Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8070834_Approved Plans_20071019
\;-�i�i1 ` \ !` w ;.slip 'mot` 3-SAUM #1 - A . _AM n woo • .� ,► IRS IV ,. . 'ro-' aw, IF .w� u / *-nAZ%M ir" - 101= #S A WOW = a EA ME 01 '1: I:N • it Q U c 0 z� zMl � � a �azN W z Z� o aoo F,04 10 E� w o c° Wes^ z w®� w c� A.. 12 11 z 0 w ax N z O U � a V/ � 0 0 z w �1 is Q� W PROJECT NO. ML-07020 FILENAME: WDL07020—SW2 DESIGNED BY: - DRAWN BY: - SCALE: 1 m=200' DATE: 08-24-2007 SHEET N0. SW-2 AMcADAMS A U w z i x � a W z Z � O I �n o r®ll V .--i pq W z w z w® w 0 w a 0 z U � O � a F�1 A a V1 � PROJECT NO. WGL-07020 FILENAME: WDL07020-SW1 DESIGNED BY: DRAWN BY: - SCALE: 1 "=200' DATE: 08-24-2007 SBEkT N0. sw-1 AimcADAMS STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM C i•:� BLADEN ' ............ ... .PENDEk..... .... ....................... _ V ' COLUMBUS •2v, ... ...... —•. .. :NEW HAN VEp ' r • i r i 'N./ l I BRUNSWICK a f r> «� E .�..: t . V ti I N_ DATUM INFORMATION The projection used in the preparation of this map was the North Carolina State Plane (FIPSZONE 3200). The horizontal datum was the North American Datum of 1983, GRS80 ellipsoid. Differences in datum, ellipsoid, projection, or Universal Transverse Mercator zones used in the production of FIRMS for adjacent jurisdictions may result in slight positional differences in map features across jurisdictional boundaries. These differences do not affect the accuracy of this FIRM. All coordinates on this map are in U.S. Survey Feet, where 1 U.S. Survey Foot = 1200/3937 Meters. Flood elevations on this map are referenced to the North American Vertical Datum of 1988 (NAVD 88). These flood elevations must be compared to structure and ground elevations referenced to the same vertical datum. An average offset between NAVD 88 and the National Geodetic Vertical Datum of 1929 (NGVD 29) has been computed for each North Carolina county. This offset was then applied to the NGVD 29 flood elevations that were not revised during the creation of this statewide format FIRM. The offsets for each county shown on this FIRM panel are shown in the vertical datum offset table below. Where a county boundary and a flooding source with unrevised NGVD 29 flood elevations are coincident, an individual offset has been calculated and applied during the creation of this statewide format FIRM. See Section 6.1 of the accompanying Flood Insurance Study report to obtain further information on the conversion of elevations between NAVD 88 and NGVD 29. To obtain current elevation, description, and/or location information for bench marks shown on this map, please contact the North Carolina Geodetic Survey at the address show below. You may also contact the Information Services Branch of the National Geodetic Survey at (301) 713-3242, or visit their website at www.ngs.noaa.gov. North Carolina Geodetic Survey County Average Vertical Datum Offset Table 121 West Jones Street ounty Vertical Datum Offset Raleigh, NC 27601 Brunswick -1.06 (919) 733-3836 www.ncgs.state.nc.us Example: NAVD 88 = NGVD 2 + -1.06 A!I streams listed in the Flood Hazard Data Table below were studied by detailed methods using field survey. Other flood hazard data shown on this map may have been derived using either a coastal analysis or limited detailed riverine analysis. More information on the flooding sources studied by these analyses is contained in the Flood Insurance Study report. FLOOD HAZARD DATA TABLE Floodway Width (feet) Left/Rlght Distance From The Center of Stream to Encroachment Boundary (Looking Downstream) or Total Floodway Width Cross Stream Flood Discharge Section Station' (cfs) 1 % Annual Chance (100-year) Water -Surface Elevation (feet NAVD 88) THE MILL POND 010 963 1 500 10.92 506 / 128 015 1 516 1,500 10.92 289 / 103 018 1 759 1,500 10.92 63 / 543 020 1 1,964 1 1,500 10.92 30 / 103 SHALLOTTE RIVER 136 13,550 2,469 _ 10.92 1,689 187 18,725 2,469 10.92 322 233 1 231300 2,469 10.72 322 ' Feet above mouth 7 Elevation includes coastal surge from Atlantic Ocean 3 Width does not match panel due to adjustment of the mapped floodway to incorporate adjacent water bodies. ������ \�. ♦.,...�.' asMONtt �: `r �. \ c. s { �r This digital Flood Insurance Rate Map (FIRM) was produced through a unique cooperative partnership between the State of North Carolina and the Federal Emergency Management Agency (FEMA). The State of North Carolina has implemented a long term approach of floodplain management to decrease the costs associated with flooding. This is demonstrated by the State's com- mitment to map floodplain areas at the local level. As a part of this effort, the State of North Carolina has joined in a CooperatingTechnical State agreement g with FEMA to produce and maintain this digital FIRM. www.ncfloodmaps.com 78°22'30" 2 190 nnn rr=Cr 80 000 FEI 33"58' 3761000 33°57'3 3760 000' 33"57'1 72 500 FEE 3759 000 ^ 33°56'31 70 000 FEE 21S itrzz'su 78°22'0" ro-ZZ-V 78°21'30" I..�,.,,,, 2 197 500 FEET 78°21'0" LEGEND 0 000 FEET SPECIAL FLOOD HAZARD AREAS SFHAs SUBJECT TO 80 000 FEET <<<<< <" INUNDATION BY THE 1 % ANNUAL CHANCE FLOOD The 1% annual chance flood (100-y3ar flood), also known as the base flood, is the flood that has a 1% chance of being equaled or exceeded in any given year. The Special Flood Hazard Area is the area subject to flooding by the 1% annual chance flood. Areas of Special Flood Hazard include Zones A, AE, AH, AO, AR, A99, V, and VE. The Base Flood Elevation is the water -surface elevation of the 1 % annual chance flood. ZONE A No Base Flood Elevations determined. ZONE AE Base Flood Elevations determined. ZONE AH Fl000 depths of 1 to 3 feet (usually areas of ponding); Base Flood Elevations determined. S3°5s'o" ZONE AO Flood depths of 1 to 3 feet (usually sheet flow on sloping terrain); average depths determined. For areas of alluvial fan flooding, velocities also determined. ZONE AR Special Flood Hazard Area formerly protected from the 1% annual chance flood by a flood control system that was subsequently decertified. Zone AR indicates that the former flood control system is being restored to provide protection from the 1% annual chance or greater flood. ZONEA99 Area to be protected from 1% annual chance flood by a Federal flood protection system under construction; no Base Flood Elevations determined. ZONE VE Coastal flood zone with velocity hazard (wave action); Base Flood Elevations determined, 77 500 FEET 3761 000 M 13°57'30" 3760 000 m 3°57'0" 3759 000 M °56'30" ) 000 FEET 78°20'30" 2 200 000 FEET NOTES TO USERS This map is for use in administering the fJational Flood Insurance program. It does not necessarily identify all areas subject to flooding, particularly from local drainage sources of Boundaries of the floodways were computed at cross sections and interpolated between cross sections. The floodways were based on hydraulic considerations Y Base map features shown on this map, such as corporate limits are based on the most u - p � p An accompanying Flood Insurance Study repot,, Letter of Map Revision {LOMR) or Letter of small size. The community map repository should be consulted for possible updated or y with regard to requirements of the National Flood Insurance Program. Floodwaywidths and other pertinent p e t to -date data available at the time of publication. Changes in the corporate limits may have g p y occurred since this map was published. Map users the Map Amendment (LOUtA) revising portions of the panel, and digital versions of this FIRM may additional flood hazard information. floodway data are provided in the Flood Insurance Study report for the jurisdictions. should consult appropriate community official or website to verify current conditions of jurisdictional boundaries and base be available. Visit the North Carolina Floodplain Mapping Program website at www.ncfloodmans.com, or contact the FEMA Ma Service Center at 1- p 800-358-9616 for To detailed obtain more d a e lied information a on in area s where Base Floo d Elevations atlons (BFEs) s and/or floodways have y been determined, users are encouraged to consult the Flood Profiles, Floodway Data and/or Summary of Stillwater Elevations tables contained within the Flood Insurance Study (FIS) report that accompanies this FIRM. Users should be aware that BFEs shown on the FIRM represent rounded whole -foot elevations. These BFEs are intended for flood insurance rating purposes only and should not be used as the sole source of flood elevation information. Accordingly, flood elevation data presented in the FIS report should be utilized in conjunction with the FIRM for purposes of construction and/or floodplain management. Coastal Base Flood Elevations shown on this map apply only landward of 0.0' North American Vertical Datum of 1988 (NAVD 88). Users of this FIRM should be aware that coastal flood elevations are also provided in the Summary of Stillwater Elevations tables in the Flood Insurance Study report for this judsd;ction. Elevations shown in the Summary of Stillwater Elevations tables should be used for construction and/or floodplain management purposes when they are higher than the elevations shown on this FIRM. ma features Certain areas not in o Special Flood Hazard Areas may a be pr otected ed b fl ood Y p control Y structures. Refer to Section 4.4 "Flood Protection Measures" of the Flood Insurance Study report for information on the flood control structures in the jurisdictions. Base map information and geospatial data used to develop this FIRM were obtained from various organizations, including the participating local community(ies), state and federal agencies, and/or other sources. The primary base for this FIRM is aerial imagery acquired as part of the National Digital Orthophoto Program. The time period of collection for the imagery is 1998-1999. Information and geospatial data supplied by the local community(ies) that met FEMA base map specifications were considered the preferred source for develop ment of the base map. See eos atial metadata for the " 9 p e associated digital FIRM for additional information about base map preparation, p lnformatl 1 t on on al relate pr oducts odt cts associated wth th is FIRM. The FEMA Ma p Service Center p I P may also be reached by Fax at 1-800-358-9620 and their website nt www fema qov/msc This map reflects more detailed and up-to-date stream channel configurations than those shown on the previous FIRM for this jurisdiction. The floodplains and floodways that were transferred from the previous FIRM may have been adjusted to conform to these new stream channel configurations. As a result, the Flood Profiles and Floodway Data tables in the Flood Insurance Study report (which contains authoritative hydraulic data) may reflect stream channel distances that differ from what is shown on this map. Please refer to the separately printed Map Index for an overview map of the county showing the layout of map panels; community map repository addresses; and a Listing of Communities table containing National Flood Insurance Program dates for each community as well as a listingf t panels o he pa e s on which each is located. If you have questions about this map, or questions concerning the National Flood Insurance Program in general, please call 1-877-FEMA MAP (1-877-336-2627) or visit the FEMA website at www.fema.gov. MAP REPOSITORY Refer to listing of Map Repositories on Map Index or visit www.ncfloodmaps.com. EFFECTIVE DATE OF FLOOD INSURANCE RATE MAP PANEL JUNE 2, 2006 EFFECTIVE DATE(S) OF REVISION(S) TO THIS PANEL For community map revision history prior to statewide mapping, refer to the Community Map History table located in the Flood Insurance Study report for this jurisdiction. To determine if fo od insurance is available in this community, contact your insurance agent, the North Carolina Division of Emergency Management or the National Flood Insurance Program at the following phone numbers or websites: NC Division of Emergency Management (919) 715_Rn00 www nocrimecontrgl orafnfio National Flood Insurance Program 1-800-638-6620 www fema. gnvinfip FLOODWAY AREAS IN ZONE AE The floodway is the channel of a stream plus any adjacent floodplain areas that must be kept free of encroachment so that the 1% annual chance flood can be carried without substantial increases in flood heights. OTHER FLOOD AREAS ZONE Areas of 0.2% annual chance flood; areas of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees from 1% annual chance flood. C� OTHER AREAS ZONE X Areas determined to be outside the 0.2% annual chance floodplain. ZONE D Areas in which flood hazards are undetermined, but possible. ® COASTAL BARRIER RESOURCES SYSTEM (CBRS) AREAS OTHERWISE PROTECTED AREAS (OPAs) CBRS areas and OPAs are normally located within or adjacent to Special Flood Hazard Areas. 1% annual chance floodplain boundary 0.2% annual chance floodplain boundary ---- ------ Floodway boundary — Zone D Boundary ��������'����""• CBRS and OPA Boundary t Boundary dividing Special Flood Hazard Areas of different Base Flood Elevations, flood depths or flood velocities. ^^� 513 — Base Flood Elevation line and value; elevation in feet* (EL 987) Base Flood Elevation value where uniform within zone; elevation in feet* *Referenced to the North American Vertical Datum of 1988 012 —I Cross section line 23 ---_— 23 Transact line 97*07'30", 32*22-30" Geographic coordinates referenced to the North American Datum of 1983 (NAD 83) 4276 000 m 1000-meter Universal Transverse Mercator grid ticks, zone 17 1 477 500 FEET 2500-foot grid values: North Carolina State Plane coordinate system (FIPSZONE 3200, State Plane NAD 83 feet) BM5510 x North Carolina Geodetic Survey bench mark (see explanation in the Datum Information section of this FIRM panel). BM5510® National Geodetic Survey bench mark (see explanation in the Datum Information section of this FIRM panel). 0 M1.5 River Mile GRID NORTH MAP SCALE 1" = 500' (1 : 6,000) 250 0 Soo 1000 FEET METERS 150 0 150 300 PANEL 1097J FIRM ® m FLOOD INSURANCE RATE MAP NORTH CAROLINA m PANEL 1097 in (SEE LOCATOR DIAGRAM OR MAP INDEX FOR FIRM PANEL LAYOUT) CONTAINS: COMMUNITY CID No. PANEL SUFFIX BRUNSWICK COUNTY 370295 1097 1 ® SHALLOTTE, TOWN OF 370388 1097 1 m Notice to User: The Map Number shown below should be used when placing map orders; the Community Number shown above should be used on insurance applications for the subject community. EFFECTIVE DATE MAP NUMBER ® JUNE 212006 3720109700J ® Sant .••:� \ .r State of North Carolina Federal Emergency Management Agency STATE OF NORTH CAROLINA FIRM PANEL LOCATOR DIAGRAM DATUM INFORMATION The projection used in the preparation of this map was the North Carolina State Plane (FIPSZONE 3200). The horizontal datum was the North American Datum of 1983, GRS80 ellipsoid. Differences in datum, ellipsoid, projection, or Universal Transverse Mercator zones used in the production of FIRMS for adjacent jurisdictions may result in slight positional differences in map features across jurisdictional boundaries. These differences do not affect the accuracy of this FIRM. All coordinates on this map are in U.S. Survey Feet, where 1 U.S. Survey Foot = 1200/3937 Meters. Flood elevations on this map are referenced to the North American Vertical Datum of 1988 (NAVD 88). These flood elevations must be compared to structure and ground elevations referenced to the same vertical datum. An average offset between NAVD 88 and the National Geodetic Vertical Datum of 1929 (NGVD 29) has been computed for each North Carolina county. This offset was then applied to the NGVD 29 flood elevations that were not revised during the creation of this statewide format FIRM. The offsets for each county shown on this FIRM panel are shown in the vertical datum offset table below. Where a county boundary and a flooding source with unrevised NGVD 29 flood elevations are coincident, an individual offset has been calculated and applied during the creation of this statewide format FIRM. See Section 6.1 of the accompanying Flood Insurance Study report to obtain further information on the conversion of elevations between NAVD 88 and NGVD 29. To obtain current elevation, description, and/or location information for bench marks shown on this map, please contact the North Carolina Geodetic Survey at the address show below. You may also contact the Information Services Branch of the National Geodetic Survey at (301) 713-3242, or visit their website at www.ngs.noaa.gov. North Carolina Geodetic Survey County Average Vertical Datum Offset Table 121 West Jones Street County Vertical Datum Offset Raleigh, NC 27601 Brunswick -1.06 (919) 733-3836 www.ncgs.state.nc.us Exam le: NAVD 88 =NGVD 29 + -1.06 All streams listed in the Flood Hazard Data Table below were studied by detailed methods using field survey. Other flood hazard data shown on this map may have been derived using either a coastal analysis or limited detailed riverine analysis. More information on the flooding sources studied by these analyses is contained in the Flood Insurance Study report. FLOOD HAZARD DATA TABLE Floodway Width (feet) Left/Right Distance From The Center of Stream to Encroachment Boundary (Looking Downstream) or Total Floodway Width Cross Section Stream Station Flood D;scharge (cfs) 1 % Annual Chance (100-year) Water -Surface Elevation (feet NAVD 88) SHARRON CREEK 021 2,145 1 363 10.42 51 / 119 029 2,900 1 363 10.42 20 / 307 10.42 10.42 10.42 10.42 10.42 10.42 10.5 \Nl i e. t \• f V, This digital Flood Insurance Rate Map (FIRM) was produced through a unique cooperative partnership between the State of North Carolina and the Federal Emergency Management Agency (FEMA). The State of North Carolina has implemented a long term approach of floodplain management to decrease the costs associated with flooding. This is demonstrated by the State's com- mitment to map floodplain areas at the local level. As a part of this effort, the State of North Carolina has joined in a Cooperating Technical State agreement with FEMA to produce and maintain this digital FIRM. www.ncfloodmaps.com 2 1qn nnn FFFT 90 000 FI 33°59' 3764 °q 33°59 t t 3763 °D' 33°58'3 82 500 FEE 3762 000 M 80 000 FEE 219 7 This map is for use in administering the National Flood Insurance program. It does not necessarily identify all areas subject to flooding, particularly from local drainage sources of small size. The community map repository should be consulted for possible updated or additional flood hazard information. To obtain more detailed information in areas where Base Flood Elevations (BFEs) and/or floodways have been determined, users are encouraged to consult the Flood Profiles, Floodway Data and/or Summary of Stillwater Elevations tables contained within the Flood Insurance Study (FIS) report that accompanies this FIRM. Users should be aware that BFEs shown on the FIRM represent rounded whole -foot elevations. These BFEs are intended for flood insurance rating purposes only and should not be used as the sole source of flood elevation information. Accordingly, flood elevation data presented in the FIS report should be utilized in conjunction with the FIRM for purposes of construction and/or floodplain management. Stillwater Coastal Base Flood Elevations shown on this map apply only landward of 0.0' North American Vertical Datum of 1988 (NAVD 88). Users of this FIRM should be aware that coastal flood elevations are also provided in the Summary of Stillwater Elevations tables in the Flood Insurance Study report for this "u nsdlctj on. I v ' E e atlons shown in nth e Summ ary y of er Elevations tables should be used for construction and/or floodplain management purposes when they are higher than the elevations shown on this FIRM. 78°22'0" 7a^1)1�an-, l-lr.-...,.-, ..,.... n 4n� cnn rrr-r NOTES TO USERS Boundaries of the floodways were computed at cross sections and interpolated between cro ss sectio ns. The floodways were based ed on hydraulic considerations with regard to requirements of the National Flood Insurance ?rogram. Floodway widths and other pertinent floodwa data y a are provided in the Flood Insurance Study report for the jurisdictions. Certain areas not in Special Flood Hazard Areas may be protected by flood control structures. Refer to Section 4.4 "Flood Protection Measures" of the Flood Insurance Study report for information on the flood control structures in the jurisdictions. Base map information and geospatial data used to develop this FIRM were obtained from various organizations, including the participating local community(ies), state and federal agencies, and/or other sources. The primary base for this FIRM is aerial imagery acquired as part of the National Digital Orthophoto Program. The time period of collection for the imagery is 1998-1999. Information and geospatial data supplied by the local community(ies) that met FEMA base map specifications were considered the preferred source for development of the base map. See geospatial metadata for the associa ted digital FIRM for additional information about base map preparation. bas e 78°21'0" Base map features shown on this map, such as corporate limits, are based on the most up- to-date data available at the time of publication. Changes in the corporate limits may have occurred since this map was published. Map users should consult the appropriate community official or website e to verify Y current conditio ns of "urt" sd ic ti onal boundaries an d se map features. This map reflects more detailed and up-to-date stream channel configurations than those shown on the previous FIRM for this jurisdiction. The floodplains and floodways that were transferred from the previous FIRM may have been adjusted to conform to these new stream channel configurations. As is result, the Flood Profiles and Floodway Data tables in the Flood Insurance Study report (which contains authoritative hydraulic data) may reflect stream channel distances that differ from what is shown on this map. Please refer to the separately printed Map Index for an overview map of the county showing the layout of map panels; community map repository addresses; and a Listing of Communities table containing National Flood Insurance Program dates for each community as well as a listing of the panels on which each is located. If you have questions about this map', or questions concerning the National Flood Insurance Program in general, please call 1-877-FEMA MAP (1-877-336-2627) or visit the FEMA website at www.fema.gov. 78°20'30" LEGEND DO FEET SPECIAL FLOOD HAZARD AREAS (SFHAs) SUBJECT TO 90 000 FEET o INUNDATION BY THE 1 /o ANNUAL CHANCE FLOOD The 1% annual chance flood (100-year flood), also known as the base flood, is the flood that has a 1% chance of being equaled or exceeded in any given year. The Special Flood Hazard Area is the area subject to flooding by the 1% annual chance flood. Areas of Special Flood Hazard include Zones A, AE, AH, AO, AR, A99, V, and VE. The Base Flood Elevation is the water -surface elevation of the 1 %annual chance flood. ZONE A No Base Flood Elevations determined. ZONE AE Base Flood Elevations determined. ZONE AH Flood depths of 1 to 3 feet (usually areas of ponding); Base Flood Elevations determined. ZONE AO Flood depths of 1 to 3 feet (usually sheet flow on sloping terrain); average depths determined. For areas of alluvial fan flooding, velocities also determined. ZONE AR Special Flood Hazard Area formerly protected from the 1% annual chance flood by a flood control system that was subsequently decertified. Zone AR indicates that the former flood control system is being restored to provide protection from the 1% annual chance or greater flood. ZONE A99 Area to be protected from 1% annual chance flood by a Federal flood protection system under construction; no Base Flood Elevations determined. ZONE VE Coastal flood zone with velocity hazard (wave action); Base Flood Elevations 33°59'30" determined. 87 500 FEET 3764 0°0 M 3'S9'0" 3763°'° M °58'30" 1762 om M 58'0" ..,: 000 FEET 2 200 000 FEET An accompanying Fl ood Insurance ce Stud y Lett y report, er of Map Revision (LOMR) or Letter of Map Amendment (COMA) revising portions of this panel, and digital versions of this FIRM may be available. Visit the North Carolina Floodplain Mapping Program website at www.ncflo odmaos.com, or contact the FEMA Map Service Center at 1-800-358-9616 for information on all related products associated with this FIRM. The FEMA Map Service Center may also be reached by Fax at 1-800-358-9620 and their website at www.fema.gov/msc. MAP REPOSITORY Refer to listing of Map Repositories on Map index or visit www.ncfloodmaos.com. EFFECTIVE DATE OF FLOOD INSURANCE RATE MAP PANEL JUNE 2, 2006 EFFECTIVE DATE(S) OF REVISION(S) TO THIS PANEL For o community map revision history prior to statewide mapping, refer to the Community Map History table located in the Flood Insurance Study report for this jurisdiction. To determine i f flood ins urance i available ' s in this community, contact your insuran ;e agent, the North Carolina Division of Ellergency Management or the National Flood Insurance Program at the following phone numbers or websites: ED NC Division of Emergency Management National Flood Insurance Program (919) 715-8000 www.nccrimecontrol.oralnfio 1-800-638-6620 www.fema.gov_lnff FLOODWAY AREAS IN ZONE AE The floodway is the channel of a stream plus any adjacent floodplain areas that must be kept free of encroachment so that the 1% annual chance flood can be carried without substantial increases in flood heights. t.-. ' OTHER FLOOD AREAS ZONE x Areas of 0.2% annual chance flood; areas of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees from 1% annual chance flood. OTHER AREAS ZONE X Areas determined to be outside the 0.2%annual chance floodplain. ZONED Areas in which flood hazards are undetermined, but possible. ® COASTAL BARRIER RESOURCES SYSTEM (CBRS) AREAS \ � \- OTHERWISE PROTECTED AREAS (OPAs) CBRS areas and OPAs are normally located within or adjacent to Special Flood Hazard Areas. "••••••••'•••••••••••••••••••••••••••••••••••� 1% annual chance floodplain boundary 0.2%annual chance floodplain boundary ----'- Floodway boundary - Zone D Boundary ���������"�"'�'• CBRS and OPA Boundary a....,.:•`•:.:.::, ,.., o..,,.....,.,,j„�_ Boundary dividing Special Flood Hazard Areas of different Base Flood Elevations, flood depths or flood velocities. ^^� 513 '^^- Base Flood Elevation line and value; elevation in feet" (EL 987) Base Flood Elevation value where uniform within zone; elevation in feet" 'Referenced to the North American Vertical Datum of 1988 012 Cross section line 23 _____ 23 Transact line 97°07'30", 32°22'30" Geographic coordinates referenced to the North Amerman Datum of 1983 (NAD 83) 4276 000 M 1000-meter Universal Transverse Mercator grid ticks, zone 17 1 477 500 FEET 2500-foot grid values: North Carolina State Plane coordinate system (FIPSZONE 3200, State Plane NAD 83 feet) BM5510X North Carolina Geodesic Survey bench mark (see explanation in the Datum Information section of this FIRM panel). BM5510® National Geodetic Survey bench mark (see explanation in the Datum Information section of this FIRM panel). • M1.5 River Mile 4 GRID NORTH MAP SCALE 1" = 500' (1 6,000) 250 0 500 1000 FEET METERS 150 0 150 300 � PANEL 1098J FIRM ® m FLOOD INSURANCE RATE MAP NORTH CAROLIl`+TA m PANEL 1098 m (SEE LOCATOR DIAGRAM OR MAP INDEX FOR FIRM PANEL LAYOUT) CONTAINS: COMMUNITY CID No. PANEL SUFFIX BRUNSWICK COUNTY 370295 1098 J ® SHALLOTTE, TOWN OF 370388 1098 J m Notice to User: The Map Number shown below should be used when placing map orders; the Community Number shown above should be used on insurance applications for the subject community. EFFECTIVE DATE MAP NUMBER ® JUNE 212006 3720109800J t..�':�' e' :�: max. ,•,ems State of North Carolina Federal Emergency Management Aeencv OCEAN 1 8 RiVER CLUB RIP �fj- WAM � 11 OWNER: VG DEVELOPMENT OMPANY 3209 GRESHAM LAKE ROAD, SUITE 160 RALEIGH, NC 27615 (919) 556-4310 CONTACT: BILLY SUTTON SANDLER AT SHALLOTTE,LLC 448 VIKING DRIVE, SUITE 220 VIRGINIA BEACH, VIRGINIA 23452 PHONE #: (757) 463-5000 • d Z O O d d C% � N �1 C- Z y � .. 7 U 0 ®C d O i) af m SaAaeg iiMEX M-1 F.3aMMG CONDMONS XC-2) E33S TNG CONDMONS XC-3 EXISTING CONDITIONS SW-1 STORMVVATER MASIER PLAN SW-2 STORMWATER MASTER PLAN M SE 2 S-1 EXMNG CONDITIONS S-2 OVERALL STTE PLAN 8-3 SrM PLAN - N012TfEWEST 8-4 SM PLAN - N01 TBPAST 6-5 SrM PLAN - SOUIEWEST S-6 SM, PLAN - SOUTIEEAST C-1 aVERALL GRADING AVID STORM DRAINAGE PLAN C-2 GRADING AND STORM DRAINAGE PLAN - N01MM S"T C-3 GRADING AND STORM DRAINAGE PLAN - NOWT C-4 GRADING AND STORM DRAINAGE PLAN - SOLTTHWEST C-5 GRADING AND STORM DRAINAGE PLAN - SOUMEASr C-11 DRAII- AGE AREA PLAN P-1 PLAN & PROFILE - RIVERVIEW DRIVE STATION 10+00.00 mm 23+50. P-2 PLAN & PROPUZ - RIVERViEW DRIVE srAZION 23+5o.00 Tf 3-;- .( P-3 PLAN & PROFLE - ECHO HARBOR WAY STATION 10+00.00 IMW 21+75.00 P-4 PLAN &: PROPSE POLAN GROVE CIRCLE STATION 10+00.00 THRU P-5 PLAN & 11'10FILE - POLAN GROVE CIRCLE srATIoN 18+50.00 m- iJ 2s+23.00 P-6 PT -AN & Fr R, -- SANITARY SEWER SYSTEM P-7 a o, ;1t & PROP - P.ANrrARY SEWER SYSTEM P-8 PLAN & PROP RE - STORM DRAINAGE SYSTEM P-9 PLAN a AtOKUP, - STORM DRAINAGE SYSTEM PD-lA WATER QUALM' POND #1 DETAILS PD-1B WATER QUALI r POND #1 DETAILS PD-IC WATER QUAUW POND #1 DETAILS PD-11) WATER QLWM POND #1 DETAILS PD-IE V,7X7i,k (, IT OND #1 DETAILS PD--11F W!V17110" °':; F xa1 ' POND #1 DETAILS PD-2A ' . „e> < ,Y POND #2 DETAILS PD-213 WAIT . i4ilN7,tlY POND #2 DETAILS PD-2C WILJ IrAt WjAM r POND #2 DETAILS PD-21) WXMR QUAUT r POND #2 DETAILS PD-2E WATER QUALM POND #2 DETAILS PD-2F tqi= QiTALM OND #2 DETAILS PD-3A V TER QUA:LI'I'Y -BIND #3 DETAILS PD-3B WA= g A$;.I'i.`Y POND #3 DETAILS PL,3C `PV,":YIER QUALM 'POND #3 DETAIIS PD-31) WATER QUAIMI POND #3 DETAILS PD-3E WATER QUALfl Y POND #3 DETAIIS PD-3F WATER QUAIZIt FOND #3 DETAIIS PD-IUS WATER QUAIJl Y POND 1 LANDSCAPE PLAN PD-21~S W&-M Q: ALbTY POND 2 LANDSCAPE PLAN PD-3I.S WA_17 S_ gUAJ1ZY POND 3 LANDSCAPE PLAN —i tip 7 3--! (. .. C-1 AUK- CO%0MONS C-2 V:Et U- Sri- PLAN APPROVED c s'$ C-3 UZk, 02,d - :.AOT NO CAROLINA ENVIRONMENTAL C 4 Sim PLAI4 WEST MANAGEMENT COMMISSION G5 ME PLAN —SOLD C-8 ,ON OF WATER 4UAL.R1�► (� AM1AIL GRADING PLAN C-7 GiREADING P;AN - EAST G. 11, 10 0'7 _- C^3 :.RADING MAN - WEST � `) C-9 GRADING PLAN - SOUTHWEST C-10 DRAINAGE AREA MAP :' w F O '70 75 4" P-1 PLAN & PROP[IE - PARADISE BAY BLVD. - STA. 21+84 TO 36+ 00 P-2 PiAN & PROFILE - PARADISE BAy BLVD. - STA. 36+00 TO 46+00 P-° PLAN & PROFUZ - PARADISE BAy BLVD. - STA. 46+00 TO 51+25 CAhHWIRE CREEK CROSSING P I PLAN & PROFILE - CAM"= CREEK CROSSING - SPA. W+00 TO 70+00 15 PLAN & PROFILE - CIRCLE A. CIRCLE B. AND PARADISE BAy CIRCLE } 6 PIAN & PROFIIE - PARADISE BAY BOULEVARD 1-11' PLAN & PROFILE - ,WALES ALONG PARADISE BAY BOULEVARD 8 PLAN & PROFQE - SWALF.S ALONG CAMPFIRE CREEK CROSSING D- 1 SITE DETAILS L)-2 STORM DETAILS THE J01"I"N R"m seIn Mrs ADAM COMPANY ■■■ ■ ■. ■ ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709--4005 #' 19) 361-5000 FINAL DRAWING -- NOT RELEASED FOR CONSTRUCTION LEGEND: EXISTING WETLANDS APPROXIMATE LOCATION OF SHALLOT-fE RIVER 100-YEAR FEMA FLOODPLAIN BOUNDARY 500-YEAR FEMA FLOODPLAIN - - BOUNDARY NOTES: 1 �r l \J 0 \ � \� I,, s,i f 71 n.8 f 1. PROPERTY BOUNDARY INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BY JIM BLANCHARD ASSOCIATES, PC AND FROM EXISTING SURVEY BY NORRIS & WARD LAND SURVEYORS, PA. 2. EXISTING WETLAND BOUNDARY INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BYJIM BLANCHARD ASSOCIATES, PC. 3. ON -SITE TOPOGRAPHY IS FROM INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BY JIM BLANCHARD ASSOCIATES, PC. 4. OFF -SITE TOPOGRAPHY WAS GENERATED BY THE JOHN R. McADAMS CWPANY, INC. USING BARE EARTH (LIDAR) DATA PROVIDED TO JOHN R. McADAMS COMPANY BY THE INC FLOODPLAIN MAPPING PROGRAM. --v ``_S �J N \ vIJ I \ 4 N34'40'33"W N34'40'33"W r \ )V34'40'33"W J \ 1vd (60.58' LINE BEARING DISTANCE LINE BEARING DISTANCE LINE BEARING DISTANCE LINE BEARING DISTANCE LINE BEARING DISTANCE L7 L8 L9 L10 N 33'14'44" W S 84'25'38" W S 14'46'26" W S 48'15'31" W 12.86' 10.03' 31.38' 23.47' L76 L77 L78 L79 S 24'04'57" W S 10'03'40" W S 26'40'59" W S 45"12'56" W 25.46' 36.02' 36.16' 40.70' L151 L152 L153 L154 S 00'58'25" E N 89'08'29" W S 38'30'52" W S 22'13'17" W 106.65' 228.44' 225.25' 128.65' L226 L227 L228 L229 S 06'42'28" E S 33'50'20" E S 44'13'45" W S 08'31'10" E 25.48' 6.95' 46.36' 58.38' L301 L302 L303 L304 S 55'02'02" E S 69'37'05" E S 52'00'53" W S 40'26'44" E 32.52' 27.34' 19.30' 17.38' L11 S 49'07'34" W 48.37' L80 S 46'06'21" W 77.06' L155 S 59'53'09" E 214.54' L230 S 47'39'53" E 178.52' L305 S 45-42'11" E 20.67' L12 S 73'05'21" W 21.35' L81 S 6T48'46" W 44.24' L156 N 79'03'19" E 50.34' L231 N 19'47'42" E 107.56' L306 S 76-24'19- E 34.00' L13 N 63'08'00" W 10.03' L82 S 69'15'39" W 33.54' L157 S 79'25'19" E 360.32' L232 N 5T02'20" E 143.50' L307 N 80'41'28" E 391.53' L14 S 75'19'29" W 70.36' L83 S 80*54'12" W 20.88' L158 S 44'01'02" E 43.70' L233 N 59'12'17" E 66.62' L308 N 80'41'28" E 53.68' L15 S 7T45'56" W 67.56' L84 N 68'33'29" W 25.14' L159 N 86'42'20" E 48.44' 1234 N 14'22'42" E 108.75' L309 S 85'36'34" E 63.27' L16 S 72'07'45" W 48.57' L85 N 89'45'43" W 30.56' L160 N 19'59'02" W 84.41' L235 N 21'39'06" E 67.06' L310 S 52'17'41" E 119.64' L17 I S 01'37'08" E 23.12' L86 N 46'03'53" W 25.95' L161 N 10'55'48" E 14.33' L236 N 08*49'13" E 26.98' L311 S 50'50'03" E 51.38' L18 N 87'15'22" W 60.59' L87 N 53'29'04" W 28.91' L162 S 43*49'17" E 30.79' L237 N 39'11'49" E 35.14' L312 S 66'35'08" E 162.22' L19 S 46'32'22" W 136.70' L88 N 74'59'21" W 95.66' L163 S 12'35'00" E 63.66' L238 S 31'24'58" E 3.98' L313 S 37*36'15" E 29.46' L20 N 78'16'19" W 23.72' L89 S 81'06'39" W 32.88' L164 S 33'40'45" E 41.98' L239 S 13'41'39" W 73.61' L314 S 76*05*01" E 210.22' L21 S 88'57'09" W 78.70' L90 N 5447'22" W 59.25' L165 S 02'05'34" E 36.99' L240 S 22'12'54" E 59.93' L315 S 40'20'18" E 207.31' L22 N 35'55'00" W 95.09' L91 N 64'05'25" W 37.68' L166 N 34'33'56" W 36.82' L241 S 00'00'00" W 5.48' L316 S 87'09'34" E 123.47' L23 I N 19'23'52" W 43.33' L92 N 8T27'44" W 88.66' L167 S 50'07'05" W 32.20' L242 S 46'16'28" W 58.36' L317 N 52'27'49" E 113.38' L24 N 17*33'14" E 123.15' L93 S 04734'26" W 62.70' L168 S 74'11'12" W 38,04' L243 S 12*47'11" W 43.39' L318 N 79'41'18" E 150.13' L25 N 15'13'37" W 60.31' L94 S 28'18'03" W 73.82' L169 S 83'38'54" W 44.57' L244 S 36*21'11" W 32.81' L319 N 71'14'39" E 42.00' L26 N 84' 16'25" W 89.44' L95 S 11'38'01 " W 86.78' L170 S 08'53'43" E 57.89' L245 S 22'25'44" W 46.69' L320 N 54'39'39" E 97.70' L27 S 12'24'13" E 69.41' L96 S 29-10'38" W 101.99' L171 S 72'17'00" E 42.44' L246 S 5T48'46" W 41.62' L321 N 43'16'36" E 30.45' L28 N 22'25'03" W 63.66' L97 S 69'46'51 " W 80.52' L172 S 16' 13' 12" E 27.20' L247 S 37'50' 18" W 40.85' L322 N 66'31'22" E 48.70' L29 I S 32*35'11" W 92.55' L98 S 18'48'02" E 55.40' L173 S 48'02'53" E 34.54' L248 S 14'51'06" W 80.85' L323 S 78'35'20" E 80.73' L30 N 08'38'03" W 35.76' L99 S 48'49'55" E 117.66' L174 S 11'45'51" W 25.69' L249 S 15'38'47" E 28.84' L324 N 73'04'50" E 146.71' L31 N 09'33'12" E 12.11' L100 S 19'28'45" W 82.43' L175 S 32'51'59" E 41.60' L250 S 68-14'16" W 11.02' L325 S 84'01'58" E 26.99' L32 S 54'57'31 " W 42.04' L101 S 36'54'42" W 90.95' L176 S 13'52'22" W 65,99' L251 S 42'03'29" W 75.78' L326 N 74'43'49" E 41.62' L33 N 05'02'57" W 23.79' L102 N 38'1O'11" W 97.41' L177 S 08'10'05" W 49.33' L252 S 23'07'24" W 72.85' L327 N 44'47'28" E 57.14' L34 S 86'31'22" W 33.01' L103 S 24'46'10" W 3.53' L178 S 26'40'38" E 99.04' L253 S 15'25'46" W 39.66' L328 S 84'52'29" E 31.49' L35 S 04'26'10" W 53.03' L104 N 34'59'19" W 113.61' L179 S 66'03'32" E 58.60' L254 N 62'40'13" W 15.58' L329 N 43'31'41" E 48.71' L36 N 81'48'38" W 44.42' L105 S 44'23'58" W 102.70' L180 S 40'21'28" E 60.71' L255 S 87'54'49" W 65.55' L330 N 03'14'24" E 89.80' L37 N 88'01'37" W 39.38' L106 S 83*48'18" W 113.02' L181 S 38'48'36" E 40.91' L256 S 25*23'11" W 61.75' L331 S 82'08'26" E 168.24' L38 S 80'54'36" W 130.98' L107 S 78'35'50" W 283.49' L182 S 15'55'04" E 86.26' L257 S 08*52'17" W 57.46' L332 S 44'51'57" E 653.83' L39 S 53*09'19" W 33.34' L108 S 72'45'54" E 229.89' L183 N 69'33'05" E 38.86' L258 S 29'44'39" W 64.72' L40 S 85'39'30" W 47.78' L109 S 1O'13'44" E 199.76' L184 S 19'32'01" E 30.18' 1259 S 47'13'21" W 170.30' L41 N 38'44'30" W 7.26' L110 S 51'23'08" W 76.81' L185 S 09'29'51" E 76.51' L260 S 27'37'24" W 58.08' L42 N 88'48'00" W 151.37' L111 S 40'01'39" W 241.78' L186 S 85'13'48" W 125.59' L261 S 38'05'57" W 70.52' L43 S 51'17'43" W 111.35' L112 S 12'59'35" W 229.80' L187 S 29'04'42" E 101.29' L262 S 5V01'15" W 54.89' L44 S 60'32'19" E 126.02' L113 N 65'40'33" E 148.21' L188 N 61'55'32" E 49.11' L263 S 59'05'45" W 62.24' L45 S 68'52'44" W 42.01' L114 N 38'47'32" E 141.80' L189 N 63'47'53" E 25.81' L264 S 19*55'14" W 94.87' L46 S 58*45'11" W 59.71' L115 N 23'29'34" E 235.99' L190 S 58'16'28" E 42.28' L265 S 40'30'30" W 97.54' L47 S 21'42' 16" W 38.17' L116 N 82'03'07" E 1 13.20' L191 S 74'29'43" E 27.51 ' 1266 S 49'55'09" W 9.04' L48 S 41'54'00" W 47.86' L117 N 73'40'04" E 140.63' L192 N 61-48'13" E 31.86' L267 S 40'08'21" E 14.74' L49 S 23*23'11" W 75.34' L118 S 50*04'10" W 81.51' L193 S 20*36'15" W 45.24' L268 S 17'53'33" W 29.08' L50 S 06'13'33" E 49.48' L119 S 28'20'44" W 118.16' L194 S 86'04'45" W 46.12' L269 S 74'03'54" E 24.52' L51 S 36*01'11" E 143.65' L120 N 83'22'24" E 219.21' L195 S 06'34'48" E 52.92' 1270 N 77'11'34" E 14.30' L52 S 82'00'02" E 19.05' L121 N 60'59'41" E 260.86' L196 S 19*47'14" E 57.53' L271 N 65'06'56" E 25.80' L53 S 09'48'06" W 81.69' L122 N 82'56'24" E 102.32' L197 S 16'10'23" W 222.26' L272 S 43'25'48" E 10.86' L54 S 35'13'28" E 26.51' L123 N 27'03'50" W 185.57' L198 S 05'03'22" E 59.05' 1_273 S 47'41'38" E 11.16' L55 S 31'05'07" W 39.00' L124 N 07'59'20" E 103.25' L199 S 42'41'12" W 63.22' L274 S 40-17'24" W 57.16' L56 S 40'09'55" W 34.00' L125 N 04'55'59" E 30.52' L200 S 46'25'33" E 55.37' L275 S 50'52'24" W 5.75' L57 S 56'02'39" W 1.32' L126 S 75'40'05" E 61.63' L201 S 75'55'26" E 76.72' L276 S 18'01'59" W 22.75' L58 S 2447'02" W 19.67' L127 S 23'03'20" E 59.28' L202 S 61'07'17" W 66,79' L277 N 73'31'37" E 6.17' L59 S 44'46'58" W 11.59' L128 S 06'20'34" W 29.20' L203 N 81'23'34" W 81.64' L278 S 59'39'23" E 9.94' L60 S 07'42'09" E 26.05' L129 S 38'43'43" W 19.09' L204 N 53'21'09" W 71.65' L279 S 74'1O'17" W 41.79' L61 S 01'43'39" W 58.07' L130 S 66'13'42" E 18.97' 1205 N 60'54'25" W 85.75' L280 S 81'12'01" E 27.36' L62 S 73'12'43- E 65.45' L131 N 35'09'23" E 77.90' L206 S 84'02'05" W 34.68' L281 S 73-16.19" E 24.64' L63 S 86'07'58" E 38.14' L132 N 44'45'42" E 40.09' L207 S 67'26'09" W 116.23' L282 S 1 O' 17'02" W 22.65' L64 N 25'37'31" E 21.32' L133 N 42'14'57" E 72.65' L208 S 24'00'08" E 94.73' L283 S 41'14'34" W 4.62' L65 S 37'56'33" E 21,52' L134 S 31'18'43" E 34.37' L209 S 86'29'S1" E 100.37' L284 S 47'55'36" E 43.27' L66 S 19'39'12" E 21.97' L135 S 33*39'15" W 44.46' L210 S 49'41'24" E 114.15' L285 S 52'57'56" W 11.94' L67 S 16'15'40" W 20.82' L136 S 69'20'45" W 23.05' L211 N 20-39'16" E 7.96' L286 S 04'12'47" E 23.60' L68 S 29'33'05" W 22.82' L137 S 10*45'22" E 35.53' L212 N 83'32'40" E 91.86' L287 S 26'26'16" E 22.77' L69 S 10'22'39" E 16.22' L138 S 71'28'42" E 22.13' L213 N 65'34'03" E 78.25' L288 S 19'18'55" E 4.36' L70 S 08'50'33" W 15.74' L139 S 49'48'35" E 36.18' L214 S 40'56'08" E 77.99' L289 S 39'22'10" E 12.76' L71 S 00'17'23" W 15.41' L140 S 25'28'01" E 42.14' L215 S 50-18'26" E _ y 190.17' 1290 S 81'54'47" E 16.37' L72 S 25*52'15" W 30.50' L141 S 34'14'45" W 54.02' L216 N 72'16'18" E_ 223' L291 N 78'53'02" E 18.93' L73 S 63'04'01" W 14.57' L142 S 70'02'56" W 50.86' L217 N 51'15-32" E _ 2 .c0' 1292 S 61'59'10" E 10.50' L74 S 64'34'45" W 36.45' L143 S 52'43'25" E 105.50' L218 N 62'52'33" E 1 13.97' 1_293 S 13'48'41" W 7.35' L75 S 63'08'41" W 18.27' L144 N 14'05'51" W 10.55' L219 N 73'1520" E 28.79' L294 S 73'14'53" W 31.81' i ���••- L145 N 82'29'56" E 33.60' L220 S 84' 17'51 " E 33.96' L295 S 14'35'50" W 3.71 ' L146 S 76'39'03" E 25.59' L221 S 77'10-41" E T 1133' L296 S 19'01'29" E 25,07' L147 S 2T 10' 18" E 1 12.32' L222 S 16' 16'07" E 15.73' L297 N 79'08'35" E 14.60' L148 S 8T53'12" E 215.70' L223 S 82'21'09" E 16.52' L298 S 17'21'31" E 15.66' L149 N 70'08'38" E 7.44' L224 S 56'50'35" E 18.85` L299 S 56'08'37" E 24.34' L150 S 86'44'05" E 114.57' L225 S 19'20'02" E 28.21' L300 I S 49'20'S5" W 17.23' CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C1 1473.82' 508.53' 506.01' N 44'33'37" W 19'46'09" C2 982.97' 384.26' 381.81' N 2328'37" W 22'23'52" C3 1209.06' 239.71' 239.32' N 41'57'57" E 11'21'34" J. (jrl � r_/ \ / � � / r ^\� - 1 \ ( ` � �r j / J 1 \ \\ � � l � f\\�1\.��� ��-i , Y -�` �e�== L \ � � \ �- � � • � `�' � �,,. \=i20� ri ii j)lI J 11/ 1r1� J1 // 1 ^'/ r i \, ! i /J ' /\1\?)(1/l/S�=/ IT L �. LOY- 50 r t (20 31 C ( �//\�� 1 �� NC GRID / J i \ / / t / NAD 83 /1/ram/T1\-�l � �� 1 _ 77 GRAPHIC SCALE .=F i %,,� •- j ([ ✓ j % ` % \\� Jar - ' 1 ^ / �� �, � � / / ® 300 0 150 300 � /�/���� '�/! J 1 1 inch = 300 ft. ^I( /}j\ // /�t� �j �/ �`/ C, ��`i,� fir `�►®� rnL ��_r;;.� PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION S 78*12'51" E N 45'02'09" E 205.50' N 64'45'34" E 290.91' N 84'47'09" E 243.61 r _�/ •� -i /\ ` r r r - J J° /. — / L I I —, �' iE _ za - 1 - I � ` /1�1�\"-lI y(\\� ��\�� \\\! � \ � I 1 6 -�~ ' } J s f r ((I(II/� �Jjr \ �J \�,_ r \ \ ���s ,r 90.E\�, r, / �� �r ( < �1 \✓ �� ( / 1 316 W �. S 61 '42' 15 E 1, 15(�\��- �`1 \ \ `v / 125.62' NV N 4 (((I I /� / — ` �/y /l} NS% Q IL, � /J --� �� r \ \ I L I )j/ ,•� / � / l l \ 1 � � / r ( I1 \\\� � � � / 1`- v ( -` ,- ,' (- I � / A fir✓ � � i ` / \ 4 --- _ /J, • J• kA Oil /-jitt \) ��/ Frt / �J i�-'� �) \ O 1 \' l\L` ---� �l r/� \ I ✓ \ � 1\\�\' J .� --`�ti �y/' ��9.1 S} �J��) fj �- / -� / l L; > / c ,��• g' — -, � j (-- r r - -. � � 1 I /� ' 1 / 1 ,., 1 so \ J ? �4J(4' / l � % � — � /�\ � � i` ( � / (J ./ � $ = � Ic }., 1\ \ \ I 1 ` ,- — � `� �/ j \ 1 � L' � ) \ \ •— .- �� i '' J 1r „ / // 1 I / � ." / , � \ / ( \ � r- \ \ / �- ` \ \\_ �i .