..IRN OF RESP N S1OLO:T 1M NM NO.f1Oia REM NMI A.WENT.NMR NW t001010M a M.RMt MA ` Y`- , A� �" - , •,e RIM a AE moor MC mom mow*AE NMtlT war OWL out moo IWO' • - �' / •F -1 ' 1 Zip / g . 1 ALL 1MD1m tIANI1EIANOC NW REp11Olr M11M RARNR!N4 t M IeCld•71Y M M O'Ali glop Draws AMR um E W oinnt iu M Palm MR OME 413.E 3 -1 • `'-/ / , i I 1 / ,• ME M.own NNONOOII M M MOM ORMIWE AND MOMS(AOEND11 WE �g ma RUM N.III:OF.A M ml A OW,0 l.GetM 1 / " \ \*11:0#. /7. /,�• AR.1111 aL� ir IIOKO R N WNL W T EA \11/1111/110111 /• A WM 1MIEmEEA - "/ %/ 7J ' III/ � I. R. MT LbIPMr0lttN//1E1RYfi11 A AON RE NIII ROOR0i1 MR NW AE IERR mow / IL M ERR 10K Jawmom OWL 00W01RIA�.MQOtO�0-17L M7�W�I�LDO MUM wan r i s WM EVIL ALCM ovum cotraaON11011A�lREIEC ONNT C0IEII..- OWL.rMOE MIS I I .it/ • O / ,S� \ / ` a . • 011 ROIN M MN NE OIAOOE IWO wri - "// L 4 I /!! \ ,1 .. ! L r M AMEt-RIOOOON arm r mover M MIM Of M M t ME MOW,M ORRE MEET EE]t RE ERORR OU.WAS:S u-so o vo tT Q NRROO a AE RIIRICIIRE MM OWL`sANSI 7NMOMS 1110110.M E7U.NE MINIM N AE MEN 1 �Y'`�l' .0 �1 111�LV�r� ON TM ME opppO no OINKANa�1�ML�O♦ML IO7�y�-IFEN11i1:1 AM IES4 1IMOL L OWNER RN EaIMI2.. N0 MOMIL maw Dinh Or Runt II MN IOW .. M ono mac mama MR ARF 11L A1MCW NR MINE MIME/ I ME[ !low".MIL-074gF NM/0010IRM EOM MO MN1OE A OMI ME 70E Fa=WM la iconNan s . ➢�y.M .°e; a IN.ram aroma ma.ea MOW NE ratWO(m am RE mama NEE. I .■+Nr ea eIAA L ammo aw 1 1 M see OIIRQ MEWL SOW OWL E NM 11E E MUM GRLFeffiC S. E r�'1� IIIRAOME FOOL QON-MORR/RAEog. M.SPAM R WOW OWN POW Etfita saa MOM'IS YA AN ro 1416 WM mgi 41 " WMCAR-•'1�22pcI I MME.ELL WA MS 111IIEob R••CBARW'1111OC ORAIl1101M MIL OW WIN le -"`PD-1A 0Emammal mu W 0-Rtl.ma as MT ?PD-E OPSOM OOM AQ O►SLIELEWI 1 urea-30 a OEL•ANE.fM A M1rMlm(AFR MA.MT FO1-f1N M CNOEOON MIL MADE A L. MIOYMEt WM 1111101 MIEN A WIWRIM N 01111r FOR 0111MION Or M w M AI WM. A OM NE EE OWL Alb E RROMb Fa MIMS MIMI'A OE 111111 IRON PRELIMINARY DRAWING - NOT RE EACCD FOR CONSTRUCTIONS ®MCADAMS Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopies for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION (please complete the following information): Project Name: San Rio -Phase 2A Contact Person: Brandon R. Finch Phone Number (919) 361-5000 For projects with multiple basins, specify which basin this worksheet applies to: Pond#1 elevations Basin Bottom Elevation 8.0 ft. (floor of the basin) ;rmanent Pool Elevation 15.0 ft. (elevation of the orifice) Temporary Pool Elevation 18.0 ft. (elevation of the discharge structure overflow) 1,1 I5.4 �t. NATO. Quaus( doLurtE EL.E.va-norl� areas Permanent Pool Surface Area 19,553 sq. ft. (water surface area at the orifice elevation) Drainage Area 4.56 ac. (on-site and off:site drainage to the basin) Impervious Area 2.32 ac. (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 68,172 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 122,573 cu. ft. (volume detained above the permanent pool) Forebay Volume 10,406 cu. ft. (approximately 20%of total volume) 1° S.-PoeK dou t-te- e3)407- Cu.Fr. C W Quau / lat.uHe-) other parameters SA/DA' 5.10 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 2.0 in. (2 to 5 day temporary pool draw-down required) Design Rainfall 1.0 in. Design TSS Removal2 90 % (minimum 85%required)) FORM SWU-102 Rev 3.99 PAGE 1 OF 4 Footnotes: 1. When using the Division SA/DA tables,the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious%and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2. In the 20 coastal counties,the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal THE NCDENR.BMP manual provides design tables for both 85%TSS removal and 90%TSS removal. H. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February, 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials BRF a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). BRF b. The forebay volume is approximately equal to 20%of the basin volume. BRF c. The temporary pool controls runoff from the design storm event. BRF d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet(include non-erosive flow N/A calculations). BRF f. The basin length to width ratio is greater than 3:1. BRF g. The basin side slopes above the permanent pool are no steeper than 3:1. BRF h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). BRF i. Vegetative cover above the permanent pool elevation is specified. BRF j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest BRF right-of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the BRF basin is specified prior to use as a wet detention basin. BRF m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) ❑ does I does not incorporate a vegetated filter at the outlet. This system (check one) n does ® does not incorporate pretreatment other than a forebay. FORM SWU-102 Rev 3.99 PAGE 2 OF 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover,mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth(see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5.25 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5.25 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation 15.0 • • Sediment emoval El. 9.75 75% Sediment Removal Elevation 9.75 75% • Bottom evation 8.0 25V V ♦ Bottom Elevation 8.0 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall he encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. FORM SWU-102 Rev 3.99 PAGE 3 OF 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any .hanges to the system or responsible party. Print name: Nathan D.Benson Title: Manager-Sandler at Shallotte,LLC Address: 448 Viking Drive-Suite 220 Virginia Beach,VA 23452 Phone: (757)463-5000 Signature --+--7 Date: v v A • , aoo 7 Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold,and a resident of the subdivision has been named the president. Virginia I, .\�n�S:,:1 e) ,a Notary Public for the State of N�a comply of Qom\y c.1 lr v tigtnl2i�� ,do hereby certify that Q c,�r y 0.„\N.\-2-,(.nSr:,\.. personally appeared before me this kt; 1.` day of IRU°\ ,20 7 and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, \\44.1A4 . 9-6,-616/ t_..r. -1. u „-C-\ ,..,'-.z:. Linda J.Todd ,; , Commonwealth of Virginia � !s"; ;f Notary Public i ', 'I' Commission No.2105i6 My Commission Expires 07/3112010 SEAL My commission expires: ° - -- `` 0 rORM S WU-1 02 Rev 3.99 PAGE 4 OF 4 SAN RIO PHASE II SWMF#1 B.R.FINCH,PE WDL-07020 8/20/2007 Stage-Storage Function Project Name: San Rio Phase II Designer: B.R.Finch,PE Job Number: WDL-07020 Date: 8/20/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Volume Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (CF) 15.0 0.0 19,553 �W 16,0 1.0 21,459 20506 20506 20506 1.01 17.0 2.0 23,425 22442 22442 42948 1.97 18.0 3.0 25.509 24467 24467 67415 2.96 19.0 4.0 27.565 26537 26537 93952 4.00 20.0 5.0 29,677 28621 28621 122573 I 5.08 Storage vs.Stage 140000 120000- 100000- y=20230x1'1oee R2=0.9995 Boom— 60000- 40000- 20000- 0- 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage(feet) Ks= 20230 b= 1.1085 SAN RIO PHASE II SWMF#1 B.R.FINCH,PE WDL-07020 8/20/2007 i _>Stage-Storage Function Ks= 20230 b= 1.1085 Zo= 15.00 Elevation Storage [feet] [cf] [acre-feet] 15.00 0 0.000 15.20 3398 0.078 15.40 7326 0.168 15.60 11484 0.264 15.80 15797 0.363 16.00 20230 0.464 16.20 24761 0.568 16.40 29375 0.674 16.60 34061 0.782 16.80 38812 0.891 17.00 43620 1.001 17.20 48481 1.113 17.40 53390 1.226 17.60 58344 1.339 17.80 63339 1.454 18.00 68373 1.570 18.20 73444 1.686 18.40 78549 1.803 18.60 83687 1.921 18.80 88856 2.040 19.00 94054 2.159 19.20 99281 2.279 19.40 104535 2.400 19.60 109815 2.521 19.80 115120 2.643 20.00 120449 2.765 Type. . . . Outlet Input Data Page 1.01 Name. . . . Pond #1 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 15.00 ft Increment = .20 ft Max. Elev.= 20.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall El, ft E2, ft Inlet Box RI ---> BA 18.000 20.000 Orifice-Circular SI ---> BA 15.000 20.000 Culvert-Circular BA ---> TW 14.000 20.000 TW SETUP, DS Channel S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:28 PM Date: 8/20/2007 Type. . . . Outlet Input Data Page 1.02 Name. . . . Pond #1 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = RI Structure Type = Inlet Box # of Openings = 1 Invert Elev. = 18.00 ft Orifice Area = 16.0000 sq.ft Orifice Coeff. _ .600 Weir Length - 16.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel - .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = SI Structure Type = Orifice-Circular # of Openings = 1 Invert Elev. = 15.00 ft Diameter = .1667 ft Orifice Coeff. _ .600 S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:28 PM Date: 8/20/2007 Type. . . . Outlet Input Data Page 1.03 Name. . . . Pond #1 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type = Culvert-Circular No. Barrels = 1 Barrel Diameter = 2.0000 ft Upstream Invert = 14.00 ft Dnstream Invert = 13.50 ft Horiz. Length = 44.00 ft Barrel Length = 44.00 ft Barrel Slope = .01136 ft/ft OUTLET CONTROL DATA. . . Mannings n = .0130 Ke = .5000 (forward entrance loss) Kb = .012411 (per ft of full flow) Kr = .5000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA. . . Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 Ti ratio (HW/D) = 1.154 T2 ratio (HW/D) = 1.301 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below Ti elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at Ti & T2. . . At Ti Elev = 16.31 ft ---> Flow = 15.55 cfs At T2 Elev = 16.60 ft ---> Flow = 17.77 cfs S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:28 PM Date: 8/20/2007 Type. . . . Outlet Input Data Page 1.04 Name. . . . Pond #1 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II r Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES. . . Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:28 PM Date: 8/20/2007 Type. . . . Composite Rating Curve Page 1.11 Name. . . . Pond #1 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes Converge Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures 15.00 .00 Free Outfall (no Q: RI,SI,BA) 15.20 .04 Free Outfall SI,BA (no Q: RI) 15.40 .06 Free Outfall SI,BA (no Q: RI) 15.60 .08 Free Outfall SI,BA (no Q: RI) 15.80 .09 Free Outfall SI,BA (no Q: RI) 16.00 .10 Free Outfall SI,BA (no Q: RI) 16.20 .11 Free Outfall SI,BA (no Q: RI) 16.40 .12 Free Outfall SI,BA (no Q: RI) 16.60 .13 Free Outfall SI,BA (no Q: RI) 16.80 .14 Free Outfall SI,BA (no Q: RI) 17.00 .15 Free Outfall SI,BA (no Q: RI) 17.20 .15 Free Outfall SI,BA (no Q: RI) 17.40 .16 Free Outfall SI,BA (no Q: RI) 17.60 .17 Free Outfall SI,BA (no Q: RI) 17.80 .17 Free Outfall SI,BA (no Q: RI) 18.00 .18 Free Outfall SI,BA (no Q: RI) 18.20 4.48 Free Outfall RI,SI,BA 18.40 12.30 Free Outfall RI,SI,BA 18.60 22.43 Free Outfall RI,SI,BA 18.80 29.34 Free Outfall RIBA (no Q: SI) 19.00 30.17 Free Outfall RI,BA (no Q: SI) 19.20 30.98 Free Outfall RI,BA (no Q: SI) 19.40 31.78 Free Outfall RI,BA (no Q: SI) 19.60 32.54 Free Outfall RI,BA (no Q: SI) 19.80 33.30 Free Outfall RI,BA (no Q: SI) 20.00 34.03 Free Outfall RI,BA (no Q: SI) S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:28 PM Date: 8/20/2007 SAN RIO-PHASE II WATER QUALITY VOLUME B.R.FINCH,PE WDL-07020 SWMF#1 9/20/2007 Determination of Water Quality Volume(WQv) WQv = (p)(R v)(A)/12 where, WQv=water quality volume(in acre-ft) Rv=0.05+0.009(I)where I is percent impervious cover A=area in acres P=rainfall(in inches) Input data: Total area,A= 4.56 acres Impervious area= 2.32 acres Percent impervious cover,I= 50.9 % Rainfall,P= 1.0 inches Calculated values: Rv= 0.51 WQv= 0.19 acre-ft = 8407 cf. Determination of WQ Volume Elevation Input data: ==>Stage-Storage Function(Above NWSE) Ks= 20230 b= 1.1085 Zo= 15 Calculated values: WQV Storage Depth = 0.45 ft WQV Elevation = 15.45 ft 1 OF 1 SAN RIO PHASE II Stormwater Management Facility#1 B.R.FINCH,PE WDL-07020 Below NWSE 8/20/2007 Stage-Storage Function-Below Normal Pool I Project Name: San Rio Phase II Designer: B.R.Finch,PE Job Number: WDL-07020 Date: 8/20/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 8.0 0.0 3962 9.0 1.0 5180 4571 4571 4571 1.06 10.0 2.0 6547 5864 5864 10435 1.94 11.0 3.0 8053 7300 7300 17735 2.85 12.0 4.0 9701 8877 8877 26612 3.82 13.0 5.0 11493 10597 10597 37209 4.88 14.0 6.0 15440 13467 13467 50675 6.10 15.0 7.0 19553 17497 17497 68172 7.57 Storage vs.Stage 80000 70000 • - 60000- y=4207.6x1•3756 1 50000- 0 R2=0.9941 w 40000- e a 30000- 20000- 10000- 0 I I I 0.0 2.0 4.0 6.0 8.0 Stage(feet) K5= 4207.6 b= 1.3756 1 OF 3 SAN RIO PHASE II Stormwater Management Facility#1 B.R.FINCH,PE WDL-07020 Forebay 8/20/2007 Stage-Storage Function-Forebay 1 (North) 1 Project Name: San Rio Phase II Designer: B.R.Finch,PE Job Number: WDL-07020 Date: 8/20/2007 Average Incremental Accumulated Estimated Contour . Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 8.0 0.0 349 9.0 1.0 675 512 512 512 1.05 10.0 2.0 1079 877 877 1389 1.91 11.0 3.0 1563 1321 1321 2710 2.85 12.0 4.0 2125 1844 1844 4554 3.89 13.0 5.0 2767 2446 2446 7000 5.04 14.0 6.0 4045 3406 3406 10406 6.38 Storage vs.Stage 12000 10000- 8000- y=469.55x1'8713 Rz=0.9947 a) 6000- E N 4000- 2000- 0 I I 1 I I I 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage(feet) Ks= 469.55 b= 1.6713 2 OF 3 SAN RIO PHASE If Stormwater Management Facility#1 B.R.FINCH,PE WDL-07020 Volume Check 9/20/2007 WATER OUALITY POND DESIGN ]X'• tIltFA:ct-444A, P. Impervious Area= 2.32 acres Drainage Area= 4.56 acres %Impervious= 51% Average Depth=(V/SA)at normal pool SA= 19553 feet V= 68172 Average Depth= 3.49 ft. From the NCDENR Stormwater BMP Manual,the required SA/DA ratio==> 3.0 3.49 3.5 Lower Boundary=> 50.0 5.60 5.00 Site%impervious=> 50.9 5.72 5.10 5.09 Upper Boundary=> 60.0 7.00 6.00 Area Required= 10140 sq.ft. Area Provided= 19553 sq.ft. OK 4 POli**** 4004 Per NCDENR"Stormwater Best Management Practices",the forebay volume should equal about 20%of the total basin volume. A. Water Quality Pond-Below Normal Pool Volume= 68172 ft3 B.Forebay Volume Volume= 10406 ft3 %Forebay= 15% 1 OF 1 SAN RIO PHASE II DRAWDOWN SIPHON DESIGN B.R. FINCH,P.E. WDL-07020 SWMF#1 9/20/2007 Inverted Siphon Design Sheet D siphon = 2 inches No. siphons = 1 Ks= 20230 b= 1.1085 Cd siphon = 0.60 Normal Pool Elevation = 15.00 feet Volume @ Normal Pool = 0 CF Siphon Invert= 15.00 feet WSEL Vol.Stored Siphon Flow Avg. Flow Incr.Vol. Incr.Time (feet) (cfl (cfs) ( ) (cf) (sec) 15.453 8407 0.064 15.413 7596 0.060 0.062 811 13084 15.374 6793 0.057 0.058 803 13752 15.334 5999 0.053 0.055 794 14558 15.294 5216 0.048 0.050 783 15560 15.255 4444 0.043 0.046 772 16854 15.215 3685 0.038 0.041 759 18625 15.176 2941 0.032 0.035 744 21276 15.136 2215 0.022 0.027 726 26768 15.096 1512 0.013 0.018 703 39348 15.057 841 0.006 0.010 671 69280 Drawdown Time= 2.88 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice= 0.185 feet Orifice composite loss coefficient= 0.600 X-Sectional area of 1 -2.0" inverted siphon= 0.022 ft2 Q= 0.0452 cfs Drawdown Time=Volume/Flowrate/86400(sec/day) Drawdown Time= 2.15 days (Conclusion : Use 1 -2" Diameter PVC Inverted Siphon to drawdown the accumulated volume from the 1.0 " storm runoff, with a required time of about 2.5 days. ABE VOLUME CALCULATORS, PYRAMIDLONG Page 1 of 1 CALCULATE VOLUME OF PYRAMID WITH INDIVIDUAL WIDTHS AND LENGTHS Enter all known values in the form below and press the "CALCULATE" button. A r WIDTH1(W1) LENGTH1(L1) WIDTH2 LENGTH2 HEIGHT VOLUME (W2) (L2) (h) 7.8 7.2 3.5 2.7 2 59.09812488554511 The answer that you can copy for other use 59.09812488554511 I CALCULATE RESET SELECT ANOTHER SHAPE Go to Unit Conversion Page http://www.abe.msstate.edu/—fto/tools/vo1/pyramidlong.html 9/20/2007 SAN RIO PHASE II SWMF#1 J. SPICER,EI WDL-07020 9/20/2007 Square Riser/Barrel Anti-Flotation Calculation Sheet Input Data=> Inside length of riser= 4.00 feet Inside width of riser= 4.00 feet Wall thickness of riser= 6.00 inches Base thickness of riser= 8.00 inches Base length of riser= 5.00 feet Base width of riser= 5.00 feet Inside height of Riser= 4.00 feet Concrete unit weight= 142.0 PCF Node: NC Products lists unit 1.14.of OD of barrel exiting manhole= 31.50 inches manhole concrete at 142 PCF. Size of drain pipe(if present)= 8.0 inches Size of siphon(if present)= 2.0 inches Trash Rack water displacement= 59.10 CF Concrete Present in Riser Structure— Total amount of concrete: Base of Riser= 16.667 CF Riser Walls= 36.000 CF Adjust for openings: Opening for barrel= 2.706 CF Opening for drain pipe and siphon= 0.185 CF Total Concrete present,adjusted for openings= 49.775 CF Weight of concrete present= 7068 lbs Amount of water displaced by Riser Structure=> Displacement by concrete= 49.775 CF Displacement by open air in riser= 64.000 CF Displacement by trash rack= 59.100 CF Total water displaced by riser/barrel structure= 172.875 CF Weight of water displaced= 10787 lbs Calculate amount of concrete to be added to ricer Safety factor to use= 1.25 (recommend 1.15 or higher) Must add= 6416 lbs concrete for buoyancy Concrete unit weight for use= 142 PCF(note above observation for NCP concrete) Buoyant weight of this concrete= 79.60 PCF Buoyant,with safety factor applied= 63.68 PCF Therefore,must add= 100.757 CF of concrete Standard based described above= 16.667 CF of concrete Therefore,base design must have= 117.423 CF of concrete SAN RIO PHASE II SWMF#1 J. SPICER,EI WDL-07020 9/20/2007 Calculate size of base for riser assembly— Length= 8.000 feet Width= 8.000 feet Thickness= 24.0 inches Concrete Present= 128.000 CF OK Check validity of base as designed Total Water Displaced= 284.209 CF Total Concrete Present= 161.109 CF Total Water Displaced= 17735 lbs Total Concrete Present= 22877 lbs Actual safety factor= 1.29 OK Results of design Base length= 8.00 feet Base width= 8.00 feet Base Thickness= 24.00 inches CY of concrete total in base= 4.74 CY Concrete unit weight in added base> 142 PCF SAN RIO—PHASE 2 J.ALDRIDGE,EI WDL-07020 8/21/2007 Velocity Dissipator— SWIM' #1 NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe,assuming the Manning's roughness number is constant over the entire length of the pipe. Flow Qio(cfs)= 1.00 Slope S (%)= 1.14 Pipe Diameter Do(in)=24 Manning's`n'=0.013 Flow Depth(ft)=0.28 Outlet Velocity(fps)=3.79 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe Diameter(ft)=2.00 Outlet Velocity(fps)=3.79 Apron Length(ft)=8.00 d50 Stone Thickness (inches) Class (inches) 3 A 9 6 B 22 13 B or l 22 23 2 27 Width=La+Do Width=8+2 Width(ft)= 10 Use NCDOT Class 'A' Rip Rap d50 =4" 8'L x 10'W x 9"Thick SAN RIO-PHASE 2 SWMF#1 B.R.FINCH,PE WDL-07020 8/21/2007 LEVEL SPREADER DESIGN CALCULATIONS Calculation of Level Spreader Length The purpose of the level spreader is to provide a non-erosive outlet by converting concentrated flow into sheet flow and release it uniformly over the vegetated filter strip. The level spreader length should be designed such that during the 25-year storm event, an non-erosive velocity(in this case, 5 feet per second maximum) is released from the level spreader into the vegetated filter strip. The required level spreader length can be computed using the weir equation: Level Spreader Length Calculation=_> 25-Year Storm Peak Flowrate, Q25= 2 cfs Weir Coefficient, Cw= 3.0 Design Flow Depth on Level Spreader, 2/3*H = 4 inches Corresponding Driving Head on Level Spreader, H = 6 inches Required Level Spreader Length= 2 feet Calculation of Level Spreader Exit Velocity As previously mentioned, the level spreader should be designed such that a non-erosive velocity is released from the level spreader into the vegetated filter strip. The velocity exiting the level spreader can be computed using the continuity equation, Q=VA: 25-Year Storm Peak Flowrate, Q25= 2 cfs Design Level Spreader Length = 10 feet Design Flow Depth on Level Spreader, 2/3*H = 4 inches Flow Area(Level Spreader L*2/3*H)= 3 square feet Computed Level Spreader Exit Velocity= 0.60 feet/second HMS * Summary of Results for Pond #1 Project : 2007-08-23 WDL-07020 Run Name : Post Ql Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 1-Year Execution Time : 24Aug07 1102 Control Specs : 1-min dT Computed Results Peak Inflow : 8.9004 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1305 Peak Outflow : 0.11049 (cfs) Date/Time of Peak Outflow : 02 Jan 01 0100 Total Inflow : 1.79 (in) Peak Storage : 0.57318(ac-ft) Total Outflow : 0.28 (in) Peak Elevation : 16.210(ft) HMS * Summary of Results for Pond #1 Project : 2007-08-23 WDL-07020 Run Name : Post - 010 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 10-Year Execution Time : 24Aug07 1103 Control Specs : 1-min dT Computed Results Peak Inflow : 22.901 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 0.30727 (cfs) Date/Time of Peak Outflow : 01 Jan 01 2329 Total Inflow : 4.69 (in) Peak Storage : 1.5734(ac-ft) Total Outflow : 0.54 (in) Peak Elevation : 18.006(ft) HMS * Summary of Results for Pond #1 Project : 2007-08-23 WDL-07020 Run Name : Post - Q25 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 25-Year Execution Time : 24Aug07 1217 Control Specs : 1-min dT Computed Results Peak Inflow : 37.960 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 2.1930 (cfs) Date/Time of Peak Outflow : 01 Jan 01 1409 Total Inflow : 6.45 (in) Peak Storage : 1.6243(ac-ft) Total Outflow : 2.29 (in) Peak Elevation : 18.094(ft) SWMF #2 - FINAL DESIGN SAN RIO-PHASES 1B&2A WDL-07020 r81TM MWATBRWAT RQUALITYPOND CONSTRUCTION ;* • / t NAM A oOEEEERK M E Rs amIR+ENML mom NIIL WEFT M IIIO ERr a 1 1 nar AMMO o�msNa _ROM NM 1 GENERAL NOES . CONSTRUCTION SEQUENCE i i 37 i \\ \ ••� f f ti ',• / 1 14 J -r I ... : . p :_ M MII�EOM A/�L RR WEN 1E EOM ONAMOENT/ET TIEDR�L �R� .A OO RI MMI11011 M MIN OF MIDI .OMR I I I \ K. r . N7fA1sE,AMI'ML �T I ' 1 eb i 2. 1�p1 MOW OPAL 1c.Np/TAM OIOIIWIOR PIMA N. I 4 1 ! .f / 3 J "I A(� R fr:OF �R�pppp�L� O Ile FM ETAM6es OMELETS M4 s MPLL.AC mew Ile MOWN OOMIIR p�'M.IMRIIW®>�6M! I e' ! iM • SOOT M M M1TIOIOI 11101170 R01 M IM MIM1 OWL.E_IEOM= ONNN.MMLTfE COWMEN MIL. EL RPM%.she Me swam �� 1 I / / ! /f I f �� MN 1s1Is1 R 1I MIRMCOR`S OFat OdQM0.MEM M OEM IM ISO.TE MML / .` / / i I \ `� r ISCON NNW&MNl-T�e 1 COIOMk Ist Mt MEM !� ! / !� r if 1 a M 00EOOR NWL NIR'm-M vim=MMl FOR M PEIINEa'r ms mMCM MSN A-MC / �/ ! � / NRMVN3>imifRL MSOE MtIII11IF NO 716>Vslsi M AIN 7MK YFM E PLNIIED.ON M \ ✓ \/� J/ r .a'�F'• / 0 IERAIos _/- W-4M MDOD DIN seVNllMf ML AWN. a CLEM MR NM AM EMI M MIS Oi'1M NOR M/DM COMEORIL ML7�MO '\ fI. OINII M NOL0.IIII41 M ■Ostp�y POIe Y7T E HIED As A TIER MO E NOT E RSOM MAN M 01N F00FRIT ARAAIe LAOOSIID ✓✓ �7�. "� ///1 F ,r ` 1 .SE N1lt MN FOR EMOM FED M-MISMCIOM OWL FORE M IDS lir 1R sY7M co maMEM per,E O01/EI'®, A 7NE s1E \V`` //JIOL'�MAl�lE R11F seYN1OR.M.IEISRs10 Ne110F.lls'seYRmF eWL E ✓ A // %%° r� ,'_ r .\ ., 1 \\ , wmEML O NIMM 1Nt ismOas1ssR A A.7e ITR NEE M E M pki •REVERT I I.OMR= Mr �' Y r t• RNDRRooF R4;No.�IsoBarm .lwaR 1°d�eIALMfaRFoEF°r¢+17e ' / �-\� �r./�f, � ► '~ -, \ 1 d - C' l p w TIR DINAR R1IR aIAIL aRRENIcr M Em1E.AIOEIM MLR I1sIDIROO. / '� r/. / n r>r '_._ `c. �\ \ ✓ ti TIeIN uNNL M Mg-WO RRIOMnr ,KEEN/N wNI®ilMll>�IN-ORR / ,, •, .�`� - 1- • Y NI R1 NiiE R OI aioi'.lA.'E' 'COIs1 rR®.OIICE 11 OOlOM AI FEW OEIW►g0. -- _. / � i!`,� . \ .} u,! . `'�is. >>t' ---`.* \ \\ if. ` • - 1. MEM FOR liEREImf TIMM AWNS MC OMER=OF M MOOED RR1 - / -� a i'�•. \� i i ' • ✓ �.. -1' i. \ bL. X` . OSVElMf. OWL motto IeMRF M 6.F[saw mop mot MO MILL ' 7 l rW. i3 a M mammy OMeOEN NM NIL E OONINFD 70 M MONIER SO.or ROAN MEMO( p - ; • • - "I ;�,"+_o MOM YOMMIOQf,NENN ' GGf"Ri r...) PM .• I . P!t ME A EDnoN M 6 fC{ltnPED IlOYIL E A MEM �' �� l r�_' M1_ _ . t•.-. \ \ .�. t M 11F SPeOIO RAIN RFem am.C Moos OONEsm DEM M ✓' �= C. ME M I�/IIFAy MC E MIL=Ms M MENIAL NEISR MINER EiR Mt M COMM M'IFRMfs OF MR �''.. / k ' ./ _ " "" " - - - \ \ k ` I AAMIINER 7 in1aMLM t MOEtRE sumo wad DE COMML701t OWL MEW M 1�e0.M aMIE OgOIMI NOL OMR OWL REIM OF Mff ji'f- - ,. • .^* ii s i1G �/ 1 ti. ��- i o 1R o: MIR PMOIR M aRMN-Out cGiL AIL Gs mw TiWic sic.. tllsM12F ire MIRE AM-East s�'9aNs �O ,� -� _;`)* !/ -` i d,- L.( IT r •- } \ t `. i a v MF NN IIIIME MEWE ER O1WDY C ` AN EMO MQ SW RONOOSI.N M, RMI mows OF'Mgpµ tf111E M IM-7RNNL.TIE E71>BN1F RIM E COMMIE � r`; !, :P .: j \, a� iA m 711E SMEOMMI WM R EM 3 OF M:N:CON 11111D NEII IM Me ONEMOIEN •' V"` \ L owe M sMl��1I OLOED Me ML macs maim prom OIIE0.M esN1OINNa,M EM Mow OWL E 7OI wmans NJEO RDOes max M mu .. .t41 \ - " r,,..• . -\ 7 {. /ONINMSNII NWL oasNNcr°i�fE Nlawe'eMIID SEWN al llis.ar� _ , - ...... 4.r I \ �'�' + �. �. R,I � 1 A S - �',- �. ! ONM M ORIOON S 041ltRF6 M CORIIICIOR IIIAY.R101lM AN RFeR.OlFL7OM 4 PNOII A .SMEAR MIO011N AtONS M.O1R1Wf RED OOOD E MIMED ti g` f r \ �a / `I. f •'••••4 f s NO MN MFO61 WI&MON m NIEESN OF M MEW MEM POe F II ME 01-011E. -RIMER RARM IMRE �\+ „. '� \' �.. � r •• `1 7E ONIIMCOE PINED(M PIERER IM90MIMIKII m AN M►sLi MEAT WO COIF WIE Okt cm aF' 4 ✓ -� 1 7 [ ,� ( SE41.. _ SMEOIOF MIT M ie Ns cIMMIM m.M SWAIN/IMA IAENE M PUNTS ML E COOIMEm Amides neam 1ps� Mize e1Nn S MEMO \� 1 / 7 �'�� 1� _ • -7 / - \ .1 - f 'Lt. _ #MOONRSAOIOeI Egor6 WINE FNWEIL! le - NYOSNOs RILL St IMAM MN ti4 1 �{ r .. e _ € t7s» _€ _ THE eDiDRMIMIRMIVL X .UM COMMIE CM FEMME Ell A MIMED M °+w\}. - t r. 7 / ® / R ONE M MOM IRS AMMO"M MOM MON&M 6OMNCTOR NITS MAW �j ✓ 1R!_10POIFS iY0C1 OMIT PM EMS mom was lA1SO0APE MN FOE DR '� '" 1 `� ( !' '^+-w ../ tI( � R.�ra' RELIT. 7. IN.'S/OE m RRF MINRST M NNL esgRNR PEON OOMIOEpOII`ME A EoaNR16 i/ l• • O. WM OOROCI M M M tANOIRFE COIIMOIO!OIIL ROYOE.A.tE11E1 MD N7R1 AO!'R r�M7L.00NNRIERe WV Olt OM 11!M�esiME IMPEDE COME 01$SE MARL IT IS MOMf / / riffe � .. 16 slie,is f "fig/��r/�TO TIE DINNERIR OC Fpe MU N MIMIR WI[eal ODDYIO Fst M MMNIYs) NCE If OrrHE 7C YsN IIMe'M .. 1J�IIOM //° / ' �. /ReVLID. MOp II '� / �; .OSIRLCAN_I‘ MYEOOD OF QIOR WR.M MFE PRRM �. NQT s- �� ) •• • • L F HIE MA e'. TNS OM N/1I�,N W M 7D HEIR'WIRE A OOIIINEW OVUM E OEDERED TOM JOIN L I1rMAl,COEMNM FOR NIMO`. VS-"IC ( r .,Fe OONe Wm'RIFE AIN1ANOS_1. / ,, 1 ✓ OI YOI RI 7O�LIER A ANNYI SF 1-100M.RIOT M ISIMT ewe OF'1-FOOT REM �� 0. WM 071RINA'ION M iK Mil.OSYgOO M MEWLS Mil.E.F7A®.N MUM ��- N,,,,\.,, 1 ,�� r �� I - r 7 MOONA Mn _I MARTS►.0 sm IBIMI Q FLL F / 4 tM SOIRIITLLIMIM M M E00[TMIL NOR M MROFOIED MNAMIOR 00MOSIM■ pO11N , /' r //� 1.�:13M RA OCSIMRERO`IIM/a Y'Dell11E ISMmis eWL E NfN101IF CL N MODS e 1 �•'E SE MEOW N.110MENML IPA.NO .� ®t 1rrr✓ \/ INOWOM OR NMMIM7MNIIED MEWDF M WWA N OMER m MORN OOIMSIML. a a. MI FOOL, r ri\.0. M M EM MIMI ON DISPpM�M(F WO IIMMO OM,/ .F M NSER M.IMIRO�MM 0. /�.eIN�IS��INN01 E M9eVRm[IIOYD Iq��RML E 1@07MY m MMLM Ir ''q 10�� 1AI000SE.MOIROMEO momL FORTS MIME •M Yy0 iRMl11 AIM IFMOOOR OOIAIMOM COFMW[TRINE 71NI WF E fOE1NIOlA�MIO 0E OF M FOIOSIN D'11100e i�� • ` r . OWL WSMOMMEM MEMOS 1MMO OM TENOR AMl11M POND I DE III WL A F M TOWARD IMICI it iLL is IRIROD. M -FORM S.\\.\\� i i 1 �j1MOp1.IWF/CE sDMgEN.1s M'IMMMFIO If I-PEM OIE M OOOR OREILL DIEM MO O011REL 1of M'. p�OppHI�I:R1s1I0 s MMIM. I! }`i�j\�, , *' ^�OF•EL M011a dgM0 .lak R1.-MIOM NCR 6NIl MIAfAIlOMO01 I lama STOOPLEI AeAfM-OOIIOIIFMIYatataR1WOEL�Ms.' IfJ� 7d - ; �` ♦ I . Cp1ppE pp��� pppO \ . . FNE //MOMOM MM OIWRIIf PNO IfANR MarM'�'OOMEI[OR1slE AE�11LPFE MINOR OO RIM , � !rt. 1 0QM' O `JJ /' N7. ANT RNO_MOI 1RMIOl NW►:E 01,1_ IM ION IR.p MNEIs OI 1E OIW DIRE OmM.III _ i• A \ 11 ,1 ,,r,.. ., .00,� - :II ,.REM CONML A FEE PIM A EIMMOMIT 1011001. EEkN1OE CC14M 1 � OOIRO AD MWNOIOOO FORM CM Mil. ~ \\Ol SCAM MM L FIE.F.IMN EEIORIIALILL s'10!RR'-1'M M IEII MARL-701ROIIOR WIOp a M 1 RIN'TE mWMf.7M OApEF OIIINR lIM1 F7N1R A OpOICUN M ON16111Nn FIL pM1IY01T M 1111 •�1 ' , �s� '_� v4riie ,Rh M 7MOM SEMI OWL MITE MNMr-r ON MEM DISIMM R NORM*FORM ORAEL MOM E NEMO ORO TN OSTIOW MO/ V OM IRO • _ �+ .OR IIIIDIIi6 IE OSR[OWL E 6ONMOIm MIR M FIOYOM \. ! , '. M r L �M001 OM LOYAL MUOS14�O!Ml NR LOWON M1f Puma EFfma II.OCM 1E1 IAOEOF M RMO .. OMR FOR EL e s NN'KNEED ME FISMF0.11.E IiOrMM N M CpRL0IO1 NM'QL [M 10.NE ML.IOM/&MEL 111847Ta�.A LIN Mk=DEI =OMIT RAIL M.OMN OIIl:R. OF'NIL- M ME EMOi ORE .M t M LOOM I DI N.M I®I SOS OWL ES ISM OM lee&MI MEM SAO*. I�y1 1MMJOE RIN.MI DE MR EL M M 711E MINIM Ili MI�LOO LEND WOO OMER MO MI AMOR TO MOOD NM IIIII ICED In � .1 ; � ►issIWOR eOlO1MNIMNI MOM LL E MOI MEI M COMMON-N171O.NO ML MMOAOi NSws wM ''', p. ', I� .��� ° iORROA.�gMINE�OAOyN1 E � IL NEM MUIR WM FEN MOIW!MOM ON MEET 1¢ILL BERM � ✓ / �• CATM! 1s 00INTI OF MION EA lOI NEW MOOD 7NEM MEM MIR WM MO RE.. 1 , / . ifo L ML MLL MAMMIES.A!�1�EDy1.loft DYl p�pp RYE.E.1NM1. MROO NNNOEOON R1'MITSSIF DE 0 .OQ MAOM M 8• L, ..' f 1 0 N-\\ �-.., • r WEDS WORM M M OE-OIE Op1EA. MIN FJtlw. .1K, Q FROISA�pMINLIERINIM SaoIMmED6 M ILL MERL OWL REIMF NEM I6AMA Oesedmo'Ne nommer:NOEOs.MMIMeOE Me EA_IRO # 1 /IIIOHINR 1!E I iO lOL7RIl0 OFOOMED.11N1r Ns-IRO®(OR OIMFI ICMF I MIL MIN MEWIERIMED 70 SEOEORfEAlOMItleN1R F N®EIIIM m AOSYE ISOMFII CO1maip.1ONyCRiO6 M ONNIlOPER MIL OMMpR�RIIL 1NlsMLkINC . f_ -I• \� �� //10(ylidi."- ,/ ! " `.. W +- eR Ile:.SF4R0IEM.OISEOIer MM00OIONMINI OWLL MOIL WR1F MO.MOML�NAMINSPNAMONLNK M'IONMMIONDMe IMINp IRE s M RIOINs .77 UMW@ ';' .. ,.•' 1 / „/�iraw • / FIRMMEOW I+TNT OIENYIL FIMLen ALL OO O Ill!MN. A.M,CIO RWL E OWNED OS MISO EEa= 2. WL RGrelelr lIWI.NOf eICNe A EMNES r OR�V I IfI NfL E MOM no N TEED N.'MMF A10 NIL eaITCDIN- N ! ., , - 1 f // -�1Np��R PIR.M.MOIELosM asOSIWOERMFLLM1M _ISY OMCLAIL OWEYrIsOsel.NWL.E IOOIED ND M NNI kini 1 1L-IFO#COMM=M W M EIM000MIL MNIFLI MOM MO S®SN EMIMEN/PER - ' • 11 ✓J� ,7 ��1)001r• '' A��• \ , i.cS; PRMI�ma ALL MAOFEIIL a PAL AL OOZE OW/N M OIMIMENT/RV TI MI OWL COMM 14 SORER F MLA: AR-ONJ WNEION NO AM-O�II�AHEM I M.M WORM OM \`.• • / I �3 i, , .� � .��'�� 7 f \ ,� .1 �1 : W W MOE NW IF M MEM MESA!MOM Off MINTY M ILL SOLE NNEINN MO E IOMOED A IMEN O'M MS MOO&Mai.m . J / 1 ." .� r ♦ `y L MAL E COMITIED NI A 11IN W&OMEN/71111IN-1 m i3 - Cr OFIRM OFORO a RONIMJ Nil EMOTES OR M�1O I/M CIF OO ERININN Mir E. HOMES COMM-M WRSMEMIR OWL E MMOOIM M 1_E ON••S1E MAMOIOL OOMOC®1O M-MEM=OF M E MEED MO'OOM.IE OIE OE ORMON OMl1 IN N. I p�1 I �'�'. ' f ' \ p OINII OOMs01ACN7S MOe7T 11A1'R1Ie b11RMO1O11-Mil WO®1 NMiOFiI.Ei17M-MIIW-M1�R1iOL!ON M TOM OF NMLIOSE NW OtlEfN T • I/ Mom \ 1 •- M FIL MOULDSETEMACIED A'NEMOOOI THE OOFMMR.N OIMR m EN0M.ORM MR ODE I OIN ON MIR M EL E ! • ! ,'--,-� APPV 1 _ 1 1. \ r - MOM MMINT IE M FIDE“ �Me1MO OWL CODE MN 1!E INK YWROM'00011[NI~Ss A YORE s NEED M 70e1 Cr OWIORO: y 'A, r� - '1 P� Y�V \ _ - `f i`7 _ \ _� a//_ . r • V ppERNR�N,, •�MENp1�y��M FI�@�MAIN REPORTS m WIET 1NQM WM ✓ • t a sM�11EO0iNT`IM11m'3 111E Ste:OOIFAC IBOREOIfL OOlMCIIOI MOM Et E OUTLET STRUCTURE RD11 clef. 1 ' ( \ 1. ., \ O Q ' V. 1 3 \.I7 Ne.OED-COMM MMMRlCAFIOIOIIpON PROCESS FOR MO.NN1egER MMDt. .. .. - N. - 1 \ /\ \ \ \ . , , ., , TIMER&-IT OPAL EM CO ILIC ORS R/ONMRY m•OOO MOTE OO/MOION ammo 1. M MO M!WILT SINE,NWL E MR R Eft tOOIlD IIL.MOSPI00►N EMO M • - r\ - \ . . g Ms mTNMOE Oo1I16TNN EITEE MNPOLt7 FOI OMM NONE OOMMOIOL IOEBORR.M Mm OlE-IMML M PEE CALL'YE MEM 0-MI0 ream DID \ h \ / \ •t C 1 1• A'' iMRS ISOM ARM 0-M{�WMI. M PIE ROM OWL E 7CE R-A I I' [�rt�tL TAMS WM NM ELL IMOIMS NILE PNMOOO A 1Mt 11YRM moomme D OWNS COMIRUCROIL 1111MOIR car wart mar MR _ ERNNnRML 7E --i• i\ l 1 �,e//11r / \1 \ J{ / iti..r: r{ OOM7M ry.001 7CN a CIOO®1. M M pM�l.ISM 11WINO FMOR 6 eMM ET E!I DMO K FOR M • •.. l /. /�,� 1( 1 s1� . I ®#� - '-1 �\ \ r 11rr../.a. E FORMiD.FOR:L1�TTf FR OF/MA FOR WOE LOT 1 W, 1 0. ICIER TILL E RASED mall M MN O-IWO.OIItq RARNL AT A NEg11DI.Y M OW `` • Mg PM M WM RR MOM FOE.OF ALL OR MOOM=W M O1-SINE a MCIMR ILMOREr OWL E MIs1M ION WES 1r ON Cs11OL f.: I •O NTICE 0_L MOLL E FEAT.OR 1E MM MIL M TEARER KN.Nei... E IN MO _/ � / f 1 N ` I * ' NM moor Ilk MOM ROM IMIL TO MEE PO-SE FOR M M MILE Oe6 `� ..E.. I t M I1+l1bM.111G1 AIL-AIOIOOR ROOK.OWL OE PROM M M COOCED. --- • L I - I V-4 ML 111hI-NMr MOIL.NDEEIs M 711E N WT MILE HIE IMISIMM M M Olt;M M IeN.gI OIROII_FALWI IM 111E PROM ME SINK E NARKED AS IMF / _ ` . 481 MpRNppEpIpp��ME S A®OLLEEN,PM 711E EM=MEOW MO WMSWIN'L AOROEDR MOIM M MIFF NINETIES 71A,T,NIL E OIIR/IIED A 11e EIRRiEee FOR.NIIM'IM[1Te14 / - ! . !/ 1 1- \ _ \ - .71RWMIAY. M,IEIL OFA M'COIWAL70R IM NTm de FMMl M. _ -.F -.-I-` l I ,( \ �- •' tM11IM INt O WN PI TIE M�OIM De MOM m rem MRNMq N. •✓q !! / / �-- if\ R. 1_M COMMON WORM/A MN M MIN_-MOMIOI MOW OM M MEN MEM ` !le �` . < - . - / ` 77 - r L M NM.RO(MR OPOgI MIL OOISOIOL TO ASIN 0-f7t.M ROM OWL E WALED I - - 1 \ , ' \ !! _/ /- / _ r _ _ dIotN11E ARP! NaNmSISFITM OORMOOR OWL MOW EMS 3 1 ( ` J ! ' �� // !! t, i / /� I \ // 11 . [... 0. F M ANTI-MCDO101110 M 1 MOM M W R M M ILLM ME MEOW NNE. PIASFI MIIM.ONICRIE�Fgt1�WM A ORPIA E1OR OF MiNO ISn M1Ey y�T OMO DIE IMMIE01 M USIRIS1Ep1 M.Op MO OWL ONORM DIM TaEOMON OWL E 1 .A' aroista O 70 M ANEHIDI IN WM MlOONIMOOR sM MR MERL L.MBMW DE SEIM Wile IMMENSE!IpOI.=s MML 70 M ENEW MID MAE 1 IFI�IE KVRRIMNRI M OdN OM NIA MIL MEM TRAM PMlS ISDI U.1_OYMOP DIVINIMS�MININI M TWIN_MMX_.-t OCIL MR MS ML MRE NOR FMIRe NWENNE :01.-: AMOMMI jar OWL MN'IMYs[ oval NO ISOC MI"NfNIIIM ECM �M 0. AIL.MOtIM OOCEI elgl E INYN]000 M(9e DC}IIlOO OOe1ML NORM �o �a JAA 0. AMIGOS Nam NOR 111E MO OUDLT MOREL MMI NMLL E MR 101E O1 omen APPOAII®FOIL OON•iOIOI MOW GRAPHIC SCALE '01� 1 watt 16-RIII/IVRil1 TOM 01YRDT MONO sMIMIF O1N�lSyEOOs1 a MA AN IY MRRS VYIOE M P ? I' • t M"'�" i+ riallUESAIUM M EE�1 �S6 NWLNIS PIM7 OIIILR" I -'�PD-2A IFIOOIIIE WI A MOONS WEE W716 Mat I10-90.M CONMILOR IIWL PROM A. I».m>t NISMSZ WOE AMMO Mil A�.OI MP MR OFNMIM M TIC O7 MRs ML C A WWI Ns 1MM MU.Mao E PMEED PM BRMO-M SWIM m M 711W1 MIL ;;MeADAMS PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STOR.MWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopies for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION(please complete the following information): Project Name: San Rio -Phase 2A Contact Person: Brandon R. Finch Phone Number (919) 361-5000 For projects with multiple basins, specify which basin this worksheet applies to: Pond#2 elevations Basin Bottom Elevation 9.0 ft. (floor of the basin) rmanent Pool Elevation 15.0 ft. (elevation of the orifice) Temporary Pool Elevation 18.2 ft. (elevation of the discharge structure overflow) i lSE%.- 16.40 Pr (wow QuAUTy VoLuNre_Gt G vaT,crl, areas Permanent Pool Surface Area 19,560 sq. ft. (water surface area at the orifice elevation) Drainage Area 3.45 ac. (on-site and off-site drainage to the basin) Impervious Area 2.08 ac. (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 58,579 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 122,675 cu. ft. (volume detained above the permanent pool) Forebay Volume 14,638 cu. ft. (approximately 20%of total volume) (" tµ sIoWME ` ;422. CIA.Fr: ( MU— QUALM/ VOL-ilKE) other parameters SA/DA1 7.03 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 1.5 in. (2 to 5 day temporary pool draw-down required) Design Rainfall 1.0 in. Design TSS Removal2 90 % (minimum 85%required)) FORM SWU-102 Rev 3.99 PAGE 1 OF 4 Footnotes: 1. When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious%and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2. In the 20 coastal counties,the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal THE NCDENR BMP manual provides design tables flat-both 85%TSS removal and 90%TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February, 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form,the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials BRF a. The permanent pool depth is between 3 and 6 feet(required minimum of 3 feet). BRF b. The forebay volume is approximately equal to 20% of the basin volume. BRF c. The temporary pool controls runoff from the design storm event. BRF d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet(include non-erosive flow N/A calculations). BRF f. The basin length to width ratio is greater than 3:1. BRF g. The basin side slopes above the permanent pool are no steeper than 3:1. BRF h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). BRF i. Vegetative cover above the permanent pool elevation is specified. BRF j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest BRF right-of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the BRF basin is specified prior to use as a wet detention basin. BRF m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) n does ® does not incorporate a vegetated filter at the outlet. This system (check one) ❑ does ® does not incorporate pretreatment other than a forebay. FORM SWU-102 Rev 3.99 PAGE 2 OF 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately,re-seed as necessary to maintain good vegetative cover,mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth(see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.50 feet in the main pond,the sediment shall be removed. When the permanent pool depth reads 4.50 feet in the forebay,the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation 15.0 A A Sediment emoval El. 10.5 75% ♦ Sediment Removal Elevation 10.5 75% 1 Bottom evation 9.0 25V ♦ Bottom Elevation 9.0 25% ♦ FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. FORM SWU-102 Rev 3.99 PAGE 3 OF 4 7. All components of the wet detention basin system shall be maintained in good working order. ' acknowledge and agree by my signature below that I am responsible for the performance of the seven .iaintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Nathan D.Benson Title: Manager-Sandler at Shallotte,LLC Address: 448 Viking Drive-Suite 220 Virginia Beach,VA 23452 Phone: (757)463-5000 Signature ---z.--- Date: v 0 v A \ 0 0- �) Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, `,`, O r` ,,e, a Notary Public for the State of 1 roll ia. Cty-o {�. .. i>c G� b . vYrgini�t ,do hereby certify that �;e1 -�,�� r�.�,c:� - personally-appea before me this \5-0,, day of vo s. s - ,200 7 and acknowledge the due 'xeoution of the forgoing wet detention basin maintenance requir ments. Witness my hand and official seal, /1 i l 11ds a.. . ,\1rt s .:-: . Linda J.Todd Commonwealth of Virginia Notary Public :,:'.,, Commission No.2f055d ' ., __ . My Commission Expires 0713'12010 SEAL My commission expires: Q i- t-(0 Y FORM SW U-I 02 Rev 3.99 PAGE 4 OF 4 SAN RIO PHASE II SWMF#2 B.R.FINCH,PE WDL-07020 8/20/2007 Stage-Storage Function Project Name: San Rio Phase II Designer: B.R.Finch,PE Job Number: WDL-07020 Date: 8/20/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Volume Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (CF) 15.0 0.0 19,560 16.0 1.0 21,482 20521 20521 20521 1.01 17.0 2.0 23,461 22472 22472 42993 1.97 18.0 3.0 25,496 24479 24479 67471 2.96 19.0 4.0 27,588 26542 26542 94013 4.00 20.0 5.0 29,736 28662 28662 122675 5.08 Storage vs.Stage 140000 120000— 100000— y=20247x1'1085 Rz=0.9995 Si 80000— 60000— • 40000— 20000— 0 I I I I I 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage(feet) Ks= 20247 b= 1.1085 SAN RIO PHASE II SWMF#2 B.R.FINCH,PE WDL-07020 8/20/2007 =>Stage-Storage Function Ks= 20247 b= 1.1085 Zo= 15.00 Elevation Storage [feet] [cf] [acre-feet] 15.00 0 0.000 15.20 3401 0.078 15.40 7332 0.168 15.60 11493 0.264 15.80 15810 0.363 16.00 20247 0.465 16.20 24782 0.569 16.40 29400 0.675 16.60 34090 0.783 16.80 38845 0.892 17.00 43657 1.002 17.20 48522 1.114 17.40 53435 1.227 17.60 58393 1.341 17.80 63392 1.455 18.00 68430 1.571 18.20 73505 1.687 18.40 78615 1.805 18.60 83757 1.923 18.80 88931 2.042 19.00 94133 2.161 19.20 99365 2.281 19.40 104623 2.402 19.60 109908 2.523 19.80 115217 2.645 20.00 120550 2.767 Type. . . . Outlet Input Data Page 1.01 Name. . . . Pond #2 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 15.00 ft Increment = .20 ft Max. Elev.= 20.00 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall El, ft E2, ft Inlet Box RI ---> BA 18.200 20.000 Orifice-Circular SI ---> BA 15.000 20.000 Culvert-Circular BA ---> TW 10.500 20.000 TW SETUP, DS Channel S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 4:29 PM Date: 8/20/2007 Type. . . . Outlet Input Data Page 1.02 Name. . . . Pond #2 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = RI Structure Type = Inlet Box # of Openings = 1 Invert Elev. = 18.20 ft Orifice Area = 16.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 16.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = SI Structure Type = Orifice-Circular # of Openings = 1 Invert Elev. = 15.00 ft Diameter = .1250 ft Orifice Coeff. _ .600 S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 4:29 PM Date: 8/20/2007 Type. . . . Outlet Input Data Page 1.03 Name. . . . Pond #2 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type = Culvert-Circular No. Barrels = 1 Barrel Diameter = 2.0000 ft Upstream Invert = 10.50 ft Dnstream Invert = 10.00 ft Horiz. Length = 77.00 ft Barrel Length = 77.00 ft Barrel Slope - .00649 ft/ft OUTLET CONTROL DATA. . . Mannings n = .0130 Ke = .5000 (forward entrance loss) Kb = .012411 (per ft of full flow) Kr = .5000 (reverse entrance loss) HW Convergence - .001 +/- ft INLET CONTROL DATA. . . Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 Ti ratio (HW/D) = 1.157 T2 ratio (HW/D) = 1.304 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at Ti & T2. . . At Ti Elev = 12.81 ft ---> Flow = 15.55 cfs At T2 Elev = 13.11 ft ---> Flow = 17.77 cfs S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 4:29 PM Date: 8/20/2007 Type. . . . Outlet Input Data Page 1.04 Name. . . . Pond #2 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES. . , Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 4:29 PM Date: 8/20/2007 Type. . . . Composite Rating Curve Page 1.11 Name. . . . Pond #2 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes Converge Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures 15.00 .00 Free Outfall (no Q: RI,SI,BA) 15.20 .02 Free Outfall SI,BA (no Q: RI) 15.40 .03 Free Outfall SI,BA (no Q: RI) 15.60 .04 Free Outfall SI,BA (no Q: RI) 15.80 .05 Free Outfall SI,BA (no Q: RI) 16.00 .06 Free Outfall SI,BA (no Q: RI) 16.20 .06 Free Outfall SI,BA (no Q: RI) 16.40 .07 Free Outfall SI,BA (no Q: RI) 16.60 .07 Free Outfall SI,BA (no Q: RI) 16.80 .08 Free Outfall SI,BA (no Q: RI) 17.00 .08 Free Outfall SI,BA (no Q: RI) 17.20 .09 Free Outfall SI,BA (no Q• RI) 17.40 .09 Free Outfall SI,BA (no Q: RI) 17.60 .09 Free Outfall SI,BA (no Q: RI) 17.80 .10 Free Outfall SI,BA (no Q: RI) 18.00 .10 Free Outfall SI,BA (no Q: RI) 18.20 .10 Free Outfall SI,BA (no Q: RI) 18.40 4.40 Free Outfall RI,SI,BA 18.60 12.25 Free Outfall RI,SI,BA 18.80 22.42 Free Outfall RI,SI,BA 19.00 34.44 Free Outfall RI,SI,BA 19.20 42.74 Free Outfall RI,BA (no Q: SI) 19.40 43.31 Free Outfall RI,BA (no Q: SI) 19.60 43.89 Free Outfall RI,BA (no Q: SI) 19.80 44.45 Free Outfall RI,BA (no Q: SI) 20.00 45.00 Free Outfall RI,BA (no Q: SI) S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 4:29 PM Date: 8/20/2007 SAN RIO-PHASE 1 WATER QUALITY VOLUME B.R.FINCH,PE WDL-07010 SWMF#1 9/20/2007 Determination of Water Quality Volume{WQ>v) WQ v =(P)(R v)(A)/12 where, WQv=water quality volume(in acre-ft) Rv=0.05+0.009(I)where I is percent impervious cover A=area in acres P=rainfall(in inches) Input data: Total area,A= 3.45 acres Impervious area= 2.08 acres Percent impervious cover,I 60.3 % Rainfall,P 1.0 inches Calculated values: Rv= 0.59 WQv= 0.17 acre-ft = 7422 cf. Determination of WQ Volume Elevation Input data: ==>Stage-Storage Function(Above NWSE) Ks= 20247 b= 1.1085 Zo= 15 Calculated values: WQV Storage Depth = 0.40 ft WQV Elevation = 15.40 ft 1 OF 1 SAN RIO PHASE II Stormwater Management Facility#2 B.R.FINCH,PE WDL-07020 Below NWSE 8/20/2007 Stage-Storage Function-Below Normal Pool Project Name: San Rio Phase II Designer: B.R.Finch,PE Job Number: WDL-07020 Date: 8/20/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 9.0 0.0 3316 10.0 1.0 4949 4133 4133 4133 1.05 11.0 2.0 6959 5954 5954 10087 1.93 12.0 3.0 8963 7961 7961 18048 2.86 13.0 4.0 11133 10048 10048 28096 3.87 14.0 5.0 15137 13135 13135 41231 5.03 15.0 6.0 19560 17349 17349 58579 6.39 Storage vs.Stage 70000 60000- 50000- 14874 C y=3853.5x 40000- Rz=0.9951 I 20000- 10000- 0 ---- -- I I I t I - 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage(feet) 1Cs= 3853.5 b= 1.4674 1 OF 1 SAN RIO PHASE II Stormwater Management Facility#2 B.R.FINCH,PE WDL-07020 Forebay 8/20/2007 Stage-Storage Function-Forebay i Project Name: San Rio Phase II Designer: B.R.Finch,PE Job Number: WDL-07020 Date: 8/20/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 9.0 0.0 467 10.0 1.0 1221 844 844 844 1.03 11.0 2.0 2281 1751 1751 2595 1.94 12.0 3.0 3306 2794 2794 5389 2.93 13.0 4.0 4393 3850 3850 9238 3.98 14.0 5.0 6406 5400 5400 14638 5.17 Storage vs.Stage 16000 14000- 12000 — y=806.8x1164' R2=0.998 V 10000 co 8000 E N 6000 4000 2000 0 I 1 1 1 1 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage(feet) %s= 806.8 b= 1.7647 • 1 OF 1 SAN RIO PHASE II Stormwater Management Facility#2 J.C.SPICER,El WDL-07020 Volume Check 9/20/2007 WATER QUALITY POND DESIGN !aril AREA CHECK Impervious Area= 2.08 acres Drainage Area= 3.45 acres %Impervious= 60% Average Depth=(V/SA)at normal pool SA= 19560 feet V= 58579 Average Depth= 3.0 ft. From the NCDENR Stormwater BMP Manual,the required SA/DA ratio==> 3.0 3.0 3.5 Lower Boundary=> 60.0 7.00 6.00 Site%impervious-_ 60.3 7.03 7.03 6.03 Upper Boundary=> 70.0 8.10 7.00 Area Required= 10568 sq.ft. Area Provided= 19560 sq.ft. OK Per NCDENR"Stormwater Best Management Practices",the forebay volume should equal about 20%of the total basin volume. A. Water Quality Pond-Below Normal Pool Volume 58579 ft3 B.Forebay Volume Volumc= 14638 ft3 %Forebay= 25% 1 OF 1 SAN RIO PHASE II DRAWDOWN SIPHON DESIGN B.R. FINCH, P.E. WDL-07020 SWMF#2 9/20/2007 Inverted Siphon Design Sheet D siphon = 1.5 inches No. siphons = 1 Ks= 20247 b= 1.1085 Cd siphon = 0.60 Normal Pool Elevation = 15.00 feet Volume @ Normal Pool = 0 CF Siphon Invert= 15.00 feet WSEL Vol.Stored Siphon Flow Avg. Flow Incr.Vol. Incr.Time (feet) (cf) (cfs) (cfs) (cf) (sec) 15.404 7422 0.034 15.369 6705 0.033 0.034 716 21326 15.334 5997 0.031 0.032 709 22363 15.298 5296 0.029 0.030 701 23602 15.263 4605 0.026 0.028 692 25124 15.228 3923 0.024 0.025 682 27059 15.192 3253 0.021 0.023 670 29645 15.157 2596 0.018 0.020 657 33375 15.121 1955 0.014 0.016 641 39704 15.086 1335 0.008 0.011 621 54888 15.051 742 0.004 0.006 593 96642 Drawdown Time= 4.33 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice= 0.171 feet Orifice composite loss coefficient= 0.600 X-Sectional area of 1 - 1.5" inverted siphon = 0.012 ft2 Q = 0.0244 cfs Drawdown Time=Volume/Flowrate/86400 (sec/day) Drawdown Time= 3.52 days Conclusion : Use 1 - 1.5" Diameter PVC Inverted Siphon to drawdown the accumulated 1 _ volume from the 1.0 " storm runoff, with a required time of about 4 days. ABE VOLUME CALCULATORS, PYRAMIDLONG Page 1 of 1 CALCULATE VOLUME OF PYRAMID WITH INDIVIDUAL WIDTHS AN.D LENGTHS Enter all known values in the form below and press the "CALCULATE" button. A kir WIDTHI(WL) LENGTH1(LI) WIDTH2 LENGTH2 HEIGHT VOLUME (W2) (L2) (h) 7 7 2.6 2.6 2 49.30666666666666E The answer that you can copy for other usel 49.30666666666666E CALCULATE RESET I SELECT ANOTHER SHAPE Go to Unit Conversion Page http://www.abe.msstate.edu,Lfto/tools/vol/pyramidlong.html 9/20/2007 SAN RIO PHASE II SWMF#2 J. SPICER,EI WDL-07020 9/20/2007 Square Riser/Barrel Anti-Flotation Calculation Sheet Input Data=> Inside length of riser= 4.00 feet Inside width of riser= 4.00 feet Wall thickness of riser= 6.00 inches Base thickness of riser= 8.00 inches Base length of riser= 5.00 feet Base width of riser= 5.00 feet Inside height of Riser= 7.70 feet Concrete unit weight= 142.0 PCF Note: NC Products lists unit tiNt.of OD of barrel exiting manhole= 31.50 inches manhole concrete at 142 PCF. Size of drain pipe(if present)= 8.0 inches Size of siphon(if present)= 1.5 inches Trash Rack water displacement= 49.30 CF Concrete Present in Riser Structure=> Total amount of concrete: Base of Riser= 16.667 CF Riser Walls= 69.300 CF Adjust for openings: Opening for barrel= 2.706 CF Opening for drain pipe and orifice= 0.181 CF Total Concrete present,adjusted for openings= 83.080 CF Weight of concrete present= 11797 lbs Amount of water displaced by Riser Structure > Displacement by concrete= 83.080 CF Displacement by open air in riser= 123.200 CF Displacement by trash rack= 49.300 CF Total water displaced by riser/barrel structure= 255.580 CF Weight of water displaced= 15948 lbs Calculate amount of concrete to be added to riser=> Safety factor to use= 1.25 (recommend 1.15 or higher) Must add= 8138 lbs concrete for buoyancy Concrete unit weight for use= 142 PCF(note above observation for NCP concrete) Buoyant weight of this concrete= 79.60 PCF Buoyant,with safety factor applied= 63.68 PCF Therefore, must add= 127.793 CF of concrete Standard based described above= 16.667 CF of concrete SAN RIO PHASE II SWMF#2 J. SPICER,EI WDL-07020 9/20/2007 Therefore,base design must have= 144.460 CF of concrete Calculate size of base for riser assembly=> Length= 8.000 feet Width= 8.000 feet Thickness= 28.0 inches Concrete Present= 149.333 CF OK Check validity of base as designed— Total Water Displaced= 388.247 CF Total Concrete Present= 215.747 CF Total Water Displaced= 24227 lbs Total Concrete Present= 30636 lbs Actual safety factor= 1.26 OK Results of design Base length= 8.00 feet Base width= 8.00 feet Base Thickness= 28.00 inches CY of concrete total in base= 5.53 CY Concrete unit weight in added base>= 142 PCF SAN RIO—PHASE 2 J.ALDRIDGE,EI WDL-07020 9/20/2007 Velocity Dissipator— SWW ##2 NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe,assuming the Manning's roughness number is constant over the entire length of the pipe. Flow Qio(cfs)=1.00 Slope S(%)=0.65 Pipe Diameter Do(in)=24 Manning's 'n'=0.013 Flow Depth(ft)=0.32 Outlet Velocity(fps)=3.11 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe Diameter(ft)=2.00 Outlet Velocity(fps)=3.11 Apron Length(ft)=8.00 d50 Stone Thickness (inches) Class (inches) —> 3 A 9 6 B 22 13 Borl 22 23 2 27 Width=La+Do Width=8+2 Width(ft)= 10 Use NCDOT Class 'A' Rip Rap d50=4" 8'Lx10'Wx9"7ihiek SAN RIO-PHASE 2 SWMF#2 B.R.FINCH,PE WDL-07020 8/21/2007 LEVEL SPREADER DESIGN CALCULATIONS Calculation of Level Spreader Length The purpose of the level spreader is to provide a non-erosive outlet by converting concentrated flow into sheet flow and release it uniformly over the vegetated filter strip. The level spreader length should be designed such that during the 25-year storm event, an non-erosive velocity(in this case, 5 feet per second maximum)is released from the level spreader into the vegetated filter strip. The required level spreader length can be computed using the weir equation: Level Spreader Length Calculation=_> 25-Year Storm Peak Flowrate, Q25= 1 cfs Weir Coefficient, Cw= 3 Design Flow Depth on Level Spreader, 2/3*H = inches Corresponding Driving Head on Level Spreader, H - 6 inches Required Level Spreader Length= 1 feet Calculation of Level Spreader Exit Velocity As previously mentioned, the level spreader should be designed such that a non-erosive velocity is released from the level spreader into the vegetated filter strip. The velocity exiting the level spreader can be computed using the continuity equation, Q=VA: 25-Year Storm Peak Flowrate, Q25= 1 cfs Design Level Spreader Length = _ feet Design Flow Depth on Level Spreader, 2/3*H = 4 inches Flow Area (Level Spreader L*2/3*H)= 3 square feet Computed Level Spreader Exit Velocity= 0.30 feet/second HMS * Summary of Results for Pond #2 Project : 2007-08-23 WDL-07020 Run Name : Post - Q1 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 1-Year Execution Time : 24Aug07 1102 Control Specs : 1-min dT Computed Results Peak Inflow : 7.9310 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1305 Peak Outflow : 0.060000 (cfs) Date/Time of Peak Outflow : 01 Jan 01 1615 Total Inflow : 2.11 (in) Peak Storage : 0.54743(ac-ft) Total Outflow : 0.21 (in) Peak Elevation : 16.159(ft) HMS * Summary of Results for Pond #2 Project : 2007-08-23 WDL-07020 Run Name : Post - Q10 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 10-Year Execution Time : 24Aug07 1103 Control Specs : 1-min dT Computed Results Peak Inflow : 18.796 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 0.093739 (cfs) Date/Time of Peak Outflow : 02 Jan 01 0100 Total Inflow : 5.14 (in) Peak Storage : 1.3836(ac-ft) Total Outflow : 0.33 (in) Peak Elevation : 17.675(ft) HMS * Summary of Results for Pond #2 Project : 2007-08-23 WDL-07020 Run Name : Post - Q25 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 25-Year Execution Time : 24Aug07 1217 Control Specs : 1-min dT Computed Results Peak Inflow : 30.531 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 0.58169 (cfs) Date/Time of Peak Outflow : 01 Jan 01 1835 Total Inflow : 6.94 (in) Peak Storage : 1.7002(ac-ft) Total Outflow : 1.06 (in) Peak Elevation : 18.222(ft) SWMF #3 - FINAL DESIGN SAN RIO-PHASES 1B&2A WDL-07020 • 1SIDORIIW�W/l�QUA llir POND CCI iwK IIOl� - 1 Flin. ell L NNR W Ceill t1101L M MEW N1010WWW MOM E L VOW M IMADEUlf a 1. NW 10�p �R IOW NstM A IA�O sisaw ■ !am nor I I\ �' / //T.