���_ t ff \; s' o �e o r f- &SK A, r in // rJ 35 '/ -rr� �'rr-! \/�y-�► I -A�-..�. � /--, —�f \ ` � .��� �^,) L `�-`\\ .� � fD� 1) 1( \•, `v J�yn _, J �_ �f �o-v �f IS 1< ,a,�� 1 -✓� 1\ r 1 J Akii C� ( \II\I( T r _ \L\\\ �� ® �` 2( \� LJJ��� Y r— i� n S 71'sk2��-,\W t � Z ✓ ,JI \ \ �— `( / ! / \� �l ✓ l / fit,\� S 57'49' 5 " W EXISTING WETLANDS APPROXIMATE LOCATION OF SHALLOTTE RIVER 100—YEAR FEMA FLOODPLAIN BOUNDARY 500—YEAR FEMA FLOODPLAIN BOUNDARY NOTES: 1. PROPERTY BOUNDARY INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BY JIM BLANCHARD ASSOCIATES, PC AND FROM EXISTING SURVEY BY NORRIS & WARD LAND SURVEYORS, PA. 2. EXISTING WETLAND BOUNDARY INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BYJIM BLANCHARD ASSOCIATES, PC. 3. ON —SIT-_ TOPOGRAPHY IS FROM INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BY JIM BLANCHARD ASSOCIATES, PC. 4. OFF —SITE TOPOGRAPHY WAS GENERATED BY THE JOHN R. McADAMS COMPANY, INC. USING BARE EARTH (i DATA PROVIDED TO JOHN R. McADAMS COMPANY BY THE NC FLOODPLAIN MAPPING PROGRAM. 0 NC GRID NAD 83 GRAPHIC SCALE 300 0 150 300 600 1 inch = 300 ft. f S 624129 W 327.79' LINE TABLE LINE BEARING LENGTH L1 S 61'32'43" E 185.94' L2 N 81'06'56" E 187.4j L3 N 41'28'57" E 56.55' L4 N 08'16'52" E 72.90' L5 N 00*21'18" E 140.21' L6 N 30'38'05" E 45.38' L7 S 87'53'47" E 86.22' 1-8 N 04'34'26" E 67.90' L9 N 26'3355" W 58.56' L10 N 50-47'39" E 42.91' CURVE TABLE CURVE RADIUS LENGTH CHORD BEARING ICH. DTS-':I:--.l DELTA TANGENT C4 1426.26' 490.80' N 44'36'13" W I 488.38 1 19-42'59" 247.85' PRELIMINARY DRA)VING — NOT RELEASED FOR CONSTRUCTION EXISTING WETLANDS APPROXIMATE LOCATION OF SHALLOTIE RIVER 100—YEAR FEMA FLOODPLAIN BOUNDARY 500—YEAR FEMA FLOODPLAIN BOUNDARY NOTES: 1. PROPERTY BOUNDARY INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BY JIM BLANCHARD ASSOCIATES, PC AND FROM EXISTING SURVEY BY NORRIS & WARD LAND SURVEYORS, PA. 2. EXISTING WETLAND BOUNDARY INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BYJIM BLANCHARD ASSOCIATES, PC. 3. ON —SITE TOPOGRAPHY IS FROM INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BY JIM BLANCHARD ASSOCIATES, PC. 4. OFF —SITE TOPOGRAPHY WAS GENERATED BY THE JOHN R. McADAMS COMPANY, INC. USING BARE EARTH (L1DAR) DATA PROVIDED TO JOHN R. McADAMS COMPANY BY THE NC FLOODPLAIN MAPPING PROGRAM. a� S6 16 1^ - 2�3.8 7 l r 327.79 �� 1 /✓� ��/ / ��r J J �f C3 in /� /� r 1 I -7 �' /, 02 ow �'� I .� N 37'09'53" E 37.55' , , c3� y ` ��-C �52 44'15 ") `A-5 j J��� � � � f, 3�2.b '� ' / 05�50 6y 0 NC GRID NAD 83 rj rl CP P- � ) /IJ� /�(12(- -q 4�pot _777_ --� y / �987.(44� \ v, y � r N04 22 W ?11. 48' N05�54'22"W J�� i��1,1 ✓, `��� 01� �� Imo= 2 `1 GRAPHIC SCALE 300 0 150 300 600 1 inch = 300 ft (j� �/�(C� \1� `� i ���\�'�� n 1 �� 1 /J }11 (}�� ° -; i / �69'05'41 .W-1L / s W 61'07,0 92: 7' S 7\8'4�'26" N 63'39'02" W 184.61' 226.98 S 84'14'46" W 193.18' 85'48'54" W 238.84' LIr'�" TABLE LINE BEARING LENGTH L11 S 68'46'09" W 117.72' L12 N 68'20'17" W 59.48' L13 N 55'47'49" W 90.71' L14 N 36'15'31" W 73.21' L15 N 72'04'51" W 56.17' L16 S 80'24'39" W 124.13' L17 S 84*08'12" W 173.25' L18 S 67'08'1 2"�W 206.50' L19 S 76'27'23" W 233.98' L20 S 83'23' 3". W 184.22' L21 S 81 `02'3 2' 69.71' L22 S 72'21'34" W 121.78' L23 N 56'42'38" W 65.28' CURVE TABLE CURVE RADIUS LENGTH CHORD BEARING CH. DIST. C2 1405.00' 842.49' S 36'08'44" E 829.92 C3 1465.00' Ri,,R 93' S 36*10'S5" E 856.25 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION rr, /s A# WETLANDS y MEAN HIGH WATER LINE ALONG WEST BOUNDARY OF SITE LEGEND: EXISTING WETLANDS OUTERMOST 100' OF WETLANDS APPROXIMATE LOCATION OF SHALLOTTE RIVER ® :f,ON41 UPLANDS O NOTES: 1. PROPERTY BOUNDARY INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BY JIM BLANCHARD ASSOCIATES, PC AND FROM EXISTING SURVEY BY NORRIS & WARD LAND SURVEYORS, PA. 2. EXISTING WETLAND BOUNDARY INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BYJIM BLANCHARD ASSOCIATES, PC. 3. ON -SITE TOPOGRAPHY IS FROM INFORMATION PROVIDED TO THE JOHN R. McADAMS COMPANY, INC. BY JIM BLANCHARD ASSOCIATES, PC. 4. OFF -SITE TOPOGRAPHY WAS GENERATED BY THE JOHN R. McADAMS COMPANY, INC. USING BARE EARTH (LIDAR) DATA PROVIDED TO JOHN R. MCADAMS COMPANY BY THE NC FLOODPLAIN MAPPING PROGRAM. 'F d K o ®® go GRAPHIC SCALE 500 0 250 500 1000 I inch = 500 ft. The most current policy (October 5, 2006) regarding the amount of wetlands that can be Included In the &% area Is dictated by whirhev®r of the fotiowing two calculation methods yields the least amount of site etas: Method 1: Ca{a.dats the acreage of the wetlands. Divide tfte wetland acreage by the total site acreage. if the result is 25% or less, then the taw project area is the total site acreage. If the result Is more than 25%, then calculate the amount of wetland too Include such that no more than 25% of the sib) area acreage consists of wetlands In fts mariner subbed tite entire wetlands area from the sits area to get the uplands area, then divide the uplands area by 0.75. Method 2. CaiWate itts area of a 100 foot wide strip of wetlands measured from the uplands area Into the wetland. Compare the two rnimbers, and choose a,e ore that yields the smallest project area. ftn M® 4 Total srq area=121.21 acres Total wind area = 36.61 acres G 100' Wde strip of wetland area = 32.39 ec ras met -rod 1: 36.61 wetland ac. / 121.21 sits ac. = 302% (>25%) 12121 site so. - 36.61 wetland ac. = 84.6 upland ac. Project area for caua.rlating density = 84.6 / 0.75 = 112.8 acres Msb` od 2: 121.21 - 36.61 = 84.6 t_q'ard as Proved area for oalctlating density = 84.6 + 32.39 = 116.99 acres Since 112.8 < 116.99 use area dertvsd via Method 1 to calculate this allowable density. 112.6 acres (project area) x 25% _ (allowable im ) ttq I dhtWM of 1 W, C n y il '9 h llM c filar. Ho -, � s kesud © cg _�nl ` lily OT b'-'nk: t~ FN A r J'w Elm cnn be gig _ 'By &iZ ," tA Pu t &TM InLr4walsa MUy t l WNIM Una. ,t: The most current policy (October 5, 2006) regarding the amount of wetlands that can be Included In the site area Is dictated by whichever of the foliovwing two calculation methods yields the least amount of site area: Method 1: Calculate the acreage of the wetlands. Divide the wetland acreage by thte total site acreage. If the result is 26% or lags, then the total project area Is the total sits acreage. If ilea result Is more than 25%, then calculate the amount of Weiland to Include such that no more than 25% of the site area acme consists of Wetlands In this manner: subtract the entire wetlands area from the site area to get the uplands area, then divide the uplands area by 0.75. Method 2: Calculate the area of a 100 foot wide strip of wetlands measured from the uplands area Into the wetland. Compare the two numbers, and choose the one that yields the smallest project area. Total site area = 607.03 acres Total wetland area=170.08 acres D I W wide strip of wetland area =133.9 acres Method 1: 170.08 wetland ac. 1607.03 site so. = 28% (>25%) 607.03 site so.-170.08 wetland so. = 438.95 Lapland ac. Project area for calculating density = 436.95 / 0.75 = 5826 acres Method 2: 607.03-170.08 = 436.95 upland ac. Project area for calculating density = 436.95 + 133.9 = 570.85 awes Since 570.85 < 582.6, use area dertved via Method 2 to calculate the allowable density. 570.85 acres (prgect area) x 30% =1TiM &waz (allowable Impervious) ►'hr^ tp0i" wr�ti•�: tot tiUrrp� rti r3u�.kr.yrrar.�.i fsUrTr Purr f+3i 1U�1 irr: r:�ate�r� arpi �irrGe� t+ilc; tic.-t4asrrel:�pt ° i E 1� t}t .t t o � c t�tetrt ._ o {U(, o bNa t r r r Ftrt I.rJ r tic;t {a7�iUV 1 .rt; e>t 8c+a trl i.roi>+jury li+rr t�trat ktr: vr•r c«r�ttt::�, fit5t No c«.rtatd`t it�r .1c.tlar rc�1�,'oc r t.ti oe+ty;sic �f t+t,� +>rntat=rty i rtc:: nr Ley• �.i tt� �� iti•1Hi^'V lr rr; �r,r hc� cy, rvtivii B dcf"rszrtac•�t�. t rc i>rnt�.c�t �tctir r tc«I rcic.� curl t+f a �r&>r<3 al�ov� t•Ii� M{iW I irr GRAPHIC SCALE 400 0 200 400 800 I inch = 400 ft. 0 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION PHASE 3 (LOW DENSrM (t 49.17 ACRES) MAX. ALLOWABLE AW. (28.0%): 13.75 ACRES PHASE 2A POND #2 PHASE 2A-----'` (HIGH DENSrM (t 54.74 ACRES) MAX. ALLOWABLE -'. (32.1%): 17.60 ACRES MEAN H 16H WATER LINE ALONG r�57 BOUNDARY OF 51TE GRAPHIC SCALE 400 D 200 I NOM -! I I I I I 1 inch = 400 fi. PROPOSED DEN51 T'r TABLE PHASE GLA551FIGATION AREA (5F) BUA (517) % IMPERVIOUS 5A / SG ? IA LOW DENSITY 3,236,164 580,143 2-7.2 SG IB 2A HIGH OEN51TY HIGH DEN51?Y i211,3bct 2,3&4_3W _�-55,571 -766 5cl 403 32.1 5G SG �� 2B --HIGH DENSITY 205,765 216,750 2b.ci 5G 3 LOW DEN51TY 2,141,672 561b,767 25.0 5G 4A LOW D 1TY 5�041,470 I,1411,36b 23.6 5A 46 i -HIGH DENSITY 7q,ci35 37p26 463 5A 5A HIGH DENSITY 2,235,662 733,637 32.5 5G 5B LOW DEN5iTY 1,122p15 424,315 37.6 SG bA HIGH DENSITY 2,73b,27q 8Ci5, T6a 32. i SG bB LOW DENSITY 671,523 261317 3q.0 SG 7A LOH DENSITY 4a45, l0q 1-140,450 21.1 5G 75 HIGH DENSITY 75165b 43,670 57.7 5G bA LOH DENSITY 3,g20,2g2 Ipb3,250 27.1 5G bB HIGH DENSITY 3&0,329> 14q,050 3q.2 5 C. Yi= L AREA (OUTSIDE OUTERMOST IOO9 1;75q 571 TOTALS 1 31,751,553 1 5,bbb,042 5A IMPERVIOUS TOTAL (4A d 43) = 1,22&,3g2 5F = 2b2 AG 5G IMPERVIOUS TOTAL = 7,45c[050 SF = 171.25 AG •: PHASE lA (LOW DENSrM (t 74.31 ACRES) MAX. ALLOWABLE Be. (27.2%): 20.21 ACRES PHASE 1B (HIGH DENSM) (t4.85ACRES) MLAX ALLOWABLE IMP. (40.5%): 1.96 ACRES PHASE lA WV0000.® POND 4 a° % WE S 4 4k DENSE (t 18.50 ACRES)', ��O MAX. ALLOWABLE ° 4a� D". (26.9%): PHASE 8B (HIGH DENSrM (t 8.73 ACRES) MAX. ALLOWABLE IMP. (39.2%): 3.42 ACRES so, ..o PHASE 7A (LOW DENSrM (t 113.61 ACRES) MAX. ALLOWABLE MIP. (27.1%): 30.77 ACRES r ' i' a 4.98 ACRESES ' f rfr�f 7B '.7%): 1.00 ACRES v 41 3 N4*13 ' n 40P (t 25.76 ORES) ' f� / I MAX. ALLOWABLE a'` ®�� . (37.8%): 4 Al (t 51.33 ACRES) %fj MAX. ALLOWABLEf',� ' �P W. (32.8%): 16.84 ACRES � �,< ,� �j 4 r4f 'A¢VA DENSrM 6�6♦,;,.. //Yj/ 9`✓�° .82 ACRES) '%%/ e %�� ` ', :\ f/ �► - MAX. ALIAWAB EMP. (32.79 32 7yb): 20. CRES f 7CC1:4"IP �� 0 PHASE 5A (HIGH DENSrrvi NIETLAND AREA (OUTSIDE OUTERMOST 100') OUTERMOST 100' OF HE`rLAND5 APPROXIMATE LOCATION OF 5HALLOTTE RIVER PHASE 4B ' (HIGH DENSn"NI (t 1.84 ACRES) MAX. ALLOWABLE DAP. (46.3%): 0.85 ACRES I. PROPERTY BOUNDARY INFORMATION PROVIDED TO THE JOHN R. MGADAM5 COMPANY, INC. BY JIM BLANGHARD ASSOCIATES, PG AND FROM EXI5TING SURVEY BY NORRIS 4 HARD LAND SURVEYORS, PA. 2. EXI5TIN6 WETLAND BOUNDARY INFORMATION PROVIDED TO THE JOHN R. McADAT-5 COMPANY, INC. BYJIM BLANCHARD ASSOCIATES, PG. 3. ON -SITE TOP06RAPHY 15 FROM INFORMATION PROVIDED TO THE JOHN R. McADAM5 COMPANY, INC. BY JIM BLANCHARD A55OGIATE5, PG. 4. OFF-51TE TUPUGRAPHY WA5 GENERATED BY THE JOHN R Mr-ADAM5 COMPANY, ING. U51N5 BARE EARTH (LIDAR) DATA PROVIDED TO JOHN R. MrADAM5 COMPANY BY THE NC FLOODPLAIN MAPPING PROGRAM. wE 41, e, .1 - PHASE 4A (LOW DENS" (t 115.74 ACRES) MAX. ALLOWABLE IMP. (23.6%): 27.35 ACRES • i ! 1 1:0'-, ahR m® &ormw+ater Mmwgemenu Narrative Located off of dray Bridge Rand, at the interPH. e with Tar Landing Road in Shailotte, Nod h Carolina, is the proposed real development currently known as San Rio. Proposed development on this site will consist of the construction of both single and midti-family residential areas, along with associated streets, pahiciag, utilities, and other ate. 'The proposed development is located within the Lug - River basin. Stotmwater runoff from this site drains to Sharron Croak, the Shallotte River, and to an unnamed tub Any to the Shallotte Rives. Aug to the N.C. Division of Water Quality BasinWide lofor oration Management System (BBAS), these drainage features are classified as either SA-HQW, SC-HQW, or C;Sw,HQW. For this reason, development on this site must meet the requirements of 15A NCAC 021L1005 and 15A NCAC 02E1006. These regulations are as follows: Per 15A NCAC 021-L1005: All do eloprnent activides within the Rival cozy - „h rye a stormwwer managementpamit in accordance with Rule .1003 of this Ply shah manage stormwater ruesoffas follows: (7) developmernt activities within the ("i al coaedes draining to Outstanding Resource Waters (ORiI) shall meet in hute .1007 of this PHASE,• (2) development adtv&es within one udfmile of and drai=g to SA waters or wvuzmed trMutaria v Sri wirers: (a) Low Density Option: Development shall be perm ued pmauant to Rule .1003(d)(1) of this PHASE if the development has: 0) built -upon area of 25 perm _r less; orpr oposes development of single famtily rwidences on lots with onathW of ran acre or greater wtfh a built -upon area of 2; pea-wrt or less; (U) skrmwaW owvpmWy by vegeW� wmreyance8; conveyatm system shall not include a discrete stornrmae colle cdon system as d *m I in Rule .1002 ofthis PHASE,• ('sit) a 30 foot wide vegetative buoer. (b) I26g*Dmq0ptwm Higher densy developments shalt be permitted pursuant to Rule .1(J03M(2) of finis PHASE if stormwaater control systems meet the following criteria (i) no dired o k!t channels or pipes to SA waters wvk= permitted in accordance with l5A NCAC 2H.0126,• (b) control system must be hfiltraion systems designed to accordance with Rule .1008 of this PHASE to control the rumafffrom all na fiwet generated by one and one-half inches of mall Alternadves as descrAW in Role .1008(h) of this PHASE may also be appnovrd tf they do not discharge to surface waters in response to the design storms; (W) r wwff in excess of the design volume must f tcnv overland through a vegetattvJZWr designed in accordmce with Rule .1008 of thin PHASE with a mbrmuum lemgt/r of 30 feet meww-ed from mean high water of SA waters,• (3) devdapment acdvhles within the coartnat counties except those areas defined in Items (1) and (2) ofday Paragraph: (a) Low Density Optm Dev�,loprr.4_t ;:tall bepermated pursuant to Ruie.1003(d)(1) of this PHASEV7he dev+elopment has: (i) built -upon area of 30 percea,i or lets; o•pnoposes development of stmgle fam* raddencer on lots with one 4hird of an acre orgreater with a built -upon area q .I U less; (rf) sror>:svaater runoff omiperted p w,,*--Jy by vegetatedwmwjwwm conw3wwe system shall not dude a ciise We stormwwser collection system as defined in Rcae .1002 of this PHASE; Cdi) a 30 foot wide vegetative bra: (b) High Density Option Higher dewtty developmentr shall bepermittedpurmant to Rune .1003(d)(2) of this PHASE tfstormwater control systems meet the fa?-4a: wb; = -- 7 (i) control *,sinus must be of itru ,on syste:• m wet detention ponds or altermotim stormwater management systems designed in aceordowe with Rule .1008 of the PHASE; Cu) control systems must be designed to control runoff from all surfaces generated by one inch of rain}ali Per 15A NCAC 02H.1006: All development activities which require a stormwater management permit under Rule .1003 4 thin PHASE and are within one mile of and drotning to waters classified as High Quality Waters (HQW) shall manage stormwater ruwff in accordance with the provWbns outlined in this Rule. More strtngrnt stormwater management meant es may be req aired on a case -by -case basis where it is determined that additional measures are required to parted water quality and maintain existing and andcipateat uses of these raters a) All waters classified as WS-1 or i3 -H (15A NCAC 2B .0212 and .0214) and all waim located in the coastal counties (Rote .1005 of this PHASE) are excluded frnm th a requi(renw& of this Rule sbxv they already have requirementrfor stormwater management. AP Md t?iYs ".t a 2; ,xis 1pio San Rio is proposed to be permuted as a low -density project with high density pockets. The site will be designed such that the total built upon area (BUA) for the single-family areas (low-densAy arras) combined with 11he multi-fam l-f / amenity areas (high -dimity poclms) will meet the overall low -density criteds, (30% impervious) for thane portions of the site draining to SC water. For thou areas draining to SA waters, the ovemn low -density goal of 29A will be met. RTrth regards to stormwater treatment in the low -density areas for areas draining to both SA and SC waters, the roadways saving the single-family lots will have curt>-w� with curb outlet systems discharging mw vegetated stormwater swaks. Es& swale will terminate at as engineered level spy device• In the high density areas, the stormwater management features will be designed to comply win DWQ standm* (per PEASE 15A NCAC 02F 1008). For the ;high deetaity pods dmmmg to SC w , these arras will be treated with we demotion ponds or other approved management systems. The high density pockets draining to SA waters will be treated with taffirWori systeuhs of other approved management systems. The information presented an this sheet represents a stumwatea master plan for the Sass Rio development to show that the intent of the overall project is to mod the low -density thresholds. As each phase of the development moves forward, the data far each individual phase (BUA, stormwater devices, be fmlized and submitted to NCDWQ as a modification to the master petmiL The overall storruwater master plan will be updated to account for actual data for those phases proposed for development PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTiON 9 0 a a rn in ED 0 I- o"- N 3 N 3 v X 0 N 0 r� 0 J 0 tl rn B 0 c t () 6 m c 3 B 0 - GENERAL MOTES: 1. BOUNDARY SURVEY PERFORMED AND PROVIDED BY JIM BLANCHARD ASSOCIATES. 2. TOPOGRAPHIC SURVEY PERFORMED AND PROVIDED BY JIM BLANCHARD ASSOCIATES 3. FEMA MAP NUMBER: 3720109800J, FEMA MAP DATE JUNE 2, 2006 4. COASTAL LIMITS DETERMINED BY JIM BLANCHARD ASSOCIATES & LAND MANAGEMENT INC. 5. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. ADJACENT PARCEL OWNERS: II) OWNER: SANDLER OF SHALLOTTE 448 VIKING DRIVE, SUITE 220 VIRGINIA BEACH, VA 23452 ZONING: R-10/PRD SAME AS ABOVE SAME AS ABOV E 0 4 SAME AS ABOVE SAME AS ABOV E SAME AS ABOVE ® SAME AS ABOVE ® SAME AS ABOVE 9Q OWNER: SANDLER OF SHALLOTTE 448 VIKING DRIVE SUITE 220 VIRGIN:A BEACH VA 23452 ZONING: MF-14/PP,D LINE TABLE LINE LENGTH BEARING L1 100.16' S 85'03'33" W L2 99.73' S 78'55'02" W L3 56.83' S 78'19'20" W L4 36.91' N 81'02'11" W L5 76.39' N 58'44'42" W L6 97.93' N 62'58'56" W L7 70.39' S 57'40'05" W LS 3.98' N 31'24'58" W L9 35.14' S 39'11'49" W L10 26.98' S 03'49'13" W L11 67.06' S 21'39'06" W L12 108.75' S 14'22'42" W L13 66.62' S 59'12'17" W L14 107.56' S 19'47'42" W L15 58.38' N 08'31'10" W L16 46.36' N 44'13'45" E L17 6.95' N 33'50'20" W L18 25.48' N 06'42'28" W L19 28.21' N 19'20'02" W L20 18.85' N 56'50'35" W L21 16.52' N 82'21'09" W L22 15.73' N 16'16'07" W L23 13.33' N 77*10'41" W L24 33.96' N 84'17'51" W L25 28.79' S 73'15'20" W L26 13.97' S 62'52'33" W L27 23.80' S 51'15'32" W L28 77.99' N 40'56'08" W L29 78.25' S 65'34'03" W L30 91.86' S 83'32'40" W L31 7.96' S 20'39'16" W L32 114.15' N 49'41'24" W L33 100.37' N 86'29'51" W L34 94.73' N 24'00 08 W L35 116.23' N 67'26'09" E L36 34.68' N 84'02'05" E L37 85.75' S 60'54'25" E L38 71.65' S 53'21'09" E L39 81.64' S 81'23'34" E L40 66.79' N 61'07'17" E 1_41 76.72' N 75'55'26" W L42 1 55.37' N 46'25'33" W L43 63.22' N 42'41'12" E 1_44 59.05' N 05'03'22" W L45 57.53' N 19'47'14" W L46 52.92' N 06'34'48" W L47 46.12' N 86'04'45" E L48 45.24' N 20'36'15" E L49 31.86' S 61'48'13" W L50 27.51' N 74'29'43" W L51 42.28' N 58*16'28" W L52 74.91' S 62'34'14" W L53 101.29' N 29'04'42" W L54 125.59' N 85*13'48" E L55 I 76.51' N 09'29'51" W L56 30.18' N 19'32'01" W L57 38.86' S 69'33'05" W L58 86.26' N 15'55'04" W L59 114.37' N 49'54'34" E L60 128.52' N 42'37'20" E L61 39.33' N 34'24'33" E L62 136.93' N 44'22'54" E L63 136.43' 1 N 42'06'20" E L64 143.05' N 31'58'36" E L65 75.00' N 53'28'50" E L66 75.00' N 53'28'50" E L67 61.13' N 52'02'03" E L68 83.65' S 38'52'18" E L69 93.92' S 89'49'53" E L70 82.05' S 89'49'53" E L71 26.22' S 01'26'00" E L72 I 30.43' S 61'40'23" W L73 70.47' S 39'09'53" E L74 37.08' N 54'05'49" E L75 18.11' S 02'06'22" E L76 20.82' S 03'53'13" E L77 50.03' N 86'02'35" E L78 19.21' N 04'02'13" W L79 18.11' N 02'06'22" W LBO 36.54' I S 82'11'03" E L81 18.26' S 63'50'05" E L82 16.80' N 64'52'43" E L83 24.21' S 67'01'52" E L84 36.85' S 25'02'13" E L85 42.59' S 52'45'16" E L86 I 60.66' I N 76'34'46" E // '��'//-/ ' ; It - '-V/ V- / t r\ _ t jt I I ( t \ \'---___ / ' \ / ar I / t _ '\- / ��� / � / / t / I - \ �� + \ �\ --- _ l\ \b / \- ` \ ` III \�'\ / \\ \\'t( iaENcH K t _�_.�"'//- r, -1�.c \�\ / \ `-- -� -' _ \'1 `;;1 MA IRON ROD (IR 601 _ -� _ -t N. /� \ \ \ • \�� / `- - _ _ _ _ 1 \ \ \ / / // I N 2 .T - 1� h %-� � a\ \�\\ ,/-\ --� � \`y \h'\\\ I / ON �9.77 _, / T- - _ _ _ _ _- , :)' _ \ \ \\ \ / � _ \\`I r\ `\ / /� ENCH tt IL�'R0 DES 6 - - , -/. -:.. \..._,::_:_� ., : \� ` ,' \ \ / \ \ \1 \ / ( JIM - / '..y; ' `._:::.::.',� 1 \ \ \ ; \ ( \ N \ \ \ �\ (( LANCHAR _ASSOC S.- - c 8 � _ _ _:, :..-..:1.-: N... \ _ \ hIR g' _ _ - \ ' ) \\ 1 _ _ , a \ \ \ '�A , �\ \ 1; .:..;::;.1 b r �� \\ 1 _ - ! \ t /j ��--� `!fit,-::\: -� \ .♦ \ / \ \ \ \ I --i� ' \ \\ \ \\�r�\ y L - \ I \ \ \ 1 I / \ \ \ / \ i� / r \ t / \ r \ N E� / - / / �- \ \ I \ \\ \ \ \ \ i' .'' \ �>F\ \/ /�` - \\ .4z ` , � :... . p . - /� G / \ / \ 1 \ "\ �` , / / / /'=;'':;� ` / � - \ " � I 1 `1 �\ �` \\ A.E. CALLENDER ._� f i / - / k �\ �\ / I \ / - 1 \ \ I \ I / -- \/ / � `/ , # `\ ` � 1 I\4`V I\ \ i ��-+-- �` -- lJ \I \\ \, \ \ / 192 / 338 -�I _ YI �_--_ .'.-_-� � �. . .."'. - 11** :.11: .... ... .... /_/- /.'.:. / I / " ' �`\ � r \ l\�_ \ \ \, I I /l / ,tI ♦ \ \ / _ t' z \ \ / I - -, v t`10 FUTURE \ \ \ _L - - / \ 1. / -' \ ( � . / � � -+- _ '�, \ \ � r '-'tl / - - ' \\ � � ,1. � ., - - 1 / �' / �\ T3 0 / \ / \ �E d ( / L E / � 6 J - ENT y: � \ / \ ...' / is - - / / 1. \ - f \ i - /! _ \ \ I a / \ I J I r T / 7 : 1 / - r \ \ I / - _ >, 1� \ I / 1 r / / _ I J \ \ I 1 \ L r I I r-' / I \ - r \ \ N V - v 1. / \ \ / f - L � I - L �J / 1 \ \ I / _ I � \ _ 7 \ / \ I / o \ \ / r-_ I \ 1 / 1 1 l \ - 1 r l / I \ � i / / 1 1 • I / I \ / \ \\ _ ...: \ �.\ J r i \ - f. \ / \ \ / r-. n\ \ ! f / > / \ I \ \ i \ J. 1 \ _ \ 1 \ 1` / \ < _ _ \ 2 �. \ `. / \ J 1 _ \ 1 \ \ \ 1 \ ` 1 . ..._ . 1 \ 1 ( _. \ 1 / ._ I / / .. I . \ 1 ,. 1 / i / / _ _ 1 \ 1 I 1 / �. / 1 ) @t -. _, . / \1. .. .-.. / / J Y / / / \. / - y . ._� 1 \ / �✓ \ EXISTING / r S NG / 11GETLAN D PYP / / f / \ '' / a �r y \ 1 \ /\ d _._...._ 'his' / / Y // / \ I / If/ i' / // III l l `y/ / / /, f. l / /� r: \ \ \ I / / ,<�r.'�'.�.;��" , r. / \ \\ \� %_\ /• . I I\./ \ I / \ /Jill ; 1 // - / ! 1i I/ I/♦ / (\ \ l . \ . I_ \ 1 _ \ �\ / } r / / 7 / 't i / / f` \ \ 1 / / I J \ I I / \ \ I r / - \ \ \ / 1 I / I1 l _ J / � � I 1 / N \ r / •I \ - - \ / I \ 1 - I \ I I \ \ / / / / 1 /. \ \ \ \ / I // \ / \ \ I \ I \ 1 \ \ / -$ ( / \ / \ I \ \ \ (/ ) 1 1• / JC ! - / ' --J / / \ \ \\ \ ' \ \ \ 1 7 / /-\ \ 1 1 �i 1 / - S / / / / `T \ / \ ^ J 1 i 1 �.. 1 r I / \ \. : , I� / / / \ , r \ �. / \ 11 _ . � J LS .....:..:. / ' \ \ : \, / "i 1 f / / / 1 / © \ t.. fi - L83 : . it I / / / / / \ \ 1 / I - I l �. / 1 I / / / / / i / ) 1 / / t t I \ I \ \ l.. /"._. ;. __. ... 1. �_.-1_:`.-.__.' 11 % . �' -4_:�:�_'��'._� / ( I . "I 3 III 1 / �.._ l f... 1 \, - - .. ' W.. . -, .... _:::n..: - . -, �'. , � 1. . - - - - , '� I - .. I � �\ //\ \ ... " t 'z: _ . - . .; '.. /. .�:. I . _ .::.. \ .1.1:: I I 1 I I I I I \ l ) N, // / I I 1 l:.,.:.: \ �. I \ / L- l l I Jli" 1 I } F\ \ \ \�- I \r. -. . -".'�:'� ..:- . - . . I " . /.. .. -_�-'.�::�'*��;�' '-.-..�,�..-..�,�*�".,,'.-,_.-:,.;..f�.-:�".,..."---,+,. , * ..'�,.",..-.,..�l.-:..'�.".,-�..�.+.."..'�"...�..... I ) \'.;.1..A-_.': �. �... ..-. _.....- .. ". .' '_ I _.. _.."'. ", - - ", . _",": --..'-. _ ) \ -., \ - I \\\ \ / / \ / / \ / \ \ . l • / \ \ / - \ / l \ -- \ y-\__ ram. � ...,. c _ / I... I _ I ✓ � I/ y � \.........,:_..:................:..,......�..: � - \ \Z �. \ \ \ / _ 1 \ / \ \ I \ / \ \ \ 1 //, / - -- \ \ \ ........... J. 1 \ / ..:.:..::.: \ \ / / \ L75 \ \ I 1 '� /. - - / r ✓ _ \ / \ \ - / \ ' I L I—— - I IRio \ I k - / SAT� \ - I / 1 l I _/ /. 11 1 l I / _ / \ \ \ / / \ \ 1 _ \ \ / \1 \ r \ I i 1 / / / �. \ \ I 0 / 1 ( - 1 \ / �: \ I - - I / / J \� / \ \ / I / / \ \ / / _ / \ \ - / \ l '� . �, '' 1 \ \ f / \ Y 1 / ✓ 1 -, � \ I ( \ ) I z / J � \ / r 1 O/ l.. \" _1'1�' - __��.... '�' _�_ - . , X \ \ ---- -/ I �\ \�'\ I I`Y / / / \ �_ _- \ \ . - ... ,. _.. �. - - \ I I 1 c / / _ \ / /' ' ;-�'-'. I �'.:". \ ` I / _ \ I1'.1..;" ,.-:.,.:,! �_ - I l ACRES (3, - I I /'_ ;. . ;.: r , '/ \ /\/ / �_' \ \ rn \ \\\ / \\\\ \ \ \ r / ) I // \ l // , - �. �_ \:._1 i / , I / I \ \ I\ ( `7 \ \ \ \ \ / ^ / / / \ / / /'�...'.'.I ) / / ) / / // ` _ -' •. /: \ � ( I 1 1 _ \ \ t� 5� \ \ \ \ \ \ \ \ \ \ \ / A� \ I / / / \ \---- / ./ �/ / / �/_ \ - - -; : l._ I 1 / / J \ I \ \ \ \ \ '\ 1 / / _ I I ^\ / // / /' / . \ \ \ / I .. ,...:. \11 \ \ _ ?41�' " cr I \\ \\\\ \\\\ � �) \ \ \ \ \ \ \\ / �/ /- ---� \ //� ------ III \'�\ ` i.:':;:k' I \ \ I_-_ / /i/, i \ /-__A: 1.+� /r yr` ... _. \.\\ \ 1 \ A \ \\ \\ \ \� ) I I 1 C \ \ \ _ / / 1 J / _ /'-\/jam/ \ \ :-..,-a / ! \\\ \ \ J \ \,\\ , J / / / / i __/ / L -- � \ \ \� // __ 1 / / \ / // \ 1_- \ ( I \I \I / // ')` h ^: // / -- ✓ / _ \� - 1 ) , 11 \ \ i / / _-- \ �%� ';: .::. \ \ ✓ \ j \ ( / ' r/ / I ':'.::: .: _ J may,: ::.::,, a•; .:.... I I I \ /' / /'11\46 :[ `.:, \ ) \ \ 'i \\\\\1\\�\\\ \ /r// ; \ /''\\ \ I // /,-_--�t I -i /,1/l _ \ / .;-`e°�. `: +:�,'.� .`;-. '; `:J. III // / I 1 I I A 1 I I <\ / \ \ \\ `-.....)/ 1' )\7 / \\ \\\\ \ / \ \ I I / J / / / J , \ :: / � } / I f \ \ \_- '/ --/ "I, // t Ik MEAN HIGH WATER MARK \1\ \��\\� \ /// \ \ -, \ I I i I I/ ! - ��/\\\✓ / .:...� -.. / / \ 1:('... / / I I i -//' !, 30UNDARY LINE \I \ ��\\/� ^ \ /// / \ \ 1 1 \ / " _.- // \ _, / // _/ -'\\ II tI`f(`\ C' I t I rZ f / //1 l t I I \ \ \ \ I ) rr \ \�\//' \1�/// � ) /, / \ / r? '. / `C/ / I J/( //// 1 1 I l \ / ®!r \ \\ /�\// /// \ 1 / / \ _� / ) 1•I; �_ / / r I \ \ \ \ \ \ \\\\ ! EXISTING MARSH LINE \ V'// � ! l ` \ - - - - - / / / , :j ; J' I J , J F`..:.1.:.:::::' l j l ` / \ . I 1\ \ \ \ \� \ \ �\ �/ r // /// \ 1 1 / . v' \ / l' l \ \ \ /////J1 / /\I ) / / -,`- / / // / , `' .. /�� \ \ / / l \.. 11 \ I i 1 \ \ \ \ \ \ \\\ r � ! �o \ 1t ///� / / I I ) / l�j / / / v 1 ( \ y / , % 1:-::,.'. \ \ \\\\\\ \ ®// O M \ I //'1/ I / v - �\ / / : \ \ �� \ /� !/ /,.f-� .!".'7 II� \/ 1 \ \ \ \ `=- N \ I Jll(�//// // \ I I / // // -_-\� /� / / // /\ '1 / 1 \ // ' \ // ,l I /",_'../1,IfI /' /� \ \ \ \ \\ \ \\\ \\\ \_ -\/ ®r'® Co \ I I r A. / \ \ d / / / I1 - \ / / / / / / I/ i / I // �% \ / / I ( EXISTING WETL ND TYP. \ \ - CV\ ////�/// / /) i I I I /_--_/ , \ I \� J/ / /� I / / I / / /-, \ 11 � \ / i�•f./,. / \ \( J \ \-_- \\11 I ( , / I / - / T \ / �/ ( I ' / `f-1:-::.I I ) /- _ \ \ / � //. \ \ \ \ / , \ \ \ \\ \ \ NL- _ _ FEMA 100 YEAR 1 I I o \ / / // i11 ' / \ ����. ( `/ l/ / .'.-..�:.;. -- _ \\ \ �. /' � \ `_� \ \ \ \_ \\ J\ _/ ; FLOODPLAIN 11j1II 11\1 \ / // / ' - � - -///, / __ \ :� -\ \ \ / '` ^ :.�\....; \ \ / \ \ 1 ELEV. (iYP.) III r /� --_,- \ ...... \ /.y- !.. \ \ _ \ l i I 1 /.. d. tiV 1 l \ /,; i \ - - t t - r / - . �� _' i' \ l y / T/ asp' \ r• \ \ / / µ/ "...' . 36 I 1 \ \ \ \/\ ) / l_` / / ' 7�'i;e�+lam, .? i6 \ .:::: _- _ \ \ j L I \ \ \ \\ / // �/� \ / / / -�.= \\ \ / / �fr�r' e' \� � 75.�3- l,a, , 9g;' •� ` :r --� - 1i1 < < \� \ "� \ _ _--\ .OR op R� \ \ \ I /- �- 1\ \ \ ' � . '�- 'L ' • '6 2 ��,. a -a \\\\ ' tp.- ) \ 1 40# �3 4% COASTAL \ \ / / I I ! 11 /- / `� �1 \ I I .:T B. �`` h �.. / � ® � 1 / // / // \ \ '# V. \ \ ff J / �� \ \ - �. Fes_ / AJ \\ \ �/ / \ \ \ \\ I /'�/// i\ 1\1\\,II II I -- / g0 5g Tj. / r- </ / / 4,\ L39 Mi WETLANDS \\\ -/ /\ \ \\ \ I r I i ( \\ \\\i I I II� / / ' �'.. 1 / I- \ 1 ' // !f' � \, \\\ \! I / )\\ \ I I / t - // / 1 --\\ 1 ��\\\\\ ��\ I I ( Ci/ 1\\Il1ll�lJl �\:' \'\/r\\\1\\\\ \ (/ r' >>♦ O� ��. 1. \� \ \ \ 1 1 III v ��'�/I�) )/'/ // \ ` t / \ \ 1 1 \ \ \ ( 01�� `�I L 3 \ \ \ \ _ / / / 1 \ \ \ I 9 L27 L26 L25 L24 `\ \ \ \ \ \\ \\ \\ _/��//! /l' ,l l/.: . - - . \ } \ \ \ \ \ I 3 `\\\ \' \\ /i \ \ \ \ \ \ \ \ \11 L3 \ __ \\\\\�\��� \��11// ti� . \\ /// \ \�11 \ r� LLL y; O \ / t �__ l/ �, 1' 79 " w \ \ \\ \<z- 'J l %- \\ �' Sy�l S �26 g3 L21 - - _ �'' j C 1, SANS E�JT�J�E ' T' L 18 ; . ,\ Q/ L17 p i l,F� L71O.�y 5p . . ,�J- _ DEVELOPMENT X�� \`,: CURVE TABLE CURVE RADIUS LENGTH CHORD BEARING CHORD DISTANCE DELTA TANGENT C1 339.45' 227.26' S 20'36'46" E 223.04' 38'21'32" 118.07 C2 22.00' 32.53' N 06'27'32" E 29.65' 84'43'25" 20.06 C3 25.00' 31.80' N 89'27'40" W 29.70' 72'53'02" 18>46 C4 335.07' 47.00' I S 57'02'16" E 46.96' 8'02'14" 23.54 C5 285.03' 72.29' N 53'47'28" W 72.09' 14'31'49" 36.34 C6 335.00' 148.43' S 59'13'07" E 147.22' 25'23'13" 75.46 C7 25.00' 26.18' N 41'54'44" W 25.00' 60'00'00" 14.43 C8 75.00' I 65.70' S 37'00'33" E 63.62' 50'11'38" 35.13 C9 25.00' 26.18' N 32'06'22" W 25.00' 60'00'00" 14.43 C10 25.00' 26.18' S 27'53'38" W 25.00' 60'00'00" 14.43 C11 75.00' 72.03' N 30-22'51" E 69.29' 55'01'34" 39.06 C12 302.50' 192.24' I S 89'27'47" E 189.02' ,36-24'41"1 99.49 C13 11.82' 1 9.38' 1 N 44'20'53" W 9.14' 45'27'36" 4.95 C14 18.59' 1 19.58' 1 S 55'12'51" E 18.69' 60'21'15" 1 10.81 MEAN HIGH WATER MARK BOUNDARY LINE / C / FIN SITE LEGEND WETLAND LIGHT POLE POWER POLE PHASE LINE/PROPERTY LINE RIGHT-OF-WAY LINE LOT LINE EASEMENT LINE CENTERUNE TREE LINE GRAPHIC SCALE 150 0 75 150 300 1 inch = 150 ft. PRELIMINARY DRAINING - NOT RELEASED FOR CONSTRUCTION 151 120 146 \, .,\ .�- /. \ 144 \ ,! P CIA S E I _ _ _ _ (UNDER/ CONSTRTACTION) I 6 o -yam f 1=-j----- 148 44 149121 143 b NDARYA \ PHASE 1 122142\ w .t 43 \ \ e w \ 1 W . \ 7 42 ! ,t I OO / ~wriro: j:.: w 124 � � _ ;\ EMERGENCY �ACCESS� 38 \ \ / 125 141 / 1--� 1 - � 1' J 126 WOODCHIP ,.41, L) 140 �'•\ Y WALKING too-YR FLOODPLAIN \.~ PATH-TYP. �� \. \ y00 �, \ ~� W 1 \ /• 139 ) PROPOSED \ i \ `i 3 ` 127 STORWATER \:\„./ MANAGEMENT 'e 138 POND -i 2 WETt,At kDS "i lTOWNHOME 1 f P 137 CONDOMINIUM 128 , 1 A �..-._ ,.`. ' ' e%'•- - ' / o /' \ - _ - �TLA D.S.. .. .. _ .. I •\� . 1 13 6 / 1 / 2.9 \ l ll BOUNDARY SE 1 `I A�,l _ �. i' . -'�` �' -.. 'P ND:'MA1NiEifANC>w � - + �'� _ ■ � � -.\- . .. . _ _ r... 1 u�c'ti,e PHA OWNER/APPLICANT IELD 3209 GRESHAM SU ROAD, SUITE 160 RALEIGH, NC 27615 (919)556-4310 i SANDLER AT SHALLOTTE LLC 448 VIKING DRIVE, SUITE 220 _ VIRGINIA BEACH, VIRGINIA 23452 EXISTING ZONING MF-10 (POST ANNEXATION) EXISTI ;_ 1�.ND USE VACANT OVERIAY DISTRICT PRD TAX PARCELS 19800002, 198JB00115 PROPOSED !-AND USE TOWNHOMES & MULTIFAMILY RESIDENTIAL CONDOMINIUMS ACREAGE 78.74 ACRES (3,430,007 SF.) PROPOSED PARCELS 1 PARCEL OF LAND PHASE 2 PROPOSED UNITS TOWNHOMES: 46 UNITS HOUSE CONDOMINIUggMS: 9gg8 UNITS 3BIG CC g 2-RRY C8ND8MINIUMS: 64 UNITS TOTAL UNITS: 304 UNITS MINIMUM LOT SIZE MULTIFAMILY: 2 ACRES PERIMETER SETBACKS FRONT: 25' SIDE: 8' REAR: 20' MAXIMUM BLDG HEIGHT 45' TOWNHOMES, 50' MULTIFAMILY (PENDING HEIGHT VARIANCE APPROVAL) MAXIMUM DENSITY 10 DU/ACRE PROPOSED: 3.59 DU/ACRE (304 UNITS/84.62 ACRES) MINIMUM BLDG SEPARATION 16' MAX. FLOOR AREA RATIO 3:1 (3,430,007 SF. X 3 = 10,290,021 SF MAX. FLOOR AREA) MIN. OPEN SPACE RATIO 55% (3,430,007 SF. X .55 = 1,886,504 SF. MIN. OPEN SPACE) MAX. IMPERVIOUS RATIO 35% (3,430,007 SF. X .35 = 1,200,502 SF. MAX. IMPERVIOUS) PARKING REQUIRED: 2 SPACES/DU (304 X 2 = 608 SPACES) PROVIDED: 797 SPACES PARKING SETBACKS OFF OF STREET ROWS: 8' OFF OF RESIDENTIAL LOTS: 15' OFF OF OTHER LOTS: 5' OPEN SPACE* PROVIDED: 15.21 AC. (662,547.6 SF.) ACTIVE RED. SPACE* PROVIDED: 4.41 AG. (192,099.6 SF.) I PLAY AREA* PROVIDED: .40 AC. (INCLUDED IN ACTIVE REC. SPACE) IMPERVIOUS AREA BUILDINGS (304 UNITS) 7.45 AC. (324,522 SF.) - SIDEWALKS 2.47 AC. (107,593.2 SF.) ROADS 7.15 AC. (311,454 SF.) TOTAL 17.07 AC. (743,569.2 SF.) *NOTE: SEE SITE PLAN ENLARGEMENTS FOR LOCATIONS & AREAS. GRAPHIC SCALE 100 0 50 100 200 z U 1 inch = 100 ft. PRELIMINARY DRAWING — NOT RELEASED FOR CONSTRUCTION Q U O O W Z p., 0.; O O F-+-i E- di In O ,,`,, `Illlllllrt4`f �N CAR0 6 / IN �' ) 0 � w o w o Cr w Q' 0 0 z a 0-4 � 3 z Q o O (Y- w o W � Q � o � E—,�e� o E-+ o zw � � w 0 W a cc Z �4a C� E z z U 04 N O z w ��a Lu � Ewa a ��v o L� w � a O Cq a Z v) w 0 4-4 00 o PROJECT N0. WDL-07020 FILENAME: WDL07020—OS1 DESIGNED BY: Div DRAWN BY: HRG SCALE: 1 " = 100, DATE: 2007-08-21 SBEEI' N0. S-2 [aMcADAMS O� W CQ N z a F�LO w�� W cQ CAR _ i•aSA 3 6 cn o � w w � N W I C� O O � w 9 U) O (/J W Q N� O � � f x w w �5ao z Q�x � � 5 f �z z a $ W� �w U 9 N O F- av z a ��v O .a g Ri W z > o � cq 0 0 PM4 rf 0 Z w z 00 a as PROTECT NO. WDL-07020 FILENAME- WDL07020—S1 DESIGNED BY. DJV DRAWN BY: WRB SCALE: 1 " = 4V DATE: 2007-08-21 SHEET N0. S-3 jiMcADAMS U a z� z W �L Lo co W � O� 6 � " ,,�'�...•�.. VAS-�'� o W o � o w o w m 0 0 a z � z m o O w � o a W L� Q W o 0 a w Ln oto ax�-- �zW x � w .4, 0 w z �4x o � ' F z a � U allo z w� w O � a g � w OQ cq 0 Z z Vl 4.4 9 , oo a V .q W PROJECT NO. WDL-07020 =NAME: WDL07020-S1 DESIGNED BY: D JV DRAWN BY: WR B SCALE: 1 " = 40' DATE: 2007-08--21 SHEET NO. S-4 McADAMS MATCHLINE — SEE SHEET S-3 SITE LEGEND 2s °o0- / 1 1 1 1 1 t1\ W W \ °s ' \ - 23 �C��� v - _ �/ / s° f \- +00 9' (TYP-)' 16.0 .0 = / s° EOP EOP R6.0 x / �� so At ESSIBLE o,, RAMP (TYP.) �0 / s F� s 1 4.0 COWATERFRGARDENVIEW DOMIONT N UMW os Z fTyp 1 ss CONDOM�NLIJM-" �� 1 ACCESSIBLE RAMPS . i i-- 1 i- i i- i i• PHASE LINE/PROPERTY LINE ACC HANDICAP PARKING STALL CENTERLINE — os — os — os -- OPEN SPACE — Tc — Tc — Tc — TREE COVER —\ EXISTING WETLANDS EXISTING MARSH PROPOSED BUILDING FOOTPRINT WOODED AREA *SEE NOTE (ILLUSTRATIVE ONLY) NOTE: "WOODED AREA" LINE IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR STAKE OUT OF CLEARING LIMITS. NOTES: 1. ALL BUILDING FINISH FLOOR ELEVATIONS SHALL BE MINIMUM 2' ABOVE FLOODPLAIN ELEVATION. 2. ALL RADIUS CALLOUTS PERTAIN TO EDGE OF PAVEMENT (UNLESS SPECIFIED OTHERWISE). 3. SEE SHEET S-2 FOR GENERAL NOTES. MATCHLINE — SEE THIS SHEET so OEM 110 W EXISTING MARSH LINE So — Slo WATERFRONT CONDOMINIUM-/ (TYP•) sO = y° \ - 00 - - so y° \ PROPOSED TREE \ = y° 0 PROTECTION $ - - X AREA (TYP.) PROPOSED STORMWATER MANAGEMENT POND POND MAINTENANCE EASEMENT 1 -----os-----------------1 os \ 1 \ os 1 z 1 1 —PT = 17+14.7 1 31, 1 1 PC = 17+79.30 PT = 19+44.82 1 1 1 i 1 ��9",00 1 "82.75'. R-- 1 D=t00.8 � PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION Q U . 0 x G7 7 \ CQ a z z W ►o 0 0 0 co \Ji z `S��d`Imil611iII'�O �N CAR 4 �''•.� U. VAS- ,��',,yl � h W O w o W CD C? o Q Z c7 O � of o a' > to W wow E-� cat ca o w 0 Z Ewa z w ca � a o z �� a O � y z z a � x z o a W w $ 0 Q cq U) 0 9 z 0�/�q V1 1 o U U H � PROJECT NO. WDL--07020 FILENAME; WDL07020—Si DESIGNED BY: DJV DRAWN BY: WRB SCALE: 1 " = 40' DATE: 2007-08-21 SKEET N0. S-5 McADAMS 1 1 \\ COND0�21 !U 1 \\ (TYP.) 1 \\ �\ 0-3 1 \ 1 rl t 1 I� � t 1 n 1 1 PROPOSED STORMWATER U2 1 MANAGEMENT POND 1 � a 1 POND MAINTENANCE 1 EASEMENT � 1 GUTTER (TYP.)\" oy o� MATCHLINE - SEE SHEET S-4 i-i.-it i i i i i i i i i i.=.m m i w mmw mwiw S 5.0' WOOD CHIP TRAIL — — — — — — — — — — — — — i — i i i i m i i = i i i i i = = M od, _ \ FUTURE AMENITY AREA N �► coo i fi \7*c \ Tc fi -•�� Tc \ �►�Tw5... *TTAr 0 N PRELIMINARY DRATYING — NOT RELEASED FOR CONSTRUCTION -\ -� - - - - - ... - - \ \: ` \ \ -^ - -I I "yam �� / / _ \ _ _ �. I \ `\ 3 \ I = �s'i I v \ \ \�, \,. \ \ \ `\ \ \ ' ti `- -,' 1-/`-___ --•_ �� ---' - :.,. .. ,. `rim .k. \ / / / / `---- \ " \ \ \ _: \ ;\ \ \ - , ,s `/: - , \ , ':/ / I \ \v:,1 ,\'\'`e,a.`\ \ \ \_ - = J ( _r ,r:..- / ./ \ \-, ,- I .«'•d- _:*F"=• - \,. - \'_ \ `\ \ ` \ \ \ YY l / \, \` -\ '{ '�$^\ \�' \ :. ._ .. -' \ _.'--_� \ `. fx, - J• .. / / F �: \•_ v,. ._ `" s 6= \ `� - - - ?Q . -_ / t`F.::- \''x:\\ I I I I 1 \ *, \ \ I \ \ \: \ - \ ---- ...- / /. ;` />= I - _ \ \ \ ,-- �,— \ / // r 11 1!' \ apft ♦ 1\rY/ \ f "\ __ _ \ \ \ _ ` — \ w.,.\ �_.�• .o.--•�'!� / / -' \� I a'': -:--_ --� ;,� \ \ - \ _ _ JI. l.!l //1 'fJ+#{f#kl fkk#M-#it#i�li / I: I , v \-_• - -------- i _.. _ ;y NDER.^CO�ISTRT�T�E}l� ' o {{ /y \ \\ t \ - r 1 \ \ --� i_ \ e.. ` . `�=' — - ••.. "•`.•. / / , ,/ /, / ` 1 �_ _ -- \- : __-__ \ \ \ \ �I-, -1 1/,--' \\ / R f IT'I I / , ,\ -; \ \ _ r \ \ \ _ / / = / \ t .- �. 2:,• . \ `__- _'-_ ,. sr,._ \ , , _ > .'\.. ',�y - \ \ \ _ \ N 1' \ P ♦ �/ / / /`\`, Z\„ :.,.. - \ /ti 1 BOUI�D�,R \-_�..... a r.\\ n. �, _ - _ ,A \ :.; •. H :, • ( - � -�' --r , v \ -_ . ,_ _ _ :, I , \ _ 41F{+�I'yl1 #JI#il• { 1d�1 I f +M#1 i# ki�\{4 {+ i{#111•�iJiF# ■I##� 11# \ - - - _ - �T� \ \ \ /t I r I _ _ , \ ' ■ ';..:: v >�. - •-:,• - - / / / s / / >• \\ l ` \ ''. .::. �r^,. !;:. ' _/ :.\-....`�.. y. \.:.. • \ . \ \ \ \ ::-,\ � \ 1 '\ \ , / 1, I / \ \ _•(G \ \ \ \ .v..\ , \ `� :' ✓ /.- - ; / / / / \ \ \ /z: V ::.:-. % \ _ \ \ \ \ M�i/�l /' \ / / ✓ \ `', "' V1 / \ / / --_. / ., /-:_ / \ _ a/.w — :_ i,. , }; ... .. •' '•:(-F,lYSIY✓�•.-..', `,\. .F. \ \ \ , I 1 - t ./`. .\,� - \ \`" I - - - / , / / .\ > / _ _. _ •r ....1:. . ` . \ . .:.\ . ... •- \ \ \\ _ - - 1 - Cam., / \ \ - - / /i L i� `\ / \\ I I i , , - s , , / \ / \ y - _ �.. \.., - ; ...'' .a,: ,h \ \\ / / ��j--1 V1 /' t\__ \ /' / /1 �\\ f/ ` "\'\ I 1 ..., ,. , - _ - _ _ :... ` I 1 f _ - / t , - \ .=- . - .-i7,- , , } / _ .. �.✓" \.::::. - .. - . .. -\''- ^'t. < _ _.: \ / = / Y�I ,. / _ --I _ / / . . _ / -'=- /./ !. , .. Z•4. -. / / s nb _� ..�. . .... _ , 1.:. -' , :. I M� / \ a \ I. \s._ - 100 YR FLOODPLAIta \ I \ 1 \. __ / - .. -; \ /� ] . \ V. - ' - _,, -- ♦ `' ��, l , l l - J! W \ \-, 1 _w :-r I , _ / /.. ' �- ♦`• ,.•. PROPOSED :,, \ ., \ \ - , ,g _ \ \�_ _ / i / , - , / ✓' ' , - - - - ' _J'• V I 1 I "1,� 'r..\'-,_� I\ t. it \ .0 .w_ \:• _' ', / , / / \ ,, _ i =,./ / / ! I\ \ \ \ / / `\ - _ I \ \ �-t .a _ / I / \ v v x STORWATER - - - ♦ `\ \ / i \ \ \ 4 „ Y L I Y _ \ \ \ r+'� , MANAGEMENT \- _, , • ../ \ / \ -\ I Y \ \ e•_ .. , \ \, ,.,_• /, \ .,' ,.\ .,..... ..� \ =`e-" - T , - "..%�':�% �._ :W -LATbDS '1.: , .`+,may' !'•-/ ` \ \ I / I I \ \ \`�\ -\_-,a \ \ \\ \ \ \ /:r ` I ,\ , / r / �, . \ ., \ POND ' _ / - ::1; • r - - :: \ ` \ \ /^ \ `a \ \ \ \ ' :..• f\' \ :..• :.. r//, \ , \ \ \ I 1 I ,., \ t is _s / I = E,a .." �i..yl I 1 .. :f.. :L: �, / a Gj t — \ \ _ r " _ - - - -- - Y .. _ �� I I I I j , \ I I ,• ,.......,....... j / ,y , _ fi.., / \•i \ a.�• `'- \` \ `__�\ \ I \ \ \ t . /jJ \ , \ I 1 1 1 I I I -'� ': l.r I 1 I •.': ',,-, /ts =,:. •'L .: ",* / ' / / \■h :____ .. .i � \:: <. �\ .\\� \ `�• \ \ `.r \ \ \ _ `` / , 1 ,,- ---,,_ _ v I- / / r _. n :, __ . -, '. �"i iI:, ..". 15.:: ?. `--- j� t.� 1 / / .: r 1 '-,.-- , - w . mil, .\,. % . _ . �- .. \ <: \ •.° / / / I / 1 - / / — �T� --\ ~ \ \ , \ \ - •( .. 1 / L - - _ - I -. - / „ , ,- - _.': ,i?'" T Nib E h , / / ... Jos, .:.. �: / - - - • / •'` . J .. f _ - \ \ I p I I I I 1 1 -� ,_ �\' / - -, - \� , \ , . I. . ., :I / \ . �'. / [1' I 'i� _ _ / _ - _ _ - - - �/� r '^ - t -- -_, / / \ 1 l.:l , I I ,;,.- ,,-.- / ,._. / /,/ r \ / \ /,',, - _ / -/ y'; ,/fix\- _ \ I �` I ♦ / l J I ,j I 1 1------- '; t ✓ / s_ / , / ..-. \♦` y .. ,. t / / \� xi r ---4 / \' = r I -, \ / , / / !{ 1 III I 1 f -,;, ,---'' ' /' ' ,' ' ` .; . \\!.,. './ / / , - / 1 1+ / �►. — f:'-=_ /'� - / - , ti <'.. ( _ = \ I \ , // .- / I 1-[_ _._1—_�. I _: _ �/- / t /: •/ \i -_�• l :<.. •AI I / l \ / / .-.. .>. 'I _ " , .', - `:\'_'- \ .nr t. i \ \_� - _ ' ♦` / / / (/ I I I, 1 I I I _.rt t J i " i , , 1 :%'•; •(,�� ' / \ •-. ,' / 1 / '�° n ..� 1... ! , / r \ \ / I , ,:\ -� `\ \ / /♦t / / // // / }ram e I / ,�_ : / :.\� , ° \ -- /\ / / / '1 \ = \ tx_ _ _ OTECTION / / ,, :., c'` 1' 1 / / / I: - - l ' i ( l I l , / I _a_.-f r.ri .. •\, 1 I 1 . I 1 2k- :rj / / /~4 J.,.:. - I :.. ' - _ \ _! \ �`` '`ki.-..:.. r r \ J AREA ( �� ) /�' '/ / / . f / / / a. / , , I -=a-- Y 1 / I 15 'J , 2� , O - .. .. _ _ •-' l \ ` \ +' \ k a - V L ~= \ l \ ♦//,/ / t \\ \ n r I / i / f: jyI . I / , r:i ♦�. PROPOSED - ry� \ `L X/ - /..... ` \ \: r + / :r.. , : f, / \ n` ,,_ / / ' ' / ,:.,::.,,WEi'LAtV_DS;.... /'.•.. / \\ y pAD - \-,,. _ `�\• , s �\ / /._ , q♦it ,,' ,/ \ \ , / ! / .' / ,..... STORWATER� - - / H I-. . , _ \ /-'--------/ ♦, / \ 1— ! �14 \ - ,.__.__.-..�.,._ :: § / / .. yr' \ .----' •,1 1 p - —/ / / ` / / \ / / ..., ,,. Y / '`v; \ ' :=\ �„ 3 F,: .. k..i, 1 // / , :1 -_ \ MANAGEMENT \ y t �' ' \ I I I I I , I" !-. �, ,� , / , , L \ .. , i N ✓ , \ i ,1 4. ,:,�`__ ,I \ •[ T ��..� !- _ � y PH E 2 ,, .,, , I I I , , I I I I tt, --. `r / /, l /: ,_.:..\ . •\ . • , : \ `.:•a \ � PO D i .. / � 14 T � - - .; E..,l I I 1 I I I ' I) ! _ -{/ / , /. / ' �.. ,. \, '>.�• .::... .: '.\•.. 1 1 \ / L' '� " _ 'I . r `\ \ ` / • _ _O-i.L � ;,;-�f ,..;:� a - /' /♦i 8 1 1 I I I I I I 1 = -, I I I t" -_.wf 1 - /: ! �. �:..`..: / :',. /.. • , :,.r :. , s. 1.:`•,',II.. / . C / / / / /.....' / � \: \ - 1. , ��. \ 1 ` \ \ / , I _ [� 1 1 ( _ ' 4' y . . ). .:-....,... , r. ,. :1 I , ' / ,- .6` �__ 4f 7 , 1 ' / - I �, \�I '`\• 11 // / ' '_ - -''F - \ \'''\`\ I \\\\ _- 1 - /' ''♦ _ _ C NT I I --fi 1 I .__'„ ,. , . . ./-t .. 'L.,•.•.. / 1 / _ 1 ( \\ -/ / __ u-� _ I _ \ \\ I /j E ER : . / / �:. \ i ,i I I I . \ , / /i.;/ i / ', I�; 1 \ I I I r / / V `J 1 .C:..,.. 1 \ \.:. ': I \ ' '>' --- _ / / / - \ ' 1 14 r .\ r'.• 1 I I \ . /._/ / L::` \ i I I I 1 i i \ / / I / L• \ ../'._. I I I l I - p \ \ \ \ / I , \ \ / / / / , f \ \ I 1 1 1 / \ / _ I \ \\ / /` •./�!_ . t;' 1. I �:1� \ _ _ _ r , 1 \ \ V \ I I \ \ \ \ - //_, ( J \ / / / / ,/ :;`: ?. \ a a / \ .\ \��'' /• r. ; 1/. / : I \ (' ,: fiF r ` y' W \ /----- /' 1 \ \ / \ \\\ \ \ /ice' 1 // ,' // / f-/• .:/ 'a\\ \ \ � I, , , 1\ b \ 1 I / / � I I „I /;-_ \ \ �\. �.. ,.� ..l �;./-/-' I. 11 I \� : �T � \\ \\ /— \ / / \. \ \ \ \ \ `\ e"'i/ I 1 ,_ ,. ... ,(' /' '``` : )•i < , ,./ 1 1 \ \ \ \\ \ \ \ / / ,� :• I: ' • - I , 1'` I o/'' _ 1 (�1 IC—n \ , '. \ \ \ \ ,�- ----' /', �' .. :. ";;�::: \ � i. 1',. '' / ;# ! / F'' \ Mom) 0 N"d \I \ ' \\ \ \ 1 �a 1 \ \ `------ - ,•- : f ' ♦ / ::: , \ \ \FFE' 21t.2 MA L / . / 17 '' , - Y €' _. - \ \ x 1 ----- ---- .. �/ - \ - s / \ \ - - - -- 1 •i:. r 'e tv' % I 1 I `\- ' - / q \ra - ° / �.�.,y.i.•: / , \` ,\ \ \ \ i ♦\ rt \ i e : - / _ ' / \ \ \ I q'HASE 2 BOUNDARY / I \ ' / ' ,� ,/ - - 9 / .>>'.:..' , -__ -- MATCHLINE - SEE SHEET C - 3 ;4 �;, --- \\ `•\ MATCHLINE - SEE SHEET C - 2 , _ `` . .. . I r. tt� I � tt� � tw � ,� � � � � ,� i� ����• � �.t tt� 1� tt� ttt� tttt�,t� * � T ;�w>a! Iitli6i - i' it i ♦\\\ MATCHLINE — SEE SHEET C-4 `� I �' 10' "� / / ' MATCHLINE — SEE SHEET C-5; _' 1 '� I \ $ f \ I I 1 FFE=29.5 ° ) yI '' \ l / -) \ / / / ♦/ I 1 \____-- / / r c =. : /' , O \ - 1 1 (iOUSE / - - s FF/-= /6.5 POSED / , \ / ' ; ' /' / --♦ 0 / (jp I / t a • . l , l I / / - i `\ FFE-19'5 \ `\ X/ / n - �y' , , - / I � / ♦ \ \ \ \ �. AMENITY - / / / . 