- '' � �.°4.t 7 : 4.. LL, ',.\to I�`• ' 7, .. 1st MAW TOME PAPIAEL FOR 1w N M ON owessos/IE II e L AIMCEt7C NINIWF ROII M IOMI a AMOR NO AL WWI I \ d . ♦ • ... • -.L MOOR-OI'�LL ORRI 11E �gLIIR KY 111dO1.O OM 6lONOR WI I - •t.` ` il- � d♦ Fr�,FIRMS W sFNSCORNi EWE NO a NISNN;;NL MOON Ale.OINIE OOOW WOW=lM SE MEWED sN W it /' •` I 1 tal1OlE'k S MN lEN1N1 FIsl1 7NN'M Im E NOOYHO OIASNI. M a111lO1E NYOE IIANOINNL AlIRCYM No'OONII I �. , r j't `� . ♦lie' 1 • /_NO 7lIIM RM COIEIL7E'!s0O1L COMML 1�OIRM FiIOO R�o�M OCIOA OML I I _�' a �e�, r .� v ANANN FR1f HIOsON C0110OC AI'MN1lI N OCollsq _ if t '� AIN I _ !_..A 1st CCNiNONL sEE►Iyst.1I7W 1NHEOWL CYAN FE M FOEYBR HAEw MOSS FNRA affOF alllla I ` * •r7 ►i f ..` ig1F .lNN�/� MO NCR 11W'Ns simo so ss'a NN TRW 111e E MAW N M ."� . \ 1 f `i. JIR6f6ODN11 �!Li ISO No llEOpp�F-S1 M MosQpFr iOIOC C■CDNY f 211160 6611.NL 71Oa'NO a ai 4\ /1. p�q M NINL IIIR a CNOOL.AW 11E OOW WIN►�tp�p�Wr`lSO MA1Mt ONE.ItlL TEE Eli 1/t eCIRRo@[ RIfQC'RlID ' 'f i 1 �f ° `eE , "�` IRIOTSrr.lOR R00011 tONIROI.NILFOEt3 r I0.M OOIIIONY.'IOR s1 ti L rC1taR MKiMNLCAII OMsdOR.M M17At71Y IMR►a'M OOAIOgQFONILRE ' t `. �� .�\ f a�. `� ,e •;.'../��,A� `..aHESL oS11E11O1rN EIOOO[1EIRMIOA: LOTI/M WESELpFIR IDPAINC lgpll <l \' f �� r ` \ �r FElAW.seas.lps fFLr N1rAlEi 1ISF r1HL FINSNOR M,W1AR ImN.. - \ ®. \� _ r l r { �i/ A 1E C:10041E 0011 OR DE O fOE ROW s Sour I1now Id:O113001 NC R10 4oMsnlNl... 11NILfE �.. �'`---- EM:k r oro ap e1 C rRAN 11 M s WE=res E• n s e.s �. ' �i i . 1 wr�+, . .»foc�116N.a iNL NmNae:Afrsr yy��rss 1 . 'O�R.IlINI 7R71FOILL K ONORJN®4L'[llt MOaON CNCR0.11NK ` t r 0 F - i- .. .. .. \ .-LIE 4. fpt 7JE 1gY 1tfiNN1 NSS-nE 1INIIIIIE a M.rRDeoNao aN \ L �5 •✓ '/ ` HIIIIIII l , JI l . a WE 1EIrORWr RINC■N.WM IItl1 E CISIN I W ltt IOIWOt Eh■.N11N MN_ A�^' E R A WNW let OF IN AWN YI M/AD.WU, - �, / , / I Q alrf N waist It MOIN i \ -r �� ' `may •I OF M. 'oissONl Was aF,ML SOL alOm H100RI sio DINGMIy�p�11E 1101k, -_ v. +I. aIEM D7ONAN 1NIOIE I s IOK®MRI 1 0E cams L l0P I E HONER or WN M DOM WO DIENaNs OF M 1ENW As • . . \` ! ` _ - _ ,- $ ,OAS •nt.RIIOML,iF M most OW.�M. aWL.IHaa M °'� .11s stlIWW0INtl.HNNm.aWl l®sl 10a11 a AN ^�. _ _ - - ' - - rt;� � • AI10136W O NN EN ROE No 6FNF.NIFF 1E WOOL AIL=Swi wait OIL - `._ - R ~�,,• , �a • SR.,ry. NI slvMNRNNIt OR Mow a y p�EIr�L� Nls.NOT IOQOIJO N CF WOW.M NIF WWI NNLL E:aNeNC7m. `� / 9�c Y9L - 17 : - -a m.. a Y COULD-NAIONN:Y a IOW wA�I OW1aIL Una WE We `,. ` .� ® . lNI6 - r ,! 41 . ♦ ,v r Ip1py� W 1NL vaclfr�poulF NW Kr1 s a►WE sEE mlL/9011.sIL No arac�nf. N. Y Ilia__ ai ti - ®t �� .. • / I L ECLM ■CWIED NL WON CNO101.1 EL 1tJ10iIN,NE '111E IaY WIWI RILL E WOW MI M lBtltiCOW IS®N VW 1 !! - �� `� �/, T ,,.....,.,,, • aNNNCO11 WAIL COEEOF7E_NRMR NNW Wool WSW aea>: L MAs-s °Es 1oM awm Fas n r a NNNIt W Ns Awls M N++sa sHuo La ✓v, `'1�\ '- �-� S 1 . 4•v� ` ,r4 ° _ _ �. 4t, ROgt HNNR,EDecussis•I Ni�`HNaI NOFFrO11ONIIaNNIOE �� �' I��C��\ yp'(�4 \ _ t -: =c • 1tM CEO,001-IWO 41 11/03Wm YNLIION.MKS 10 Ni-0F T OLRN Om NLp � _ - ` ` ` � t SEAL . - sImENNFAFFI0111)<Nr wf1ElEM W 11E.EFfICtiO/.K-NANIM/.a I�NIII IIIL E �LIo�NFa NDFs EIOI'ACOI MIN ® -- - ��� , f,� R M Of1111t6701/9 RI= PARK RIT CIENCIM El11ORNL FEL IHI. CONtst7E.CI I OWELL FEL AS ILORM N ` -- 0 - JJJ \ s F:.ONCL O:PJEF NO �M OpO1K170R OWL F7ANF 11E OsmE SOIIpNaL MOREL I �---- -/51.-6 t ` _ I M- tKF11 tliY11Y �s10t11f 4111E 11E 061FL FLAN MR 71M N 1 \\\\,' \\` ®` �, +gyp-�d-f- R 7. WOW=W Kw F.NE.T.lso IOL OIIOINE FROM m (CE.W OrasIIE &l : - -N ,t\\, \. �= \ !::,,N ` �ru,.� �.:WNW No EIOW1 WOE NE area OWE F s orRORIL7 `\ , � \L 70 li 13606/N aM 1E WONN![per ,p�sIPot THEOE 41 FO0 WAF�11pMyFgA�.Of 116 Of W+F' -61unixf low ! E' INT_E_.row \ ,���\ . ��\\ _ \� •• . \ tL . OWOHMt own?Owe MNLs NAOI INE NFIf MEIID FOt 11EN/RWRI pIINRL'1ORFN1�ldl soNNmTRT 7NEWIJIaY al�avM: R#[L aN E MUTED.1 11110 Q a CCU O.M WR M.WE N 7E �, • \. ` \�� 1 / f-�` ■ a F M wows N INE s 01011/ O01 Oaf ail 1131231,MOW A a1 7NR WW2 K.OENIE•70 M.OE-L WOW a1rNK FNR.INNM Air iiiirillirr ��� -- \ \\ \ I \\ ��� f71ROB1 MAW ,. �� r RNNNOr ONA Onilla ri l- 10'-1IOOI►IIIIlILL A OJr truara a1A 1lMWOR1 1 t a1/ACIeD.IO 1E oNOEI�N°a�ar DMA MH/N(-C?,-WN IHnE uM fnEN aNE�a1 r-Wm AWN a KaN�CNsnl+clE Cr wN WI s1aVI0OK FILL WOWS.ru E•FfN®.M wow �` 1 1. WI�MI' I \� 11 1 K S• � f'rram- �.M lionoll 9R17011'a 1L Rool`.sew aI ME'FR01'0�HANW WIDOW■ rep qq��R,,� rir 4ROrAle Mo1FaEFr 1: IIIi ,y - ' tp 'i A.EEMINIo.IIO!E OIONFL,IE.IN1l lILOfL E Nilali6 E N COa stVQIC E aIRMLIL 4Nt.. ItF10Rf OF FM.F ., t,� � I I I �11 •.1, 1 , _ , 1 L . RN 161 wam E mom MFMIO INMIOR F i�l►LIFO�NAIHML WA K CYgELr•l l�WIT No 1 -- -t t J I t'I �j`\\�`1� r 1 • art so'icoi E IN IANR W MEW MEWS CDIIFDInk - I 1 \ r' ny ,!'-1' f ` • a M EMOM WWII IN 711I FIR ME 11NM®ON1m•F M E1V11O IDL woo N M R M a M-psNIFOR NOYFA E E tONiIARF W sou.M P `\ \ I I I >P I �� \ i r' p�MS gNy1Y Lal OT MR NO( s■wtr N A coal=�11111 WIC aN1OlOM WA arm FAWNS S W111NE _ . . II�tlIFE.F�F�LIL WII iFM�RhIK�IWlI1t WE�1E OOOML7CR � + �„ � • . .. +� Ill))) ��/�� �•-�i- - - ^ j�-� \•\ (�:11111111k1P's • � - OWL W ratio E M WNW FO ROW Cr M WER WSW ED M EVIL pospos , •FEL WNW s CE®lie. INOWI N .M -\ -- \NE HLNOW 1D 7 IEOIO N f-F.N IO CEIRICII OW.ST.MN INO ■IgEp y _ RMs1M MA R=i n AINm NW16 OO.M IION716 aAN HLWOIL NQ MEIR�/FALL 1�7to '10 _ \.:: , , F _=- \\ ,... i / _ .,, �� ... 4FML,M OAR InMOnIIELNILE-WS Oslt MONO FDAM moor • plgNlp�M Alf YI/N4g7Fa�107M��O�8Op1Ia r .'F `.\• FErOIM'OOs1 wIIEIY rD10 FIIAMNRR �1EEE�71pC�rpp Ep1�IEI Nl aEO1N1LK 1EE,D FfIFM MAD CONCAVE - t.. - I t l 1I • - ��- �� !- r i, ~ '_ . �„,, \ 7. Nr:Florin swift IIIEL:E 1AONFIR,Ca 1i.OPIRA: a M WI gvNi fl49N: - 1 1 i I 1- - ` ° SSNNIOtr OWE nNL SOIL a DIE allEo• ESE 1111W 1 LED - L: • .t .. F I 1 + i 1V e- gg 6.01 C01 11 FM NM 1B IONOL MWIsso 41E aI1 swam/NW M DE L r MUMMER�Ia11N1L.Fu II NE.NRI=K 1E POIWW N WR.11t I I i- ,• 10F}'-T 4IRE oairol'I1011.1H nowt WWI OF M 7010OL MN 1R=WSW COm=a l&11104on R W aNOOONO M slugs L AL 1IMsoNN M 1 , J FCIti I FO \ EpEff / R 11 lR _ I a` •• 1LL-M woos oWIN NEAL IWIE FINE I• E 1R tIIN lioNE al WOI WMg ME MOLE MOW E IMAM aN.NO EaNe No/ I , a ,1 .1 1 1 fit,�IpN70k OF NSW tt 11 11�, /. r`r r/"- . I. M'OONEg011 STILL 1,SINL.. Nl6 IINiF ONIOIE OR LOff IMA gun INE.7E arm sou.E CN STRUCI 1 Ma M Maw* q -,\ ..� .A. 1 \ Wi WP'(E1i 7-0o 1�1`1. /` - --- E.. N®®tat l,lOrl.a WOW II a1$ED11� .a nNNsEnse�fq awstrgM 111\ ��,,x .f.. - '\ _ ``\ r r l r •��'---` _ • MC 6.o NEC 120.DI AT wwwW. •IsC W,I'IQILEN �9EE. f- A�1��_ MN Wp sONN1N-POP WM&1RL sNN , \ - i-o---�� =- --- - �\ `\\- {... N M f710NA0fN1 IIE/s OL-PRY 74 .. 1E _k- fi Wes.'^lE[ . '. .-w / .`" OWN CF Elk M1r17Na Ig CHE74rtSm M Y LF �••. s CFOI vwi�4 Al.NY AS-Os7 COIl10HON . I )11) / IN -M I� OOO UAL a LE HOMRFIL NO M OOEI No PIP NINOWL W WOW NI/WOE NNW Or J • .. L�` __ .• / // /- _ /7 _em srN.IM M 111Np1 M,OHL: Hrm.Wl HOMAOIOEINIfN NH r ,✓ i.. .. !ElE10FB NJL t1I1IrL. ,,.MKL flIIN7 RIM FRdI M tEIIL EHN E Hest ith16 Iiik , t `�` --_\ _ , , , • BERM M v EtMIOrfR m�IrEH1sH:�1EEm�NMMEIWON�OM oIEaE Jtii r r- ...... . - \` $f. AIL.EaAY11ONI W E IND MEN 121011AMlT�W1,E WIN FIO A TOME CINNEO ICS 101E ONYFnO1f,LL YIbOOL DWl 1OW M1lE/W01ML sF IEM M 1 I I "'� IL_ . 1- / --- _`�\���/ .t -�NOG AFAO111 N 71 /s121111'AL OIIIIR.11E FLL IIt 51 s1IL K.FR3 ' 1 sNLaWb;.WECOWON 10.D101 11 IQI , I. \ NE N 1IID .. \ � `��•��j` J •I J \_ - t f•• - I FIMI��pppp��Eqlppl��';�.��pp01�MS swam 11NN.r AIo E lii. OR L a1.10 7: '1101 M r JBE DI W MIEK'IEEFR M HOSpp�Ni.FI YHOL1t IISHEs.1t.lCtILMN.EOt TRM AEstOELrO OK'MFLL MIEF71t.OW 110.E WHN 1L11NO OJT NNO W 1NAL IMOE/sr-IWO I O ` ! ` _ Js L. S R00003 r Isf sink IL RD a. r win/IL Tess ma MOONED E COIr■DIOr.ACs1E1. Iat E aM1 IS 14-I1pE A I (h a -- r �� 1 _�� I" 1 '� V d sMYEL FO agIE.aodNEON.swim waso tosw swAse WWI ION IaE I�CpE NOE ME.�aY1��ffI1H1ILr� No OOOEIAE M 7E•FMK - f\\J� - -.r J r MIME M-Oa7 sMIW1IL EYWioMIE LEI AO:�xis*ESL E M ONCIM"N / - i �`� :r1 ` \ i it t!` Opp aML RM► / •t f' -I 1 s F,.qq M.CN-eIE.ODIN1l101L RIMER No M'Omo N'Olt NN at CS/MaIDl 1 d J .. ! - / .I f 11E1e L Et tE' f C' -t �' =i! L Fat OWL MN'INAMA INI■N/'INf RCN tR:NIL E lfOi M'. r __ - - D OIf✓ t \ _' Mni RR 1 WIF 1N FOR IDIMOF o1WIL0OR. �(Fa FLL 1pRM 1- i� i 4 •'- f tI . I e 1CN ri J t/ _ +.` tPi 4 -__ wras�Fa1 ru MOa1L sou.EL room NO M sLl o&NOFGa7 a.troll COIMILONi Erotic WINIONE,'gowns IIIEat NO ova ow ONNOOIF Ion - r �� 1 ,-•• lat. .. ; y J _ 3 F .� A AIL FILL srt INN N.M OONNOER(IDLY-1NMI1 aNNlL7l 11.NINU[A 1NL Is.ELT NSO.71014 NO M-Ma7 EOl ID MN 11E'OOfR..•OME. K r� \-r .:i i - --' ` is` �/. 7Ai \ ////1 f�/. , * r /'--. - - � 9 W,A7 LIIN a M IIAi .OZ/ t1101 Nr'BOtlnym M FIL son moss sSOI1. :olio E/NNIEm.A INMN a ID DOS snow ;soli W 7 - .. wowHILL W A I0M 1NO INIE MATT-,W a WI WI I WOOD IF ..NOE 041fMNO in M'DO OIIfN IIOIIIILE 11INaMIL E•b11COm M1111E At-Wr w. CONOWED 7091061211911116911111,157W EWEOI NO.WM WOW fm/12661 WU IN . - o' _, - -_- _ 1• , - CggpCspl� yp��1t¢1E 1EER- LOLL INI MOl qC I N ARIINML MW 1 ita .NODRE Ms tr 1E rN , / --� - - -�' - , MOW TE FEL INNIIA WE OOYFCINL N OIEN W /OIINI OMNIMM'NR IE-AIONraINIFOOFICN NCO (x `\ / �' - �`' MINT WWI,o- N a1ND110N EE WL NOE NW RE UM IFaNOOI wow R=NM W DOOM o WAD moo M WM Cf Mtuolz E • f�.. ` ,t • \' �� ..ate..r/, 1 _ ',• - f! �'^ yT l\ a 1E NCR sWL 7RgiOE M ROI�1 mg wows W. MOW ,ti, \ 41 //if - we. C E. H.INOOR'EImf,EIaEENOItFN•�IOOIfa a:YW7g1I" ELE OUTLET s {✓ L w►! Qt� - �'- � Si(♦- p '�///' -/-' _M*IN �, • 7Nllpmpm�N�N�r M Mtrw mlRId0.ID1I OOEIIF MIry:IpM.NOAtENmI NEIn. �Op� i - s �. � A_ NO W Oi1KaYMfE'ITONE FIOFOIN J�NI014m pLCNrWOlO1L COVACION=� 1. M]aY Ia a16II slOEl sWl E CIAA6 I b.mown t♦ol NO MOM /-- +� \� - -' r.'�' .. ��, 1NCIr0001 a me C7D.USIN. •M per.awn. 011 OWNED o-Mo sENf _ • I. 1BSO a M-NN FEL WOWLO.NWL W 1gIp1� .1O VE1ff NNE 11E IOOOOIEo swig MEMO .C�41flq[sl: M 11F[A1NIsf tilts E TIE R-4. •. low.a comma N o InOm SIL10 CNOOOInl 71RrF01!ONE AIWA FEN WU L - 41 , " I • l le•FEIIOIIa11E RAW It ww'WOE/MA: M oFIF Iif a FILL O R M DD�y#y��Il��NR��I MILa I pO�LSa tootles V (OIMIN IMR NI eIN accrom EKK -, "�Mlt / 1 + ,�o. ./ '�-e l•q '� $` ;\ OaffiItn N M CIFSR OIfNEER �onl SOF SNONt am IF Ml F�N CNIW W�NR M --\ I ' =. A' II. MOM ISM E FLa11M MOM IS Ws caw MNIFL AT A f11INIBOY OF 4E IO1HL \\ \\ I j a - - ,� \1\l\ n 'Ili �. • #1.M 1 ilaw IF OF OML FM,RIOL WN OF FEL DR AI MEOW Sr M OF•SlE 3. miaow pl NEE swum sWL R MOM 1s SIPS IM'Co:CSRR.I1p�s \ I I I ' B� l ++l\ I, L. .i-Y'✓ ;, F J,II` 77... ry®I�woa RNLI A�1pN ISM E FlIOrOM of M yrL MILL WINE HEIR s111 sfFl sF11 E E A7aMNt1 ♦ I l - �` 1 J 1 •i s'y11E1�1�CIF�..'.POlwilwl� ME WOOF MD:sass Ffoli OM W MILT FI,w WI 151110 WOE mE NHL `s \ \\ \ +\ 1 ` N. ...' `I I+I i i '': iiiig. 1. 7M{E t}1.,t1laEC 7MS MONO Sept AWL E WWI M M g1QLED \ \ \� . - -: 1 ` \ 1 l •1 l ! . ALL ttmlll.NtMGNIMS AIe MEMOIOIR a'ow NAST GILL E M IINF4ISNt a M a1K a 111E tiles 4NE OgIMF IMSIOt0101L 11E PROW IAE SNIL E FININO tD FFJRF -� \ \ \ f 1 ., \ i I / t r ' Mown/ONrt[f AMNIOnL PR M SWUM C DI IE No 1WINIWm ANEEN=RE Ong aIF tILNllll Ito twl OE WOWED W M oNBFe WR Nam pIl[11HI L /! 1' ... r / M cc FIC lEIF 1E 1N1r m to M / . \ 1 f 1 I I t pmk NM 4>OL. gslW 001sIS1aN0 M-Np-yr�I / % \� A 4 [ A I t .. 1 -I 1!N RIgl11: C0mNIRIL OWL IMF 1OF ORtINOI W M SO00 FOR MEI \ .�.: A. N. I I l I I �i r • A: II1LL 10la1CHOR / tJ EL M CRISCION YIIIW01 W.ION 1E MIFRaW1011 SANE IaN M IIEt ODIUM J �- ��\ �\��r t 1�r 1 ! ' 4 • [�.rN/�• . a WE MEN Ia.OR NEW WL COWIN W MIN D-47a M dPEI SILL E MILD `\ \ l ,�\ /41 ,! , r $/ - . ' CE ION IE No wow SO1 Wan aNIMC10R sWL FFI1IL[Was \ 1 s1 , / / ' 'f a FM AMI►•HIEObIf Nopt S RMDIER M FAN WOE SO71 M lMR \ ���� '�1 \. �. \ I((/i/f,1/,l L. Nj•+ -� FI EDEF SOK' ■IDIOMS OWL NL4'A ^0Q1E'OF01E CS011SS - EIIOIR.INYL E M wpm.mom me ova E N1RISmE�l nEDRN.7Ne M'Maw ffrORMWA�i WRIER QUAU1YP HI PI VIEW I a 4 WNW s.061011s PROM WE MOW I NUCTURE.1tHIL MS WOMO11N,'OWL E Y..Eol 01113 COME sNF MINE EMOTED W 1E MOM FOa siE.r sN OXIINAOR $001! M Alin-ROW231 M aI111N10 1 11AL MA E M IElGllf aOM WINE Sgp1g1ISIMONE s EVIL 10 M WNW INKE Mt D AIM 7. • �I Wf1 MGfIRM61011�OWu... 1 NEWT KM owl S 1Er0 lI1N 700l /� 1p p Orel a If1,D7D AItCJO.00(11010 11141. t110rOE A WWI NO150E WAR>�iliE Awns IlIIpl �YG,LD71lSo-PD3, a ALL mum 000011 s1L E 00110]WOI y a WO wag C11csEc mom ■■ &e a AMMO EOM QON-INOI FAST INOMMW wags FOR WE wit 0=37 frrin JOINTS MOIL E WWI tsw E EINea1 OIEAPEX SCALE '�m 1' 1a 1ilSai MILE [I DC7 269166141 s YA M I'1!FYO 111t�L M f 4 f T ,r, Am Tom` 0Y-S6-`1ElUS.. WIL7L E A MMI IMF m LAA.NO OW.OR MH1Nm WIW.1M$tL s N I 4 �..�D_�� AOOCIIicNIK MM Ars►O-E04 sO:sA NO OWL W OFHIIM1 HMI la q SIRE Os1C1sE 1N A 1N1os1 .(INE MAL YNI F0•.M}.11E 1NE1 011 OWL mix A 1 1mD so R IOONier ME,E 11Mn1 111E A 1Ot00EH.a1 1a FOR a'ENOON a M 1st tI111 WOK A.0NN AN ISO!OWL WO le►1F1E1I RR slpON/M WW1 W M 111111 NVX. �',;McADAMS PRELIMINARY DRANiNG - NOT RELEASED FOR.CONSTRUCTION Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopies for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION(please complete the following information): Project Name: San Rio -Phase 2A Contact Person: Brandon R. Finch Phone Number (919) 361-5000 For projects with multiple basins, specify which basin this worksheet applies to: Pond#3 elevations Basin Bottom Elevation 2.0 ft. (floor of the basin) ".trmanent Pool Elevation 8.0 ft. (elevation of the orifice) _:,mporary Pool Elevation 11.8 ft. (elevation of the discharge structure overflow) I " WsE1. 9' .S1- (WATF - QURLrry VOLUKe._ E1-EYPr1lo1�) areas // Permanent Pool Surface Area 54,811 sq. ft. (water surface area at the orifice elevation) Drainage Area 24.39 ac. (on-site and off-site drainage to the basin) Impervious Area 13.28 ac. (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 225,304 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 431,326 cu. ft. (volume detained above the permanent pool) Forebay Volume 51,005 cu. ft. (approximately 20%of total volume) StoeN iOwKE 44,S13 Oa Pr (v4TE�Quilts-1 sioutrte- other parameters SA/DA1 4.65 (surface area to drainage area ratio from DWQ table) Diameter of Orifice 3.0 in. (2 to 5 day temporary pool draw-down required) Design Rainfall 1.0 in. Design TSS Removal2 90 % (minimum 85%required)) FORM SWU-102 Rev 3.99 PAGE 1 OF 4 Footnotes: 1. When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious%and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2. In the 20 coastal counties,the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal THE NCDENR BMP manual provides design tables for both 85%TSS removal and 90%TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February, 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials BRF a. The permanent pool depth is between 3 and 6 feet(required minimum of 3 feet). BRF b. The forebay volume is approximately equal to 20% of the basin volume. BRF c. The temporary pool controls runoff from the design storm event. BRF d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet(include non-erosive flow N/A calculations). BRF f. The basin length to width ratio is greater than 3:1. BRF g. The basin side slopes above the permanent pool are no steeper than 3:1. BRF h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). BRF i. Vegetative cover above the permanent pool elevation is specified. BRF j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest BRF right-of-way. 1. If the basin is used for sediment and erosion control during construction, clean out of the BRF basin is specified prior to use as a wet detention basin. BRF m. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system(check one) n does PI does not incorporate a vegetated filter at the outlet. This system (check one) ❑ does Fl does not incorporate pretreatment other than a forebay. FORM SWU-102 Rev 3.99 PAGE 2 OF 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover,mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth(see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.5 feet in the forebay,the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation 8.0 ♦ A Sediment emoval El.3.5 75% Sediment Removal Elevation 3.5 75% Bottom evation 2.0 25°/ Bottom Elevation 2.0 25% . FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. FORM SWU-102 Rev 3.99 PAGE 3 OF 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any hanges to the system or responsible party. Print name: Nathan D.Benson Title: Manager- Sandler at Shallotte,LLC Address: 448 Viking Drive- Suite 220 Virginia Beach,VA 23452 Phone: (757)463-50`I Signature �� �---r Date: �1`1�3 .- S b 0 7 Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. • Virginia`� ,a Notary Public for th State of - h Coun�f--Cam. o irg ,do herebycertifythat aa�� �y � personally appeared before me this \E-k--,k day of `( t,t ,20007 and acknowledge the due _ execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, \i---4,4499-6"-861 Undo J.Todd °'a Commonwealth of Vir4 inia 15; ' Notary Public '.1 Commission No.210593 My Commission Expires 0713 12010 SEAL My commission expires: } iRM SWU-102 Rev 3.99 PAGE 4 OF 4 SAN RIO PHASE II SWIM#3 B.R.FINCH,PE WDL-07020 8/20/2007 Stage-Storage Function i Project Name: San Rio Phase II Designer: B.R.Finch,PE Job Number: WDL-07020 Date: 8/20/2007 Average ^Incremental Accumulated Estimated Contour Contour Contour Contour Volume Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (CF) 8.0 0.0 54,811 9.0 1.0 58,252 56532 56532 56532 1.02 10.0 2.0 61.745 59999 59999 116530 1.98 11.0 3.0 65,297 63521 63521 180051 2.95 12.0 4.0 68,910 _ 67104 67104 247155 3.95 13.0 5.0 72,765 70838 70838 317992 4.99 14.0 6.0 76,480 74623 74623 392615 6.05 1 ! 6.5 78,367 77424 38712 431326 6.60 Storage vs.Stage 500000 450000- 400000- 350000- y=55540x1088 u 300000- R2=0.9996 o) 250000- e S 200000- N 150000- 100000- 50000- ✓- 0 I I I I I I - 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage(feet) Ks= 55540 b= 1.086 SAN RIO PHASE II SWMF#3 B.R.FINCH,PE WDL-07020 9/20/2007 _>Stage-Storage Function Ks= 55540 b= 1.086 Zo= 8.00 Elevation Storage [feet] [et] [acre-feet] 8.00 0 0.000 8.20 9672 0.222 8.40 20533 0.471 8.60 31892 0.732 8.80 43587 1.001 9.00 55540 1.275 9.20 67701 1.554 9.40 80039 1.837 9.60 92529 2.124 9.80 105155 2.414 10.00 117903 2.707 10.20 130761 3.002 10.40 143719 3.299 10.60 156771 3.599 10.80 169910 3.901 11.00 183130 4.204 11.20 196426 4.509 11.40 209793 4.816 11.60 223229 5.125 11.80 236729 5.435 12.00 250290 5.746 12.20 263909 6.059 12.40 277585 6.372 12.60 291314 6.688 12.80 305094 7.004 13.00 318924 7.321 13.20 332802 7.640 13.40 346725 7.960 13.60 360693 8.280 13.80 374704 8.602 14.00 388757 8.925 14.20 402850 9.248 14.40 416982 9.573 14.50 424062 9.735 Type. . . . Outlet Input Data Page 1.01 Name. . . . Pond #3 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: f REQUESTED POND WS ELEVATIONS: Min. Elev.= 8.00 ft Increment = .20 ft Max. Elev.= 14.50 ft ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall El, ft E2, ft Weir-XY Points ES ---> TW 12.200 14.500 Inlet Box RI ---> BA 11.800 14.500 Orifice-Circular SI ---> BA 8.000 14.500 Culvert-Circular BA ---> TW 7.000 14.500 TW SETUP, DS Channel S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 5:48 PM Date: 8/20/2007 Type. . . . Outlet Input Data Page 1.02 Name. . . . Pond #3 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = ES Structure Type = Weir-XY Points # of Openings = 1 WEIR X-Y GROUND POINTS X, ft Elev, ft .00 14.50 6.90 12.20 36.90 12.20 43.80 14.50 Lowest Elev. = 12.20 ft Weir Coeff. = 3.000000 Weir TW effects (Use adjustment equation) Structure ID = RI Structure Type = Inlet Box # of Openings = 1 Invert Elev. = 11.80 ft Orifice Area = 36.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 24.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8 :0058 Time: 5:48 PM Date: 8/20/2007 Type. . . . Outlet Input Data Page 1.03 Name. . . . Pond #3 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = SI Structure Type = Orifice-Circular # of Openings = 1 Invert Elev. = 8.00 ft Diameter = .2500 ft Orifice Coeff. _ .600 S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 6:11 PM Date: 9/18/2007 Type. . . . Outlet Input Data Page 1.04 Name. . . . Pond #3 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type = Culvert-Circular No. Barrels = 1 Barrel Diameter = 3.0000 ft Upstream Invert = 7.00 ft Dnstream Invert = 6.50 ft Horiz. Length = 46.00 ft Barrel Length = 46.00 ft Barrel Slope = .01087 ft/ft OUTLET CONTROL DATA.. . Mannings n = .0130 Ke = .5000 (forward entrance loss) Kb = .007228 (per ft of full flow) Kr = .5000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA. . . Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) = 1.155 T2 ratio (HW/D) = 1.301 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below Ti elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at Ti & T2. . . At Ti Elev = 10.46 ft ---> Flow = 42.85 cfs At T2 Elev = 10.90 ft ---> Flow = 48.97 cfs S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 5:48 PM Date: 0/20/2007 Type. . . . Outlet Input Data Page 1.05 Name. . . . Pond #3 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES. . . Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance .10 cfs Max. Q tolerance = .10 cfs S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 5:48 PM Date: 8/20/2007 Type. . . . Composite Rating Curve Page 1.17 Name. . . . Pond #3 File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes Converge Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures 8.00 .00 Free Outfall (no Q: ES,RI,SI,BA) 8.20 .06 Free Outfall SI,BA (no Q: ES,RI) 8.40 .12 Free Outfall SI,BA (no Q: ES,RI) 8.60 .16 Free Outfall SI,BA (no Q: ES,RI) 8.80 .19 Free Outfall SI,BA (no Q: ES,RI) 9.00 .22 Free Outfall SI,BA (no Q: ES,RI) 9.20 .24 Free Outfall SI,BA (no Q: ES,RI) 9.40 .27 Free Outfall SI,BA (no Q: ES,RI) 9.60 .29 Free Outfall SI,BA (no Q: ES,RI) 9.80 .31 Free Outfall SI,BA (no Q: ES,RI) 10.00 .32 Free Outfall SI,BA (no Q: ES,RI) 10.20 .34 Free Outfall SI,BA (no Q: ES,RI) 10.40 .36 Free Outfall SI,BA (no Q: ES,RI) 10.60 .37 Free Outfall SI,BA (no Q: ES,RI) 10.80 .39 Free Outfall SI,BA (no Q: ES,RI) 11.00 .40 Free Outfall SI,BA (no Q: ES,RI) 11.20 .41 Free Outfall SI,BA (no Q: ES,RI) 11.40 .43 Free Outfall SI,BA (no Q: ES,RI) 11.60 .44 Free Outfall SI,BA (no Q: ES,RI) 11.80 .45 Free Outfall SI,BA (no Q: ES,RI) 12.00 6.90 Free Outfall RI,SI,BA (no Q: ES) 12.20 18.62 Free Outfall RI,SI,BA (no Q: ES) 12.40 41.98 Free Outfall ES,RI,SI,BA 12.60 75.22 Free Outfall ES,RI,SI,BA 12.80 112.72 Free Outfall ES,RI,BA (no Q: SI) 13.00 138.96 Free Outfall ES,RI,BA (no Q: SI) 13.20 169.03 Free Outfall ES,RI,BA (no Q: SI) 13.40 202.72 Free Outfall ES,RI,BA (no Q: SI) 13.60 239.89 Free Outfall ES,RI,BA (no Q: SI) 13.80 280.43 Free Outfall ES,RI,BA (no Q: SI) 14.00 324.28 Free Outfall ES,RI,BA (no Q: SI) 14.20 371.41 Free Outfall ES,RI,BA (no Q: SI) 14.40 421.75 Free Outfall ES,RI,BA (no Q: SI) 14.50 448.12 Free Outfall ES,RI,BA (no Q: SI) S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 6:12 PM Date: 9/18/2007 SAN RIO-PHASE II WATER QUALITY VOLUME B.R.FINCH,PE WDL-07020 SWMF#3 9/20/2007 Determination of Water Quality Volume(WQ WQ v = (p)(R v)(A)/12. where, WQv=water quality volume(in acre-ft) Rv=0.05+0.009(I)where I is percent impervious cover A=area in acres P=rainfall(in inches) Input data: Total area,A= 24.39 acres Impervious area= 13.28 acres Percent impervious cover,I= 54.4 % Rainfall,P 1.0 inches Calculated values: Rv= 0.54 WQv= 1.10 acre-ft = 47813 cf. ->Determination of WQ Volume Elevation Input data: ==>Stage-Storage Function(Above NWSE) Ks= 55540 b= 1.086 Zo= 8 Calculated values: WQV Storage Depth= 0.87 ft WQV Elevation = 8.87 ft 1 OF 1 SAN RIO PHASE II Stormwater Management Facility#3 B.R. FINCH,PE WDL-07020 Below NWSE 8/20/2007 Stage-Storage Function-Below Normal Pool ' Project Name: San Rio Phase II Designer: B.R.Finch,PE Job Number: WDL-07020 Date: 8/20/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 2.0 0.0 25625 3.0 1.0 28838 27232 27232 27232 1.03 4.0 2.0 32261 30550 30550 57781 1.96 5.0 3.0 36343 34302 34302 92083 2.91 6.0 4.0 40211 38277 38277 130360 3.92 7.0 5.0 47433 43822 43822 174182 5.02 8.0 6.0 54811 51122 51122 225304 6.25 Storage vs.Stage 250000 • 200000- y=26308x1'1722 R2=0.998 C) 150000- $. 100000- 50000- 0 . I I I I I I 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage(feet) K5= 26308 b= 1.1722 1 OF 1 SAN RIO PHASE II Stormwater Management Facility#3 B.R.FINCH,PE WDL-07020 Forebay 1 (North) 8/20/2007 Stage-Storage Function-Forebav 1 (North) I Project Name: San Rio Phase II Designer: B.R.Finch,PE Job Number: WDL-07020 Date: 8/20/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) _ _ (SF)__ _ _ (SF) (CF) (CF) (feet) 2.0 0.0 6563 3.0 1.0 7692 7128 7128 7128 1.03 4.0 2.0 8979 8336 8336 15463 1.94 5.0 3.0 10862 9921 9921 25384 2.92 6.0 4.0 12469 11666 11666 37049 3.98 7.0 5.0 15443 13956 13956 51005 5.18 Storage vs.Stage 60000 50000- y=6902.7x12159 40000- R2=0.9978 w 30000- e 0 N 20000- 10000- 0 I I I I I 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage(feet) Is= 6902.7 b= 1.2159 1 OF 1 SAN RIO PHASE II Stormwater Management Facility#3 B.R.FINCH,PE WDL-07020 Volume Check 9/20/2007 WATER QUALITY POND DESIGN SitittAet AtIA caxa AlfffiggiStriqt Impervious Area= 13.28 acres Drainage Area= 24.39 acres %Impervious= 54% Average Depth=(V/SA)at normal pool SA= 54811 feet V= 225304 Average Depth= 4.11 ft. From the NCDENR Stormwater BMP Manual,the required SA/DA ratio==> 4.0 4.11 4.5 Lower Boundary=> 50.0 4.30 3.90 Site%impervious=> 54.4 4.74 4.6S 4.30 Upper Boundary=>' 60.0 5.30 4.80 Area Required= 49366 sq.ft. Area Provided= 54811 sq.ft. OK P4:441tArY4440441$10,... .. • Per NCDENR"Stormwater Best Management Practices",the forebay volume should equal about 20%of the total basin volume. A. Water Quality Pond-Below Normal Pool Volume= 225304 ft3 B.Forebay Volume Volume= 51005 ft3 %Forebay= 23% 1 OF 1 SAN RIO PHASE II DRAWDOWN SIPHON DESIGN B.R. FINCH, P.E. WDL-07020 SWMF#3 9/20/2007 Inverted Siphon Design Sheet D siphon = 3 inches No. siphons = 1 Ks= 55540 b= 1.086 Cd siphon = 0.60 Normal Pool Elevation = 8.00 feet Volume @ Normal Pool = 0 CF Siphon Invert= 8.00 feet WSEL Vol. Stored Siphon Flow Avg. Flow Incr.Vol. Incr.Time (feet) (cf) (cfs) (cfs) (cf) (sec) 8.871 47813 0.204 8.794 43261 0.193 0.198 4552 22934 8.718 38747 0.182 0.187 4514 24089 8.641 34275 0.170 0.176 4473 25468 8.565 29848 0.156 0.163 4427 27159 8.488 25473 0.142 0.149 4375 29306 8.411 21157 0.126 0.134 4316 32164 8.335. 16909 0.108 0.117 4247 36261 8.258 12746 0.086 0.097 4164 42917 8.181 8689 0.052 0.069 4057 58941 8.105 4781 0.023 0.037 3908 105213 Drawdown Time= 4.68 days By comparison, if calculated by the average head over the orifice(assuming average head is half the total depth), the result would be: Average driving head on orifice= 0.373 feet Orifice composite loss coefficient= 0.600 X-Sectional area of 1 -3.0"inverted siphon = 0.049 ft2 Q = 0.1444 cfs Drawdown Time=Volume/ Flowrate/86400 (sec/day) I Drawdown Time = 3.83 days Conclusion : Use 1 - 3" Diameter PVC Inverted Siphon to drawdown the accumulated volume from the 1.0 " storm runoff, with a required time of about 4 days. ABE VOLUME CALCULATORS,PYRAMIDLONG Page 1 of 1 CALCULATE VOLUME OF PYRAMID WITH INDIVIDUAL WIDTHS AND LENGTHS Enter all known values in the form below and press the "CALCULATE" button. a air WIDTH 1(W 1) LENGTH 1(L 1) WIDTHS LENGTH2 HEIGHT VOLUME (W2) (L2) (h) 10.33 9.66 5.85 5.3 2 124.2772156410085; The answer that you can copy for other use 124.2772156410085; CALCULATE I RESET] SELECT ANOTHER SHAPE Go to Unit Conversion Page hiip://www.abe.msstate.edui—fio/tools/vol/pyramidlong.htmi 9/20/2007 SAN RIO PHASE II SWMF#3 J. SPICER,EI WDL-07020 9/20/2007 Square Riser/Barrel Anti-Flotation Calculation Sheet Input Data==> Inside length of riser= 6.00 feet Inside width of riser= 6.00 feet Wall thickness of riser= 6.00 inches Base thickness of riser= 8.00 inches Base length of riser= 7.00 feet Base width of riser= 7.00 feet Inside height of Riser= 4.80 feet Concrete unit weight= 142.0 PCF Note: NC Products lists unit wt.of OD of barrel exiting manhole= 41.50 inches manhole concrcte at 142 PCF. Size of drain pipe(if present)= 8.0 inches Size of siphon(if present)= 3,0 inches Trash Rack water displacement= 124.28 CF Concrete Present in Riser Structure=> Total amount of concrete: Base of Riser= 32.667 CF Riser Walls= 62.400 CF Adjust for openings: Opening for barrel= 4.697 CF Opening for drain pipe and orifice= 0.199 CF Total Concrete present,adjusted for openings= 90.171 CF Weight of concrete present= 12804 lbs Amount of water displaced by Riser Structure=> Displacement by concrete= 90.171 CF Displacement by open air in riser= 172.800 CF Displacement by trash rack= 124.280 CF Total water displaced by riser/barrel structure= 387.251 CF Weight of water displaced= 24164 lbs Calculate amount of concrete to be added to riser=> Safety factor to use= 1.25 (recommend 1.15 or higher) Must add= 17401 lbs concrete for buoyancy Concrete unit weight for use= 142 PCF(note above observation for NCP concrete) Buoyant weight of this concrete= 79.60 PCF Buoyant,with safety factor applied= 63.68 PCF Therefore,must add• 273.262 CF of concrete Standard based described above= 32.667 CF of concrete SAN RIO PHASE II SWMF#3 J. SPICER,EI WDL-07020 9/20/2007 Therefore,base design must have= 305.928 CF of concrete Calculate size of base for riser assembly > Length= 11.000 feet Width= 11.000 feet Thickness= 32.0 inches Concrete Present= 322.667 CF OK Check validity of base as designed Total Water Displaced= 677.251 CF Total Concrete Present= 380.171 CF Total Water Displaced= 42260 lbs Total Concrete Present= 53984 lbs Actual safety factor— 1.28 OK Results of design=> Base length= 11.00 feet Base width= 11.00 feet Base Thickness= 32.00 inches CY of concrete total in base= 11.95 CY Concrete unit weight in added base>= 142 PCF SAN RIO—PHASE 2 J.ALDRIDGE,EI WDL-07020 8/21/2007 Velocity Dissipator— SWMF #3 NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe,assuming the Manning's roughness number is constant over the entire length of the pipe. Flow Qio(cfs)=7.00 Slope S (%)= 1.09 Pipe Diameter Do(in)=36 Manning's`n'=0.013 Flow Depth(ft)=0.64 Outlet Velocity(fps)=6.45 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe Diameter(ft)=3.00 Outlet Velocity(fps)=6.45 Apron Length(ft)= 18.00 d50 Stone Thickness (inches) Class (inches) 3 A 9 -) 6 B 22 4. 13 B or l 22 23 2 27 Width=La+Do Width=18+3 Width(ft)=21 Use NCDOT Class 'B' Rip Rap d50= 8" 18'L x 21'W x 22"Thick SAN RIO-PHASE 2 SWMF#3 B.R.FINCH,PE WDL-07020 8/24/2007 LEVEL SPREADER DESIGN CALCULATIONS Calculation of Level Spreader Length The purpose of the level spreader is to provide a non-erosive outlet by converting concentrated flow into sheet flow and release it uniformly over the vegetated filter strip. The level spreader length should be designed such that during the 25-year storm event, an non-erosive velocity(in this case, 5 feet per second maximum) is released from the level spreader into the vegetated filter strip. The required level spreader length can be computed using the weir equation: Level Spreader Length Calculation=_> 25-Year Storm Peak Flowrate, Q25= 37 cfs Weir Coefficient, Cw= 3.0 Design Flow Depth on Level Spreader, 2/3*H = 4 inches Corresponding Driving Head on Level Spreader, H = 6 inches Required Level Spreader Length= 35 feet Calculation of Level Spreader Exit Velocity As previously mentioned, the level spreader should be designed such that a non-erosive velocity is released from the level spreader into the vegetated filter strip. The velocity exiting the level spreader can be computed using the continuity equation, Q=VA: 25-Year Storm Peak Flowrate, Q25= 35 cfs Design Level Spreader Length = 35 feet Design Flow Depth on Level Spreader, 2/3*H = 4 inches Flow Area(Level Spreader L*2/3*H) = 12 square feet Computed Level Spreader Exit Velocity= 3.01 feetisecond J HMS * Summary of Results for Pond #3 Project : 2007-08-23 WDL-07020 Run Name : Post - Q1 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 1-Year Execution Time : 18Sep07 1804 Control Specs : 1-min dT Computed Results Peak Inflow : 39.834 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1305 Peak Outflow : 0.32404 (cfs) Date/Time of Peak Outflow : 02 Jan 01 0100 Total Inflow : 1.51 (in) Peak Storage : 2.7665(ac-ft) Total Outflow : 0.15 (in) Peak Elevation : 10.040(ft) HMS * Summary of Results for Pond #3 Project : 2007-08-23 WDL-07020 Run Name : Post - Q10 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 10-Year Execution Time : 18Sep07 1804 Control Specs : 1-min dT Computed Results Peak Inflow : 112.49 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1305 Peak Outflow : 7.3922 (cfs) Date/Time of Peak Outflow : 01 Jan 01 1500 Total Inflow : 4.25 (in) Peak Storage : 5.7591(ac-ft) Total Outflow : 1.56 (in) Peak Elevation : 12.008(ft) HMS * Summary of Results for Pond #3 Project : 2007-08-23 WDL-07020 Run Name : Post - Q25 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 25-Year Execution Time : 18Sep07 1809 Control Specs : 1-min dT Computed Results Peak Inflow : 190.54 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 36.658 (cfs) Date/Time of Peak Outflow : 01 Jan 01 1328 Total Inflow : 5.96 (in) Peak Storage : 6.3007(ac-ft) Total Outflow : 3.24 (in) Peak Elevation : 12.354(ft) I PHASE 1B AMENITY POND -REVISED DESIGN SAN RIO-PHASES 1B&2A WDL-07020 '8D311111WAMIRA1 1FP ND CONBIRUCITON BPECNICAEIIOfiB CORRAL NIMES CCWS1R JC110N . . I , rn • POOL m aN�Erea_4 s oN-EE OEDtNNftrrL nEtml OVAL TnfY aE T Tucanr■.■s A wo osnAs■a PONT • � I \ \ \\ \ \ \\ \r ■N W NN1N!MEMO.RA MN TO WA MON AlN WPM/NO 10 HOIS W■rE AO s 7E aFR s• \ \ \ l \ 1 \ \ raEW�NK ■11 1W 7!Er1 IF s MITAILMOON O�,O EMORa '�F `. .'� 1 '.\ \ 4 CONSNNIoIs NO CQSat'uF"Now TAEelpNlar Pita¢ew EOM/M� MOON ORINE�yyL�ns EEL RAN NL'EA A R NO • I 11 J •�- \ 1 \ \ CENOI aO E WOO AIN w m a 11E.ONIaI eRACIORs TON TIN IEY EaoNEoEIApIapvNow I' . 1f1 WIR .. ., \ 1 EFBR • IEaallo or o'o wwe®wA 11E�e Na�Elae M • \ N \ ` \ s \. \\' U a 71E awaAeEN lWL II�ER W.7E W0■XC PM RR 7t IgNNOR MONO IMMO A► PA TO NO \ . • /'+ . . r \ `*' 3.^ 41q- ` } '\ \ , N. / \T---7-1 �y Fc� NAII/<aA®iL mu NOTE wale /�air ANY 111T ow E mono 3 7aF�M.NO w■AREA NII■17■1E MO E M l�.p� OAY All \ - /y/� ) �/ W F�1 Z ON tE Nora am no A■aem f AIEAf} AYGL:r o °tli1ol slNEt ea.wmEiAL On Ra l 11E . \ \ -js`" • 1 \\ T 1' \`�.. ���/// t . +AI A e 012010 VA we FM esRAGO�ia■oROi�■i M�1°i fq 1 e oalMO�or�a ORO awlH�s•Nll ONIONOS AV m A�iurtANr OPE All e■m1®� 1 rNlCF�11E<BAOUI mnEoaN.a1aRNE MOO WC.EO■OM�'L 41NRE E ^ • - • ' Y■Y LL arrow_moo W E'IQTNrMQ WO <, • A. 1N[ W PENOE MOMM NA■■AM7EIR NA ND il■NYNINr i • ' i \ \ common Bull m1EEtcT THE RII_IE MEW paNNpR aNItET rAyawe E NACE Fat M'_ R AT 11mClI;YML 11r_1101f1".�M Win �._ � �,_ Y �sd / \ \Y�, 1 II i�i - ,,....a.o a .4 Ism BIIProE NasE AMR .Ei tieiAKv.IydoM Tire wont sID1wsMA INNIOEL _ Y •r S aNAtsn IEL-E Caii■L7m'O)IK M 1 _�_ y ,`\ \. \\, 1 tip aNt■4'nuE■�z + IENNM1EalaY A(dnM aF7E vim \�\ • \ s\l 1\\ \ I/ mint M Ttitopt Lanai A,Aalioi EF Ort law aux ice= -. : • .1' - _\, ' �'C 0 ♦ ~ \ \i !\ 1 I\ O L 1K meow mama!Mat OWL E COYN[OIE W M PaslAlpl s'/ irtt A, L RN IItY EIZNp. -YNIcull t[oOIPAO1m 101N[sAIE $ \ A'coo on �a K \ �+ ' � S ,a \ 1t aapI� GIOIR '-r'- � IAY YAW NZ a7 aAIN - -f : - ®/•- - - 1 INI ` _-'a�aE omANetPrx - •--A\\ `S‘ ' \\ ,coo RA„rdRN m ANY wwAllo�` . . - - ��� !I `\ \ ''' , \ • ANFLln aI TIR aNLc „TAMED NdlIOA7aiL WE MY 1Av101 M PTO MEOW WA■.E ��� rum N A iOs MVE AAFNLT swots- LL WM OE PAT AWOL 1't't 1 4.��� -� • I \ .. . . OaWOACOR awl CAn1E111 l�OWIAOATANN LIMED 1wr 'E 11210 N011! ll % e ONCE M MONO■ aNfIRAONN OVAL EaarAN OHM .: .\ //)ve7400›...--- _ ' J �a�4\�`� S` . \% ,t•' ,♦< 1c I N �ammo AND M AO-ELT _NINE 1q NrwIAIDN O M 1fflQ l _slCll W 1Ir1A.s.e.e OgO111On Nan iNE s7taa rFliwTaE _ .. / _1`�• \ , \ \ • ale,11. NANIa F TIN ILNfE tff 1lWIADE • LYA{wllp ON-NE iNNN14 m AN[W .MR m AN AwIRr Van fArn N fENskl AlPNO 1N11 maw m • sFMNp mggd 0 a_n Ar M i FOIL■1(Ln E. l ' // ,��.\ , \_ I = M iMCSID/E=RININO Or imam ALA AT M O4INACINI'd COWL :MD OONOOINISaaE■IONMI■wT�¢AtN_10�1E rl�Alq�'1 L _ _ _ - , F. OIIE S•MNene W4pl� aNNfR 11N�[N 70OAl��E iatAcm ryAE�NATa�EjF M Nam,rrANR ` ', //! , 4-' *IT' ,. i- ` ' A\. `z--\ \ \ ' t % • 111e p NAMN i0N AE �µ KMOO'■oN ON 4N OONONiE ON ROM=AL ACME=MIME pFilE ■L=M L. s '� / /\� \ \ \ \ _"� , COMM� YNs 7.N mat 1PIOM;PIMA ...." PA. .¢1ENNNiTM1 .\ ,,, ' // /� ` 1 4 M' a mot 701ARt EENlDMr M IA1OsraPR.ONrNpC10R MALL PI■7aL NO'O�NC MOM;sFaAt4 Ato: R i tt(41p,... 7■1T A r i / POO I elT \! \ 1 PEE Of MEMO VANE OMIT POO 7N��TE EAN I wrt NMI IMAM m 4 TIbC NNo E OM 1K s■ogE au ns s /' i< ma.wm.-10 rr _� \\ ` \, •- \ \ /r' roe M■oars or a+ •.'a■EA IIOI.ME 11120111 ■w \ , , �\ % �� � '-S,'C - aae a9 aNs-1aF� ° � '..\\ \ \ \\ . I a <NrrNl0e0QA�11 _MLFN M RA Epp{,M EIINo N4ai NN TR NIN, r11 M 1 a °`'�, \-- / .\\ \ \\ \ �6Y OS I OAT ANON s OOI MOIOD aiNm m TIE MO a Y'A01 1N1 NO!_L i, � �s� sw ` \ -_immiwimj `` \ \ M"�}TOOT A MA]Rr EIC MI aMo[.Ne i-IOOT ttnaa M faFon ilLANO O TE \ -..a- \\,, \ \\ moor lAlllON'M PIOlCOE PiAMIs1E 1A1_Na■A OECSYNOEI■ & soEl OO■IIMa ar AR ElNtAISOBIt rLL w7OWs AMA A{A®N \ al IimF NNIaEO WOOL MtNM1�IN1i E NNIOwT'LL n EIOO WNI 1LCINNoe OE 1�7 NMIt ib trans sx TNr � � �� ''*�//x/ - / �. *. via_ NLfFm.■Wt E OE■Na■°01Q 1K 41■N s' i' / w.S/ ` \ \, \.r -\ ` 5 \''..'�j► .J L M ONAOE-NICEI E 7■O RAN AAr PNIa@ woo.!7E C0■Is ow_was max OF M.IFIa �M■■AR001►NIL LIARRYL OIL E NNMLT \ \�\/ -A. s . Ras >f11t■.aULlf 10N air 1FFi1L.MAE WOW m AWOL Nll♦R4 - f \/ �7� ��ir" , \ `. �\ I \ A. 1 /OFTEN olggM77�q0p As[NOF<ertAEE FORM ' �, / I ` \ `\ I r11NE rO1Q MNRMIs4.7HE Oatpaf■IItiMII OiaOJtYLI[M 1 MOOR►CNIICI■of TE M1W OGRn Pa1Ie�Aa�TE'aim a sls■t AMI1R ANryM.Y AtEts M oa_IPNn NNW stsIEL M \ - `. /\ , .a 7.t�� _ \ 1 ■�LYqATIW 1nM Or 1tQua t EafdGC'!OR AMA 7101 AIM 1E MID! WA WL1a Tm ,MO i lr LNI!WL E al BI.M M L 313 T ,1L C ran AEA A 11t IMI N V=OSN-1E APIA. ON-■la mama O IM=in 11.a DEMUR MO AN APNOEA m AMMO /��, -S, �.;•`a, r ` \�\ '., \\ \..' t 1111 'Nwaa wawa TANrumsrota ET■N Fume ONpm■ ve manna WN Nil 00-0 Of••NI-NNMANE MDIKf. i :a L IL MVO!<LErraTE EOI M atTALs.Met a Nor Po-It e��� / �� ��/ �'.ale ---- ` \ \ \ \ \ \ \ r 1 r i i R TIE IE■Ns. mamma awl Os vain.pima OQICts tor LAM= OF TE Ppl► E t■nN. Ft ` 1 \ • \ • / WE IETNN O WY.AT IN PECK n OERLNO_M N WENT PM AMMIAM aN UM N S MIEN v l0.imma sca _ `•(! (� ` \ \ \ \ •ONF4OOW' Aln EaINE01K 7N[aN 0m LMALD /� OOP • /\ \ ',. .�NI - \ I \ \\ \ � \\ L KR1OIEls WW�■g1tLNmEA.D»si�EEO ryM EINYEI.All�Oi M 1 `�' /. / . ♦' \ \re) . ONIIOAOTOw..R1W4E 7E ■■NSO01r rL4NAIDSAL IWL M �,' \m■Mlalat NN�a1a �'aa`Lmm as lEllbN JIGp1: N011p■ / le / .. \\ ''.. 1i;�r . .e. YN7NIE0'N1EIs IaN H msEueoErNOIL .OAN ALL • : w F TOL IN ANYL R .AIo ' •I►-! / ��, \\ \\ ,',\\� \ \\ .R."q J[W!N■v1NorMNo0Nnor / \.OF TS 1117211010 WO. • a .• l 71E AtiNNli' aU14E.Asfs1°1++w.�._'L:�"`�',7:.,'9r�K �fi'��� M"-^""'�'�'-Y31 Fi'+"■ O N irl ulOEiriN NNE c'- , • \`' ,a ,,\ 1 �ruwoN.W�■ NO�LinoEt+®PNL IAIAas OOIfIAOpR GN sEa aN m CalACIICMeMeE AND YNOEIE RaE00Ns AN M Erss!E■ANEOiE \110111E E2ivm ANI TE B■slat A0 TK KTNNAP WL�Q NN IINNIR.IQILts■wLE GIN®aRAf N■CIO.'Or 7C 1 ,/ tNCN n e T6 \ t r \AOL •'' `\ J - --17 \ \ ,NAT' r Aa{MAEL aFiE sEl CNI El!LaFNE EOIMNIL_NiE7f Afp-AO INNO YI-'IEIM O'M BElllglNl: /� �. \ c' \to TE 7O!AIv saT1oN of MLL AOLa1TIaa.a1r■!ar EMa Pa1Io IL.lealraaNOrCNEoAY.■■AR;01FrNNFRYsNM1EJIIC®NYA \T� pp�y I PEN.IIn AA �. \ \ \ F aME.,EEAIDNs a1kK M BIEWn,N117 M.ILTAs■IA rNL AL E Q[�OM ■■ Nr rNt s®sw se.eu �/"'� .,,��if `ri OL.rwciBy r_ c•� ` ` \ \ • a!sOEEWI AO=!MLL E EEtsa E M ETM=TALL / .1101il■■IIOI eNAsslpa A T.A•EEIAL i■-UM.T I 1l N Alsl At-Na7 NN+ar rw M 015 AN / . 1 4' i /if,/, { _ ,_ \ _ _\ \lBrr4lloa■Ia6 E 101ifDlL_p A MNsllsl to's0 OLTy'NI=RNNsf '' / l f \ ', ` \n ANY A■IatRo TN!saLauM E AAIOaQlO raf IE ry NMINq.( aN tE SI IN N OU N EOOI an N 1E V L t / - Y I / �.✓� roa \ � \ . \ \ QONO■NNNOOR OVA A N..EMOa a■s1r M ORAN= 1�iSE NNI NPIIONIL_OOFAI■TIETORI.CF■IMAINi NIQO TOIeOa Midy.1A71QtMR1K'1EI� • E NWIIE I/ON rNAL / /NMLL sGIfY AE M 70r 3'Y OF 11R.wlif�IMYI W IIINNNE s0■sli O M a0E M stotaNOM was tom N M mall= . • i _TOrsNL■pl M oEFAc>m rtl.TE ta'tol ts*ot a1Et RAMETaOr s'-O a LN'aUEra taTBl INI'MTE E AraY■E Nrae AN APPNOrN.mLroYo ! / }. i \ \\ \ \ \ 44 +'£I it ? NE MM BNNpp1L• ■MNB NNIN M 7M■Oi a� • \ ` \ ' , A IL MOE■ACONNIW,MOAN MAW OENA AIn worm NW PISN1n OUTLET=...MAIMAL / I 'f- if 'i ( . , ertEIDe OMIT Pan ma R■ TMr wtllq tot E I. ma IOTr�q war awe. II1I��E cams N moo \ r y/ � /��� \ ATTIE ,\\\\:\ \\ \IINIONAT sr RN TIONNOO/71KASQ,� INY aim,...A[OiRO/= MEMO fE KaalIDIts OFeANN vs-IMINE Am PFE NALLSAE •- " '' > / IOwIMOIOO7u■8 � \ \ son M.IaY1OIO1dal AIM Ae M'6p1OM O ■W6IMAM wow Arts ma)AYIY O-411-MI L TE IFL AONIO Am J / - -• ' ''1. . \ WQ00I 71N OR \ \ \ \ if TIE GATE OM E.w 11g uarm1 ar a n V oaksonar NO l N w_OI arAT r' / / / A mamma N - ` \ \\\ • ATI C NAIL mom Nwt E i1Qr NUT ma mGYATNN sOnONun swoss • / • ., m AOIImRMA.IOyi 7D le LAIC \ _ \ \\�VV..\ \ \.\ g oli i �IE...M fAL IMi.M i1 01 A NMI1 0. [OMl OEO as 4O7 \ •. -� _.j \ \\ � .\ _ • lAiraO ME awl E IT AAA PEE 10 OEEE■71E NI■I= 1w _ - / ' / .... ,. `- Z\ .. BERM ALe SOIL OOLPA+CRON SIPECMICA71ONS Amillim N N""`ENP"°1°EGEanMt nasact um MOP DRAMA sNa iY�N ow. �// • / ��,y o rss / r_, \ \ \ \ I. Alt P<L INIDass•m E Of0 FOs 11E OAY NWL arms*PIEI � • (\% / ✓ _ a ��-_ 1`� _-` .- \ ' ,a • ,- ' . il R1N0O7YRAl MAMA Et ME WOW BNIIIEI.M FM MA'OSAt a TNEN Sl NN mu sswL E sABN 1s'ON tam • / //. / _ .'/ a•`�� -_ ---- - )\ r. L OB urn \ \. .'�. a1AIC II�OQ-nj,,ME OW AmoNs�NRATQ II L I NN PONII E eIDb NNNI:EN1 131W ,PIER ALL NE AL sOri NWL E N t / Nolii - ONOIt -+...r.M FarArls so. . TY14!AE NAO�[AOR uE As 1-1 LISPS NEOr MEAL MENU 10 t m war root IGOIITIE dr •li PA 1tsW x •rI■AIN<NNF ANsALT TNBgk,m AIM.aL. - if \ - \ \ \ 3. rAu NACEIptr Not BL>®A 1WNSAI E IFT 4 TNc!T'�■'R TIAER Nltl.-BarAAON LOOt NWT.AE LI¢GITT A3 TE 1 - \ \ • .\ \ �p�0� EAaA aaow NAtL v M AIaN. � �� \ slE01S ' - �- , • NLe AIr NyrpOpR�M WnIE tLAMIN as B 1gQIE-rlA0I0r_Or ISN�� oaBAs rMISG►DOII 16AEWf MfE NWL E / i \ = a , i. `. ai \ \ � � - l YQNY ASO eMLAf101LETEL E I0101E NO M P.IN'IEO Ae N K1NE.'Jld'1M1Amlw 11N1T EL E'NMNIO m M.BININ!! �� p .,s - �. NSFAE rNOBa _ND POIt NL NN.IWEYat InOlkl N tEKOF A NFG q aY1NAWON AY - I \ iBSItAt- 11OQ\ \___ i \ -- ..e.. ` / ' • / \ M M FLUas A,�A7tep!� 711pp�lE ilia I � _� i COMMAT N r s B■Ns➢01I NIT• Catl1E101101fisitu E ■ NE CCM.EAOIE Nast iIOI r i \\ r i \/\ 1 /t 11 '.. . OOCIO W 1F7 war MN E 7HE POO.00INI W1MN:ONY.OBaIY m.M Bli®1 -FOR M1/■N 1fE _ -l \ / NL Aftss OWL E A01®AT A IIOISNII!canna mot-I A.aim NIIINavplr \ ` NAEINAL A_.■4AFL=4 rL _ /// I t • 43eill- M Mfrs a m tialsw QO o.LW eCW111 wIrW lfucNolr ...... ���-r -- \\ \ Ah m+lN1 n1aR ured0w ■YAL E POMONA ry M 01-ATE .0lOSN,AL ammo L lE-Ops[Clpr KliNWN_W Al TE NOFRO►AIMM. W 1aEY 7NAr P=R•COlACVIIT lLt6 ®!At71Ra>k 11!Nl.NI0E0 N10E11 ■OOC 11ts M■!11 \ \ \\ \. M1aR aR n6Y o-AN{Alv..tllO / ( le' nE CO Tft NO PACIO IINII A U =main'mitt MMOT WC N a11CB170,PIETa DSNAat \ I �- _ \ _ .- 'O`� / /•�( 1 \\ esMr AWN i°0Nr AM PS!INN INN li AWN a M NNL SM Arrmm NMLL aN1aw m Aso o-ga M OPIts SHALL E 1 \ - \ \ ! \ lALO WINO Will..ALUM MIANF 4ONOYn TO MOI=Na if 0Y1OAOar I \ \ \ r��i lwl' + M ONIOIACIOR MAIL OWL.PME AIR IN s0 1 M M=MN WOOL TIN Na1F,!_ it ONO./T. / / I < 1 1: !� ANpy�M moan NE'CRR lit TORT M NAY I / / i \\ \ • AO NIAPP♦0 • � / `�/ i ' ONNsfpRIOEts WIT NRFiEO OOFACgI Ip1NL aOpAO1OL Apa11O 4 F ma ANIfNO'fATNM ECE n'rKL'1s[Al Ivor d•MAIR Nist�sq�,TIE IJ 7 1NL E MOD MAW M M-MAT COIRM` ICIM MI$PIIDL1 A FOs TM STAMATE O E PRECAST MO ANT OE11lI E SOIL HAW A NFNR#TORT LIP WO'UM / _ t( mum 71ERAaIF,R DOLL DR M IINOp IOAPCIRfLIIY W maOIATE M sl■M,NsIE color_OVAL E M arrNo WONT AM6 aulL E OLIESNOO M / / I '-' -\\` \\ N N Jage x►AM° •\ _ \ " / \\* /., • woACOM commix W Nam Off!16EN 101s ma roomy EIFO■m NROGGTNq or ma �F NAM a1 Ili s:nail M Nam iE1CNE / r I I - _ �\ GC�I1 i BA■OE.[0N M RM!DRAM M Nalll_O m M ! - - ` �•J I` '�! �1{( S 0. wow ar TE.ILt nit NRID<A7a NULL AS__IFOR,Ip W IDe1r THAT TIE N1N-NsrAA_N:■pPL 71EC�.aE NWL MNYR TE YOWF K M AWE l N / I - - \ \ \ i - A1'J;a1s0N0 tnPl O'CaFACMOI■A1Nafs n■N, OE■-_aML 10 7NEI/NSL(UsIO MpyL \ / `J \ \ \\ p0 IpY // // =, CK'mNRYTEM suLLlE PBOIpm FOR EIvor AA sTUNETILI O NFFA AI N C I`\-____ Y , [^•r1 may lIT or_4 OR Af O■Bl0 FM M OFER Om10ON1�IL.BAN81L 7. MTV M.CalOMOl011 OVAL NWT TIMA PAIR!IO!Mom m \ i ==-'' -\, i ---\ \ \ -1 L"�,.EL-A FOeL _ / / S. wawa NE iE1r�Eieea7��6��tj0f AWN THE ter!o-1N11.auNLT MrINI AY A PIlq(IBnp v PROMOOE MOM ICA ME°N 'l Emom.AE iaGIp(�]TwrAe r NUN(1*1011 B 5N \ `N. > I_\ - \ \ \ EorEA I_ _ F� ,F +�•if ( . I . NN-NIE NoNOIN?IL IN m lirE=I. 1O1rOd1.FOOT 10 arm.01 M OSEca H M FONNE WBEI TFI1NE AM aw EUl MAIL ALSO PSOfNE A OIAN Np Lift I N. N I \ / /� \tea\ \ IQ i�il)n 4=0D � NCDar�af0. / i 1 / lP/ry - i FOR NL1Ets M cROO AWL s • STA7EiENT (� \ \\`- / \\--�1 / /� 1NNAlot1(17N \\ ;-"" "t`aae s` 3 NA an:Dori oneAs sf6a/ / / / /1�14YY a uA.raEB aaIaE1E awl E I.-aaN ooao PN om9 IwIeN ailmiss NONa /11111PONINEAT OF ON ALL I■aOaO IMIlUNNE AI■SISSIa1101a CF llsl rACllir auLL E TIE L NC00IIRE.[AESO ICR M 1sY O(ILLI sAIOOL Ara awL E IaAN 1101 OI \) \ \ J ` -_ /~ / / \.. \ \\ \ \ \ \ \\ ---_ . / s ZOO minim=mama FA lis P MOW 050a'Am MSDOA71Ol PE M BROEINO WOMEN NO _MMa♦m!APNVYE DYUL QIW-NO(DI NANO) N _ 1 �L Y 7e LY / A SMAIMlit'#1 7E MTE awrlr PNs1 rIOYNNar licORIAILLEM■NA M M NIn AMCiii \ / \ C \ \\ \ \ \` -_-- / I"- ... „ // M YALK'awl.E A-ria fI1IE m 71-1ar06 1011E 4F APIMAYO EOM In ) t 1AILK-■N A COROANE AN Alm 0-NN NM 04 MO awl E swum now --J\ - / / / //. •.,. \ \ \ \ \ I 1 / \. '\ Tor a•OIINLr NA A IIAIEOIlE O[TAa N16T re-I TE • �/•7E\F� N N \ ) \/ a►r,-7C1' // - ' 't: \ wee�a -61QI0 - OOIvµ7a1■MLL_IICIYapAtyESYO1tlINt'max v01171 MITI A IwpNIA AY�Laj.Y'v. VIEW • - / , ". ' Mom Mr FM FM 010A11011Y lIt Vi to l WAN WONSIN 1001 SHALL Ns0 E PIIGYaO I �o aev GRAPHIC SCALE i NAN 1....10 . 7[. • IINA g m 00,24-2G07 I Inch.�a AL I �"PD-1A _---- /3 FL DRAWING - NOT RELEASEDof FOR CONSTRUCTION ..MO MCADAMSJ Permit No. (to be provided by DW 2) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORM WATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopies for vse as an original DWQ.Storrnwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin arid outlet structure details. I. PROJECT INFORMATION(please complete the following information): Project Name: San Rio- Phase 1 B Contact Person: Brandon R. Finch Phone Number (919) 361-5000 For projects with multiple basins,specify which basin this worksheet applies to: Phase 1B Amenity Pond elevations Basin Bottom Elevation 16.0 it. (floor of the basin) Permanent Pool Elevation 22.5 R. (elevation of the orifice) Temporary Pool Elevation 23.8 ft. (elevation of the discharge structure overflow) W5E4- 22.b2' 1 NA7FiZQURe.i•iy Voi u14E. Eu.EVA-1Id areas Permanent Pool Surface Area 52,138 sq. ft. (water surface area at the orifice elevation) Drainage Area 4.13 ac. (on-site and off-site drainage to the basin) Impervious Area 1.78 ac. (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 192,331 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 182,117 cu. ft. (volume detained above the permanent pool) Forebay Volume 32,555 cu. ft. (approximately 20%of total volume) (" SILVIA doe E (Q)5"4ci (Y100.12- &tia n/ Iou Hi) other parameters SA/DA' 4.21 (surface area to drainage area ratio•from DWQ table) Diameter of Orifice 2.5 in. (2 to 5 day temporary pool draw-down required) Design Rainfall 1.0 In. r Design TSS Removal2 90 % (minimum 85%required)) FORM SWU-102 Rev 3.99 PAGE I OF 4 Footnotes: 1. When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious%and permanent pool depth. Linear interpolation should be employed to determine the correct value far non- standard table entries. 2. in the 20 coastal counties,the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal THE NCDENR 13MP manual provides design tables for bath 85%TSS removal and 90%'rSS removal II. REQIUIRED ITEMS CHECKLIST The•following checklist outlines design requirements per the Stonnwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February, I999) and Administrative Code Section: 15 A NCAC 211 .1008. Initial in the space provided to indicate the following design requirements have been met•and supporting documentation is attached. .if the•applicant has designated an agent in the Stormwater Management Permit Application Form,the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials 13i2 a. The permanent pool depth is between 3 and b feet(required minimum of 3 feet.). grit; b. The forebay volume is approximately equal to 20%of the basin volume. gea' c. The temporary pool controls runoff from the design storm event. •} gar d. The temporary pool draws down in 2 to 5-days. e. If required, a 30-foot vegetative filter is provided•at the outlet(include non-erosive flow tqA calculations). oaf f. The basin length to width ratio is greater than 3:1. BQ{ g. The basin side slopes above the permanent pool are no steeper than 3:1. WIC -_ h. A submerged and vegetated perimeter shelf with a-slopeof 6:1 or less(show detail). gi .__ i. Vegetative cover above the permanent pool elevation is specified. 6ti:C j. A trash rack or similar device is provided for both the overflow and orifice. 6wo l o,l gar lc. A. recorded drainage easement is provided for each basin including access to nearest Nor Yid 124.400PCS, right-of-way. I. If the basin is used for sediment and erosion control during construction,clean out of the _ ge( basin is specified prior to use as a wet detention basin. t30 in. A mechanism is specified which will drain the basin for maintenance or-an emergency. III. WET DETENTION BASIN OPERATION.AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) .[ does does not incorporate a vegetated filter at the outlet. This system(check one) I .1 does : El does not incorporate pretreatment other than a forebay. FORM SWU-102 Rev 3.99 PAGE 2 OF 4 Maintenance activities shall be performed as follows: '. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention'basin system for sediment accumulation, erosion, trash accumulation, vegetated cover,and general condition. b. Check and clear the orifice-of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately,.re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches,and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75%of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention-basin or stream,etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4.875 feet in the main pond,the sediment shall be removed. When the permanent pool depth reads 4.875 feet in the forebay,the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation 22.5 Sediment temoval El. 17.625 75 0 Sediment Removal Elevation 17.625 75% Bottom E evation 16.0 25° • ♦ Bottom Elevation 16.0 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. FORM SWU-102 Rev 3.99 PAGE 3 OF 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven i aintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Nathan D.Benson Title: Manager-Sandler at Shallotte,LLC Address: 448 Viking Drive-Suite 220 Virginia Beach,VA 23452 Phone: (757)463-5000 Signature _.„6i y-- Date: \' -c i Q 0 0 7 Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, 1.__\:vv Cl -, ,a Notary Public or the tate of sty-of- Cam, •yy o . M 0,_t'7-each ,do hereby certify that K`�o, l�nv elvv5 personally appeared before me this -r• t:-- \., day of 4V\0 [ -°° i ,-2000-- and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, Vi11:149-'616/ . - 6 , 0111111104 ti: tar .. : ,.„, .gin . :::„ i4vrAm.07-,:4:, SEAL My commission expires: p`]-3 t- l 0 FORM SWU-l02 Rev 3.99 PAGE 4 OF 4 SAN RIO-PHASE 1 STAGE-STORAGE FUNCTION B.R.FINCH,PE WDL-07010 Phase IB Amenity Pond 9/20/2007 Stage-Storage Function Project Name: San Rio-Phase 1 Designer: B.R.Finch,PE Job Number: WDL-07010 Date: 9/20/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 22.5 0.0 52138 --_ 23.0 0.5 58094 55116 27558 27558 0.49 24.0 1.5 61397 59746 59746 87304 1.51 25.0 2.5 63814 62606 62606 149909 2.55 25.5 3.0 65018 64416 32208 182117 3.08 Storage vs.Stage 200000 - 180000 — 160000 — y=57125x10534 140000 — R2= 1 C.).1 120000 — 100000 - S80000 — H 60000 — 40000 — 20000 — 0 r I I I I I I 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Stage(feet) K5= 57125 b= 1.0305 SAN RIO-PHASE 1 STAGE-STORAGE FUNCTION B.R.FINCH,PE WDL-07010 Phase 1B Amenity Pond 9/20/2007 =>Stage-Storage Function Ks= 57125 b= 1.0305 Zo= 22.5 Elevation Storage Worst Cse [feet] [cf] [acre-feet] [acre-feet] 22.5 0 0.000 - 22.6 5325 0.122 - 22.8 16520 0.379 - 23 27965 0.642 - 23.2 39555 0.908 - 23.4 51248 1.176 - 23.6 63020 1.447 - 23.8 74859 1.719 0.000 24 86754 1.992 0.273 24.2 98697 2.266 0.547 24.4 110683 2.541 0.822 24.6 122708 2.817 1.098 24.8 134768 3.094 1.375 25 146860 3.371 1.653 25.2 158981 3.650 1.931 25.4 171130 3.929 2.210 25.5 177215 4.068 2.350 Type. . . . Outlet Input Data Page 1.01 Name. . . . SWMF #1 File. . . . X:\Projects\WDL\WDL-07010\Storm\Phase 1\Design Files\WDL07000REVISED.PPW Title. . . Project Date: 5/29/2007 Project Engineer: Brandon R. Finch Project Title: San Rio - Phase 1 Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 22.50 ft Increment = .20 ft Max. Elev.= 25.50 ft Spot Elevations, ft 22.50 25.50 ********************************************** OUTLET CONNECTIVITY ********************************************** ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall El, ft E2, ft Weir-Rectangular WR ---> TW 24.000 25.500 Inlet Box RI ---> BA 23.800 25.500 Orifice-Circular OR ---> BA 22.500 25.500 Culvert-Circular BA ---> TW 21.200 25.500 TW SETUP, DS Channel S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:44 AM Date: 8/24/2007 Type. . . . Outlet Input Data Page 1.02 Name. . . . SWMF #1 File. . . . X:\Projects\WDL\WDL-07010\Storm\Phase 1\Design Files\WDL07000REVISED.PPW Title. . . Project Date: 5/29/2007 Project Engineer: Brandon R. Finch Project Title: San Rio - Phase 1 Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = WR Structure Type = Weir-Rectangular # of Openings = 1 Crest Elev. = 24.00 ft Weir Length = 15.00 ft Weir Coeff. = 2.600000 Weir TW effects (Use adjustment equation) Structure ID = RI Structure Type = Inlet Box # of Openings = 1 Invert Elev. = 23.80 ft Orifice Area = 16.0000 sq.ft Orifice Coeff. _ .600 Weir Length = 16.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 Structure ID = OR Structure Type = Orifice-Circular # of Openings = 1 Invert Elev. = 22.50 ft Diameter = .2080 ft Orifice Coeff. _ .600 S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:44 AM Date: 8/24/2007 Type. .. . Outlet Input Data Page 1.03 Name. . . . SWMF #1 File. . . . X:\Projects\WDL\WDL-07010\Storm\Phase 1\Design Files\WDL07000REVISED.PPW Title. . . Project Date: 5/29/2007 Project Engineer: Brandon R. Finch Project Title: San Rio - Phase 1 Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type = Culvert-Circular No. Barrels = 1 Barrel Diameter = 1.2500 ft Upstream Invert = 21.20 ft Dnstream Invert = 21.00 ft Horiz. Length = 36.00 ft Barrel Length = 36.00 ft Barrel Slope = .00556 ft/ft OUTLET CONTROL DATA. . . Mannings n = .0130 Ke = .5000 (forward entrance loss) Kb = .023225 (per ft of full flow) Kr = .5000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA. . . Equation form = 1 Inlet Control K = .0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 Ti ratio (HW/D) = 1.158 T2 ratio (HW/D) = 1.304 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below Ti elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at Ti & T2. . . At Ti Elev = 22.65 ft ---> Flow = 4.80 cfs At T2 Elev = 22.63 ft ---> Flow = 5.49 cfs S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:44 AM Date: 8/24/2007 Type. . . . Outlet Input Data Page 1.04 Name. . . . SWMF #1 File. . . . X:\Projects\WDL\WDL-07010\Storm\Phase 1\Design Files\WDL07000REVISED.PPW Title. . . Project Date: 5/29/2007 Project Engineer: Brandon R. Finch Project Title: San Rio - Phase 1 Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES. . . Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:44 AM Date: 8/24/2007 Type. . . . Composite Rating Curve Page 1.11 Name. . . . SWMF #1 File. . . . X:\Projects\WDL\WDL-07010\Storm\Phase 1\Design Files\WDL07000REVISED.PPW Title. . . Project Date: 5/29/2007 Project Engineer: Brandon R. Finch Project Title: San Rio - Phase 1 Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes Converge Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures 22.50 .00 Free Outfall (no Q: WR,RI,OR,BA) 22.60 .01 Free Outfall OR,BA (no Q: WR,RI) 22.80 .07 Free Outfall OR,BA (no Q: WR,RI) 23.00 .10 Free Outfall OR,BA (no Q: WR,RI) 23.20 .13 Free Outfall OR,BA (no Q: WR,RI) 23.40 .15 Free Outfall OR,BA (no Q: WR,RI) 23.60 .16 Free Outfall OR,BA (no Q: WR,RI) 23.80 .18 Free Outfall OR,BA (no Q: WR,RI) 24.00 4.49 Free Outfall RI,OR,BA (no Q: WR) 24.20 12.54 Free Outfall WR,RI,BA (no Q: OR) 24.40 19.33 Free Outfall WR,RI,BA (no Q: OR) 24.60 27.98 Free Outfall WR,RI,BA (no Q: OR) 24.80 38.14 Free Outfall WR,RI,BA (no Q: OR) 25.00 49.59 Free Outfall WR,RI,BA (no Q: OR) 25.20 62.21 Free Outfall WR,RI,BA (no Q: OR) 25.40 75.89 Free Outfall WR,RI,BA (no Q: OR) 25.50 83.10 Free Outfall WR,RI,BA (no Q: OR) S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:45 AM Date: 8/24/2007 SAN RIO-PHASE 1 WATER QUALITY VOLUME B.R.FINCH,PE WDL-07010 Phase 1B Amenity Pond 9/20/2007 Determination of Water Quality Volume(WQ WQ v =(P)(R v)(A)/12 where, WQv=water quality volume(in acre-ft) Rv=0.05+0.009(I)where I is percent impervious cover A=area in acres P=rainfall(in inches) Input data: Total area,A— 4.13 acres Impervious area= 1.78 acres Percent impervious cover,I= 43.2 % Rainfall,P= 1.0 inches Calculated values: Rv= 0.44 WQv= 0.15 acre-ft = 6579 cf. Determination of WQ Volume Elevation Input data: ==>Stage-Storage Function(Above NWSE) Ks= 57125 b= 1.0305 Zo= 22.5 Calculated values: WQV Storage Depth = 0.12 ft WQV Elevation = 22.62 ft 1 OF 1 SAN RIO-PHASE 1 PHASE IB AMENITY POND B.R.FINCH,PE WDL-07010 9/20/2007 Stage-Storage Function-Below Normal Pool Project Name: San Rio-Phase 1 Designer B.R.Finch,PE Job Number: WDL-07010 Date: 9/20/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 16.0 0.0 15395 17.0 1.0 18687 17041 17041 17041 1.05 18.0 2.0 22181 20434 20434 37475 1.94 19.0 3.0 25892 24037 24037 61512 2.85 20.0 4.0 31133 28513 28513 90024 3.83 21.0 5.0 37500 34317 34317 124341 4.92 22.0 6.0 48275 42888 42888 167228 6.19 22.5 6.5 52138 50207 25103 192331 6.89 Storage vs.Stage 250000 200000- • L::: Y= R50000- 0 I I I I I I 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stalls PO Ks= 15925 b= 1.2904 1 OF 1 SAN RIO-PHASE 1 PHASE 1B AMENITY POND B.R.FINCH,PE WDL-07010 9/20/2007 Stage-Storage Function-Forebay#1 i Project Name: San Rio-Phase 1 Designer: B.R.Finch,PE Job Number: WDL-07010 Date: 9/20/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 16.0 0.0 1988 17.0 1.0 2670 2329 2329 2329 1.06 18.0 2.0 3457 3064 3064 5393 1.93 19.0 3.0 4367 3912 3912 9305 2.84 20.0 4.0 5239 4803 4803 14108 3.83 21.0 5.0 6351 5795 5795 19903 4.89 22.0 6.0 9372 7862 7862 27764 6.20 22.5 6.5 9790 9581 4791 32555 6.94 Storage vs.Stage 35000 • I 30000- 25000- Y=2145.9x1A°34 g; R2=0.9943 ts 20000-1 15000- X. 10000- 5000 - 0 I I I I 1 I 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 Stage(feet) Ka= 2145.9 b a 1.4034 1 OF 1 SAN RIO-PHASE 1 PHASE 113 AMENITY POND B.A.FINCH,PE WDL-07010 9/20/2007 WATER QUALITY POND DESIGN #01t44Y.VOLUMEOP4t ' --- Per NCDENR"Stormwater Best Management Practices",the forebay volume should equal about 20%of the total basin velume. Total Volume Below NWSE= 192331 cf Forebay Volume= 32555 cf %Forelbay= 17% 44040:44.::.:01tPig Impervious Area= 1.78 acres Drainage Area= 4.13 acres %Impervious= 43.2% Total Below NP Volume= 192331 cf Surface Area= 52138 sf Average Depth= 3.7 ft From the NCDENR Stormwater BMP Handbook(4/99),the required SA/DA ratio for 90%TSS Removal is as follows: 3.5 3.7 4.0 Lower Boundary=> 40.0 4.00 3.50 Site%impervious=> 43.2 4.32 4.21 3.76 Upper Boundary=> 50.0 5.00 4.30 Area Required= 7581 sq.ft. Area Provided 7 52138 sq.ft. 1 OF 1 SAN RIO-PHASE 1 PHASE 1B AMENITY POND B.R.FINCH,PE WDL-07010 9/20/2007 Inverted Siphon Design Sheet D siphon= 2.5 inches No.siphons = 1 Ks= 57125 b= 1.0305 Cd siphon= 0.60 Normal Pool Elevation= 22.50 feet Volume @ Normal Pool= 0 CF Siphon Invert= 22.50 feet WSEL @ 1"Runoff Volume= 22.623 feet WQ Volume= 6579 By comparison,if calculated by the average head over the orifice(assuming average head is half the total depth),the result would be: Average driving head on orifice= 0.009 feet Orifice composite loss coefficient= 0.600 X-Sectional area of 1 -2.5"inverted siphon= 0.034 ft2 Q= 0.0158 cfs Drawdown Time=Volume/Flowrate/86400(sec/day) Drawdown Time= 4.81 days Conclusion : Use 1 -2.5"Diameter PVC Inverted Siphon to drawdown the accumulated volume from the 1.0 " storm runoff, with a required time of about 4.8 days. SAN RIO-PHASE 1 PHASE 1B AMENITY POND B.R.FINCH,PE WDL-07010 8/24/2007 Square Riser/Barrel Anti-Flotation Calculation Sheet Input Data=> Inside length of riser= 4.00 feet Inside width of riser= 4.00 feet Wall thickness of riser= 6.00 inches Base thickness of riser= 8.00 inches Base length of riser= 5.00 feet Base width of riser 5.00 feet Inside height of Riser= 2.60 feet Concrete unit weight= 142.0 PCF Note: NC Products lists unit wt.of OD of barrel exiting manhole= 21.00 inches manhole concrete at 142 PCF. Size of drain pipe(if present)— 8.0 inches Trash Rack water displacement= 0.00 CF Concrete Present in Riser Structure > Total amount of concrete: Base of Riser= 16.667 CF Riser Walls= 23.400 CF Adjust for openings: Opening for barrel= 1.203 CF Opening for drain pipe= 0.175 CF Total Concrete present,adjusted for openings= 38.689 CF Weight of concrete present= 5494 lbs Amount of water displaced by Riser Structure > Displacement by concrete= 38.689 CF Displacement by open air in riser= 41.600 CF Displacement by trash rack= 0.000 CF Total water displaced by riser/barrel structure= 80.289 CF Weight of water displaced= 5010 lbs Calculate amount of concrete to be added to riser=> Safety factor to use= 1.15 (recommend 1.15 or higher) Must add= 268 lbs concrete for buoyancy Concrete unit weight for use= 142 PCF(note above observation for NCP concrete) Buoyant weight of this concrete= 79.60 PCF Buoyant,with safety factor applied= 69.22 PCF Therefore,must add= 3.867 CF of concrete Standard based described above= 16.667 CF of concrete Therefore,base design must have= 20.534 CF of concrete SAN RIO-PHASE 1 PHASE 1B AMENITY POND B.R.F1NCH,PE WDL-07010 8/24/2007 Calculate size of base for riser assembly > Length= 8.000 feet Width= 8.000 feet Thickness= 8.0 inches Concrete Present= 42.667 CF OK Check validity of base as designed Total Water Displaced= 106.289 CF Total Concrete Present= 64.689 CF Total Water Displaced= 6632 lbs Total Concrete Present= 9186 lbs Actual safety factor= 1.38 OK Results of design=> Base length= 8.00 feet Base width= 8.00 feet Base Thickness= 8.00 inches CY of concrete total in base= 1.58 CY Concrete unit weight in added base>= 142 PCF SAN RIO—PHASE 1 B.R.FINCH,PE WDL-07010 8/24/07 NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe,assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs:2.00 Flow depth(ft) 0.56 slope S in%:0.56% Outlet velocity(fps)=3.753 pipe diameter D in in. : 15 Manning number n:0.013 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe diameter(ft) 1.25 Outlet velocity(fps) 3.75 Apron length(ft) 5.00 AVG DIAM STONE THICKNESS (inches) CLASS (inches) >>3 A 9<< 6 B 22 13 B or l 22 23 2 27 CALCULATION: Minimum TW Conditions:W=Do+La = 1.25'+5' =6.25 ft CONCLUSION: USE NCDOT CLASS'A'RIP RAP 5'Lx7'Wx9"THK D50=4" SAN RIO-PHASE 1 B.R.FINCH,PE WDL-07010 8/24/2007 LEVEL SPREADER DESIGN CALCULATIONS Calculation of Level Spreader Length The purpose of the level spreader is to provide a non-erosive outlet by converting concentrated flow into sheet flow and release it uniformly over the vegetated filter strip. The level spreader length should be designed such that during the 25-year storm event, an non-erosive velocity(in this case, 5 feet per second maximum) is released from the level spreader into the vegetated filter strip. The required level spreader length can be computed using the weir equation: Level Spreader Length Calculation=_> 25-Year Storm Peak Flowrate, Q25 = 3 cfs Weir Coefficient, Cw= 3.0 Design Flow Depth on Level Spreader, 2/3*H = 4 inches Corresponding Driving Head on Level Spreader, H = 6 inches Required Level Spreader Length= 3 feet Calculation of Level Spreader Exit Velocity As previously mentioned, the level spreader should be designed such that a non-erosive velocity is released from the level spreader into the vegetated filter strip. The velocity exiting the level spreader can be computed using the continuity equation, Q=VA: 25-Year Storm Peak Flowrate, Q25= cfs Design Level Spreader Length = 3 feet Design Flow Depth on Level Spreader, 2/3*H = 4 inches Flow Area (Level Spreader L*2/3*H)= 1 square feet Computed Level Spreader Exit Velocity= 2.12 feet/second HMS * Summary of Results for Ph1B Amenity Pd Project : 2007-08-23 WDL-07020 Run Name : Post - Q1 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 1-Year Execution Time : 24Aug07 1102 Control Specs : 1-min dT Computed Results Peak Inflow : 10.965 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 0.11156 (cfs) Date/Time of Peak Outflow : 02 Jan 01 0100 Total Inflow : 2.45 (in) Peak Storage : 0.74453(ac-ft) Total Outflow : 0.30 (in) Peak Elevation : 23.077(ft) HMS * Summary of Results for Ph1B Amenity Pd Project : 2007-08-23 WDL-07020 Run Name : Post - Q10 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 10-Year Execution Time : 24Aug07 1103 Control Specs : 1-min dT Computed Results Peak Inflow : 24.090 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 0.31414 (cfs) Date/Time of Peak Outflow : 01 Jan 01 2259 Total Inflow : 5.59 (in) Peak Storage : 1.7275(ac-ft) Total Outflow : 0.61 (in) Peak Elevation : 23.806(ft) HMS * Summary of Results for Ph1B Amenity Pd Project : 2007-08-23 WDL-07020 Run Name : Post - Q25 Start of Run : 01Jan01 0100 Basin Model : Post End of Run : 02Jan01 0100 Met. Model : 25-Year Execution Time : 24Aug07 1217 Control Specs : 1-min dT Computed Results Peak Inflow : 38.444 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 1.7797 (cfs) Date/Time of Peak Outflow : 01 Jan 01 1504 Total Inflow : 7.42 (in) Peak Storage : 1.8203(ac-ft) Total Outflow : 2.43 (in) Peak Elevation : 23.874(ft) 100-YEAR STORMROUTING SAN RIO-PHASES 1B&2A WDL-07020 SAN RIO PHASE II SWMF#1 B.R.FINCH,PE WDL-07020 Worst-Case Scenario 8/20/2007 Stage-Storage Function Ks= 20230 b= 1.1085 Zo= 15.00 Elevation Storage ��- [feet] [cf] [acre-feet] 100-YR 15.00 0 0.000 - 15.20 3398 0.078 - 15.40 7326 0.168 - 15.60 11484 0.264 - 15.80 15797 0.363 - 16.00 20230 0.464 - 16.20 24761 0.568 - 16.40 29375 0.674 - 16.60 34061 0.782 - 16.80 38812 0.891 - 17.00 43620 1.001 - 17.20 48481 1.113 - 17.40 53390 1.226 - 17.60 58344 1.339 - 17.80 63339 1.454 - 18.00 68373 1.570 0.000 18.20 73444 1.686 0.116 18.40 78549 1.803 0.234 18.60 83687 1.921 0.352 18.80 88856 2.040 0.470 19.00 94054 2.159 0.590 19.20 99281 2.279 0.710 19.40 104535 2.400 0.830 19.60 109815 2.521 0.951 19.80 115120 2.643 1.073 20.00 120449 2.765 1.196 Type. . . . Composite Rating Curve Page 1.07 Name. . . . Pond #1 - 100yr File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes Converge Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures 18.00 .00 Free Outfall (no Q: RI,BA) 18.20 4.29 Free Outfall RI,BA 18.40 12.14 Free Outfall RI,BA 18.60 22.31 Free Outfall RI,BA 18.80 29.34 Free Outfall RI,BA 19.00 30.17 Free Outfall RI,BA 19.20 30.98 Free Outfall RI,BA 19.40 31.78 Free Outfall RI,BA 19.60 32.54 Free Outfall RI,BA 19.80 33.30 Free Outfall RI,BA 20.00 34.03 Free Outfall RI,BA S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 5:52 PM Date: 8/20/2007 SAN RIO PHASE II SWMF#2 B.R.FINCH,PE WDL-07020 Worst-Case Scenario 8/20/2007 Stage-Storage Function Ks= 20247 b= 1.1085 Zo= 15.00 Elevation Storage [feet] [cf] [acre-feet] 100-YR 15.00 0 0.000 - 15.20 3401 0.078 - 15.40 7332 0.168 - 15.60 11493 0.264 - 15.80 15810 0.363 - 16.00 20247 0.465 - 16.20 24782 0.569 - 16.40 29400 0.675 - 16.60 34090 0.783 - 16.80 38845 0.892 - 17.00 43657 1.002 - 17.20 48522 1.114 - 17.40 53435 1.227 - 17.60 58393 1.341 - 17.80 63392 1.455 - 18.00 68430 1.571 - 18.20 73505 1.687 0.000 18.40 78615 1.805 0.117 18.60 83757 1.923 0.235 18.80 88931 2.042 0.354 19.00 94133 2.161 0.474 19.20 99365 2.281 0.594 19.40 104623 2.402 0.714 19.60 109908 2.523 0.836 19.80 115217 2.645 0.958 20.00 120550 2.767 1.080 Type. . . . Composite Rating Curve Page 1.06 Name. . . . Pond #2 - 100yr File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** CUMULATIVE HGL CONVERGENCE ERROR .000 (+/- ft) WS Elev, Total Q Notes Converge Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures 18.20 .00 11.00 .000 (no Q: RI,BA) 18.40 4.29 11.00 .000 RI,BA 18.60 12.14 11.00 .000 RIBA 18.80 22.31 11.00 .000 RIBA 19.00 34.35 11.00 .000 RIBA 19.20 42.74 11.00 .000 RIBA 19.40 43.31 11.00 .000 RIBA 19.60 43.89 11.00 .000 RIBA 19.80 44.45 11.00 .000 RI,BA 20.00 45.00 11.00 .000 RIBA S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 5:54 PM Date: 8/20/2007 SAN RIO PHASE II SWMF#3 B.R.FINCH,PE WDL-07020 Worst-Case Scenario 8/20/2007 Stage-Storage Function Ks= 55540 b= 1.086 Zo= 8.00 Elevation Storage [feet] [ci] [acre-feet] 100-YR 8.00 0 0.000 - 8.20 9672 0.222 - 8.40 20533 0.471 - 8.60 31892 0.732 - 8.80 43587 1.001 - 9.00 55540 1.275 - 9.20 67701 1.554 - 9.40 80039 1.837 - 9.60 92529 2.124 - 9.80 105155 2.414 - 10.00 117903 2.707 - 10.20 130761 3.002 - 10.40 143719 3.299 - 10.60 156771 3.599 - 10.80 169910 3.901 - 11.00 183130 4.204 - 11.20 196426 4.509 - 11.40 209793 4.816 - 11.60 223229 5.125 - 11.80 236729 5.435 0.000 12.00 250290 5.746 0.311 12.20 263909 6.059 0.624 12.40 277585 6.372 0.938 12.60 291314 6.688 1.253 12.80 305094 7.004 1.569 13.00 318924 7.321 1.887 13.20 332802 7.640 2.206 13.40 346725 7.960 2.525 13.60 360693 8.280 2.846 13.80 374704 8.602 3.167 14.00 388757 8.925 3.490 14.20 402850 9.248 3.814 14.40 416982 9.573 4.138 14.50 424062 9.735 4.301 Type. . . . Composite Rating Curve Page 1.07 Name. . . . Pond #3 - 100yr File. . . . X:\Projects\WDL\WDL-07020\Storm\POND OUTLET STRUCTURES.PPW Title. . . Project Date: 8/3/2007 Project Engineer: Jason Spicer Project Title: San Rio Phase II Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** CUMULATIVE HGL CONVERGENCE ERROR .000 (+/- ft) WS Elev, Total Q Notes Converge Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures 11.80 .00 11.00 .000 (no Q: ES,RI,BA) 12.00 6.44 11.00 .000 RIBA (no Q: ES) 12.20 18.21 11.00 .000 RIBA (no Q: ES) 12.40 41.63 11.00 .000 ES,RI,BA 12.60 76.40 11.00 .000 ES,RI,BA 12.80 99.79 11.00 .000 ES,RI,BA 13.00 127.29 11.00 .000 ES,RI,BA 13.20 158.50 11.00 .000 ES,RI,BA 13.40 193.24 11.00 .000 ES,RI,BA 13.60 231.38 11.00 .000 ES,RI,BA 13.80 272.85 11.00 .000 ES,RI,BA 14.00 317.55 11.00 .000 ES,RI,BA 14.20 365.48 11.00 .000 ES,RI,BA 14.40 416.60 11.00 .000 ES,RI,BA 14.50 443.35 11.00 .000 ES,RI,BA S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 5:55 PM Date: 8/20/2007 SAN RIO-PHASE 1 STAGE-STORAGE FUNCTION B.R.FINCH,PE WDL-07010 Phase 1 B Amenity Pond 8/24/2007 =>Stage-Storage Function Ks= 57125 b= 1.0305 Zo= 22.5 Elevation Storage � 'Worst Cse [feet] [cf] ' [acre-feet]IL[acre-fectj 22.5 0 0.000 f! - 22.6 5325 0.122 - 22.8 16520 0.379 - 23 27965 I 0.642 - 23.2 _ 39555_I 0.908 - 23.4 51248 1.176 - 23.6 I 63020 1.447 - _- 23.8 74859 1.719 0.000 24 86754 1.992 0.273 24.2 98697 2.266 0.547 24.4 110683 2.541 0.822 24.6 122708 2.817 1.098 24.8 134768 3.094 1.375 25 146860 3.371 1.653 25.2 158981 3.650 1.931 25.4 171130 3.929 2.210 25.5 177215 4.068 2.350 Type. . . . Composite Rating Curve Page 1.08 Name. . . . SWMF #1 - 100 File. . . . X:\Projects\WDL\WDL-07010\Storm\Phase 1\Design Files\WDL07000REVISED.PPW Title. . . Project Date: 5/29/2007 Project Engineer: Brandon R. Finch Project Title: San Rio - Phase 1 Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes Converge Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures 23.80 .00 Free Outfall (no Q: WR,RI,BA) 24.00 4.29 Free Outfall RI,BA (no Q: WR) 24.20 12.54 Free Outfall WR,RI,BA 24.40 19.33 Free Outfall WR,RI,BA 24.60 27.98 Free Outfall WR,RI,BA 24.80 38.14 Free Outfall WR,RI,BA 25.00 49.59 Free Outfall WR,RI,BA 25.20 62.21 Free Outfall WR,RI,BA 25.40 75.89 Free Outfall WR,RI,BA 25.50 83.10 Free Outfall WR,RI,BA S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 12:07 PM Date: 8/24/2007 HEC-HMS Project: 2007-08-23 WDL-07020 Basin Model: Post-100yr i fSB3•To BWMF 01 Amoolty Food Pond 02 k"\\\ Pond03 HMS * Summary of Results for Pond #1 Project : 2007-08-23 WDL-07020 Run Name : Post - Q100 Start of Run : 01Jan01 0100 Basin Model : Post - 100yr End of Run : 02Jan01 0100 Met. Model : 100-Year Execution Time : 24Aug07 1231 Control specs : 1-min dT Computed Results Peak Inflow : 47.737 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 29.439 (cfs) Date/Time of Peak Outflow : 01 Jan 01 1309 Total Inflow : 9.62 (in) Peak Storage : 0.48430(ac-ft) Total Outflow : 9.58 (in) Peak Elevation : 18.824(ft) HMS * Summary of Results for Pond #2 Project : 2007-08-23 WDL-07020 Run Name : Post - Q100 Start of Run : 01Jan01 0100 Basin Model : Post - 100yr End of Run : 02Jan01 0100 Met. Model : 100-Year Execution Time : 24Aug07 1231 Control Specs : 1-min dT Computed Results Peak Inflow : 37.628 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 25.665 (cfs) Date/Time of Peak Outflow : 01 Jan 01 1308 Total Inflow : 10.16 (in) Peak Storage : 0.38744(ac-ft) Total Outflow : 10.12 (in) Peak Elevation : 18.856(ft) HMS * Summary of Results for Pond #3 Project : 2007-08-23 WDL-07020 Run Name : Post Q100 Start of Run : 01Jan01 0100 Basin Model : Post - 100yr End of Run : 02Jan01 0100 Met. Model : 100-Year Execution Time : 24Aug07 1231 Control Specs : 1-min dT Computed Results Peak Inflow : 245.17 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 171.00 (cfs) Date/Time of Peak Outflow : 01 Jan 01 1308 Total Inflow : 9.07 (in) Peak Storage : 2.3208(ac-ft) Total Outflow : 9.00 (in) Peak Elevation : 13.272(ft) HMS * Summary of Results for Amenity Pond Project : 2007-08-23 WDL-07020 Run Name : Post - Q100 Start of Run : 01Jan01 0100 Basin Model : Post - 100yr End of Run : 02Jan01 0100 Met. Model : 100-Year Execution Time : 24Aug07 1231 Control Specs : 1-min dT Computed Results Peak Inflow : 45.143 (cfs) Date/Time of Peak Inflow : 01 Jan 01 1304 Peak Outflow : 19.123 (cfs) Date/Time of Peak Outflow : 01 Jan 01 1314 Total Inflow : 10.68 (in) Peak Storage : 0.81362(ac-ft) Total Outflow : 10.58 (in) Peak Elevation : 24.394(ft) STATE STORMWATER MANAGEMENT PERMIT APPLICATION SAN RIO-PHASES 1B&2A WDL-07020 JUL-17-2007 TUE 08:59 AM NODENR FAX NO, 9103502004 P, 02/02 \NAr� �� 9p Michael P.Easley,Governor O G William G.Ross Jr.,Secretary yNorth Carolina Department of Environment and Natural Resources O l r • Coleco Fl.Sullins,Director Division of Water Quality July 13, 2007 Nathan D. Benson, Manager Sandler at Shallotte, LLC 7246 Beach Drive Suite 2 Ocean Isle Beach, NC 28469 Subject: Stormwater Permit No. SW8 070202MOD San Rio Master Stormwater Plan and Phase I Permit High Density Subdivision Project Brunswick County Dear Mr. Benson: On July 13, 2007, the Wilmington Regional Office received a plan revision for Stormwater Management Permit Number SW8 070202. The revisions include the relocation of 3 Stormwater drainage swales. It has been determined that a formal permit modification is not required for the proposed changes. Please replace the old approved plan sheets with the new ones Please be aware that all terms and conditions of the permit issued on June 18, 2007, remain in full force and effect. Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on a case-by-case basis. Any other changes to this project must be approved through this Office prior to construction. The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions concerning this matter, please do not hesitate to call me at (910) 796-7304. Sincerely, Chris Baker Environmental Engineer ENBlcsb: S:\WQS\STORMWATER\PERMIT1070202MODPR.jul07 cc: Johnathan P. Eakins, P.E., The John McAdams Company, Inc, Brunswick County Building Inspections Chris Baker Wilmington Regional Office Central Files NoaihCurolinu North Carolina Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 Phone(919)733-7015 Customer Service Internet; www.ncwatcrquality,org Location: N.512 Salisbury St. Raleigh,NC 27604 Fax (919)733-2496 1477-623-6748 An Equal Opportunity!Alflrnietive Action Employer-50%Recycled/1 D%Post Consumer Paper It r •-%i:: r ::S:r.H. ::.-;Z':=,-.:.'-. .qr y.!E rk=.1r., e; .. ,.:,_::-•'• • • • % , _ , . w JUN-19-2007 TUE 11:28 AM NCDENR FAX NO. 9103502004 P, 02 ;W2G WAr� Michael F.Easley,Governor William G.Rosa Ir.,Secretary North Carolina Department of Bnvimnmcnt and Natural Resources 'C Colcon H.Sullins,Director Division of Water Quality June 18, 2007 Nathan D. Benson, Manager Sandler at Shallotte, 448 Viking Drive—Suite 220 Virginia Beach, VA 23452 Subject: Stormwater Permit No. SW8 070202MOD San Rio Master Stormwater Plan and Phase I Permit High Density Subdivision Project Brunswick County Dear Mr. Benson: The Wilmington Regional Office received a complete Stormwater Management Permit Application for San Rio Master Stormwater Plan and Phase I Permit on June 7,2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 070202MOD, dated June 18,2007,for the construction of the project, San Rio Master Stormwater Plan and Phase I. This permit shall be effective from the date of issuance until February 15, 2017, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements;or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty(30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at (910) 796-7215. Sincer , aft.<0 E and Beck Regional Supervisor Surface Water Protection Section ENB/csb: S:IWQSISTORMWATERIPERMIT1070202.feb07 cc: Johnathan P. Eakins, P.E., The John McAdams Company, Inc, Brunswick County Inspections Chris Baker Wilmington Regional Office oath Central Files N, t�tCaro r a North Carolina Division of Water Quality I617 Mail Service Center Raleigh,NC 27699.1617 Plionc(9l9)733-7015 Customer Service Internet, www.ncwntergtalily,4ti; Location; N.512 Salisbury St. Raleigh,NC 27604 Fax (9t9)733-2496 1-877-623-674A An Equal Opportunity/Affirmative Action Employer—50%Recycled/1n Post Consumer Paper JUN-19-2007 TUE 11:29 All NODENR FAX N0. 9103502004 P. 03 • State Stormwater Management Systems Permit No. SW8 070202M00 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Nathan D. Benson and Sandler at Shallotte, LW San Rio Master Stormwater Plan and Phase I Permit Grey Bridge Road, Brunswick County • FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 15, 2017 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The Master Stormwater Permit covers the construction of 8,688,042 square feet of built-upon area with the Phase I section permitted as described in section 1.3 of this permit. 3. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on page 3 of this permit.The subdivision is permitted for 151 lots, each allowed a maximum of built-upon area as follows: Lot# Maximum Built- Upon Ares (sf) 1-21,28-48 2900 22-27, 49-80, 90-100, 3900 106-125, 134=150 81-89, 101-105, 126-133 4900 . 151 8000 4. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 2 of 9 JUN-19-2007 TUE 11:29 A11 NCDENR FAX NO, 9103502004 P. 04 State Stormwater Management Systems Permit No. SW8 070202MOD 5. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. a. Drainage Area, acres: 4.8 Onsite, ft2: 209,088 • Offsite,1tt2: None b. Total Impervious Surfaces, ft2: 77,7730 Lots,ft2:' 12,195 Roads/Parkia g, ft2: 46,087 Sidewalks, ft`: 8,558 Other,ft2: 10,890 c. Pond Depth, feet: 6,5 d. TSS removal efficiency: 90% e. Design Storm: 1 f. Permanent Pool Elevation, FMS : 22.5 g. Permitted Surface Area a@. PP.4.f 50,599 h. Permitted Storage Volume, ft . 191,038 i. Storage Elevation, FMSL: 22.63 j. Controlling Orifice: 2"f pipe k. Permanent Pool Vooume,ft3: 6,560 I. Forebay Volume,ft : 31,836 m. Maximum Fountain Horsepower: 3/4 n. Receiving Stream / River Basin: Shallotte River/ Lumber o. Stream Index Number: 15-25.-2-(7.5) p. Classification of Water Body: "SC;HQW" 11. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as sw.ales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built-upon area for the entire lot does not exceed the maximum allowed by this permit Once the lot transfer is complete, the built-upon area may not be revised without approval from the Division of Water Quality,and responsibility for meeting the built-upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must Include all proposed built-upon area.Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to,those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permiee,for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. Page 3 of 9 JUN-19-2007 TUE 11 :29 AM NODENR FAX NO, 9103502004 P. 05 State Stormwater Management Systems Permit No. SW8 070202MOD 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans, 7. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice,the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum.requirements.The permittee shall provide copies of revised plans and certification in wilting to the Director that the changes have been made. 8. The stormwater management system shall be constructed in its entirety, vegetated and operational for Its intended use prior to the construction of any built-upon surface, 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10, Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11, If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual, • 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals Including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 14. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 4 of 9 JUN-19-2007 TUE 11:29 AM NODENR FAX NO, 9103502004 P, 06 State Stormwater Management Systems Permit No. SW8 070202M0D 15. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit,the approved plans and specifications, and other supporting data. 16. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 070202M0D, as issued by the Division of Water Quality under NCAC 2H.1 000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater. Management Permit. c. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage.as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built-upon area per lot is as follows: Lot# Maximum Built- Lot Area (sf) 1-21, 28-48 2900 _ 22-27,49-80, 90-100, 3900 106-125, 134-150 • 81-89, 101-105, 126-133 4900 151 8000 This allotted amount includes any built-upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. i. All runoff on the lot must drain into the permitted system.This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. j. Built-upon area in excess of the permitted amount will require a permit modification. 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 18. Prior to transfer of the permit,the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. Page 5 of 9 JUN-19-2007 TUE 11:29 Ati NCDENR FAX NO. 9103502004 P. 07 State Stormwater Management Systems Permit No. SW8 070202MOD 19. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. • b. Separated units, where the nozzle, pump and intake are connected by • tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump Is based on the permanent pool volume.The maximum pump power for a fountain in this pond is 3/4 20. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director, In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form"must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a'signed Operation and Maintenance plan. The project must be In good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215,6A to 143-215.6C, 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies(local, state, and federal)which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Page 6 of 9 JUN-19-2007 TUE 11:29 AM NCDENR FAX NO, 9103502004 P. 08 State Stormwater Management Systems Permit No. SW8 070202MOD 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within.30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 18th day of June 2007. NORTH OLINA ENVIRONMENTAL MANAGEMENT COMMISSION or Coleen Sullins, Dire or Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW8 070202MOD • Page 7 of 9 JUN-19-2007 TUE 11:29 Ali NCDENR FAX NO. 9103502004 P. 09 State Stormwater Management Systems Permit No. SW8 070202MOD San Rio Master Stormwater Plan and Phase I Permit Page 1 of 2 Stormwater Permit No. SW8 070202MOD • Brunswick County • Designees Certification I, ,as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time)the construction of the project, (Project) for (Project Owner) hereby state that,to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date • • Page 8 of 9 JUN-19-2007 TUE 11:30 At1 NCDENR FAX NO. 9103502004 P. 10 State Stormwater Management Systems Permit No. SW8 070202MOD Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack Is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. Ali required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. • cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections Page 9of9 JUN-19-2007 TUE 11:30 AM NCDENR FAX NO. 9103502004 P. 11 OFFICE USE ONLY Dare Received Fee Paid Permit Number _.�... 47107 fibieo ` . ?__— 5WB 70 4'2. itfoi) . i State of North Carolina • Department of Environment and Natural Resources Division of Water Quality STOR.MWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original L •GENERAL INFORMATION 1. Applicants name(specify the name of the corporation, individual, etc.who owns the project): Sandler at Shallotte,LLC 2. Print Owner/Signing Official's name and title(person legally responsible for facility and compliance): Nathan D.Benson-Manager 3, Mailing Address for person listed in item 2 above; 448 Viking Drive..Suite 220 City: Virginia Beach State: VA Zip: 23452 Telephone Number: (757) 463.5000 Project Name (subdivision, facility, or establishment name — should be consistent with project name on plans, specifications, letters,operation and maintenance agreements,etc.): San Rio 5. Location of Project(street address): Located off of Gray Bridge Road/Tar Landing Road City: Shallotte County: , Brunswick 6. Directions to project(from nearest major intersection): Pram intersection of US 17 and NC 130,go east on NC 130. Turn right onto Gray Bridge Road.The project entrance-will be on the right(before the intersection with Tar Landing Road) 7. Latitude: 33 58`00"N • Longitude: 78 21'20"W of project, 8. Contact person who can answer questions about this project: Name: Mr.Jim Wiseman/Mr.Jim Green Telephone Number: (910) 575 4.300 II. PERMIT INFORMATION 1. Specify whether project is(check one): ❑ New ❑ Renewal ® Modification mn SWU-101 Version 3.99 Page 1 of4 JUN-19-2007 TUE 11 :30 AM NODENR FAX NO. 9103502004 P, 12 2. if this application is being submitted as the result of a renewal or mediflcation to an existing permit, list the existing permit number SW8 070202 and its issue date(in known) 2/15/2007 3. Specify the type of project(check one); Low Density 0 High Density ,n,, Redevelop ❑ General Permit ❑ Other • 4. Additional Project Requirements(check applicable blanks): ❑ _ CAMA Major f] Sedimentation/Erosion Control ❑ 404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-.877-623- 6748 • III. PROTECT INFORMATION I. In the space provided below, summarize how stonnwater will be treated. Also attach a detailed narrative (one to two pages)describing stonnwater management for the project. The project is proposed as a low-density project with high-density pockets. Runoff from the proposed roadway/ sidewalk areas in the low-density portions will be treated with curb-outlet systems.Runoff from the impervious . areas within the high-density pockets.will be treated with wet detention ponds/infiltration devices. 2. Stormwater runoff from this project drains to the Lumber River basin. 3, Total Project Area; SA- 112.80 ac. 4. Project Built Upon Area; 25(SA)/30(SC) % SC-570.85 ac. 5. How many drainage areas does the project have? 13 Complete the following information for each drainage area. if there are more than two drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving,Stream Name See Attachment A See Attachment A Receiving Stream Class Drainage Area Existing Impervious ' Area Proposed Impervious ' Area • %Impervious * Area(total) Impervious * Surface Area Drainage Area 1 Drainage Area 2 On-Site Buildings See Attachment A See Attachment A _ On-Site Streets On-Site Parking_ On-Site Sidewalks Other On-Site Off-site i Total: See Attachment A Total: See Attachment A *Impervious area is defined as the built upon area including, but not limited to, buildings, roads,parking areas, -idewal/cs, gravel areas, etc. • �rni SWU-101 Version 3.99 Page 2 of 4 JUN-19-2007 TUE 11 :30 AM NCDENR FAX NO. 9103502004 P. 13 7. How was the off-site impervious area listed above derived? N/A • • IV: DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels'and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number,size and allowable built-upon area for each lot must be provided as an attachment, 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number N/A as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than Attachment A square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or water surface of swimming pools. 3. Swales shall nor be filled in,piped, or altered except as necessary to provide driveway crossings. 4. Built-upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. All permitted 1 unoff fro,n outparcels or future development.shall be directed into the permitted,stormwater control system. These connections to the stormwater control system shall he performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the State,and that they will be recorded prior to the sale of any lot. V. SUPLEIVIENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-50S3 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off-site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWII-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement 'rm SWU-101 Version 3.99 Page 3 of 4 JUN-19-2007 TUE 11:30 AN NCDENR FAX NO 9103602004 P. 14 �.. SUBMITTAL REQUIREMENTS only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the Items listed below. The complete application package should be submitted to the appropriate DWQ Regional office. 1. Please Indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form [3t2C • • One copy of the applicable Supplement Form(s)for each BMP Otte • Permit application processing fee of$420(payable to NCDENR) SOF • Detailed narrative description of stormwater treatment/management 82 • Two copies of plans and specifications,including: gof Development/Project name -Engineer and firm -Legend -North arrow -Scale -Revision number&date -Mean high water line -Dimensioned property/project boundary -Location map with named streets or NCSR numbers -Original contours,proposed contours,spot elevations,finished floor elevations -Details of roads,drainage features,collection systems,and stonnwater control measures -Wetlands delineated,or a note on plans that none exist -Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations -Drainage areas delineated -Vegetated buffers(where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf,please complete this section. Designated agent(individual or firm): The John R.McAdams Company,Inc. Mailing Address; 2905 Meridian Parkway City: Durham State: NC Zip: 27713 Phone: (919) 361-5000 Fax: (919) 361-2269 VIII. APPLICANT'S CERTIFICATION I, (print or type name ofperson listed in C3eneral Information, item 2) Nathan D.Benson ,certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded,and that t proposed project complies with the requirements of 15A NCAC 211.1000. Signature: ,�/��/ Date: rh./ `anc)-] n SW 01 Version 3.99 Page 4 of 4 JUN-19-2007 TUE 11:30 AN NCDENR FAX NO. 9103502004 P. 15 c"B1, In accordance with Title 15. NCAC 2H-1000, the Coastal Stormwater Management Regulations, deed restrictions and protective covenants are required for Low Density Residential Subdivisions with curb outlet swales and high-density pockets,where lots will be subdivided and sold and runoff from the high-density pockets will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built-upon" area consistent with the applicable regulation governing the density level, >' NA-MIA a gr s4:4 acknowledge and affirm by my signature below, that I will cause the following deed restrictions and protective covenants to be recorded for 5ArJ Ott:,_ PHASE prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number 5v1 o-a2n2, as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State ofNorth Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. 6. The maximum built-upon area per lot is as follows: "1-21 2900 22-27 3900 28-48 2900 49-80 3900 81-89 4900 90-100 3900 101-105 4900 106-125 3900 126-133 4900 134-150 3900 151 8000 This allotted amount includes any built-upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt. concrete,gravel, brick, stone, slate; coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. . 7. In the case of a lot within CAMA's regulated AEC, where the Division of Coastal Management calculates a different maximum allowable built-upon area for that lot JUN-19-2007 TUE 11:30 AM NCDENR FAX NO. 9103502004 P. 16 than is shown herein, the governing maximum built-upon area for that lot shall be the most restrictive of the two . 8. This project proposes a curb outlet system. Each designated curb outlet swale shown on the approved plan must be maintained at a minimum of 100`long with 5:1 (FLY) side slopes or flatter, have a longitudinal slope no steeper than 5%, carry the flow from.a 10 year storm in a non-erosive manner, and maintain a dense vegetated cover, 9 Filling in or piping of any vegetative conveyances(ditches, swales, etc.) associated with the development except for average driveway crossings, is strictly prohibited by any persons. 10. Each lot will maintain a 30'wide vegetated buffer between all impervious areas and surface waters. 11. All roof drains shall terminate at least 30'from the mean high water mark of surface waters. 12. Filling in,piping or altering any designated 5:1 curb outlet swale associated with • the development is prohibited by any persons. 13. All stormwater runoff from the street sections within the low-density areas must drain into the permitted vegetated swales though the curb-outlet system. 14. All runofffrom the high-density areas shall drain into the permitted system. This • may be accomplished through providing roof drain gutters which drain to the street, grading the areas to drain toward the street, or grading perimeter swales and directing them into a component of the stormwater collection system. Areas that will naturally drain into the system are not required to provide these additional measures. 15. Built-upon area in excess of the permitted amount will require a permit moderation. Signature: Date: P I, �. A. S.�ca' , a Notary Public for the State of \,.7s- w;r1 earn , do hereby certify tat day �•Q• . • e�.S`W. ��perrssoonally appeared before me this Sr k am, , 7 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, & c 6./. 5;20„64/ Linda J.Todd `� Commonwealth of Virginia ', Notary public ' 4: Commission No.21E08 ? My Commaolon Ei plrs 07/8112010 SEAL My commission expires l 7---",?•, \-\ b JUN-19-2007 TUE 11:30 AM NODENR FAX NO. 9103502004 P. 17 Permit No. 414070Z02.14,06) (to he provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopies for use as an original DWQ Storrnwater Management Plan.Review A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. 1. PROJECT INFORMATION(please complete the following information): 'Project Name: San Rio-Phase 1 Contact Person: Mr.Jim Wiseman/Mr.Jim Green Phone Number (910) 575-4300 For projects with multiple basins,specify which basin this worksheet applies to: Section I C elevations Basin Bottom Elevation 16.00 ft. (floor of the basin) 'erm.auent Pool Elevation 22.50 ft. (elevation of the orifice) ;mporary Pool Elevation 22.63 It, (elevation of the discharge structure overflow) areas Permanent Pool Surface Area 50,599 sq, it. (water surface area at the orifice elevation) Drainage Area 4.02 cc. (on-site and of-site drainage to the basin) Impervious Area 1.78 ac. (on-site and off-site drainage to the basin) volumes Permanent Pool Volume 191,038 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 6,560 erg.ft. (volume detained above the permanent pool) Forebay Volume 31,836 cu. ft. (approximately 20%of total volume) other parameters SA/DA1 4.27 (surface area to drainage area ratio from bWQ table) Diameter of Orifice 2.00 in. (2 to 5 day temporary pool draw-down required) Design Rainfall 1.00 in. Design TSS Removal' 90 . % (minimum 85%required)) )RM SW[1-102 Rev 3.99 PAGE 1 OF 4 JUN-19-2007 TUE 11:31 AN NODENR FAX NO. 9103502004 P. 18 Footnotes: • When using the Division SA/DA tables,the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious%and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. 2 In the 20 coastal counties,the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90%TSS removal Ti-IS NCDENR BMP manual provides design tables for both 85%TSS removal and 90%TSS removal. IL REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Departnient of Environment, Health and Natural Resources, February, 1999) and Administrative Code Section; 15 A NCAC 2H.1008. • Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached, If the applicant has designated an agent in the Stormwater Management Permit Application Form,the agent may initial below. If requirement has not been met, attach justification. Applicants Initials 1312F a. The permanent pool depth is between.3 and 6 feet(required minimum of 3 feet). b. The forebay volume is approximately equal to 20%of the basin volume. Oaf c. The temporary pool controls runoff from the design storm event gOF d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet(include non-erosive flow ts,lA calculations). gef f. The basin.length to width ratio is greater than 3:1. get g. The basin side slopes above the permanent pool are no steeper than 3:1. . tic h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less(show detail). Seg i. Vegetative cover above the permanent pool elevation is specified. get' j. A trash rack or similar device is provided for both the overflow and orifice. si,..3.40,4parg,gut k. A recorded drainage easement is provided for each basin including access to nearest bier ler ov.cesaet4, right-of-way. I. If the basin is used for sediment and erosion control during construction,clean out of the 8tt basin is specified prior to use as a wet detention basin. t5e0 in. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one) ❑ does ® does not incorporate pretreatment other than a forebay. ARMSWU-102 Rev 3.99 PAGE,2OF4l JUN-19-2007 TUE 11 :31 AM NODENR FAX NO, 9103502004 P. 19 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: • a. • inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover,and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs Within 2 to 5 days as designed. 2. Repair eroded areas immediately,re-seed as necessary to maintain good vegetative cover,mow vegetative cover to maintain a maximum height of six inches,and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75%of the original design depth(see diagram below). Removed sediment shall be disposed of• in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.stockpiling near a wet detention basin or stream,etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 4,87 feet in the main pond,the sediment shall be removed. When the permanent pool depth reads 4.87 feet in the forebay,the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation 22.5Q A a Sediment .emoval El. 17.63 75a/ A Sediment Removal Elevation 17.63 75% Bottom evation 16.00 2 /a Bottom Elevation 16.00 25% FORT?BAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. )RM SWU-IO2 Rev 3.99 PAGE 3 OF 4 JUN-19-2007 TUE 11:31 AM NODENR FAX NO, 9103502004 P. 20 7. All components of the wet detention basin system shall be maintained in good working order, • acknowledge and agree g gr by my signature below that I am responsible for the performance of the seven aintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Nathan D.Benson Title: Manager-Sandler at Shallotte,LLC Address: 448 Viking Drive-Suite 220 Virginia Beach,VA 23452 __ .. Phone: (757)463-5000 Signature `,,��,1�------ 67 Date: ile'vex:_ M.4--- --,,.., 0-7 A Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. Nros.,,NN ex, I, \ vJ..kc � c,' ,a Notary Public r the Late of North Cal eb -► County-of C y o,. .mac ,do hereby certify that `)d .�.