1 \ \ \ / / \ ,FFE=21.2 p // . \: ' ., \POND I FUT(JR / / // ♦♦ 1 \ r \ - _ Y :f `, \ ,:../...' ITOF�WArER - - 0 \ \\ \`------ \ ` \ \ ` - 25 \ ;4 ' • MANAGEMENT-`----- /, \ \ \ / / ♦// \♦ \ \ \ {\ . \ POND-- __ // - i \\ \\ ;* I ` - - _ \ \ e' ` ,\ \\ , \ \\ / ' ° '' - _--_ a -- \ ' - \ - I I .- .\\: .-\ _\ ..I` . _ 11 \\ \ 1_-- ' //ii'i' /-'-..'i'.iS ., 1 \ \ `\ \ \ \ `_ I \ ♦,/♦ _ \ _ ' , -€, :_ ` �- `` `\`\\ \ \ \ - l� - . \ �` ` ` �- I, , -+ #ate - \ \ \ % ; \ , --' - / \ \ / 1.\ : ! 1~tETAI \ r ! NIA \ ' r . \\`\ ` / i , - _ --- FFE=19.5 -\ 24 <- s • a '::\ \WALL �TYP� //-�. �' hT x , :,. > \\\\ \, , , / , \ FFE 8 ' / •: •�>^'' t" ■ .. ' \\\ , r S LA I \ \ \ �:, ` A� , \ \ - i � i / � � ro '•' /: ,..::. r ir.d_�..:..:•-.•.:: `\ •.: 1+•• •, I I 1 `\ I \ \ I I I I \ � / � / 1 - - - \F/ � , \ I 1 1 1 c _", /' / \ - J - , /' <.. ,•! i .� :J I J I 1 I / t \ \ \ \ / \ SITE OBSERVATION \ \ \ ` /'\ / ' J I r' , / `\\ \\ `\ ' / i TOWER f = ` \ ` `� \ ; i ..:..<....,::: ,'r ./ / I I \ l ' - =t.:° ,. -,_;:, yl, \}f \ \\ \ \\ ' \ \ \ I / , E;� .••'.� ' \ v-. ,` -'' I I 1 , / - - ' t a�.,• ',,r' _;; \ \ \ \\ \\ /-- ' \ \ \\ _, I I ' ,/ /�^\ / ' /' -- \ \,t.>�:�': - `\ `I 1 I \ Il I I i ( -'-� \ \\ \, t _ _ =1r -zl,r iS� \ "Ye -/ \ \ \ li , .`\% ' 19 \ ` t. :-.4.. ... 1 \ , 1 I I \ . , i' \ \ \ :. I \ \ I ` ` • \ , ` \ ` '' \. ' --' \ 1 ' , ;•I` .• \ I I I I I I I 1 \ '\ I I i \ + _ - - _ `' 1 \^\ \`� \ / ' , ' ' n `=1 .5 I t 1 \\`� i . - / / / a - `11 ,., I.... �`I: �. �: .j 11 I I / C, tl t\ 11 ( 11 \ \1 \ \ It 1 f / _ '`'' - -� W _ } ,'. 4' c --` , � - - M'�''I \ \ i PROPOSED �/ - .. ,:. \ \ \ \ / J _�,' - �✓ - �'\\ � / / / \ / I \ 1 STORW TER' / �... / 1 i L, 1. : I r � I I , _� / \ \ I I \ \ \ \ v1 / /, , , / _ F - 71 .5 :> GENERAL NOTES• \ \ `\ J i / / , I , �\ \ i- - �lAN1CGEMENT ' ', ----- tu�AIL t .1 ` r , �I J / i / \ I \ \ \\ `\\ \ \ \ ' EXISTING PROP / / \ / _ \ KIbSFG / r / "i 100-YPi FLOODPLAIN ;, x S 1 \ \ POND - -- / f' - ---' \ \ , /' :.(:`'t . , ` ' `- i 11 \\ \\ \\ \ \ \ ,,/ - �' x LINE}FHASE 2 / t -- --' / :i;" ` \ \ \ / \\ { :: \ / \ \ \\ ` \\ 1 r�-, 1. THE R I I BOUNDARY \\ r �, _I I / / 1 / / ' - - 20 /' 'r , I - f-': i' m •''' i i I `\ \,' \ \ `\ I\ `\ `\ \ `\ `\ \ w ETA N NG WALL AUGNMENTS SHOWN ON THESE I / \\ _ ' /. /': • ;' ° I ` \ \ \ 1 Co PLANS DEPICT THE LOCATION OF THE FRONT FACE OF \ I to I , / / / / / ,, �T \ \_ - 1 -!; - \ ` i - , I ! / ' \ , ' /", / / / / to �-� I e / .. / . <..: / \ \ `\ \\ ` \ Y I I I ," / PR OSED a ; -\ : ,'I.. -- FFE=X9.5 ,' / ^ ; // \ \ \ `\ \ \ \\ THE RETAINING WALLS AT THE BOTTOM. \\ I i i� l � � 1 i SH _ - i .- _< \ i / / / I —�" / '.l.. (., .f •..' is I I / I \ \ \ I 1 ' Ci / C MPACT --- , , I .- \ 1 .1 ... /,. / \ `\\ \\ \\ \\ \ I _ - _ : :r -.x_: \ \V / / / / , / 1 r ` / ��_ \ -/ /::./ \ \ t / :y,./I'/7-• �:: /' I 1\ \ I / I \ \ \ \ \ 2, — _ ETAINING WALLS ARE TO BE DESIGN BUILD _ \ _. ir �' \ i l i i / �1) i j 1 - ------ -'' — -\\ ' / ?.. ,..: i �19.5 :.,.', //.:,,. \� '��`\ `\ `\ `\ \ `\ M--1 PROJECTS) BY THE CONTRACTOR. IT SHALL BE THE EXISTING I 1 i IJ 1 Ji r / _ ° i "-'' _ / t''/{ / . \ \ I \ `\ `\ \ \ \1 MARSH UNE I - I / \ / '� ' ' \ ` \ CONTRACTORS RESPONSIBILITY TO OBTAIN FINAL ' rl _ \ \ i 1 / --- / - - ,, .� t N -----\ \ \` t � CONSTRUCTION DRAWINGS FROM A REGISTERED �� J \ \` I / 29 ° \ F/ : / \ \ 1 ENGINEER AND GAIN ALL REQUIRED PERMITS a , 1 1 \ �\ \ \ / _ \ \ I / ;r : \, \ - FFfr19.5/ t \ 1 \\ \I NECESSARY FOR THE CONSTRUCTION OF THE `1:- 1 \ 1 \ / FFE-17.5 1 \ - - \ ` /` --- -. - ` / - J .\....'t:. \ \ `\ ` i \ I, - _ I \ .' _ \ t .' / , RETAI 1 z:. .' -- `- --- � __ 1 N NG WALLS. -1 , \ l \\ \ \\\ ' / / '/ /.- -'_� __■ \ \ \ /�._v..___-�r. '--^,. .`.. _ 4/`K :V f/ <•',". •.\ :.'\\ill. `('. \ \ _ \ I I 1 t is _,: -_ \ - / - :....:,: I�OP�J �--- _ /...,. a�i. ,•..'\_ /, - \ I 3. RETAINING WALLS SH _ ,_ . i \ t . :\PRO fEGTION .:'' , _ _ \ -, J. ' '...: ,• :. I �, / ` '` \•Ih+! • sn :: • :: r ., ' I t I , BACKFILLED WITH OFF -SITE RROW DMATERIAL OR 1 \ \ I \ I - � EA �' s �: �� �• . 1 OCESSED FI \ - < v - LL UNLESS CONTRA T R \ �.' C 0 CAN PROVIDE ,_. = MARS 1- • 1 \ '- - \\, :.... , ,-,, , : . j ^ ., +\}, ..... L _ ., i:...:.:. !s� ' \ W OWNER WITH N CO FIRMATION FROM THE GEOTECHNICAL i _ I I ■ ♦ N - �:�' _ '` ti - E GINEER AND T / , r f • HE RETAINING \�. � :.: _ �'� . . � s \ WALL DESIGNER THAT of • \ r I V# t r -\• i \ _, - �- - REA ILY x I \ b7 5 WET61{NOS ♦ •/ ' \ / M� BLE ON SITE SOILS CAN BE USED. x �� r' \ r• a - � r " , \ \ \ �. :- ':; •' ,' - - 4. THE TOP AND BOTTOM OF WALL ELEVATIONS SH �s r _ \ - �; ' OWN �4y \ \ o - \ _ _-- \ ON THESE PLANS IDENTIFY FINISHED GRADE _. .. �- -- ., , , I ,_ , ..\ : .. , . .:.. - : -.♦ : - •. 'PHASE 2 BOUNDA`�iY '��' ♦/; , a / ' O-1'R F OODPLAIN I \ ;. . ._. .., .:.:..... :..::. _...:::.;..t:.: - ; +� 10 L \ \ / / \ 1 / - \ . \ - 0 IU. .:.:•' \\y- - ..... . _ tiii,rp. \It� - - I 1 /` I�M►1'I .. M, _ - \ \ _ R }. ELEVATIONS ONLY. THE EXTENT THAT THE RETAINING \ _/ t / / J \ 1 \.yam - l- - -- - __ / / / ./ \ r \ \ \ :� F. - \ WALL WILL BE EXTENDED BELOW GRA E T - \ - '� E..l D 0 THE �' t - 3 _ ' '' - \ \ \ i / \ /' o♦ / / FOOTING SHALL BE IDENTIFIED ON THE RETAINING ... �,i/y ��,,� WATERFRONT ` \ \ 1 ! \ \ ' / , :, 4/• ::..i -•- rah \ , / WALL CONSTRUCTION DRAWINGS. k ,, ` =_F \y *�t!i+• _ CONDOMINIUW \ \ \ \\ \ `\ t\ \ I 1 I \r --- \ / \� . x= - I. wl - - - - - - `r`3 \ y� x-' -' • - - - \ - �.. MATCHLINE — SEE SHEET C —4 \\ \ 1\\ �FL`�;\� 5 i,;//11'�,1 t.1 MATCHLINE -- SEE SHEET C — 5 l , ,_:: l _ - _ -\0\,�� � f - - - - - r• r• r• tt� «� try m m m m m m = m \� �'Afl� - «r�. .,.. - -�tt . - r� w .� tt� r• tt� 1tf� w w r• tt� tt� tt� tt� tt� r. tt� tt� Itf� GRADING LEGEND �' �i1,11.� �'♦' \ \\\\\` ' MATCHLINE — SEE SHEET C —4 z _ --MATCHLINE — SEE SHEET C-4 \`\ ) �I - , _ _ . =a/ -_= =, '\ \ \' 111, r ~' .,. , {� >� FLARED END SECTIQN WOODED AREA *SEE NOTE / _ " \\ L STRATI 0 \ \ / 'a,. _-_= \\\ > �`\\ `---�,` _,I; =f` CATCH BASIN NOTE: "WOODED AREA" LINE IS FOR ILLUSTRATIVE ;. 1. \ "; `. / 9z j r, y ` \ _ / . '''.. i PURPOSES ONLY AND CLARITY OF THE PLANS. REFER ,_I/ \>" = � _-_ _------- \ - IN 0 CLEAR IMI f \ STURBANCE" LIN ;_ ,_. _,.; - i DROP LET TS OF DI E FOR STAKE OUT _ ING LIMITS. •"" R DR IN _ ,: x,/ ry = - _ - � _ ---- - \s M A AGE x.. T x. 4 S/ 0 �'�'' _€. / 25 `/ x. z. N T U " 5 CO 0 R . , : {; ., :.......::. -.` _ - ISTING PROPERTY UN i \� ._ ,:. ,.•, (SEE SHEETS 1 FOR I ONTOU 1, ,:3_ 1`-X iF/ BEARINGS AND DISTANCE ----------------- TIN CONT R :r - - _ - G 5, ;` f E' // 41 \� . y . '_.;.....'.. .`. •':::..:: ------ 24 ---- EXISTING 1' CO S --- EXIS OU - OUR ' _ ;, - _ _ _ __ _ _ _ — — EASEMENT LINE :_ { x . - E - _ _ I I �. _ � LEVEL SPREADER SC - �,. _,_ '. h;';:.` �� / � GRAPHIC ALE .`'.� EXISTING WETLANDS i o0 0 5o i o0 200 i _ _.: r n = _. I , _ : „t - , z;a. ;. 3, _a/ },; `;{ �_, = EXISTING MARSH 1 inch = 100 ft. 3I \: x:= L: z i :. ', PRELIMINAR`� DRAWING - NOT RELEASED FOR CONSTRUCTION V 1 !� f-1 C) • 5 O P- ►--4 w z x o i�i 4 � 0� x a �a4�N z W c1O I --I O O M O w ao In r-I W P4 O m z w�� z w� w xa" ``,``j111111///!!/I ��.% �N CARD ., • / ?:°O` i r � 'fI ° • . Q 0 2 �. ��•,� J VA\-�'�, 17 !!!!/1111111``� ((J1 0 V) N O S c W 0O W O a a Z � Z � 0 0 0 z � x M o a o a I...1 t- H fn to a a � w E-� `� -- o o��� ,..a p z d' S 4 x P' C� i`• ax-- �, u W � w a" y � zo Ix a m z a � ��5 O Cn .>4 F� z a $ W O^ U O N . H z `�z� h w .lUm : w C) a g C4 w w O A C a 0 1 O A O Z I '^ O-4 O O U z O PROJECT NO. WDL-07020 FILENAME: WDLO7020-G1 DESIGNED BY: D JV DRAWN BY: WR8 scALE: 1 " = 100' DATE: 2007- 08- 21 SHEET N0. �-1 McADAMS -� ,- i % __. _ _ _ ___. __ -�__ _ --�- _v 0 a co 1p N m G' N O N f7) 0 o W z Lo o �QG �..� w C4 00�rurnrrrrr04p CAR, D 3 ' ,, �F�'• J • VALE' �,��, ��o} rrrrrrrriir►rrr� � o � w o w5; Ckf w � � o z � � o 0 O w o_ cn W � Q r� W o � cu as Oo �wx U O � > z U O ry v z�� w a ��v o � a � W � � w O Q cq 40 � i a ° a � w U � 1 F a4-4 0a Iw V o� �z PROJECT NO. WDL-07020 Fa.ENAME: WDL07020-G3 DESIGNED BY: D J V DRAWN BY: WRB SCALE: 1 >, = 40' DATE: 2007-08-21 SHEET N0. C-3 giMcADAMS NOTES: 1. ALL BUILDING FINISH FLOOR ELEVATIONS SHALL BE MINIMUM 2' ABOVE FLOODPLAIN ELEVATION. 2. "WOODED AREA" LINE IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR STAKE OUT OF CLEARING LIMITS. 3. SEE SHEET C--7 FOR GENERAL NOTES. 4. ALL ROOF DRAINS WILL OUTLET INTO THE STREET SO AS TO BE CAPTURED BY THE STORMWATER TREATMENT SYSTEM. GRADING LEGEND CA FLARED END SECTION CATCH BASIN DROP INLET �- DRAINAGE FLOW ARROW LINE BREAK SYMBOL 25.50 TOP & BOTTOM CURB ELEVATIONS 25.00 TW=22.00 —TOP OF WALL ELEVATION BW=21.00 —BOTTOM OF WALL ELEVATION (NOTE: BOTTOM OF WALL IS GROUND ELEVATION NOT WALL FOUNDATION) 1 25.60 SPOT ELEVATION STORM DRAINAGE 25 5' CONTOUR 24 1' CONTOUR ----- --2-5-------- EXISTING 5' CONTOUR 24 EXISTING 1' CONTOUR — — EASEMENT LINE LEVEL SPREADER EXISTING WETLANDS EXISTING MARSH WOODED AREA *SEE NOTE (ILLUSTRATIVE ONLY) MATCHLINE - SEE THIS SHEET sw Mir \ \ 1 EXISTING MARSq LINE \ W R' \ \ \ \ CON MfP(IU \ \� \ (TYP.) MATCHLINE - SEE SHEET C-2 o RETAINING WALL W=I6 � DESIGN BY \ \ OTHERS (TYP.) \ \ \ % / / / / - J DI A1,3 / ( � SITE OSSIf2VATI( 1 TOWER \ \ \ \ / / / / WATERFRONT ! CONDOMINIUM 1 DI 2 ESS E \\\ \ \ \\\ \ \ \ PAR KG \ \\ \ \ \ \ \ \ \ ACCESSIBLE RAMPS (TYP.) K OSK \Vv -FFE= 7.5 \ fit/ �/ �/ �� � ' � ` � �• / � ! ! / 1 EXISTING PROPERTY \ \ LINE/PHASE 2 \ 15 BOUNDARY \ / /10�0-Y� FL60DP,LAIN i76 N C`\ 7 7 \7I / j /WETLANDS — — — — — — — — — — MATCHLINE - SEE THIS SHEET i I j ■Lo i 1 � PRO�OSED 1 STO WATER I 1 MANA EMENT I 1 E" 4 P�ND w E W w � 1 � � Iw \ \ ; s4 \ 1 -1275.4� 1 a s� Q C� 0 a U1 `� C\2 o� W 4 a z � era o W a 4 ® o o F" -t ►O w aoco 0 CARO��',��' o r L 2 f Iffnnnle�o W cn w o w w m c� o a z z 0 3 O w a o W ix a E- � � o Q � z a x V z w xa+w � ;> co a z ��a O C� r z 0A� 4 � z w ��a o ��v w OQ cq W � , ri 0 o a z w O0 Gl� PROJECT NO. WDL-07020 FII.ENAME: WDL07020-G4 DESIGNED BY: D JV DRAWN BY: WR B SCALE: 1 „ = 40' DATE: 2007-08-21 SHEET N0. C-4 PRELIMINARY DRAWING — NOT RELEASED FOR CONSTRUCTION IIIII .Of W MATCHLINE - SEE SHEET C-3 /= M�• ��%" T 'C r r' wow----ww \ \ Di 13 26 / / f PROPOSED v TW=17.00. / / �21 FF,E=/20.5 -- / \ BW=/ I. 1 � AMENITY POND �12.00 t8 TW=18.50 -1.1..80 11.50 Z 18 \ s / \ / \ POSED TREE x00 CB-{620 / \ / / f ) / / , \ \ \ CTION / ! WETLANDS _ / / - /' \ f / / � � � - � i . \ \ / FUARE I / Ma�ACEMErRiT a FFE=18.5 \ ! I i f \ \ -- -- / -- �* ..._. - i� \\ PONa\ Bl 7'7/ _ / i / \ \ \ 5.0' NATURE -B1s ~� -, � -� r II \ \ � \.: TRAIL (TYP.) 100 YR FLOODPLAI�1 FFE=19.5 WETLANDS - 1 ! - FFE=17.8 - _ \ �� \ 3 J �•--� �•� /� J ) / / / / GARDENVIEW`` iJ / r(TYP.)OMINIU / TW=15.50 �,=low o TW=1�.00 t r 1 18" STANDARD \ / BW=10.00 1 CURB AND � . B1.g BW=7,50 GUTTER (TYP. DI-B14 / J / / / / TW=16.10 BW=9.70 TW=17.00 \ K / CB B05 / i� / / / / / / TW 1800 j / FFE=17.5 - \ / ' \ I t7l CB- 6- / \ N. • - X / BW=8.80 -FFE=17 Y �' °Ro �9 - 1 a (.. ? L - .I 1 i i i i / TW-17.40 00 BW-7�80 CB-B07 NCDOT CLASS "B" RIPRAP 1 24'L x 12''W xx 2" TIiTL� /•/ J V. I 1 / / / 1YYLis.so , I \ MAI�}<IosK /.. AIDING wLL / J a / / _ / - BW 7.50/ / J 1 / ESIGNED By 1 SPROPOSEDTORWATER / / TS // is _ 16 / \ 1 !. �THE�2S BW-6m / DILB09 MANAG�MEt r- I -----nND / / \ \. / / TW= BW=8..00 .00 TWA 15.00 \ I I J I F DI-B11 / FFE=19 - 2 _ t. 1 / - TW=13.00 f o i - - FF 19.5 1800 '-BIG- HOUSE \ \ a COND FFE=193`- 18.00 IFFE=17.5 Bw�l10.00 . \ BW=10.00 TW GRADING LEGEND :WETLANDS - / _ TW=] 6.00 - ® STORM DRAINAGE _ 'BW=, 0.00 SW=B.Op �.\\ FLARED END SECTION ' \ / / j\�\ \ 25 5' CONTOUR / /;- % _ / \ . �! ♦ - . CATCH BASIN 1 / / / \ TW=11.00 WETLANDS \\ 24 7 / / \ \ BW=6.00 \ TW=7..00 j / .\\ ! 1' CONTOUR / \` ■ DROP INLET ------- 25 --- / ' y / I. I. I I ■ I I ■. ■ I I ■ I a I I ■ ■ I I �.I ■ ■ ■ �t/�// . BW=6.50: EXISTING 5' CONTOUR 24 - _ - - �--- DRAINAGE FLOW ARROW - - EXISTING 1' CONTOUR EASEMENT LINE 1 TW=10.00 - . I \ �J i' ., j .v LINE BREAK SYMBOL k� \ \ \ 1VVa4 80 \\� _ PHASE` 2 BOUNDARY •' �''♦\\•/ �.! LEVEL SPREADER " o �.� t .. 25.50 TOP & BOTTOM CURB ELEVATIONS EXI TW=.12.50 :. \\• '/ . 25.00 STING WETLANDS \ i \� \ - \� ,lf EXISTING MARSH TW=22.00 -TOP OF WALL ELEVATION /' BW=21.00 -BOTTOM OF WALL ELEVATION -..(NOTE: BOTTOM OF WALL IS GROUND TW=15.5b / . \� / ' ELEVATION NOT WALL FOUNDATION) WOODED AREA *SEE NOTE BW=4:50 / \ (ILLUSTRATIVE ONLY) 1 25.60 SPOT ELEVATION n 1 I / /.. ` - ,. \\ - 4000 �.000 r i BW=5.2a _ • - I® r;-®----ram-'-----------'-------�------i-------------------------------� MATCHLINE - SEE SHEET C-4 NOTES: 1. ALL BUILDING FINISH FLOOR ELEVATIONS SHALL BE MINIMUM 2' ABOVE FLOODPLAIN ELEVATION. 2. "WOODED AREA" LINE IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR STAKE OUT OF CLEARING LIMITS. 3. SEE SHEET C-7 FOR GENERAL NOTES. PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION 0 c ►o a a �o CD E mo ral LO Er W V ��•� �,r, CAROB :Q E - - 3 J LJ ® 1 to � W Z I ! z � i a~ F rn w c1z o O H Lo w � �zW DPW �5� o �" ►�-� m z z �-,ra o � Q z a � U ENO 94u z� w Boa Z w o " cq W � r/ j 0 o a W a z° w A 00 U U o PROJECT NO. nL-07020 FHENAmE: nL07020--G5 DESIGNED BY: DJV DRAWN BY: WRB SCALE: 1 „ = 40' DATE: 2007-08-21 SHEET N0. C®5 JiMcADAMS 3 m `a O 9 It 0 r- 0 N r 3 9 0 N O 0 J 0 I rn C .I 0 t U N m 0 \ _ r f _ --- t\ .. _ /" 1 .• .,. .... r / .,: , >.. \ 1 'mom, ... , . / .. ; 4 � , , i ., --_ . - _ , PHASE'. , \ 1 1. I y - ., \ -- -.... _ 4 W LA DS _. _ _ r _ _ r r LTNDER,r C0 - - - - - r ,:•" , f J - r NSTRi'�CTIOi - - r ET N ,. , ....._..._ . _-`--- r _. - .. .. _ *�,.,... ,: r / ':r r r.•---,�.r ., ..;: .. - `i 1 f i 1:r r^ .°;>,.•..:". __ I 1 1 _ ! _� \ Y A \ _a _ _ - r _..- I PHASE ., BOU D f2Y_ .._ , r -- ! r . Y ., , 2. L,, ,,w .:. ,. _::.: :.. r r r it r t - ' CR Y� N J W 1 a _ ,, t , _ , - 1 - ♦r \ \ \\ l r d \ \ \ r 1 .r .. _WETLANDS. .. / r r. \ .l .. . ... Y:.r _ .. ) t A "1 - _ . f _.__ _ \ f , \ \ , , O ; s ,r \ . , f !� _ i d \\- , _ t 1 a _� ,, , _ l,. _ 1 _ r 1 > , V�/ETLAN _ / _ _ - --- - .. , D.S . ... 1 , t , i , J. r _.. r 1 - ,`` w r r.. -♦ , {. 1 _ 1 / i .. ! - a J / ! Fu \ t _ �O ...:..- J - _ - "�.� , x 1 : _ _ _. _, , ^ , ` d 1� , E-i 1 ` 1� 100 YR FLOODPLAIt\�. -.'-- : . . / / _ I t .a ... ., f 1, r' - v I ... ,.. y Ir y 1 COU .. � , ,,: f e W RT r� - \ r� '\ _ ♦` ar �l� • r� 1 , ..:�. r.: .! r t , ` _ .r%, - r' __ . I ♦/J - t r \ \.'tea J RMW , ,., - - 1 ,.. ♦, \ c GE' ----... 1 O \ , I P: R r �, , � r , _ J. EA - lOrb6 2 _ - - W - LANDS ET - r. \ PON `� \ i \ t J- - , i y ._ / ERV R r !i EA -90%' r - / �-\' f I .:' � 4 i — Ar i \ ! r- \ ♦ y e _ \ ! r J -' Y ` , , . v \, - I , \ t \ r r J / l' f f - // 1'' \ \\ ,'`• \ ICI 0:58, AC. ,. \ . , IMP. REA - - - - _ �._ J' : : t 1 . -: I t t , , , t 4 f , I;;. r.1 1. t I F / a .. >. ''\ `\ _ Et'C AR -- • .t , . t t _, •� ::gin. t , i ,\ I 7 ...,. r; :� 1 % ,::,J,` f r � :' .. , \_ ,i- -_' _ -_i 1"'�"� ww _ _ ♦ \ - _/---_ r 4% 1' f S 1 r .. r J.. , , _. „ _ : r ! , , _. .. , i_. ! / 1 . n /. Iry ! ✓ r .,,. :: _ / t ! . _ `a ... I , , i , / /.. ,, !° , A \ ,. _ % - � - J� -fir- \- - ''\ ,'i 1 , ` , 6� AC. r : f- . 1 - r - ..\ ,ram,. �,•,` r. r _ y PHAS \ , ,, , - _ _ =fir `',, \ q _ ! r \ - / y \ „ 1 Ir...y' Ir�..�( ,.: , I BOd1VDAR'Sf .-r ,;: Y-_ ... _ _ \ :_ ,: ` -- _ r r •---- -- ♦!/ t ..: \ _ _ r , , - O .,. : ,% i is .. J .� .. .... ,_�- 4 Y � .,- __.,_- .._ , v . y.- N I ..Y , r I : _..: _ - AE. _ W W . ! \ J 1 4, - J .-.. \ „ - , : : :.: ,. '. r .+ � / .- _,I .J ri. , r t • : 1. - - - §. - /(' \ Ir . _ R --' PHASE I p{ _ f, _ r _ J , --- ♦i !�••I•n•1 1�•�1 ,: .:,. E ` Q IJNDE C�(JNSTI TIO, rr I \ r i. RV AR f , , J' 1- :... - : -,^ .. ., , ./ .:,.," 1 - \ n �_ ,t, =,- ( 1, Ik : J r ,r I a ,. a`'r ....-- :: ( l , :'-, trr' _:..:!: - \ tY '1 \ r, f ♦j \ ! \ _- :. �. `, .F, PRO OSED"FREE r � , V l `I 1 1 pp 3" : r ' x r ' r J'.. '\ / , . I r , r \.1 / r S r ? �✓ 15 Ly:' \ AREAS PN - / r , / j , ! r i. l t / I 5 ! 73 / I ,.iy /�':� _ ,Tsui \... __... 1 !i P I ry -' f 7 - \. !r RO n r }.. . I r r 1 ° , / 11 WETLANDS \, �� 1, M A _- 4 ry 1 - :rJ / 1 ! , i TOR / i , f A ' :t � _ 1 y ! _ 51 A ♦. ADISE-' � � ` I� I : I I / / / \ \ .. t _ AR - e 44 �AY -.� ♦ , \ :. \ r N P E 2 // .. , � _ - 'r HAS / r Jr — 0% _ 1 ,Y`� %j t11 r I , yl 1 , / / ,- \ .. t } 1 ,. r V A to � i _ i' `` ` j:- �O LC ♦/r ' ! .,. , , r ��.� , , , ! i i 1 r r r /; ._-l- _. ° r \ , , /E r % 'i"\ z .`. 41 - ,,` - i , !� ! ♦,'. IT 1 PROPdSED AMENITY it r ! 1 I I _-..,._. — .r 1 r .; , : \ r /' , I. i f - . \ i ..\ / / ♦/i I r 1 - r 4 1 ,,. IMP. ��;/� _ A� 1 -``� , W LY�N �Iq i , r .. � - ,. r . -; _ r _ , .. ' ` _ CENTER BY r � i I I, .. r .:. r .. i .. I �1\ __..._ C ,b - I I •Tr I 1 1 • _ i I -, :r . , _ _. r I AREA — Q/o , .. ,' _ r , 1 1 1 , , r.: .. �J ,,r r } .a / \r - h , J . 'i I \� �\ - R / , , w , '. _ E , i i I ..:, ,:r > r ,,:,: r P. AR - 7 .: _ , , r : ,` _ , y .. f ! r ,"� ,� i-' 5, .,w RV AR � � = , �, y'1 �T ' i r \ , - r � � 0 IMP . A � � `, i I \ i i \ , f., i PER AREA -30% z r.. %' ', r' r` \ \ .: i r ! \ r: /:i /,., t / r ,. ., \ \ T' ! ? _ - _ 1. C " i k. �° f r ! 5 \ PERV A �% \ 1' .' w - b i '1 i -` s i a rr \ 1 \ i C \ \ , r' - ry ,, , , / t .': _ . , %`, . , , : I /: it F, I t J� ` , •, , \ \ J r ..a .. I I, _/ \ ,.. , \ • r ( . ,. 4° - ,I f } '. I ,• y , \ ^. '\ \ S . ry � k 1� 1 `� t '.,.. , .; \ d \ \ ' ..... r ., 1 r' \ r , -- ....---'' r }� . ., q \ /' - IMP: A EA i 1� \ P \ / , p 1 ._. _. ,, MP. AR �• _. : r �' -- `. .. ,... " i� , \ , \ 1 / A. �h PERtii'. REA r - - 1 7 P AFfEA a 1 ,... r -� , ERV. AR 36' 5 C. 10-. r`, R } _ L/ \fir / r 3 - `1 0. ! _ z° / POND _ .\ ♦,. ::: 1. -25% ERV. AR _ -- Itl d+ C - : .3�C , -.., 0.27 A ': ,' : „ , \ 1 ' _ \ !i;;` r , , k I 1 . , M / R 1 : r .`„ 2, ,.'( 4° o _ - _ .._- - - , - .. _, r, ! -- \'\ ' ` ,,♦ - HASE A _ A n. , z r. _ I r 2 BOUND RY ,z \ �p CA -Y ERV , EA - - - Izl ' - - I 1 _- --- -- 1 I i \,♦ i `. _ -- r ,: :.L/ \ 6 i r I A - % \:.h Q•Q4 _ 60 I 4 ' r 1 I 1 $ 0 Y _ : r IMP. AR - 0% - - - y _ 40 e A . E�%. AR r r 1 \ -- �ii�u■ \ I rr P RV AR = 09' , .'�/ J _..,- = 54 -J! 1 1 - 1 J 1 }, 1+ ,r r\ \, 1 I 0/ I 1 1 `•♦ �,, �` � i r 1 1 i `\' i �� .' '•• MIP. AREA = 4Q%' �-- P. A` 85%, , 1 �`` i /r � r i Jy \ �. /`+ ! 1 ♦,,- t /.''. 0 AC. -6Q% I 07 A 36 A I OPOSED ' ,,. f J > \ \ , 1 r J ! fir' :1 ° I PERV. AR =6 %i _ ° /i A EA =1 rJ% f, r, \ , f 1 r I rrr y \\ , r f /♦/ i 9 \ i 0 rC �- AMENITY /r r J1 I j , % ' !! fJ ,♦� i I ``v \9/ •`d, '`1/• ✓! •� 1?> 1 \ _ _ MP. A EA Ot' POND 1 , r' t !' / �\ \, +' \ r ,\ t t ;'1 \ '" ''rH r' / , .,r - _ - ! / ,, ! q I t 1.89 AC I !'` � 'i rr �' J i / , rr S s I ! l ♦ `, \ `. \ ', �0.�9 C. - ,� !FUTURE r ♦! r v 3 l J '1 1 4 , r ! , S C ♦ t \ , \ , \11 \�' ,1: / '',I, `, � \ , O . ,� .. .. ` - - - 7 _ -= t �', - - .' t STORIvIWI,<TER -' - Y y 't r } \, \ 4 �. IM Aft - 3 f' _ t ♦ t t 11 \ 'O = 60� \: l P. AREA ,� -1 1. MJQNA ENT _ "ry 5 ,s "\ ` \ `\-- ,` 44 AC.! _ /' �_ �: �,. ,PONa-' --- _ /, i I I t \\ i ,, \P `\1/ .IV `.V \` ! M . AO — 25% iC I - 9 PERV. AREA 1 = 5� e _ i. \ r / /r' - '%/ \ �' \ \ } \ / I/ \ t \ AREA =75% t \ , PE�tV• AREA = i' _--._ yy -- r '' \\ `'\ 1ri \,♦ l - A _ v _ / \` I I \ `, 1 - _ - P RV. =50% ; , .- - `%!' r r r,,z .. \ , ',\ \ `\F \ ♦/ \ �- 1` \\ ,\i\ \ I e 1 / I , ^ `� - _ e rc \ n - / !1 / `I i,:_ \ I \ -'r' 1 rr t1' F "v' r .A �`\ ♦!/ \ 0 1 AC ~ ` ` `\ ` ` - MP. AR 8Q ° ---- PEA%."A 25 AC. ; ..:\ 1m.;1. 1 \ f y t 1 ,� \`' 3 , e� n , 1 . \..d? '\I! \1 ' iwm�#!}'�" �/ \ ,v , y } r >' 1 P A = 0_/ - _ _ :. 7 \\ 7 i J .. r 1 `, w ` `S�y^„ \ \ /� ,. \ % 0 C J e J J a , , _ L r i IMP AEA MI A = 25%_ 4 _ \ % ii/ f I _ ,-. r`\ . I _ ~_ , ` ` \\1, r ' j !' ---- _ _. PERV AR ' ��. / 1 0:2 C. ;� 1 \ , ',S/ \I/•' \�- ...1:` `J/ \' \\\ \♦ \, }\ , 1 C% _� = 25%.- ERV. AREA -75% , =20% '� - ■ . 1 - _ - - - IMP. ,4f��A 75%' , f 1r /" \ -DERV. AR M\P\\\\\\r 0.4 AC W�fLAND'S r' r , I AR 55 - 29 � AC - . %'�..\ 9 �; .,✓ `,l'' PERV. AREA -2 91i ' -75 E AR =45 ;\ - _ _ �' `.\ i i s / f' __; �/ _.,■ '\1/ \i ` . . , \b` RV. t i r r J ,1v' \ \ ,'. ' :�\I \ i ` \ r , .Q f F1 v ..i I � i�� -i t�t l�. 'A j 1, '' <t I .. I I I t } ! I '\ I I I' !r /'r- ^ ! IMP. Af�EA - 85%• - % 50i = - r-' - t , l \ _ . 1 ..I . PERV... =,15% AR - 'S ° , \ , ,>_ r.;,\ ` - 0� i' '� i ! I ; I `I ( ° •�\ ,.\i `r \i,r I' � ',., ,\ - - r - \ P V Eq iIE0 AR - �'1 ` \` \''/ \ y gyp, - �. ,� , ; t �; . Y ERV. AR -25 - IMP. AREA i ! p = _ t', f. r F ! \ t - M AR .. f _ '\ t.i: \\ y `ti,_ , /`r\\ - 50% t i i = di 5p 20 `A _ , `\\ li ,' I I I 'r j \/, • \ 0.� 1�i4� PER .AREA I I / \ `. / I 1 , / G/ l ,J \I ' \I/ I/ \/ j Y \ \ \ y q \� \ - = I r / ` 1 = ! `, I I I ; 1 I r c - , . - t p Ag f ' j , -J _ ! _r ,\ \ r E i i.. .:.� : , \ r 20% \ \ \ - _ 19 I, ' \ - -- r I i '' } \ }. , ''} t. l \V .:,j/ `ar V I , .�,: , , , _ -- ', \l ' - -I (19 A } i " rr'^\ \ I f r' Y I I I } I q\ I` 1 0 40 A i 1 ' I , . \ t ==PERV AR C. I \ i I , , i 1 I II -, s `\ t `. -'IMP. AREA = Y° } - I AR =%. 1 1 k' I I - f r I I i ` W '\r \ 1 W' `, ,`�, rr - ' ' y , Y _ = 74% 1 _ P. EA - 85° ) i , f `� ' A \t '; t, Y i \ \1; \ : ",� ,w ; \I/ I/ \ PERV, AREA =50%: - / , v % ; , I t l '\ y - I V/` 1 ` , \ , \ f } ! l ,-!✓•� _ - _ - ! ''I' I t y f r r _ r r J I I. i I I \ \ t y " \ i \\ \ ` \ "`, Y \ _ -PERV. AEA -VfA -15% } ,' , } y \ 1 r, 1 ` \ \ ` PROPOSEDg . i / r YI } \ \ :. .` ' O.d8 AC: ' =30 _ _ .. ,c-� i I , , , ; 1 I , 1 % 1 yy \ \ 1 ,^ l/ 1 j/ `1 \' \ , i r t i • - - f r t !. I• ! I I i r \ t i\ \`i \ \ , V 1 '' 3/ `1 l.; \/ \ - r / r \ STORMWATEf� , • 1. _, . v 1 ! - JJI. r� r,•' r f f1 \ `, 1 �\ ,. -- '- -- - NFAi\TAGEMENT ,' r . r' _ - '- , r !. ;i ' r , r , i y `, EXISTING PROPERTY - \\\ \ Jr, I r 1 1 \ qZ / , _ 0., '. i`'1 f .t I I r ; l00 �ff� FLOODPLAIN \ \ \ '•� \\\,,` :` / �, /` I`` \ LINE HASE 2 4/ !� / f 1 j ,5 AC. __ POND_ _ - i /' (1 I I ,I I I! i w I '1 ` \ \ \,, 'I, '\',.t\\ *. '...-'\ l T I 1 / l r f `� / BOUNDARY I' : i IMPAEA .r t r r \ 1 r ,} rr ` !. '\ I AREA = Q%' S r Y 6C°�e /' S 41 AC. _ _ / rr .r f . ; r ( y ` \ `'\ \\ \ \ \✓ IMP. o r r - -' - -- _ — f , 1..;` ,: r 1 ) / /' `i I\ '''\ I \ \ \ \ \�:' \I:' .1::. \' \jr \/ AREA - °%, / � � _ --- (' / - /' r \ IMP. AR�q 5% s r! I. ;' I / ,r` ` , \ \ \ \ PERV - �; ! r J ; i t - °i r PER AREA =35 -.. - 1 r r, .r! I . '� /` r y_ 1 \ F\ `'\ `\ \, \\ `i 0.12 AC. 11 f 1 I J 1 Y ``\ A ` IMP. = 85% ► \ \ Nv :,r \I/i j N r r ! J ! r /J I' , I .2 A % - , " = 1r' ' ,`' i'� �, t /' ) i l``\\ \ \ *` '\ ~` ,I \` \I, 'll/ ,...L:, `\l, \% ,,j;� � ! I ! J f 1 1 I - _ � -1 °,, (j , t 1 I / r \ \ ` \ , ,. 1--'-1 ! , � (1'fl / 1 I I' / __ -•\. ~`, IF, I� ! (. i - i ,i f . , I iiy �_ ^\\ } \ \ , \ I \\ f r/ I +�' ' '� ''> --- IMP. 0%_. 52 AC.-, J, 1! ``., \`\ `'\� \'\ \ . ``-\ \ \ \ \ \ \I , ,j/ •,:.j. N1 '`,1- ``,/ \a/ \:i ,\ I i' 1 ° / r PERq/. AREA = % - _ - ,`,� ". \\-\ 1- w\ \ \ `_---- \ y \ \ , r /' \ '`` I,' `� . 1 IM AREA - 60 a ./ z,lM � �A = 50% - - - --- - _ , \ \ y , i — - ' — — _ _ _ `, � E V , . / % KV. AR ,-5 %�....__._ \ . + a _ __ �, - .rr '- ♦\\tirl�rl■ \ 't y. `,_ `\ ' i \: ! \ \ \ _ r/ ! it J^ ` , ' - _ - '`\ .. - -' - - - -, _ \`, . - \� � \\ II�H \i ' I , . . , I - \\` '! `� ,t \J:: \ \✓ I'' - i \ ��_ / : ` r~ \, •!!Ire \ - �"-1 r- . `� IMP. AREA - 5d% x - ♦- •. _ \� r PERV. AREA =50% i `, -' _i a ' _ .. r ` .. - - ". 4 ♦\i 1r !1r11»1n '`•-• �\ t ` ,\ ,, ,\I ,\ \I,/ `-.j` Q.05 AC.\I/ , ` _ - r - `C„ rn v = .. - .. - I,- / - - , r. /. �// \ I!t '\ ♦ \ \ 1 ` `r ,b 1 , 7 Y ,/ ,e e --v�u�ltlll�. I • - /lrlfa - - lY�'J rr` \\� _•i.�`' - . �11 ' - - \ \ `. ( r i - / _r . \\�. (, fnh . _ - . ♦\\� - \ rti- _•- - r1♦fir `,, `' \ _ �� \ i `[i ` % \% \ \ �` l r \ , -- WETLANDS ,\♦ r1p1r \w`' \ , \� fir \ . --ti I --I �:/ ,I;` \/ \lr r t - ♦.. Ir '' "ice \ ♦ ) ` ` y r - r , 1 \ :: y ' - - �lr I - \ �. r d t / 1 �Sr 6 1 > -' - ll / y� / , \ �r1 \, f 1R, ' 100 l'R FLOODPtAIN \ ` /` / \ ~_:� ,\♦ � PHASE 2= BOUNDA''RY r ♦41 \ASI t. i J r� l\ \!;' \ j/ \ \/ '\I/ `vi \I/- \✓ ',/ \ � f' '\ '\ ` `•I r PEl!•. REA _ ,Q% /' _ _ _ _ _ ` - EI'( i ' f ~` GRADING LEGEND `` �� �� � FIrHN�µ�, \\ `, t i rd f ' y \ r / rr } }, `, i i t1 l J♦\\♦\\• � � � � � ' / \` i y r r ,I, �► `3r `\1 2 "`..1/ \� \1 ,� ,,1 "]/ `., f '�., ,fir- - _ �A\ .'\•`` 1, Y \ , .\, � �. { 1 I . 1 I i .;\.\\ � �� � i i - rr ,,' `�� V MARSH \ ` '`\ t I I t, r i ., \ Y\} � r - r \ ', \ \ I -ate_ r f. Y i f f. I / -- ice`',.-t� ,` \\ \ ` , tt \} 41 I I - _ it r. .. - - / /! .. l h 'II '' ")"1- '\3:� "-!/ \1/ `\:I/' \✓ \v' \li \-' `,;j `',j y __ \ , i 4 i - r� 1 j/ ++f++�d■!+� -~`- •\ \ };} 1 `I `� rl _ '` �I 1 i 1, �r J. /i�' _ ; t i : j }} t �.� � FLARED END SECTION ` !1 / . ,,\!, I.,: �,:_ �/ \- \✓` ,,I/ \Ifr, \,Fi \; \�/ ``�'' '\�.'' \�/ \`Y , 1\ i\ \\ \ - j ,l ti 1 %! - } 7 / +� ♦\♦� \ \ \ `\ I �/. i \} , 'i\ 1 = CATCH BASIN tt, EXISTING MARSH LINE \ , Ike . - ! \ i 1 \1 ',J.. ' \I,/ • y +la+a \1_/ \!, \11/ \;/ \j: .� �:' ',j:`• \I/ \!/ . y , �•, , i 1 BiR�IF'MINDIINAGE \j/ \Ir \ \I:` \L` `\€/ \j/ \'` -_ \ Y\\, , I t I '1rr1 ' . Y i - 1 STORM DRAINAGE 25 5' CONTOUR y i I / - / i ` i \ i i 1 \I, /y \, \� 4� = !/rr :. i\ 1 1' CONTOUR ' ♦+�s' ��♦`' \I/ I \'\ ■ - _ - _ __- _ _ -__ .- EXISTING ONTOUR \l, \/ ,L! ,,jr: \I/` .\I/ -,j/ \l,. /♦ \,,! _1 _ � 3 \ 5 C Aweo* ___ "__ - r, , ..__.:.! -.,. __ EXISTING 1' CONTOUR %` LEVEL SPREADER EXISTING PROPERTY LINE \. i `\ \' f,' )i J " \/ \yr' li S/ \f; - 1 1 \[,;' \(; i \� \L:; . ,' �...: I EXISTING WETLANDS m \� (SEE SHEET C-1 FOR i BEARINGS AND DISTANCES) / - I:� '` 1`' \✓ , / - i , \; =,; I: 1, / \ ,..1r` '\1- Ir \j:' i 0 \� ;� j/ ``/ EXISTING MARSH f . ' \{ ,. `1r' \ir. \�/, '+,y' +: , •: `' ,' •.,/ \.✓ \I,r `,.I!' _ / �"1:' \ 1 \1/ \I/' - ; % z i �s � /% \�,,:.:/,' i,`, \:: �', \,: ,�;, ,�, ,,�j,, 1 GRAPHIC SCALE 1 _�' ii 100 0 50 100 200 ,. ,4/: \I. ,,1f / Ili/ \� ,,.1/ `J/ \ ' ,\j, N\ , \I; \i/ ,.,I ,'1r �/ ! ,1; \I/ i . 1 inch = 100 ft. \� \I,/ \fir \I!' \% \'I ,f ',,,..' \_ . `✓ \}; `., , ,',j/ \4, ,.,j,:. .. 1 r 1 r . PRELIMINARY DRAWING —NOT RELEASED FOR CONSTRUCTION 7D V i U) in • e O 6--d W Z I P4 'Y O a-I•-� � , 1/ N N W ,-� � z � N Z ,-7 Y•�•-, O O bb��--��--''11 p'••I O O .--1 ,-•i W U O cc � d PZI W . m ZW O I" W (� Gl, � `,,\1111111111,1,'I I . X' CAROB 'I �� • Q ` E L 6 = �•. I .: �/�•• ,�, ��i.'CN°•• ���o 1j1111 I111\� r� N N � O i r\ W (,I W rn O O W Q Q o 0 0 z O o o ,--I (11 (n �O a C.-> '-4 N In E--+ '' `� 0 C) P in ,�V)z to x C L0 L '.L ' Q' Z W � x Fn w z W - � o I� � = — CL. z Q�x O � C� H z z �T� a $ W0 C1 U O N O z Viz- w 12 a �- 0 � a g w �w P w O A C9 W z_ 1-4 W 0 r l O U � � a 0 I '^ VS W OO 0 Uz x U Q A PROJECT NO. WDL-07020 FILENAME: WDLO7020—G6 DESIGNED BY: D J V DRAWN BY: W R B SCALE: 1 " = 10 0' DATE: 2007-08-21 SHEET N0. C-11 McA�AMS DI -Al 3 i— ez+£z x C13-007 'FV ""-- FU CB-005 CB-D08 • • — —. _ - —. — • • V iF �f ' V�FRVIE DR _ +9t 1 +Lt o +Ft ---_•+—• I t oo+st — oa+tz-- 4° CB —Al 6 00+n B C04 o + DI -Al 7 CB -Al 9 SANITARY SEWER SERVICE (TYP.) WATER SERVICE (TYP.) HIGH POINT STA = 10+93.79 HIGH POINT ELEV = 26.75 PVI STA = 10+91.32 4 RIVERVIEW DRIVE PVI ELEV = 26.88 HIGH POINT STA = 13+62.50 A.D. = 1.59% HIGH POINT ELEV = 24.89 _35 K = 40.93 PVI STA = 13+90.00 = f 35 - - — -- 00 N = 3310Q0 _ -- O II O N N 00uj s _ = = s -- II II m `D _ 0+ _ _ = _ _ HIGH POINT ST 'LEV = 18+7.5Q = _ _ _ = v~i 3 a w - N w _ r _ = .. _ g _ °' ca 0 - o m _ --- _ - --� - _- - _ - _- - - : _ _ _:- _ - --- ----- - -- _ - z HIGH POINT PVI STA = - - - 2t.33 18+75.00 _-- - -- -- - - -- -- _ _ 30 _ u - -- _ _ - -s N - - -- -- - - 0_ n > ----- > - _ _. = + n + PRI ELEV - - 1.D5 _ _ = _ = _ - __ __- _ -- a _ - -- _ - __ _� _ IL a m 3 = _ = o: _ _ _ A.D. = 1.26% t U t17 r til — - to 00 1.79 0.8 � m - w o _ _ -- _ - LOW POINT ST = 22+26.51 , " i o _m .rn _ _ ---- LOW�'OTI�T -= �4=8 25 _ = ---- - - - ---- -- - - --- --- _- =-- -- - -+N -- `� _ �� _ _ - - - _ _ - - _ -- = STA - PIVI ELEV 22+25.OQ = 14.00 25 _ `' _ _ _ tr _ _ _ - C0 > �`' vi U = : t _ A.D. K - 3.96% = - 2.96 ri 0 o -759; — V. Lo _ Ld 00 d € _ 20 _ a _ , - . - - - - - = - - - - - - - --- -- _ - _ _ —9 = - - — --- -- - - _ - = __ -- ---- --- - 00t` Oh C14-ro wr af -00 — _ O s .ro O — ro W __- - N �n U to o _ _9 \ _ U cn o- m_tt__ 3 '-rn to La m ¢� ¢� - N II r , = ow 1n c>w 1515 z _ I , , , : O _ : , , _ z 10 ry_ = 3 = E = - , _ _ -- _--- - _ - - - - ___ - - - _-_y=--- - _ - = F O = _ _ : II _ _ — — L R CP 1=010 5Z - _ _ e ' > O I II s c 5 , _ , z _ 56. LF 18" RCP ® 1.00 0 0 O 00 t 10 IN to t7 o tf) 0 o O O O cot0 00 0 0o t >7 to O to t7 0 coO 0 tf 0 c� tr) t7 O t d c� M 00 Cn O Oto fO 0 -00 Qto 00 N coco N N N N N N iN N N N N N N N I N LV ! N C14 N N N N N N NN r r r .— 0N r ON ,_ 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 5 00 5 50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 PRELIMINARY DRAWING — NOT RELEASED FOR CONSTRUCTION OWNER: WAKEfiELD. D E V E LOP M ENT C o M PAN Y OWNER: SANDLER AT SHALLOTTE,LLf; 448 VIMG DRIVE SUM 220 ' VIRGINIA BEACH, VIRGINIA 23452 PHONE' #: (757) 463-5000 THE JOHN R. McADAMS COMPANY, INC . ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 `,���tnurrrrr `� �-- R ;•_���� S.. •0< 9% ••FE ��• _ ;Q : : S = 0 6 3 p •: � '••. G NEB; • o ,: , � �• �'••• ,.,,� vg�� : ,�` jj `""'tt""`�1� PROJECT NO. WDL-07020 PLAN $� PROFILE n +' ROAD A STATION 10+00 THRU 23+50 ' SAN RID - PHASE, 1 O,r �+ 1V of w7rl L`�ll BRUNSWICK COUNTY, NORTH CAROLIlVA FII.E.NAME: WDL07020-PI DESIGNED $Y: Dw DPAiPN HY: WRB 3209 GRESHAM LAKE ROAD, SUITE 160 RA.LEIGH, NC 27615 (919)55611310 aoRlz. SCALE: " 1 = 40 j , STORM DRAINAGE REVISED PER DWO 09/20/07 �%RT. scALE: _ 4 REVISIONS DATE DA E: 2007-08-24 SaEET NO. P-1 MMcADAMS PRINT DATE: 4 STORM DRAINAGE REVISED PER DWQ 09/20/07 REVISIONS I DATE OWNER: OWNER: WAKEhELD SANDLER AT SHALLQTTE,LLC DEVELOPMENT COMPANY 448 VIIUNG DRIVE, SUITE 220 VIRGINIA. BEACH, VIRGINIA 23452 3209 GRESHAM LAKE ROAD, SUITE 160 PHO 1Ll757 463-5000 ; // RALEIGH, NC 27615 ff (919)556-4310 THE JOHN R. McADAMS COMPANY, INC. ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 ttlt11tt1►rrrr PROJECT NO. .%`� CAR '� �' ••.. A>E: ti.•• DESIGNED BY: 'Q C E DRAWN BY: 3?� O q` •.• HORIZ. SCALE: •••'� �.` VERT. SCALE: �''%`'� • J' VAS"-: �''rrrt I ... 10� I�1 DATE: _ 4+ tt 00 -- - - JLTVV 3,5+uu 33+50 34+00 34+50 WDL-07020 WDL07020-P1 DJV PLAN & PROFIL E WRB 1 " = 40' ROAD "A" 1 " = 4' STATION 23+50 THRU 34+99 2007-08-24 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION mmmk SHEET NO. P-2 SAN RIO - PHASE 2 TOWN Of SHAL [JiMeADAMS BRUNSWICK COUNTY, NORTH CAROLINA PRINT DATE: l:r.+r-rr0au1w:I.+r001nsa%lwlkll kq[vAMraaw2rilaws •mnsM@nawE:a"MEuWe OWNER:OWNERTHE WAELD. DEVELOPMENT COMPANY SANDLER AT SHALLOTTE,LLC 448 VIEING DRIVE SUITE 220 VIRGINIA BEACH, VIl2GINIA 23452 PHONE #: (757) 463-5000 JOHN R. MCADAMS C 0 MPANY, IN C . ENGINEERS/PLANNERS�SURVEYORS RESEARCH TRIANGLE PARK, NC�' P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 .`` N CAR '�. `,4.... •�A: = ? Q tiF: -: = S - 26 - ' o -•...•••'•• Q- .` '•, � ,1 VAS-�F��`� '''f1,►,1,11►1``�y ' �`7'0. VVDL-07020 PLAN &PROFILE ROAD "B" STATION 10+00 THRU 21+75 SAN RTQ - POSE 2 'T'O� of SHAL BRUNSWICK COUNTY, NOR'I`Fi CAROLINA SHEET NO. MCADAMS PRINT DATE: WDL07020-P1 DE�G�� �Y: D�� DRAWN BY: WRB HGRIZ. SCALE: » = 40' 3209 GRESHAM LAKE ROAD, SiRTE 160 �wi9)SSG43�p615 °' 'CA 1 " = 4 j, STORM DRAINAGE REVISED PER DWQ 09/2]TE DAB` 2007-08-24 REVISIONS DA y� L.IU -- =E7= - . .. _... - _ — . - _ —it I I it I - - - - --- -- - - - - - - - - - —_-_ O oo tLtV A.D. = _ 1.75� PVI ELEV- = 14.60 = O _ _ - o+ r+ r _ t _ � P'GH POINT ELEV = 15.60 ¢ - _ � � - K = 85.29 � r OV.C.c PV1_ W T _ _ - -- II II = PVI ELEV = 15.77 '- 1n w f w ao II i - - cFi�l -� ° E `(a; -- K = 92.20w,= orno �� I - > j ' - -- - € �M LO - - --- - U _ w .=� -__ri W �,� �•- _ ----+-ca Ntfj O +� d z r- �.- - - - ._ - = r� - . oo-- wloNoO as=- - - -- > ONOo �.- - - - _ 20 - - = ---rn ---- - -. - _ �. -- __ z-- af ¢ InOf rU (n M o Cq z oz q r p rw - +CD u M `� +`.t+mo c� �� Ua n cn cn� - .-w oz ¢ r it ¢z g •- II Ld 5 , m r aio �- m a OIL cn 0 m m o v a- cn > m c~i1 _in \ J -- ---- ------ 15 0.75% E _ --� 0.5 - 0� ' I 15 2 .23 LF 24" RCP ®0.9990 2.10 LF 1 _ "RCP ® 1.00% 0.757 24.24 LF 18" CP ® 0.78% I - _ - - � �. _ _ - - _- = � - �� .. - _�- = _ -�_ - -- __. - - - - -��- = 10 _ LF 3 "RCP-0- _ _ � = - �,� —• - _ _ _ - 19.45 - i - i -N _ LF 36"2CP ® 1 _ to _ 0000 z I- € 00 zO i _Il- r II r O _ = - II 11 z -- - -- - - Z - -� _ >O a £ Z O- 0 , -_ N`- N "d M n ca M M^ IN r O I� C) M O '- an Q) O OJ "N n O M =0f M m r` O §Lf) _ C7 ;� O { r 1 IcD (6 i r N c0 ;an d d - M M Er M d r `t d �- it <n r it �! r r M M r r i0 N N r r ;O r =r s(cD O € r 'O OOD. .�. jjj a) (O M ai Q1 Q) IM CO CO I O CL7 to ;CD I r - OWNER: WAK&ELD. D E V E L O P M E N T C O M PANY OWNER: SANDLER AT SHAL LOTTE LLC 448 VIIONG DRIVE, SUITE 220 v1ItGINiA BEACH, vII2GIIVIA 23452 PHONE #: (757) 463-5000 THE JOHN R. McADAMS 4COMPANY, INC . COMPANY, ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 ,`,,,�� n � n" ,,.��N CA ��' ��,: °.�oF ss oti• = L1. - - - 0 6 3 = - :� = ° ' :F� F,F;.•' i .� (NE . Q •••...•••• J. '���,,,,,,,,�.��`�(� PRorEcr xo. v WDL-07020 PLAN & PROFILE ROAD "C" STATION 10+00 TFIRU 18+50 SAN PJO — PHASE V V 1V Of SiZAli TOLOTFE BRUNSWICK COUNTY, NORTH CAROLINA WDL07020-PI DESIGNED BY - DRAB BY: WRB HORIz. scA> E: 1 " = 40' 3209 GUSHAM LAKE ROAD, SUITE 160 RALFIGH, NC 27615 (919)55&4310 VERT. SCALE: 1 " = 4' 1 STORM DRAIWE REVISED PER DWO 09/20/07 DATE: 2007-08-24 REVISIONS DATE PRF.T,TMTNARY T)PAIVTN(-- - NnT T TVT VAcr, T) 17nia CIO I\TQ PDTTrmrn7\1 OWNER: WA ELDw n E v a L o r M E N T COMPANY OWNER: SANDLER AT SHALLOTTE,LLC 448 VIKING DRIVE, SUITE 220 VIRGINIA BEACH, VIRGINIA 23452 PHONE #: (757) 463-5000 THE J 0 HN R . M cADAM S C 0 MPANY, IN C .°��QF ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 . CAR '' ` '• • '� - SS ��� '; A _ 6 N ��;�' •• (' NE.. Q . %C-�'• •• � .` � � ,���''�. J vAL%;:`'��lqy PROJECT NO. WDL-0702' PLAN &PROFILE ROAD Itch STATION 18+50 THRU 25+23 SHEET NO. SAN RIU - PHASE 2 TOWN Of cu T JiMeADAMS 1 �+�Y 1V S lAL PRINT DATE: BRUNSWICK COUNTY, NORTH CAROI�� DE�G,� BY: DJV DP -kW, BY. WRB 3209 GRESHAM LAKE ROAD, SUM 160 RALEIGH, NC 27615 (919)556-4310 HCRIz. SCALE: + - 40' I�L STORM DRAINAGE REVISED PER DWQ 09/20/07 tiT. SCALE: ++ 1 = 4' REVISIONS DATE DATE: 2007-08-24 RIVERVIEW DRIVE GRAVITY SEMTER _35 LAJ 0 ?7= 6 4 ry rl) el*' < Ll ,30 < + C14 CENTERL-INE---CF--PIPE--AT---�t 00 it EXISTING GROUND 6 can co (n Xm Lr_ 0 cq 06 q < 0 Ld U) _j i�4 25 U) x LJ 14 En 0 00 Q ci 0 0 CENTERLINE' OF PIPE AT r V) V) 0 m L) C) < 0 a) LO + 0 0 ro M CENTERLINE OF PIP AT CO CO Q_ L —115" RCP FINISHED GRADE M m < �7_ 0 > It 20 0 n .0— u� M + T- V) V) V) w + 04 z V) < U) < 0 —4 cn x z > A CENTERLINE OF PIPE AT t FINISHED GRADE 15 150.E LF VL 6" X 20' CONCRETE CISING (TYPE) LO U) 2 z F- 11 11 It r-i vi > �2 1 11 11 U z ux 10 C14 a ZZ > Kz' Iz 159.43 1 LF 8' PVC !> 0 0 A K-K > e lz> 48" RCP — f I > > ---------- z Z 5 — Z z _F m m 0 -0) 00 �lm 04 co In Lr) 04 L0 .00 _(D ro m n ic) L0 0 04 (0 (D lc:) 0 0 to lc io ti C14 0 10 0 _0 0 lZ LO CIO 0 a 0 ic 04 lo if) !0 cs C) i C6 Ao L6 A6 Lri L6 t-i 1 4 r1i vi ei 10 0 1 c� . N I c 0 c; 0i 06 106 (6 IC6 (0 104 Z _.cll 0 04 N C14 ;C'4 C4 t 04 C44 04 C14 04 N C*4.. icq 04 C14 04 04 icq 04 Cl4 C4 _rl4 L0 _(0 04 --A 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 2__ 1- -5 6 22+00 22�50 23+00 Rh►TERVIEW DRIVE GRAVITY SE�iTER 35 ALLEY A - GRAVITY QUTFA.LL 30 35 35 ALLEY A - GRAVITY UUTFALL I C14 Li 35 30 35 K uj E-4 r 0 -00 uj -1 0 En 0 06 CENTERLINE OF PIPE AT CE 0 0 < u") 00 Imo}. -q- + C'4 fr co n < (0 00 c; 6 < 0 olq _j <7 04 30 u- 0 -0 cr 00 co (6 0 0 . ...... L E-4 LfNf— PE AT 9 v) V) Wl Lr_ '..j CENTERLINE OF FIPE AT OUNP C) U') U) 0 .1- 9 FINIS ED GRADE d EXISTING GR 0 > Lo IN 0 t6 0� r-1 to 1 10 to V)- < U) co _c%l < + N + C'4 It Ld r� 04 _j ') : :7! L F PIPE 20 < + 04 15 CENTER 2Ea LINE 0 20 �--EXISTING�GROUND Ff — V V) < (n w 0 PVC a 0.60% 139.02 Lj PVC @ CN .6(0) PVC PIPE AT LO CENTERLINE OF in 0 20 20 15 -GRADE 15 E4 0 (6 L6 20 > 1L.J 0 Z CONCRETE CASING LO > z > z I b)Z.On IF __pVc @ 0.40%. > CENTERLINE PF PIPE AT zz� 5 15 15 10 7:0310 STING- -GROUN D - - -- ---- EXIST zz> c6 r t -Irl, C14 z U') LO LO 0 G > 0 > > ni Z§ 10 0 5 5 00 .10 cq CD r4 eq 0) cu C� 04 04 4 14 4 4 'c6 F -0) C14 rD C14 to IN un LO 0) a) Ho 0) 0 to to 10) ic� q 04 a) cq to Ln '0 ci U0, U0, LO rl- 00 00 a6 i CN to 04 to to _JC14 C*4 04 -—N- cq N cq jcq cq 04 cq cq cq (N C14 N 04 N c'4 cq 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 10+50 11+00 11+50 12+00 12+50 13+00 10+50 11+00 11+50 12+00 12+50 un IN rn I g , E � - --- ¢� _ cs II Il II cti ro PRELI INAPY IlPAWTNlji-_ — NTi-)T DVTLlAQT4-T) UnT.) OnNTO OWNER: WAWIELD DEVELOPMENT COMPANY OWNER: AT SHALLOTTE,LLC 448 VIKING DRIVE, SUITE 220 VIRGINIA BEACH, VIRGINIA 23452 PHONE #: (757) 463-5000 THE JOHN R. McADAMS X L_x COMPANY, INC. ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709 —4005 (919) 361-5000 % C % 4, *% s 3 6 3 i z N ...e . '$ /1 J. ff I J, P% PFOJECF NO. nL-07020 PLAN- & PROFILESANDLER PROFUM - SANITARY SEWER SYSTEM RIQ SAN PHASE 2 TOWIN of SHALIA)TIE BRUNSWICK COUNTY, NORM CAROLINA TKUCZION SF= NO. p -6 JiMcADAMS - DATE: =NAME: WDL07020—P6 DESIGINED BY: DJV DRAWN BY: WRB 3209 GRESHAM LAKE ROAD, SUM 160 RALEIGH, NC 27615 (919) 55&A310 HORIZ. SCALE: 1 40' 1 VERT. SCALE: 4' REVISIONS DATE DATE: 2007-08-21 RIVERVIEW DRIVE GRAVITY SEWER OUTFACE 1 U-ruU 1 0*r1ju I zi-t-uu I a-t-ou zu+uu 20+50 21+00 21+50 22+00 CONDO SEWER FORCEMAIN OUTFALL CENTERUNE OF QNISHED G R, n- EE PIPE AT 15 .0 -7� 15 m LCENTERLINE OF (PIPE AT t fff;IG (3RADE.---- . .... .. 10 --- ----- --- - E)(STING GRNDE 16" L SAqITARY SEWER CLEARANAE FORCE MAIN (MIN.) 5 5 O fC'4 N (6 0 100 0 of L2 0 10 T 0 .0 Lr5 96 10+50 11+00 11+50 12+00 SANITARY SEWER FORCEMAIN OUTFACE ? 1i n = 20 20 RUNE OF P CENTE PE AT Es FIN SHLU GRADE 0 m 15 V 15 3'-CLEARAMIF r—A" qANITAI?Y (MIN.) RCP FORCE MAIN ------------ 10 10 ---------- ------------ ---------- (MIN.) CENTERLINE OF PIPE AT EXb11NU UHQUNU A 3' CLEARANCE 5 �Mftj 5 LO L0 n -0 to C14 LO -'0 0 0 LO 0 0 0 0 0 00 04 N 0) C6 .10 Ln C14 a; 0 LO a; C6 C6 Mo r- m OD :c; C14 Eli C-4 rn r-i r1i 17 N C14 CD 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 OWNER: OWNER: THE JOHN R. McADAM it WA ELDW SANDLER AT SHAI.LOTTE,UCOMPANY, INC. C COMPANY, X Q E V E LOP PA E NT CO M PA N Y, 448 MING DRIVE, SUM 220 ENGINEERS/PLANNERS/SURVEYORS J VIRG-FiJA BEACH, VIRGINLA 23452 3209 GRESHALE GH, M LAKE NC 27RD, SUITE 160 RAOA615 PHONE #: (757) 463-5000 RESEARCH TRIANGLE PARK, NC 11 (9 19) 55&-43 10 P.O. BOX 14005 ZIP 27709-4005 REVISIONS DATE 1 1 (919) 361-5000 Ti Ills,,, Is, PROJECT NO. WDL-07020 S-\ \,\ C 0/ N A-14E - . ....... WDL07020—P7 % DESIGNED BY: DJV L DRAWN BY: WRB 3 2 EORIZ. SCALE: 11 % 1 40' ....... J. VERT. SCALE: 1 4 11111111- 01P DATE: 1 2007-08-21 L<� ALLEYGRAVITY"B" SEN'k7ER OUTFY�L'L 25 0 cl __j 25 "o 06 0 '0 C6 0 <- M + U LO CENTE LINE OF PIRE AT 0 0 00 00 FINISHED GRADE 20 CENTERLINE OF PI F E AT to u') --jj < U) w m + cn "wl V) V:) cvn) w m < Ti- 15 15 % CONCRETE CONCRETE CAST NG L ?2 LF 8 PVCj Z4 �� 142.08 �Ilpvc _PVC ®0 A+ % 4) U) LO 14 8 PVC 0.40% , C14 10 CONCRETE CASINrn > IL > -1 > > Z 3) 5 5 Z> > m m 0 -04 Oq NCA �cq cy) ,d CA10 cy) Ln 00 00 (c) Ro 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 11-ELIAMNANY IJEAVYINU — NOT R1:1,EASED FOR CONSTRUCTION NO. P-7 No PLAN & P173f"'IFIT IM P-7 JEkki J-djUd SAN RIO PHASE 2 ms PROFILES - SANITARY SEWER SYSTEM TOWN of SHALLO= JiMeADAMS I BRUNSWICK COUNTY, NORTH CAROLINA PANT DATE: SDOF Bl 25 25 SDOF Al SDOF A2 SDOF A3 SDOF A4 20 0 20 25 25 25 25 25 25 ED ato 0+00 0+50 1+00 1+50 0+00 0+50 1+00 1+50 0+00 0+50 1+00 1+50 0+00 0+50 0+00 0+50 1 +00 1 +50 2+00 Ai SDOF B3 SDOF B4 SDOF B5 SDOF B2 25 25 25 25 25 25 30 30 oc 0+00 0+50 1+00 1+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 0+00 0+5a 1+00 r 1+50 0+00 0+50 1+00 1+50 2+00 2+50 3+00 tri ' EXISTING GRADE N o��II ¢ + ROPOSED{GRADE o � 15 I 15 O i O O O p o? � t E ! 10 oh 10 Wp 0 F¢--� 175.44 L I p � M I it m m c0 � r- O� 0 � z�� _ z z a > � Z Z —5 —5 Obi�tf� C1� 0 EXISTING GRADE PROPO ED GRAD 0 25 25 0 00 1 rn 0 i o rn O r-m + N� m T i N O it 0 i 20 I o �� o� (n� 20 -- I I P p .00% i 1 15 �LF 18„ R P Q 1.0 % � 15 -- �^ t it I mm � p z M m m m � uo ( " � 10 _10_zr pocfl Z z�r z zz >> zz 5 5 ---- ((( �rn O — N O tD M O 1� � O O O Irn of r c0 N N N M M M M M L N _�__--_ N 'N N — iN -- N 'N N {N N N N N PROPOSED GRADE EXITING GR l i ( I o o o _ o ? �i —20 0 20 o coo . —� -- - � � --- -- o ¢ � I O (n (n tY 7 { 15 _ 15 (_ t a 3 1 -- � L.� � "RCP � 1.00 ° a 4.98 �5„ RCP ® 1. ° � 7 1a 1a > Z ptn M�� I d 1 N N E i Z j » > 1 { ! i l 1 0 0 .O N •M i h 't0 ;M 1 O M ,N N � o 0 -� EXISTING GRADE i � i O o PROPO ED GRAQ o i I "� r; 20 0 rl CO t m + 20 co h r cfl m + ms_ t I I I 15 � ( { i 15 � I � 133.21 F 18 R t i -- � co r � { Nmm 10 �! 0 10 Z � I O rn i 1 z II 11 � 5 m m { 5, II p t zz i ! zz 0 - i { o � N c0 �M a� id' O) �� c0 `•� � O -- O- cD c0 co r h � o� cU a0 r r r P OPO�ED GRAD i EX STING GRADE O o � 20 � N 20 --- 0o o r rn Q il- o I o� � O � `� + m U O H to to ¢ p 15 15 — g .83 LF .0 % to ^ ^ O 10 N N ¢_¢ n 10 II �� � O d' d- � > z�`- Z Z } f 5 > z z z 5 0 � 0 I I N tb � � � �� tb i p 3 i EXISTING GRADE 0 20 � PROPOSE GRADE ¢ � � i ,M� 20 om_om + Io¢� �cn �m mo I I 00 I�oli �O —1 0 1,_ � cn � 1 a 120.00 LF 1 g.05 LF �8 c I ' 5 t � I O m m ' m { O cD et- t N p� Z h O i Ii 0 _ z> _ 5 t —5 ±o " i o o EXISTING GRADE o o PROPOS D GRADE o 2a N� r00 �O�t + 20 �m+ MM� Ion — m IOF� I 15 1 15 8LF15.'RPp1.OP° �p h CO Nmm. Z ! � Z O M N I Z II II Z Z 5 zz � 5 rn c[> N o0 i r ahp co I ! ' ! ROPOSEU GRADE EXISTING GRADE T 0 2a _moo — -sr moo 10 II-! U(n tn� 15 15 56. 1 LF ( 15" RCP 1. 15" RG � r i 1a �m Imo`. O tCi cD d' N — �mm z 5 >aN z 5 ..— zz zZ a a_ �� :M N o d- (o I� N a � M r id- t� E M ! o t}- _ OWNER: WAU ELDTu DEVELOPMENT COMPANY OWNER: SANDLER AT SHALLOTTE,LLC 448 VIHING DRIVE, SUITE 220 VIRGINIA BEACH, VIRGINIA 23452 PHONE #: (757) 463-5000 (�, g� ��v+ THE J 0 HN R . M CADAM S C OIVII�ANiT, INC.= ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709-4005 (919} 361-5000 �,,,,,,,,,� .�`���N ••CAR ��''�.� O� •F SS • '•.• �, :�O ._ ?:a� E L �•;• 0 23 r '•.;l'• ►NE��''•� ; �''�, J••VA������I��� �,,��1����.��`I 'v' PROJECT NO, WDL-07020 PLAN &PROFILESANRI PROFILES - SANITARY SEWER SYSTEM Q - PHASE `� TOW1V of SHALLOTTE BRUNSWICK COUNTY, NORTH CAROLINA SHEET NO. Q P i V FH.ENAIE: WDL07020-SDPP DESIGNED BY: DJV DRAWN BY: WRR JiMcADAMS PRINT DATE: 3209GRESIIAMLAKE ROAD, SU1'CE160 RALEIGH,NC 27615 (919)5564310 HORIZ. SCALE: > 1' = 4a STORM DRAINAGE REVISED PER DWO 09/20/07 VERT. SCALE: _ 1 4 REVISIONS DATE DATE: 2007-08-21 SDOF B6 2,15 PROPOSEDi GRADE 0 EXISTING GRADE C? 0 0 20 00 C" a 20 +I 2", M + ML_ 10 ED I Cks U 0 U) U) Of (n U) a 36.43 LF 15 iu 15" RCP 0 0.75% T 15 9. iL 124.1-9 _F 1 75"RCP 04757 o 075% LF 15" IRCP Lo C4 ^I 10 ENO 04 M �l 0 0- c*4 > o O > z z If If z 5 Z Z > z 5� z 0 co In ici t-.,R 0) 10 c� �0) i o 30 25 15 10 5 %J-ruu u-t-ou 1+00 1+50 SDOF B7 PROPOSED GRADE --i I r) rl EXISTING GRADE C; c Lo Lf coo M + 20 0 07 + 0 11 m o In v) Y V) (n a _12— 15 -73.50 15 c� 00— rn rn II 10 5 U) U-) 10 > > z 5 1 5 lrn !C*4 0+00 0+50 SDOF C3 PROPOSED GRADE 1 EXISTING GRADE 0 0. n 0 C14 c e 0 u+ O II =Cco--) Lo 0 + M 0 to In I 0 IL M ICI U LL- co 7m 0 FEZ - 0v)(r ov)0 V) . . . ............ . ... M 14 �LF 1 RCP me F is" RCP 0 0.76% ---------- C-) 0IILu c) 0 0 0 o coo Q 0 Q m m 0 C) > :D 0 Lo T_ z C) GO > c6 > z > �> gz V) 00 Kc) no It L0 kq co pe) 0 L0 to 04 .0 04 04 104 C5 CNI 00 irl� 06 loti 06 a; c; 04 04 c - I __ 1 -rvv I -t-ov z+uu 2+50 3+00 3+50 SDOF B8 0+00 0+50 4+00 4+50 5+00 5+50 OWNER: OWNER: THE JOHN R. McADAM SANDLER AT SHALLOTTE,LLC COMPANY, INC. WA ELDT� I I DEVELOPMENTCOMPANY448 VIKING DRIVE, SUITE 220 ENGINEERS/PLANNERS/SURVEYORS STORM DRAINAGE REVISED PER DWQ 10/17/07 of VERGINU BEACH, VIRGE41A 23452 3209 GRESHAM LAKE ROAD, SUITE 160 STORM DRAINAGE REVISED PER DINO 09/20/07 RALEIGH, NC 27615 PHONE #: (757) 463-5000 RESEARCH TRIANGLE PARK, NC 7 REVISIONS DATE (919) 5564310 P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 25 20 15 10 5 SDOF Cl 0+00 0+50 1+00 1+50 2+00 SDOF C2 0+00 0+50 PROF c SDOF D2 0+00 " RCP 0 8.75% G GRADE SDOF DI 0 30 EXISTING GRADE co en PROPOSED GRADE (6 0 Q ib cl a U- 0 0 q 0 % Lo W) 0 < m a C-) US riM to k� ul C4 a a) cq _C4 (D (3) + Lo 25 L6O L Iq JE 00 zi m cl, ce C�d oj + 0 11 oa 0 + LL- Lc) + in US irl ;k V) Of n 0 0 LLJ_ N 11 op m 0 C U) of 0 U) 21. 16 LF 18" RCP 0 1.04A.' 60.50 L RCP 0 F 20 I'00% 0 c� 125.96 U Lo CD 00 + 0 26.20 LF 94.67 L. F En D 24" RCP 0 1.3070 60.67 U p gp Li LL F Rcp 0 j.01% ------ 00 0 15 RCP. 0 1.00% )4" R Cq CO •C) F- 24" RCP 1p 1.027* (a 1 if 5 07 T C3 > 0) H F_ 0 > 0 0 z A II F- 0) Ld ro LL_ Lo z: > C14 rD z z 10 > z > if z > z > Z z > > z 5 co 0! i 04 cq to lo �w a to lco - .0 00 00 lco ro 00 ic,4 .0 cq cq 00 C*4 cq cq cq c"I C4 ui Lo cq LN tolA cq 104 Lo 1C -4 ui C4 I I I I I 11 PROJECT NO. WDL-07020 s CAR . ........ 01.1 •S/ % FnENAME: WDL07020-SDPP DESIGNED BY: D J V J I 1� A 0 DRAWN BY: WRB HORIZ. SCALE: 40' % � VERT. SCAM: = 4 DATE: 2007-08-21 -r%ju I _rju z-t-uu z+ou J+uo 3+50 4+00 PLAN & PROFILE PROFUM - SANITARY SEWER SYSTEM CATT T3 T t"*% 4+50 5+00 5+50 PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION SHEET NO. P-9 - PHASE 2 Ji TOWN of SHALLOTIE McADAMS BRUNSWICK COUNTY, NORTH CAROLINA PRINT DATE: S'PORMWATER WATER QUALrlY POND CON GENERAL NOTES 1. PRIOR TO CONSTRUCTION, THE ON -SITE GEOTECHNICAL ENGINEER SHALL VERIFY THE SUI TABILTTY OF THE PROPOSED BORROW AREA/FILL FOR USE IN THE DAM EMBANKMENT/KEY TRENCH. 2. THE ON -SITE GEOTECHNICAL ENGINEER SHALL INSPECT THE KEY TRENCH EXCAVATION PRIIOR TO PLACEMENT OF ANY BACKFILL WITHIN THE KEY TRENCH. IF THE CONTRACTOR CONSTRUCTS; AND COVERS UP THE KEY TRENCH PRIOR TO INSPECTION, THEN THE KEY TRENCH SHALL BE UNCOVERED AND TESTED AT THE CONTRACTOR'S EXPENSE. 3. THE CONTRACTOR SHALL REFER TO THE LANDSCAPE PLAN FOR THE PERMANENT PLANTING PLAN/SCHEDULE. PLEASE NOTE THAT NO TREES/SHRUBS OF ANY TYPE MAY BE PLANTED ON THE PROPOSED DAM EMBANKMENT (FILL AREAS). 4. DURING THE INITIAL STAGES OF CONSTRUCTION, THE WATER QUALITY POND MAY BE USED AS A SEDIMENT BASIN FOR EROSION CONTROL PURPOSES. IF SO, THE CONTRACTOR SHALL FOLLOW THE GENERAL CONTRUCTION SEQUENCE BELOW: A. THE CONTRACTOR SHALL CONSTRUCT THE ENTIRE FACILITY (PERMANENT OUTLET STRUCTURE, DAM, KEY TRENCH, ETC.) WITH THE EXCEPTION OF THE INTERIOR WATER QUALITY POND GRADING. THE INTERIOR GRADING WILL BE CONSTRUCTED ONCE THE EROSION CONTROL PHASE IS COMPI ETE. B. THE TEMPORARY DRAWDOWN RISER SHALL BE CONNECTED TO THE PERMANENT 8"0 DIP DRAIN PIPE. C. ONCE THE UPSTREAM DRAINAGE AREA IS STABILIZED AND THE EROSION CONTROL INSPECTOR APPROVES THE REMOVAL OF THE SEDIMENT BASIN, THE CONTRACTOR SHALL REMOVE THE TEMPORARY DRAWDOWN RISER AND CLEAN -OUT THE BASIN. ALL SEDIMENT, TRASH, ETC. SHALL BE DISPOSED OF PROPERLY (I.E. - PLACED IN A LANDFILL) AND NOT STOCKPILED IN AN AREA WHERE WATER QUALITY COULD BE ADVERSELY AFFECTED. D. ONCE THE BASIN IS CLEANED OUT, AND ALL EROSION CONTROL DEVICE REMOVED, THE CONTRACTOR SHALL CONSTRUCT THE INTERIOR GRADING SHOWN ON THIS SHEET. E. ONCE THE GRADING IS COMPLETE, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION AND AN AS -BUILT SURVEY PRIOR TO INSTALLATION OF THE WATER QUALITY POND PLANTS. IF THE CONTRACTOR PLANTS THE PROPOSED VEGETATION PRIOR TO AN AS -BUILT SURVEY (AND SUBSEQUENT APPROVAL), ANY CHANGES TO THE GRADING / RE -PLANTING OF PLANTS WILL BE AT THE CONTRACTOR'S EXPENSE. F. ONCE THE ENGINEER HAS APPROVED THE AS -BUILT GRADING, THE CONTRACTOR SHALL PLANT THE PROPOSED WATER QUALITY POND PLANTS SHOWN ON THE LANDSCAPE PLAN FOR THIS FACILITY. G. AFTER COMPLETION OF THE PLANTING, THE LANDSCAPE CONTRACTOR SHALL PROVIDE A LETTER TO THE ENGINEER CERTIFYING THAT THE PLANTS HAVE BEEN INSTALLED PER THE APPROVED WATER QUALITY POND PLANTING PLAN. 5. IF THE INFILTRATION RATE IS GREATER THAN 0.01 IN/HR, IN ORDER TO HELP MAINTAIN A PERMANENT POOL, THE CONTRACTOR WILL NEED TO INSTALL A CLAY LAYER OR A PERMANENT GEOSYNTHETIC CLAY LINER A MINIMUM OF 1-FOOT BELOW THE LOWEST GRADE OR 1-FOOT BELOW THE BOTTOM ELEVATION OF THE ROOT BALL FOR THE PROPOSED PLANTINGS (WHICHEVER IS GREATER). IF A GEOSYNTHETIC LINER IS CHOSEN, THE LINER SHALL BE BENTOMAT CL BY CETCO LINING TECHNOLOGIES OR ENGINEER APPROVED EQUIVALENT. 6. THE GRADES SHOWN ON THIS PLAN ARE FINISHED GRADES. IF THE EXISTING SOIL LAYERS IN THE PROPOSED WATER QUALITY POND (AFTER EXCAVATION) ARE NOT DETERMINED SUITABLE Bl A LANDSCAPE PROFESSIONAL FOR THE FUTURE WATER QUALITY POND PLANTINGS, THE CONTRACTOR SHALL OVEREXCAVATE THE INTERIOR PORTIONS OF THE WATER QUALITY POND (FROM THE NORMAL WATER SURFACE ELEVATION TO THE BOTTOM) BY 1-FOOT. THE CONTRACTOR SHALL THEN BRING THE WATER QUALITY POND AREA TO THE FINISHED GRADES USING THE TOPSOIL STOCKPILED ON -SITE. THE OVER EXCAVATION WILL ALLOW FOR BETTER PLANTING CONDITIONS FOR THE PROPOSED WATER QUALITY POND PLANTS. 7. ANY REMOVED TOPSOIL SHALL BE STOCKPILED FOR USE IN PLANTING (SEEDING) ON THE DAM EMBANKMENT ONCE FINAL GRADES (AS SHOWN ON THE GRADING PLAN) HAVE BEEN ESTABLISHED WITH COMPACTED FILL. PRIOR TO TOPSOIL INSTALLATION, THE CONTRACTOR SHALL SCARIFY THE THE TOP 2"-3" OF THE BERM SECTION TO PROMOTE BONDING OF THE TOPSOIL WITH THE COMPACTED FILL. THE TOPSOIL DEPTH SHALL RANGE FROM 3"-4" ON THE DAM EMBANKMENT. S. THE CONTRACTOR SHALL FURNISH, INSTALL, OPERATE, AND MAINTAIN ANY PUMPING EQUIPMENT, ETC. NEEDED FOR REMOVAL OF WATER FROM VARIOUS PARTS OF THE STORMWATER WATER QUALITY POND SITE. IT IS ANTICIPATED THAT PUMPING WILL BE NECESSARY IN THE EXCAVATION AREAS (I.E. - KEY TRENCH). DURING PLACEMENT OF FILL WITHIN THE KEY TRENCH (OR OTHER AREAS AS NECESSARY), THE CONTRACTOR SHALL KEEP THE WATER LEVEL BELOW THE BOTTOM OF THE EXCAVATION. THE MANNER IN WHICH THE WATER IS REMOVED SHALL BE SUCH THAT THE EXCAVATION BOTTOM AND SIDESLOPES ARE STABLE. BERM AND SOIL COMPACTION SPECIFICATIONS 1. ALL FILL MATERIALS TO BE USED FOR THE DAM EMBANKMENT SHALL BE TAKEN FROM BORROW AREAS APPROVED BY THE ON -SITE GEOTECHNICAL ENGINEER. THE FILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, WOOD, STONES GREATER THAN 6", AND FROZEN OR OTHER OBJECTIONABLE MATERIAL. THE FOLLOWING SOIL TYPES ARE SUITABLE FOR USE AS FILL WITHIN THE DAM EMBANKMENT AND KEY TRENCH: ML AND CL. IF OTHER SOIL TYPES ARE DETERMINED TO BE SUITABLE BY THE ONSITE GEOTECHNICAL ENGINEER, DOCUMENTATION SHALL BE RETAINED FOR FUTURE AS -BUILT SUBMITTALS. 2. FILL PLACEMENT SHALL NOT EXCEED A MAXIMUM 8" LIFT (UNCOMPACTED). EACH LIFT SHALL BE CONTINUOUS FOR THE ENTIRE LENGTH OF EMBANKMENT. BEFORE PLACEMENT OF FILL FOR THE BERM SECTION, ALL UNSUITABLE MATERIAL SHALL BE REMOVED AND THE :SURFACE PROPERLY PREPARED FOP, FILL PLACEMENT. 3. ALL FILL SOILS USED IN THE EMBANKMENT / KEY TRENCH CONSTRUCTION SHALL BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM-698). THE FILL SOILS SHALL BE COMPACTED AT A MOISTURE CONTENT WITHIN -1 TO +3 PERCENT OF ITS OPTIMUM MOISTURE CONTENT. COMPACTION TESTS SHALL BE PERFORMED BY THE ON -SITE GEOTECHNICAL ENGINEER DURING CONSTRUCTION TO VERIFY THAT THE PROPER COMPACTION LEVEL HAS BEEN REACHED. THE FILL SHOULD BE COMPACTED USING A SHEEPSFOOT TYPE COMPACTOR. IN ORDER TO PREVENT DAMAGE TO THE PIPE, NO COMPACTION EQUIPMENT SHALL CROSS ANY PIPE UNTIL MINIMUM COVER IS ESTABLISHED ALONG THE PIPE. 4. THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH REPORTS TO VERIFY THAT THE DAM EMBANKMENT MEETS THE SPECIFIED COMPACTION REQUIREMENTS. COMPACTION REPORTS WILL BE NEEDED DURING THE AS -BUILT CERTIFICATION PROCESS FOR THIS STORMWATER FACILITY. THEREFORE, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE COMPACTION TESTING AND TO ENSURE COMPACTION TESTS ARE PROPERLY PERFORMED DURING CONSTRUCTION. 5. TESTING OF THE NEW FILL MATERIALS SHALL BE PERFORMED TO VERIFY THAT THE RECOMMENDED LEVEL OF COMPACTION IS ACHIEVED DURING CONSTRUCTION. THEREFORE, ONE DENSITY TEST SHALL BE PERFORMED FOR EVERY 2,500 SQUARE FEET OF AREA FOR EVERY LIFT OF FILL OR AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. 6. TESTING WILL BE REQUIRED ALONG THE 24"0 0-RING OUTLET BARREL AT A FREQUENCY OF ONE TEST PER 25 LF OF PIPE PER VERTICAL FOOT OF FILL OR AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. STATEMENT OF RESPONSIBILITY ALL REQUIRED MAINTENANCE AND INSPECTIONS OF THIS FACILITY SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER'S ASSOCIATION, PER THE EXECUTED OPERATION AND MAINTENANCE AGREEMENT FOR THIS FACILITY. STRUCnON SPECIFICATIONS CONSTRUCTION SEQUENCE 1. PRIOR TO CONTRUCTION, THE OWNER SHALL OBTAIN A LAND DISTURBING (GRADING) PERMIT FROM NCDENR AND AN APPROVAL TO CONSTRUCT FROM THE TOWN OF SHALLOTTE AND ALL OTHER APPLICABLE AGENCIES. 2. INSTALL ALL SEDIMENT AND EROSION CONTROL MEASURES PER THE APPROVED SEDIMENT & EROSION CONTROL PLAN. THE CONTRACTOR SHALL MAINTAIN ALL APPROVED SEDIMENT AND EROSION CONTROL MEASURES THROUGHOUT THE ENTIRE PROJECT, AS REQUIRED. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE EROSION CONTROL INSPECTOR, AS REQUIRED BY GOVERNING AGENCIES, PRIOR TO ANY CLEARING. 3. CLEAR AND GRUB AREA WITHIN THE LIMITS OF THE PROPOSED DAM CONSTRUCTION. ALL TREES AND THEIR ENTIRE ROOT SYSTEMS MUST BE REMOVED FROM THE DAM FOOTPRINT AREA AND BACKFILLED WITH SUITABLE SOIL MATERIAL. THE BACKFILLED AREAS SHALL BE COMPACTED TO THE SAME STANDARDS AS THE DAM EMBANKMENT. THE REMAINING AREA OF THE EMBANKMENT SHALL BE STRIPPED TO A SUITABLE DEPTH AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. ANY RESIDUAL SOILS TO BE LEFT IN PLACE MUST BE WELL SCARIFIED TO PROMOTE BONDING OF THE NEW EMBANKMENT FILL. NO EMBANKMENT MATERIAL SHALL BE PLACED FOR THE DAM OR KEY TRENCH UNTIL APPROVAL OF THE DAM SUBGRADE / TRENCH IS OBTAINED FROM THE ON -SITE GEOTECHNICAL ENGINEER. 4. EXCAVATE FOR THE NEW KEY TRENCH ALONG THE CENTERLINE OF THE PROPOSED DAM EMBANKMENT. THE TRENCH SHALL EXTEND A MINIMUM OF 5 FT BELOW EXISTING GRADE AND SHALL HAVE A MINIMUM BOTTOM WIDTH OF 5 FEET. THE KEY TRENCH SIDESLOPES SHALL BE A MINIMUM OF 1:1 (H:V). DEPENDING UPON ON -SITE SOIL CONDITIONS ENCOUNTERED DURING EXCAVATION, THE ON -SITE GEOTECHNICAL ENGINEER MAY VARY THE DEPTH AND DIMENSIONS OF THE KEY TRENCH AS DEEMED NECESSARY. THE ON -SITE GEOTECHNICAL ENGINEER SHALL RETAIN DOCUMENTATION OF ANY VARIATION FOR FUTURE AS -BUILT SUBMITTALS. 5. BEGIN PLACEMENT OF BACKFILL WITHIN THE KEY TRENCH. THE KEY TRENCH SHALL BE COMPACTED TO THE SPECIFICATIONS LISTED ITEM 3 OF THE SECTION TITLED "BERM SOIL AND COMPACTION SPECIFICATIONS." THE KEY TRENCH SHALL BE TESTED PER THE SPECIFICATIONS LISTED IN THAT SECTION. 6. PRIOR TO INSTALLATION, SUBGRADE CONDITIONS ALONG THE SPILLWAY PIPES SHOULD BE EVALUATED BY THE ON -SITE GEOTECHNICAL ENGINEER TO ASSESS WHETHER SUITABLE BEARING CONDITIONS EXIST AT THE SUBGRADE LEVEL. SHOULD SOFT OR OTHERWISE UNSUITABLE CONDITIONS BE ENCOUNTERED ALONG THE PIPE ALIGNMENTS, THESE MATERIALS SHOULD BE UNDERCUT AS DIRECTED BY THE GEOTECHNICAL ENGINEER. THE UNDERCUT MATERIALS SHALL BE REPLACED WITH ADEQUATELY COMPACTED STRUCTURAL FILL, LEAN CONCRETE OR FLOWABLE FILL AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. 7. IN ORDER TO HELP PROTECT THE SOIL SUBGRADE FROM DETERIORATION (DUE TO EXPOSURE, RAINFALL, SEEPAGE, AND RUNOFF) BEFORE THE CRADLE CAN BE POURED, IT IS STRONGLY RECOMMENDED THAT A 3" TO 4" THICK CONCRETE MUD MAT BE POURED OVER THE SUBGRADE ONCE IT IS APPROVED BY THE ON -SITE GEOTECHNICAL ENGINEER. THE MUD MAT WILL ALSO PROVIDE BEARING FOR THE BLOCKS THAT TEMPORARILY SUPPORT THE SPILLWAY PIPE UNTIL THE CRADLE CAN BE POURED. THE METHOD OF BLOCK SUPPORT FOR THE PIPE PROPOSED BY THE CONTRACTOR SHOULD BE SUBMITTED TO THE JOHN R. McADAMS COMPANY FOR REVIEW. 8. BEGIN CONSTRUCTION OF THE NEW EMBANKMENT. FILL MATERIALS SHALL BE PLACED IN MAXIMUM 8' THICK LIFTS PRIOR TO COMPACTION, UNLESS DIRECTED OTHERWISE BY THE ON -SITE GEOTECHNICAL ENGINEER. FILL LIFTS SHALL BE CONTINUOUS OVER THE ENTIRE LENGTH OF FILL. IF IT IS NECESSARY, THE EMBANKMENT FILL MATERIAL WILL BE OVERBUILT IN HORIZONTAL LIFTS AND CUT BACK TO FINAL GRADE IN ORDER TO ACHIEVE PROPER COMPACTION. 9. AS CONSTRUCTION OF THE EMBANKMENT MOVES FORWARD, IT WILL BE NECESSARY TO INSTALL THE CONCRETE CRADLE. THIS MAY BE CONSTRUCTED USING ONE OF THE FOLLOWING METHODS: A. IF THE PROPOSED STRUCTURAL FILL MATERIAL IS UTILIZED AS THE FORMWORK FOR THE CONCRETE CRADLE, THEN THE STRUCTURAL FILL SHOULD BE INSTALLED AND COMPACTED UP TO THE TOP OF CONCRETE CRADLE ELEVATION. ONCE THE STRUCTURAL FILL REACHES THE NEXT DOWNSTREAM JUNCTION BOX OR HEADWALL AND IS COMPACTED TO THE ELEVATION OF THE TOP OF THE CONCRETE CRADLE, EXCAVATE THE CONCRETE CRADLE TRENCH PER THE PROVIDED DETAILS AND CONSTRUCT THE CONCRETE CRADLE AS PER THE PROVIDED CONCRETE CRADLE DETAIL. B. IF THE PROPOSED STRUCTURAL FILL IS NOT UTILIZED AS THE FORMWORK FOR THE CONCRETE CRADLE, THEN PRIOR TO CONSTRUCTING THE STRUCTURAL FILL EMBANKMENT, THE FORMWORK FOR THE CONCRETE CRADLE SHOULD BE INSTALLED ON EXISTING GROUND AND / OR THE MUD MAT. THE CONCRETE CRADLE SHALL BE CONSTRUCTED PER THE PROVIDED DETAILS. 10. INSTALL RISER / BARREL ASSEMBLY, ALONG WITH THE EMERGENCY DRAIN SYSTEM. THE DRAIN VALVE LOCATED WITHIN THE RISER BOX SHALL BE KEPT OPEN UNTIL AN AS -BUILT CERTIFICATION HAS BEEN COMPLETED BY THE ENGINEER AND AN APPROVAL TO IMPOUND HAS BEEN ISSUED BY ALL APPLICABLE AGENCIES. 11. INSTALL SPILLWAY FILTER FROM THE DETAILS SHOWN ON SHEET PD-11). 12. CONSTRUCT EMBANKMENT PER SPECIFICATIONS LISTED IN THE SECTION TITLED "BERM AND SOIL COMPACTION SPECIFICATIONS" AND REQUIREMENTS OF THE ON -SITE GEOTECHNICAL ENGINEER. ALL CHARACTERISTICS OF THE EMBANKMENT FILL MATERIAL SHALL MEET THE STANDARDS SET FORTH IN "BERM SOIL AND COMPACTION SPECIFICATIONS", INCLUDING COMPACTION AND MOISTURE REQUIREMENTS. IF NECESSARY TO ACHIEVE PROPER COMPACTION, THE EMBANKMENT FILL MATERIA.'_ WILL BE OVERBUILT IN HORIZONTAL LIFTS AND CUT BACK TO PROPER FINAL GRADE. ANY HAND COMPACTION ACTIVITIES AROUND SPILLWAY OR DRAIN STRUCTURES SHALL BE CONDUCTED IN 4-INCH LOOSE LIFTS AND BE TO THE SAME COMPACTION AND MOISTURE REQUIREMENTS AS THE ENTIRE EMBANKMENT. ALL COMPACTION AND MOISTURE TESTING SHALL BE CARRIED OUT AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER AND AS LISTED IN "BERM AND SOIL COMPACTION SPECIFICATIONS". 13. UPON COMPLETION OF DAM EMBANKMENT, PROMPTLY STABILIZE AND SEED DAM EMBANKMENT PER SEEDING SCHEDULE. 14. SCHEDULE A FINAL AS -BUILT INSPECTION AND AS -BUILT SURVEY WITH THE ENGINEER. AN AS -BUILT INSPECTION SHOULD BE SCHEDULED A MINIMUM OF 60 DAYS BEFORE A PERMIT TO IMPOUND IS REQUIRED. ANY COMMENTS OR DEFICIENCIES IN THE DAM CONSTRUCTION MUST BE CORRECTED TO THE SATISFACTION OF THE ENGINEER AND OWNER BEFORE CERTIFICATION SHALL BE GRANTED. UPON FINAL APPROVAL FROM THE TOWN OF SHALLOTTE AND NCDENR, CLOSE THE 8"0 BOTTOM DRAIN VALVE IN THE RISER BOX AND BEGIN IMPOUNDING WATER. NO WATER SHALL BE IMPOUNDED BEFORE AN APPROVAL TO IMPOUND IS ISSUED FROM THE TOWN OF SHALLOTTE. OUTLET STRUCTURE MATERIAL SPECIFICATIONS 1. THE 24"0 RCP OUTLET BARREL SHALL BE CLASS III RCP, MODIFIED BELL AND SPIGOT, MEETING THE REQUIREMENTS OF ASTM C76-LATEST. THE PIPE SHALL HAVE CONFINED 0-RING RUBBER GASKET JOINTS MEETING ASTM C-443-LATEST. THE PIPE JOINTS SHALL BE TYPE R-4. 2. THE STRUCTURAL DESIGN FOR THE 4'x4' (INTERNAL DIMENSIONS) RISER BOX WITH EXTENDED BASE SHALL BE BY OTHERS. PRIOR TO ORDERING THE STRUCTURE, THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH SHOP DRAWINGS, SEALED BY AN P.E. REGISTERED IN NORTH CAROLINA, FOR REVIEW. 3. THE RISER BOX OUTLET STRUCTURE SHALL BE PROVIDED WITH STEPS 16" ON CENTER. STEPS SHALL BE PROVIDED ON THE INNER WALL OF THE RISER BOX. STEPS SHALL BE IN ACCORDANCE WITH NCDOT STD. 840.66. PLEASE REFER TO SHEET PD-1 B FOR LOCATION OF THE RISER STEPS. 4. THE 8'Lx8'Wx18" THICK CONCRETE ANTI -FLOTATION BLOCK SHALL BE PRECAST AS THE EXTENDED BASE OF THE RISER BOX DURING FABRICATION. THE PRECAST BASE SHALL BE INCLUDED AS PART OF THE SHOP DRAWINGS THAT WILL BE SUBMITTED TO THE ENGINEER FOR REVIEW (SEE ITEM 2 ABOVE). IN LIEU OF A PRE -CAST BASE, THE CONTRACTOR MAY OPT TO CAST -IN -PLACE THE ANTI -FLOTATION BLOCK IN THE FIELD. HOWEVER, PRIOR TO CONSTRUCTING THE CAST -IN -PLACE BASE, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR REVIEW DENOTING THE FOLLOWING: A. STEEL REINFORCEMENT B. THE CONNECTION MECHANISM TO JOIN THE ANTI -FLOTATION BLOCK WITH THE RISER SECTION 5. THE RISER BOX JOINT DESIGN SHALL CONFORM TO ASTM C-478. THE JOINTS SHALL BE SEALED USING BUTYL RUBBER SEALANT CONFORMING TO ASTM-990. THE CONTRACTOR SHALL PARGE JOINTS ON BOTH THE INSIDE AND OUTSIDE WITH NON -SHRINK GROUT. 6. IF THE ANTI ---FLOTATION BLOCK IS PRECAST AS PART OF THE RISER BASE SECTION, THE ENTIRE PRECAST RISER BOX STRUCTURE SHALL HAVE A SHIPPING WEIGHT OF 22,900 LBS. THE STRUCTURE WEIGHT SHALL BE THE SHIPPING WEIGHT AND SHALL BE DETERMINED BY SUBTRACTING THE WEIGHT OF THE FACTORY BLOCKOUTS FROM THE GROSS STRUCTURE WEIGHT. THIS INFORMATION SHALL BE SHOWN ON THE SHOP DRAWINGS SUBMITTED TO THE ENGINEER FOR REVIEW. IF THE CONTRACTOR OPTS TO CAST -IN -PLACE THE ANTI -FLOTATION BLOCK, THE CONTRACTOR SHALL ENSURE THE WEIGHT OF THE ENTIRE RISER STRUCTURE IS EQUAL TO THE MINIMUM LISTED ABOVE. 7. PRIOR TO ORDERING, THE CONTRACTOR SHALL SUBMIT TRASH RACK SHOP DRAWINGS TO THE ENGINEER FOR REVIEW. CONTRACTOR SHALL ENSURE THAT AN ACCESS HATCH IS PROVIDED WITHIN THE TRASH RACK (SEE DETAIL FOR LOCATION) THAT WILL ALLOW FOR FUTURE MAINTENANCE ACCESS. CONTRACTOR SHALL ALSO PROVIDE A CHAIN AND LOCK FOR SECURING THE ACCESS HATCH. 8. ALL POURED CONCRETE SHALL BE MINIMUM 3000 PSI (28 DAY) UNLESS OTHERWISE NOTED. 9. GEOTEXTILE FABRIC FOR THE 24"0 OUTLET BARREL JOINTS SHALL BE MIRAFI 180N OR ENGINEER APPROVED EQUAL (NON -WOVEN FABRIC) 10. STORMWATER WATER QUALITY POND EMERGENCY DRAWDOWN IS VIA AN 8"0 PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 820 X-CENTRIC VALVE OR APPROVED EQUAL. THIS VALVE IS IN ACCORDANCE WITH AWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL (SEE DETAIL SHEET PD-1 B). THE CONTRACTOR SHALL PROVIDE A REMOVEABLE VALVE WRENCH WITH A HANDWHEEL ON TOP FOR OPERATION OF THE 8"0 PLUG VALVE. A CHAIN AND LOCK SHALL ALSO BE PROVIDED FOR SECURING THE WRENCH TO THE TRASH RACK. / /\ I `T �J / -�3 9 - s. MO./ `N - i S MRMWATER WATER QUALITY POND # 1 PLAN VIM 1"=30' GRAPHIC SCALE 1 inch = 30 ft. T".RELIMINARY DRAWING:, - NOT RE%EASED FOR CONSTRUCTION TOP OF HANDWHEEL TO EXTEND 1—FOOT ABOVE TRASH RACK TOP OF DAM = EL 20.00 TOP OF RISER = EL 18.00 2" PVC SIPHON INV = EL. 15.00 (NWSE) SIPHON TO EXTEND 6" FROM THE FACE OF TIME RISER AND ELBOW 90' TO 6" BELOW NORMAL POOL (EL. 14.50) NORMAL POOL = EL. 15.00 INVERT OUT = EL. 14.00 �— DRAWDOWN DRAIN TRASH RACK (SEE DETAIL SHEET PD—i C) CONCRETE ANTI —FLOTATION BLOCK CONTRACTOR SHALL FORM INVERT OF RISER STRUCTURE TO DRAIN POSITIVELY TO INVERT OF OUTLET BARREL USING NON —SHRINK GROUT NOTES: 1. CONCRETE ANTI —FLOTATION BLOCK TO BE PROVIDED WITH MINIMUM TEMPERATURE AND SHRINKAGE STEEL REINFORCEMENT. 2. TRASH RACK NOT SHOWN FOR CLARITY. TRASH RACK (SEE DETAIL) CONCRETE COLLAR (TO BE CONSTRUCTED IN THE FIELD BY 10 FT. WIDE MINIMUM COMPACTED BERM SECTION (SEE BERM AND SOIL COMPACTION SPECIFICATIONS ON SHEET PD—lA) PROPOSED GRADE THE CONTRACTOR, SEE DETAIL) 10FTO3 - fIIII�IIIIIIIIIIIIIIIII�IIII�IIIII�IIIIIII�IIII� 3 H+ COVER (MIN.) IIIIIIIII-_ _ _-- I -III -III -III -I iI I I - III-IIIIII-I I IIII i t-I I I-_ III -I I I -I I I= ®� � I- I� I I I I-IIIIII-IIIIII-III-I IIII-i I I-IIIIII-I I -I I I I i I I I IIIII I -III_ - • 44 LF 24"0 0—RING RCP ® i . i 4% FLOW —� — — — — — — — — — c .• d a ••- — _d�.� �t�_•fT. -la �.— • + ? _ .�. 5 FT. (MIN.) • d ,e i d d •- •� 1 Ti_d' J NON —WOVEN GEOTEXTILE FABRIC I I I -I I I I I I —III 8" PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 820 X—CENTRIC VALVE OR ENGINEER APPROVED EQUAL THIS VALVE SHALL BE IN ACCORDANCE WITH AWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL SHALL BE PLACED AROUND EACH JOINT OF THE 24" 0—RING RCP BARREL IN 2' WIDE STRIPS CENTERED ON JOINT. -r ovuv vr�r.n (BY OTHERS) NOTE: BRICK SHALL ATTACH AND LAY TIGHT AGAINST PRECAST STRUCTURE USING BRICK TIES WITH NO VOID SPACE BETWEEN 5.0' (MIN.) PEI Y ANENT D" CROSS SEQUON N.T.S. CONCRETE COLLAR (TO BE CONSTRUCTED IN THE FIELD BY THE CONTRACTOR — SEE DETAIL) PRECASTER SHALL PROVIDE A BLOCK OUT FOR THE 24"0 0—RING RCP CONCRETE CRADLE (SEE DETAIL SHEET PD-1 D) CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. (SEE DETAIL SHEET PD—lC) CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. TOP OF HANDWHEEL TO EXTEND (SEE DETAIL SHEET PD--1 C) 1—FOOT ABOVE TRASH RACK 4" SOLID BRICK (BY OTHERS) NOTE: BRICK SHALL ATTACH 4" SOLID BRICK (BY OTHERS) AND LAY TIGHT AGAINST NOTE: BRICK SHALL ATTACH PRECAST STRUCTURE USING AND LAY TIGHT AGAINST GUIDE STEM BRICK TIES WITH NO VOID PRECAST STRUCTURE USING SPACE BETWEEN BRICK TIES WITH NO VOID SPACE BETWEEN CONCRETE COLLAR (TO BE CONSTRUCTED IN THE FIELD TOP OF RISER = EL. 18.00 BY THE CONTRACTOR — 4" (r�P.) SEE DETAIL) PVQ SIPHON _—, 6" MIN. WALL 2 PVG SIPHON = INV = EL. 15.00 (NWSE) PRECASTER SHALL PROVIDE ''%� ' INV = EL 15.00 (NWSE) THICKNESS (TYP.)..SIPHON I EXTEND 6" FROM :- �: A BI-OCK OUT FOR THE SIPHON TO EXTEND 6" FROM ¢. THE FACE OF THE RISER AND o- 24"o 0—RING RCP THE FACE OF THE RISER AND 4.00' ELBOW 90' TO 6" BELOW Lr — — — — ELBOW 90' TO 6" BELOW / NORMAL POOL (EL 14.50) " NORMAL POOL (EL. 14.50) 24"0 0—RING RCP - 1 (TYP.) • d. •d 0.50' • _ a 24" a ti- 2.00' 8"0 DIP DRAIN CONTRACTOR SHALL FORM CONCRETE INVERT OF RISER STRUCTURE ANTI —FLOTATION TO DRAIN POSITIVELY TO BLOCK INVERT OF OUTLET BARREL USING NON —SHRINK GROUT INVERT OUT = EL. 14.00 DRAWDOWN DRAIN 2 LF 8"0 DIP ® 0.00% INV = EL. 14.23 CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT AND STAINLESS STEEL HARDWARE CONCRETE ANTI —FLOTATION BLOCK PER ANENT OLT= =UCTURE DETAQS N.T.S. 8"0 DIP DRAIN PIPE CONTRACTOR SHALL CORE —DRILL THE HOLE FOR THE 8"0 DIP PIPE IN THE FIELD. PRECASTER SHALL OMIT REINFORCEMENT IN THIS AREA 24 0 0—RING RCP • d + `— CONCRETE CRADLE (SEE DETAIL SHEET PD-1D) 8" PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 820 X—CENTRIC VALVE OR APPROVED EQUAL THIS VALVE SHALL BE IN ACCORDANCE WITH AWWA C-504 SEC. 5.5. AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL KEY TRENCH (SEE BERM AND SOIL COMPACTION SPECIFICATIONS, DETAIL SHEET PD—lA) CONCRETE CRADLE (SEE DETAIL SHEET PD-1D) APPROXIMATE LOCATION OF EXISTING GROUND 6" OF COVER ENDWALL PER NCDOT STD. 838.80 (MIN.) (SEE DETAIL SHEET PD-1C) LEVEL SPREADER (SEE DETAIL SHEET PD-1D) LENGTH = 10' — O LIP ELEV. = 13.50 O I 24' 0—RING RCP � O O INV. OUT — 13.50 VELOCITY DISSIPATOR NCDOT CLASS 'A' RIPRAP SPILLWAY FILTER 8'L x 1O'W x 9" THICK (SEE DETAIL D50 = 4" SHEET PD-1D) (SEE DETAIL SHEET PD-1C) NOTES: 1. ALL REBAR TO BE #4 REBAR. 2. ALL REBAR AND ANGLES TO BE GALVANIZED AND BE PROVIDED WITH AN EPDXY COATING. 3. THE HOT —DIPPED, GALVANIZED 2"x2"xl/4" ANGLES SHALL BE WELDED TO THE REBAR TRASH RACK. ONCE WELDED, THE ENTIRE ASSEMBLY SHALL BE PLACED ONTO THE RISER WITH ANGLES SITTING DIRECTLY ON TOP OF RISER. THE DENOTES THE ACCESS HATCH TO BE PROVIDED BY THE TRASH RACK FABRICATOR (SEE SHEET PD—lA, OUTLET STRUCTURE MATERIAL SPECIFICATIONS, NOTE #7) NOTE: 1. ALL REBARTO BE #4 REBAR. 2. GROUT SHALL BE USED TO FILL ALL VOIDS INSIDE THE STRUCTURE AROUND THE PIPE. AL:L:LJJ HAIUM .4" (TYP.) 10.6 LF 2"x2"x 1 /4" ANGLE FOR THE TRASH RACK DETAIL N.T.S. 5.0' 3" CLEARANCE TO 3" CLEARANCE TO OUTSIDE OF #4 REBAR 3" CLEARANCE TO OUTSIDE OF #4 REBAR OUTSIDE OF #4 REBAR r e . d - ° a i (24" 0—RING n \ RCP a a•- 0.5' 4 � a af 3.2' 17 3.7' CONCRETE ANTI —FLOTATION BLOCK M� 7�l�Iril�1�1•i�l�lsj>♦t�l!}ii�j���I6�1�1�:\ r� ImImII•it�i�'' 1 #4 REBAR TRASH RACK (ABOVE) I! ANCHOR TRASH RACK TO MANHOLE WALL WITH FOUR EQUALLY SPACED HOT —DIPPED GALVANIZED STEEL CLAMPS. EACH CLAMP ATTACHED TO MANHOLE RISER BY 2-4"xl/4" CONCRETE ANCHOR BOLTS EACH CLAMP TO BE COATED W/ AN EPDXY COATING. 3" ANCHOR DEPTH I I , #4 REBAR ANCHORS ---- HALL = DRILL INTO PRECAST — STRUCTURE WALL AND SET ANCHORS USING d EPDXY GROUT 3" CLEARANCE TO OUTSIDE OF #4 REBAR CONCRETE COLLAR DETAIL N.T.S. 4" SOLID BRICK (BY OTHERS) NOTE: BRICK SHALL ATTACH AND LAY TIGHT AGAINST PRECASR STRUCTURE USING BRICK TIES WITH NO VOID SPACE BETWEEN 1' DEPTH 3000 PSI CONCRETE COLLAR /(MIN. 28 DAY STRENGTH) 3" CLEARANCE TO OUTSIDE OF #4 REBAR 5.5" CENTER TO 24" 0—RING RCP CENTER • 6" ANCHOR DEPTH #4 REBAR ANCHORS. CONTRACTOR SHALL DRILL INTO PRECAST BASE AND SET ANCHORS USING EPDXY GROUT CONCRETE ANTI —FLOTATION BLOCK PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION c + st n1 :it ., 4 D g` TI 3 PFC{f.IT-ZAZW.+.._ M' 7r l _] fly: T' C 'aLLCAIMU y`y Ij Itaf=LE t4C �I ttL+� LI s111t NIl3 MD Y �C��Z FC . IS ACC, -A 0:7H Z, EECIF_C47`10'1 SEC. _34 ;Z,3. W ef <' U- L.s 4UM P3T S S FC'C Ir C tZ �� I ! „__.1, �,J I to I;:E t.t i l�,fCrC:1 :ii',Ft tclt( vFF .i q'ifk ttit t-s ~ZLL' z- jr e 1 n ryt],.. r k p _--" fO n1t c� Ef :.k V.xv 4114 . trll< Slt tr�tr.�y F ,�k �C T1 i ' �' * M ``s` _ TO X3Tii w1 B5ITan� 4I^:. "LEX74iC a ��, __r l a PLs _ L_ ; II �9 CF M15 14 AC:.7 V.14v_ C,i-3r t .£It CL 0 l i caj PC' 1 I P P= :=tD TO GC UJT_G =YTO ,L'AXti _L .uz ':TE 1; m LL (` t•larirt-e c.�t ,., � F=—='t NSL^=-1 fj1E FA311C WAY o KES77TI.7cv FCF -IEEE .... . _ >.._ _ _ _ . _ ... 4 � • .: � •: � _..._ .a SG '.3 Ti-_ UVE hAF:1 0Lc _CL .3 G :aEP. °—J f.f ^:V! f.t? ALL i tr•. 3°FFF T f'{plT s' :R ;3A9 5 7= Ev;A S:Z. y3T_: Y'NTY N BAB flI EF LL � 05 W,,AE} a � Y d Q" 3.71E ,. tC1 CTD?'A u r T C 07TIL 1 ELEVATION SIDE 3 T'iIE ERA ,s c AS EEDED. C ...i .. _< u_ 47 — L C3 m rr m EN4IVALI tI MEH II FtS W t O zF FI ti Rt , N h .� yl l ktE<. FiI.'1. Nip{ NIN iDL.X 41 .1. i[i15C. �— m _ F1F� Dtn h I H (=T.i H FT) D ;� s �`2 _ �� ez,� - 9 -•J '►�% CJ ? rr Ei .� h 2 34 .'.',7i i '�._S t dr f.' .''� _` 02 ,D._ 75 ..ir '�Qr �.L� CC z - h: in + 27, 2.-,Jo 3.'.Q ? 75 r_'. IO z c i.: i 0 r0, § •'� z s, S - r2.50 3.'v3rf 25 D!2.50 3. 0 3.? 0 `r3'3.r5 �. 2.' ' b s^ G ` ? `. �❑ r' 2.5D 4 D a =.25 7 rOlB.. -5 r 2.a ga r E" c 13.SU �.CJ f#.0.1 2 CD:3.04 4 S.3Ct 10.lu�J:11.50 UZ v 4+ '' 17«r+P-:I[l a.:i,�rii f �..7�:13.:�1} !� " .'�� +1; as s• �' 1 d• �. rt e5 e- w, i 3.25,�4.50 3.'C0•E.75 .3.25!3..50 B.t�3 R.75 12.20,13,25 1_„ Lull t2 tr ;, H tt-t i PLAN 1_a 25 t f3 { at L-511 r EQ 17' 3.2 '4.aD L `FJ.`r 1S 7'11.2503. CC � _.- ---- _ 4.. s +. F3 7 t7 !P,:t.z'i I.i ..1,'15. T? 1_+. 4 ,5 i5_00 7.; 0 2 r 3 r 4., lO 7 '�r S.255 13 `r_ 4 r .-. �1... . 4Ct: 1.`2•X?... r. 1 i E" av-v•741 r3 3-5w 3•e5.14. �0 t9. 2.51/. r L5 F 6" j $..`.rC;°i.clll 1'.0, r.:r': 0.�5F4.3D r.,y,9.2.•i I4 A.t'tCi.w3 Re==T I Cf 1 E'i=ET 6r i, 24" ENDWALL DETAILS N.T.S. Z NOTES; ova ALL STEPS SHALL PROTRUDE 4' FROM INSIDE FACE OF STRUCTURE WALL. } STEPS DIFFERING IN DIMENSI❑NS, C❑NFIGURATION OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PROVIDED THE CONTRACTOR HAS FURNISHED THE ENGINEER WITH DETAILS OF THE PROPOSED STEPS AND HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER F❑R THE USE OF SUCH STEPS, z¢3 �D:�=U c\u LL— _j Z ih m Lj 1� m HU��LD = Q Lv W (�G'-L,0Q 5/8' ° =- o O C/) Q PLAN wQ PLAN SIDE M N SIDE N ELEVATI❑N ELEVATI❑N FL F, LLJ �F 14 1/2' CAST IR❑N 1 _Q. —_! LFt CAST IRON ELEVATI❑N ELEVATI❑N '� W R ~ I3n6' U ce � i• 3 3/4' Eo I I/4` #6 BAR ❑R #8 BAR q GALV'D. Z � o` 1/4' POLYPROPYLENE Q. Q 5/8` M� PLASTIC L.1 PLAN SIDE SIDE1/2' 1/8' N ELEVATI❑N PLAN ELEVATION LD Q I ^' C❑MP❑SITE c� REINFORCING STEEL Q #3 DEFORMED_, 1!4 STEEL ROD E ELEVATION SECTION A —A I 12' NOT TO BE USED IN SHEET 1 �F1 ELEVATION SANITARY SEWER MANHOLES. 840,66 MfAEMNANCE ACCESS STEPS N.T.S. NCDOT STD 838.80 HE (SEE 24" RCP A 4' WIDE (M NCDOT 838.80 HEAD (SEE DI Qm-g A FILTER BLANKET IS TO BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. THE FILTER BLANKET WILL CONSIST OF A MINIMUM 4" THICK LAYER OF STONE (NCDOT #57) UNDERLAIN WITH MIRAFI FILTER WEAVE 700 OR APPROVED EQU; ,',\LENT #6 REBAR PERIMETER FRAME 2" PVC SIPHON 4" x 4" 6/6 WELDED WIRE — FABRIC (EACH SIDE & TOP OF CAGE) 1 14" (TYP.) 2.03' 4" ANCHOR DEPTH CONTRACTOR SHALL DRILL INTO PRECAST EXTENDED BASE AND SET ANCHORS USING EPDXY GROUT a" RIPRAP THICK 9" LAYER OF CLASS "A" RIP —RAP 4" FILTER BLANKET �.: BLANKET (SEE NOTE) 24" OU"IZ.ET BARREL VELOCITY DISSIPATOR N.T.S. 4" SOLID BRICK (BY OTHERS) NOTE: BRICK SHALL LAY TIGHT AGAINST PRECAST STRUCTURE USING BRICK TIES WITH NO VOID SPACE BETWEEN a a II14 a ° ° 2 LF 8"0 DIP ° e 4 a a 0.86' (CENTER TO CENTER) a CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT AND STAINLESS STEEL HARDWARE 8"0 DIP DRAIN PIPE CONTRACTOR SHALL CORE —DRILL THE HOLE FOR THE 8"0 DIP IN THE FIELD. PRECASTER SHALL OMIT REINFORCEMENT IN THIS AREA. 8" PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 820 X—CENTRIC VALVE OR ENGINEER APPROVED EQUAL THIS VALVE SHALL BE IN ACCORDANCE WITH AWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL. 0.86' i• (CENTER TO CENTER) 2" PVC SIPHON 4" x 4" 6/6 WELDED WIR FABRIC (EACH SIDE &TOP OF CAGE) 2.80' #6 REBAR PERIMETER FRAME J"O GRADE 8 STAINLESS STEEL CONCRETE LAG SCREW 0 12" X 4" X GALVANIZED STEEL STRAP (4 PER �;• I RISER JOINT) 3.0" RISER JOINT CONNECTION DETAIL N.T.S. I M W LIVIA 1 mi 4" SOLID BRICK (BY OTHERS) - NOTE: BRICK SHALL LAY TIGHT AGAINST PRECAST STRUCTURE USING BRICK TIES WITH NO VOID SPACE BETWEEN 8" DIP DRAIN TRASHRACK DETAILS N.T.S. a 4- a 4 8"0 DIP DRAIN PIPE CONTRACTOR SHALL CORE —DRILL THE HOLE FOR THE 8"0 DIP IN THE FIELD. PRECASTER SHALL OMIT REINFORCEMENT IN THIS AREA 6" MIN. WALL 8" PLUG VALVE. THE VALVE THICKNESS SHALL BE A M&H STYLE 820 X—CENTRIC VALVE OR APPROVED EQUAL. THIS VALVE SHALL BE IN ACCORDANCE WITH AWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE FROM TOP OF OUTLET STSTRUCTURE VIA A HANDWHEEL 2 LF 8"0 DIP CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT AND STAINLESS STEEL HARDWARE PRELIMINARY DRAWING — NOT RELEASED FOR CONSTRUCTION Q G x a H w zdI CQ �N Z ;� Fn CE R.tl4 O ^r Z eG ■ Z W O Q) °.- ,lllllllllf f/ff// CA ;��,p •. tiG f NEF,; Gam; R' ''�fffffllllll` c;i a 0 w V3 W s2� cqC\)co to Ewa � P4 z 4 rr w z WS60 w'� .mod, a z o � a Pi p w z O O P o 4 0 i� W PROJECT NO. WDL-07020 FILENAI,'E: WDL070277D1 DESIGNED BY: BRF- DRAWN BY: JAA SCALE: N TS DATE: 09-20-2007 Si§AEI` N0, IUD-1 IMcADAMS II I[^r 11 �� CONCRETE ANTI -FLOTATION BLOCK d 1" THICK JOINT FILLER MATERIAL 24"0 0-RING RCP FLOW 1" THICK JOINT FILLER MATERIAL Cv.Nl rxLIL ANTI -FLOTATION BLOCK f ILLCR MNILMIAL NOF-S: 1. ALL TIE BARS (U-BARS) ARE #3 (AS LABELED) REBAR (GRADE 60) SPACED AT 10 FT. CENTER TO CENTER ALONG THE LENGTH OF THE CRADLE. 2. MAINTAIN A MIN. COVER OF 3" OF CONCRETE (TO THE OUTSIDE OF THE REBAR) FOR ALL REINFORCEMENT. 3. TRENCH TO BE BACKFILLED IN 5" LIFTS WHEN COMPACTION IS BY HAND. BACKFILL IS IN 8" LIFTS WHEN CONDUCTED BY MACHINE. MINIMUM OF 2 FEET COVER MUST BE PRESENT ON 24"0 RCP BEFORE DRIVING OVER WITH HEAVY EQUIPMENT. 4. REINFORCED CONCRETE CRADLE MAY BE REPLACED PER RECOMMENDATION FROM THE ON-SfTE GEOTECHNICAL ENGINEER. ANY DEVIATION FROM THIS DETAIL SHALL BE SUBMITTED TO AND REVIEWED BY THE DESIGN ENGINEER PRIOR TO IMPLEMENTATION. iu uulz:,iut ur #3 TIE BAR (TYP.) RISER EARML CONNEMON DETAIL N.T.S. 24" CONCRETE CRADLE DETAIL N.T.S. y a w W w 4, w w •Y w w .v w w w / 3-FOOT WIDE LAYER OF #57 w w w w w w STONE (4-INCHES DEEP) w w w w w UNDERLAIN WITH FILTER FABRIC w w w w w w w w w w w w w •i w w w w w w W w w w w w w REINFORCED CONCRETE FOOTING 3" SOLID MASONARY BLOCK UP STUBBED ABOVE GRADE LIP ELEV. = 13.50 10' SOLID MASONARY BLOCK LEVEL SPREADER 6-FOOT WIDE (1-FOOT DEEP) TRIANGULAR CHANNEL ® 0.00% SLOPE LINED WITH LANDLOK TURF REINFORCEMENT MATTING 450 D MASONARY BLOCK - CHANNEL SHALL BE LINED WITH LANDLOK TURF REINFORCEMENT MATTING 450 AND SEEDED PER SEEDING SCHEDULE (SEE LINING ANCHOR DETAILS SHEET PD-1 E) 6' , 2 " 8" (TYP) f>�::: �J I j .,III -III_ I�I I�� 3 II SOLID MASON Y BLOCK 1 REINFORCED CONCRETE FOOT1N U94- NDISTURBED EARTH CROSS-SECTION LEVEL SPREADER DETAILS N.T.S. (3) #4 REBARS CONTINUOUS #4 REBAR ® 18' O.C-1 8" (TYP) 12' 8" 1141 1 3" (TYP) 4. 4 l:_:_. 24" T 2" DEEP ` CONTINUOUS KEYWAY •. 10moa: GENERAL NOTES: 1. CONSTRUCT CONCRETE LEVEL SPREADER LIP ON A ZERO PERCENT GRADE TO ENSURE UNIFORM SPREADING OF FLOW. 2. LEVEL SPREADER SHOULD BE CONSTRUCTED ON UNDISTURBED SOIL, AND NOT ON FILL 3. THE TRIANGULAR CHANNEL SHOULD BE CONSTRUCTED ON A ZERO PERCENT GRADE. 4. THE TRIANGULAR CHANNEL SHOULD BE UNED WITH LANDLOK TURF REINFORCEMENT MATTING 450 OR APPROVED EQUIVALENT. THE TRM MATTING SHOULD BE ANCHORED PER THE DETAILS PROVIDED. THE TRM MATTING SHOULD BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 5. THE 3-INCH LAYER OF #57 STONE SHALL BE UNDERLAIN WITH MIRAR FILTERWEAVE 400 OR APPROVED EQUIVALENT. PROPOSED GRADE i I —_ 1 i I� Ii I —III—III—6" (MIN.) T�Fl jai 24.0 0-RING RCP > FLOW a �___.i�,I — C :0' MIN. _`. 1 NO. 67 WASHED STONE ENCASED IN NON -WOVEN FILTER FABRIC (MIRAFI 18ON OR EQUIVALENT) ENDWALL PER NCDOT STD. 838.80 (SEE DETAIL SHEET PD-1C) NOTE: 4" WEEPHOLES TO BE PROVIDED WITH VARMINT GUARD ON DOWNSTREAM SIDE AND GALVANIZED HARDWARE CLOTH ON UPSTREAM SIDE (Y4" MAXIMUM OPENINGS) 4"4 WEEPHOLES ON EACH SIDE OF SPILLWAY ENDWALL PER NCDOT STD. 838.80 (SEE DETAIL SHEET PD-1C) SPILLWAY FILTER DETAIL N.T.S. BARREL PIPE CONCRETE CRAD CONSTRUCTION SEQUENCE 1. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, THEN BRING GRADE OF DAM EMBANKMENT TO SPRINGUNE OF PIPE ELEVATION. IF OPTION B IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, THEN CONSTRUCT FORMWORK FOR CONCRETE CRADLE ON EXISTING GRADE. 2. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, THEN EXCAVATE TRENCH FOR CRADLE AND BARREL PER DIMENSIONS ON DRAWINGS. IF OPTION B IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, PROCEED TO STEP 3 BELOW. 3. PLACE REINFORCING STEEL AND JOINT FILLER MATERIAL PER DRAWINGS. ALL REINFORCING STEEL SHALL HAVE A MINIMUM OF 3" OF CONCRETE COVER (INCLUDING TIES). 4. PLACE BARREL PIPE ON CONCRETE BLOCKS TO GRADE. CONTRACTOR SHALL WRAP JOINTS WITH 2-FT WIDE STRIPS OF FABRIC AT THIS STEP. 5. POUR CONCRETE FOR CRADLE FOR EACH SECTION FROM ONE SIDE OF THE TRENCH. ALLOW CONCRETE TO FILL ENTIRE AREA UNDER PIPE AND PIPE HAUNCHES AS TO LEAVE NO VOIDS UNDER THE PIPE BEFORE POURING ON THE OPPOSITE SIDE OF THE TRENCH. POUR ENTIRE CRADLE AS ONE LIFT (VERTICALLY) PER DRAWINGS, 6. ALLOW CRADLE TO CURE FOR A MINIMUM OF 7 DAYS BEFORE ANY VIBRATING COMPACTION EQUIPMENT IS USED IN THE VICINITY OF THE BARREL PIPE. BARREL PIPE CRADLE MATERIAL SPECIFICATIONS CONCRETE 0 COMPRESSIVE STRENGTH OF 3500 PSI AT 28 DAYS 0 APPROVED MIX DESIGN 0 4-6% AIR ENTRAINED 0 MAXIMUM MIX TO POUR TIME OF 90 MINUTES 0 FOUR CYLINDERS SHALL BE PREPARED FOR TESTING FOR EACH LIFT. ONE SHALL BE TESTED AT SEVEN DAYS, TWO AT 28 DAYS, AND THE FOURTH SHALL BE HELD FOR 54 DAYS. 0 A MINIMUM OF 3" OF CONCRETE COVER ON ALL STEEL IS REQUIRED (INCLUDING TIES). 0 CONCRETE TO BE VIBRATED VERTICALLY. WET CONCRETE SHALL NOT BE MOVED HORIZONTALLY WITH THE VIBRATOR. STEEL 0 ALL STEEL TO BE GRADE 60. 0 ALL STEEL SHALL BE FREE OF RUST OR OTHER DEBRIS THAT MIGHT PREVENT BONDING TO THE CONCRETE. 0 ALL STEEL SHALL BE BENT WITH A MINIMUM RADIUS OF 3DB (1.13' FOR #3) AS SHOWN ON THE DRAWINGS. 0 THE #5 BARS IN THE CONCRETE CRADLE SHALL BE SPLICED WITH A MINIMUM OVERLAP OF 32". THE SPLICES SHALL BE SPACED SUCH THAT NO TWO SPUCES OCCUR WITHIN THE SAME LENGTH OF PIPE. 8'-7.5" 2'-7.5" O.D. SHED STONE NON -WOVEN ZIC (MIRAFI 18ON ENT) 55.5" ENCASED IN NON -WOVEN SIDE OF SPILLWAY FILTER FABRIC (MIRAFI 10N OR EQUIVALENT) PRELIMINARY DRAWING - NOT RELEASED 1='OR CONSTRUCTION V L 'I/I�-/l• ' W z Q PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT F:O - cm INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS (2 - 3 ft) BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT _�_... BE USED FOR A SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY. I PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABIUTY AND ACCURACY. co a �C)� • f • •• "'e 8 Z 0 0. z a o a �n y w x v TEMMMAL CHANNEL ANCHOR TRENCH DETAIL • N.T.S. LONGITUDINAL ANCHOR TRENCH DETAIL ZZ, z .,;. "fto =-_ zw In45:5 0 ki, co zz 't a o � CD P F h PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A ' SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, "RACY �PPUCABLITY AND ACCU ■ PROJECT NO. WDL-0702❑ FILKNAME: WDL07020-PD1 DESIGNED BY: BRF DRAWN BY: JAA ANCHOR PATTERN FOR 3H:1V < SLOPES < 2H:1V SCALE: N TS N.T.S. DATE: 09-20-2007 SHEET NO. P D -1 E PRELIMINARY DRAFVING - NOT RELEASED FOR CONSTRUCTION aMcADAMS pa- 0 llllc� cq Q ®� V ' -1 0 0 Y H?MRNB'ITENr CHECK SLOT DETAIL � N.T.S. INI'MU, ANCHOR TRENCH DETAEL N.T.S. PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FCR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A. SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY. PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY. 7 F !.^•ro 0 Lo tea© H Lo c R. ,ettitltt ltltttt �O� QFES /p Y e� a m i � q O d W ' W CQ W o � c c, a Q w era tD � Ewa � � w 0 o � � 4 cq U A O o T FFWY OD I r� PROJECT NO. WDL-07020 FILENAmE; WDL07020-PD1 DESIGNED BY: BRF DRAWN BY: JAA SCALE: N TS DATE; 09-20-2007 SHEET NO. P ® — 1 F JiMcADAMS `v" R°.+ � .a` � � . �} WATER " � "�� ifQUALflY POND h i' y` �'' u 1 �w• .R � � ,,; ,. k. , "� - .' ,. `' i 1-GENERAL NOTES CONSTRUCTION SEQUENCE 1. PRIOR TO CONSTRUCTION, THE ON -SITE GEOTECHNICAL ENGINEER SHALL VERIFY THE SUITABILITY OF THE PROPOSED BORROW AREA/FILL FOR USE IN THE DAM EMBANKMENT/KEY TRENCH. 2. THE ON -SITE GEOTECHNICAL ENGINEER SHALL INSPECT THE KEY TRENCH EXCAVATION PRIOR TO PLACEMENT OF ANY BACKFILL WITHIN THE KEY TRENCH, IF THE CONTRACTOR CONSTRUCTS AND COVERS UP THE KEY TRENCH PRIOR TO INSPECTION, THEN THE KEY TRENCH SHALL BE UNCOVERED AND TESTED AT THE CONTRACTOR'S EXPENSE. 3. THE CONTRACTOR SHALL REFER TO THE LANDSCAPE PLAN FOR THE PERMANENT PLANTING PLAN/SCHEDULE. PLEASE NOTE THAT NO TREES/SHRUBS OF ANY TYPE MAY BE PLANTED ON THE PROPOSED DAM EMBANKMENT (FILL AREAS). 4. DURING THE INITIAL STAGES OF CONSTRUCTION, THE WATER QUALITY POND MAY BE USED AS A SEDIMENT BASIN FOR EROSION CONTROL PURPOSES. IF SO, THE CONTRACTOR SHALL FOLLOW THE GENERAL CONTRUCT10N SEQUENCE BELOW: A. THE CONTRACTOR SHALL CONSTRUCT THE ENTIRE FACILITY (PERMANENT OUTLET STRUCTURE, DAM, KEY TRENCH, ETC.) WITH THE EXCEPTION OF THE INTERIOR WATER QUALITY POND GRADING. THE INTERIOR GRADING WILL BE CONSTRUCTED ONCE THE EROSION CONTROL PHASE IS COMPLETE. B. THE TEMPORARY DRAWDOWN RISER SHALL BE CONNECTED TO THE PERMANENT 8"0 DIP DRAIN PIPE. C. ONCE THE UPSTREAM DRAINAGE AREA IS STABILIZED AND THE EROSION CONTROL INSPECTOR APPROVES THE REMOVAL OF THE SEDIMENT BASIN, THE CONTRACTOR SHALL REMOVE THE TEMPORARY DRAWDOWN RISER AND CLEAN -OUT THE BASIN. ALL SEDIMENT, TRASH, ETC. SHALL BE DISPOSED OF PROPERLY (LE. - PLACED IN A LANDFILL) AND NOT STOCKPILED IN AN AREA WHERE WATER QUALITY COULD BE ADVERSELY AFFECTED. D. ONCE THE BASIN IS CLEANED OUT, AND ALL EROSION CONTROL DEVICE REMOVED, THE CONTRACTOR SHALL CONSTRUCT THE INTERIOR GRADING SHOWN ON THIS SHEET. E. ONCE THE GRADING IS COMPLETE, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION AND AN AS -BUILT SURVEY PRIOR TO INSTALLATION OF THE WATER QUALITY POND PLANTS. IF THE CONTRACTOR PLANTS THE PROPOSED VEGETATION PRIOR TO AN AS -BUILT SURVEY (AND SUBSEQUENT ?v-PROVAL), ANY CHANGES TO THE GRADING / RE -PLANTING OF PLANTS WILL BE AT THE CONTRACTOR'S EXPENSE. F. ONCE THE ENGINEER HAS APPROVED THE AS -BUILT GRADING, THE CONTRACTOR SHALL PLANT THE PROPOSED WATER QUALITY POND PLANTS SHOWN ON THE LANDSCAPE PLAN FOR THIS FACILITY. G. AFTER COMPLETION OF THE PLANTING, THE LANDSCAPE CONTRACTOR SHALL PROVIDE A LETTER TO THE ENGINEER CERTIFYING THAT THE PLANTS HAVE BEEN INSTALLED PER THE APPROVED WATER QUALITY POND PLANTING PLAN. 5. IF THE INFILTRATION RATE IS GREATER THAN 0.01 IN/HR, IN ORDER TO HELP MAINTAIN A PERMANENT POOL, THE CONTRACTOR WILL NEED TO INSTALL A CLAY LAYER OR A PERMANENT GEOSYNTHETIC CLAY LINER A MINIMUM OF 1-FOOT BELOW THE LOWEST GRADE OR 1-FOOT BELOW THE BOTTOM ELEVATION OF THE ROOT BALL FOR THE PROPOSED PLANTINGS (WHICHEVER IS GREATER). IF A GEOSYNTHETIC LINER IS CHOSEN, THE LINER SHALL BE BENTOMAT CL BY CETCO LINING TECHNOLOGIES OR ENGINEER APPROVED EQUIVALENT. 