\. s personally appearell before me this ' S�\,, day of 0.14Q00`7 , 08O - and acknowledge the due xecntion of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, .GLZ /-a--r+1.11 .S1 001111111 4/44 ' "1\41-kW '''' OP N •N � Y ARV ' iitittii SEA Ia _ My commission expires: a'7-- I 0 RM SWU-lot Rev 3.99 PAGE OF 4 JUN-19-2007 TUE 11 :31 AM NODENR FAX NO. 9103502004 P. 21 Permit No. Sw O702-oZMo 0o be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM CURB OUTLET SYSTEM SUPPLEMENT FOR LOW DENSITY DEVELOPMENT WITH CURB AND GUTTER This form may be photocopied for use as an original • DWQ Stormwater Management PIan Review: A complete stormwater management plan submittal includes a stormwwatei' management permit application, a curb outlet system supplement; a low density supplement, design calculations, and plans and specifications showing all stormwater conveyances and curb outlet details. I. PROJECT INFORMATION Project Name: San Rio-Phase 1 Contact Person: Mr.Jim Wiseman/Mr.Jim Green Phone Number (910) 575.4300 Curb outlets to (check one): le Swale Vegetated Area REQUIRED ITEMS CHECKLIST ne following checklist outlines design requirements per the North Carolina Administrative Code Section 15A NCAC 2H.1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent on the Stormwater Management Permit Application Form,the agent may initial below. If a requirement has not been met,attach justification. Applicants Initials et Z a. Curb outlets direct flow to a swale or vegetated area. b. Swales or vegetated areas receiving curb outlet flow arc designed to carry, at a minimum,the peak flow from the 10-year storm. c. Flow velocity is non-erosive for peak flow from the 10-year storm event, irs d. Longitudinal slope of the swale or vegetated area does not exceed 5%. e. Side slopes of the swale or vegetated area are no steeper than.5:1 (horizontal to vertical) f. Length of swale or vegetated area is> 100 feet. g. The system takes into account the run-off at ultimate built out potential from all surfaces draining to the system(delineate drainage area for each swale). h. Swales are located in recorded drainage easements. i. Grass type(s)for permanent vegetative cover specified on detail. j. Swale detail provided on plans. RM SWU-105 Rev 3.99 PAGE i O1 3 JUN-19-2007 TUE 11:31 AM NCDENR FAX NO. 9103502004 P. 22 • 5© o dGCr e.o...oo600066O0.-6 W q1 w N W N N N 1A 1 W N otif N C C �� IwL�W 9IR iO, N • Cda� ��lV rrrC7rQ O �00000000 0 00OO00000O0O 0iiaviMpiptivioSpimmmmffivonotimMedricdmipi K'+mmooimmm ®n oir oiad w 'ammd0iwQiw0 oi 0 U ]w w°v ugt"-V 'r i-.w 4 ilk a ceo D] w` - - oo c CS P o cir7e - e6 - - - �iaoc gl m ailV u ca c7 tt 0 4 b U W f.7 U c! J u u U u u to o c7 tt mN m W N m td m m m m m m W m N m m R m m l6 A LG 101��e1�•.0 Nm 47O a-.try p- 03 a� r en-.M U7 ID 0 10 m cD P.�OO tUR I7 N 1 r M N v-eY N O ry m ry 07 N MN 0C OC tlCi 111 g090pOOQ000 ciC CiC 13 4 W Nuu WUU0 b miee NN0 W N to W N ea m N di 14 N W co iU0 gl dl-.w100 Na+JN0NrN Qh 0 v' eD CAS In 700O0o060.=d6660d00o06a00 a 2 N m m M Ic0 W W W N N N N IUD 2 2 N N 2 m °a 163 III 31 PI 41�app24 eeQQ gi le,21 OO! PI q IT C1 fa hh..d7 C.... ..o a-+OOOGq pCj O t]dC�Cj ~V .3 N{V R:O po 4..�, usrn�m�o,or 7 s- Rww v m 43 - g� tb(sl(0(35 aga cN7v rd, wmlonmwmo7 W11~ gSg el6o0o�000o]'15og��� _°I15 rn� 'wln.4..4..4 .4 .r_J� .4 .nti, m m m a ram. A m d3'.��f '.T._!3 m m o 0 0 f. l N ie f f > O N Ig MN3 L33Laa ��oo �o ii�� &lj6adeLtllthtiitgQ?rgV1tA[AyNN(�A V)f%7ACI JUN-19-2007 TUE 11:31 AM NCDENR FAX NO 9103602004 P. 23 IV. CURB OUTLET SYSTEM MAINTENANCE REQUIREMENTS Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at any time. 2. Swales will be inspected monthly or after every runoff producing rainfall event for sediment build-up, erosion,and trash accumulation. 3. Accumulated sediment and trash will be removed as necessary. Swales will be reseeded or sodded following sediment removal. 4. Eroded areas of males will be repaired and reseeded. Swales will be revegetated as needed and in a timely.manner based on the monthly inspections. 5. Catch basins, curb cuts, velocity reduction devices and piping will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 6. Swales will not be altered,piped,or filled in without approval from NCDBNR Division of Water Quality.I acknowledge and agree by my signature below that 1 am responsible for the performance of the six maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system of responsible party. Print name and Title: Nathan D.Benson-Manager $audler at Shallotte, LLC Address: 448 Viking Drive-Suite 220 Virginia Beach,VA 23452 'lone: (757)463- 00 Date: 1 Y 1 a\r a U cv-7 signature Note: Th"(alb)responsible party should not be a homeowners association artless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, � a c� , ,a Notary Public f r the S to of tr �'� tc. - � Q.� n �c u,te� ,do hereby certify that . personally appearedtx before me this `ate-k day of VV\ ..-q co7,'z000 and acknowledge the due execut;'n of the f oi�g in filtration basin maintenance requirements. Witness my hand and official seal, 44 i f . ‘10166111Flll4 SEAL OF My commission expires: . r1`7-31— 0 : a etl�lPilil{11h`�, RM SWU-105 Rev 3.99 PAGE 3 OF 3 JUN-19-2007 TUE 11:31 AM NODENR FAX NO. 9103502004 P. 24 WET DETENTION POND ANALYSIS ( EILE NAME: SAWQSISTORMWATERIEXCELSPREADSHEETSIFONDt070202mod.Wk1 I 'ROJECT* SW8 •Pkgi4.2.0:100.11 - REVIEWER: 64:02015e...11.-.. .. • • PROJECT NAME: rdatifiicil! f..:..::-.1.;::... ;P1..: in,l'iit':::!g::pii..1.!'.;!9.:;DATE: 18-Jun-07 Receiving Stream: !•Slialf4tieit'gv-ei; Class: .. .. Drainage Basin: :Lbeiter: -;: ' ,:. Index No. 16-2.5i-247.6) Site Area - .:. .. ; i.... !,,.• 670z.85;'acres Drainage Area 1:1-7:209085l00l.:square feet Area in Acres 4.80 IMPERVIOUS AREAS Rational C Buildings (!-'l.!' p119.5-1.0.':square feet Parking 11,:::!. 110S4;00-l:square feet Streets 1...i •:1.053!.13.ii; square feet Sidewalks !f ..: - 5.61-0p.]:i square feet Other ii' •qd.i49.6:0V'square feet 'l!:-- •:'''':..4.....4...:1.:'*i sq u are feet -,.-:-„:::i;41, •..r!..:;%f i -;1::..'-' i.',;;';!i square feet TOTAL 77730.00 square feet Rational Cc= 0.13 SURFACE AREA CALCULATION % IMPERVIOUS 37.18% SA/DA Ratio 1.66% Des. Depth .: *:;•:::•: ••.6::5 Req. SA 3468 sf TSS, 86 or 90: , ',,..:'••i:.!.::.::i'!i];':;90. Prey. SA !!.:.:(4:150599- at OLUME CALCULATION * place a "1"in the box if Rational is used Rational ?* :::::. 1.:. . 1....!•,i':.: ',... FOREBAY Des. Storm • ; -:i: ia.'.inches Perm. Pool Volume= i'i d1i91iQ38 Rv= • 0.385 Req. Forebay Volume= 38207.6 Bottom - ,:.-':i.,-•-i:;: -:...':;.:1 6 rnsi Provided Volume= .. a1.836.00 Perm, Pool :••••:1!.: ;•,22:504: nisi Percent= 16.7% Design Pool ... i.:.:"::.:l22.i'6$ msl Storage met @elev 22.63 msl Elevation Area Inc.Vol. Acc. Vol. Req. Volume 6701 cf iir7.12 :i80:1:•2 !11:1:'5:68991 Olt': two Vol Pray. at DP 6553 cf i.lifj;P:Aggir:':!::•:1'..117:§4•:P.Ail::: 25888-00 25588.00 ORIFICE CALCULATION .._ Avg. Head = 0.02 ft 02 Area = 7.69 sq. inches Flow 02, cfs 0.039 cfs 05 Area = 3.04 sq. inches Flow 05, cfs 0.016 cfs Orifice Area 3.14 sq. inches No. of Orifices If :;::•;,:.......;-!;::;1•;1 Q= 0.016 of's Diameter, inches 1: .:-.•-,::. .:2:00..weir H x W ;:!;..;!:t:::r..!:?1,4•1,)!.,•:.;....,l:. in x ' -,": • :•:-• • in Drawdown = 4.8 days Surface Area 41Dp= 50899 sq.ft. Falling Head Drawdown= 4.0 days C= 3.271435897 L.= -0.005 COMMENTS Surface Area ,Volume and Orifice are within Design Guidelines. JUR 19-2007 TUE 1'1:31 AM NODENR FAX NO. 9103502004 P. 25 Permit No. 5WP70-7OZ02. (to be provided by()We) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form may be photocopies for use as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater collection systems as defined by 15A NCAC 21-I .1002(18). Low density requuewents and density factors can be found in 15A NCAC 2H .1005 through.1007. I. PROJECT INItORMATION Project Name: San Rio Contact Person: Mr.Jim Wiseman/Mr. Jim Green Phone Number (910) 575-4300 Number of Lots: See Attachment A Allowable Built Upon Area Per Lot*: See Attachment A * If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers acid provide area tbtotals and totals. IL BUILT UPON AREA See the Stormwater Management Permit Application for specific language that must be recorded in the deed restrictions for all subdivisions For uniform lot sizes,complete the following calculation in.the space provided below where: • SA Site Area - the total project area above Mean High Water. Wetlands may be excluded when the development results in high density pockets. • DF Density Factor-the appropriate percent built upon area divided by 100. • RA Road Area-the total impervious surface occupied by roadways. • OA Other Area-the total area of impervious surfaces such as clubhouses,tennis courts,sidewalks,etc. • No. Lots-the total number of lots in the subdivision. * BUA/Lot-the computer allowable built upon area.for each lot including driveways and impervioYrss surfaces located between the front lot line and the edge of pavement `RM S WU-104 Rev 3.99 PAGE. I OF 2 JUN-19-2007 TUE 11:32 AM NCDENR FAX NO, 9103502009 P. 26 (SA x DF)—RA—OA = BUA No. Lots Lot lculation: 5E6 AITM I M¢N'r &i III. REQUIRED ITEMS CHECKLIST .,plicannts Initials a. A 30-foot vegetative buffer is provided adjacent to surface waters. Projects in the Neuse ,geF River basin may require additional buffers. b. Deed restriction language as required on form SWU-101 shall be recorded as a restrictive covenant. A copy of the recorded document shall be provided to DWQ within 30 days of Bar platting and prior to sale of any lots. BRJF c. Built upon area calculations are provided for the overall project and all lots. d. Project conforms to low density requirements within the ORW AEC (if applicable). B12r [15A NCAC 21-1 .1007(2)(b)] tMSWU-J04 Rev 3.99 PAGE 2OF2 GEOTECHNICAL REPORT SAN RIO-PHASES 1B&2A WDL-07020 GEO GEO-STRUCTURAL ENS;•'JEERS RESOURCE CONSULTANTS QUALITY CONTROL SPECIALISTS Engineering&Resource Consultants June 1, 2007 The John R. Mcadams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 Attn: Dave Bartone, P.E. RE: Seasonal High Groundwater Levels San Rio Ocean & River Club Shallotte, North Carolina GeoMetrics No. SR-WD03-C1 M Dear Mr. Bartone: At your request, GeoMetrics has completed an investigation to determine the seasonal high groundwater elevation at the San Rio Ocean Club development. Test pits Were excavated to a depth of 10 feet below the existing grade at 2 locations within the perimeter of the proposed pond near the main entrance (see enclosed location plan). The sides of the test pits were examined to determine the depth at which soil mottling became evident. Mottled soil is a good indicator of recent groundwater presence. The interpreted seasonal high water level in test pit #1. was 20 inches below existinggrade and.45 inches in test pit#2. The actual groundwater phreatic surface was encountered at a depth of approximately 10 feet in both pits. Copies of the test pit logs are enclosed. If you have any questions or if you need further information please contact me at (843) 236-8800. • Sincerely, GeoNletrics, Inc.. sen, P.E, r. ch E.gg erin ' nager 1;G1N�$' r'1 cc: James H. Green, P.E., Wakefield Dev. Co. COLUMBIA • MYRTLE BEACH • CHARLOTTE 136Stonernark Lane 3650 ClayA,;c/Road 11719 Tom Short Road • Suite 100a-.Stonerrtark Centre Myrtle Beach,South Carolina 29579' Charlotte,North Carolina 28277 Columbia,South Carolina 29210 (843)236-8800 FAY( 43)236-5292 (7 0-1)814-4060 FAX(704)814-4067 (803) 783-9001 FAX(803) 783-9210 San Rio LOG OF TEST PIT No. TP-2 Shallotte,North Carolina Location: 33.96716°N 78.35812°W SR-WD03-C1 M Offset: N/A Date Excavated: 5-30-07 Supervisor: A. Rabon Ref: Casing Length: N/A • Ground Elevation: 26 msl Excavation Method: Test Pit Water Level: 10'4"big al a)- MATERIAL DESCRIPTION g 9. E al o I E F P.I.D. COMMENTS w . 0 CO To Soil 0:5 p Poorly graded SAND, light gray - 10YR 7/1 • • - 2.0 Silty SAND, yellowish brown 10YR 5/4 4.4 Poorly graded SAND,yellowish brown 10YR 5/4 • • - 5.6 ::::. Poorly graded SAND, light brownish r gray 10YR 6/2 - - 10.2- - • Test pit terminated at 10.2' • - - - 5 a 0. SS Q to - F- a I- 136 • Suite 100-Stone ark C ntre ��'O l _�ETI�IC9 iilvc 3650 Claypond Road Columbia,South Carolina 29210 —Ms Myrtle Beach,South Carolina 29577 Phone:(803) 783-9001 Phone:(843)236-8800 FAX (803)783-9210 FAX: (843)236-5292 GEOIC• SINC GEO-STRUCTURAL ENGINEERS RESOURCE CONSULTANTS QUALITY CONTROL SPECIALISTS Engineering&Resource Consultants July 10, 2007 The John R. Mcadams Company, Inc. 2905 Meridian Parkway Durham, NC 27713 Attn: Dave Bartone, P.E. RE: Seasonal High Groundwater Levels San Rio Ocean &River Club Phase II Shallotte, North Carolina GeoMetrics No. SR-WD03-CI M Dear Mr. Bartone: At your request, GeoMetrics has completed an investigation to determine the seasonal high groundwater elevation at the San Rio Ocean Club Phase II development. Test pits were excavated to a depths ranging from five (5) to thirteen and one-half (13.5) feet below the existing grade at 11 locations within the perimeter of the proposed ponds. The sides of the test pits were examined to determine the depth.at which soil mottling became evident. Mottled soil is a good indicator of recent groundwater presence. Below is a table indicating the results of the test pits: Test Pit Latitude Longitude Water Table Seasonal High Water Table TP-1 33.96484°N 78.36079°W 13' 2" 9' 5" TP 2 33.96518°W 78.36105°W 13' 6" 10' 2" TP-3 33.96706°W 78.36224°W 5' 1" 3' 6" TP-4 33.96670°N 78.36209°W 13' 6" 7' 9" TP-5 33.96756°N 78.36207°W 8' 2" 5' 4" TP-6 33.96788°N 78.36179°W 10' 0" 6' 3" TP-7 33.96701°N 78.36089°W 9' 5" 7' 2" TP-8 33.96683°N 78.36137°W 12' 1" 6' 3" TP-9 33.96617°N 78.35842°W 4' 2" 3' 1" TP-10 33.96609°N 78.35831°W 4' 1" 2' 6" TP-11 33.96601°N 78.35813°W 8' 2" 5' 7" COLUMBIA • MYRTLE BEACH • CHARLOTTE 136 Stonemark Lane 3650 Claypond Road 11719 Tom Short Road Suite 100- S!on:°;nark C',r'r, Myrtle Beach,South Carolina 29579 Charlotte,North Carolina 28277 Columbia.South Carolina 29210 (843)236-8800 FAX(843)236-5292 (704)814-4060 FAX(704)814-4067 (803)783-9001 FAX(803)783-9210 If you have any questions or if you need further information please contact us at(843)236-8800. Sincerely, GeoMetrks, Inc. iiIrr • 1. And �oub a field Al• :nsen, P.E. Operations Manager ngineering Manager 9 9 9 Encl rUMii11/ , %\sM � r SP.\ ,�tllultll'l-/[lil���i CARq cc: James H. Green, P.E., Wakefield Dev. Co. "c�;GEOMETRICS.INC. Z Na.13249 -7= ,:.m No.C01533 R.=..73 l�l/Idd1411N1� ian111114d����� GE° TRICSmc n Engineering&Resource Consultants M:ICURRENT CONSTRUCTION PROJECTSISR-WD03-C1MSan RiolSeasonal High Water Level Phase II.doc 2 lK>I( (]K1I(>I(****lK****lK>I( (>I( (>I(%KtKlKlK7K***** ( ( (*>I(WJK>I(]K**lK1l(****KKK**** **** (lK****]K1I(]K]Kll( (lK1l( (]K]KlK1l(*7KtK>K**lK*lK***%K]K******** P. 01 * TRANSACTION REPORT �c SEP-14-2007 FRI 11 :39 AM FOR: NCDENR 9103502004 ]K :K SEND * DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP * * SEP-14 11 :39 AM 919193612269 28" 3 FAX TX OK 608 * *------- TOTAL : 28S PAGES: 3 �c >Ic***************Ic**********>Ic**********>Ic***************************>K*****>Ic***********>Ic*************** AA NCDENR North Carolina Department of Environment and Natural Resources Wilmington Regional Office (910) 796-7215 • Michael F. Easley, Governor 1,Vil]iam G. Ross Jr., Secretary • FAX COVER, SHEET IDate:J_ 9 - 1 Lk v - # pages .3 _ To: o cc"nc From: J C .T 'Ku5sc- Co•_ Division_ E-.K ?CcSa Fax:' Co t "2-2— 5 FAX #: 910-350-2004 Rtem a rks: l -1h •, 0 . 17T C:aILiinal Drive El.Wilmington, North Carolina 28.1.05-3845 • Phone: 910.796 72151 FAX. 910-350-2004 FVJA 9 QG Michael F.Easley,Governor O William G.Ross Jr.,Secretary North Carolina Department of Environment and Natural Resources Coleen H.Sullins,Director Division of Water Quality September 14, 2007 Nathan D. Benson, Manager Sandler at Shallotte, LLC 448 Viking Drive — Suite 220 Virginia Beach, VA 23452 Subject: Request for Additional Information Stormwater Project No. SW8 070843. San Rio - Phase 2A and 3 Brunswick County Dear Mr. Benson: The Wilmington Regional Office received a Stormwater Management Permit Application for San Rio - Phase 2A and 3 on August 30, 2007. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Stormwater pond labeled Pond #2 in plan view and Pond #1 in title block sheet PD — 1A, please correct. 2. Please locate the pond / swales in a recorded access/drainage easement. 3. Maximum spacing for bars on racks is 5.5" with a minimum spacing of 2", please correct. 4. Bottom of pond elevation (Pond #2 — sheet PD —1 F) on the section view is 9' but is reported to be 8' on the supplement, please correct. 5. Pond #3 shows stormwater drainage system entering the main pool. All stormwater must enter the forbay. 6. Section II item 3 on the application should be marked high density or other (low density w/ high density pockets) because of the pockets of high density associated with this permit application, please correct. 7. A high density fee is $4,000. Please submit the $2,000 balance for the high density review. 8. Pond #2 ofifice is reported to be 1.5" diameter on the supplemental but shown to be 2" diameter on the plans (sheets PD-2B, PD-2F) please correct. 9. Pond #3 ofifice is reported to be 3" diameter on the supplemental but shown to be 4" diameter on the plans (sheets PD-3B, PD-3F) please correct. NOne Carolina Naturally • North Carolina Division of Water Quality 1617 Mail Service Center Raleigh,NC 27699-1617 Phone(919)733-7015 Customer Service Internet: www.ncwaterauality.org Location: N.512 Salisbury St. Raleigh,NC 27604 Fax (919)733-2496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer—50%Recycled/10%Post Consumer Paper Nathan D. Benson, Manager September 14, 2007 Stormwater Application No. SW8070834 10. Please add note to plans stating that all roof drains to be direct to stormwater treatment system. 11. Please provide wetlands calculation. 12. Please-provide lot built-upon-area calculation. 13. Each drainage area to be treated must be defined for each individual treatment system with the drainage area and the built-upon-area as shown on page 2 of the application. Note: detention ponds cannot be evaluated without this information. 14. Provide map/plan delineating the SA/SC section of this permit. Because the application has significant permitting issues/deficiencies, a resubmittal fee of$2,000 will be required in order for this project to remain in the express program. Note: $2,000 fee for comments and $2,000 additional for high density review, $4,000 total. Please note that this request for additional information is in response to a partial, preliminary review. The requested information should be received by this Office prior to September 21, 2007, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7301. Sincerely, Chris Baker Environmental Engineer II ENB/csb: S:IWQS\STORMWATERIADDINFO120071070843.sep07 cc: Brandon Finch, P.E., The John McAdams Company, Inc. Chris Baker 2 State Stormwater Permit Application Tracking Cover Sheet Wilminzton Regional Office Project Name: SAN RIO PHASES 2 AND 3 Project Category: MOD Ne1/473 Project Type: LOW DENSITY App Accept Date: (3o(Oi Application Fee Amt: $ 2_0 Fee Check Number: y s 6 Reviewer Name: BAKER, CHRIS Record the following information from BIMS after project has been entered! Permit Number(BIMS): (d B 07 c)E 3`f Please update the SW Access System by entering the Permit Number for the project! Date Entered in Access: 'j 107 Entered in Access By: LA 2 j ei Liu kl E 5 Date Printed: 8/27/2007 2:58:29 PM i —r THE JOHN R McADAMS COMPANY, INC. LETTER OF TRANSMITTAL To: Mr. Chris Baker Date: August 30, 2007 Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 ** HAND DELIVER ** (910) 796-7215 Re: San Rio Job No.: WDL-07020 I am sending you the following item(s): COPIES DATE NO. DESCRIPTION 2 Post-development Watershed Map (Color) These are transmitted as checked below: ❑ As requested ® For your use For approval ❑ ❑ For review and comment ❑ Remarks: Copy to: Signed: randon R. Finch, PE Sr. Stormwater Project Manager FOR INTERNAL USE ONLY ® Copy Letter of Transmittal Only to File ❑ Copy Entire Document to File CIVIL ENGINEERING • LAND PLANNING • SURVEYING PO Box 14005 • Research Triangle Park,NC 27709 • (919)361-5000 • fax(919)361-2269 www.johnrmcadams.com 1I . THE JOHN R McADAMS COMPANY, INC. LETTER OF TRANSMITTAL To: Mr. Chris Baker Date: August 27, 2007 Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 ** HAND DELIVER** (910) 796-7215 Re: San Rio Job No.: WDL-07020 I am sending you the following item(s): COPIES DATE NO. DESCRIPTION 1 SWP Application w/deed restrictions for PH2 & PH3 1 $4,000 Express Review Fee 2 sets PH2 & PH3/Master SW Mgmt Plans(narrative on plan 1 set); Revised PHI Plans(Only sheets that changed) Wet Detention/Low Density/Curb Outlet Supplements 2 copies SW Mgmt. calculations These are transmitted as checked below: ❑ As requested ►/ For your use ® For approval ❑ ❑ For review and comment ❑ Remarks: Copy to: Signed: ./Brandon R. Finch, PE Sr. Stormwater Project Manager I FOR INTERNAL USE ONLY /1 Copy Letter of Transmittal Only to File ❑ Copy Entire Document to File CIVIL ENGINEERING • LAND PLANNING • SURVEYING PO Box 14005 • Research Triangle Park,NC 27709 • (919)361-5000 • fax(919)361-2269 tvww.johnrmcadams.coni August 27,2007 Mr. Chris Baker Environmental Engineer II NCDENR 127 Cardinal Drive Wilmington,North Carolina 28405 Re: San Rio—Master Stormwater Permit Revision Permit#SW8 070202MOD WDL-07000 Dear Mr. Baker: Please accept the following narrative describing our proposed revision request. Along with Phases 2 and 3 being detailed within this submittal, some small Phase 1 revisions are proposed as well. These revisions include the adjustment of the stormwater management pond calculations due to the reduction of the proposed road right-of-way span width,the addition of a road drainage swale along the north end of Phase 1 (at the road crossing to Phase 3, near the span) and the adjustment of the road alignment at the connection to Phase 2. All of these adjustment s occurred due to the Phase 2 and Phase 3 design continuation, or due to internal adjustments within Phase 1. In addition,the area of Phase 1 land along the west coast of the phase used use during the calculation of allowable impervious has been adjusted. This is in response to the finalization of the Phase 2 and Phase 3 calculations, necessitating the need to update the areas for clarification and consistency. No drainage increases are currently proposed beyond the original permitted areas, and the current impervious area does not exceed the permitted area as well. Thank you for your consideration of our request and please do not hesitate to contact us with any questions at(919) 361-5000. Sincerely, THE JOHN R. McADAMS COMPANY,INC. Dave Bartone, P.E. Senior Project Manager Civil Engineering-Residential c.c. Billy Sutton, Sandler at Shallotte, LLC Jim Green, Sandler at Shallotte,LLC *: SOSJD:800219 Date Filed:8/30/2005 9:39:00 AM Elaine F.Marshall North Carolina Secretary of State State of North Carolina C200524100202 Department of the Secretary of State APPLICATION FOR CERTIFICATE OF AUTHORITY FOR LIMITED LIABILITY COMPANY Pursuant to§57C-7-04 of the General Statutes of North Carolina,the undersigned limited liability company hereby applies for a Certificate of Authority to transact business in the State of North Carolina,and for that purpose submits the following: 1. The name of the limited liability company is Sandier at Shallotte, L.L.C. and if the limited liability company name is unavailable for use in the State of North Carolina,the name the limited liability company wishes to use is • 2. The state or country under whose laws the limited liability company was formed is: Virginia 3. The date of formation was August 19,2005 ;its period of duration is: Perpetual 4. Principe]office information: (Select either a orb) a. The limited liability company has a principal office. The street address and county of the principal office of the limited liability company is: Number and Street 448 Viking Drive, Suite 220 City.State,Zip Code Viroinia Beach.Virainia 23452 County Virginia Beach The mailing address,41 different fram the street address,of the principal office of the corporation is: b. ❑The limited liability company does not have a principal office. 5. The street address and county of the registered office in the State of North Carolina is: Number and Street 225 Hillsborough Street City,State,Zip Code Raleigh, North Carolina 27603 County Wake 6. The mailing address,ijdiferent front the street address,of the registered office in the State of North Carolina is: 7. The name of the registered agent in the State of North Carolina is: CT Corporation System CORPORATIONS DIVISION P.O.BOX 29622 RALEIGH,NC 27626-0622 (Revised January 2002) (Form L-09) APPLICATION FOR CERTIFICATE OF AUTHORITY Page 2 S. The names,titles,and usual business addresses of the current managers of the limited liability company are: (use attachment if necessary) Name Business Address • Nathan D. Benson 448 Viking Drive, Suite 220 Virginia Beach,Virginia 23452 Raymond L. Gottlieb 448 Viking Drive, Suite 220 Virginia Beach,Virginia 23452 9. Attached is a certificate of existence(or document of similar import),duly authenticated by the secretary of state or other official having custody of limited liability company records in the state or country of formation. The Certificate of Existence must be less than six months old. A photocopy of the certification cannot be accepted. 10. If the limited liability company is required to use a fictitious name in order to transact business in this State,a copy of the *solution of its managers adapting the fictitious name is attached. 