6. THE GRADES SHOWN ON THIS PLAN ARE FINISHED GRADES. IF THE EXISTING SOIL LAYERS IN THE PROPOSED WATER QUALITY POND (AFTER EXCAVATION) ARE NOT DETERMINED SUITABLE BY A LANDSCAPE PROFESSIONAL FOR THE FUTURE WATER QUAUTY POND PLANTINGS, THE CONTRACTOR SHALL OVEREXCAVATE THE INTERIOR PORTIONS OF THE WATER QUALITY POND (FROM THE NORMAL WATER SURFACE ELEVATION TO THE BOTTOM) BY 1-FOOT. THE CONTRACTOR SHALL THEN BRING THE WATER QUALITY POND AREA TO THE FINISHED GRADES USING THE TOPSOIL STOCKPILED ON -SITE. THE OVER EXCAVATION WILL ALLOW FOR BETTER PLANTING CONDITIONS FOR THE PROPOSED WATER QUALITY POND PLANTS. 7. ANY REMOVED TOPSOIL SHALL BE STOCKPILED FOR USE IN PLANTING (SEEDING) ON THE DAM EMBANKMENT ONCE FINAL GRADES (AS SHOWN ON THE GRADING PLAN) HAVE BEEN ESTABLISHED WITH COMPACTED FILL PRIOR TO TOPSOIL INSTALLATION, THE CONTRACTOR SHALL SCARIFY THE THE TOP 2"-3" OF THE BERM SECTION TO PROMOTE BONDING OF THE TOPSOIL WITH THE COMPACTED FILL THE TOPSOIL DEPTH SHALL RANGE FROM 3"-4" ON THE DAM EMBANKMENT. 8. THE CONTRACTOR SHALL FURNISH, INSTALL, OPERATE, AND MAINTAIN ANY PUMPING EQUIPMENT, ETC. NEEDED FOR REMOVAL OF WATER FROM VARIOUS PARTS OF THE STORMWATER WATER QUALITY POND SITE. IT IS ANTICIPATED THAT PUMPING WILL BE NECESSARY IN THE EXCAVATION AREAS (I.E. - KEY TRENCH). DURING PLACEMENT OF FILL WITHIN THE KEY TRENCH (OR OTHER AREAS AS NECESSARY), THE CONTRACTOR SHALL KEEP THE WATER LEVEL BELOW THE BOTTOM OF THE EXCAVATION. THE MANNER IN WHICH THE WATER IS REMOVED SHALL BE SUCH THAT THE EXCAVATION BOTTOM AND SIDESLOPES ARE STABLE. PERM AND SOIL COMPACTION SPECIFICATIONS 1. ALL FILL MATERIALS TO BE USED FOR THE DAM EMBANKMENT SHALL BE TAKEN FROM BORROW AREAS APPROVED BY THE ON -SITE GEOTECHNICAL ENGINEER. THE FILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, WOOD, STONES GREATEI THAN 6% AND FROZEN OR OTHER OBJECTIONABLE MATERIAL.. THE FOLLOWING SOIL TYPES ARE SUITABLE FOR USE AS FILL WITHIN THE DAM EMBANKMENT AND KEY TRENCH: ML AND CL IF OTHER SOIL TYPES ARE DETERMINED TO BE SUITABLE BY THE ONSITE GEOTECHNICAL ENGINEER, DOCUMENTATION SHALL BE RETAINED FOR FUTURE AS--BUiL.T SUBMITTALS. 2. FILL PLACEMENT SHALL NOT EXCEED A MAXIMUM 8" LIFT (UNCOMPACTED). EACH LIFT SHALL BE CONTINUOUS FOR THE ENTIRE LENGTH OF EMBANKMENT. BEFORE PLACEMENT OF FILL FOR THE BERM SECTION, ALL UNSUITABLE MATERIAL SHALL BE REMOVED AND THE SURFACE PROPERLY PREPARED FOR FILL PLACEMENT. 3. ALL FILL SOILS USED IN THE EMBANKMENT / KEY TRENCH CONSTRUCTION SHALL BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM-698). THE FILL SOILS SHALL BE COMPACTED AT A MOISTURE CONTENT WITHIN -1 TO +3 PERCENT OF ITS OPTIMUM MOISTURE CONTENT. COMPACTION TESTS SHALL BE PERFORMED BY THE ON -SITE GEOTECHNICAL ENGINEER DURING CONSTRUCTION TO VERIFY THAT THE PROPER COMPACTION LEVEL I1AS BEEN REACHED. THE FILL SHOULD BE COMPACTED USING A SHEEPSFOOT TYPE COMPACTOR. IN ORDER TO PREVENT DAMAGE TO THE PIPE, NO COMPACTION EQUIPMENT SHALL CROSS ANY PIPE UNTIL MINIMUM COVER IS ESTABLISHED ALONG THE PIPE. 4. THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH REPORTS TO VERIFY THAT THE DAM EMBANKMENT MEETS THE SPECIFIED COMPACTION REQUIREMENTS. COMPACTION REPORTS WILL BE NEEDED DURING THE AS -BUILT CERTIFICATION PROCESS FOR THIS STORMWATER FACILITY. THEREFORE, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE COMPACTION TESTING AND TO ENSURE COMPACTION TESTS ARE PROPERLY PERFORMED DURING CONSTRUCTION. 5. TESTING OF THE NEW FILL MATERIALS SHALL BE PERFORMED TO VERIFY THAT THE RECOMMENDED LEVEL OF COMPACTION IS ACHIEVED DURING CONSTRUCTION. THEREFORE, ONE DENSITY TEST SHALL BE PERFORMED FOR EVERY 2,500 SQUARE FEET OF AREA FOR EVERY LIFT OF FILL OR AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. 6. TESTING WILL BE REQUIRED ALONG THE 24"0 0-RING OUTLET BARREL AT A FREQUENCY OF ONE TEST PER 25 LF OF PIPE PER VERTICAL FOOT OF FILL OR AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. STATEMENT OF RESPONSIBILITY ALL REQUIRED MAINTENANCE AND INSPECTIONS OF THIS FACILITY SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER'S ASSOCIATION, PER THE EXECUTED OPERATION AND MAINTENANCE AGREEMENT FOR THIS FACILITY. 1. PRIOR TO CONTRUCTION, THE OWNER SHALL OBTAIN A LAND DISTURBING (GRADING) PERMIT FROM NCDENR AND AN APPROVAL TO CONSTRUCT FROM THE TOWN OF SHALLOTTE AND ALL OTHER APPLICABLE AGENCIES. 2. INSTALL AU_ SEDIMENT AND EROSION CONTROL MEASURES PER THE APPROVED SEDIMENT & EROSION CONTROL PLAN. THE CONTRACTOR SHALL MAINTAIN ALL APPROVED SEDIMENT AND EROSION CONTROL MEASURES THROUGHOUT THE ENTIRE PROJECT, AS REQUIRED. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE EROSION CONTROL INSPECTOR, AS REQUIRED BY GOVERNING AGENCIES, PRIOR TO ANY CLEARING. 3. CLEAR AND GRUB AREA WITHIN THE LIMITS OF THE PROPOSED DAM CONSTRUCTION. ALL TREES AND THEIR ENTIRE ROOT SYSTEMS MUST BE REMOVED FROM THE DAM FOOTPRINT AREA AND BACKFILLED WITH SUITABLE SOIL MATERIAL THE BACKFILLED AREAS SHALL BE COMPACTED TO THE SAME STANDARDS AS THE DAM EMBANKMENT. THE REMAINING AREA OF THE EMBANKMENT SHALL BE STRIPPED TO A SUITABLE DEPTH AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. ANY RESIDUAL SOILS TO BE LEFT IN PLACE MUST BE WELL SCARIFIED TO PROMOTE BONDING OF THE NEW EMBANKMENT FILL NO EMBANKMENT MATERIAL SHALL BE PLACED FOR THE DAM OR KEY TRENCH UNTIL APPROVAL OF THE DAM SUBGRADE / TRENCH IS OBTAINED FROM THE ON -SITE GEOTECHNICAL ENGINEER. 4. EXCAVATE FOR THE NEW KEY TRENCH ALONG THE CENTERUNE OF THE PROPOSED DAM EMBANKMENT. THE TRENCH SHAD_ EXTEND A MINIMUM OF 5 FT BELOW EXISTING GRADE AND SHAD_ HAVE A MINIMUM BOTTOM WIDTH OF 5 FEET. THE KEY TRENCH SIDESLOPES SHAD_ BE A MINIMUM OF 1:1 (H:V). DEPENDING UPON ON -SITE SOIL CONDITIONS ENCOUNTERED DURING EXCAVATION, THE ON -SITE GEOTECHNICAL ENGINEER MAY VARY THE DEPTH AND DIMENSIONS OF THE KEY TRENCH AS DEEMED NECESSARY. THE ON -SITE GEOTECHNICAL ENGINEER SHAD_ RETAIN DOCUMENTATION OF ANY VARIATION FOR FUTURE AS -BUILT SUBMITTALS. 5. BEGIN PLACEMENT OF BACKFILL WITHIN THE KEY TRENCH. THE KEY TRENCH SHALL BE COMPACTED TO THE SPECIFICATIONS LISTED ITEM 3 OF THE SECTION TITLED "BERM SOIL AND COMPACTION SPECIFICATIONS." THE KEY TRENCH SHALL BE TESTED PER THE SPECIFICATIONS LISTED IN THAT SECTION. 6. PRIOR TO INSTALLATION, SUBGRADE CONDITIONS ALONG THE SPILLWAY PIPES SHOULD BE EVALUATED BY THE ON -SITE GEOTECHNICAL ENGINEER TO ASSESS WHETHER SUITABLE BEARING CONDITIONS EXIST AT THE SUBGRADE LEVEL SHOULD SOFT OR OTHERWISE UNSUITABLE CONDITIONS BE ENCOUNTERED ALONG THE PIPE ALIGNMENTS, THESE MATERIALS SHOULD BE UNDERCUT AS DIRECTED BY THE GEOTECHNICAL ENGINEER. THE UNDERCUT MATERIALS SHALL BE REPLACED WITH ADEQUATELY COMPACTED STRUCTURAL FILL, LEAN CONCRETE OR FLOWABLE FILL AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. 7. IN ORDER TO HELP PROTECT THE SOIL SUBGRADE FROM DETERIORATION (DUE TO EXPOSURE, RAINFALL, SEEPAGE, AND RUNOFF) BEFORE THE CRADLE CAN BE POURED, IT IS STRONGLY RECOMMENDED THAT A 3' TO 4" THICK CONCRETE MUD MAT BE POURED OVER THE SUBGRADE ONCE IT IS APPROVED BY THE ON -SITE GEOTECHNICAL ENGINEER. THE MUD MAT WILL ALSO PROVIDE BEARING FOR THE BLOCKS THAT TEMPORARILY SUPPORT THE SPILLWAY PIPE UNTIL THE CRADLE CAN BE POURED. THE METHOD OF BLOCK SUPPORT FOR THE PIPE PROPOSED BY THE CONTRACTOR SHOULD BE SUBMITTED TO THE JOHN R. McADAMS COMPANY FOR REVIEW. 8. BEGIN CONSTRUCTION OF THE NEW EMBANKMENT. FILL MATERIALS SHALL BE PLACED IN MAXIMUM 8" THICK LIFTS PRIOR TO COMPACTION, UNLESS DIRECTED OTHERWISE BY THE ON -SITE GEOTECHNICAL ENGINEER. FILL LIFTS SHALL BE CONTINUOUS OVER THE ENTIRE LENGTH OF FILL IF IT IS NECESSARY, THE EMBANKMENT FILL MATERIAL WILL BE OVERBUILT IN HORIZONTAL LIFTS AND CUT BACK TO FINAL GRADE IN ORDER TO ACHIEVE PROPER COMPACTION. 9. AS CONSTRUCTION OF THE EMBANKMENT MOVES FORWARD, IT WILL BE NECESSARY TO INSTALL THE CONCRETE CRADLE. THIS MAY BE CONSTRUCTED USING ONE OF THE FOLLOWING METHODS: A. IF THE PROPOSED STRUCTURAL FILL MATERIAL IS UTILIZED AS THE FORMWORK FOR THE CONCRETE CRADLE, THEN THE STRUCTURAL FILL SHOULD BE INSTALLED AND COMPACTED UP TO THE TOP OF CONCRETE CRADLE ELEVATION. ONCE THE STRUCTURAL FILL REACHES THE NEXT DOWNSTREAM JUNCTION BOX OR HEADWALL AND IS COMPACTED TO THE ELEVATION OF THE TOP OF THE CONCRETE CRADLE, EXCAVATE THE CONCRETE CRADLE TRENCH PER THE PROVIDED DETAILS AND CONSTRUCT THE CONCRETE CRADLE AS PER THE PROVIDED CONCRETE CRADLE DETAIL B. IF THE PROPOSED STRUCTURAL FILL IS NOT UTILIZED AS THE FORMWORK FOR THE CONCRETE CRADLE, THEN PRIOR TO CONSTRUCTING THE STRUCTURAL FILL EMBANKMENT, THE FORMWORK FOR THE CONCRETE CRADLE SHOULD BE INSTALLED ON EXISTING GROUND AND / OR THE MUD MAT. THE CONCRETE CRADLE SHALL BE CONSTRUCTED PER THE PROVIDED DETAILS. 10. INSTALL RISER / BARREL ASSEMBLY, ALONG WITH THE EMERGENCY DRAIN SYSTEM. THE DRAIN VALVE LOCATED WITHIN THE RISER BOX SHALL BE KEPT OPEN UNTIL AN AS -BUILT CERTIFICATION HAS BEEN COMPLETED BY THE ENGINEER AND AN APPROVAL TO IMPOUND HAS BEEN ISSUED BY ALL APPLICABLE AGENCIES. 11. INSTALL SPILLWAY FILTER FROM THE DETAILS SHOWN ON SHEET PD-21). 12. CONSTRUCT EMBANKMENT PER SPECIFICATIONS LISTED IN THE SECTION TITLED "BERM AND SOIL COMPACTION SPECIFICATIONS" AND REQUIREMENTS OF THE ON -SITE GEOTECHNICAL ENGINEER. ALL CHARACTERISTICS OF THE EMBANKMENT FILL MATERIAL SHALL MEET THE STANDARDS SET FORTH IN "BERM SOIL AND COMPACTION SPECIFICATIONS", INCLUDING COMPACTION AND MOISTURE REQUIREMENTS. IF NECESSARY TO ACHIEVE PROPER COMPACTION, THE EMBANKMENT FILL MATERIAL WILL BE OVERBUILT IN HORIZONTAL LIFTS AND CUT BACK TO PROPER FINAL GRADE. ANY HAND COMPACTION ACTIVITIES AROUND SPILLWAY OR DRAIN STRUCTURES SHALL BE CONDUCTED IN 4-INCH LOOSE LIFTS AND BE TO THE SAME COMPACTION AND MOISTURE REQUIREMENTS AS THE ENTIRE EMBANKMENT. ALL COMPACTION AND MOISTURE TESTING SHALL BE CARRIED OUT AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER AND AS LISTED IN "BERM AND SOIL COMPACTION SPECIFICATIONS". 13, UPON COMPLETION OF DAM EMBANKMENT, PROMPTLY STABILIZE AND SEED DAM EMBANKMENT PER SEEDING SCHEDULE. 14. SCHEDULE A FINAL AS -BUILT INSPECTION AND AS -BUILT SURVEY WITH THE ENGINEER. AN AS -BUILT INSPECTION SHOULD BE SCHEDULED A MINIMUM OF 60 DAYS BEFORE A PERMIT TO IMPOUND IS REQUIRED. ANY COMMENTS OR DEFICIENCIES IN THE DAM CONSTRUCTION MUST BE CORRECTED TO THE SATISFACTION OF THE ENGINEER AND OWNER BEFORE CERTIFICATION SHALL BE GRANTED. UPON FINAL APPROVAL FROM THE TOWN OF SHALLOTTE AND NCDENR, CLOSE THE 8"0 BOTTOM DRAIN VALVE IN THE RISER BOX AND BEGIN IMPOUNDING WATER. NO WATER SHALL BE IMPOUNDED BEFORE AN APPROVAL TO IMPOUND IS ISSUED FROM THE TOWN OF SHALLOTTE. OUTLET STRUCTURE MATERIAL SPECIFICATIONS 1. THE 24"0 RCP OUTLET BARREL SHALL BE CLASS III RCP, MODIFIED BELL AND SPIGOT, MEETING THE REQUIREMENTS OF ASTM C76-LATEST. THE PIPE SHALL HAVE CONFINED 0-RING RUBBER GASKET JOINTS MEETING ASTM C-443-LATEST. THE PIPE JOINTS SHALL BE TYPE R-4. 2. THE STRUCTURAL DESIGN FOR THE 4'x4' (INTERNAL DIMENSIONS) RISER BOX WITH EXTENDED BASE SHALL BE BY OTHERS. PRIOR TO ORDERING THE STRUCTURE, THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH SHOP DRAWINGS, SEALED BY AN P.E. REGISTERED IN NORTH CAROLINA, FOR' REVIEW. 3. THE RISER BOX OUTLET STRUCTURE SHALL BE PROVIDED WITH STEPS 16" ON CENTER. STEPS SHALL BE PROVIDED ON THE INNER WALL OF THE RISER BOX. STEPS SHALL BE IN ACCORDANCE WITH NCDOT STD. 840.66. PLEASE REFER TO SHEET PD-213 FOR LOCATION OF THE RISER STEPS. 4. THE 8'Lx8'Wx28" THICK CONCRETE ANTI -FLOTATION BLOCK SHALL BE PRECAST AS THE EXTENDED BASE OF THE RISER BOX DURING FABRICATION. THE PRECAST BASE SHALL BE INCLUDED AS PART OF THE SHOP DRAWINGS THAT WILL BE SUBMITTED TO THE ENGINEER FOR REVIEW (SEE ITEM 2 ABOVE). IN LIEU OF A PRE -CAST BASE, THE CONTRACTOR MAY OPT TO CAST -IN -PLACE THE ANTI -FLOTATION BLOCK IN THE FIELD. HOWEVER, PRIOR TO CONSTRUCTING THE CAST -IN -PLACE BASE, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEEF, sFOR REVIEW DENOTING THE FOLLOWING: A. STEEL REINFORCEMENT B. THE CONNECTION MECHANISM TO JOIN THE ANTI -FLOTATION BLOCK WITH THE RISER SECTION 5. THE RISER BOX JOINT DESIGN SHALL CONFORM TO ASTM C-478. THE JOINTS SHALL BE SEALED USING BUTYL RUBBER SEALANT CONFORMING TO ASTM-990. THE CONTRACTOR SHALL PARGE JOINTS ON BOTH THE INSIDE AND OUTSIDE WITH NON -SHRINK GROUT. 6. IF THE ANTI -FLOTATION BLOCK IS PRECAST AS PART OF THE RISER BASE SECTION, THE ENTIRE PRECAST RISER BOX STRUCTURE SHALL HAVE A SHIPPING WEIGHT OF 30,640 LBS. THE STRUCTURE WEIGHT SHALL BE THE SHIPPING WEIGHT AND SHALL BE DETERMINED BY SUBTRACTING THE WEIGHT OF THE FACTORY BLOCKOUTS FROM THE GROSS STRUCTURE WEIGHT. THIS INFORMATION SHALL BE SHOWN ON THE SHOP DRAWINGS SUBMITTED TO THE ENGINEER FOR REVIEW. IF THE CONTRACTOR OPTS TO CAST -IN -PLACE THE ANTI -FLOTATION BLOCK, THE CONTRACTOR SHALL ENSURE THE WEIGHT OF THE ENTIRE RISER STRUCTURE IS EQUAL TO THE MINIMUM LISTED ABOVE. 7. PRIOR TO ORDERING, THE CONTRACTOR SHALL SUBMIT TRASH RACK SHOP DRAWINGS TO THE ENGINEER FOR REVIEW. CONTRACTOR SHALL ENSURE THAT AN ACCESS HATCH IS PROVIDED WITHIN THE TRASH RACK (SEE DETAIL FOR LOCATION) THAT WILL ALLOW FOR FUTURE MAINTENANCE: ACCESS. CONTRACTOR SHALL ALSO PROVIDE A CHAIN AND LOCK FOR SECURING THE ACCESS HATCH. 8. ALL POURED CONCRETE SHALL BE MINIMUM 3000 PSI (28 DAY) UNLESS OTHERWISE NOTED. 9. GEOTEXTILE FABRIC FOR THE 24"0 OUTLET BARREL JOINTS SHALL BE MIRAFI 18ON OR ENGINEER APPROVED EQUAL (NON -WOVEN FABRIC) 10. STORMWATER WATER QUALITY POND EMERGENCY DRAWDOWN IS VIA AN 8"0 PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 820 X-CENTRIC VALVE OR APPROVED EQUAL THIS VALVE IS IN ACCORDANCE WITH AWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL (SEE DETAIL SHEET PD-2B). THE CONTRACTOR SHALL PROVIDE A REMOVEABLE VALVE WRENCH WITH A HANDWHEEL ON TOP FOR OPERATION OF THE 8"0 PLUG VALVE A CHAIN AND LOCK SHALL ALSO BE PROVIDED FOR SECURING THE WRENCH TO THE TRASH RACK. ENDWALL�PER 7 �CDOT STD. 838.80 (SEE ZETAIL SHEET PD-2C) r INV. OUT (24"0 0-RIN(y RCP) = 10.00 r r -LEVEL-SPREADER - (SEE DETAIL SHEET PD-2D) LENGTH = 10' UP ELEV. = 9.50 I NCDOT 8'L �X 77 \ 24"0 0-RING R ® 0.65 (JOINTS WRAPPED IN EOTE)TILE FABRIC) GRAPHIC SCALE 1 inch = 30 ft. PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUC-1710 v TOP OF DAM = EL. 20.00 TOP OF RISER = EL. 18.20 NORMAL POOL = EL. 15.00 INVERT OUT = EL. 10.50 1.5" PVC SIPHON INV = EL. 15.00 (NWSE) SIPHON TO EXTEND 6" FROM THE FACE OF THE RISER AND ELBOW 90' TO 6" BELOW NORMAL POOL (EL. 14.50) TOP OF HANDWHEEL TO EXTEND 1-FOOT ABOVE TRASH RACK DRAWDOWN DRAIN -/ CONCRETE TRASH RACK (SEE ANTI -FLOTATION DETAIL SHEET PD-2C) BLOCK CONTRACTOR SHALL FORM INVERT OF RISER STRUCTURE TO DRAIN POSITIVELY TO INVERT OF OUTLET BARREL USING NON -SHRINK GROUT NOTES: 1. CONCRETE ANTI -FLOTATION BLOCK TO BE PROVIDED WITH MINIMUM TEMPERATURE AND SHRINKAGE STEEL REINFORCEMENT. 2. TRASH RACK NOT SHOWN FOR CLARITY. 1.5" PVC INV = EL. 15.00 SIPHON TO EXTEND E THE FACE OF THE IRIS ELBOW 90' TO 6" NORMAL POOL (EL. 24"v 0-RINC 8" 0 DIP 4" SOLID BRICK (BY OTHER NOTE: BRICK SHALL ATTAI AND LAY TIGHT AGAIN PRECAST STRUCTURE USII BRICK TIES WITH NO VC SPACE BETWEI CONTTACTOR 19VERT OF RISER STRUCTURE TO DRAN POSITIVELY TO INVERT OF OUTLET BARREL !USING NON -SHRINK GROUT ANT! -FLOTATION BLOCK TRASH RACK (SEE DETAIL) 10 FT. WIDE MINIMUM COMPACTED BERM SECTION (SEE BERM AND SOIL COMPACTION SPECIFICATIONS ON SHEET PD-2A) CONCRETE COLLAR (TO BEPROPOSED GRADE CONSTRUCTED IN THE FIELD BY THE CONTRACTOR, SEE DETAIL) 3 3 ! - -1 ��, 1.0 FT OF 1('IIIIII-III-IIIIIII I-i I IIII-IIIIIIIII-IIII _ APPROXIMATE LOCATION COVER (MIN.) III-i I IIII! I IIIIIIIIII1 I IIIIIII IIII-III-IIIIIIi _- OF EXISTING GROUND o --- 1 I I-1 I I`I I I -III -I ICI I1 I ICI -1 = -III. - I I ICI I I1 11=1 I: I I 1 I I=1 I I`! I I III 1 I I 11 I I I i�l 11 1 I 1 1 i 1 I I=1 f I 1 I I 1 I -1 1=1 11 0 q yy_�... - �--------------------------- 77 LF 24"0 0-RING RCP 00.65------- _ FLOW r ! ... ` C amp d 9 P + ° .�d -= • ' e t °: e. • ° d (MIN.) • ♦.5 FT.a' ..4 4 - - > 8" PLUG VALVE. THE VALVE NON -WOVEN GEOTEXT►LE FABRIC SHALL BE A M&H STYLE 820 SHALL BE PLACED AROUND EACH X-CENTRIC VALVE OR JOINT OF THE 24" 0-RING RCP CONCRETE CRADLE SPILLWAY FILTER ENGINEER APPROVED EQUAL. BARREL IN 2' WIDE STRIPS (SEE DETAIL (SEE DETAIL THIS VALVE SHALL BE IN CENTERED ON JOINT. KEY TRENCH (SEE BERM AND ACCORDANCE WITH AWWA 5.0' (MIN.) SOIL COMPACTION SPECIFICATIONS, SHEET PD-2D) SHEET PD-2D) C-504 SEC, 5.5, AND SHALL DETAIL SHEET PD-2A) BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL. PERIVIANEir DAM CROSS SEG" UON N.T.S. •+ avuu omi%,n (BY OTHERS) NOTE: BRICK SHALL ATTACH AND LAY TIGHT AGAINST PRECAST STRUCTURE USING BRICK TIES WITH NO VOID SPACE BETWEEN TOP OF HANDWHEEL TO EXTEND 1-FOOT ABOVE TRASH RACK CONCRETE COLLAR (TO BE CONSTRUCTED IN THE FIELD BY THE CONTRACTOR - SEE DETAIL) PRECASTER SHALL PROVIDE A BLOCK OUT FOR THE 24"0 0-RING RCP CONCRETE CRADLE (SEE DETAIL SHEET PD-2D) CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. (SEE DETAIL SHEET PD-2C) CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. GUIDE STEM (SEE DETAIL SHEET PD-20) TOP OF RISER = EL. 18.20 4" SOLID BRICK (BY OTHERS) 1.5" PVC SIPHON NOTE: BRICK SHALL ATTACH INV = EL. 15.00 (NWSE) AND LAY TIGHT AGAINST SIPHON TO EXTEND 6" FROM a PRECAST STRUCTURE USING THE FACE OF THE RISER AND BRICK TIES WITH NO VOID ELBOW 90' TO 6" BELOW SPACE BETWEEN NORMAL POOL (EL. 14.50) CONCRETE COLLAR (TO BE CONSTRUCTED IN THE FIELD BY THE CONTRACTOR - • SEE DETAIL) '• PRECASTER SHALL PROVIDE A BLOCK OUT FOR THE 24"4 O-RING RCP 24"4 0-RING RCP O INVERT OUT = EL. 10.50 d °e DRAWDOWN DRAIN �.' 2 LF 8"0 DIP ® 0.00% .• •d.. • 4 ... ♦a �, INV = EL. 10.73 • • - - `4 d.. - -- . .. - 1- - - ° .-i. - - f CONCRETE CRADLE d • d - -.• ' .. - (SEE DETAIL SHEET PD-2D) CONTRACTOR SHALL SEAL• 8"o DIP DRAIN PIPE 8" PLUG VALVE. THE VALVE THE PIPE PENETRATION USING A RUBBER BOOT CONTRACTOR SHALL SHALL BE A M&H STYLE 820 AND STAINLESS STEEL CORE -DRILL THE HOLE FOR X-CENTRIC VALVE OR HARDWARE THE 8"0 DIP PIPE IN THE APPROVED EQUAL. THIS VALVE FIELD. PRECASTER SHALL SHALL BE IN ACCORDANCE OMIT REINFORCEMENT IN WITH AWWA C-504 SEC. 5.5, CONCRETE THIS AREA AND SHALL BE OPERABLE ANTI -FLOTATION FROM TOP OF OUTLET BLOCK STRUCTURE VIA A HANDWHEEL. O '1 33 NOTES: 1. ALL REBAR TO BE #4 REBAR. 2. ALL REBAR AND ANGLES TO BE GALVANIZED AND BE PROVIDED WITH AN EPDXY COATING. 3. THE HOT -DIPPED, GALVANIZED 2"x2"x1/4" ANGLES SHALL BE WELDED TO THE REBAR TRASH RACK. ONCE WELDED, THE ENTIRE ASSEMBLY SHALL BE PLACED ONTO THE RISER WITH ANGLES SITTING DIRECTLY ON TOP OF RISER. 7.0' 7.0' 5.3" (TYP.) THE BOLD DENOTES THE ACCESS ,HATCH TO BE PROVIDED BY THE TRASH RACK FABRICATOR (SEE SHEET PD-2A, OUTLET STRUCTURE MATERIAL SPECIFICATIONS, NOTE #7) ACCESS HATCH�v�y v NOTE: 1. ALL REBAR TO BE #4 REBAR. 2. GROUT SHALL BE USED TO FILL ALL VOIDS INSIDE THE STRUCTURE AROUND THE PIPE. 5.0' 3" CLEARANCE TO 3" CLEARANCE TO OUTSIDE OF #4 REBAR OUTSIDE OF #4 REBAR e ° - 4 d - - - 3� CLEARANCE TO ° QUTSIDE OF #4 REBAR _. � d a e e ° d d a - d•.. / \ ° (24" 0-RING 5.33' RCP ! ° °4.. \ / - ° d 0.5 G 4 ° d d - ° .a. - _ --- -- - °-4 e ° d 7.8 3.2' 7.8" 9.9 LF 2"x2"x1/4" ANGLE .9 LF "x2"x 1 /4" NGLE TRASH RACK DETAIL N.T.S. CONCRETE ANTI -FLOTATION BLOCK 6" OF COVER ENDWALL PER NCDOT STD. 838.80 (MIN.) (SEE DETAIL SHEET PD-2C) VELOCITY DISSIPATOR NCDOT CLASS 'A' RIPRAP _� 8'L x 10'W x 9" THICK - D50 = 4" (SEE DETAIL SHEET PD-2C) �o t now mrmw -,o_ wasmm 24" 0-RING RCP!- INV. OUT = 10.00 LEVEL SPREADER�- (SEE DETAIL SHEET PD-2D) LENGTH = 10' LIP ELEV. = 9.50 4.8" (TYP.) r-� #4 REBAR TRASH RACK (ABOVE) ANCHOR TRASH RACK TO MANHOLE WALL WITH FOUR EQUALLY SPACED HOT -DIPPED GALVANIZED STEEL CLAMPS. EACH CLAMP ATTACHED TO MANHOLE RISER BY 2-4"x1/4" CONCRETE ANCHOR BOLTS EACH CLAMP TO BE COATED W/ AN EPDXY COATING. 3" ANCHOR DEPTH I #4 REBAR ANCHORS CONTRACTOR SHALL - DRILL INTO PRECAST - STRUCTURE WALL AND SET ANCHORS USING d EPDXY GROUT 3" CLEARANCE TO OUTSIDE OF #4 REBAR CONCRETE COLLAR DETAIL N.T.S. 1' DEPTH 4" SOLID BRICK (BY OTHERS) NOTE: BRICK SHALL ATTACH AND LAY TIGHT AGAINST PRECASR STRUCTURE USING BRICK TIES WITH NO VOID SPACE BETWEEN 3000 PSI CONCRETE COLLAR (MIN. 28 DAY STRENGT i) 3" CLEARANCE TO OUTSIDE OF J4 REBAR 5.5" CENTER TO 24" 0-RING RCP CENTER d. +• 6" ANCHOR DEPTH #4 REBAR ANCHORS. CONTRACTOR SHALL DRILL INTO PRECAST BASE AND SET ANCHORS USING EPDXY GROUT CONCRETE ANTI -FLOTATION BLOCK U CO a C,2 x a_ W 0 O E- di uO OWN rr■ Z 30CAR e--f .� �,€ 7 N R 8 z z U1 s O a W --� ni tn 14 E- ca o O w a 5 � A x z w �5 d o � W y lie �r C4q cq O t� A �-+ o 1 4--1 0 0 OD 14 "I Lni PROJECT NO. WDL-07020 FILENAME: WDL070207PD DESIGNED BY: BRF DRAWN BY: JAA SCALE: NTS DATE: 09-20-2007 SHEET NO. ` ` i 2 B PRELIMINARY DRAWING - NOT RELEASED FOP CONSTE TCTION t:taf 0 Cr I !! V TTFS' ►..` i <F- 0 3`° TI =13 FFECAIT " �' 1= .:.} rla. PIE -QLLC" ak:i r f cr- o t3 A,J1 1:.-1 r t •f 1 - f Tf 3TAI 1 UrlRT FIXUALL S WITT 477155 A%7 =AY ` " C'7 = 0 ( FC.. Ik KC'.RC "I 0.7H c� ,:IF_ ATI41 E� : =+3Y E-13. to 7G � L6 -. T rl �. f R 1 _ y1 �' 1 1 C ._ r FUI �'3k FE-Et='. l'JC;0^.E ALL 7 ,kr..resT. ,:EFL fi.ITri- 14trTf: AnTW h!1tn I.-X_ zW `ate y�`T o'^ Fr 33iL= TiG J7 fE®aFC r•',F = 3RTG kFG=Elil,lll.f�+_J -TC+ .PSTM .* 185 -.Tu V VIK , LL&d=M GE 00 (J: L -1 x• ._ . - t_ Y f _ P ...:C L:- + 11+F 9 iF, Pll.:s =ti I7=-;1 L H2 y =i f .:1 .,TAK:llnD s P2fl :'3t, . tn P 1 e Lt vS+F:C° 1 R I P Pr TO CE a 0JT=0 _ R'.' tl=hM%_L � 43 *='E Gr � d �j + t E3 j% rf?7'�9�r f,'1 L LH IIr• L T H Lt 4 C01, 3. 1:1= E FABIT C WAY 6a ti S 7 lTL' .1 FCP ,IEBAA � h5 Ul!ir3 :e3 TF 3_1'31E hAFA 07 U77EL _3 PR +_7EL. _ .. .Lr...... +._ ta'Atlpl,l: ALL r7f ,<r 1'" f?'=. 'iA�.: !: n�5.<,, ' - METER- f. U44I1T F11:1 iL&fi .l�`.;`E t 3- c V:I 4 V a++A SIZE EF ' L 6_ tl5 &,,;!S ELEVATIO T m -4 M A _ .. L r rr PLAN 3 N'38.80 SIDE r.. 8 t 3.TH h' v'C D� III +,,'tE .-E 0?TICIt IL : 74 IhCCFcd.SE AIS 6A3 T LS EEED, LL ` 911:cm � t7 _ ENDWALL M!>> ENSIGNS a. d' TY. 4i��(_ 4I1 tJti I�1'1.,6fn{.' f+It1.iID;x_ 41at1.JtLiY N1MG W a. PIPE DIA, I LiAK G_Z w T'A (FT ,FT_) D FT.' Ya Lu ti `0j3 7!a?2.tyf2.jisE" a: T u 4`1S �` t y2 lTF 3. of?! T5 ' r:,7 M) '' 50f.9 76 2 2.00 3. 0 4 2t ' t pf 2.`.)o _. cx .537�!;%50 .",, 0 75 7n 12.5D 4 02,f4.25 vi,'3_50 V:$.ftu 2.Cr.`t.0C1 4_ 3,`8.5i5 1U vClr'11.JU (!I 2 00 3.5i1 a.C+TtE,b" C �.^7 tt` 3 Lf' t � •p ^- GO ` :r.' fJ ? Oa 3 9 +Q C S Fi. -ri 1 ] l d 7 i r CL. CC 4.5 i da ` 8` ' d li^f 14 .EA fs 5 9 r;r1 00 0ljQ,.?5 17. 15 S 5. 1 '' aZi ` s 4.5Cmr,_-lllj 7.00 K.ri.', 3 r,4.00 r ' 7.ra(8.2G 13 7.a11b 75 G.G +':a H 6' 4.aY'a-70 '.v7,0. v 3-2,4.YrJ v+9.7S 14.44r15_7] ._4a . GCa " :; 4.0- .0U + MAD 24' ENDWALL DETAILS N.T.S. NOTES: ALL STEPS SHALL PROTRUDE 4' FROM INSIDE FACE OF STRUCTURE WALL, STEPS DIFFERING IN DIMENSIONS, CONFIGURATION OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PROVIDED THE CONTRACTOR HAS FURNISHED THE ENGINEER WITH DETAILS OF THE PROPOSED STEPS AND HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE OF SUCH STEPS. z o� 1->- HQ�=Lj •. 1' � V--IED L3Z p�t/�= WQZ = M w CD <: a,��~ZJ ��W0< m oov�� 5/s' z �Q W 11 PLAN PLAN SIDE c; N SIDE ELEVATI❑N ELEVATI❑N FL CD W CAST IR❑N l_ 1411L` r• 1 -0 _ ELEVATI❑N 1 3/16' 1• 8 3/4' 1 1/4' `v a+ 1/4' 5/8' M PLAN DE ELEVIATI❑N %1416 COMPOSITE #3 DEFOI 12 STEEL RI ELEVATION SECTI❑N A -A +-, W Q � Q� U < #6 BAR OR zo #8 BAR q GALV'D. Z m Q � F-- W l� � <L SIDE -i H PLAN ELEVATI❑N z Q W � pj_7� i REINFORCING STEEL Q N❑TE! 12' _ NOT TO BE USED IN SANITARY SEWER MANHOLES. ELEVATION MAEMNANCE ACCESS STEPS N.T.S. 1EET 1 OF 1 840.66 NCDOT r,Tn 838.80 HE (SEE 24" RCP A 4' WIDE (MIN.)--" NCDOT 838.80 HEAD (SEE DE A FILTER BLANKET IS TO BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. THE FILTER BLANKET WILL CONSIST OF A MINIMUM 4" THICK LAYER OF STONE (NCDOT #57) UNDERLAIN WITH MIRAFI FILTER WEAVE 700 OR APPROVED EQUIVt�LENT 16 REBAR PERIMETER FRAME 4" x 4" 6/6 WELDED WIRE FABRIC (EACH SIDE & TOP OF CAGE) 14" (TYP.) 2.03' 4" ANCHOR DEPTH CONTRACTOR SHALL DRILL INTO PRECAST EXTENDED BASE AND SET ANCHORS USING EPDXY GROUT " RIPRAP THICK 1" LAYER OF CLASS "A" RIP -RAP F" FILTER BLANKET BLANKET (SEE NOTE) 2C OUTLET BARREL VELOUTY DISSIPATOR N.T.S. 4" SOLID BRICK (BY OTHERS) NOTE: BRICK SHALL LAY TIGHT AGAINST PRECAST STRUCTURE USING BRICK TIES WITH NO VOID SPACE BETWEEN a d 4 2 LF 8"0 DIP a d d a 0.86' (CENTER TO CENTER) CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT AND STAINLESS STEEL HARDWARE 8"0 DIP DRAIN PIPE CONTRACTOR SHALL CORE -DRILL THE HOLE FOR THE 8"0 DIP IN THE FIELD. PRECASTER SHALL OMIT REINFORCEMENT IN THIS AREA. 8" PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 820 X-CENTRIC VALVE OR ENGINEER APPROVED EQUAL. THIS VALVE SHALL BE IN ACCORDANCE WITH AWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL. (CENTER TO CENTER) 4" x 4" 6/6 WELDED WIRE-, FABRIC (EACH SIDE & TOP OF CAGE) e a 2.80' #6 REBAR PERIMETER FRAME 4" SOLID BRICK (BY OTHERS) - NOTE BRICK SHALL LAY TIGHT AGAINST PRECAST STRUCTURE USING BRICK TIES WITH NO VOID SPACE BETWEEN a� A - 6" J"0 GRADE 8 o STAINLESS STEEL CONCRETE LAG SCREW < O 12" X 4" X" GALVANIZED STEEL ° STRAP (4 PER RISER JOINT) 3.0" RISER JOM CO ON DETAIL N.T.S. 8"0 DIP DRAIN PIPE CONTRACTOR SHALL CORE -DRILL THE HOLE FOR THE 8"0 DIP IN THE FIELD. PRECASTER SHALL OMIT REINFORCEMENT IN THIS AREA 6" MIN. WALL 8" PLUG VALVE. THE VALVE THICKNESS SHALL BE A M&H STYLE 820 X-CENTRIC VALVE OR APPROVED EQUAL. THIS VALVE SHALL BE IN ACCORDANCE /F1 WITH AWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE FROM TOP OF OUTLET m STRUCTURE VIA A HANDWHEEL c- a n 2 LF 8"0 DIP CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT AND STAINLESS STEEL HARDWARE ►-j '. u7 U x Q W aN �azu W z d Cf? O CL4 0.i O O W �o co rr■ �-+ O 9.Ao J((J((1141 tEf,, i~ 1 z O , ifJ S W U a W o Lo EMo C .4 o off ��Z M 5� � A x 'T Z W � W 5 O co o d � Pe cx z O cq R cq z a O o 0 a O z p � l PROJECT NO. WDL-07020 FrrENAaIE: WDL07020-PD DESIGNED BY: BRF DRAWN BY: JAA SCALE: N TS DATE: 09-20-2007 STFR'r NO. P D - 2 C PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION McADAMS CONCRETE ANTI --FLOTATION BLOCK 1" THICK JOINT FILLER MATERIAL 24"0 Q—RING RCP FLOW —_ 4 1" THICK JOINT FILLER MATERIAL w v w v w W w w w w w w 3—FOOT WIDE LAYER OF #57 w w w w w w STONE (4—INCHES DEEP) w w w w w UNDERLAIN WITH FILTER FABRIC w w w w w w w W w W w w W w w w w w w w w REINFORCED CONCRETE FOOTING 3" SOLID MASONARY BLOCK LIP STUBBED ABOVE GRADE LIP ELEV. = 9.50 Cv lv\i I \ L- 1 L ANTI — FLOTATI O N BLOCK RISER BARREL CO. ON DETAIL N.T.S. 10' SOUD MASONARY BLOCK LEVEL SPREADER 6--FOOT WIDE (1—FOOT DEEP) TRIANGULAR CHANNEL 0 0.00% SLOPE LINED WITH LANDLOK TURF REINFORCEMENT MATTING 450 LID MASONARY BLOCK — CHANNEL SHALL BE LINED WITH LANDLOK TURF REINFORCEMENT MATTING 450 AND SEEDED PER SEEDING SCHEDULE (SEE LINING ANCHOR DETAILS SHEET PD-2E) 6' ,# I IIII—III—III— 8" (�) + 18", 1 I_I _ 3 _I (IIII I I_SOLID MASO Y BLOCK 3 —1 1 1 I-1 REINFORCED CONCRETE FOOTIN I— UNDISTURBED EARTH L41901.4-ImMm 12" LEVEL SPREADER DETAILS N.T.S. rILLCK MAILMIAL (3) #4 REBARS CONTINUOUS #4 REBAR ® 18" O.C:—1 8" (TYP) 12" 8" 3" (TYP) -� f ate__—_ 24" 2" DEEP x CONTINUOUS KEYWAY =01112lembim GENERAL NOTES: 1. CONSTRUCT CONCRETE LEVEL SPREADER LIP ON A ZERO PERCENT GRADE TO ENSURE UNIFORM SPREADING OF FLOW. 2. LEVEL SPREADER SHOULD BE CONSTRUCTED ON UNDISTURBED SOIL, AND NOT ON FILL 3. THE TRIANGULAR CHANNEL SHOULD BE CONSTRUCTED ON A ZERO PERCENT GRADE. 4. THE TRIANGULAR CHANNEL SHOULD BE LINED WITH LANDLOK TURF REINFORCEMENT MATTING 450 OR APPROVED EQUIVALENT. THE TRM MATTING SHOULD BE ANCHORED PER THE DETAILS PROVIDED. THE TRM MATTING SHOULD BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 5. THE 3—INCH LAYER OF #57 STONE SHALL BE UNDERLAIN WITH MIRAFI FILTERWEAVE 400 OR APPROVED EQUIVALENT. 1. ALL TIE BARS (U—BARS) ARE #3 (AS LABELED) REBAR (GRADE 60) SPACED AT 10 FT. CENTER TO CENTER ALONG THE LENGTH OF THE CRADLE. 2. MAINTAIN A MIN. COVER OF 3" OF CONCRETE (TO THE OUTSIDE OF THE REBAR) FOR ALL REINFORCEMENT. 3. TRENCH TO BE BACKFILLED IN 5" LIFTS WHEN COMPACTION IS BY HAND. BACKFILL IS IN 8" LIFTS WHEN CONDUCTED BY MACHINE. MINIMUM OF 2 FEET COVER MUST BE PRESENT ON 24"0 RCP BEFORE DRIVING OVER WITH HEAVY EQUIPMENT. 4. REINFORCED CONCRETE CRADLE MAY BE REPLACED PER RECOMMENDATION FROM THE ON —SITE GEOTECHNICAL ENGINEER. ANY DEVIATION FROM THIS DETAIL SHALL BE SUBMITTED TO AND REVIEWED BY THE DESIGN ENGINEER PRIOR TO IMPLEMENTATION. PROPOSED GRADE 24"Q 0—RING RCP FLOW © a \� 1 > 1MIN. NO. 67 WASHED STONE ENCASED IN NON —WOVEN FILTER FABRIC (MIRAFI 180N OR EQUIVALENT) ER IV UUIJIUt ur )f'5 TIE BAR (TYP.) 24" CONCRETE CRADLE DETAIL N.T.S. ENDWALL PER NCDOT STD. 838.80 (SEE DETAIL SHEET PD-2C) NOTE: 4" WEEPHOLES TO BE PROVIDED WITH VARMINT GUARD ON DOWNSTREAM SIDE AND GALVANIZED HARDWARE CLOTH ON UPSTREAM SIDE (Y4" MAXIMUM OPENINGS) 4"0 WEEPHOLES ON EACH SIDE OF SPILLWAY L PER NCDOTESTD. A 838.80 (SEE DETAIL SHEET PD-2C) SPILLWAY FILTER DETAIL N.T.S. BARREL PIPE CONCRETE CRADLE CONSTRUCTION SEQUENCE 1. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, THEN BRING GRADE OF DAM EMBANKMENT TO SPRINGLINE OF PIPE ELEVATION. IF OPTION B IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, THEN CONSTRUCT FORMWORK FOR CONCRETE CRADLE ON EXISTING GRADE. 2. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, THEN EXCAVATE TRENCH FOR CRADLE AND BARREL PER DIMENSIONS ON DRAWINGS. IF OPTION B IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, PROCEED TO STEP 3 BELOW. 3. PLACE REINFORCING STEEL AND JOINT FILLER MATERIAL PER DRAWINGS. ALL REINFORCING STEEL SHALL HAVE A MINIMUM OF 3" OF CONCRETE COVER (INCLUDING TIES). 4. PLACE BARREL PIPE ON CONCRETE BLOCKS TO GRADE. CONTRACTOR SHALL WRAP JOINTS WITH 2—FT WIDE STRIPS OF FABRIC AT THIS STEP. 5. POUR CONCRETE FOR CRADLE FOR EACH SECTION FROM ONE SIDE OF THE TRENCH. ALLOW CONCRETE TO FILL ENTIRE AREA UNDER PIPE AND PIPE HAUNCHES AS TO LEAVE NO VOIDS UNDER THE PIPE BEFORE POURING ON THE OPPOSITE SIDE OF THE TRENCH. POUR ENTIRE CRADLE AS ONE LIFT (VERTICALLY) PER DRAWINGS.. 6. ALLOW CRADLE TO CURE FOR A MINIMUM OF 7 DAYS BEFORE ANY VIBRATING COMPACTION EQUIPMENT IS USED IN THE VICINITY OF THE BARREL PIPE. BARREL PIPE CRADLE MATERIAL SPECIFICATIONS CONCRETE Q COMPRESSIVE STRENGTH OF 3500 PSI AT 28 DAYS o APPROVED MIX DESIGN 0 4-6% AIR ENTRAINED o MAXIMUM MIX TO POUR TIME OF 90 MINUTES FOUR CYLINDERS SHALL BE PREPARED FOR TESTING FOR EACH LIFT. ONE SHALL BE TESTED AT SEVEN DAYS, TWO AT 28 DAYS, AND THE FOURTH SHALL BE HELD FOR 54 DAYS. G A MINIMUM OF 3" OF CONCRETE COVER ON ALL STEEL IS REQUIRED (INCLUDING TIES), o CONCRETE TO BE VIBRATED VERTICALLY. WET CONCRETE SHALL NOT BE MOVED HORIZONTALLY WITH THE VIBRATOR. STEEL o ALL STEEL TO BE GRADE 60. Q ALL STEEL SHALL BE FREE OF RUST OR OTHER DEBRIS THAT MIGHT PREVENT BONDING TO THE CONCRETE. o ALL STEEL SHALL BE BENT WITH A MINIMUM RADIUS OF 3DB (1.13" FOR #3) AS SHOWN ON THE DRAWINGS. o THE #5 BARS IN THE CONCRETE CRADLE SHALL BE SPLICED WITH A MINIMUM OVERLAP OF 32". THE SPLICES SHALL BE SPACED SUCH THAT NO TWO SPLICES OCCUR WITHIN THE SAME LENGTH OF PIPE. 8'-7.5" 2'-7.5" O.D. ;HED STONE NON —WOVEN IC (MIRAFI 180N ENT) ENCASED IN NON —WOVEN SIDE OF SPILLWAY FILTER FABRIC (MIRAFI 180N OR EQUIVALENT) PRELIMINARY DRAWING — NOT RELEASED FOR CONSTRUCTION -D - morn (2.3ft) VIAISR. FLOITI -4r- 1 5 sm (6 ail) T I I::E, + riIq, PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY_ NnTF6. 1. SECurlR A°T 30 �; (1 It) INTERVALS, BA.CKFI'-a AND aONI 'AGT SOIL .TERAGNAL CHANNEL ANCHOR TRENCH DETAIL N.T.S. PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY. , 777 - t .- - f..:.. i T— _ f — 6 in) l - HAPEC WIRE. STAPLES. ►vIETAICEOTEXTI E PI'NSe TR:ANr--U:-,'1F %fV-DODEN O;R PLr\ST C. STAKES CA,NBE US .0 'TO ,\'4Gt4t lI "FUNIS T O I HI- UHUUN1d!5U tI-AL;L- ANCHOR PATTERN FOR 3H:1V < SLOPES < 2H:1V N.T. S. 1a cm (t� h1I NOTES: I. SECL RI-; A'r 3U (1 't) tkTCRVALS, BACKFIL- Ar-,D :,-OMPACT ,SOII I= Nt CHECK SLOT DETAIL N.T.S. PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPt ICABILITY AND ACCURACY. PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY. 10 cm ANrpnRS (4 NOTES: 1, INSTALL LANDLCK',, OR P` RAMAT� TURF REINFORCEMENT MAT (OR EQUAL) AND SOIL FILL (OPTIONAL' 2.. ScCURE LONOiTODIINAL ,ANCHOR TRENCH AT 30 cra (I I`.) eNTERVALS, 9ACKFILL AND CQWP ACT SOIL LONGITUDINAL ANCHOR TRENCH DETAIL N.T.S. rr z - y4 tj`{:� VVATCR FLt7y�,� t jr �r-ram.-+ . • .4 _-�.+�.Y?_- � f•a^�. i :1 r+ NOTES: 1. SECURE AT 30 e;,--n (1 (t) INTEfRVALS. BAC.KFII_t_ AND C07APACT S0111. OffrIAL ANCHOR TRENCH DETAIL N.T.S. PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY. 30 cn z PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION n ... W z W 91 — \`\\Illllirrr \A CAR ` A v •`•• s� Ile, R U U2 R z A o i W E— E-a z � x � W ass o z � '4 a � � r W cq is cq �9 I� a r� O^ 4 �1 O O OD PROJECT NO. ML-07020 FIiENAMF: WDL07020-PD DESIGNED BY: 'DRF DRA N BY: JAA 5� NTS Ilrr No. MWADAMS TOP OF DAM = EL. 20.00 10' MIN. WIDTH 12-FT AQUATIC SHELF PRECAST RISER OUTLET STRUCTURE FROM EL. 15 TO EL. 13 SHAPE = SQUARE 6:1 SLOPE (TO BE INSTALLED INTERNAL DIMENSIONS = 4 FT. x 4 FT. TOP OF RISER = 18.20 AROUND POND PERIMETER) FOREBAY BERM = EL 14.00 1.5"0 SIPHON INVERT (NWSE) = 15.00 MIN WIDTH = 5 FT. INVERT OUT (24"4 0-RING RCP) = 10.50 TEMPORARY POOL = EL 18.20 _.._.._..-..-..-.._..__._.._.._.._.._.._..-..-..-,._.._..- - - ._.._.._.._...-__.._.._.._... --.._..-..-..-..-..-..-.._.._ 3 NORMAL POOL EL. 15.00 3 3 3 3 1 FOREBAY 1 �- -� MAIN POOL 1 F- POND INVERT = EL 9.00 POND INVERT = EL WATER QUALITY POND #2 CROSS SECTION N.T.S. TOP OF DAM ® EL. 20.00 10' MIN. WIDTH _.._._._.._.._.._....... ...... _.l I{�a II1� I __ 77�,l I I -I I (- II I f-I I- • a _ J - b _ • _ e - U 77 LF 24"0 0-RING RCP ® 0.657. (JOINTS WRAPPED IN GEOTEXTILE FABRIC) ENDWALL PER NCDOT STD. 838.80 (SEE DETAIL SHEET PD-2C) INV. OUT (24"0 0-RING RCP) = 10.00 VELOCITY DISSIPATOR NCDOT CLASS 'A' RIPRAP 8'L X 1O'W X 9" THICK D50 = 4" (SEE DETAIL SHEET PD--2C) LEVEL SPREADER (SEE DETAIL SHEET PD-2D) LENGTH = 10' LIP ELEV. = 9.50 w; PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION ' r y �. ��s .a 3 ,: '.a,�,. �' '� x ':� �$ r � '�`�. ';�?� � r i ; ,.i. .'w �, :�.�'i e,.k ",•d r %� "' �` � #.`" '� s. ;' { 1. PRIOR TO CONSTRUCTION, THE ON -SITE GEOTECHNICAL ENGINEER SHALL VERIFY THE SUITABILITY OF 1. PRIOR TO CONTRUCTION, THE OWNER SHALL OBTAIN A LAND DISTURBING (GRADING) PERMIT FROM THE PROPOSED BORROW AREA/FILL FOR USE IN THE DAM EMBANKMENT/KEY TRENCH. NCDENR AND AN APPROVAL TO CONSTRUCT FROM THE TOWN OF SHALLOTTE AND ALL OTHER APPLICABLE AGENCIES. 2. THE ON -SITE GEOTECHNICAL ENGINEER SHALL INSPECT THE KEY TRENCH EXCAVATION PRIOR TO PLACEMENT OF ANY BACKFILL WITHIN THE KEY TRENCH. IF THE CONTRACTOR CONSTRUCTS AND COVERS UP THE KEY TRENCH PRIOR TO INSPECTION, THEN THE KEY TRENCH SHALL BE UNCOVERED AND TESTED AT THE CONTRACTOR'S EXPENSE. 3. THE CONTRACTOR SHALL REFER TO THE LANDSCAPE PLAN FOR THE PERMANENT PLANTING PLAN/SCHEDULE. PLEASE NOTE THAT NO TREES/SHRUBS OF ANY TYPE MAY BE PLANTED ON THE PROPOSED DAM EMBANKMENT (FILL AREAS). 4. DURING THE INITIAL STAGES OF CONSTRUCTION, THE WATER QUALITY POND MAY BE USED AS A SEDIMENT BASIN FOR EROSION CONTROL PURPOSES. IF SO, THE CONTRACTOR SHALL FOLLOW THE GENERAL CONTRUCTION SEQUENCE BELOW: A. THE CONTRACTOR SHALL CONSTRUCT THE ENTIRE FACILITY (PERMANENT OUTLET STRUCTURE, DAM, KEY TRENCH, ETC.) WITH THE EXCEPTION OF THE INTERIOR WATER QUALITY POND GRADING, THE INTERIOR GRADING WILL BE CONSTRUCTED ONCE THE EROSION CONTROL PHASE IS COMPLETE. B. THE TEMPORARY DRAWDOWN RISER SHALL BE CONNECTED TO THE PERMANENT 8"0 DIP DRAIN PIPE. C. ONCE THE UPSTREAM DRAINAGE AREA IS STABILIZED AND THE EROSION CONTROL INSPECTOR AFPROVES THE REMOVAL OF THE SEDIMENT BASIN, THE CONTRACTOR SHALL REMOVE THE TEMPORARY DRAWDOWN RISER AND CLEAN -OUT THE BASIN. ALL SEDIMENT, TRASH, ETC. SHALL BE DISPOSED OF PROPERLY (I.E. - PLACED IN A LANDFILL) AND NOT STOCKPILED IN AN AREA WHERE WATER QUALITY COULD BE ADVERSELY AFFECTED. D. ONCE THE BASIN IS CLEANED OUT, AND ALL EROSION CONTROL DEVICE REMOVED, THE CONTRACTOR SHALL CONSTRUCT THE INTERIOR GRADING SHOWN ON THIS SHEET. E. ONCE THE GRADING IS COMPLETE, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION AND AN AS -BUILT SURVEY PRIOR TO INSTALLATION OF THE WATER QUALITY POND PLANTS. IF THE CONTRACTOR PLANTS THE PROPOSED VEGETATION PRIOR TO AN AS -BUILT SURVEY (AND SUBSEQUENT APPROVAL), ANY CHANGES TO THE GRADING / RE -PLANTING OF PLANTS WILL BE AT THE CONTRACTOR'S EXPENSE. F. ONCE THE ENGINEER HAS APPROVED THE AS -BUILT GRADING, THE CONTRACTOR SHALL PLANT THE PROPOSED WATER QUALITY POND PLANTS SHOWN ON THE LANDSCAPE PLAN FOR THIS FACILITY. G. AFTER COMPLETION OF THE PLANTING, THE LANDSCAPE CONTRACTOR SHALL PROVIDE A LETTER TO THE ENGINEER CERTIFYING THAT THE PLANTS HAVE BEEN INSTALLED PER THE APPROVED WATER QUALITY POND PLANTING PLAN. 5. IF THE INFILTRATION RATE IS GREATER THAN 0.01 IN/HR, IN ORDER TO HELP MAINTAIN A PERMANENT POOL, THE CONTRACTOR WILL NEED TO INSTALL A CLAY LAYER OR A PERMANENT GEOSYNTHETIC CLAY LINER A MINIMUM OF 1-FOOT BELOW THE LOWEST GRADE OR 1-FOOT BELOW THE BOTTOM ELEVATION OF THE ROOT BALL FOR THE PROPOSED PLANTINGS (WHICHEVER IS GREATER). IF A GEOSYNTHETIC LINER IS CHOSEN, THE LINER SHALL BE BENTOMAT CL BY CETCO LINING TECHNOLOGIES OR ENGINEER APPROVED EQUIVALENT. 6. THE GRADES SHOWN ON THIS PLAN ARE FINISHED GRADES. IF THE EXISTING SOIL LAYERS IN THE PROPOSED WATER QUALITY POND (AFTER EXCAVATION) ARE NOT DETERMINED SUITABLE BY A LANDSCAPE PROFESSIONAL FOR THE FUTURE WATER QUALITY POND PLANTINGS, THE CONTRACTOR SHALL OVEREXCAVATE THE INTERIOR PORTIONS OF THE WATER QUALITY POND (FROM THE NORMAL WATER SURFACE ELEVATION TO THE BOTTOM) BY 1-FOOT. THE CONTRACTOR SHALL THEN BRING THE WATER QUALITY POND AREA TO THE FINISHED GRADES USING THE TOPSOIL STOCKPILED ON -SITE. THE: OVER EXCAVATION WILL ALLOW FOR BETTER PLANTING CONDITIONS FOR THE PROPOSED WATER QUALITY POND PLANTS. 7. ANY REMOVED TOPSOIL SHALL BE STOCKPILED FOR USE IN PLANTING (SEEDING) ON THE DAM EMBANKMENT ONCE FINAL GRADES (AS SHOWN ON THE GRADING PLAN) HAVE BEEN ESTABLISHED WITH COMPACTED FILL PRIOR TO TOPSOIL INSTALLATION, THE CONTRACTOR SHALL SCARIFY THE THE TOP 2"-3" OF THE BERM SECTION TO PROMOTE BONDING OF THE TOPSOIL WITH THE COMPACTED FILL THE TOPSOIL DEPTH SHALL RANGE FROM 3"-4" ON THE DAM EMBANKMENT. 8. THE CONTRACTOR SHALL FURNISH, INSTALL, OPERATE, AND MAINTAIN ANY PUMPING EQUIPMENT, ETC. NEEDED FOR REMOVAL OF WATER FROM VARIOUS PARTS OF THE STORMWATER WATER QUALfIY POND SITE. IT IS ANTICIPATED THAT PUMPING WILL BE NECESSARY IN THE EXCAVATION AREAS (I.E. - KEY TRENCH). DURING PLACEMENT OF FILL WITHIN THE KEY 'TRENCH (OR OTHER AREAS AS NECESSARY), THE CONTRACTOR SHALL KEEP THE WATER LEVEL BELOW THE BOTTOM OF THE EXCAVATION. THE MANNER IN WHICH THE WATER IS REMOVED SHALL BE SUCH THAT THE EXCAVATION BOTTOM AND SIDESLOPES ARE STABLE. BERM AND SOIL COMPACTION SPECIFICATIONS 1. ALL FILL MATERIALS TO BE USED FOR THE DAM EMBANKMENT SHALL BE TAKEN FROM BORROW AREAS APPROVED BY THE ON -SITE GEOTECHNICAL ENGINEER. THE FILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, WOOD, STONES GREATER THAN 6", AND FROZEN OR OTHER OBJECTIONABLE MATERIAL THE FOLLOWING SOIL TYPES ARE SUITABLE FOR USE AS FILL WITHIN THE DAM EMBANKMENT AND KEY TRENCH: ML AND CL IF OTHER SOIL TYPES ARE DETERMINED TO BE SUITABLE BY THE ONSITE GEOTECHNICAL ENGINEER, DOCUMENTATION SHALL BE RETAINED FOR FUTURE AS -BUILT SUBMITTALS. 2. FILL PLACEMENT SHALL NOT EXCEED A MAXIMUM 8" LIFT (UNCOMPACTED). EACH LIFT SHALL BE CONTINUOUS FOR THE ENTIRE LENGTH OF EMBANKMENT. BEFORE PLACEMENT OF FILL FOR THE BERM SECTION, ALL UNSUITABLE MATERIAL SHALL BE REMOVED AND THE SURFACE PROPERLY PREPARED FOR FILL PLACEMENT. 3. ALL FILL SOILS USED IN THE EMBANKMENT / KEY TRENCH CONSTRUCTION SHALL BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM-698). THE FILL SOILS SHALL BE COMPACTED AT A MOISTURE CONTENT WITHIN -1 TO +3 PERCENT OF ITS OPTIMUM MOISTURE CONTENT. COMPACTION TESTS SHALL BE PERFORMED BY THE ON -SITE GEOTECHNICAL ENGINEER DURING CONSTRUCTION TO VERIFY THAT THE PROPER COMPACTION LEVEL HAS BEEN REACHED. THE FILL SHOULD BE COMPACTED USING A SHEEPSFOOT TYPE COMPACTOR. IN ORDER TO PREVENT DAMAGE TO THE PIPE, NO COMPACTION EQUIPMENT SHALL CROSS ANY PIPE UNTIL MINIMUM COVER IS ESTABLISHED ALONG THE PIPE. 4. THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH REPORTS TO VERIFY THAT THE DAM EMBANKMENT MEETS THE SPECIFIED COMPACTION REQUIREMENTS. COMPACTION REPORTS WILL BE NEEDED DURING THE AS -BUILT CERTIFICATION PROCESS FOR THIS STORMWATER FACILITY. THEREFORE, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE COMPACTION TESTING AND TO ENSURE COMPACTION TESTS ARE PROPERLY PERFORMED DURING CONSTRUCTION. 5. TESTING OF THE NEW FILL MATERIALS SHALL BE PERFORMED TO VERIFY THAT THE RECOMMENDED LEVEL OF COMPACTION IS ACHIEVED DURING CONSTRUCTION. THEREFORE, ONE DENSITY TEST SHALL BE PERFORMED FOR EVERY 2,500 SQUARE FEET OF AREA FOR EVERY LIFT OF FILL OR AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. 6. TESTING WILL BE REQUIRED ALONG THE 36"0 O-RING OUTLET BARREL AT A FREQUENCY OF ONE TEST PER 25 LL OF PIPE PER VERTICAL FOOT OF FILL OR AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. ALL REQUIRED MAINTENANCE AND INSPECTIONS OF THIS FACILITY SHALL BE THE RESPONSIBILITY OF THE PROPERTY OWNER'S ASSOCIATION, PER THE EXECUTED OPERATION AND MAINTENANCE AGREEMENT FOR THIS FACILITY. 2. INSTALL ALL SEDIMENT AND EROSION CONTROL MEASURES PER THE APPROVED SEDIMENT & EROSION CONTROL PLAN. THE CONTRACTOR SHALL MAINTAIN ALL APPROVED SEDIMENT AND EROSION CONTROL MEASURES THROUGHOUT THE ENTIRE PROJECT, AS REQUIRED. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE EROSION CONTROL INSPECTOR, AS REQUIRED BY GOVERNING AGENCIES, PRIOR TO ANY CLEARING. 3. CLEAR AND GRUB AREA WITHIN THE LIMITS OF THE PROPOSED DAM CONSTRUCTION. ALL TREES AND THEIR ENTIRE ROOT SYSTEMS MUST BE REMOVED FROM THE DAM FOOTPRINT AREA AND BACKFILLI_D WITH SUITABLE SOIL MATERIAL THE BACKFILLED AREAS SHALL BE COMPACTED TO THE SAME STANDARDS AS THE DAM EMBANKMENT. THE REMAINING AREA OF THE EMBANKMENT SHALL BE STRIPPED TO A SUITABLE DEPTH AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. ANY RESIDUAL SOILS TO BE LEFT IN PLACE MUST BE WELL SCARIFIED TO PROMOTE BONDING OF THE NEW EMBANKMENT FILL. NO EMBANKMENT MATERIAL SHALL BE PLACED FOR THE DAM OR KEY TRENCH UNTIL APPROVAL OF THE DAM SUBGRADE / TRENCH IS OBTAINED FROM THE ON -SITE GEOTECHNICAL ENGINEER. 4. EXCAVATE FOR THE NEW KEY TRENCH ALONG THE CENTERLINE OF THE PROPOSED DAM EMBANKMENT. THE TRENCH SHALL EXTEND A MINIMUM OF 5 FT BELOW EXISTING GRADE AND SHALL HAVE A MINIMUM BOTTOM WIDTH OF 5 FEET. THE KEY TRENCH SIDESLOPES SHALL BE A MINIMUM OF 1:1 (H:V). DEPENDING UPON ON -SITE SOIL CONDITIONS ENCOUNTERED DURING EXCAVATION, THE ON -SITE GEOTECHNICAL ENGINEER MAY VARY THE DEPTH AND DIMENSIONS OF THE KEY TRENCH AS DEEMED NECESSARY. THE ON -SITE GEOTECHNICAL ENGINEER SHALL RETAIN DOCUMENTATION OF ANY VARIATION FOR FUTURE AS -BUILT SUBMITTALS. 5. BEGIN PLACEMENT OF BACKFILL WITHIN THE KEY TRENCH. THE KEY TRENCH SHALL BE COMPACTED TO THE SPECIFICATIONS LISTED ITEM 3 OF THE SECTION TITLED "BERM SOIL AND COMPACTION SPECIFICATIONS." THE KEY TRENCH SHALL BE TESTED PER THE SPECIFICATIONS LISTED IN THAT SECTION. 6. PRIOR TO INSTALLATION, SUBGRADE CONDITIONS ALONG THE SPILLWAY PIPES SHOULD BE EVALUATED BY THE ON -SITE GEOTECHNICAL ENGINEER TO ASSESS WHETHER SUITABLE BEARING CONDITIONS EXIST AT THE SUBGRADE LEVEL SHOULD SOFT OR OTHERWISE UNSUITABLE CONDITIONS BE ENCOUNTERED ALONG THE PIPE ALIGNMENTS, THESE MATERIALS SHOULD BE UNDERCUT AS DIRECTED BY THE GEOTECHNICAL ENGINEER. THE UNDERCUT MATERIALS SHALL BE REPLACED WITH ADEQUATELY COMPACTED STRUCTURAL FILL„ LEAN CONCRETE OR FLOWABLE FILL AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. 7. IN ORDER TO HELP PROTECT THE SOIL SUBGRADE FROM DETERIORATION (DUE TO EXPOSURE, RAINFALL, SEEPAGE, AND RUNOFF) BEFORE THE CRADLE CAN BE POURED, IT IS STRONGLY RECOMMENDED THAT A 3" TO 4" THICK CONCRETE MUD MAT BE POURED OVER THE SUBGRADE ONCE IT IS APPROVED BY THE ON -SITE GEOTECHNICAL ENGINEER. THE MUD MAT WILL ALSO PROVIDE BEARING FOR THE BLOCKS THAT TEMPORARILY SUPPORT THE SPILLWAY PIPE UNTIL THE CRADLE CAN BE POURED. THE METHOD OF BLOCK SUPPORT FOR THE PIPE PROPOSED BY THE CONTRACTOR SHOULD BE SUBMITTED TO THE JOHN R. McADAMS COMPANY FOR REVIEW. 8. BEGIN CONSTRUCTION OF THE NEW EMBANKMENT. FILL MATERIALS SHALL BE PLACED IN MAXIMUM 8" THICK LIFTS PRIOR TO COMPACTION, UNLESS DIRECTED OTHERWISE BY THE ON -SITE GEOTECHNICAL ENGINEER. FILL LIFTS SHALL BE CONTINUOUS OVER THE ENTIRE LENGTH OF FILL IF IT IS NECESSARY, THE EMBANKMENT FILL MATERIAL WILL BE OVERBUILT IN HORIZONTAL LIFTS AND CUT BACK TO FINAL GRADE IN ORDER TO ACHIEVE PROPER COMPACTION. 9. AS CONSTRUCTION OF THE EMBANKMENT MOVES FORWARD, IT WILL BE NECESSARY TO INSTALL THE CONCRETE CRADLE. THIS MAY BE CONSTRUCTED USING ONE OF THE FOLLOWING METHODS: A. IF THE PROPOSED STRUCTURAL FILL MATERIAL IS UTILIZED AS THE FORMWORK FOR THE CONCRETE CRADLE, THEN THE STRUCTURAL FILL SHOULD BE INSTALLED AND COMPACTED UP TO THE TOP OF CONCRETE CRADLE ELEVATION. ONCE THE STRUCTURAL FILL REACHES THE NEXT DOWNSTREAM JUNCTION BOX OR HEADWALL AND IS COMPACTED TO THE ELEVATION OF THE TOP OF THE CONCRETE CRADLE, EXCAVATE THE CONCRETE CRADLE TRENCH PER THE PROVIDED DETAILS AND CONSTRUCT THE CONCRETE CRADLE AS PER THE PROVIDED CONCRETE CRADLE DETAIL B. IF THE PROPOSED STRUCTURAL FILL IS NOT UTILIZED AS THE FORMWORK FOR THE CONCRETE CRADLE, THEN PRIOR TO CONSTRUCTING THE STRUCTURAL FILL EMBANKMENT, THE FORMWORK FOR THE CONCRETE CRADLE SHOULD BE INSTALLED ON EXISTING GROUND AND / OR THE MUD MAT. THE CONCRETE CRADLE SHALL BE CONSTRUCTED PER THE PROVIDED DETAILS. 10. INSTALL RISER / BARREL ASSEMBLY, ALONG WITH THE EMERGENCY DRAIN SYSTEM. THE DRAIN VALVE LOCATED WITHIN THE RISER BOX SHALL BE KEPT OPEN UNTIL AN AS -BUILT CERTIFICATION HAS BEEN COMPLETED BY THE ENGINEER AND AN APPROVAL TO IMPOUND HAS BEEN ISSUED BY ALL APPLICABLE AGENCIES. 11. INSTALL SPILLWAY FILTER FROM THE DETAILS SHOWN ON SHEET PD-3D. 12. CONSTRUCT EMBANKMENT PER SPECIFICATIONS LISTED IN THE SECTION TITLED "BERM AND SOIL COMPACTION SPECIFICATIONS" AND REQUIREMENTS OF THE ON -SITE GEOTECHNICAL ENGINEER. ALL CHARACTERISTICS OF THE EMBANKMENT FILL MATERIAL SHALL MEET THE STANDARDS SET FORTH IN "BERM SOIL AND COMPACTION SPECIFICATIONS", INCLUDING COMPACTION ANE. MOISTURE REQUIREMENTS. IF NECESSARY TO ACHIEVE PROPER COMPACTION, THE EMBANKMENT FILL MATERIAL WILL BE OVERBUILT IN HORIZONTAL LIFTS AND CUT BACK TO PROPER FINAL GRADE ANY HAND COMPACTION ACTIVITIES AROUND SPILLWAY OR DRAIN STRUCTURES SHALL BE CONDUCTED IN 4-INCH LOOSE LIFTS AND BE TO THE SAME COMPACTION AND MOISTURE REQUIREMENTS AS THE ENTIRE EMBANKMENT. ALL COMPACTION AND MOISTURE TESTING SHALL BE CARRIED OUT AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER AND AS LISTED IN "BERM AND SOIL COMPACTION SPECIFICATIONS". 13. UPON COMPLETION OF DAM EMBANKMENT, PROMPTLY STABILIZE AND SEED DAM EMBANKMENT PER SEEDING SCHEDULE. 14. SCHEDULE A FINAL AS -BUILT INSPECTION AND AS -BUILT SURVEY WITH THE ENGINEER. AN AS -BUILT INSPECTION SHOULD BE SCHEDULED A MINIMUM OF 60 DAYS BEFORE A PERMIT TO IMPOUND IS REQUIRED. ANY COMMENTS OR DEFICIENCIES IN THE DAM CONSTRUCTION MUST BE CORRECTED TO THE SATISFACTION OF THE ENGINEER AND OWNER BEFORE CERTIFICATION SHALL BE GRANTED. UPON FINAL APPROVAL FROM THE TOWN OF SHALLOTTE AND NCDENR, CLOSE THE 8"0 BOTTOM DRAIN VALVE IN THE RISER BOX AND BEGIN IMPOUNDING WATER. NO WATER SHALL BE IMPOUNDED BEFORE AN APPROVAL TO IMPOUND IS ISSUED FROM THE TOWN OF SHALLOTTE. OUTLET STRUCTURE MATERIAL SPECIFICATIONS 1. THE 36"0 RCP OUTLET BARREL SHALL BE CLASS III RCP, MODIFIED BELL AND SPIGOT, MEETING THE REQUIREMENTS OF ASTM C76-LATEST. THE PIPE SHALL HAVE CONFINED 0-RING RUBBER GASKET JOINTS MEETING ASTM C-443-LATEST. THE PIPE JOINTS SHALL BE TYPE R-4. 2. THE STRUCTURAL DESIGN FOR THE 6'x6' (INTERNAL DIMENSIONS) RISER BOX WITH EXTENDED BASE SHALL BE BY OTHERS. PRIOR TO ORDERING THE STRUCTURE, THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH SHOP DRAWINGS, SEALED BY AN P.E. REGISTERED IN NORTH CAROLINA, FOR REVIEW. 3. THE RISER BOX OUTLET STRUCTURE SHALL BE PROVIDED WITH STEPS 16" ON CENTER. STEPS SHALL BE PROVIDED ON THE INNER WALL OF THE RISER BOX. STEPS SHALL BE IN ACCORDANCE WITH NCDOT STD. 84-0.66. PLEASE REFER TO SHEET PD-3B FOR LOCATION OF THE RISER STEPS. 4. THE 11'Lx11'Wx26" THICK CONCRETE ANTI -FLOTATION BLOCK SHALL BE PRECAST AS THE EXTENDED BASE OF THE RISER BOX DURING FABRICATION. THE PRECAST BASE SHALL BE INCLUDED AS PART OF THE SHOP DRAWINGS THAT WILL BE SUBMITTED TO THE ENGINEER FOR REVIEW (SEE ITEM 2 ABOVE). IN LIEU OF A PRE -CAST BASE, THE CONTRACTOR MAY OPT TO CAST -IN -PLACE THE ANTI -FLOTATION BLOCK IN THE FIELD. HOWEVER, PRIOR TO CONSTRUCTING THE CAST -IN -PLACE BASE, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR REVIEW DENOTING THE FOLLOWING: B. THE CONNECTION MECHANISM TO JOIN THE ANTI -FLOTATION BLOCK WITH THE RISER SECTION 5. THE RISER BOX JOINT DESIGN SHALL CONFORM TO ASTM C-478. THE JOINTS SHALL BE SEALED USING BUTYL RUBBER SEALANT CONFORMING TO ASTM-990. THE CONTRACTOR SHALL PARGE JOINTS ON BOTH THE INSIDE AND OUTSIDE WITH NON -SHRINK GROUT. 6. IF THE ANTI -FLOTATION BLOCK IS PRECAST AS PART OF THE RISER BASE SECTION, THE ENTIRE PRECAST RISER BOX STRUCTURE SHALL HAVE A SHIPPING WEIGHT OF 54,000 LBS. THE STRUCTURE WEIGHT SHALL BE THE SHIPPING WEIGHT AND SHALL BE DETERMINED BY SUBTRACTING THE WEIGHT OF THE FACTORY BLOCKOUTS FROM THE GROSS STRUCTURE WEIGHT. THIS INFORMATION SHALL BE SHOWN ON THE SHOP DRAWINGS SUBMITTED TO THE ENGINEER FOR REVIEW. IF THE CONTRACTOR OPTS TO CAST -IN -PLACE THE ANTI -FLOTATION BLOCK, THE CONTRACTOR SHALL ENSURE THE WEIGHT OF THE ENTIRE RISER STRUCTURE IS EQUAL TO THE MINIMUM LISTED ABOVE 7. PRIOR TO ORDERING, THE CONTRACTOR SHALL SUBMIT TRASH RACK SHOP DRAWINGS TO THE ENGINEER FOR REVIEW. CONTRACTOR SHALL ENSURE THAT AN ACCESS HATCH IS PROVIDED WITHIN THE TRASH RACK (SEE DETAIL FOR LOCATION) THAT WILL ALLOW FOR FUTURE MAINTENANCE ACCESS. CONTRACTOR SHALL ALSO PROVIDE A CHAIN AND LOCK FOR SECURING THE ACCESS HATCH. 8. ALL POURED CONCRETE SHALL BE MINIMUM 3000 PSI (28 DAY) UNLESS OTHERWISE NOTED. 9. GEOTEXTILE FABRIC FOR THE 36"0 OUTLET BARREL JOINTS SHALL BE MIRAFI 180N OR ENGINEER APPROVED EQUAL (NON -WOVEN FABRIC) 10. STORMWATER WATER QUALITY POND EMERGENCY DRAWDOWN IS VIA AN 8"0 PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 820 X-CENTRIC VALVE OR APPROVED EQUAL THIS VALVE IS IN ACCORDANCE WITH AWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL (SEE DETAIL SHEET PD-3B). THE CONTRACTOR SHALL PROVIDE A REMOVEABLE VALVE WRENCH WITH A HANDWHEEL ON TOP FOR OPERATION OF THE 8*0 PLUG VALVE. A CHAIN AND LOCK SHALL ALSO BE PROVIDED FOR SECURING THE WRENCH TO THE TRASH RACK. GRAPHIC SCALE 0 25 50 1 inch = 50 ft_ PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION TOP OF HANDWHEEL TO EXTEND 1-FOOT ABOVE TRASH RACK TOP OF DAM = EL. 14.50 EMERGENCY SPILLWAY = EL 12.20 TOP OF RISER = EL. 11.80 3" PVC SIPHON NV = EL. 8.00 (NWSE) SIPHON TO EXTEND 6" FROM THE FACE OF THE RISER AND ELBOW 90' TO 6" BELOW NORMAL POOL (EL. 7.50) NORMAL POOL = EL. 8.00 INVERT OUT = EL. 7.00 DRAWDOWN DRAIN - TRASH RACK (SEE DETAIL SHEET PD-3C) CONCRETE ANTI -FLOTATION BLOCK CONTRACTOR SHALL FORM INVERT OF RISER STRUCTURE TO DRAIN POSITIVELY TO INVERT OF OUTLET BARREL USING NON -SHRINK GROUT NOTES: 1, CONCRETE ANTI -FLOTATION BLOCK TO BE PROVIDED WITH MINIMUM TEMPERATURE AND SHRINKAGE STEEL REINFORCEMENT. 2. TRASH RACK NOT SHOWN FOR CLARITY. EMERGENCY SPILLWAY PROPOSED GRADE 10 FT. WIDE MINIMUM (SEE DETAIL SHEET TRASH RACK - SHEET PD-3F) (SEE DETAIL) CONCRETE COLLAR (TO BE CONSTRUCTED IN THE FIELD BY THE CONTRACTOR, SEE DETAIL) 3 _ 3 APPROXIMATE LOCATION 1.0 FT OF 1 1 OF EXISTING GROUND COVER (MIN.) - - _ --� I -1•I I -1' I I� 11-1 f � I ifi 111-' 11fi I1fi ifit' -- q = 11 I I1 I I-III`i I I1 I ICI I I1 i i-1 I I-1 I I�i I I1 I I1 I I lii I I�1 I _I __-�_ ® 4 � 46 LF 36"0 0-RING RCP ® 1.09% FLOW fir. �� �■ - - - -+►N7-. ~� m� �� ® .c d ° a : •6. " a d 5 FT. (MIN.) ° d • ♦ . .1.. `e :. +. - riYr �ii� 2 d: '. . ♦ - _ • d • C,♦ • - d - -4- ♦ d - - d ♦ ♦ - _y • ' NON -WOVEN GEOTEXTILE FABRIC KEY TRENCH (SEE BERM AND CONCRETE CRADLE SHALL BE PLACED AROUND EACH 5.0' (MIN.) SOIL COMPACTION SPECIFICATIONS, (SEE DETAIL 8" PLUG VALVE. THE VALVE SHALL JOINT OF THE 36" 0-RING RCP DETAIL SHEET PD-3A) SHEET PD-3D) BE A M&H STYLE 820 X-CENTRIC BARREL IN 2' WIDE STRIPS SPILLWAY FILTER VALVE OR ENGINEER APPROVED CENTERED ON JOINT. (SEE DETAIL EQUAL. THIS VALVE SHALL BE IN SHEET PD-3D) ACCORDANCE WITH AWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL. 10.0' 7.0' 10.0' t• • } - -d. ' tea-• - .d. a d `.a d.• - .. . - - d d - � - 4" SOLID BRICK (BY OTHERS) NOTE: BRICK SHALL ATTACH AND LAY TIGHT AGAINST PRECAST STRUCTURE USING LL BRICK TIES WITH NO VOID SPACE BETWEEN PERMANENT DAM CROSS SECTION N.T.S. CONCRETE COLLAR (TO BE CONSTRUCTED IN THE FIELD BY THE CONTRACTOR - • SEE DETAIL) PRECASTER SHALL PROVIDE A BLOCK OUT FOR THE 36"0 0-RING RCP a 36"0 0-RING RCP FLOW a. 'a CONCRETE CRADLE (SEE DETAIL SHEET PD-3D) - CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. (SEE DETAIL SHEET PD-3C) CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS 4" SOLID BRICK SHALL BE PLACED AT 16' O.C. (SEE DETAIL SHEET PD-3C) (BY OTHERS) NOTE: BRICK SHALL ATTACH AND LAY TIGHT AGAINST PRECAST STRUCTURE USING TOP OF HANDWHEEL TO EXTEND BRICK TIES WITH NO VOID 7.0' 1-FOOT ABOVE TRASH RACK SPACE BETWEEN COLLAR CONCR4" SOLID BRICK 6.0' GUIDE STEM CONSTRUCTED N HE FIELD (BY OTHERS) BY THE CONTRACTOR - NOTE: BRICK SHALL ATTACH TOP OF RISER = EL. 11.80 SEE DETAIL) AND LAY TIGHT AGAINST PRECAST STRUCTURE USING PRECASTER SHALL PROVIDE BRICK TIES WITH NO VOID 6" MIN. WALL- A BLOCK OUT FOR THE SPACE BETWEEN 4" (j.(P) THICKNESS (TYP.) 3" PVC SIPHON 36"0 O-RING RCP 36" 0-RING RCP --ft '`T fNv = EL. 8.00 (NWSE) p- SIPHON TO EXTEND 6" FROM - 8"m GIP DRAIN THE FACE of THE RISER AND . 4 80' ELBOW 90' TO 6" BELOW a 36"4 O-RING RCP NORMAL POOL (EL. 7.50) FLOW - INN = EL. 8.00 (NW'SE) 8.14' o SIPHON TO EXTEND 6" FROM ° •. THE FACE OF 'THE RISER AND / ELBOW 90' TO 6"' BELOW NORMAL POOL (E:L, 7.50) o •-'' . :' . (TYP.) i ' INVERT OUT EL. 7.00 - _ ..d . 0.67' ° d" d. •° . d . ° e j +.• ±a '• DRAWDOWN DRAIN 2 LF 8"4 DIP CAD 0.00'!0 d • ' �d + .. ° ' + - = : a r • .d 32" ..d.y .•� - • d .•• � - - . e .. ;, 'a • 2.67` _ INV EL 7.23 ` - • - A .,• � - d . .. - - '.,-= - s` • �_' - : �'.. • - - .a "' k ♦ _ • _ CONCRETE CRADLE • d• { d• (SEE DETAIL SHEET PD-: CONTRACTOR SHALL SEAL CONTRACTOR SHALL FORM CONCRETE THE PIPE PENETRATION INVERT OF RISER STRUCTURE ANTI -FLOTATION USING A RUBBER BOOT TO DRAIN POSITIVELY TO BLOCK AND STAINLESS STEEL INVERT OF OUTLET BARREL HARDWARE USING NON -SHRINK GROUT CONCRETE ANTI -FLOTATION BLOCK PERMANENT OUTLET STRUCTURE DETAILS N.T.S. 8"0 DIP DRAIN PIPE CONTRACTOR SHALL CORE -DRILL THE HOLE FOR THE 8"0 DIP PIPE IN THE FIELD. PRECASTER SHALL OMIT REINFORCEMENT IN THIS AREA COMPACTED BERM SECTION (SEE BERM AND SOIL COMPACTION SPECIFICATIONS ON SHEET PD-3A) 6" OF COVER ENDWALL PER NCDOT STD. 838.80 (SEE DETAIL SHEET PD-3C) 36" 0-RING RCP INV. OUT = 6.50 NOTES: 1. ALL REBAR TO BE #4 REBAR. 2. ALL REBAR AND ANGLES TO BE GALVANIZED AND BE PROVIDED WITH AN EPDXY COATING. 3. THE HOT -DIPPED, GALVANIZED 2"x2"xl/4" ANGLES SHALL BE WELDED TO THE REBAR TRASH RACK. ONCE WELDED, THE ENTIRE ASSEMBLY SHALL BE PLACED ONTO THE RISER WITH ANGLES SITTING DIRECTLY ON TOP OF RISER. THE BOLL DENOTES THE ACCESS HATCH TO BE PROVIDED BY THE TRASH RACK FABRICATOR (SEE SHEET PD-3A, OUTLET STRUCTURE MATERIAL SPECIFICATIONS, NOTE #7) NOTE: 1. ALL REBAR TO BE #4 REBAR. 3" CLEARANCE TO OUTSIDE OF #4 REBAR) 5.1' 8" PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 820 X-CENTRIC VALVE OR APPROVED EQUAL THIS VALVE SHALL BE IN ACCORDANCE WITH AWWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE FROM OUTLET 1 0 UR VI STRUCTURE VIA A HANDWHEEL. 3" CLEARANCE TO OUTSIDE OF #4 REBAR) f U ' _ //• i 0-RING RCP d \36»0 f (2) 14.14 LF 2"x2"xl/4' ANGLE „ijv,7L.,> aOR THE ACCESS HATCH VELOCITY DISSIPATOR NCDOT CLASS 'B' RIPRAP 181 x 21'W x 22" THICK D50 = 8" (SEE DETAIL SHEET PD-3C) (2) 14.14 LF 2"x2"xl/4" ANGLE TRASH RACK DETAIL N.T.S. 3" CLEARANCE TO OUTSIDE OF #4 REBAR) 5.8' d , CONCRETE ANTI -FLOTATION BLOCK 5.2' 4.6' 5.2" LEVEL SPREADER (SEE DETAIL SHEET PD-3D) LENGTH = 35' LIP ELEV. = 6.00 5.85' I� #4 REBAR TRASH RACK (ABOVE) ANCHOR TRASH RACK TO MANHOLE WALL WITH FOUR EQUALLY SPACED HOT -DIPPED GALVANIZED STEEL CLAMPS. EACH CLAMP ATTACHED TO MANHOLE RISER BY 2-4»xl/4" CONCRETE ANCHOR BOLTS EACH CLAMP TO BE COATED W/ AN EPDXY COATING. 3" ANCHOR DEPTH n PRECAST STRUCTURE WALL #4 REBAR ANCHORS CONTRACTOR SHALL DRILL INTO PRECAST STRUCTURE WALL AND SET ANCHORS USING EPDXY GROUT 0.4° (TYP.) 2.0' 0.75' 4" SOLID BRICK (BY OTHERS) NOTE: BRICK SHALL ATTACH AND LAY TIGHT AGAINST PRECASR STRUCTURE USING BRICK TIES WITH NO VOID SPACE BETWEEN 1' DEPTH 36"0 O-RING RCP ♦. I 3000 PSI CONCRETE COLLAR (MIN. 28 DAY STRENGTH) 3" CLEARANCE TO OUTSIDE OF #4 REBAR) 5.5" CENTER TO CENTER Fi d ° 12" ANCHOR DEPTH `♦ . d 3" CLEARANCE TO OUTSIDE OF #4 REBAR) CONCRETE COLLAR DETAIL N.T.S. #4 REBAR ANCHORS. CONTRACTOR SHALL DRILL INTO PRECAST BASE AND SET ANCHORS USING EPDXY GROUT CONCRETE ANTI -FLOTATION BLOCK PRELIMINARY DRAjYING - NOrf RELEASED FOR C ONSTRliCTlW\ :0 �5 M rr Ay m mom- M X M Z r� r 4F E ? t'i- 7 .838 ,r $0 ELEVATIO L r F S PLAN f POTFS . 1- =! � TI _S=FLC,'•7T I.;rCl_� Yn 3C 4 J f0- T?'C YJLLLy'Ji h:J ^ + ti � tn, � 1�.. ,.I^. PC : I117 21 9Q ; , tI 99 X111 J �,...,. = — It 3T[t L *V_RT SLKALt S itlT`-r �47155 ', Y `� 6 GT - FC . IS CICZHEI '4 ti; H S" CIF GATIOA SEC _'3Y E-33. LIJ LL. 1.- J 1 1 f a I,„ yr u 4 FCC t'tC;,•I^.0 RI.L t kF,.GG I.. CCI, ri-liCF� VF f T f�5T11 F.rTr,=A!'.TW � (" � ,atli:� � z � � I -POI Fr,T ?qsL_ ft 17 AF;7FG to RF =4-I ,. Jl - 0 J U. Cc TO :STV AIRS 't Tu V YIh. CLEA MCE 00" UJ P •:C L. , p 16°* b UP PIM5 :ti (i: I 7.11 > H2 .r ! 12 f '; Lk 9TAK2- D 1 Mt t 3,1 , P ?=4' TCL :i=iG• MY OJT=D :'ITG _L R. :_"C 3 cGY D w D IN C.r ;t. '• : i % 'y. '" � (, R:IE F.•.3jIC. WAY E,_ x � . =TLa= J FLF .IEEE a I.v43 :',3 TIr 31SIE AAE 4 3' o- _CL '3 Fa a?EL. __ �__ +_� -1 rl�.tf Lr ,+,I L � g r- { r,; �4�, ,,, rt,�,.,, � r:� , •, t�Fe r„ , u-►�ItI 17 _ N:{f Y St a'.R 5 E =F *L BE #, 6'?S t,,�•Gax U 8 C 3."rHE h. 1C OF !A1 {A-IA:.E `}?TICt1 ; (r c-, 51 F3E {I8 Eka ti s� ,_ELEa C r..! _ ? I?s�F:- V- C LL. _ _.., v .._.,., ... _.._ w....... . �z o ENDWALL DIMENSIONS w M _ 71. _01%_`NLU :` tV_hi.,°St 4I:1..'11M10.13.r.AtiX. 1°II4.r'fL;X.. 1.1 111.,4W'x. Lu _ PIF'u CJIR F o F1G �T C'f .�' -kJ t 5 f5 r- r 1 J❑ n n e rt Y ;t BJ'._, 't r �_'_� ._... 9U;l3 �._._._ C Q h `" P`_.:_1 p d3 6 n� a'? Ir7 3. QP t ., r .,1t7 a !4„ 5 [I ..�Y,F.. i.` .; . Q w R 2! i ,10 a. 0,'4 21 1 F. 2.tio 1 ot 0 'i 2.: $ Kalf. ' > G 5 ,+2.50 '.. tlrz.75 75!?..=,D d D^.j+.;,g iq%A_✓' cJ 4 306.50 101+0III to V3 C/) u DLLs} #5 i' B' r.QCf3.iCS S..tJr'E.D2 ' 5.50 5.2 fo.?5 11 .:Q%11.in ' G uj 3.5 5 i= P" t 50 9.`J t3.75 .1 25,a.50 C C. i6 ?b 1' C7y13.26 a.3 r 6" ,y a li O 53.!:0 7 0, 3 S. III L J.!/J. J IS .Os'IG 75 � 9x Q 7 4 r ( L';i 6 1 r IQ 3.°A 5 C?., 3 4!4.On i1.,J9 ?P 19 �li'1.5 '.:i rti f JS F' h �ni 4 �.1 CIO T.M2,5C. 3 5 4.00 7.2.s,°D.21 1a.rv,'11..v Er.G :i i S" 4 50 II ''54 -3 C!4.i)Q f.?7f$.7 14.,- I -.. r. $. .. �7 'a� 6" i•DC! .JC! 7.t0'n. r^. �J.25!4.30 7.7"j9.25 14.76!1G.rS i y SH=ETQ1 fS= 1 t..-83 r 130:.. 36" ENDWALL DETAILS N.T.S. z NOTES: ALL STEPS SHALL PROTRUDE 4' FROM INSIDE FACE OF STRUCTURE WALL. I ->- STEPS DIFFERING IN DIMENSIONS, CONFIGURATION OR MATERIALS FROM THOSE SHOWN MAY ALSO BE USED PROVIDED THE CONTRACTOR HAS FURNISHED Q z�3 THE ENGINEER WITH DETAILS OF THE PROPOSED STEPS AND HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER FOR THE USE OF SUCH STEPS. cv LL _j \ 1' C7rlCLJ co m=~ZJ C-3 0 5/8'� Z H TT CL wR PLAN PLAN SIDE ti SIDE ELEVATION ELEVATION CL 0 LL_ CAST IRON I— 14 1/2' L7 (� Fl- 1'-0' CAST IRON ELEVATI❑N Ld ELEVATI❑N Q < 1• 8 3/4' 1 1/4' � #6 BAR OR #8 BAR Q q GALV'D, z li4 POLYPROPYLENE Q Q 5/8'� PLASTIC Ld _ L3 PLAN SIDE ~' z 1/8, ELEVATION PLAN ELEVATION CD , E 4 COMPOSITE i REINFORCING STEELQ,I/4' W�#3 DEFORMEDf�� STEEL ROD ELEVATION SECTION A -A �I2_' NOTE: NOT TO BE USED IN SANITARY SEWER MANHOLES. SHEET I ❑F1 840,66 ELEVATION MAMENMCE ACCESS STEPS N.T.S. NCDOT STn 838.80 HE (SEE 36" RCP A 5.25' WIDE (MIN.) NCDOT 838.80 HERE (SEE DI NOTE: A FILTER BLANKET IS TO BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. THE FILTER BLANKET WILL CONSIST OF A MINIMUM 4" THICK LAYER OF STONE (NCDOT #57) UNDERLAIN WITH MIRAFI FILTER WEAVE 700 OR APPROVED EQUr-w-ENT #6 REBAR PERIMETER FRAME 4" x 4" 6/6 WELDED WIRE FABRIC (EACH SIDE & TOP OF CAGE) 14" (TYP.) 2.03' 4' ANCHOR DEPTH CONTRACTOR SHALL DRILL INTO PRECAST EXTENDED BASE AND SET ANCHORS USING EPDXY GROUT 3- RIPRAP 22" THICK 22" LAYER OF CLASS 'B" RIPRAP 4' FILTER BLANKET BLANKET (SEE NOTE) 36" OUTLET BARREL VELOCHY DISSIPATOR N.T.S. 4" SOLID BRICK (BY OTHERS) NOTE: BRICK SHALL LAY TIGHT AGAINST PRECAST STRUCTURE USING BRICK TIES WITH NO VOID SPACE BETWEEN 0 6' MIN. WALL THICKNESS d a 2 LF 8'0 DIP O 0 Q ° o� O - 7-A G� a a d d _ 0.86' (CENTER TO CENTER) CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT AND STAINLESS STEEL HARDWARE 8"0 DIP DRAIN PIPE CONTRACTOR SHALL CORE -DRILL THE HOLE FOR THE 8*0 DIP IN THE FIELD. PRECASTER SHALL OMIT REINFORCEMENT IN THIS AREA 8" PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 820 X-CENTRIC VALVE OR ENGINEER APPROVED EQUAL. THIS VALVE SHALL BE IN ACCORDANCE WfTH AWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL. 0.86' --'- (CENTER TO CENTER) 4" x 4" 6/6 WELDED WIRE--, FABRIC (EACH SIDE & TOP OF CAGE) 2.80' d a J*O GRADE 8 a STAINLESS STEEL CONCRETE LAG SCREW 0 12" X 4" X" GALVANIZED STEEL STRAP (4 PER RISER JOINT) 3.0" RISER JOINT CONNECTION DETAIL N.T.S. 8"0 DIP DRAIN PIPE CONTRACTOR SHALL CORE -DRILL THE HOLE FOR THE 8"0 DIP IN THE FIELD. PRECASTER SHALL OMIT REINFORCEMENT IN THIS AREA Q d c 6" MIN. WALL 8" PLUG VALVE. THE VALVE THICKNESS SHALL BE A M&H STYLE 820 X-CENTRIC VALVE OR APPROVED EQUAL. THIS VALVE SHALL BE IN ACCORDANCE Q WITH AWWA C-504 SEC. 5.5, AND SHALL BE OPERABLE c FROM TOP OF OUTLET m n STRUCTURE VIA A HANDWHEEL. d 14" (TYP.) d a 2 LF 8"0 DIP zi -d n #6 REBAR PERIMETER FRAME 4" SOLID BRICK (BY OTHERS) - NOTE. BRICK SHALL LAY TIGHT AGAINST PRECAST STRUCTURE USING BRICK TIES WITH NO VOID SPACE BETWEEN 8" DIP DRAIN T.RASI-IRACK DETAILS N.T.S. -H'u ] N— CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT d - AND STAINLESS STEEL HARDWARE A PRELIMINARY DRAWING — NOT RELEASED FOR CONSTRUCTION 1 u� aJ w \ acq W Z h -,I' LO co AAA z W W4 rrr t..t �• Phi II wCA `ttttt►Iltlllse .ereeelet Rt'tt`i O W cq in EO ...t p w to E I Z `4 Z w � � w w� o 71 o � � w z 0 cq 4 o 4-4 Z OD/ W PROJECT NO. WDL-07020 FILENAME: WDL07020-PD DESIGNED BY: BRF DRAWN BY: JAA SCALE: NTS DATE: 09-20-2007 SHEET NO. P D — 3 C aMcADAMS 3—FOOT WIDE LAYER Of STONE (4—INCHES UNDERLAIN WITH FILTER F d a ° d. do d 1" THICK JOINT FILLER MATERIAL 36"0 0-RING RCP FLOW --"°- I! ° d ' to 1" THICK JOINT °,° d —v FILLER MATERIAL CONCRETE ANTI —FLOTATION BLOCK MGIIVr VIRL.LL/ I.,VIVVI♦GIL I VVIUVV 3" SOLID MASONARY BLOCK LIP STUBBED ABOVE GRADE UP ELEV. = 6.00 NOTES: 1. ALL TIE BARS (U—BARS) ARE #3 (AS LABELED) REBAR (GRADE 60) SPACED AT 10 FT. CENTER TO CENTER ALONG THE LENGTH OF THE CRADLE. 2. MAINTAIN A MIN. COVER OF 3" OF CONCRETE (TO THE OUTSIDE OF THE REBAR) FOR ALL REINFORCEMENT. 3. TRENCH TO BE BACKFILLED IN 5" LIFTS WHEN COMPACTION IS BY HAND. BACKFILL IS IN 8" LIFTS WHEN CONDUCTED BY MACHINE. MINIMUM OF 2 FEET COVER MUST BE PRESENT ON 36"0 RCP BEFORE DRIVING OVER WITH HEAVY EQUIPMENT. 4. REINFORCED CONCRETE CRADLE MAY BE REPLACED PER RECOMMENDATION FROM THE ON —SITE GEOTECHNICAL ENGINEER. ANY DEVIATION FROM THIS DETAIL SHALL BE SUBMITTED TO AND REVIEWED BY THE DESIGN ENGINEER PRIOR TO IMPLEMENTATION. e.. d _ Q< d ae 36"0 O—RING RCP a o FLOW A a d a d d 4__ e ° e d e e a v e d. 4 d. e a a c d a a ° Q ' 'a .d - - - _ d. a d 'a d e 13.80" 1" THICK JOINT FILLER MATERIAL 23.40" if CONCRETE ANTI —FLOTATION 1 BLOCK (MIN.) RISER BARREL CO ON DETAIL N.T.S. pla"NW21"R�� 1 .... """^NARY BLOCK LEVEL 6—FOOT WIDE (1—FOOT DEEP) TRIANGULAR CHANNEL ® 0.00% SLOPE LINED WITH LANDLOK TURF REINFORCEMENT MATTING 450 - CHANNEL SHALL BE LINED WITH LANDLOK TURF REINFORCEMENT MATTING 450 AND SEEDED PER SEEDING SCHEDULE (SEE LINING ANCHOR DETAILS SHEET PD-3E) 6' i 8. 1--SOLID MASO Y BLOCK Tll - - _�'- REINFORCED CONCRETE FOOTIN _ — UNDISTURBED EARTH 24- CROSS—S.EQTION 12" LEVEL SPREADER DETAIIS N.T.S. (3) #4 REBARS CONTINUOUS #4 REBAR ® 18" O.C-.j 8" (Typ) _� I- I / 12" 3" (TYP) t', , d -5 . 24" 2" DEEP ` CONTINUOUS KEYWAY 0812_ GENERAL NOTES: 1. CONSTRUCT CONCRETE LEVEL SPREADER UP ON A ZERO PERCENT GRADE TO ENSURE UNIFORM SPREADING OF FLOW. 2. LEVEL SPREADER SHOULD BE CONSTRUCTED ON UNDISTURBED SOIL, AND NOT ON FILL 3. THE TRIANGULAR CHANNEL SHOULD BE CONSTRUCTED ON A ZERO PERCENT GRADE. 4. THE TRIANGULAR CHANNEL SHOULD BE LINED WITH LANDLOK TURF REINFORCEMENT MATTING 450 OR APPROVED EQUIVALENT. THE TRM MATTING SHOULD BE ANCHORED PER THE DETAILS PROVIDED. THE TRM MATTING SHOULD BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 5. THE 3—INCH LAYER OF #57 STONE SHALL BE UNDERLAIN WITH MIRAFI FILTERWEAVE 400 OR APPROVED EQUIVALENT. 12" MI IVV. V/ vvm'J L_u JIVIVL ENCASED IN NON -WOVEN FILTER FABRIC (MIRAR 18ON OR EQUIVALENT) 16.80" C/C (TYI 36"0 0—RING RCP 6" (TYP.) #6 REBAR (GRADE 60) #3 REBAR TIES (U—BARS) SPACED AT 10 FT. ON CE 15- C/C (TYP.) 6" FROM BOTTOM OF CRADLE TO CENTER OF #6 REBAR 3" COVER (MIN.) TO OUTSIDE OF #3 TIE BAR (TYP.) 36" CONCRETE CRADLE DETAIL N.T.S. ENDWALL PER NCDOT STD. 838.80 (SEE DETAIL SHEET PD-3C) NOTE: 4" WEEPHOLES TO BE PROVIDED WITH VARMINT GUARD ON DOWNSTREAM SIDE AND GALVANIZED HARDWARE CLOTH ON UPSTREAM SIDE (Y4" MAXIMUM OPENINGS) VALL PER )T STD. 838.80 DETAIL T PD-3C) ENDWALL PER NCDOT STD. 838.80 (SEE DETAIL SHEET PD-3C) EPHOLES ON EACH - SPILLWAY BARREL PIPE CONCRETE CRADL CONSTRUCTION SEQUENCE 1. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, THEN BRING GRADE OF DAM EMBANKMENT TO SPRINGLINE OF PIPE ELEVATION. IF OPTION B IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, THEN CONSTRUCT FORMWORK FOR CONCRETE CRADLE ON EXISTING GRADE. 2. IF OPTION A IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, THEN EXCAVATE TRENCH FOR CRADLE AND BARREL PER DIMENSIONS ON DRAWINGS. IF OPTION B IS CHOSEN FROM NOTE 9 OF THE CONSTRUCTION SEQUENCE, PROCEED TO STEP 3 BELOW. 3. PLACE REINFORCING STEEL AND JOINT FILLER MATERIAL PER DRAWINGS. ALL REINFORCING STEEL SHALL HAVE A MINIMUM OF 3" OF CONCRETE COVER (INCLUDING TIES). 4. PLACE BARREL PIPE ON CONCRETE BLOCKS TO GRADE. CONTRACTOR SHALL WRAP JOINTS WITH 2—FT WIDE STRIPS OF FABRIC AT THIS STEP. 5. POUR CONCRETE FOR CRADLE FOR EACH SECTION FROM ONE SIDE OF THE TRENCH. ALLOW CONCRETE TO FILL ENTIRE AREA UNDER PIPE AND PIPE HAUNCHES AS TO LEAVE NO VOIDS UNDER THE PIPE BEFORE POURING ON THE OPPOSITE SIDE OF THE TRENCH. POUR ENTIRE CRADLE AS ONE LIFT (VERTICALLY) PER DRAWINGS. 6. ALLOW CRADLE TO CURE FOR A MINIMUM OF 7 DAYS BEFORE ANY VIBRATING COMPACTION EQUIPMENT IS USED IN THE VICINITY OF THE BARREL PIPE. BARREL PIPE CRADLE MATERIAL SPECIFICATIONS CONCRETE 0 COMPRESSIVE STRENGTH OF 3500 PSI AT 28 DAYS 0 APPROVED MIX DESIGN 0 4-6% AIR ENTRAINED 0 MAXIMUM MIX TO POUR TIME OF 90 MINUTES 0 FOUR CYLINDERS SHALL BE PREPARED FOR TESTING FOR EACH LIFT. ONE SHALL BE TESTED AT SEVEN DAYS, TWO AT 28 DAYS, AND THE FOURTH SHALL BE HELD FOR 54 DAYS. 0 A MINIMUM OF 3" OF CONCRETE COVER ON ALL STEEL IS REQUIRED (INCLUDING TIES). 0 CONCRETE TO BE VIBRATED VERTICALLY. WET CONCRETE SHALL NOT BE MOVED HORIZONTALLY WITH THE VIBRATOR. STEEL 0 ALL STEEL TO BE GRADE 60. o ALL STEEL SHALL BE FREE OF RUST OR OTHER DEBRIS THAT MIGHT PREVENT BONDING TO THE CONCRETE. o ALL STEEL SHALL BE BENT WITH A MINIMUM RADIUS OF 3DB (1.13" FOR #3) AS SHOWN ON THE DRAWINGS. o THE #6 BARS IN THE CONCRETE CRADLE SHALL BE SPLICED WITH A MINIMUM OVERLAP OF 32". THE SPLICES SHALL BE SPACED SUCH THAT NO TWO SPLICES OCCUR WITHIN THE SAME LENGTH OF PIPE. 9'-9.5" 3'-9.5" O.D. IVV. V/ xx/113IlLV JIVIVL SPILLWAY F rIMR DETAII. ENCASED IN NON —WOVEN FILTER FABRIC (MIRAFI 180N N.T.S. OR EQUIVALENT) . 67 WASHED STONE CASED IN NON —WOVEN TER FABRIC (MIRAR 18ON EQUIVALENT) SIDE OF SPILLWAY — cn a C9 z M+d ® E-+ UQ LCAD Er z pq ®rv� rrrxrxxll nrrir®i 'Y{)Q z O W 02 tn Ew4 o cq o z z � � W � z 5 0 a coz a z ryl W z Q cq W R 4'ge, A M� Z_ n a o PROJECT NO. WDL-07020 FILENAME: WDL07020—PD DESIGNED BY: BRF DRAWN BY: JAA SCALE: NTS DATE: 09-20-2007 SHEET NO. P D o 3 D PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION 0-0t1=-rn (2 - 3 ]I) r n i 3 t r ya - ♦ •—�— •�� .....-.._� k .,:, y—"'—fit ti, "•• ` eM 30 crag ; r` t ` (12 n), i 1 S crrs NOTES- 1. sECl1Rr: AT 30 cm (1 £t)11WERVALS EACKFI'_L AND t OMPACT SOIL TE AL CHANNEL ANCHOR TRENCH DETAEL N.T.S. PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTCN. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FCFR ?. SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSION -IL EXAMINATION EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY. 0.D I I j 13 i i I i f:fDtF�; I ANC I0R PA1!-rr- N "I,S A 4C's1 11S tr W (1 112 ANC'-iCRS 1 Yd; 1} F'OR : 31H : I # SL1�7=-S { .2H ; I i SNr`►i'Et ,'!R- STAPLES, fv1ETA! C-EOTEXTLE PINS, TRANGULVIDIC. ,1R V01)EN 0R PLAST STAICS CAN 0E: US`0 TO ANtGt UIt TR-MIfS t) rHF 1aHQUNU-1iUKFA.Ut; ANCHOR PATTERN FOR 3H:1V < SLOPES < 2H:1V N.T.S. p IG A!f PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFuRMAT10N ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY_ 1 a` cm ($ Irr) ,N-OTES: 1. SECURE AT 30 cn (1 It) tsTERVALS. BA KV I L, AI•: F) :.Oh V)ACT '0011. _=RW=Yr CHECK SLOT DETAIL N,T,S. PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR ?. SPECIFIC APPUCA70N 'WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY. -t•r PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT HAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY. 10c I LANOLCIK('n�) OR t= YFi,1"` VA i Co (OR EQUAL) 10 ell) 'I SURF R�IINFOI�GFr%l=%T �J?A �� in) NOTES: 'I. INSTALL LAN QLC—�j OR PYRAMAT� TURF REINFORCEM-zNT 10AT (CCIR EQUAL) AND SOIL FILL (OPTIONAL 2. SECURE LONI GIFFU INA,L ANCHOR TRENCH AT 30 c r. i 1 �I INTERVALS, BACKFILL AND C{OM."AC T SOIL LONGITUDINAL ANCHOR TRENCI I DETAIL N.T.S. A WA r CFI €-LOW _._._ tt4� 17, P I 3G # 15 cm f t (13 in) NOTES: 1. SECURE AT -30 can 0 tt) INTERVALS, BACKFILL AND CO",4PA T RWTIAL ANCHOR TRENCH DETAIL N.T.S. PLEASE NOTE THAT THE INFORMATION PRESENTED HEREIN IS GENERAL INFORMATION ONLY. IT IS FOR CONCEPTUAL USE ONLY AND NOT INTENDED TO BE USED FOR CONSTRUCTION. WHILE EVERY EFFORT FIAS BEEN MADE TO ENSURE ITS ACCURACY, THIS INFORMATION SHOULD NOT BE USED FOR A SPECIFIC APPLICATION WITHOUT INDEPENDENT PROFESSIONAL EXAMINATION AND VERIFICATION OF IT'S SUITABILITY, APPLICABILITY AND ACCURACY. PRELIMINARY DRAINING — NOT RELEASED FOR CONSTRUCTION cry � tit W Wa rn � � z ACC) E-"14 .r■ W �^. oil d = 6 . Ft > U � c2 p w ua � � w a �N® W C ek cq R 4-4 0Z� C T ,F" dAME: WDL07020 --Y--' D': ata> r,r:S1GNED BY: FRs DRAWN BY: JA A SCAT.F.: N TS DATE: 09-20-2007 SHEET NO. P V — 3 F HiMeADAMS / / / / LEGEND QTY. SYM. SCIENTIFIC NAME COMMON NAME HATCH TYPE SPACING 393 N IRIS VIRGINIANA 359 PC PONTEDERIA CORDATA 274 SV SCRIPUS VALIDUS 322 SL SAGITTARIA LATIFOLIA TEMPORARY. SEEDING SCHEDULE BLUE FLAG IRIS PICKEREL WEED SOFT —STEM BULRUSH ARROWHEAD SEEDING DATE SEEDING MIXTURE APPLICATION RATE JAN 1 — MAY 1 RYE (GRAIN) 120 LBS/AC KOBE LESPEDEZA 50 LBS/AC MAY 1 — AUG 15 GERMAN MILLET 40 LBS/AC AUG 15 — DEC 30 RYE (GRAIN) 120 LBS/AC SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY PER ONE 11ME APPLICATION OF 2,000 LB/AC GROUND AGRICULTURE LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER (FROM AUG 15 — DEC 30, INCREASE 10-10-10 FERTILIZER TO 1000 LB/AC). MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE JAN 1 — AUG 15: IF GROWTH IS NOT FULLY ADEQUATE, RESEED AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 — DEC 30: REPAIR DAMAGED AREAS IMMEDIATELY. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. NOTE: USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN DATE IS NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE. SEEDBED PREPARATION + �m QUART/ BARE ROOT 24" O.C. + + BARE ROOT/ PLUG 24" O.C. LLLLL BARE ROOT/ PLUG 24" O.C. LLLLL �� BARE ROOT/ PLUG 24" O.C. PERMANENT SEEDING SCHEDULE (DAM EMBANIUVLE" SEEDING DATE SEEDING MIXTURE APPLICATION RATE AUG 25 — OCT. (BEST) TALL FESCUE 200 LBS/AC FEB. — APR 15 (POSSIBLE) SOIL AMENDMENTS APPLY LIME AND FERTILIZER PER ONE TIME APPLICATION ACCORDING TO SOIL TESTS, OR APPLY 4000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE INSPECT AND REPAIR MULCH FREQUENTLY. MOW REGULARLY TO A HEIGHT OF 2-4 INCHES. NURSE PLANTS BETWEEN MAY 1 AND AUG. 15, ADD 15 LB/ACRE SUDANGRASS OR 10 LB/ACRE GERMAN MILLET. BEFORE MAY 1, OR AFTER AUG. 15, ADD 40 LB/ACRE RYE (GRAIN). NOTE: PERMANENT SEEDING SCHEDULE IS FOR EXTERIOR SLOPES OF THE DAM, AND INTERIOR SLOPES OF THE DAM (FILL EMBANKMENT) TO NORMAL POOL ELEVATION. 1.) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2.) RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3.) REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4.) PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL 5.) CONTINUE TILLAGE UNTIL A WELL —PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6.) SEED ON A FRESHLY PREPARED SEEDBED AND COVER 7.) MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8.) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. 9.) CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AFTER PERMANENT COVER IS ESTABLISHED. PLA vG INS MUCTIONS Planting Techniques A) Insure that roots, once removed from pot, are straightened and face downward. B) Create planting area for each plant and excavate pit. C) Place plants in pit insuring roots ore facing completely downward. D) Heel in soil arouond plant and proceed to next planting location. E) Newly planted plants need to be fastened to the substrate for the establishment of new roots. F) Roots shall be spread in their normal position. All broken or frayed roots hall be cut off cleanly. G) The diameter of the pits for all vegetative stock shall be at least three times the diameter of the root mass. Plant pit wall shall be scarified prior to plant installation. H) Set the plants upright, in the center of the pit. The bottom of the root mass should be resting on undisturbed soil. 1) Place the backfill around the base and sides of the root mass, and work each layer to settle backfill and to eliminate voids and air pockets. When pit is approximately 2/3 full, water thoroughly before placing remainder of the backfill. Water again after placing final layer of backfill. J) Broken or damaged parts will be cut back to undamaged tissue, leaving as much green basal tissue as possible above the roots. If more than fifty percent (507.) of the plant is damaged then contractor shall replace the plant. Container Stock/ Bare Root: A) Stock shall have been grown in a container long enough for the root system to have developed sufficiently to hold its soil together once removed from the container. B) Container plants will need to be watered regularly and placed in shady conditions until planting occurs. C) Bare root plants are for immediate planting, otherwise see D) below. D) If bare roots specimens are not to be planted within four (4) days, temporary holding of bare root specimens are to be covered entirely by a suitable medium (etc. soil, sawdust, mulch or the like) and watered regularly so as to not dry out. Plant Locations: A) New plantings shall be located where shown on plan except where changes have been made in proposed construction. B) Necessary adjustments shall be made only after approval by the owner or the owner's representative. Water. Water shall be potable and shall not contain elements toxic to plant life. ----------- r-------- ! \ \ / 00 SPORMWATER WATER QUAI= POND # 1 LANDSCAPE PLAN VIEW 1" = 30' GRAPHIC SCALE 30 0 15 30 45 1 inch = 30 ft. PRELIMINARY DRAWING — NOT RELEASED FOR CONSTRUCTION PERMANENT SEEDING SCHEDULE (DAM EMBANIUVLE" SEEDING DATE SEEDING MIXTURE APPLICATION RATE AUG 25 — OCT. (BEST) TALL FESCUE 200 LBS/AC FEB. — APR 15 (POSSIBLE) SOIL AMENDMENTS APPLY LIME AND FERTILIZER PER ONE TIME APPLICATION ACCORDING TO SOIL TESTS, OR APPLY 4000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE INSPECT AND REPAIR MULCH FREQUENTLY. MOW REGULARLY TO A HEIGHT OF 2-4 INCHES. NURSE PLANTS BETWEEN MAY 1 AND AUG. 15, ADD 15 LB/ACRE SUDANGRASS OR 10 LB/ACRE GERMAN MILLET. BEFORE MAY 1, OR AFTER AUG. 15, ADD 40 LB/ACRE RYE (GRAIN). NOTE: PERMANENT SEEDING SCHEDULE IS FOR EXTERIOR SLOPES OF THE DAM, AND INTERIOR SLOPES OF THE DAM (FILL EMBANKMENT) TO NORMAL POOL ELEVATION. 1.) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2.) RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3.) REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4.) PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL 5.) CONTINUE TILLAGE UNTIL A WELL —PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6.) SEED ON A FRESHLY PREPARED SEEDBED AND COVER 7.) MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8.) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. 9.) CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AFTER PERMANENT COVER IS ESTABLISHED. PLA vG INS MUCTIONS Planting Techniques A) Insure that roots, once removed from pot, are straightened and face downward. B) Create planting area for each plant and excavate pit. C) Place plants in pit insuring roots ore facing completely downward. D) Heel in soil arouond plant and proceed to next planting location. E) Newly planted plants need to be fastened to the substrate for the establishment of new roots. F) Roots shall be spread in their normal position. All broken or frayed roots hall be cut off cleanly. G) The diameter of the pits for all vegetative stock shall be at least three times the diameter of the root mass. Plant pit wall shall be scarified prior to plant installation. H) Set the plants upright, in the center of the pit. The bottom of the root mass should be resting on undisturbed soil. 1) Place the backfill around the base and sides of the root mass, and work each layer to settle backfill and to eliminate voids and air pockets. When pit is approximately 2/3 full, water thoroughly before placing remainder of the backfill. Water again after placing final layer of backfill. J) Broken or damaged parts will be cut back to undamaged tissue, leaving as much green basal tissue as possible above the roots. If more than fifty percent (507.) of the plant is damaged then contractor shall replace the plant. Container Stock/ Bare Root: A) Stock shall have been grown in a container long enough for the root system to have developed sufficiently to hold its soil together once removed from the container. B) Container plants will need to be watered regularly and placed in shady conditions until planting occurs. C) Bare root plants are for immediate planting, otherwise see D) below. D) If bare roots specimens are not to be planted within four (4) days, temporary holding of bare root specimens are to be covered entirely by a suitable medium (etc. soil, sawdust, mulch or the like) and watered regularly so as to not dry out. Plant Locations: A) New plantings shall be located where shown on plan except where changes have been made in proposed construction. B) Necessary adjustments shall be made only after approval by the owner or the owner's representative. Water. Water shall be potable and shall not contain elements toxic to plant life. ----------- r-------- ! \ \ / 00 SPORMWATER WATER QUAI= POND # 1 LANDSCAPE PLAN VIEW 1" = 30' GRAPHIC SCALE 30 0 15 30 45 1 inch = 30 ft. PRELIMINARY DRAWING — NOT RELEASED FOR CONSTRUCTION ----------- r-------- ! \ \ / 00 SPORMWATER WATER QUAI= POND # 1 LANDSCAPE PLAN VIEW 1" = 30' GRAPHIC SCALE 30 0 15 30 45 1 inch = 30 ft. PRELIMINARY DRAWING — NOT RELEASED FOR CONSTRUCTION LEGEND QTY. SYM. SCIENTIFIC NAME COMMON NAME HATCH TYPE SPACING 313 IV IRIS VIRGINIANA BLUE FLAG IRIS �D QUART/ BARE ROOT 24" O.C. 287 PC PONTEDERIA CORDATA PICKEREL WEED CD BARE ROOT/ PLUG 24" O.C. LLLL 294 SV SCRIPUS VALIDUS SOFT —STEM BULRUSH LLLLL BARE ROOT/ PLUG 24" O.C. 293 SL SAGITTARIA LATIFOLIA ARROWHEAD a BARE ROOT/ PLUG 24" O.C. TEMPORARY SEEDING SCHEDULE SEEDING DSEEDING MIXTURE APPLICATION RATE JAN 1 — MAY 1 RYE (GRAIN) 120 LBS/AC KOBE IESPEDEZA 50 LBS/AC MAY 1 — AUG 15 GERMAN MILLET 40 LBS/AC AUG 15 — DEC 30 RYE (GRAIN) 120 LBS/AC SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY PER ONE TIME APPLICATION OF 2,000 LB/AC GROUND AGRICULTURE LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER (FROM AUG 15 — DEC 30, INCREASE 10-10-10 FERTILIZER TO 1000 LB/AC). MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE JAN 1 — AUG 15: IF GROWTH IS NOT FULLY ADEQUATE, RESEED AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 — DEC 30: REPAIR DAMAGED AREAS IMMEDIATELY. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. NOTE: USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN DATE IS NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE. 01 : 10� .. PERMANENT SEEDING SCHEDULE (DAM EMBANEME" SEEDING DATE SEEDING MIXTURE APPLICATION RATE AUG 25 — OCT. (BEST) TALL FESCUE 200 LBS/AC FEB. — APR 15 (POSSIBLE) SOIL AMENDMENTS APPLY LIME AND FERTILIZER PER ONE TIME APPLICATION ACCORDING TO SOIL TESTS, OR APPLY 4000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR 4 MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE INSPECT AND REPAIR MULCH FREQUENTLY. MOW REGULARLY TO A HEIGHT OF 2-4 INCHES. NURSE PLANTS BETWEEN MAY 1 AND AUG. 15, ADD 15 LB/ACRE SUDANGRASS OR 10 LB/ACRE GERMAN MILLET. BEFORE MAY 1, OR AFTER AUG. 15, ADD 40 LB/ACRE RYE (GRAIN). NOTE: PERMANENT SEEDING SCHEDULE IS FOR EXTERIOR SLOPES OF THE DAM, AND INTERIOR SLOPES OF THE DAM (FILL EMBANKMENT) TO NORMAL POOL ELEVATION. 1.) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2.) RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3.) REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4.) PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. 5.) CONTINUE TILLAGE UNTIL A WELL —PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6.) SEED ON A FRESHLY PREPARED SEEDBED AND COVER 7.) MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8.) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. 9.) CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AFTER PERMANENT COVER IS ESTABLISHED. IV OWMI,1 Planting Techniques A) Insure that roots, once removed from pot, are straightened and face downward. B) Create planting area for each plant and excavate pit. C) Place plants in pit insuring roots are facing completely downward. D) Heel in soil arouond plant and proceed to next planting location. E) Newly planted plants need to be fastened to the substrate for the establishment of new roots. F) Roots shall be spread in their normal position. All broken or frayed roots hall be cut off cleanly. G) The diameter of the pits for all vegetative stock shall be at least three times the diameter of the root mass. Plant pit wall shall be scarified prior to plant installation. H) Set the plants upright, in the center of the pit. The bottom of the root mass should be resting on undisturbed soil. 1) Place the backfill around the base and sides of the root mass, and work each layer to settle backfill and to eliminate voids and air pockets. When pit is approximately 2/3 full, water thoroughly before placing remainder of the backfill. Water again after placing final layer of backfill. J) Broken or damaged parts will be cut back to undamaged tissue, leaving as much green basal tissue as possible above the roots. If more than fifty percent (50%) of the plant is damaged then contractor shall replace the plant. Container Stock/ Bare Root: A) Stock shall have been grown in a container long enough for the root system to have developed sufficiently to hold its soil together once removed from the container. B) Container plants will need to be watered regularly and placed in shady conditions until planting occurs. C) Bare root plants are for immediate planting, otherwise see D) below. D) If bare roots specimens are not to be planted within four (4) days, temporary holding of bare root specimens are to be covered entirely by a suitable medium (etc. soil, sawdust, mulch or the like) and watered regularly so as to not dry out. Plant Locations: A) New plantings shall be located where shown on plan except where changes have been made in proposed construction. B) Necessary adjustments shall be made only after approval by the owner or the owner's representative. Water: Water shall be potable and shall not contain elements toxic to plant life. 1 law - I T M 154 r / / I I 15 S EMWATER WATER QUALITY POND #2 LANDSCAPE PLAN VIEW 1 " = 30, GRAPHIC SCALE 30 0 15 30 45 I inch = 30 ft. PRELIMIANRY DRAWING - NOT RELEASED FOR CONSTRUCTION DATE: 09-20-2007 SHEET ND - 2 L McADAMS LEGEND QTY. SYM. SCIENTIFIC NAME COMMON NAME HATCH TYPE SPACING 586 IV IRIS VIRGINIANA 480 PC PONTEDERIA CORDATA 599 SV SCRIPUS VALIDUS 577 SL SAGITTARIA LATIFOLIA TEMPORARY SEEDING SCHEDULE SEEDING DATE SEEDING MIXTURE APPLICATION RATE JAN 1 - MAY 1 RYE (GRAIN) 120 LBS/AC KOBE LESPEDEZA 50 LBS/AC MAY 1 - AUG 15 GERMAN MILLET 40 LBS/AC AUG 15 - DEC 30 RYE (GRAIN) 120 LBS/AC BLUE FLAG IRIS IRA INIn QUART/ BARE ROOT PICKEREL WEED CD BARE ROOT/ PLUG SOFT -STEM BULRUSH LLLLL BARE ROOT/ PLUG ARROWHEAD BARE ROOT/ PLUG SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY PER ONE TIME APPLICATION OF 2,000 LB/AC GROUND AGRICULTURE LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER (FROM AUG 15 - DEC 30, INCREASE 10-10-10 FERTILIZER TO 1000 LB/AC). MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE JAN 1 - AUG 15: IF GROWTH IS NOT FULLY ADEQUATE, RESEED AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. AUG 15 - DEC 30: REPAIR DAMAGED AREAS IMMEDIATELY. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/AC KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. NOTE: USE THE TEMPORARY SEEDING SCHEDULE ONLY WHEN DATE IS NOT CORRECT TO USE THE PERMANENT SEEDING SCHEDULE. SEEDBED PREPARATION 24" O.C. 24" O.C. 24" O.C. 24" O.C. PERMANENT SEEDING SCHEDULE (DAM E N SEEDING DATE SEEDING MIXTURE APPLICATION RATE AUG 25 - OCT. (BEST) TALL FESCUE 200 LBS/AC FEB. - APR 15 (POSSIBLE) SOIL AMENDMENTS APPLY LIME AND FERTILIZER PER ONE TIME APPLICATION ACCORDING TO SOIL TESTS, OR APPLY 4000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4000 LB/AC STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE INSPECT AND REPAIR MULCH FREQUENTLY. MOW REGULARLY TO A HEIGHT OF 2-4 INCHES. NURSE PLANTS BETWEEN MAY 1 AND AUG. 15, ADD 15 LB/ACRE SUDANGRASS OR 10 LB/ACRE GERMAN MILLET. BEFORE MAY 1, OR AFTER AUG. 15, ADD 40 LB/ACRE RYE (GRAIN). NOTE: PERMANENT SEEDING SCHEDULE IS FOR EXTERIOR SLOPES OF THE DAM, AND INTERIOR SLOPES OF THE DAM (FILL EMBANKMENT) TO NORMAL POOL ELEVATION. 1.) CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2.) RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3.) REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4.) PER ONE TIME ONLY, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. 5.) CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6.) SEED ON A FRESHLY PREPARED SEEDBED AND COVER 7.) MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8.) INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. 9.) CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AFTER PERMANENT COVER IS ESTABLISHED. PLANTING INSTRUCTIONS Planting Techniques A) Insure that roots, once removed from pot, are straightened and face downward. B) Create planting area for each plant and excavate pit. C) Place plants in pit insuring roots ore facing completely downward. D) Heel in soil arouond plant and proceed to next planting location. E) Newly planted plants need to be fastened to the substrate for the establishment of new roots. F) Roots shall be spread in their normal position. All broken or frayed roots hall be cut off cleanly. G) The diameter of the pits for all vegetative stock shall be at least three times the diameter of the root mass. Plant pit wall shall be scorified prior to plant installation. H) Set the plants upright, in the center of the pit. The bottom of the root mass should be resting on undisturbed soil. !) h I settle backfill and to eliminate m n work each layer to ett bac Place the backfill around the base and sides of the root ass, and y i is approximately 2 /3 voids and air pockets. When t , P P PP Y full, water thoroughly before placing remainder of the backfill. Water again after placing final layer of backfill. J) Broken or damaged parts will be cut back to undamaged tissue, leaving as much green basal tissue as possible above the roots. If more than fifty percent (50%) of the plant is damaged then contractor shall replace the plant. Container Stock/ Bare Root: A) Stock shall have been grown in a container long enough for the root system to have developed sufficiently to hold its soil together once removed from the container. B) Container plants will need to be watered regularly and placed in shady conditions until planting occurs. C) Bare root plants are for immediate planting, otherwise see D) below. D) If bare roots specimens are not to be planted within four (4) days, temporary holding of bare root specimens are to be covered entirely by a suitable medium (etc. soil, sawdust, mulch or the like) and watered regularly so as to not dry out. Plant Locations: A) New plantings shall be located where shown on plan except where changes have been made in proposed construction. B) Necessary adjustments shall be made only after approval by the owner or the owner's representative. Water: Water shall be potable and shall not contain elements toxic to plant life. j \ l f i - / i � ru — Cl) i � f c / \ 0 to I' _ 105 L ? I I I / y` 1 / z / N 0 0-4 s w CQ \�\ i a \ > Co 1 I 1 A— -' z O I L_ \ / 1 / / /� U 0 — / ------ \ \ / + + / mg mg In co 4.4 OD - / \ s �} :sue -•� -�—� � -` ���v, \ / \ \ / � U STORMWATER WATER QUALITY POND #3 LANDSCAPE PLAN VIEW 1" = 30' AC PROTECT NO. WDL-07020 Ffl-EIAmWDL07020—PD3L DESIGNED BY: AMT DRAWN BY: JAA GRAPHIC SCALE SCALE: 1 "=30' 30 0 15 30 45 DATE: 09--20— 2 007 SHEET N 1 inch = 30 ft. PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTI D `� 11WADAMS 0 om H � H�Z > C/) 0 fn O -H Im-i z m > =-nZDm _CO00 Z H 0 - TI • [,SOH C)DDD cn H ` O Z ISOMETRIC VIEW z CD z 0 SIDEWALK (5' STD.) O Cn -O PROPOSED QH Cn O � 3 H 8 A e Q Q ICI i Z-WxENING DcuEs-, F- Q C -i ----UTILITY STRIP -" _.--. _---- .-.. - Q S' - Qz O Ot (MIN.) Z F- x �I ((J Q DROP CURB _ _ _ _ __ _ _ _ _ _ _ _ _ ¢)"'- �' DROP CURB 2' DETECTABLE 0.02 ((MIN ) 0 04 YAX. j q" Ct C� D ,.� O L - - - - - Z x O (STD. 2 6 CURB h'hRYING OOY�S 0.08 (MAX.) 0.02 (NORM,) H O Q i -T1 Cn C d GUTTER SHOWN : `0.04 (NORM.) LL J H O -1 ` r i _ _ _ _ _. _ _ _ _ _. H O T.-I U r •'E) ( i �/ 7 _ _�-- OO(nx F t -1 D \ - A\` _ _ - _ _ _ OO = HZ-1 D ---� � - -J-; w¢Qwx =�DDm •�`---------- wQQwx =ODnm 9 12:1 MAX RAMP QU�OLy` •' Z9 / -3 kfS QC3 C:3 �z=D] F. F4 =cf)OO --- ------ - -- c~n��o� ?Hor-m _, '. ;,\ o' IOe"�<k SECTION B B ��)-zow zH�QO _ __ SECTION B-B ZQH� p-xiy 2 ' . O�oU)= c�==Z -- D 3-4" Z H� MTH. SIDEWALK _6' 0 3 4 6 0"__-__ TOP _OF rZ 0 Cn H [-4 l\ _ ` < �I ?XSFF� 4r� e`�� t DROP'' � H H ELEVATION CURB MYN." -.CURB GO , W O ? °r C \ O _ _ - _ _ _ CURB_ oI d in O ic TRANSITION DROP TRANSITION O Z , d 7jS .1�gS i `~ - ... - _ _ I I _ 0 Z Q CURB -/ / ! ` ��� GUTTER - - ` P OF: SIDEWALK 2`''; TIC1AA.E CURB w VARIABLE SLOPES NOT _ ED „ 1 ,( 1/ TO EXCEED 12:1 (8 3316) - 1,'i/.�"y' PRO>OSEO D TECTABLE ?' ELEVATION-yippy((yG DOMES m l' _._ POSEDKkqNlu WHES _ Y G SECTION A -A -- O -- - -- - --- O O SECTION A -A G � N ISOMETRIC VIEW m z - SIDEWALK -.__..__.. O O -1 m '.'I z ! i = Z LE (7) EXPANSION JOINT _. \ (SEE STD 846.01) LL m EXISTING I tq EXISTING O LL Z CC z' Q r .I� H �+ NOTE: A PORTION OF ONE OR BOTH RAMPS MAY EXTEND OUTSIDE THE RETURN. (3 CL r x Z H I"I L± _ NOTES: :_SIDEWALK; '� I II I i) SI OEYfALK T I Q �+ �,.� Q f H Cn NOTES: Z Cn 1. DETECTABLE WARNING DOMES SHALL COVER 2'-C" LENGTH AND - -�, - v ( I Z (n .m. = WARNING ME SHALL COVER 2'-0" LENGTH AND FULL WIDTH OF THE DETECTABLELOOSRN G DOMES CO FU H = FULL WIDTH F THE R U L 0 E RAMP FLOOR AS SHOWN ON THE DETAILS. I • m RAMP FLOOR AS SHOWN ON THE DETAILS. 2. OBTAIN 704, CONTRAST VISIBILITY WITH ADJOINING SURFACE, EITHER LIGHT -ON -DARK, t __ ---- -----._-- EXPANSION. JOINT Q Q v N 7 2. OBTAIN 70% CONTRAST VISIBILITY WITH ADJOININO SURFACE, EITHER LIGHT -ON -DARK, OR DARK -ON -LIGHT SEQUENCE I l i i I ' . I r,---- -;-> - 1 ¢ �..' m (fj m -j OR DARK -ON -LIGHT SEQUENCE COVERING THE ENTIRE RAMP. �,� of 2_O° \ q (SEE STD. 848.01) (n FBI m I COVERING THE ENTIRE RAMP, t 11 1 .'1 , - �� Ir w J m C� ii z . CA a D RAMP WIDTH AREA IS VARIABLE --- z SEE NOTE 1 -�' `CG F `9g. ,q ,iP y L%q`c 1GY"Ly EXPANSION JOINT (SEE STD. 846.01), 0 f- M Q Q C ^Z D W L/ z O D �] I I I I I; I I I I RAMP WIDTH AREA IS VARLABIE - 1 I l ZY. S t F N G f ~'� 9 2HGSK \ N SEE NOTE cccjjj LE'� \ t t - -� v Q ..i w co w (� < 3 V 0 r D _] a a ono -'1 Ca l - BASE DIAMETER 0.45•R TO 0.70'R <_ 2. TOP O OF NO LESS )-450 - THAN % T NO MORE z Q - r :� 65% OF THAN 65% OF 171E BASE DIAMETER 7'I 1 I �__-__ 1i t..I ___ . --; ri A WIA+9" X B 5' 0.0' _ S.8° 5.8' : - 6' 0. 0' 6. 8' 6.8, 6.O"' 7' 0. 0' 7. 8' 7.3' 6.5"' e' 0.0' _ 8.8' 7.3' 6.5 ' 5' 2.0' 7. 8' 7.8' 5.0- 5 2. 5' 8.3' B.V 4.8' 5' 3_5' 9.3' 8.4' 4. 1' 5' 4. 0' 9.8, S.6' 3.S' 5' 4-5' 10.3' B.7' 3.4' L 5' -S. -0' 1 10.8' 18.9.1 3. i ?� SIDEWALK Z �: Q F- m m r <- l.. !` ... (' ' BASE DIAMETER I6 TO 0.70'R \ ` ��-1-.-' _-•-'-:-'_.�, I ` t \; \\ ( \ T-_- A zcc Q Z 0 Q e" W w r m � � Z: 'y 0.45'R •• f TOP DIAMETER OF O i\ \ \\ `'- W N L D THIS PORTION OF RAMP.;_ ,-./ MUST FAIL WITHIN '..-...-_.... _. �� M :" - \ = Z' (n 3 H Z _NO -LESS t. THAN 5Q% TO NO MORE THAN O. THE BASE ,-•" ,: R'••C \ -- - - - . ��. \ V� ! t ` :. Z o S V/ (n H z CROSSWALK LIMITS. 1 SEE NOTE 13 < ) i'T F-IG� -I 0.� a a F"�I .� Z m ni ;I O; O:E ... ., I DAMETER% ' f .- �(� 1 _ tiv, -%' -� -_ - - -i J ' t� H J Z i'C F�1 w 'C7 Tt .- SEE NOrE t _ (} W � z 3D t . _ �T- ..... THIS PORTION OF RAMP ' � t j >" 1...... , MUST FALL WITHIN _- - W F- O � SEE NOTE 1 ii% ( CROSSWALK LIMITS. 0.9- TO b 65 T b TO. TIjr - _ - - - ( ) -1.4 MINA ry I24 8 = X-(A+9") 5EE NOTESv 0.9 TO 0,6$7 _, 1.6•TO F7 - - E tO7L 1 Y' SEE NOTE i I w .I B = DISTANCE FROM FRONT EDGE OF SIDEWALK 2 12 d 17 O 14Ml .y 74 7 Iv 0 O -1 TO BACK POINT OF 12:1 (8.33%) SLOPE. SEE NOTES .t i • s _ _.2 12 d 1/ LL BACK OF SIDEWALK DROP REQUIRED FOR ALL r _.. r S .- �' .-. _ PRECAST CLASS cuss •B` SIDEWALK SLOPES. LLI PLAN VIEW y I_?..-- --.-:--- -=-- .-.. r MtECAsr a,�5s -n• - ' CONCRETE " BACK OF SIDEWALK DROP REQUIRED FOR _ _ _ SIDEWALK SLOPES 0.04. ;HEFT I OF 4 DETECTABLE WARNING DOMES DUAL RAMPS `°" LAN VIEW PLAN VIEW p o �'y ANY RADII SHEET 1 OF 4 SHEET 2 OF a DETECTABLE WARNING _DOMES UAX.. •IAL RAM. I ANY RAMPSII 848.05 (40" YIN. FLOOR WIDTH) 848.05 848.05 MAX. 28' RADII (40" MIN- FLOOR WIDTH) HEFT 2 OF 4 SHEET 3 OF 4 (6°" M"'. FLOOR WIDTH) 848.05 1848.05 � z z rTT �mv NOTES: CD a-u PAVEMENT Oco % ¢`< <�z 1 8" RAD. 9" 9" 3 4" RAID.ID PAVEMENT SURFAC Q>- H z 1. CONSTRUCT THE WALKING SURFACE WITH SLIP RESISTANTANCE AND A 70° CONTRASTING COLOR TO THE SIDEWALK. zlcn O zH's 70 1/2" RAD. 6 2-0 I - SURFAC JRA ¢1--Q DHOW H�CjV DO�70V) h 1 8" RAD. Zry�U mm--1Q = 2. CROSSWALK WIDTHS AND CONFIGURATION VARY BUT MUST CONFORM TO TRAFFIC DESIGN STANDARDS. w0JOa-=z frTiZ-i=D 3" RAD. 1 8" RAD. J O = N oOD_(DZ 0 Z -I 3. NORTH CAROLINA GENERAL STATUTE 136-44.14 REQUIRES THAT ALL STREET CURBS BEING CONSTRUCTED OR RECONSTRUCTED FOR MAINTENANCE =z G7O>I --I _ °• I 0U7= - O c� w¢ N x �DCtm QZ n D m PROCEDURES, TRAFFIC OPERATIONS, REPAIRS, CORRECTION OF UTILTIES OR ALTERED FOR ANY REASON AFTER SEPTEMBER 1, 1973 SHALL )- UQ 0 = Z D o .° ::v W PROVIDE WHEELCHAIR RAMPS FOR THE PHYSICALLY DISABLED AT ALL INTERSECTIONS WHERE BOTH CURB AND GUTTER AND SIDEWALKS ARE Q FO-1 =��O 1 0 p'..o p:.o p _ 1» O�" f-UQLLO=0 = PROVIDED AND AT OTHER POINTS dF PEDESTRIAN FLOW, _ ~ z w Z O TI v v= v' v �'• Q OWO LL J Or � /4" RAID cnn� Z-) ZD IN ADDITION, SECTION 228 OF THE 1973 FEDERAL AID HIGHWAY SAFETY ACT REQUIRES PROVISION OF CURB RAMPS ON ANY CURB CONSTRUCTION p O Uj n L7 Z 1 3/4" RAD. f�� v G O Q 2'-6" 1'-6' p 00D AFTER JULY 1,1976 WHETHER A SIDEWALK IS PROPOSED INITIALLY OR IS PLANNED FOR A FUTURE DATE. z 1i D 1 D r• • � (n -<,-, ''1 CL" ((n� 2'-6" CURB AND GUTTER 1'-6" CURB AND GUTTER �1 �. z�� (n THE AMERICANS WITH DISABILITIES ACT (ADA) OF 1990 EXTENDS TO INDIVIDUALS WITH DISABILITIES. COMPREHENSIVE CIVIL RIGHTS p (L p O PROTECTIONS SIMILIAR TO THOSE PROVIDED TO PERSONS ON THE BASIS OF RACE, SEX, NATIONAL ORIGIN AND RELIGION UNDER THE CIVIL w O „ Q z CA RIGHTS ACT OF 1964. THESE CURB RAMPS HAVE BEEN DESIGNED TO COMPLY WITH THE CURRENT ADA STANDARDS, O Z 8" X 12" OR 18" 9 X 12" OR 18" PROPOSED CONCRETE CURB CONCRETE CURB 4. PROVIDE WHEELCHAIR RAMPS AT LOCATIONS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. LOCATE WHEELCHAIR RAMPS 4`-0EDGE OF AS DIRECTED BY THE ENGINEER WHERE EXISTING LIGHT POLES, FIRE HYDRANTS, DROP INLETS, ETC. AFFECT PLACEMENT. WHERE 2'-0" 2'-0" PAVEMENT Z4"10 A . 'TWO RAMPS ARE INSTALLED PLACE NOT LESS THAN 2 FEET OF FULL HEIGHT CURB BETWEEN THE RAMPS. PLACE DUAL RAMPS 2-0' ASNEAR PERPENDICULAR TO THE TRAVEL LANE BEING CROSSED AS POSSIBLE. 2'-4" MIN. 8" RADIUS 1'-0" v 5, PAY FOR ALL VARIABLE DEPTH CONCRETE USED FOR CONSTRUCTION OF WHEELCHAIR RAMPS AS CONCRETE WHEELCHAIR RAMPS. SQ. YDS.) :.. 2:1 6. PAY FOR ALL DEPRESSED CURBS AT WHEELCHAIR RAMPS AS THE TYPE CURB AND GUTTER USED ADJACENT TO DEPRESSED CURB. (LN. FT.)LL °• �`r' P' °' `' G o-17�' o v•' 5" :?:o;�i v '' U MIN"'::' " 1r-1 7. SUCH PRICES AND PAYMENTS IS CONSIDERED FULL COMPENSATION FOR ALL ILL. Lij MATERIALS, LABOR, EQUIPMENT, TOOLS AND INCIDENTALS 0 Z (n EXPRESSWAY CURB AND GUTTER SHOULDER BERM GUTTER F 8 ; ca � LLI w _ = NECESSARY TO SATISFACTORILY COMPLETE THE WORK. H fir- C = Z m� 8. DO NOT EXCEED 0.03 (12:1) SLOPE ON THE WHEELCHAIR RAMP IN RELATIONSHIP TO THE GRADE OF THE STREET. Q 8' X 6 MEDIAN CURB VALLEY GUTTER U C cy Z 9• CONSTRUCT WHEELCHAIR RAMPS 40" (3'-4") OR GREATER FOR DUAL RAMPS. O FTI Z SECTION VIEW OF CURBS OR CURBS AND GUTTERS o m 2 a > 10. USE CLASS "B" CONCRETE WITH A SIDEWALK FINISH IN ORDER TO OBTAIN A ROUGH NON-SKID TYPE SURFACE. ¢ Q co coC. C > Dif 0 � CD I"I Q 11. PLACE A It" EXPANSION JOINT WHERE THE CONCRETE WHEELCHAIR RAMP JOINS THE CURB AND AS SHOWN ON STD. OWG. 848.01. O = Q ;:7 0 GENERAL NOTES: 3 8" x 1" DEEP Q U m z C? GROOVED OR SAWN C7 12. PLACE THE INSIDE PEDESTRIAN CROSSWALK LINES NO CLOSER IN THE INTERSECTION BY BISECTING THE INTERSECTION RADII, Q J U CU 0 -CONTRACTION JOINTS SHALL BE PLACED AT 10' INTERVALS, z x Of H G7- JOINT TO BE FILLED Lr1 y� WITH ALLOWANCE OF A 4' CLEAR ZONE IN THE VEHICULAR TRAVELWAY WHEN ONE RAMP IS INSTALLED. (SEE NOTE 17) w EXCEPT THAT A 15' SPACING MAY BE USED WHEN A MACHINE IS C D WITH JOINT SEALER F- U w USED OR WHEN SATISFACTORY SUPPORT FOR THE FACE FORM CAN JOINT SEALER (n W 13. COORDINATE THE CURB CUT AND THE PEDESTRIAN CROSSWALK LINES SO THE FLOOR OF THE WHEELCHAIR RAMP WILL FALL WITHIN = _ 1 8 RAID Z C Z BE OBTAINED WITHOUT THE USE OF TEMPLATES AT 10' INTERVALS. / " GUTTER m THE PEDESTRIAN CROSSWALK MARKINGSLONLEACH SIDE OF THE PLACE FLARESNAL . WITH FLARED SIDES SO 24" OF FULL HEIGHT CURB FALLS WITHIN 3 0 1 8" RAD SURFACE (= U z � (T1 -i 0 -JOINT SPACING MAY BE ALTERED IF REQUIRED BY THE ENGINEER. / PAVEMENT ZI -1 -CONTRACTION JOINTS MAY BE INSTALLED WITH THE USE OF SURFACE Z 14. CONSTRUCT THE PEDESTRIAN CROSSWALK A. MINIMUM OF 6 FEET. A CROSSWALK WIDTH OF 10 FEET OR GREATER IS DESIRABLE. w O TEMPLATES OR FORMED BY OTHER APPROVED METHODS. o•' v•' - °.� O Q NON -TEMPLATE FORMED JOINTS SHALL BE A MIN. of 1 1/2" DEEP. :Q ..�',9 :a:. _o,` ;a: P' :� w'•' o' =� L'. o: o ' o ; o:: o _ o N w U 15. USE STOP LINES, NORMALLY PERPENDICULAR TO THE LANE LINES, WHERE IT IS IMPORTANT TO INDICATE THE POINT BEHIND WHICH -ALL CONSTRUCTION JOINTS, EXCEPT IN 8"x6" MEDIAN CURB, : D'- .Q p':. 0_ v•' :o. _o•' , VEHICLES ARE REQUIRED TO STOP IN COMPLIANCE WITH A TRAFFIC SIGNAL, STOP SIGN OR OTHER LEGAL REQUIREMENT. AN UNUSUAL APPROACH SHALL N FILLED WITH JOINT FILLER AND SEALER. PROPOSED SKEW MAY REQUIRE THE PLACEMENT OF THE STOP LINE TO BE PARALLEL TO THE INTERSECTING ROADWAY. -EXPANSION JOINTS SHALL BE SPACED AT 90' INTERVALS AND CURB & GUTTER PROP. 1/2" JOINT FILLER 16. TERMINATE PARKING A MINIMUM OF 20 FEET BACK of PEDESTRIAN CROSSWALK. ADJACENT TO ALL RIGID OBJECTS. JOINT PAVEMENT i 17. PLACE ALL PAVEMENT MARKINGS IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) LONGITUDINAL JOINT TRANSVERSE EXPANSION JOINT I PUBLISHED BY THE FEDERAL HIGHWAY ADMINISTRATION AND THE NORTH CAROLINA SUPPLEMENT TO THE MUTCD. IN CURB AND GUTTER HEET 4 OF 4 848.05 Q� HIGH POINT AT ROAD CROWN EXISTING WETLAND GRADE - 20.0' SHEET 4 of 4 EET 1 OF 3 SECTION VIEW OF JOINTS HEFT 1 of 3 848.051 846.0 32' FRONT OF WALL 2' 23' B-B 7' LAWN 2' GAP LAWN 1.5' 10' LANE 10' LANE 1.5' GAP 1 5' SIDEWALK r 0 o { 1/2'/FT 1 2'/FT 1/4 /FT 1 /4'/FT 11/4'/FT �--_- 4.'-lll - - till I iII It I�C11-i. 4' CLEAR TER LINE SANITARY SEWER LINE- :CTRIC CONDUIT TYPICAL SECTION AT FULL -SPAN CULVERT TELEPHONE AND (LOOKING PEST) CABLE CONDUIT NO SCALE RAILING (TYP.) G SIDEWALK_ \ LidSEE NOTE 12SEE NOTE 4 TYP) SIDEWALK SIDEWALK - SEE _3 SIDEWALK NOTE 12 !< - SEE- Z'� 4 0" (TYP) __---_.INE_.^ + - :.� SNOTE 3 ¢ - SEE NOTE 4- LI NE- ' O:U DETAIL SHOWING TYPICAL LOCATION OF WHEELCHAIR RAMPS, PEDESTRIAN CROSSWALKS AND STOP LINES FOR TEE INTERSECTIONS DETAIL SHOWING TYPICAL LOCATION OF WHEELCHAIR RAMPS, PEDESTRIAN CROSSWALKS AND STOP LINES ROADWAY PLAN SYMBOL CCFR CURD CUT FOR FUTURE RAMP ~ ROADWAY PLAN SY6BOL ;WCR FOR PROPOSED riHEELCHAIR RAMP i _ � PROPOSED WHEELCHAIR RAMP PROPOSED OR FUTURE SIDEWALK_ RIVERVIEW DRIVE 19' B-B ' 1.5' 8' LANE I �i Q 1/2"/FT ;Ij 18" SPILL CURB o O ---------- 1111- 11, lI 1 /4"/FT c31 ALLOWABLE LOCATIONS ------------------- DUAL RAMP RADII ....... -...ANY 8' LANE 1,51 6.5' Z O� EH-• } Q Q H0C3V lL J EL H Z 0 0 w = wQQLL. 4v�Qc� Lu F- H inoQ Z (n CC d 0 W m cc O LL O z CL �Q Q CC LL CC zcr U < J U co w Cn = �3 0 Z W HEET 3 OF 4 848.05 5' SIDEWALK IRRIGATION ---� 1 /4"/F I iJ'll 1 /2"/� 1 /4"/FT 1 / LINE (TYP) 2' SOCK DRAIN (TYP -�- AS NECESSARY) 1.25" SF 9.5A ON • 1.25" 119.OB ON • 9" COMP. COQUINA 18" STANDARD 2 IRRIGATION CURB (TYP) LINE (TYP) WATER LINE (3' COVER) TYPICAL PRIVATE COLLECTOR SECTION 19' B-B STREET 4' (ONE SPAY) N.T.S. ELECTRIC CONDUIT (4' COVER AND WITHIN 10' EASEMENT) 5' SIDEWALK 1 7' 10' LANE ECHO HARBOR WAY 23' B-B 10' LANE 11.51 7' 0 11h o ao 1/2'/FT /2 /FT 1/4 /FF 1/2"/FT N 1/4"/FT 1/4"/FT 1/2„/FT -'�---'- IRRIGATION U N E (TYP) 1.25" SF 9.5A ON SOCK DRAIN 1.25119.OB ON CABLE CONDUIT 2' " 2' (4' COVER AND (TYP - AS • 9" COMP. COQUINA 18" STANDARD WITHIN 10' NECESSARY) CURB (TYP) EASEMENT) TYPICAL PRIVATE WATER LINE NON -COLLECTOR SECTION (3' COVER) TELEPHONE 23' B-B STREET 4' CONDUIT N.T.S. (4' COVER AND WITHIN 10' EASEMENT) POLAN GROVE CIRCLE 5' SIDEWALK , 18, 25' B-B 1.51 11' LANE 11' LANE .5 5' SIDEWALK 1/4"/FT I 1/2"/FT IRRIGATION LINE (TYP) j1 3 � II 1 +I O O Ijj` 1/2"/FT 1/4"/FT it 1/2"/FTit1. f IRRIGATION LINE (TYP) CABLE CONDUIT (4' COVER AND 2' SOCK DRAIN (TYP - AS 1.25" SF 9.5A ON • 1.25" 119.013 ON 2' WITHIN 10' NECESSARY) 9" COMP. COQUINA IRRIGATION LINE (TYP) EASEMENT) WATER LINE TYPICAL PRIVATE (3' CovER) NON -COLLECTOR SECTION TELEPHONE 4' 25' B-B STREET CONDUIT N.T•S. (4' COVER AND WITHIN 10' EASEMENT) ELECTRIC CONDUIT (4' COVER AND WITHIN 10' EASEMENT) PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION 0 grrl DO��In rz ___j D On>om =cn700 Z�5-o0_ n*70z D D D c/) O z rTT n Z O z 7- N � -M --- -T ---I D m M O C c D 01 D p -I -� = D rrrT co Z o z 0 0 x L BACK OF CURB X 5 •Y :a D• •:O O ::Y v-A- PLAN LX m 0 6 SECTION Y-Y .�ti:•d o • :o:;' VIEW WHEN 8" X 6' CURB IS USED IN PUCE OF HOOD TOP OF FILL SECTION X-X SECTION J-J PLAN GROUND LINE H GROUND LINE �-- w3lfi;e liter ru „ rn I.D.9� MIN- 1/10 O.D. Is iu it II_=n_ I!� ❑1 Ou MIN. O.D. 1/10 O.D. 1/2• PER FOOT OF H O.D. + 4' BUT NOT LESS THAN 12' NOR MORE THAN 24" NORMAL EARTH FOUNDATION TOP OF FILL .- H MIN. O.D. I T MIN. O.D. co _ T GROU;UINIEO (n GROUNDTiD 2UNE MIN. 1/10 O. M Z -I � �II�71 Cln=/ �IIF�I_f�111 �IOs/srll D 0 �i-I ALE o.D. MIN. 1/10 O.D. GENERAL NOTES: CLASS 'B" CONCRETE TO BE USED THROUGHOUT. AU_ CATCH BASINS OVER 3-6' IN DEPTH TO BE PROVIDED WITH STEPS 1'-2' ON CENTER. STEPS SHALL BE IN ACCORDANCE WITH STD. NO. 840.65. OPTIONAL CONSTRUCTION - MONOUTHIC POUR V KEYWAY OR fl BAR DOWELS AT 12' CENTERS AS DIRECTED BY THE ENGINEER. FORMS ARE TO BE USED FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OR BOX, ADD TO BASE AS SHOWN ON STD. NO. 840.00. USE TYPE 'E', "F' AND 'G" GRATES UNLESS OTHERWISE INDICATED. FOR 8'-0' IN HEIGHT OR LESS USE 6' WALLS AND BOTTOM SLAB. OVER B'-O" TO 16'-0' IN HEIGHT USE 8' WALLS AND BOTTOM SLAB. QUANTITIES TO BE ADJUSTED ACCORDINGLY. TOP OF FILL H •J ll�,lf_I+ �111 JI �= Intel O.D. O.D. + 4' ROCK FOUNDATION PIPE IN TRENCH TOP OF FILL SIDE ELEVATION SECTION M-M M a • 6: C;::: e:: 5. M e . A m e. e • O PLAN GROUND UNE MIN. 1/10 O.D. L J 'mac - ROCK I AS DIRECTED BY ENGR. J UNSUIT, TOP OF FILL _11Ind TH O.D. O.D. + 4' MATERIAL FOUNDATION TOP OF FILL � U 1/2r- PER F00T OF H O.D. + 2' D Z BUT NOT LESS THAN 12" NOR MORE THAN 24" _ (n D NORMAL EARTH FOUNDATION ROCK FOUNDATION UNSUITABLE MATERIAL FOUNDATION D � PIPE ABOVE GROUND (- Om APPROVED SUITABLE LOCAL MATERIAL OR SELECT MATERIAL FOR FOUNDATION CONDITIONING (- GENERAL NOTE : AS DIRECTED BY THE ENGINEER. D O I.D. = THE MAXIMUM HORIZONTAL INSIDE DIMENSION. APPROVED BACKFlLL OR SELECT BACKFILL MATERIAL WHEN 'H' IS GREATER THAN 30', ® SELECT MATERIAL OF THE APPROPRIATE CUSS SHALL BE USED AS FOLLOWS: .0 O O.D. = THE MAXIMUM HORIZONTAL OUTSIDE DIMENSION. n;=arl=rrr_fr UNDISTURBED EARTH MATERIAL z H - THE FILL HEIGHT MEASURED VERTICALLY AT ANY POINT ALONG THE PIPE SELECT MATERIAL H FROM THE TOP OF THE PIPE TO THE TOP OF THE EMBANKMENT AT THAT POINT. CUSS IV OVER 50 FEET CLASS III OVER 40 FEET THROUGH 50 FEET CUSS 11 OVER 30 FEET THROUGH 40 FEET THE CLASS OF SELECT MATERIAL TO BE USED FOR AN INDIVIDUAL PIPE INSTALLATION WILL BE BASED ON THE MAXIMUM 'H' WHICH OCCURS ALONG THE PIPE INSTALLATION. A HIGHER CUSS SELECT MATERIAL NOT TO EXCEED CLASS IV, MAY BE USED IN UEU OF CLASS II OR III. SELECT MATERIAL WILL NOT BE REQUIRED AROUND THOSE PORTIONS OF AN INDIVIDUAL EET I OF 1 PIPE INSTALLATION LOCATED UNDEP, THAT PART OF THE FILL WHERE 'H' IS 30 FEET OR LESS 3 0 0. O 1 HEAVY EQUIPMENT SHALL NOT OPERATE OVER ANY PIPE CULVERT UNTIL THE PIPE CULVERT HAS BEEN PROPERLY BACKFILLED AND COVERED WITH AT LEAST 3 FEET OF APPROVED MATERIAL z � oN o-mv a} z zQ Er �J00� =10 = D to 0�( 0 =Z -X=D Qz = 0-,TD0m W 1, -0< ZD la-2�OW =cn700 Ind ZJ ZOmoTI [If OQ n=Or 00�Ch . DMD U) w O 0 Z w LL. 179 z O CD Q r0 Z N = Z M W n N ' Q = a m -i oU- =MZ O ~ U Q C 0 n D � QUA cyl> o x -P. -I W D N m W = U Z D cn z 0 cn Z O z LLI 840.02 840.02 Z 0� Qa = (30CL0Z O:�<n= W Q Z = F-0< U Q of 0 - F_ W OUQ!�Lr_0Q 000of z a_ 0 W z O oQ 0 J Z_ J � Q rr, (f Q = Q 0 W 0 Q r O 0 Z = W I O Vo JO 0 _ Z LLI LLI 300.01 S-1 S -_i i PLAN OF TOP SLAB 6' In � w R ?a ME, C7 La i7 O SECTION S-S 8' E 'W BARS WI;ACES T tt SECTION R-R PLAN CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES EXPANSION JOINT USE ON FLAT GRADES 29, AND UNDER DEPRESSED GUTTER LINE EXPANSION JOINT 3'-0' ELEVATION SEE STANDARD NO. 840.01 OR 840.02 NORMAL CURB AND GUTTER ON LIGHT GRADES NORMAL GUTTER LINE 6' EXPANSION JOIN USE ON GRADE OVER 27 DEPRESSED GUTTER LANE EXPANSION JOINT I 10' MA 1'- ELEVATION 'S STANDARD NO. 840.01 OR 840.02 NORMAL CURB AND GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR CONCRETE CATCH BASIN DIMENSIONS OF BOX AND PIPE COVER DIMENSION CU. YDS. CONC. IN BOX ADD TO FT.HT. DEDUCTIONS ONE PIP£ PIPE SPAN WIDTH WIDTH SPAN HEIGHT HEIGHT BARS-U NO. LENGTH BARS-V NO. LENGTH BARS-W NO. GTH TOTAL LBS. TOPOOR SUB CONE N 9MUS TOTAL CONIC. WALL/ FT.H D A B C G MIN. H1 H2 E F 1Y 3'-0' 2'-2' - - 2'-3' - - - -- -- - - - - -- -- 0.235 0.513 0.748 EVE0.023 MIN. H1 -- 0.015 0.032 15' 3'-0' 2'-2' 2'-6' 0.235 0.583 0.818 hFTV. 0.038 2-2' 2'-1D' 0.235 0.659 0.894 -- O.OW QG49 2,V 3'-O' 2-2' 3'-2- 0.235 0.774 1.009 -- 0.059 0.085 30' 3'-O' 2'-2' 3"-4' 3-4' VAR. 1'-V 4'-0' 4 1-5' 2 3-9' 3 3'-9' 39 0.123 0.321 0.950 1.394 0 H� 0,077 0.092 0.127 36" 1 3'-0' 2'-2' 3'-10' 3'-8' VAR. 1'-8' 4'-0' 4 1'-11' 3 3'-9' 3 3'-9' 43 0.161 0.358 1.154 1.673 M290 0.077 0.132 0.178 42' N-0' 2'-2'3'-2" 4 1'-8' 2 2 -11' 3 2'-11' 32 0.112 0.316 1.315 1.745 0.281 0.085 0.180 0.243 41r I 3'-0' I 2'-2' 1 5'-0' 4'-10' VAR. 2'-0' 3'-Y 4 2'-3' 3 2'-11' 3 2'-11' 35 0.145 M352 1.WO 203E 0.302 0.0155 0.235 0.317 54 3'-0' 2'-2' 5'-7' 5'-4' VAR. 2'-7' 3'-Z' 4 2'-10" 5 2'-11' 3 2'-it' 41 0.180 0.388 1.826 2-392 0.324 0.085 0.29E 0.401 �o tE Lgs. -5 GRP �56 �FE'�1 t' y Era1E 6 ti wi, p�rpPt�OT 0 �EA1E X� y �5 0 PING �1 0pE E kt 2 GO��PR NtOR�P� DROP INLET 6Y .PF 51ZE� �Z•5�) Pst I�0 PE z oco QQ z Er =0=U � Oa_Oz WQz = F-UQtiO Q C = O w J �ofLL 0�Q 0 cf) Z W5;0 0 a- 0 U cf) Q7 � Q = a_ �0 0QLo cy- Q U o � Q LLI I- LLI _ � � N = U In z JO O C.)Z W CURB -DROP DETAIL (STANDARD CURB) PRELIMINARY DRAWING - NOT RELEASED FOR CONSTRUCTION • GENERAL NOTES: 1. BOUNDARY SURVEY PERFORMED AND PROVIDED BY JIM BLANCHARD ASSOCIATES. 2. TOPOGRAPHIC SURVEY PERFORMED AND PROVIDED BY JIM BLANCHARD ASSOCIATES 3. FEMA MAP NUMBER: 3720109800J, FEMA MAP DATE JUNE 2, 2006 4. COASTAL LIMITS DETERMINED BY JIM BLANCHARD ASSOCIATES & LAND MANAGEMENT INC. 5. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. MEAN HIGH WATER MARK/ BOUNDARY LINE L3 ADJACENT PROPERTY OWNERS TAX MAP # NAME ADDRESS ZONING 1980000201 SANDLER AT SHALLOTTE PHASE 3 TRACT R-10 PRD 198CA031 BRANSON, JAMES V AND TAMMY W 421 SHERROW RIVER DR. SHALLOTTE NC 28470 (BRUNSWICK) R-6000 198CA033 CAUSEY, BOBBY 413 SHERROW RIVER DR SHALLOTTE. NC 28470 (BRUNSWICK) R-6000 198CA034 SAYLOR, ROBERT D AND 409 SHERROW RIVER DR (BRUNSWICK) 198CA035 LOGAN, MARCUS W 405 SHERROW RIVER DR (BRUNSWICK) 198CA036 LOGAN, MARCUS W 405 SHERROW RIVER DR SHALLOTTE, NC 28470 (BRUNSWICK) R-6000 GERRY SHALLOTTE, NC 28470 R-6000 GERRY SHALLOTTE, NC 28470 R-6000 198CA039 SANDBRO INVESTMENTS 389 SHERROW RIVER DR SHALLOTTE, NC 28470 (BRUNSWICK) R-6000 9 CA040 SAYLOR, K NNETH W AND SHERRICE D 387 SHERROW RIVER D SHALLOTTE, NC 28470 UNSWI K R-6000 198CA041 KELLEY, TIMOTHY P AND ANGELA K 285 SHERROW RIVER DR SHALLOTTE, NC 28470 BRUNSWICK R-6000 198CA042 FRENCH, VIRGIL AND AUDREY 377 SHERROW RIVER DR SHALLOTTE, NC 28470 BRUNSWICK R-6000 198CA043 DOYLE, ROBERT J AND PATRICIA 373 SHERROW RIVER DR SHALLOTTE, NC 28470 BRUNSWICK R-6000 198CA044 DOYLE, ROBERT J AND PATRICIA 369 SHREEOW RIVER DR SHALLOTTE, NC 28470 (BRUNSWICK) R-6000 SHERROW CREEK L3C5, �11 L8' �k6 L1 O L1 / 1g L3 d- , $ Aca L4 L41 /����\ 1\\ L3 \ L1 ` �� :;e 1g$GPO KID 603 kN NN FEMA 100 YEAR \�\� t\\ / -\ - , �,/ - ' . FLOODPLAIN/1% = 3\\\\ \\ ) ice_ v`, NO l - \ ELEV. 11 / ��� \\ \ = - ems\ / I� J ) \ , / / GPp III I�If( I \\\ =,:\� �� _ ✓ IJ;': _.. 1+ : ;,: �`F1/�� �', I / / g$cPp�g SHERROW RIVER p {� ) / ESTATES i -•� I 1 1 �. ,- I -:�. �r�=� / -� //��� �.� ��� _ _ ;:mow a;: _ _ _ .�:,•: [� Q ge .I I SITE BENCHMARK 9 IRON ROD (IR 601) O dO 1 f N 81209.92 E 2192026.39 �� -` ELEVATION 9.77' P4A�'E � �� \ � �- \ � � / / � / 1 . -: - •� � i L60 L6 BENCHMARK PROVIDED BY JIM L6 1 ` \ \ ' <<o / " L61��T \ / : 1 '=''-;.' r , ` ` r - S'� I { { BLANCHARD ASSOCIATES. L66 - \ �)I l \f'y E �`�� \ / ��t -' ' `_ Pg Ppco L67 -0 / ,�g Q I� h - L91 L92 L71 )1 _ L72 L .-L94 L74 L95 L75 \ I L97 i ) - ( • �> _ _ :� =� ' i- �'� - a►. �>_~'~~�`' - - - : r Ti'• _ , r�':' • :.psi :'• - >:51,. ;;. I U - L87 To Lt49 _at /��..<� c \ r1�' 14 L}45 / _: / ` ~'` _i,3 '. --� \ �\ �\ \ rZ iF i I ;i • � / 'tom" �� ` �_ � :,�`. _ l �,� ��'-�.. / � !. �\\ - ;_- � '��i - �•'�1 .,\;.t �i `,\ \ � „"�: - � \'�' I�' I � L98 I V.CONCREIl L126 �11\I1 /� \� \..� \/ / / ! )/ t`'//y / //�! I I /r�' /'_\ \\ _ Y`=`� / j\ °3`�` r� ``'\ \a\ as 1 \ i' S frs L12 1 I f / \ ri - /j / _� s / , ���i// _ - .? \ , ` • / / /y -� �\ \ ' /%` '997! 7 \=.�\r - \// .._� J9'/ i i I ,I k-- % \ /.'-.t ' i i �!\•�� �\ `;\( /,..5.... _ .+.- --+. Z�. �,'` I ; �''/•f f -\ \ \� L I- � , / _ -- 1 its\ �3 f- -�Il j� t / \� . l.: i'_i•,._ --'sue J"a'.. it a3e y I MEAN HIGH WATER MARK/ \\\ \ 1 i �� -J. L12 i `ea !� BOUNDARY UNE \` _ L12 L13_ �� .-- , �+r�� y�y� /QE- to �� `'��--� \_' ' l ( > ) )�' i "` f ` 1, �, \ �; '�./, •�•t; ; `-^ , ` \ /�- _-S, \ '.\ 022-� 29 2, L 1 1-�,1 \ x� -�;✓ / r�= •-:�;: ` \� A.E. CALLENDER i I I� l% • �. �� �;:::�� 180 6 Oj \\\ # 1 IIII \\ � .� �/j� �� / i ^ ;,f� �.i•? � Z 1 1 �`�192 338 11\\ �: ' �V;?�'.- ;� '` /� �} •�>`�"•s,,.� +��-\fir \-_`, `` ,'\ \ / c!- ,- 1\ \ =?�i� _�.:r\\ • y� :....e \ \ ��� j' �t`� �\�-•-.-...,. `"`� ���� �/} � j J � \ \ `,' iEXIS�N W>[itAN =\ j \ j ���� _1v MEAN HIGH WATER MARK/ BOUNDARY LINE �.; � - -,;_, - � /_� / �, � �F#� � - •yz",�=�� �' _ _- ;::�.; -==� I \ \ � \ �/,:- ( I r ' ISfINb` 1 \ '+ �' � \ \ +4'.• / � t - � O - ��. r �t_.^\';.- =ram ;c-'t;1;-� \ r/ _ _ .. � I 1 _ ,..li'` J ( l l 1 � / is .N �` %Ft .R>� __ Vt 1-i _ '-:- • -- _.,'+s•i �.`, ' \ #%. \.. i _ - L.a:r- I r SE COASTAL , ,�-� :_ J '�_ I ( / ,r,: // '!`- ~"-',�\ \ 1 / 2'�.-`'_ :�- '� \"=. _ / `/ f• �� .sue _ f'J• \ \ ;;�.- - _ WETLANDS I /PURE�> It lYI O / \ O I `l ro �- o / I \\ \ 7 `-� - \� +°.'•Ili \� ��/%! r;,�/J� II1� - � �,. _ //1 / -;. , JI � Y>�` ✓��_ ,�� LINE BEARING DISTANCE L1 N 54'26'42" W 2516.51' L2 N 34'40'33" W 60.58' L3 N 34'40'33" W 329.60' L4 N 34'40'33" W 96.89' L5 N 29'35'39" W 451.75' L6 N 30'26'26" W 1648.51' L7 N 33' 14'44" W 12.86' L8 S 84'25'38" W 10.03' L9 S 14'46'26" W 31.38' L10 S 48' 15'31 " W 23.47' L11 S 49'07'34" W 48.37' L12 S 73'05'21 " W 21.35' L13 N 63'08'00" W 10.03' L14 S 75'19'29" W 70.36' L15 S 7745'56" W 67.56' L16 S 7TO7'45" W 48.57' L17 S 01'37'08" E 23.12' L18 N 8715'22" W 60.59' L19 S 4632'22" W 136.70' L20 N 78' 16' 19" W 23.72' L21 S 88'57'09" W 78.70' L22 N 35'55'00" W 95.09' L23 N 19'23'52" W 43.33' L24 N 1 T33' 14" E 123.15' L25 N 15'13'37" W 60.31' L26 N 84'16'25" W 89.44' L27 S 1 T24' 13" E 69.41' L28 N 2T25'03" W 63.66' L29 S 3T35' 11 " W 92.55' L30 N 08'38'03" W 35.76' L31 N 09*33'12" E 12.11' L32 S 54'57'31 " W 42.04' L33 N 05'02'57" W 23.79' L34 S 86'31'22" W 33.01' L35 S 04!26'10" W 53.03' L36 N 81'48'38" W 44.42' L37 N 88'01'37" W 39.38' L38 S 80'54'36" W 130.98' L39 S 53*09'19" W 33.34' L40 S 85'39'30" W 47.78' L41 N 3844'30" W 7.26' L42 N 88'48'00" W 151.37' L43 S 51' 17'43" W 111.35' L44 S 60'32'19" E 126.02' L45 S 68'52'44" W 42.01' L46 S 58'45' 11 " W 59.71' L47 S 21'42' 16" W 38.17' L48 S 41'54'00" W 47.86' L49 S 23'23' 11 " W 75.34' L50 S 06' 13'33" E 49.48' L51 S 36*01'11" E 143.65' L52 S 82'00'02" E 19.05' L53 S 09'48'06" W 81.69' L54 S 35'13'28" E 26.51' L55 S 31'05'07" W 39.00' L56 S 40'09'55" W 34.00' L57 S 56'02'39" W 1.32' L58 S 24 47'02" W 19.67' L59 S 44'46'58" W 11.59' L60 S OT42'09" E 26.05' L61 S 01'43'3 3" W 58.07' L62 S 73'12'43" E 65.45' L63 S 86'07'58" E 38.14' L64 N 25'37'31 " E 21.32' L65 S 37*56'33" E 21.52' L66 S 19'39' 12" E 21.97' L67 S 16'15'40" W 20.82' L68 S 29'33'05" W 2-2.82' LEGEND LINE BEARING DISTANCE L69 S 10 22'39" E 16.22' L70 S 08'50'33" W 15.74' L71 S 00"7'23" W 15.41' L72 S 25!52'15' W 30.50' L73 S 6,704'01 " W 14.57' L74 S 64'34'45" W 36.45' L75 S 6308'41 " W 18.27' L76 S 24 04'57" W 25.46' L77 S 1 W03'40" W 36.02' L78 S 26'40'59" W 36.16' L79 S 45' 12'56" W 40.70' L80 S 460621 " W 77.06' L81 S 67*48'46" W 44.24' L82 S 69'15'39" W 33.54' L83 S 80*54'12' W 20.88' L84 N 68'33'29" W 25.14' L85 N 89'45'43" W 30.56' L86 N 46'03'53" W 25.95' L87 N 53'29'04" W 28.91' L88 N 74 59'21 " W 95.66' L89 S 81'06'39" W 32.88' L90 N 54'47'22" W 59.25' L91 N 64'05'25" W 37.68' L92 N 8727'44" W 88.66' L93 S 04'34'26" W 62.70' L94 S 28' 18'03" W 73.82' L95 S 11'38'01 " W 86.78' L96 S 29.10'38" W 101.99' L97 S 69'46'51 " W 80.52' L98 S 18'48'02" E 55.4C' L99 S 48'49'55" E 117.66' L100 S 19'28'45" W 82.4'.'v L101 S 36'54'42 90•` •: 1 97 ' I L102 N 38*10'11" W L103 S 24 46' 10' W 3 c<. 113. . ` 102.IF)' L104 N 34!59'19" W L105 S 44 23'58" W L7 06 S 83'48' 18" W 113.0'a, L107 S 78'35'50" W 283.49' L108 S 72'45'54 E 229.89' L109 S 10' 13'44" E 199.76' L110 S 51'23'08' W 76.81' L111 S 40'01'39" W 241.78' L112 S 1 T59'35" W 229.80' L113 N 65'40'33" E 148.21' L114 N 38*47*32" E 141.80' L115 N 23'29'34" E 235.99' L116 N 8TO3'07" E 113.20' L117 N 73'40'04" E 140.63' L118 S 50'04'10" W 81.51' L119 S 28'20'44" W 118.16' L120 N 83*22*24" E 219.21' L121 N 60'59'41 " E 260.86' L122 N 8T56'24" E 102.32' L123 N 2TO3'50" W 185.57 L124 N OT59'20" E 103.25' L125 N 04'55'59' E 30.52' L126 S 75'40'05" E 61.63' L127 S 23'03'20" E 59.28' L128 S 06'20'34" W 29.20' L129 S 38'43'43" W 19.09' L130 S 66'13'42' E 18.97' L131 N 35'09'23" E 77.90' L132 N 44-45'42" E 40.09' L133 N 42' 14'57" E 72.65' L134 S 31' 18'43" E 34.37' L135 N 48'00'55" E 54.58' L136 N 42'09'06" E 328.47' L137 N 71'29'52" E 44.62' L138 N 69' 17' 11 " E 186.04' L139 S 87*44'02" E 175 47' ,. L140 N 55'53'06" E _ 54.91 a L141 N 19'39'57" E --- 20.7 ' L142 N 5557'27" E 12 3«8_' L143 N 66'46'03" E - 12 34' L144 N 5T41'50" E 74.0 ' L145 N 19'37'06" E 18.6-.' L146 S 70'41'46" E 18.5' L147 S 62'20'28" E 17.80' L148 S 58'58'24" E 14.84' L149 N 72'42'06" E 33.84' L150 N 68'49'56" E 29.23' L151 N 6634'09" E 16.87' Li 52 S 89'24'57" E 36.25' L153 N 83'30'23" E 113.04' L154 S 74`06'48" E 77.37' L155 N 8401'51" E 89.95' L156 S 35'28'36" E 20.09' L157 S 3528'36" E 198.85' L158 S 35'28'36" E 81.41' L159 N 48.53'43" E 295.64' L160 S 76'49'21 " E 50.45' L161 N 4537'53" E 50.00' L162 N 44'22'07" W 53.35' L163 N 69'43'56" E 4.80' L164 N 69'43'56" E 22.53' L165 N 59'33'07" E 431.69' wv m WATER VALVE ® WATER METER xyv FIRE HYDRANT _______ 252 __ EXISTING 1' CONTOUR - - GRAVEL DRIVE - - - - LOT LINE W WATER LINE WETLAND HATCH Mil. PHASE LINE GRAPHIC SCALE 200 0 100 200 400 1 inch = 200 fL FINICAL DRAWING - NOT RELEASED FOR CONSTRUCTION 20' REAR SETBACK (UNLESS NOTED OTHERWiS 1 � I 1 8' SIDE SETBACK I I 120- FRONT SETBACK -� (UNLESS SEtL_ NOTED HP4t;K OTHERWISE) 10' UTILITY AND SIDEVALKI EASEMENT RZW_LWfDTH WARIEST - - - SETBACK DETAIL Site Data: Proposed Use: Single-family home lots Acreage: 59.42 acres (2,588,335 s.f.) Number of parcels created: 108 parcels Maximum Density: 4.356 u/acre 108 units / 59.42 acres = 1.82 u/acre Per Brunswick County standards for calculating PUD density Minimum Setbacks: (Article 15, PRD) Front: 20 Side: 8 ft Comer Lot Side: 16 ft Rear. 20 ft Maximum Height: 40 ft Internal Lots Minimum lot size: 4,800 s.f. (Article 15, PRD) Minimum lot width: 60 ft Minimum street frontage: 40 ft [60 ft Min lot width at setback line] Perimeter Lots: Minimum lot size: 7,500 s.f. (Brunswick County UDO) Minimum lot width: 60 ft Minimum street frontage: 40 ft [60 ft Min lot width at setback line] Per Brunswick County standards for PUD perimeter lots Minimum Parking: (Section 20-6) Dwellings: 2 spaces per unit 108 units x 2 = 216 spaces (driveways) OpenP S ace: Total San Rio Site Acreage: 728.24 acres Total Required d Open Space: 1 2 .06 acres 0 25 /o of site acreag e, per County Pe rmit ermit - 9 # SE 12 P 6 ty ) Provided Open Space, by Phase: Phase11: 55.03 ac res Phase11 I . 25.43 acres c es (as sho wn in this prelimin ary Plat Remainder, Provide in additional Phases 101.6 acres Total: 182.06 acres • Open sp ace provided fo r or the n - P San Rio project P P o ect shall be in P 1 accordan ce with Bruns wick County Special ecial Exception Pe rmit # SE-12 which 6 hich does not re quire uire minim um open space ce for individual bases but do es state that Pthe minimu m total op en space a P ce shall be 25 /o of the gr oss project acreage. Base donthecu 9 P iwent property P P rtY survey,the r 0 gross project acre age a is 728. 24 acre a g P I s and the 2 9 5 /o open space calculation is 182.06 acres. • At least 25% of total open space for the San Rio project shall be active recreational space. Individual phases do not have a minimum active recreat ional space re quirement, uirement so long as the requirement 4 9 for the entire project is met. • L97 • L89 L90 L 91 L92 L93� L94� L L� L n=- Ml tit Mt _ L34 L31 L33� L10 L3 L3 5 cp `-s` L 1 1 LBO ALONG G OUNDARY BUFFER L38 L1 L12 L 1 L 2 /� 4 -L3 OPEN SPACE MEAN HIGH WATER LINE I 10' UTILITY AND (PROPERTY LINE) O,o _41 I L3 6 SIDEWALK EASEMENT L 17 4 Q / (TYP) wo -4 2�W III 2�* / C 11.756 SF ► , 493 SF / 18 nt , L2 0 0) �-- 1 o�EAR ,4976 SO:. e 4' • _ „�07 r 1\®r FLOODPLAIN 14.102 SF W�TMjS .\ �* -? • \ / , / I r \ . Aga/ ' \ //9 SF t0.74o SF 10 // 11 ' * 20 ` -A GPO 25' SETBACK ALONG PERIPHERY BOUNDARY (TYP) 13,512 SF , 0,S5, SF * r 1 ► * 1 9.024 ' \ ` ,t ► / \ \ • '\! \ / l / 1 U79 SFI r , 4*��I!�!SF' 1' 9.111 SF t SF i ; 6179 SF 7.N4 SF 10 233 sF I I e.299 SF \ o� %� RISE _ _ e / . \ /, /10.462 SF I , /' - 1 , 1 t I aM6 SF /10.aPDsF / 49 --__- , ► N� J l �r l -OPEN SPACE t� 1 54 5 394 SF 50 5 / - eoo sF9X54 SF I I � 9= SF ///8,1� �/ eoo sF 17,B00 SF� ► I 9.959 SF / \ \ 24 / 8= SF 1 / / 5.9W SF `i~D ,UTILITY_.RNI} -'_. .. �.11 I j � \ ��// L r v j L- SIDEWALK ; :Et�SEMENT _I t J�I`rk 13.506 SF ~ NDS 19 - 1 L- _ 0SF ' 10,097 SF 1t,529 - - g AMENITY SF PON D _--- to 3 J - `�� ! .i - _ t r t t ► VJEFIA _Ios 0� I 2 \\ Ngb / n r r t - sF / 2,34.5 - t n sF 39 3,3 _ O 0 1 L_ 1 - D.. urn �r ` _._._ 9 TY � Alb- 2 4 _ l � - I � 4 _ I _ 4 !�-/ sF 1 �-� � � ,1.t62 sF - °" / �� / a 36+ sF ► 9,254 sF ► I 1 I 8,978 SF OP SPACE J ► La oa sFI I 9.= SF OPEN SPACE �P 96 /100�ISAWSF ` 3 :': \ 0 3 % `,'. b°. �100DPLAIN 00 Y 7.408 sF ELEV.=1 1 F OODPLAIN LEV. =1 \ L] ] i IN, /a7os SF t 17.262 SF\ .. \\\ / / / 15.MS 55 77 sF 8761 SF %/%�� �P IMS ' 16 � 16 \ �" y /T/' � ���\� 6.221t sF r � - WET\ -- - - s`\• / 6 / 9.T03 sF 9 130 SF I 0 1 J I I - >k I / / f sF o 7.499_ - III / at39 SF 1 I i s= SF L 1 44 _ ET'L.4VDs - - - O • �, . t 7 SF 2a9 \ ( G 7 sF - - - ..as22 161 _ > 0 l - O 9 I - - 194 / 713 SF Q - 2 / /loe J 6,159 SF i r , r - WETIANOS .: .. - ► t^ -' ... ~ Pg - - 1 _ 5 - / O P 1 8 5 g O 778 SF / 1 1 59 - 160 - - O 30 * asoa sF > / - 0 / 459 SF �-" 4 , sF 3, ,34 ~ 1 � - s \ 156 1. I � - I t 4s9 SF SF / I \ \ f l 40 ► - 7.909 SF , - / 169 - 1 - UVIE-iff , i 15 2 625 sF 77 � P L w_ / J t-. 7 sF ,909 +: J DESTGIJ- BY-Y3THERS- 19 t .29sSsFr J 154 J - O \ / : 7 .sae SF D . WEF�AN - ETI A .......: .... 9 / , T IDO � / �. L 0 \ 7 - ,200 SF \ o - - 1 �1 V - 1- r <..-r - - .•L1'6-4' . _/ � ACE ..... .... ~.. .. - _ 15 L88 I .� • \ :. 18,524 SF `' "• - - - - .. 10.499 SF 5 I L9 1 4 16 ,�g I L / ; 1so - - _ 1 :v.. * _ � , 660 . - /? � SF - - I \, I 52 .. . 7 /Ll 1 18s \ \ t L 14 s8 \i I � 9 O r I * \\ 25 9027 1 7518 //�\ / 100 YEAR SF /\ ,\ _ L 142 L 145 FLOODPLAIN 21.473�sF \� 1 �/ < O \\ \ _ L141 O 60 ELEV. 11 � - \ j 7,511 SF - \ \ 1 6 \ / O r 178 7,292 SF I WETLANDS \ - - =� 61 -� L 12 6 \ 14,537 sF `. 80 77 �� ,// /� • ,so\\ I / O �� \ I 67 �\ NOTE: d L 12 5 �. / \\ ,0670 \ R� ®'T �JRT �� t ,.� j�� r� ��� l;-�NO \ ` 81// \\ i_ 1 t(74 I �I / � :- \ 63 �\ HOMEOWNER IS ALLOWED IN DES DESIGNATED WETLAND DE @�ATNE/SCREENI '�- / \ �` 75 73 - \\ • I - 181 \ \/ i O I I � � O AREAS WITHOUT THE PERMISSION OF THE DWQ OPEN SPACE L12a L129 L130 L52 L54 - L55 - L5 6 - L57 - L58- L59 - L60- L61 - L63-- L66_ L 67 L68 - L69- L 70 L - 71- L72 - MEAN HIGH WAT ER LIN E (PROPERTY ERTY LIN E) L83 L 84 L85 L81 L86 L 82 L 7 3 �- L74 L75� V9 U8- L80 * > - ,3.o9v3 \\\ WALLS TE AT RO / \ 76 , ' 72 / .\ /, _ "� t 64 �\ \ AND/OR ARMY CORPS OF ENGINEERS. 184 D r�aX ERS 1 18 \ , ,1 DIERY A���, tD rlr 71 �, , I,� ---� , 65 1 \ NOTE: / * 10,419 SF �\ TILITY AND \ \ � - - - - / 1 / �' - / I 1 66 t� "� " + �I EASEM / -� �J / ( ' ALL BUILDING FINISH FLOOR ELEVATIONS SHALL BE \ 1/ 1 7,ia�sF III �., (TYP • (UN `� - _` / (I I '�� t MINIMUM 2' ABOVE FLOODPLAIN ELEVATION. - - \ 1j 11 )il CONSTRUE I _- --- _ ,��,.J�� NOTE: ool -'__1 I F" - I-- GENERAL NOTES: PHASE 3 ACCESS IS TO BE ACHIEVED THROUGH LANDS _-..•--` _.- / � 1. 8 FOOT UTILITY AND STORM WATER EASEMENT ALONG EXISTING PHASE 1. ---' _ BOTH SIDES OF ALL SIDE LOT LINES IS RESERVED NOTE: UNLESS OTHERWISE NOTED. SEE SHEET C-5 FOR TYPICAL ROAD SECTIONS. I r}- DJACENT PROPERTY OWNERS 2. 404 WETLANDS ON LOTS CAN NOT BE DISTURBED 13 4 ` _�, -;--,, WITHOUT A WRITTEN PERMIT FROM TH TAX MAP # NAME ADDRESS ZONING 1980000201 SANDLER AT SHALLOTTE PHASE 3 TRACT R-10 PRD 198CA031 BRANSON, JAMES V AND 421 SHERROW RIVER DR. (BRUNSWICK) TAMMY W SHALLOTTE NC 28470 R-6000 198CA033 CAUSEY, BOBBY 413 SHERROW RIVER DR (BRUNSWICK) 198CA034 SAYLOR, ROBERT D AND 409 SHERROW RIVER DR (BRUNSWICK) 198CA035 LOGAN, MARCUS W 405 SHERROW RIVER DR (BRUNSWICK) 198CA036 LOGAN, MARCUS W 405 SHERROW RIVER DR (BRUNSWICK) SHALLOTTE, NC 28470 R-6000 GERRY SHALLOTTE, NC 28470 R-6000 GERRY SHALLOTTE NC 28470 R-6000 198CA039 SANDBRO INVESTMENTS 389 SHERROW RIVER DR (BRUNSWICK) SHALLOTTE, NC 28470 R-6000 198CA040 YLO , KENNETH W 38T-sRERROW RIVER R UNSWICK AND SHERRICE D SHALLOTTE, NC 28470 R-6000_ 198CA041 KEUEY, TIMOTHY P AND 285 SHERROW RIVER DR BRUNSWICK ANGELA K SHALLOTTE, NC 28470 R-6000 198CA042 FRENCH, VIRGIL AND 377 SHERROW RIVER DR BRUNSWICK AUDREY SHALLOTTE, NC 28470 R-6000 198CA043 DOYLE, ROBERT J AND 373 SHERROW RIVER DR BRUNSWICK PATRICIA SHALLOTTE, NC 28470 R-6000 198CA044 DOYLE, ROBERT J AND 369 SHREEOW RIVER DR PATRICIA SHALLOTTE, NC 28470 RBR 000 ICK) E U.S. ARMY CORPS OF ENGINEERS. 3. FOR 404 WETLAND DELINEATION SEE PLAT ON FILE SITE LEGEND AT U.S. ARMY CORPS OF ENGINEERS. 4. ALL FLOOD HAZARD DETERMINATION MUST BE MADE ACCESSIBLE RAMPS FROM FEMA FLOOD MAPS. 100 YEAR FLOOD LINE ON THIS PLAT IS SCALED. PHASE LINE 5. SIDEWALKS MAY ENCROACH INTO FRONT OF LOTS. - - PROPERTY LINE 6. ALL STREETS ARE PRIVATE AND MUST BE DEDICATED - - - RIGHT-OF-WAY LINE TO THE HOME OWNERS ASSOCIATION. - - - - LOT LINE 7. 10' UTILITY AND SIDEWALK EASEMENT IS - - EASEMENT LINE RESERVED ON FRONT OF ALL LOTS. - CENTERLINE B. ANY AREA NOT PLATTED AS LOTS WILL BE DEDICATED TO AND MAINTAINED BY THE HOME OWNERS ASSOCIATION 100 * 70' WIDE LOT ' 9. A 20' ACCESS UTILITY AND STORMWATER EASEMENT IS 180 60' WIDE LOT RESERVED CENTERED ON ALL STORMWATER PIPES. FLOODPLAIN A 10. LOTS 176-186, 190-192, 197, 202, 204-211 ARE IN A WETLANDS FLOOD HAZARD AREA. COMMUNITY PANEL#3720109800J EFFECTIVE DATE JUNE 2, 2006 AS SHOWN ON PLAT. , 11. STREET RIGHT OF WAY WIDTHS AND NAMES ARE GRAPHIC SCALE 9 LABELED ON PLAN. 50 FOOT MAXIMUM AND 40 FOOT 100 0 50 100 200 a MINIMUM. 