11.This application will be effective upon filing,unless a delayed date and/or time is specified: This one day of August ,20 05 Sandler at Shallotte, L.L.D. Name of Lin' d Liability Company Signature of Manager • Type or Print Name Notes: l. Filing fcc is S250. This document must be filed with the Secretary of State. CORPORATIONS DIVISION P.O.BOX 29622 RALEIGH,NC 27626-0622 (Revised January 2002) (Form L-09) r t 4 ! i ...r ..I' 'rI IwP,ONAMita 0 0 A •, 4,. aP 4' 0' 05010 t i"( i*."0 t,illi ,;'l $fxfr !tnrpørftøn eommission ill ;' ,. I Certin, the F'oITowing from the Wscortis of the Commission: A certificate of organization was issued by the Commission to Sandler at Shallotte, L.L.C.,a limited liability company formed under the laws of VIRGINIA,effective as of August 19, 2005. As of the date below,articles of cancellation have not been filed in this office by Sandler at Shallolte, L.L.C., a Virginia limited liability company. Nothing more is hereby certified. �-- �:, Signed•and Seakiat ichmoncfon this Date: E`er h;\ og.9- - " 0at�t .august 23, 2005 s 5 (i) ii, ( * .rpt`i,J, codAfgAi , ,,;,. ti k e lt,,i . } . %-E',° /,, 6:7oe; cf�,(' r ,of brae oananfssaaaa iSl \1-=• : r903 r C1S0505 ea/ 0T3 sue , ' ` Tip,, C� North Carolina Department of Environment and Natural Resources Ca'4 efih 127 Cardinal Drive,Wilmington NC 28405 (910)798-7307 FAX(910)350-2004 Request for Express Permit Review 44 -e ,x d FILL-IN all information below and CHECK required Permit(s). FAX or email to Cameron.Weave►fincmail net along with a narrative and vicinity map of the project location. Projects must be submitted by 9:00 A.M.of the review date,unless prior arrangements are made. APPLICANT Name 9.4404.Ere AT SNA :MEj1.4C, ( t .a- wt1u4 ,a.Svcr ) Company -- sAme ac AwAng Address we/ 4444004 --4tArE 140 City/State VALSICAAft Zip 210s . County w+r Phone 1i4-554,-48 o Fax ter-s5.-coo. Email tilija VORICCACY4cCann PROJECT Name ato- ?OW a PROJECT SYSTEM(S)TRIBUTARY TO "a' O'l '4/� iE (STREAM NAME) uum(sa� ENGINEER/CONSULTANT a ioo4 t2 rwcti �"'"'� RIVER BASIN Company - rJ R. iwtcAoA toi.mobe,we. Address otos + vfw ptec► City/State PvethVA. G Zip trio County Phone Itt-mac- Fax qc -nc-z Email -6',0,8-johnrehaviami.e.wit State or National Environmental Policy Act(SEPA, NEPA)—EA or EIS Required❑Yes 0 No STREAM ORIGIN Determination; #of stream calls; Stream Name Lv! SiORiv1WA#TER ❑Low Density ❑ High Density-Detention Pond ❑High Density-Other Wetlands MUST be addressed below []rLow Density-Curb&Gutter 0 High Density-Infiltration ❑Off Site ❑ COASTAL ❑ Excavation&Fill ❑Bridges&Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑Marina Development ❑Urban Waterfront LAND QUALITY 0 Erosion and Sedimentation Control Plan with acres to be disturbed. WETLANDS(401) Wetlands on Property HI'Yes 0 No _ y Isolated Wetlands on Pro _—_opertjr 0Yes[`'j No Check all that apply Wetlands Will Be Impacted El Yes El-No Wetland Impacts: / Acre(s) Wetlands Delineation has been completed [Y:s❑No ❑Buffers Impacted: fi Acre(s) USACOE Approval of Delinoslion conwleejed R'Yes❑No 4f 4.Application in process wiUSACC� Des LI o l Permit received from USAGE❑Yes[Bit 401 Application requi,ed DYes .-= No If Yes, ❑ Regular❑Express Additional fees,not to exceed 50%of the original Express Review permit application fee,may be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only SUBMITTAL DATES: $ee Split for multiple permits: ICE JE IV] I1 CAMA $ LQS $ JUR 2 7 2007 401 $ Total Fee Amount $ DWQ Pao'# e • ejke+ I[it7!t ! x n Rem 're Loney {ert rr , ) `v • : • I r !r Grow �, ;i � m • - P WI' • . A(1 , 4, I ,*":• • }' *'1F}.• ( f} 7� .. i8hsilot '') �r"�3 1 t '- j�t .ti ' 1 d.. AIY RIO—PH:4$E 3 - I ," l - -sr k ;;Skv. _ -• s,.,'' ✓ r .- r-Q : ;,fir • KsCwmPCh- r•- • •. ( . y �� .;4.+yQsI '„ •!.{ ...,-•-- ♦ •. ~ ( •. +.,+ x\ id \ + of if n r t ti i • 1 • t r ^+ ,.� 0 1 • • �• d� t- P, .r°� ,• ` t%\ .,/• .,, •'- •-... . ! 4. • • l- + 4- .__ ''.....,„.*•,....", • L i";>• •r, •k •r,,.. I ,• ., 2;t s a _" ti-te • 1•t /*.\ 11 • jt - .• '- • "' / y{ 11' • •. : ,... °.5 . .- j:11/ .' ,� 4. •• - . .11r 1 N•lr) .1 ,4.t`.. ,r. f \ \. d \ .., r' . ' ' 1•••••••;- ";,-) I 1:r,.kii, -::::‘, - ( .../ ' ,. . • •fir • ,. . ••%. • • if ... . i • ,..* v"., ,...• • ot.,,',4\t, ! ., 4• i -I- 1 i , . _r h �466ffTT • tl ` . (!; , • .�%•� , '♦ •/•J' f •v. • •'•tea f •� • • r r f _ , f V ti • t:t ' r r S ; ,Aillik/` Monogtara!• ! ,-~ c:t t t_. . • i -1. „,sis1/4,j Copyright(C)1998,:Maptech,Inc. Project Name s, ? a -efts%S Stormwater Express Questionnaire(6/15/2007) 1. What is the applicant's full legal name? nt ,"1 plf a corporation, LLC or Partnership is involved, what is that name? 9# ru.C,. If it's an LLC, is it E manager-managed or 0 member-managed? What is the applicant's title within the corporation, LLC or partnership? a jw e Will an agent(someone other than the applicant) be signing the application? L7 Yes L 1 No If Yes, what is the agent's name and title? ate4f4 9. +4 Acto4 cA 4PAN(,04c,. WPlease note the application signature requirements are listed in NCAC 21-1.1003 (e). In summary, only the sole proprietor of a sole proprietorship, the designated manager, member- manager, president or vice president of a corporation or LLC, the general partner of a partnership, or a ranking official of a municipality may sign permit applications and supplements. The signature of the engineer or other agent can be accepted only if accompanied by a signed letter of authorization from one of the aforementioned individuals. Corporations, LLC's and Partnerships must be registered with the NC Secretary of State's Office, and be active. Please note that spelling, capitalization, and punctuation are extremely important. Please provide the entity name exactly as on file with the NC Secretary of State. 2 Where is the project located? County 07w44vncK Nearest Town/City 4.+ (Attach a detailed vicinity map with both local street names and SR, NC, US or Interstate highway numbers, plus other relevant information such as town or city names, directions to, etc. Show the nearest intersection of two major roads on the vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway.) If the project is located in Brunswick, Onslow or New Hanover Counties, NPDES Phase 11 Post- Construction rules will apply. 3. What is the name of the receiving stream? s t /s; to-cute image, What River Basin is it located in? L> Bsz What is the classification of the receiving stream? 5c,;+ W-s etuc I G,sw, -fly For SA or SR waters, a separate scaled topographic map will be required. The project must be accurately located on the map and the%mile radius from the property corner closest to the SA or SR receiving stream must be drawn on the map. 4. If the project is high density, what type of stormwater management BMP's are being proposed? (check all that apply)--cklrs.S n curs rear Aerue- u 's eedts=t of 6.404ea? Wet Detention J Infiltration Trench Infiltration Basin ` Sand Filter Bio-retention r Wetlands Alternative Offsite _ Dry Detention Other How many separate BMP's are being proposed? 1 2 3 4 5 6 7 8 9 10 11 12 Other 5. Is there offsite runoff from the adjacent properties or public right-of-way that will drain into any of the proposed BII P's on the project and is not being diverted?4,trar'-uvrc, ❑ Yes ] No v ++ 6. Is an access road across other property required to access the project? ❑ Yes ''io Act r te.ru 5ueahnksr4 7. Is there any existing development or pre-1988 existing BUA located on the property? (Please provide documentation&delineate and identify on the plans.) 0 Yes ErNo ,, 8. For high density projects, has all of the proposed BUA been collected? p p ❑Yes ❑ No (If not, attach a separate explanation sheet) sise.x104 p dot AMPM.Y so MS pitikA of MJ etc, Page 1 of 2 Project Name 5Ar moo- 1,144e 3 9. Will the project involve the subdivision and sale of property? ErYes ❑ No Is the subdivision residential or 0 commercial? How many lots are proposed? 144yr'cs-rDegrfremtarw errDero aartecalo.6 viku,ge rectttp p (Deed restrictions are required for all residential, commercial, low density or high density sub- divisions. Specific language for the various types of subdivisions is available from DENR.) 10. Have the wetlands been delineated? 12-Yes ❑ No (All projects require either a signed wetlands delineation map or a wetlands report to be submitted with the application. Only a trained professional may provide information regarding the presence or absence of wetlands.) sue it c .4 MACrge PFAX4Atr Ae r;04 11. Are wet detention ponds or other engineered controls proposed to be located adjacent wetlands? '- -u4 s uea v© Ateur �s t� ot�, raw ❑�Yes 0 No (if, yes, a physical means to prevent the dewatering of the wetland must be provided, or the SHWT must be provided to demonstrate that the permanent pool of the BMP is above the SHWT and will not dewater the wetlands over time, Where possible, all BMP's and swales should outlet into back the wetland(with level spreaders). 12. For infiltration projects, has a site visit been completed with the DENR soils scientist to verify the soil type, water table and infiltration rate provided in the soils report? 0 Yes 0 No a'h tt5 stetto,a atif4 gcr'r Oweve ID-lots tOtio a Of'SAN PLO. If yes,what was the date of the site visit? Include a copy of the consultant's soil report with the application. 13. Does the project propose Level Spreaders at the outlet of all engineered controls and swales prior to entering surface waters or wetlands?.. -ra se 5 c ) [ Yes 0 No et.J At. Pc M. roe Pt1RS6 (The purpose of the level spreader is to reduce the energy of the incoming runoff and to promote diffuse sheet flow to prevent erosion and scour into the receiving waters or wetlands.) 14. Is this project aJmodcation to an existing permitl part of a larger subdivision, or is it a lot that will be treated in a BMP under a previously issued permit? [E'Yes ❑ No If yes, what is the name of the permitted facility? r'/A uw1 or4 Y What is the permit number of the permitted facility? J►/A t ae/pQfs5cre Is the permitted facility in compliance with its permit? _ Yes _ No Have the deed restrictions been recorded? _ Yes No Have the deed restrictions been submitted? Yes No Has the Designer's Certification been submitted? — Yes No 15. Do the plans reflect all information as listed in 15A NCAC 2H.1003(g)? E f Yes 0 No - -tb 'OE 44.3.444 o 4 rwitt.94.4,405 16. Have all of the design requirements of each proposed BMP been met? L 1Yes ❑ No (If not, attach a separate explanation sheet. Please note that the Express program is not set up to handle any type of deviation from the standard design.) 17. For each BMP in all high density projects, and low density curb outlet swale projects, has a drainage area delineation map been provided? DrYes ❑ No v+riw $ ? DO o i 4 osier 18. Any revisions made to the application as a result of this review may cause changes to the other documentation. Plans, calculations, application, and supplements should be reviewed for any necessary changes. For example, changing the orifice size will require a modification to the calculations, the pond details on the plans, and page 1 of the supplement. Page 2 of 2 SOSID:800219 Date Filed: 8/30/2005 9:39:00 AM Elaine F.Marshall North Carolina Secretary of State State of North Carolina C200524100202 r Department of the Secretary of State APPLICATION FOR CERTIFICATE OF AUTHORITY FOR LIMITED LIABILITY COMPANY Pursuant to§57C-7.04 of the General Statutes of North Carolina,the undersigned limited liability company hereby applies for a Certificate of Authority to transact business in the State of North Carolina,and for that purpose submits the following: 1. The name of the limited liability company is Sandler at Shallotte, L.L.C. • and if the limited liability company name is unavailable for use in the State of North Carolina,the name the limited liability company wishes to use is 2. The state or country under whose laws the limited liability company was formed is: Virginia 3. The date of formation was August 19, 2005 ;its period of duration is: Perpetual 4. Principal office information: (Select either a orb) a. El The limited liability company has a principal office. The street address and county of the principal office of the limited liability company is: Number and Street 448 Viking Drive, Suite 220 City,State,Zip Code Virainia Beach.Virginia 23452 County Virainie Beach The mailing address,if different from the street address,of the principal office of the corporation is: b. 0 The limited liability company does not have a principal office. 5. The street address and county of the registered office in the State of North Carolina is: Number and Street 225 Hillsborough Street City,State,Zip Code Raleigh, North Carolina 27603 county Wake 6. The mailing address,ifdifferent from the street address,of the registered office in the State of North Carolina is: 7, The name of the registered agent in the State of North Carolina is: CT Corporation System CORPORATIONS DIVISION P.O.BOX 29622 RALEIGH,NC 27626-0622 (Revised January 2002) (Form L-09) .. .. y APPLICATION FOR CERTIFICATE OF AUTHORITY Page 2 8. The names,titles,and usual business addresses of the current managers of the limited liability company are: (use attachment if necessary) Name Business Address • Nathan D. Benson 448 Viking Drive, Suite 220 Virginia Beach, Virginia 23452 Raymond L. Gottlieb 448 Viking Drive, Suite 220 Virginia Beach, Virginia 23452 9. Attached is a certificate of existence(or document of similar import),duly authenticated by the secretary of state or other official having custody of limited liability company records in the state or country of formation. The Certificate of Existence must be less than six months old. A photocopy of the certification cannot be accen ed. 10. If the limited liability company is required to use a fictitious name in order to transact business in this State,a copy of the *solution of its managers adopting the fictitious name is attached. 11.This application will be effective upon filing,unless a delayed date and/or time is specified: • This then ltv day of August ,zo 05 Sandler at Shallotte, L.L.C. Name of Lin ' d Liability Company Signature of Manager Type or Print Name Notes: 1. Filing fee is$250. This document must be filed with the Secretary of State. CORPORATIONS DIVISION P.O.BOX 29622 RALEIGH,NC 27626-0622 (Revised January 2002) (Form L-09) ....... ., ofjl. �� w;i tii,,Oia°1° =OM 0 6 V (9k to ttnitoter ,. ��,. .ram f( • .„ • ..,.., , ,a) ,tact Corpvratitin Cuntittission ,, .,„tY •, 40 , .,. .,. I Certify the ''olCowingfrom the Records of the Commission: A certificate of organization was issued by the Commission to Sandler at Shallotte, L.L.C-, a limited liability company formed under the laws of VIRGINIA, effective as of August 19, 2005. As of the date below, articles of cancellation have not been filed in this office by Sandler at Shallotte, L.L.C., a Virginia limited liability company. Nothing more is hereby certified. I F. r . -�� Signed and Sea(ed at cchmond'on this Date: r oto:rioN,e\� august 23, 2005 '41'o .��41 1 411,1 4 !4E i ai 0 , „q1942,1,41444,... , ow. ;,�\ r irl z op ,,2�b b,,tl L joerO.. (Peck Crkof the Commission \1.1• eFVPEa 40 PE+ .�Al �� 19 o 3 v. \�yC._q�a' �oi- CIS0505 .� _._..,, . ...,.G.a.�..a • .. .. _...__.. .. �....,. .,.. ....... .. , \ \ l l N ....::,:.:!.::...::.:,......:.-).llr , ,:::�,:, A ... . . . ...:.:z ..::::• : •...: :.....................:::..*:.:::::,::::4r'::': c::::::.:"....:N..,,-.4-.4:,;..,1..".. :i::j........-::::':::"..!': -:::::':::';''''...1 , • D •.... -.............:.......::::.},..:...............:,..::.::..:.,....., 4,.e,......:.:......,.....:::.:.:.:::.c,..-:::,::i:-:::.;:..::. :,......,.4.:.k-..i:::::::,:,.,:.::...,„,- ;.....;.,„ .. ....:_.._, ---- ,...:•.......••..•....." ...':......,:i^•:;.c: ::;7:i:..,.•:.‘.•7::-..,..:•..:.•:..:•:,-•..,:...•:•.. L.'::::,..:r:.•..‘'..,\:.":42:.-...;:1•::?:7..."1,........,.:...;.:::.::... p g OY08 8 1 AVUO /'f.. :.::....:....1...F....:.::,'.....'....'...".,\.3.;..,....•..0..,.::...•..„........:.::...:I...:.....,.:..'S..:)..,.,,.:..• 'i s ...,!..:•.::..t:,:..,..:...:.:.:.:..-.'•:a':—.•....:.•::...::..:.::H..•:•:..•.,.':.:.•:.•::.,:..•:..•...•:,.......••::....:.... ...1..:;'e.......::1.;N.1.:'::t •r i ----.-.....(::::".:.'"-.1'.1''\'' 1 4 .. ,.,1) o [—L.. 1 (•:.;;••••':... .- ‘ (r r 7 j—-..\ 4. 8EZ9Z'l I.'4ou!d'W1!Eb 8b=8 LOOZ1LZ/9'BMP'S�OLOLO1aM1s6u!me�d}ua�in3\ueid Jalsayy.ie)eM WJoiy�wiolS10E0L0-1CIM1'1QM1sPefoJdl:X SAN RIO ATTACHMENT 'B' B.R.FINCH,PE WDL-07000 8/25/2007 ==>Impervious Surface Breakdown i Impervious Area Breakdown I Total Impervious Total Area of Phase .. --1--- 7 Phase ID I[A #of Lots Impervious Area Per Lot 'Lot Imper u vious On-site Buildings[sfliOn-site Streets I I On-site Parking IOn-site Sidewalk[sil Other On-site Impervious 1 Off site impervious Lot# [a]. l [sfj ! [acres] I Esi i [sfi I Isfi i 1 IA Isfl 1- - --- -,-- - • - , . -- TrcT3: 36,764 - 1-21,28-48 42 1 2,900 121,800 1 __I. 268,152 i ..4 -38,991 : - I - 22-27,49-80,90-100,106-125,134-150 86 I 3,900 335,400 I I - I I - - I - I i 81-89,101-105,126-133 22 ! 4,900 107,800 -.1 I r _ - _ ---I • 151 1 1 8,000 I 8,000 . - I -4- I -I: I -, j . . Totals 1 .1 1_ ! I 573,000 ., ._0 ! 26r8,152 I I 0 38,991 - -7,- 0 Li I 880,143 20.21 _ _ _ )8,731 3im lB I 211,369 - 12,195 i 3:5,853 t 10,234 I - - _ 8,558- I 10,234 -t. I Totals 1 - . _ j_. _ i _ I 0 12,195 t 35,853 I I 8,558 18,731 I 0 1 85,571 I 1.96 ,- - •At-- . _ -Tromie- : Ammiipilmr- rruminor--- i Im 2A I 2,384,365 I ___1_ 324,6-06 1 310,915 ! - I 98,368 . 32,670 32,670 - , , I Totals _1mmil . I I - 0 I ' iil"gri6-. . '.1 .-, - 3 10,915 0 I 98,368 (-- I 0 I 766,559 I 0.00 ___ ..• • •-- ' 111117117 805,768 TO BE DETERMINED 1 216,750 i I • . . .. Totals I I i ! i ' 216,750 i I 216,750 I 0.00 . arisimi r mo , , •mmismosmIssmossmir - -no lmerm --- 3 j 2,141,672 " 152-156,161-168,173-179,231,234-259 47 3,000 . 141,000 i 166,781 I 27,496 • 19,690 - 157 1 i 3,200 , 3,200 1 1 158,172 2 3,405 i 1 I i i --i- -- .-L-- • - -,-- , 1 159-160,229-230 ! 4 ; 3,600 I 14,400 I - --E- -. ..........--.....- "" i- I 3,800 -1-1 11,400 I _j 1 : -4- . 169-171 180217,220228 1 3 47 I 4,000 1 - 188,000 I - - 1 I--- . _._ ____ -1- 232-233 2 _ : 4,600 J 9,200 I 218-219 2 I ,.. 5,400 I 10,800 I - 1 -.-, I I I I I Totals I 108 I • 384,800 I 0 166,781 ! 0 I 27,496 I 19,690 ; 0 598,767 1 13.75 _ 4A I 5,041,470 1 TO BE DETERMINED . .. . - I 1,191,366 1 I Totals 1 I 1 I f- ' t 1,191,366 i 1,191,366 I 27.35 -Nmaisimr -- ._ -- - - - 4B I 198 i TO BE DETERMINED 37,626 I I Totals I I I I I 37,026 - j 0 37,026 I 0.85 . mot-- _..., I . _ ___ __._.._ __ 5A I 2,235,86-2 I TO BE DETERMINED 733,637 I - -- - - 1 733,637 I Totals I _I_ I I 0 73.3,637 I 16.84 , ‘ _ . , _ . - --i-- r 5B I 1,122,015 I TO BE DETERMINED . 424,318 i ._,..........„_......7,,,,_......,..,„_„,____,_,____ ,,,„_.,. _... ,. I _........d. .._. _ 0 424,318 1 9.74 I _ " `t- 3MIMEN 6A ( 2,736,279 I TO BE DETERMINED I - - ,I - Totals i -- -4--" 895,768 1 I - I I I 95,76.820.56'' 7 _ I --- =Elii 6B I 671 523 TO BE DETERMINED 1 261,717 I i Totals 1 1----- 1 - 1.- • 261,717 0 261,717 I 6-.01, . 7A [..._ 4,948,709. I TO BE DETERMINED 1 t 1,340,450 j otals --r. i i r - 1 - r- 1 I 1,340,450 A I 0 1,340,450 I 30.77:monk ,. imm-- _..1Mr„._--Init 7B 75,658 TO BE DETERMINED I 43,00 i . _ - - I -- .. . . I Totals I I 1 I 43,670 I 0 - 43,670 1 1.00 8A I 3,920,292 I TO BE DETERMINED ! 1,063,250 I I ----1.---- •:+m......-,.. •-rem.9A-+A.,...:-..- -e 1,......a.4•nay..? I TotalS 1 I I -r--------.7.-- - i 1,063,250 I 0 1,063,250- . --muminic- 8B I 380,328 I TO BE DETERMINED I 149,050 .I I . j_____ Totals 1 149,050 0 _j 149,050 I 3.42 .__,,__,, - _ . 29,992,012 (Total onsite area including outermost 100'of wetlands) 8,688,042 1,759,571 (Remaining wetland area outside outermost 100') 31,751,583 SF SAN RIO ATTACHMENT'A' B.R.FINCH,PE WDL-07000 825n007 a_.____ .;__----- , -_-__R_—._ -__...------- __,„__,-_._,.._ - _ _...__—__._ ..__�._,�-_,—,__��TM�-_��_�____ _,_._.-_- .,_....,r_—.�_e._,,.—__-_-__.._v_..,---- n fi:— -'"—ride 1-•-- __---,_77:—r.:_:,.,....—.,_ Basio Ilfame�ti__ I Phase lA Phase IB Phase 2A Phase 2B _ Phas:3 A Phase 4A ,_ _Phase 46 �_^-'���Phase SA Phase 5B � Phase 6A I Phase 6B ,=�, I Phase 8A Phase 8B J Shallotte River, I i -.~. T' Shallotte River,Sharron_I �" -" -..� Receiving Strewn Name ' SLazron Creek ' Shallotte River Shallotte River Shallotte River I Creek I Shallotte River �.I Shallotte River _ Shallotte River Shallotte River Shallotte River -}` Sharron Creek Sharron Creek Sharron Creek Sharron Creek _�� Sharron Creek Receiving Stream Classification SC;HQW SC;HQW SC;HOW - SC;HQW SC;HOW SA;HOW SA;HQW_ SC:HQW I SC;HQW I SC;HQW . SC;HOW I SC;HQW-C;Sw:HQW I-SC;HQW-C,Sw,HQW i SC;HOW-C,Sw,HQW 1 SC;HOW-C;Sw;HQW -_ Drainage Area -----r 3,236,764 SF I 211,369 SF 2,384,365 SF ' 805,768 SF 2,141,672 SF _I 5,041,470 SF __79,938 SF 2,235,662 SF _ 1,122,015 SF _ 2,7.36,279 SF _ 671,523 SF _ 4,948,709 SF 75,658 SF I_ 3,92Q292 SF i 380,328 SF Existing Impervious Area 0 SF I_ 0 SF 0 SF • I 0 SF I 0 SF 0 SF 0 SF '_ _ 0 SF __,_ 0 SF E_ 0 SF 0 SF 0 SF f 0 SF ! 0 SF t_ 0 SF Proposed Impervious Area = 680,143 SF I 85,571 SF766,559 SF I 216,750 SF I 596,767 SF 1 1,191,366 SF 37,026 SF 733,637 SF i 424,318 SF 895,768 SF I 261,717 SF 1 1,340,450 SF 43,670 SF } 1,063,250 SF -�— .._�_ 149,050 SF%ImperviorsArea(totaQ 27.2% 405% 32.1% I 26.9% 28.0% 23.6% 6.3% 32.8% 37.8% I 32.7% 27.1% 57.7% ..1 . _ 27.11% 39.2% — � • I_Lpervlous S_rfsce rtre„�__.•,�Phase lA., I Phase 1B r-� ��Phase 2A i Phase 2B I Phase 3 : Phase 4A pm Phase 4B may= Phase SA Phase 56 Phase 6A Phase 6B -I Phase 7A I Phase I Phase BA I Phase On-siteLots ' 573,000 SF 1 0 SF 0 SF I _i-.......__ �..... ; i_,�_� .w. .. ...� - ----,i i..._._� �..__.,r-- .. -- ----- _ On-site Buildings 0SF I 12,195SF 324.606SF i TBD '__ TBD TBD I TBD TBD 4-� TBD I TBD TBD !-_—_ TBD ---j Ti TBD - TBD—'"" On-site Streets . 268,152SF I 35,853SF 310,915SF - 1----- TBD _ I TBD I TBD TBD I TBD TBD -1'BD TBD ---- TBD TBD--` •-- TBD --- TBD On-site Parking I 0 SF I 10,234 SF i 0 SF i TBD _I TBD _ TBD TBD TBD - TBD TBD I TBD TBD TBD TED -� TBD _ On-site Sidewalks I 38,991 SF i 8558 SF II 98,368 SF - I- TBD TBD - __ TBD --_ TBD • - TBD TBD TBD I I TBD TBD --� TBD TED TBD Other On-site I 0 SF 1- 18,731 SF 1 32.670 •SF { TBD-_ TBD _ I TBD _ TBD I.-- TBD __'_ TBD —- TBD —i- Teo �I-----TBD --� TBD TBD ---I TBD - --'-'-- ---�-- TBD TBD - TBD -- - TBD +I .�D•-- I-- ----�. .E TBD i Off-site 0 SF 0 SF 0 SF TBD __.._TBD -.__ _ ,._..�,..._.,...,._e._.. TBD -� ._._._..:_.� - 85,571 �. TBD Total .„ Y. 880�143 SF 85,571 SF I 766,559 SF _ TBD�y TBD TBD TBD . TBD TBD 1 TBD ' "�- , _. -- `� ---- _.».,•�,_...._�., _ � - I i TBD i TBD I TBD TBD RE:Express Review- San Rio,Phase 3 Subject: RE: Express Review- San Rio,Phase 3 From: "Finch, Brandon" <Finch@johnrmcadams.com> Date: Wed, 27 Jun 2007 16:08:57 -0400 To: "Janet Russell" <Janet.Russell@ncmail.net>, <billy@wakedev.com> Ms. Russell, Thank you very much for the quick reply. I would like to confirm this date. Have a good afternoon, Brandon R. Finch, PE Sr. Stormwater Project Manager THE JOHN R. McADAMS COMPANY, INC. 2905 Meridian Parkway Durham, NC 27713 919-361-5000 RTP, NC Office 704-527-0800 Charlotte, NC Office 919-210-2912 Mobile finch@johnrmcadams.com The John R. McAdams Company, Inc. provides a unique collection of land development design services including land planning, zoning administration and permitting, surveying, site engineering, contract administration, landscape architecture, stormwater management, and traffic engineering. McAdams has offices in Durham and Charlotte, North Carolina. For more information, visit www.johnrmcadams.com. McADAMS COMPANY: Assisting our clients to have successful projects for over 25 years. Original Message From: Janet Russell [mailto:Janet.Russell@ncmail.net] Sent: Wednesday, June 27, 2007 4:00 PM To: Finch, Brandon; billy@wakedev.com Subject: Express Review - San Rio, Phase 3 Brandon: Phase 3 of San Rio has been scheduled for an Express Stormwater Review Submittal with Chris Baker on *August 27, 2007 at 8:30 a.m. Please respond within 2 business days to confirm and reserve this meeting date and time. No further notification will'be sent. If you need to reschedule, please advise as soon as possible. Please note: if the project package is not *complete* as the August 27th meeting approaches, please call and cancel the meeting so that other projects may be reviewed. Thanks, Janet Russell 1 of 1 6/28/2007 8:28 AM Re: San RW Phase 3 -Request for Express Review Subject: Re: San Rio Phase 3 -Request for Express Review From: Linda Lewis <linda.lewis@ncmail.net> Date: Wed, 27 Jun 2007 08:44:13 -0400 To: "Finch,Brandon" <Finch@johnrmcadams.com> CC: Janet Russell<janet.russell@ncmail.net> Brandon: Prior to scheduling, you will also need to complete and submit the attached questionnaire. Thanks, Linda Finch, Brandon wrote: Ms. Lewis, I hope all is well . We are beginning to move forward with the next phase of the San Rio development . For this reason, I am attaching a pdf file of a request for Express Review, along with a vicinity map depicting the approximate location of this phase. «16160 01 .pdf» This will be a modification / follow up to our recently completed master plan / Phase 1 permit (SW8 070202MOD dated June 18, 2007) . This phase is proposed to be low density with curb-and-gutter (no high-density pockets) . If possible, we would like to continue the review with Chris Baker since he has reviewed the previous phases . Please let me know if you need any additional information to process this request. As always, thank you for all of your help, ***Brandon R. Finch, PE*** *Sr. Stormwater Project Manager*** *THE JOHN R. McADAMS COMPANY, INC. * 2905 Meridian Parkway Durham, NC 27713 919-361-5000 RTP, NC Office 704-527-0800 Charlotte, NC Office 919-210-2912 Mobile 1 of 2 6/27/2007 8:44 AM Re: San-Rio Phase 3 -Request for Express Review finch@johnrmcadams.com <BLOCKED: :mailto: finch@johnrmcadams .com> The John R. McAdams Company, Inc. provides a unique collection of land development design services including land planning, zoning administration and permitting, surveying, site engineering, contract administration, landscape architecture, stormwater management, and traffic engineering. McAdams has offices in Durham and Charlotte, North Carolina. For more information, visit www. johnrmcadams .com <BLOCKED: :http://www.johnrmcadams .com/> . *McADAMS COMPANY: **/ Assisting our clients to have successful projects for over 25 years . /* • -- Content-Type: application/msword Express Permit Questionnaire.doc Content-Encoding• base64 2 of 2 6/27/2007 8:44 AM