12. WATER TO BE PROVIDED BY BRUNSWICK COUNTY AND SEWER TO BE PROVIDED BY TOWN OF SHALLOTTE. 1 inch = 100 ft FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION E U.S. ARMY CORPS OF ENGINEERS. 3. FOR 404 WETLAND DELINEATION SEE PLAT ON FILE SITE LEGEND AT U.S. ARMY CORPS OF ENGINEERS. 4. ALL FLOOD HAZARD DETERMINATION MUST BE MADE ACCESSIBLE RAMPS FROM FEMA FLOOD MAPS. 100 YEAR FLOOD LINE ON THIS PLAT IS SCALED. PHASE LINE 5. SIDEWALKS MAY ENCROACH INTO FRONT OF LOTS. - - PROPERTY LINE 6. ALL STREETS ARE PRIVATE AND MUST BE DEDICATED - - - RIGHT-OF-WAY LINE TO THE HOME OWNERS ASSOCIATION. - - - - LOT LINE 7. 10' UTILITY AND SIDEWALK EASEMENT IS - - EASEMENT LINE RESERVED ON FRONT OF ALL LOTS. - CENTERLINE B. ANY AREA NOT PLATTED AS LOTS WILL BE DEDICATED TO AND MAINTAINED BY THE HOME OWNERS ASSOCIATION 100 * 70' WIDE LOT ' 9. A 20' ACCESS UTILITY AND STORMWATER EASEMENT IS 180 60' WIDE LOT RESERVED CENTERED ON ALL STORMWATER PIPES. FLOODPLAIN A 10. LOTS 176-186, 190-192, 197, 202, 204-211 ARE IN A WETLANDS FLOOD HAZARD AREA. COMMUNITY PANEL#3720109800J EFFECTIVE DATE JUNE 2, 2006 AS SHOWN ON PLAT. , 11. STREET RIGHT OF WAY WIDTHS AND NAMES ARE GRAPHIC SCALE 9 LABELED ON PLAN. 50 FOOT MAXIMUM AND 40 FOOT 100 0 50 100 200 a MINIMUM. 12. WATER TO BE PROVIDED BY BRUNSWICK COUNTY AND SEWER TO BE PROVIDED BY TOWN OF SHALLOTTE. 1 inch = 100 ft FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION 12. WATER TO BE PROVIDED BY BRUNSWICK COUNTY AND SEWER TO BE PROVIDED BY TOWN OF SHALLOTTE. 1 inch = 100 ft FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION FULL SPAN'CULVERT \ \ � y BL � L / (DESIGN 8Y "OTHERS) P ,r 50 R aETRsmvrRVB 1 (BOTH SIDES = 5' CONCRETE \ V i'Lt�?®s: R=22sa 7EWALK(TYP.) � — D=69y o f / 10' UTILITY AND \ r I I 24" ROLLED CURB 15' VEGETATED BUFFER \ .! _ _- \ / X� i / SIDEWALK EASEMENT \ � \ AND GUTTER (TYP) TYP\s � - - r' O R98' RCHITECTURAL WALL � _!y r 25' SETBACK ALONG / �. (pESIGN BY OTHERS) 259 PERIPHERY BORDER (TYP) --'t WETLANDS % O \ ,/ / \\ WETLANDS \ \ ♦ °aRs $�� 9" °° 11y3(oo % / 231 P BAY BLVD STA 30+ 0 0 \ 24'B/B 16' DRAINAG \ �— EASEMENT r_ WETLANDS 0 1— - _ _'_ - --_ _ — --� / — — / R98' �-- - - _ AMENITY POND t 32' t/B t 254 234 / 1 _ N 1 253 A- t \ ti/c 236 / o"' a o _ _ a _ / 214 ' tt 1� - / �\ �\ / R18' (237� ♦ I 213 t . �- WETLANDSi- + 1 / 24" ROLLED CURB ^A / a / - - ` L I : AND GUTTER (TYP) / // I ^ ... / 238 212 M / O 10' UTILITY AND ' J I % SIDEWALK EASEMTENPT ( I W - o �39 ) well wo low ow low ♦ - - � 41111111! i wo BEGIN CONSTRUCTION AT STATION 21 +83.99 s ac\2 z�N W z .Z4 �n o p,.a 0 0 V W V ® 'o W r n. z po ti. �SAL9�° 365 ti °E D. EIAR04 w a o � w o O O rn z z. Z o cy O U 5 ¢ W w U g Ndf ms0 E-+ Q F 0o � ED d' � A x �zwqk w ix 5 o C>~ a oc z a O � } a F o c� °moo zz� w .ova a w� o v o zw > " oQ W O w� a Oo o Z PROJECT NO. WDL-07023 FnzNAw: WDL07030-S1 DESIGNED BY. MAD DRAIN BY: MAD SCALE: 1 " = 50' DATE: 8-21-07 Sll�f N0. -3 IIII . � . •� 1I --------------------�AIATCw LICE SEE or /'� N AAA ��; � �52 I i ' i N� i / / SIDEWALK (TYP) _ SEE Cal �4E&T 7- 31 Bmim _ 100 YEAR FLOODPLAIN ELEV.= 11 !'(251 / �I b 8Ell 1 1 , 1 � WETLANDS 24" ROLLED CURB A 250 \ AND GUTTER (TYP) j / !� 242 e \ t �j• 16 DRAINAGE EASEMENT w w o 169 w - , ' 20 / N , ► t / o / LAD DRIVE NORTH- STA 10+00.00- /,/l'.. 2 t (165� LADERA R(V OUTH STA -62+4 :30: _ QD fw \ 207 o / \ \ _ - - - - - o N ' A 16' DRAINAGE — cd n PAfv4Bi E CIRCLE STA 10+00.00 - h 248 \ N EASEMENT \/ J P TSE�Y BLYD STA 45+42.55 `/ �� \ WETLANDS I o N 16 \ ► ~ i� 171 \� ` t / � \ SHERROW CREEK \ �� / / \ ` �I I 24" ROLLED CURB WETLANDS i \ w / / \ \ : 1. 50 /W ' AND GUTTE�TYP� ' \ \ : 10 UTILITY AND �\ /` ` / / / \ w `� SIDEWALK EASEMENT Nr 2 ' s r w \ \ I 32' /B . / / �--' \ � (TYP) /\/ \ w 100 YEAR / R9.5' f�29 C� `� FLOODPLAIN -- / ELEV.= 11 1 10 UTILITY AND 1 SIDEWALK EASEMENT :. s DRAINAGE (') �. I -.-EASEMENT-', i 0 CIRCLE: B- STA. 10+86:88 I PARADISE BAY�CIRCLE'-STA 1 +59 7 = t' 1 PARADISE BAY BLV 4 + 7 + \ �- \ / TIMBER BRIDGE-: (DESIGN - BY-OTHERS)10 205 20..SHARED- CONCRETE �55' >>ko R55' ACCESS DRIVE - - - � . \ �_ : i- . :� : _ - ' - I \ \ �CIR B STA 11 3.83 = \ `° \ / i--�.: \ \ .PARADISE Y LYD STA 51 +25.27 R98' i , 24'B/BBB"' e4 �a \ \ t ?X� x \ ' / / 244 ` _ -_'� ► / / / �� y ' WETLANDS 245 16 DRAINAGE , \-('79 \ EASEMENT / 00 IN R29.5'- \ \ / 1E 242' - t 20D` , - _ _ , �- I A / / / 2' 24'w I \ S2 `_ —► / 72 24.99' \ / � t:1 x°0 12+2s r2+� ` " 174 / s 24 ROLLED CURB - - - -.__. - AND GUTTER \ \ 80 /f1'1_1 11 11 �03 , / \ / 2 49+00 50+00 �,2�es$' R55' t i = _ t, \ // •. L_� a29- , CIRCLE B STA 10+OOA0 -��s � I / 'x'' R=250•�' // PARADISE BAY BL TA 10+00.07 �`' R PARADISE BAY 202 ,75 CIRCI 194i _ -- / 193 � k - 81 199 I tT 198 ' 1 ' i 97 / \ / _ _ t �l 00 YEAR : ' 100 YEAR / FLOODPLAINR \ \ �� / 192 \ \ \\\/ FLOODPLAIN �, ELEV.= 11 \ / ' \ \ \ \ ELEV.= 11 t w 25 SETBACK ALONG w �_ _ _ .---._1 \- \ \ / \ / ` PERIPHERY BORDER (TYP). ' 191 �� $ `� / '�e�j 5 CONCRETE \ I \� SIDEWALK (TYP) ;%%* \ �` \ 50'R/W\ 10 24'B/B \� SITE LEGEND rrT n 's SHERROW CREEK r _ 4 ' DECORATIVE SCREENING- Y WALL W/ GATE AT ROAD (DESIGN BY OTHERS) NOTE: ALL BUILDING FINISH FLOOR ELEVATIONS SHALL BE MINIMUM 2' ABOVE FLOODPLAIN ELEVATION NOTE: SEE SHEET C-2 FOR GENERAL NOTES HANDICAP RAMPS ■��-��-���11-11■ PHASE LINE PROPERTY LINE RIGHT-OF-WAY LINE - - - - LOT LINE EASEMENT LINE CENTERLINE WETLANDS -' FLOODPLAIN GRAPHIC SCALE 50 0 25 50 100 I inch = 50 ft. Q U • � w z�i PLq � x a N W z � � a P4 a Q hy■i Q E' -- - Z a �. w a o � w � o Q (V rn z F o o bi m o to 1n 5 w W w U CQ o OFF � w zo Co ; 5 o � z a U oho w auk, W O � Co 1 o0 z� PROJECT NO. WDL-07023 Pamwa: WDL07030-S1 DESIGNED BY: M A D DRAWN BY. MAD SCALE: 1 " = 50' DATE` 8-21-07 SHEET NO. C-4 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION JiMcADAMS 1 C UTILITY & SIDEWALK EASEMENT w z 0 J 9' 2' 14' BIKE LANE 1 10' LANE 50' R.O.W. (PRIVATE) 32' B-B 3. 0 a: OJ 10' LANE 4' BIKE LANE 2' n' 9' 10, UTILITY & o vi SIDEWALK EASEMENT SIDEWALK a a z m � o m I- TRANSFORMS U O ww Z 0 1 /4"/Ff 1 /?FT / !1 ► 1/2/FT I I I 1/4"/Ff 5' SIDEWALK (MEANDERING IRRIGATION WITHIN R.O.W.) LINE (TYP) o • 1.25' SF 9.5A ON 24" SPIN ROLLED O� 24" ROLLED CURB (TYP) zCABLE CONDUIT 2' CURB (TYP) 1.25" 119.OB ON 2. (4' COVER AND SOCK DRAIN (TYP - 9' COQUINA IRRIGATION WITHIN 10' AS NECESSARY) UNE (TYP) EASEMENT) �RglzY SEWER ffl SAN (3' COVER) TYPICAL PRIVATE COLLECTOR SECTION WATER LJNE LINE WITH 4' ASPHALT BIKE LANES (3' COVER) TELEPHONE 5' 50' R/W, 32' B-B STREET 5' CONDUIT N.T.S. ELECTRIC CONDUIT (4' COVER (4' COVER AND .I AND WITHIN WITHIN 10' 10' EASEMENT) EASEMENT) 10' UTILITY & SIDEWALK EASEMENT w Zw z Q a- ~ U J m O U U TRANSFORMER fy-w wI-z Li O a 50' R.O.W. (PRIVATE) 24' B-B 13, 10' UTILITY & o rA SIDEWALK EASEMENT Z 0 10' LANE 10' LANE 2' 5' SIDEWALK a w m z 0 J J 6 m TRANSFORMER 3 o cs o 0 o Cr � Wz ci' G' 1/2*/FT 1/4"/Fr o - 1/� / �--- 5' SIDEWALK (MEANDERING WITHIN R.O.W.) LINE (TYP) 24' ROLLED 1.25" SF 9.5A ON 24' SPILL CABLE CONDUIT 2' CURB (TYP) , 1.25" 119.0B ON ROLLED 2' (4' COVER AND SOCK DAS RAIN 9" COQUINA CURB (TYP) IRRIGATION WITHIN 10' ( Typ - LINE (TYP) EASEMENT) SANITARY SEWERCESSARI) LINE (3' COVER) TYPICAL PRIVATE WATER LINE COLLECTOR SECTION (3. COVER) 5' S0' R/W, 24' B-B STREET 5' TELEPHONE N.T.S. CONDUIT (4' COVER AND WITHIN 10' EASEMENT) 13' 2' i 1/2%F7 IRRIGATION 10' UTILITY & j FWAI K FASFMF 8' R.O.W. VARIES (PRIVATE) B-B VARIES Z Z W D ¢ n. 2' 4' BIKE LANE 12' LANE 2' 2-1 12LANE 0 O 6 TRANSFORMER U W Z 1/_2'/Fr 1/_ 2'/FT IRRIGATION LINE (TYP)�Q 24" ROLLED CURB (TYP) CABLE CONDUIT 2' 24" SPILL 24" SPILL (4' COVER AND SOCK DRAIN ROLLED ROLLED WITHIN 10' (TYP - AS CURB (TYP) CURB (TYP) EASEMENT) SANITARY SEWER NECESSARY) PER TYPICAL PRIVATE LINE (3' COVER) GEOTECH COLLECTOR ONE-WAY SECTION TELEPHONE 5' R/W VARIES, 20' B-B STREET N.T.S. CONDUIT 1.25" SF 9.5A ON (4' COVER 1.25' 119.OB ON AND WITHIN 9" COQUINA 10' EASEMENT) 1 /4'. ELECTRIC CONDUIT (4' COVER AND WITHIN 10' EASEMENT) 10' UTILITY & 8' SIDEWALK EASEMEN o� w 4' BIKE LANE 2 i' 5' SIDEWALK ¢ EL D O O (3 ¢ TRANSFORMER V) U Ww Z 1 /2"/Ft 1 /4"/FT a I 1 /? /FT 24" ROLL - CURB (TYP) WATER LINE (3' COVER) 5' SIDEWALK (MEANDERING WITHIN R.O.W.) IRRIGATION LINE (TYP) ELECTRIC CONDUIT (4' COVER AND WITHIN 10' EASEMENT) I C,* , DECORATIVE SCREENING K WALL W �p \ / / / GATE AT ROAD50'R/W (DESIGN BY OTHERS) ' �• BAY BLVD STA 16+20.35 = \ / / 179 - ✓ BAY BLVD STA 22+49.99 x - ' \ �� 24'B/B - .40 ,- i Al .s C8-0) WETLANDS 16' DRAINAGE EASEMENT / _ I 10' UTILITY AND / SIDEWALK EASEMENT Cl 89) f e x� \ o + 100 YEAR 100 YAR I FLOODPLAIN\ FLOODPLLAIN 24' B/B / \ ELEV.= 11 183 L=22t7$ / 1 25' SETBACK ALONG PERIPHERY BORDER (TYP). ISHERROW CREEK I SITE LEGEND NOTE: ALL BUILDING FINISH FLOOR ELEVATIONS SHALL BE MINIMUM 2' ABOVE FI_OODPLAIN ELEVATION NOTE: SEE SHEET C-2 FOR GENERAL NOTES HANDICAP RAMPS PHASE LINE (se arm) auto am PROPERTY LINE RIGHT—OF—WAY LINE LOT LINE EASEMENT LINE GRAPHIC SCALE 50 0 25 50 100 CENTERLINE 1 inch = 50 ft. U CIS lO O CQ a z �N W d O a =0 0 O E-4� Lp co w moo° z w�� CS Z W O •-i w Lx a. N CAR 31 65 s�4 IN D. N01111% w o_ u.i \ � o cn � N Q � O� z O L 3 U) W uj � Q a CQ o ' CwQ 'M2o 0 (= E- u� r�i a •�• �Ax r z w rl W o � co W Qua LQ � 5 z o a �zm ry ac?a Ewa a a q co O rf v' a® �a PROJECr No. WDL-07023 FnmAm: WDL07030—S1 DEMGNED BY: MAD DRAWN BY: MAD SCALE: = 50' DATE` 8-21-07 SHESr N0. C-5 FINAIL DRAWING — NOT RELEASED FOR CONSTRUCTION MWADAMS SECTION 1 GR/ CROSS SECTION PERMANENT SECTION 1 SWALES (1' DEEP) SWAM LOT 165-166 SWALE LOT 179-180 SWALE LOT 243-244 SWALE LOT 249-250 DRAINAGE NOT TO SCALE GRA 0 �\ s AND / Z�_ r may` 222 G223 / I 122� / -- I / 225 \ 226 t J } / 228 / 196 \\ --1-6 7 � \ � 165. / \ \ n � � � v \ WE�t.DS- / / _ - .. ..-:.•_-� ..' 7T-'�,, - � � _ \ ) ( Ion \ \t63. \ / 229` - I / i I / I q/ / / / / ► I - ."NDS I i - /- l - / 158 ' - / ,I _ - I 0 159 _ i1 - - / 230 I / 156 1 I I I { r r 169 I I - � 1 i / I - I - — 55 - 1 I / I \ 4 I \ i- / 92 100 YEAR � - _ FLOODPLAIN i" r _ - I - - I / ETt.�nl - -- / J- - L i191 - 1173 } 153 152 I L , f' N ^ t� / WETLANDS-:_ i / 171 - , i i 74 - _ - - z f / /C : I - s 9 f 188 90 r 1z F e I / FA is IS �.ls,Y �� z. _ e 1 r 1 / \ i / \ -178 Fit" 479, 181 r� l r - / / / / l \ 'f/}1j / l - ►l^E — r-�: ! — / / �r�f \ \ I �\• / ��� 17 \ \ / WETLANDS /' � ,*/ / / / / •`°/ ` :, \ � _ �- � / �i� E I: % �� / '3'�• \ � � ��� \ \ �� — — // / _ .:.� / . _.�_: � \ / ! `� / . � %� � \ v_•�-' / r ram-_ f Ae-° -- - - �,r�_..-•••;�-'= _^"ice J '�� r. -`��� - � / �---�.=.� / // f \ SECTION 2 SWALES SECTION 2 SWALES (1.5' DEEP) SWALE LOT 156-157 SWALE LOT 244-245 SWALE LOT 256-257 n / � jig J / \ \ \ � ^:\ •, 7 / r "2 206 \\ 21-4 �207 ►/ \ — --- -- % ; - \ ` - -- - EAR o 217 219 212_- 2t3 \ 4§- /\\\\\�7 I ---- \ 24'd1 / \/ \ ► t 255 256 50 251� / / / 253 254 \ 2 7 / 258 I I i I I 24 - , ::^W LA LAN b . l I 1 � / 1 I I , 1 II I - - I - / I - - 1 / I f 4 .- I y - - 7 / / 4b I - 'r` j '244 .W S- - i� --- - ND I I L /-�43 I � 2 4 197 j 23�5 \ \\L _ .. �233 i 232 231 i NOTE: ALL FINISH FLOORS FOR PROPOSED HOUSES ' SHALL BE AT A MINIMUM ELEVATION OF 13' (2- ABOVE FLOODPLAIN ELEVATION OF 11') GRADING NOTES: 1. THE RETAINING WALL ALIGNMENTS SHOWN ON THESE PLANS DEPICT THE LOCATION OF THE FRONT FACE OF THE RETAINING WALLS AT THE BOTTOM. 2. RETAINING WALLS ARE TO BE DESIGN -BUILD PROJECT(S) BY THE CONTRACTOR. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN FINAL CONSTRUCTION DRAWINGS FROM A REGISTERED ENGINEER AND GAIN ALL REQUIRED PERMITS NECESSARY FOR THE CONSTRUCTION OF THE RETAINING WALLS. 3. RETAINING WALLS SHALL BE ASSUMED TO BE BACKFILLED WITH OFF-SfTE BORROW MATERIAL OR PROCESSED FILL UNLESS CONTRACTOR CAN PROVIDE OWNER WITH CONFIRMATION FROM THE GEOTECHNICAL ENGINEER AND THE RETAINING WALL DESIGNER THAT READILY AVAILABLE ON -SITE SOILS CAN BE USED. 4. THE TOP AND BOTTOM OF WALL ELEVATIONS SHOWN ON THESE PLANS IDENTIFY FINISHED GRADE ELEVATIONS ONLY. THE EXTENT THAT THE RETAINING WALL WILL BE EXTENDED BELOW GRADE TO THE FOOTING SHALL BE IDENTIFIED ON THE RETAINING WALL CONSTRUCTION DRAWINGS. GRADING LEGEND CA FLARED END SECTION m CATCH BASIN _,%% DRAINAGE FLOW ARROW r.. LINE BREAK SYMBOL 25.50 TOP & BOTTOM CURB ELEVATIONS 25.00 TW=22_00 —TOP OF WALL ELEVATION BW=21.00 —BOTTOM OF WALL ELEVATION (NOTE: BOTTOM OF WALL IS GROUND ELEVATION NOT WALL FOUNDATION) + 25.60 SPOT ELEVATION 25 24 25 ----------------- 24 0 STORM DRAINAGE 5' CONTOUR 1' CONTOUR EXISTING 5' CONTOUR EXISTING 1' CONTOUR EASEMENT LINE LEVEL SPREADER m GRAPHIC SCALE 100 0 50 100 200 1 inch = 100 fL FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION GRA SECTION 1 I ( . CROSS SECTION I PERMANENT DRAINAGE SWALEStp \. NOT TO SCALE \ ( \ ,/► , \ _ : \ 1 _ \ I \ / ► \ SECTION 1 SWALES SECTION 2 SWALES (1' DEEP) (1.5' DEEP) ' \ ( 227 SWALE LOT 165 166 SWALE LOT 156 157}\ \ i� _ . \. } \ SWALE LOT 179-180 SWALE LOT 244-245 \ !!! 1 j } f } SWALE LOT 243-244 SWALE LOT 256-257 \ // _ \ r \ : I- : 26.00 - SWALE LOT 2 9 2 \ �/ j \ \ } -$W=�5:25- GRADING LEGEND 5 1 _ _ I WETLANDS f - \ \ / - ' r /CULVERT A" } '. \ � WITH HEADWALLS 24" RCP f ,- / t \ TW= 0.00 TW=29:75� / �23 BW= '50 . TW ?J AO _ \ � UT = 17.0 ,.� � ` % .- BIN=25.56 - p r �( \17. b \^ 00 /"�229 ( / 0 B ( i BW� 4.OQ =2�.00 \ \ _20 7.N �f / / =25.50 \ \ TW=14.00 _ / '� �/ \ BW=17.00 14�00 10 t X 7,5'W :k 9'T , / / / ( �� \ DISSAPATOR- PAD WJTH ., �ti t / BW=2 0 / WETLANDS / > / *=17.00 - - I �✓ \ CLASS A- RIP -RAP WETLANDS -' _ \ 152 \ \ ' / __ -�W 17. / ♦ r _ I &Z =29.50 \ BW=1 .00 / y �. BW=25.50�,. \ \ BV =14.00 / } // ( \\ 7� \ \1 I I CIRCLE A 1s3 \\ \ l/TW:g/1'4 ,1 ' / / ( / i y � = _1-'- 7 � - = - - - ✓ ` -= - - -: - WETLAt DS A, 232 TW 1 POND / / E -: : ,. \ I \ \ 256 ' 16' DRAINAGE EASEMENT _ / _ _ _-- �- .722:25 % - x 16 DRAINAGE EASEMENT FLOODPLAJN J. 216 w. SPREADER CA FLARED END SECTION } \ \1\ WETLANDS \\ \ \ CATCH BASIN �- DRAINAGE FLOW ARROW \ \ \ \ \ \ \ - ' - / r I / \ -tom _ _ \ \ ti LINE BREAK SYMBOL 25.00 TOP &BOTTOM CURB ELEVATIONS , \ \ 214 TW=22.00 -TOP OF WALL ELEVATION l ( / 1 ! r / / s� / ~ ` . BW=21.00 BOTTOM OF WALL ELEVATION (NOTE: BOTTOM OF WALL IS GROUND ELEVATION NOT WALL FOUNDATION) / / I _ } i : - / / / / ♦ \ \ \\ / , _ + 25.60 SPOT ELEVATION } 1 STORM DRAINAGE 25 5' CONTOUR N NOTE: / / I I I i I 1 - / / / -T \ \ - `/ ,� \ �_ \ ALL FINISH FLOORS FOR PROPOSED HOUSES 24 1 CON TOUR / I / { / / / /� / / / _ = __ - - \ SHALL BE AT A MINIMUM ELEVATION OF 13' f ���---yyy ------- ?5------- EXISTING 5' CONTOUR _ l l / l I I- { / / \ \ _ _ . \� (2' ABOVE FLOODPLAIN ELEVATION OF 11') / / / ` ti ----2-4--- - - O EXISTING 1' CONTOUR � / / / � lr l l-- I - - , - / // / l 23 / / \ / 1�✓ / 160 `. - - :: � \-. EASEMENT LINE LEVEL SPREADER AfA ll so, will on 8 Nor Wei r LIB low L AfA ?,C, Lr% \ \ GRAPHIC SCALE LINE \ \ \ 50 0 25 50 100 L SLi�iMR !It �LTa \\ \. L �tk- �♦ ` ` I inch = 50 fL c-8 U� Q U U a Q� w z I R 0 �+ a � � w wa �az�N w � �o = o CD Q \ F� ko W wog Z W Z W ® to °..' L��- 65 13 a: w a o r` w o o 0 0 0 a rn z � o O w 3 E o w En G; Q U ►a7 � In L-" o Ow4� a� w w a zx� O F rn N ono F' wz„ z Qx� w .•� c? a w U a w w O M 0 0 t PROJECT NO. WDL-07023 PamuNE: WDL07023-G1 D=GNED Br: MAD DRAWN BY: MAD SCMZ: 1" = 50' DATE: 8-21-07 SHSSf N0. c 1114-7 JiMcADAMS FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION *0 \ J ' 100 YEA 1 1 t FI_90DPLA7 C \\ 1 I 2os / 207 �,i { \ \ 10' UTILITYrz I ` EASEMENT (TYP) 00 \ t96 1 50 I _ 12.5'L x_9.375'W x 9'T - DIS8AP(T0` PAD CLASS A 100 YEAR / RIP -RAPS \ - — —� — — _ — - — { FLOODPLAIN -A/ \ — �- _ ---- -- 1 --- r J Op IN \ \ SPACES, GRADING LEGEND .4v ® FLARED END SECTION CATCH BASIN DROP INLET 25.50 TOP do BOTTOM CURB ELEVATIONS 25.00 TW=22.00 —TOP OF WALL ELEVATION BW=21.00 —BOTTOM OF WALL ELEVATION (NOTE: BOTTOM OF WALL IS GROUND ELEVATION NOT WALL FOUNDATION) + 25.60 SPOT ELEVATION 25 24 25 24 DRAINAGE FLOW ARROW LINE BREAK SYMBOL STORM DRAINAGE 5' CONTOUR 1' CONTOUR EXISTING 5' CONTOUR EXISTING 1' CONTOUR EASEMENT LINE LEVEL SPREADER CROSS SECTION ►101=111t►`1rtUq SECTION 1 SWALES (1' DEEP) SWALE LOT 165-166 SWALE LOT 179-180 SWALE LOT 243-244 SWALE LOT 249-250 SECTION 2 SWALES (1.5' DEEP) SWALE LOT 156-157 SWALE LOT 244-245 SWALE LOT 256-257 NOTE: ALL FINISH FLOORS FOR PROPOSED HOUSES SHALL BE AT A MINIMUM ELEVATION OF 13' (2' ABOVE FLOODPLAIN ELEVATION OF 11') (se aVM) mxa .W GRAPHIC SCALE 50 0 25 50 100 I inch = 50 ft. U) � U Cq 0 �azN Z W z too 1-+-� 0 E- t 1n �UW oto z z wok EAL y9� - \ 1365ty' w a_ 0 1 w � ® o 0 N a � c» Z z o W � � o 5 Q UJ aj E4�C � C�2 0 Ow 00 20 v r 4k w W o co a o � � Q� 1 � a N is p Q r a o�— H Wz� z Q� w �R � aaa O ua a 0 Q 0 t r rrakk oW V � z PROJECT No. WDL-07023 FRENAME: WDL07023-G1 DESIGNED BY. M A D DRAWN BY' MAD SCAR: 1" = 50' DATE: 8-21-07 SHEET N0. C-8 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION 11WADAMS BERMUDA GRASS CHANNEL LINING SEI p \ 82 \ e!/ ,Y `X. ~ \ BER GRASS ur t 1 1 ,1 1 1 ` \ 1 i \ 1 1 � 84 "�WETLAIVD 1 GRADING LEGEND ® FLARED END SECTION CATCH BASIN PERMANENT DRAINAGE SWALES DROP INLET NOT TO SCALE �- DRAINAGE FLOW ARROW SECTION 1 SWALES SECTION 2 SWALES (1' DEEP) (1.5' DEEP) ti LINE BREAK SYMBOL SWALE LOT 165-166 SWALE LOT 179-180 SWALE LOT 243-244 SWALE LOT 249-250 SWALE LOT 156-157 SWALE LOT 244-245 SWALE LOT 256-257 25.50 TOP & BOTTOM CURB ELEVATIONS 25.00 TW=22.00 -TOP OF WALL ELEVATION BW=21.00 -BOTTOM OF WALL ELEVATION (NOTE: BOTTOM OF WALL IS GROUND ELEVATION NOT WALL FOUNDATION) + 25.60 SPOT ELEVATION NOTE: ALL FINISH FLOORS FOR PROPOSED HOUSES SHALL BE AT A MINIMUM ELEVATION OF 13' (2' ABOVE FLOODPLAIN ELEVATION OF 11') 25 24 25 24 STORM DRAINAGE 5' CONTOUR 1' CONTOUR EXISTING 5' CONTOUR EXISTING 1' CONTOUR EASEMENT LINE LEVEL SPREADER GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 ft. FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION U� Q U rn ►n w z I O O C 2 U) a O w alp z100 C40a U w a® m z w�� z w0 w x a� °._' •••••tlt i I/II % I %'��,��N ��fl Q y _7A . 1365( ND. � Ln..11ll••` w a O n W � Q O N Q � O z Z O � 3 � w p W w R; q a CQ Cam-+ RI2 `� o ©w E- @z &I as w o ..4 coz a 0 4 0 W�LQ a O�- Oy z wz� O a u W'11 > a Co 0 rV J W O 0 a PROHCr No. WDL-07023 FnzNAw: WDL07023-G1 DEMGNED BY: MAD DR&WN BY: MAD SCAIE: 1" = 50' DATE: 8-21-07 SEUM NO. C-9 11WADAMS SWALE DATA CHART Swale ID Total DA Total Impervious Grassed Area Weighted C Runoff Swale Lot 156-157 1.10 ac 0.58 ac 0.53 ac 0.64 6.9 cfs Swale Lot 165-166 0.78 ac 0.32 ac 0.45 ac 0.57 4.3 cfs Swale Lot 176-177 1.64 ac 0.74 ac 0.89 ac 0.59 9.5 cfs Swale Lot 243-244 1.42 ac 0.58 ac 0.84 ac 0.56 7.8 cfs Swale Lot 244-245 1-53 ac 0.77 ac 0.76 ac 0.63 9.3 cfs Swale Lot 249-250 0.80 ac 0.42 ac 0.38 ac 0,64 5-0 cfs Swale Lot 256-257 1.73 ac 0.93 ac OM ac 0.65 10.9 cfs Swale at Span 0.44 ac 0.24 ac 0,20 ac 0.65 2.8 cfs owl 5 7 206 207 20 U0- 2f6 2117 211 22�1 212 t 2t3 ►A 222 A % / / lr Il j j/ x / / • •_� N \2-47 'Till ►1223 24k -�- 1 249 255 256 254 7 22� 25 )5 LOT 2 258 fill -V LOT 24N9*,� ��24R 225 V 2,OZ7 ISWALE LOT 244&2 ONT 244• 226 L �2�2 V 227 IC92 L \197\ 36\ 228 1233 232 1 23 k231 ig X34 166 Ile 165-\ )k - vl� 7 229, T62- 65& j J 58 59 X 230 V �60 9� \4 'Ile 1561 155 192 154 N LOT T 17(3 SPA Xr NNW- 153 191 731 A % do 171 152 j )74 A V2 2�. 90 ---i a7 < 9 188 13N All A T7 W N, X r 78 7Y 8 0 17 75 A 84 1$2 SWALE LOT 179&180 \ \ lil - 3\ .. .. .... . r GRAPHIC SCALE 100 0 50 100 200 1 inch = 100 ft. 0 0 >- C:) CQ 0 � W �N to Z Z a;� 00 P4 CD 0 I"-04 In E-ol pq W z pq z ;4 pq eo AL 65 10 D. BAR a. ui o Z z 0 Gi d P-4 m 3: W J3 V) W C,2 ko E-1 ccqv cmq 00 E--4 ro- r- pq z co < 0 U PG 0� 3z > co 0 C) 0 z PROJECT NO. WDL-0702 FuXNAKE: WDL07023-D DESIGNED BY: AVS DRAWN BY: AVS SCAM: 1" = 100, DATE: 8-21-07 SHEET NO. C-10 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION E OVE EXISTING BLOW —OFF ASS MBLY ° — —� D TIE NEW WATER LINE TO EXI TINE I _ � _ — .�— �-- _---• . N)� LINE FROM PHASE 1 (CO CTQR I --- ° R NSIBLE TO FlELD—VERIFY I EXISTING WETLAND ' LO ON AND ELEVATION OF EXI G WA. NE BEFORE CONSTRUCTI N °AN ° i 15 156 / I I REP \ ANY DISCREPANCIES TO E INEER) 15 154 BEGIN PHASE 3 CONSTRUCTION 15 I ® STA 21 +83.99 CONTRACTOR ° ° I ° RESPONSIBLE TO FIELD —VERIFY I \_ I ° I ACCESSIBLE ELEVATION OF EXISTING ROAD WA J ° X \ RAMP , o BEFORE BEGINNING CONSTRUCTION + ° + AA �� pp �� V f�T j�T �i`' � j�g� ` r kRADISEAND REPORT ANY DiSCREPpK(CIEPtaiti�lJ��A 1V. V'T�•• V tillrJ.//`\\\/ ° ° BOO A � Tn rk1r_1n'rri�\ �1� 1J V V �C1�lrD EXISTING 4" PVC — PRESSURE SEWER LINE furl MIN I 4, 41 N 40' 4" TEE �� SEWER UNEvvv .� (2) 4" G.V. AND V' BOX WITH CLEANOUT 2s GRAPHIC SCALE 0 20 40 6-TV 3%2", REDUCER ,1 EXISTING' WETLAND i — 3- �VC\PRESSURE SEWER E\ F \ ® EXISTING40, ®•..WETLAND-` I ® tiffs 40' \\\ v- 35 4f I — ® 50' R/W / �� ®FM FM�V /\\\\ y1� 3" PVC PRESSURE RADISHPjkYDO V�T� �r, L SEWER LINE GRAPHIC SCALE 1 inch = 40 ft. 1 inch = 40 ft~ v� _a 45 r I HIGH POINT A = 23 15.18 40.LO LOW i POINT hI R:OINT = 22+33.65 17 —H A PVI_E 23+28.60 { I I ` ' 40 � STA 22+25.8 } A.D. 4.787� A.D. _ 4.32i IV.C. 100.00'_ t � I I V.C. 80.00' I ! g s j d s I 6 00 r 9 .—�. a�� _.. 35 35 i to — N Cn I f i 04 I I iLI V3 U U Ci i 1 I � 3 t { F 38 gg 4 ROPOSED`'GRADE to 04 30 BLOW— ASSEMB IT } 1 I i I ° \ I: DESIGN BY OTHERS: ! Cn w s 4 1 1 g_rl 1 _ 25 N n T iii -F I I I 20 � j � , .. EXI G►�AI)E NG CEN UNE � ,.,. N � 20 EXISTING G DE N�-t°, +_ I N ' I II TIE N PRESSURE SEWER LINE TOcn w s (CONTRACTOR RESPONSIBLE TO LEFT > — tELD m ON ANDt 15 i --y ELEVATIC ,. BEFOR N OF EXITING SEWER GONSTRUr TION—AND) LINE REPOR- , I } j s: 15 ANY DI REPANCI�S TO EN INEER) s ' 10 1 0)�I 10 11-4 ��� 00 !to t�A Ic" Oi �� N 0) O) N N 0) 0) N N Oi N � di N 0) N 00 IN ^ N Co IN co N O to N N N 22+00 22+50 23+00 ZS+bU L4+UU z4+DU zotuu zuY•uu cvtuu 1, EASEMENTS ADDED PER DWQ. 09/20/07 REVISIONS DATE OWNER: WA ELD. SANDLER AT SHALLOTTE,LLC DEVELOPMENT COMPANY 448 VHUNG DRIVE, SUITE 220 of VMGRGA BEACH, VIRGINIA 23452 3209 GRESHAM LAKE ROAD, SUrI•E 160 PHONE #: (757) 463-5000 RALEIGH, NC 27615 (919) 556-4310 THE JOHN R. McADAMS COMPANY, INC. ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 30+00 30+50 31 +00 31 +50 32+00 32+50 33+00 PROJECT• NO. WDL-07023 Fa,ENAME` WDL07023-P1 DESIGNED BY: MAD DRAWN BY: KAM BORIZ. SCALE: 1 " — 40' VERT. SCALE: 1 " = 4' DATE: 8-21- 07 PARADISE BAY BLVD. - STA. 21+84 TO 36+00 ! 33+50 34+00 34+50 35+00 35+50 36+00 "TNT ♦ T TI TI A TATTWT 1'll`I L1L Lift-i 7i 11Y 1T — 1TVi i`. i_aieiai9s_71J i1 1'VlV l�V1V 1.71AVVl�liV1V . _ S1iEET Na. SAN1771 T 0 . PHAS'Kw-=A%l P-1 TOXIN OF SHALIA= McADAMS NORTH CAROLINA PRINT DATE: EXISTING WEILAN F_H_ ASSEMRLY, 16' DRAINAGE/ / EASEMENT 00 *00 w Pc46 00 U� \ \\ — )UCER \ 14 w 2" PVC PRESSURE SEWER LINE / o \ \ ISE BAY IRCLE GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. PARADISE BAY BOULEVARD 40 40 35 35 . -. 30_ i 30 j i EH16H POINT STA- ' i i I I t4GH POINT ELEV = 17.68 I i r LOW POI qT ELEV 16.56 PVI ELEV = 18.52 t i — 43+97-11 PVI LEV = 1 .47 = K 227.88 i IGH POINT ELEV = 47+ 15.25 25 = 35.7 j ---- LOW POINT STEAD-- 44��+35$8�0 PVI DEtcEV 15. 7 25 j PVI ST = 44+32.73 j PVI ELEV = 13.74 i 0 f z A.D.= 1.83_ , _ rn i i d — '* I ► 1 + (o 7 (6 - hri . , I 20 �.-r ----- --.> ----- - --------- ---- - r .- _.�- ----- 4 _ - --. € i__ ao _ 20 - - — m vi M ,} [D r 3 iAn U �/ j W .i� Lj r! s i P RESSU EW _ - i 1 ��0 / 15 - - - �0.77% .., .I PRESSURE B _> _PR SSI IRE N� 1 f GRADE I EXISTING GRADE 1 10 d ! ! RIGHT i € 10 _ �# PROP GRADE y f LEFr 5- r i f 5 .e -- - - --- - -- j W O O fl0 O O jW) O (\ 00 to 00 t1) 1� �`' OA S O CA M O to CA In � (D 00 (D E� r(0 O O itD N oO '- N 1 CA tD O N Cn €� tD r st #d I CO `N CO (D `CA K) 0 CD 00 t� OD 00 O ca N tD Ln (D 00 z t (O (t0 (C) (G (D c0 �N (- t` n (` n f\ i� n IIIr n r (D (D (D �(O t!) Iv7 r7 rM a d d t I� I I 36+00 36+50 37+00 37+50 38+00 38+50 39+00 39+50 40+00 40+50 41+00 41+50 42+00 42+50 43+00 43+50 44+00 44+50 45+00 45+50 46+00 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION ����o OWNER: OWNER: ���,� �, ,�'.��a� ''%,,� THE JOHN R. McADAMS ®� �� ��%��, =�v� (\ ss1��� . �y \\J � ,y< • � COMPANY, INC. ` .:. ,L /� WAKILELD.SANDLER AT SHALLOTTE,LLC __ �+ • 'i l O . 448 ViKING DRIVE, SUITE 220 1 - DEVELOPMENTCOMPANY ENGINEERS/PLANNERS/SURVEYORS v V, :, \\ VIRGINIA BEACH, viRGINIA 23452 �� !, � 3209 GRESHAM LAKE ROAD, SUITE 160PARK,�GF� `V '• `a ���� PHONE: (757) 463-5000 RESEARCH TRIANGLE NC RALEIGH, NC 27615 �j � • � • � � � • •' `J �� 09/20/07 (919)556-4310 P.O. BOX 14005 ZIP 27709-4005''yO,rr����,�I',i����\\\ DATE 919 361-5000 - I - PRORCT No. WDL-07023 PLAN & PROFILE PARADISE BAY BLVD. - STA. 38+00 TO 46+00 11 10TO PB SAN INI +L� A T T ���]�� ®L� SHALL TOWN rr w7.C"itil.L NORM CAROLM I WDL07023—P2 DESIGNED BY- MAD nopa���fi} t�V DRAWN BY: KAM Hoxiz. scmx: 1 = 40 EASEMENTS ADDED PER DWQ. �T SCALE: 1" — 4' Nz REVISIONS DATE: 8-21-07 _lllw� ® ® tt 00 Y� to / to fol®� Eli CD \ \ I( v N, loo _ 12+00 i +0 32 B B 2" PVC PRESSURE . SEWER LINE 2" G.V. AND BOX o W/CLEANOUT I I I ! A !1 EXISTING WETLAND Y J �m \ 16' DRAINAGE EASEMENT \\ / \ cp / x \ / a 01 / I® MATCHL�INE� SEE SHEET P 4 J J � � 12+00 / 61 4 x3" TEE (2) 3' G.V. AND BOX W/CLEANOUT / 196 3"x2" REDUCER 2" PVC PRESSURE \` \ — < SEWER LINE \ \ Pv w \ 22"" G.V. AND BOX W/CLEANOUT ' \ (49y I I PARADISE BAY BOULEVARD r � t 1 1 I t 1 3 I I I i \ \ 39 1 t 1 3" PVC I t l PRESSURE LINE I \. 13+00 / \ \ / N F.H. ASSEMBLY a v/ CL fY / 10 OO _ 3+00 4"x3" TEE (1) 4" G.V. AND BOX W/CLEANOUT (1) 3-x2" REDUCER (1) 2- G.V. AND BOX W CLEANOUT I / I r 17 IF l 4"1 PVC o PRESSURE j 1 — \\ 1 S WER LINE 2" BLOW —OFF ASSEMBLY '8"x6" TEE LADERA DRIVE (1) 8" G.V. (1) 6" G.V. 2" G.V. AND BOX 2' PVC W/CL.EANOUT PRESSURE _ - - ER—LIN •+ rn a ,6 I Q I I- � II I I� 16 I I 16 I h I 16 I 1 I I t I I GRAPHIC SCALE 40 0 20 40 80 i 1 1 inch = 40 ft" .t.1 P c 35 35 I _._ ._ _ I 1 E l 30 25 & o --- —_ EXI _�..®0 NG CENTERLINE I ow —POI t A-_---.49+8.1�1 tt 1 t : i 25 n _ 4 EXISTING 9 GRADEPIA LOW POI ELEV = 13.58 , _ RI HT ; PVI E = 13 .67 41 E Q, t 3 g ! I K,= _ 37.001 t; � r- �o M — — 4 I EXISTIN GRADE ( (i 1 _ � � { + a '- r- t ! in t 20 , ' a0 "' ! n a 11 4 20 + CD } cD J I i �cwi co +� E`1 +n Locn I 4 #` uj 15 � __ 1 t _Q.89% I 10 Og6 .. 1 1 ' 1 i SEWER E. 3 I PRESSI RE SEWER LINEui / t -- • j N 10 `. :env i t Lo tt t I " I 3 1 - RC I 1 t iINV IVIN=980 OUT=759I I { I 5 0 i 1 0 B� •-fT - 1n to dtt7 N to �N to M^ N to to CO O tf) CO 0) O 00 �O ID 00 M 00 1n M IN tD M N 00 M P^ O Nn t7 d' •- to O zd I 1 r- i 46+00 46+50 j, EASEMENTS ADDED PER DWQ. 09/20/07 REVISIONS DATE 47+00 47+50 48+00 48+50 'ilN 49+00 49+50 SU+UO 50+50 51 +00 51 +5U 51 +70 WA EL D.. SANDLER AT SHALLOTTE,LLC DEVELOPMENT COMPANY 448 VH NG DRIVE, SUITE 220 VIRGINIA BEACH, VIRGINIA 23452 3209 GRESHAM LAKE ROAD, SUrrE 160 PHONE #: (757) 463-5000 RALEIGH, NC 27615 (919)556-4310 THE JOHN R. McADAMS COMPANY, INC. ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 1'�� may`•. '�•S Ap �03105 c� . FiIjGINE�P �✓ PROJECT NO. WDL-07023 Fn,ENAME` WDL07023—P3 DESIGNED BY: M A D DRAWN BY: KAM HORIZ. SCALE: 1" = 40' VERT. SCALE: 1" = 4' DATE: 8-21-07 0 I I N I I1 159 u 160 1 I / 6l A-00 I I all I I I 11 1 t i.. i � f / � Ia 11' 158 i e `1 ut I 1 '1 1U+5U 11+00 11+5U 1z+UU 12+50 13+00 13+50 14+00 14+50 PARADISE BAY BLVD. - STA. 46+00 TO 51+25 LADERA DRIVE Lft__vAlfkvmFw]ff AI 15+00 15+50 FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION SHEET NO. P- TOWN OF SHAL NORM CAROLINA I LLLS McADAMS PRINT DATE: e EASEMENTS ADDED PER M. 109/20/07 REVISIONS I DATE OWNER: OWNER: WAK&ELD. SANDLER AT SHALLOTTE,LLC DEVELOPMENT COMPANY 4748 VIIffNG DRIVE, SUITE 220 or VMGRUA BEACH, VIRGRRA 23452 3209 GRESHAM LAKE ROAD, SutrE 160 PHONE #: (757) 463-5000 RALEIGH, NC 27615 (919)556-4310 THE JOHN R. McADAMS COMPANY, INC. ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 3-1365 N° VGINE�' PROJECT NO. WDL-07023 I=IAME: WDL07023—P4 DESIGNED BY: MAD DRAWN BY: KAM ]ROM. SCALE: 1 n c 40' VERT. SCALE: 1 " — 4' DATE: 8-21-07 I.ADERA DRIVE - STA. 60+00 TO 70+00 ■ •' uAN LIU—PHASE TOWN OF • NORM CAROUNA SHEET NO. I- McADAMS PRINT DATE: EXISTING WETLAND \ 440 — PVC PRESSUR \ / / SEWER UNE \ •GA\9*on F.H. ASSEMBJ_Y / o (�) \ k / 8"x8" TEE (2) 8' G.V. \ CIRCLE A 4n EXISTING WETLAND / / 4" PVC PRESS E SEWER LINE / �— 4" TEE \ / (2) 4" G.V. AND BOX \ ` W/ CLEANOUT I / 30 � I� m 1 40 3 35- ' 1 35 a Low POINT STA = 12+03.96 ( OW POINT ELEV = 22.38 - i ; PM STA = 12+20 00 j P%A ELEV_ = 22.06 POINT 24.18 1 ? f K - 20.92 r HIG ELEV = - _ , 80 PVI ELEV = 24.58 i 30Lo 30 _ K-26.14 V.C. _ 100.00' i a 1 p IPROPOSED! GRADE `n _ 4. i j 1I i g N i 25 25 8� \. I-1.15�j1 20 ' + E ; 20 f' p I / to rnM i v�, G RADE s ui y m ; _ RIGHT IXISTIN4 GRADE r I - i P 15 15 I 'tS i I f 10 10 3 I I [ i I ! 3 5 0 i 0 Z ,N M 0) to M st o t• In M �M m toiN im m N IM !N I0) N _ C N N N N C4 N N N IN N IN N 9+50 10+00 10+50 11+00 11+50 1• EASEMENTS ADDED PER DWQ. 09/20/07 REVISIONS I DATE OWNER: OWNER: A ELIjT,, SANDLER AT SHALLOTTE,LLC DEVELOPMENT COMPANY 448 VHaNG DRIVE, SUITE 220 of VIRGINIA BEACH, VMGINIA 23452 3209 GRESHAM LAKE ROAD, SUITE 160 PHONE (757 453-5000 RALEIGH, NC 27615 (919) 556-4310 12+00 ra 2" PVC PRESSURE 4"x3" TEE SEWER LINE (2) 3" G.V. AND BOX W/CLEANOUT (1) 3'x2' REDUCER / r \ Xryh \ 3' PVC PRESSURE / SEWER LINE 19 / do— / / / I 8"x8" TEE (2) 8' G.V. \ I � � 16 - II GRAPHIC SCALE 40 0 20 40 80 1 inch = 40 ft. 40 An 1 1 1 1 1 j i i I 35 i 35 F 7 i I 30 ; ----- 30- _.-� i 9 ) f i HIG A POINT ELEV = 1v .53 3 25 PV1 ELEV = 15.70 - Low LOB/ POINT EL.EV = 14.41 � � 25 k2570 _"` a F'S/i�STT =''mi.1"-FOD: --_-- K = 28.84 - PVI ELEV = 14.25 i K = �28.90 -- — � +� 4- ? V.C. _ 65.00' _ m d it O ! i 1 2( to M €t n p 20 _ <y� 0_ IL U� 3 p j on W m 1 151 r :I — ._' 1.4 —r. - o.ao% 15 ..10 ----m 1 0 — =I --- - -- -- 5 I � i 5 0 0 8 1p ai c� jin M dto N M E� n N O� tD to p 't d d l�� c0 �� OD p N in iti �� st ;Lo in THE JOHN R. McADAMS COMPANY, INC. ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 9+50 10+00 �\\�ot\wutt;aQA ^.ununtnr �i , •i � •.Q�,ESSip'••• �� S EA n �,,�• r GIVE ' S� '• . �0 13 10+50 11+00 PROJECT No. WDL_07023 FILEN"E: WDL07023—P5 ni�oNEn Hr: M A D nxAwx BY: KAM Hax>z. scALE: 1" = 40' VERT. SCALE: 1" = 4' HATE: 8-21-07 11+50 12+00 CIRCLE A STA 9+45.87 TO 12+50.00 CIRCLE B STA 9+42,30 TO 12+50.00 PARADISE BAY CIRCLE 44 / PARADISE BAY CIRCLE I u+SU 1 i +00 11 +50 CATT DT/l I 2" PVC PRESSURE I SEWER LINE 12+00 12+50 FINAL DRAjYING — NOT RELEASED FOR CONSTRUCTION SHEET N0. P-5 TOWN OF SHALLOTM NORM CAROLINA McADAMS PRINT DATE: ,t .c FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION OWNER: OWNER: PROJECT NO. THE J O H N R. M c AD AM S YELEPiAME: s No. WDL-07023 o��N�O �y c�/ y - WDLOMAD3-P6 PLAN 8 PROFILE SANDLER AT SHALLOTTE LLC 1p L COMPANY, INC. �' nE�GN� SANr-)TO WAK�MELD. 448 VII�NG DRIVE, SUM 220 = ` —�L � = nRAwx BY` KAM DEVELOPMENT COMPANY ENGINEERS/PLANNERS/SURVEYORS 31365 AY = '� C� McADAMS VIRGINIA BEACH, V>RGINIA 23452 + J HORiZ. sCALB: 40' PARADISE BAY BLVD S 3209 GRESHAM LAKE ROAD, sulrE 16o PHONE J: (757) 463-5000 RESEARCH TRIANGLE PARK, NC IN :�` VERT. SCALE: » RALEIGH. NC 27615 i / / P.O. BOX 14005 ZIP 27709-4005 D. BAR�o'�� NORM CAROLINA 1, EASEMENTS ADD® PER DWQ. � 20 �% (919) 556-4310 � � � 1 = 4 \ ,� PRINT DATH: REVISIONS DATE (919) 361-5000 DATE: 8-21-07 Y rllNal. ViNIIAV►IINU - INVI nr1Lr1El1!)r.L) run I.VIVJItCt1l,lll)IV OWNER: WAKEhELD. D E V E L O P M E N "r COMPANY OWNER: SANDLER AT SHALLOTTULIC 446 VIIffNG DRIVE, SUITE 220 VERGINIA BEACH, VIRGINIA 23452 PHONE �: (757) 463-5000 s THE JOHN R. McADAMS (� COMPANY, INC. ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709-4005 919 361-5000 ,,..o��N 0 RoZ;2. =�ti �.� s AL = 1365 q = 0 Fryc I NE� �, ,' i '-9 F D BPFt��.�`` '''''„,►IIIIW`` PROJECT NO. WDL-07023 PLAN & PROFILE ROADWAY DRAINA E SHEET N0. SAN RIO PHASE r�,,� • !r OF cU /� T MCi�iDAMS TOWN w7r11 �L NORTH GAROLINA PxnvT DATE: �xAiU: wDL07023-P7P-7 DESIGNED BY - MAD MAD DRAWN �: KAM HORtz. SCALE: , 1 = 40 3209 GRESHAM LAKE ROAD, SUITE 160 RALEIGH, NC 27615 (919)556�310 VERT. SCALE' n 1 = 4 EASEMEM'S ADDED PER DWQ. 09 20 07 / / DATE: 8-21-07 REVISIONS DATE z FINAL DRAWING — NOT RELEASED FOR CONSTRUCTION OWNER: WAK&ELD DEVELOPMENT COMPANY OWNER: SANDLER AT SHALLOTTE,LLC 446 VHONG DRWE, SUITE 220 VIRGINIA HEAcx, VIRGINIA 23452 PHONE #: (757) 463-5000 THE JOHN R. McADAMS COMPANY INC. ENGINEERS/PLANNERS/SURVEYORS RESEARCH TRIANGLE PARK, NC P.O. BOX 14005 ZIP 27709-4005 (919) 361-5000 � .••"�"��•. ,.`���� c` 0Z;--., �0 .7 �,� ti� _ AL = - 136V `l. xA = - r ;'1'GF- �'�� �, _ � D. BPR��`�� '' '� PROJECT NO. WDL-07023 PLAN & PROFILE ROADWAY DRAINAGE SW�►LF.S - ALONG LADERA DRIVE S� RjQ PHASE 3 TOWN OF cu A T w711t�L NORTH CAROLdNA sir N0. -$ NiMcADAMS PRINT DATE: �ENAME: wDL0MAD3-P7 DESIGNED BY:w DRAWN BY: KAM 3209 GRESHAM LAKE ROAD, SUTI'E 160 RALEIGH. NC 27615 (919)55&4310 RORIZ. SALE: = 40' j. EASEMENTS ADDED PER DWQ. 09/20/07 VERB,. SCALE: „ , = 4 REVISIONS DATE DATE. $-21-07 to am -i a n__j wz �>� s� zm t� tii d Z C 848.05 m -i D�C7p r� n 27 20- > sv.m ZM-vp-n MOM Z W 0 Dr7 848. 11buMLIMIG VIEW N01PS: f. aCIE6 mu upauKO mrra smu OOVCR r-o• u3cnr.4jv ruu WIOnr Or nit RAMP ELBQt A5 SHE(: 6N THE OE7AIL8. 2. OWTAIN 709 CeNTRAST VISleI6ITT AWOENrNS affACE, ElniR LIOHT-aW-WAR, aR DARN-(N-LIMIr SeMO (x aO MNS THe eM t RArf. RAIa WM AMA IS TAMMU I _i_TMHiWpSPr TO�i- Ci Q� or ni, a+a ti� f7 co. n co) W a k �TFirrnE 9.O! t 7 00 04 ��- 1 MA:. Rrar s ySECTION 8-8 / nlxtsrraar �. % tFAlesM011 k Tr6 F)ZUMt -12! 1 - K812 nF_Y SECTION A -A EXPAIMUN JCM (SEE M. $a.(" ff / t TRIG PORT OF (Su NOTE 131 NOT>:: A Poarta O>: rlrl ON roTx RAEOI y "T Vam aims E THE iffnm. EYP� 1 T-� b 6DJFi'¢k B • DISTM= FEd FlOQ 1W CF StOM" TO SAM i•OMT OF 1211 (e.M) Q"f. -� �` •• EACR OF ImEEPAX S" MEMnF awr PLAN VIEW 8IDer" MOPED 0.�. DETEI ABBE iMARl��NC GG S A0lff a` WII NOTES: i. CONSTRUCT THE WALKING SURFACE WIT" SLIP RESISTANTANCE AND A 70% CONTRASTING COLOR TO THE SIDEWALK. 2. CROSSWALK WIDTHS AND CONFIOPATION VARY BUT MUST CGFIFORM TO TRAFFIC DESIGN! STMMAROS. 3. NORTH CANUM GENERAL STATUTE 138-44.14 REWIRE$ THAT ALL STREET CURBS BEI40 CONSTRUCTED OR RE£BRSTM CTO FOR MAINTENAACE PROCEDURES. TRAFFIC OPERATIONS, REPAIRS, CORRECTION OF UTILTIES OR ALTERED FOR ANY REASON AFTER SEPIMMER 1, 1973 % li PROVIDE iHEELCHAIR RAMPS FOR THE PHYSICALLY DISABLED AT ALL INTERSECTIONS MERE BOTH CURB AND GVrTER AND SIDEWALKS ARE PROVIDED AND AT OTHER POINTS OF PEDESTRIAN FLOW. IN ADDITION, SECTION 228 OF THE ISM FEDERAL AID HIGHWAY SAFETT ACT REQUIRES PREVISION OF MTM RAGS ON ANY CM oWSTRWTION AFTER JULY 1,1976 WHETHER A SIDEWALK IS PROPOSED INITIALLY OR IS KAMM FOR A FUTURE DATE. THE AMERICANS WITH DISABILITIES ACT (ADA) OF 1M E7MNIO9 TO INDIVIDUALS W1iT14 DISABILITIES. COMPREHENSIVE CIVIL RIGHTS PRUTECTION3 SIMILIAR TO THOSE PROVIDED TO PERSONS ON THE BASIS OF RACE, SEX, NATIONAL ORIGIN AND RELIGION UNDER THE CIVIL RIGHTS ACT OF 1984. THESE CURB RAMPS HAVE BEEN DESIGNED TO COMPLY WITH THE CURREAT ADA STAND",;=. 4. PROVIDE WHEELCHAIR RAMPS AT LOCATIONS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. LOCATE WHEELCHAIR RAMPS AS DIRECTED BY THE ENGINEER WHERE EXISTING LIWTT POLES. FIRE HYDRANTS, DROP INLETS, ETC. AFFE£T PLACEb*M. (THERE TW7 RA1@3 ARE. INSTALLED PLACE NOT LESS THAT% 2 FEET OF FULL HEIGINT CURB BETWEEN THE RAMPS. FLACE DUAL. RAMPS AS NEAR PERPENDICULAR TO THE TRAVEL LANE BEING CROS8£D AS POSSIBLE. 5. PAY FOR ALL VARIABLE DEPTH CONCRETE USED FOR CONSMCTION OF WHEELCHAIR RAMPS AS CONCRETE WEEECHAIR RAMPS. (SO. YI•S.) 8. PAY FOR ALL DEPRESSED CURETS AT WHEELCHAIR RAMPS AS THE TYPE CURB AND GUTTER GM AWACENT M DEPRESSED CURB. (@N. FT.) 7. SUCH PRICES AND PAYMENTS IS MMIME13 FULL COMPENSATION FOR ALL MATERIALS, LABOR, EIUIPMERT, TOOLS AND INH;IDEtiTALB NECESSARY TO SATISFACCTOSITLY COMPLETE THE WORK. 8. DO NOT EXCEED 0.08 (12:1) SLOPE ON THE MEELCHAIR RAMP IN RELATIONSHIP TO THE 6RAriE OF THE STREET. 9. CONSTRUCT WHEELCHAIR RAMPS 40" (3'-4") OR GREATER FOR MAL RAMPS. 10. USE CLASS "8" CONCRETE WITH A SIDEWALK FINISH IN ORDER TO OBTAIN A ROU13H NON-SKID TYPE SURFACE. 11. PLACE A %" EXPANSION JOINT WHERE THE CONCRETE WHEELCHAIR RAMP JOINS THE CURB AND A9 VMWN OR STD. DW, S48.01, 12. PLACE THE INSIDE PEDESTRIAN CROSSWALK LINES NO CLOSER IN THE INTERSECTION BY BISECTINGTn IRTEASECTION RADII, WITH ALLOWANCE OF A 4' CLEAR ZONE IN THE VEHICULAR TRAVELWAY MEN ONE RAMP IS INSTALLEE. (SEE NOTE 17) 13. COORDINATE THE CURB CUT AND THE PEDESTRIAN CRg&tW t LINES 90 THE FLOOR OF THE WHEELOWR RAMP WILL FALL WITHIR THE PEDESTRIAN CROSSWALK LINES. PLACE DIAWRAL RAMPS WITH FLARED SIDES SO 24" OF FULL HEIGHT CURB FALLS WITHIN THE CROS31111ALK MARKINGS ON EACH SIDE OF THE FLARES. 14. CONSTRUCT THE PEDESTRIAN CROSSWALK A MINIU MI OF 8 FEET. A CROSSWALK WIDTH OF 10 FEET FR GREATER IS i3ESIRABLE. IS. USE STOP LINES NORMALLY PERPENDICULAR TO THE LANE LINES (THERE IT IS IMPORTANT TO INDICATE THE POINT BEHIND MICH VEHICLES ARE 406IRED TO STOP IN COMPLIANCE WITH A TRAFFIC SIGNAL, STOP SIGN OR OTHER LEGAL REQUIREMENT. AN UNUSUAL APPROAM S1rfEIE MAY REWIRE THE PLACEMENT OF THE STOP LINE TO BE PARALLEL TO THE INTERSECTING ROAIRAY. 1B. TERMINATE PARKING A MINIMUM OF 20 FEET BACK OF PEDESTRIAN CROSSWALX. 17. PLACE ALL PAVEMENT MARKINGS IN DANCE WIT" THE LATEST EDITION OF THE MANUAL OF LWIFORM TRAFFIC CONTROL DEVICESS (MUTCD) PUBLISHED BY THE FEDERAL HIGHWAY ADMINISTRATION AND THE NORTH CAROLINA SiIPPLEMENT TO TiE Mt7TCD. 10' UTILITY & SIDEWALK EASEMENT 50' R.O.W. 40' FRONT OF WALL 2' 31, B-B 7' LAWN 2' ^ GAP 1.5' 4' BIKE LANE 10' LANE LAWN I 10' LANE IIV BIKE LANE GAP 15' SIDEWALK I 1 3 0 0 p HIGH POINT AT c�+ 1/2 /� 1 4'/FT 1/4 /FT ROAD CROWN 12'/T 1/4', .a 4' MIN EXISTING WETLAND GRADE COVER z v vu En H- 6 < -t o�Z-cn)'wa 4QJ cz F Od Sim Lr bin LkI d CD d ' �i�lt m Z 'c -t Fi ISOMETRIC VIED( ' z o m t7} fl� -------------------- r--------------- ELJ�ttZr' FIiZ s-4 -- - - - - SECTION B-S ut-silt-Zo40 CO o+mD �� Z >�D _ __ --_ `_ --------�-ter WANUM PF�Rtl5Ft1 - ' OGW3 ; g SECTION A -A � p 26 F I it I t r ` e r, r 2c MQ-1 Z Ii I I eosL Z do a Q d P4 s 33v M 0Lga Ch r f aad D �° � d d u d .R at- �Na ` ` xu r sr - I!S IO �"• • E _ to PLAN VIElY CGAL RIBS 2 OF 4 ANY MBII (ao• rnt- FEOOC W10TN) tS. 05 z PAVEMENT 0(n Q (Sj� Z 1/8' RAD. 9" 9" 3 4' RAD. " PAVEMENT SURFAC QQQ 9=40 z1o00 1/2' RAD 6" 2'-0" _ - SURFAC 1 8" RAD z�� .•+ov aZTr�cn 1 8" RAD. 1 4' RAD. �j c°tsiZ m -i�D 3" RAD. 1 8' RAD.io ooaO�z P- O b7 Z D ;o' 1- CJ Q LL < Z� Z�cn00 I :o:. a .v :':o:'.'a'.v�:'.o: •'a'o�:.o.'•'a . O� C :'; 1' Oco < cr-0 Tn� M�=Or o• . o• :v: c� 1 3 4' LJJ RAD cnI_z-' rp p vl * 70Z 1 3/4" RAD. .°- o cKL` p< Z rf D-fD 2'-6" 1'-6" p': • • Oo� ja (cno 2'-6' CURB AND GUTTER 1'-6" CURB AND GUTTER Zao fn z w 8"X12"OR18" 9"X12"OR18" o PROPOSE D CONCRETE CURB CONCRETE CURB 4'-0' EDGE OF 2" 2'-0' PAVEMENT AD, 2'_O- 8Ile. - 1 8" RADIUS Z4- 2.1 17- O tL DO Ml�l•:: Lt_ wz SHOULDER BERM GUTTER g" �- O I~- w H Q _ Z H � M (n 8" X 6" MEDIAN CURB VALLEY GUTTER Q CD 0 C rn z SECTION VIEW OF CURBS OR CURBS AND GUTTERS o m CD c1 Ty u CO C� D ocif :D GENERAL NOTES: 3/8" x 1" DEEP o U m � Oj 0 0 -CONTRACTION JOINTS SHALL BE PLACED AT 10' INTERVALS, GROOVED OR SAWN 1 Z P- ctf G7 � JOINT TO BE FlLTD Q 1-i-1 W EXCEPT THAT A 15' SPACING MAY BE USED WHEN A MACHINE IS I- W C D USED OR WHEN SATISFACTORY SUPPORT FOR THE FACE FORM CAN WITH JOINT SEALER JOINT SEALER (n LL1 U -i C z BE OBTAINED WITHOUT THE USE OF TEMPLATES AT 10' INTERVALS. 1/8" RAD GUTTER = p J M -i O -JOINT SPACING MAY BE ALTERED IF REQUIRED BY THE ENGINEER. .a . �8� RAD PAVEMENT SURFACE (n C) Z CONTRACTION JOINTS MAY BE INSTALLED WITH THE USE OF SURFACE O Q z171p TEMPLATES OR FORMED BY OTHER APPROVED METHODS. ;o• o. a N p o '� x NON -TEMPLATE FORMED JOINTS SHALL BE A MIN. OF 1 1/2" DEEP. o '' v,' :�:;v.: :? :� p:: ';o'• ';o'. .-;v' G .. C .o,• a .' a .' :o,. a . .p.' a LxJ Li -ALL CONSTRUCTION JOINTS, EXCEPT IN 8'x6" MEDIAN CURB, o. - o 0 0 o SHALL BE FILLED WITH JOINT FILLER AND SEALER. PROPOSED -EXPANSION JOINTS SHALL BE SPACED AT 90' INTERVALS AND CURB & GUTTER PROP. 1/2' JOINT FILLER ADJACENT TO ALL RIGID OBJECTS. JOINT,/,. PAVEMENT LONGII r" C *+ * Al TRANSVERSE EXPANSION JOINT IN CURB AND GUTTER W-LT 4 O 44 EET 1 OF 3 848.05 846.01 '=:LCTIOt�..v'EW OF JOINTS g46 01 0 oyz M Pq Zt'tf► FI �: W aITESTAeLI M(Dsfl DE1Ee SOU eM R 7-0- UMM AND RrLt -10, Or TIC RAM rLOM AS � a THE a.TAILS. v tXt �"♦ tit 2. 6WTAI11 7(A CaHTRAIT viellELrn WITH A0Ja3L'10 IIJIFACEL E:ITFEE L101fT•Qt Q11M, oR Mrr(-alf-EIlfr !>W LUM COvmrn TM ENTAIL PIMP. �✓z_ 2 p C 0mCC 69 n t7 oil oa. werx ,aIEA 0;VANOM AI= zwM a c�wo O @ V U 0 as Trl v q J m z M 0 O O v d, O C�3 z 0 low V7 _ .� rEEtAQri3 MET 1 0F'4 -ee 2of s DmGTmE. WXRNINS, ImIt 848.05 84'8.05 a ypq} M 0'U WATER LINE SANITARY SEWER LINE-/ ELECTRIC CONDUIT TYPICAL SECTION AT FULL -SPAN TELEPHONE AND CULVERT ALONG PARADISE BAY BOULEVARD CABLE CONDUIT NO SCALE (LOOKING NORTH) 10, UTILITY & SIDEWALK EASEMENT RAILING (TYP.) .)L,` `� �:, JOLT _ -- - - - - -� J t-i W Q F • to r- a - TM2 PORTION OF WMP� win 12) IL off p PLAN VIEW PTJVQALAL KAM (60" SIN. FLMR WIC1)4i .05 SEE MOTE 4 STO - E.IRE iAl&+lla JS.i t....:.:. '^ ..:a <lC ROACIM(7 =KwT PYl7i s.Tm � PWt s7rlbL F Fa Pry L-76R,� _J »iH.aNAIE f9� PROMM WHEEL01AIR RAMP PROPOSED OR FOURE SIDETULK AIA-01EABLE LOCATIONS ................... DUAL RAMP RADII ........... ANY z m 61'i W" OB%iZ uj�t,:, fr 1!- 0m03- Z 7 I d11 LuC9 d . C W O ry w z `i HJ •r � x," O zU1 o �"4 W ►W-7 N Z W z d its O N U w �Xto z W . MOM reeeeerli l u rrhr 't I� CA 04 AL � = . 36�,° - rrrrunrie o= 13 n. 0 0 w O CV m Z Fes- O Z O N o 5 a W w U N to EEcq '- O w -aa I c7 � En 5 � z W " M W �-( �✓ z w z x rcoO. W ��5 i� z z a e W � F u °Go 4 a w� O � v a o W > Q co A �o o z� PRMCT NO- WDL-07023 FnENAmE: WDL07010-DT DMGNgn BY: MAD DRAWN BY: KAM SCAIE: AS NOTED DATE' 8-21-07 SHEET N0. D-1 FINAL DRAWING - NOT RELEASED FOR CONSTRUCTION o U � Z D �_O�;Cn r- Z --i D =�Dc7m zn =cn;�O0 ZO-UO-T1 n-roz nDD 0 z -n 0 �J ITl O Z m C -tl Z O 0 rn/^�� l J I rTl V D C) Z m D CA � m Z_ Z Z O C7 ::E 0 m 2 838.22 9 I� 1'-1015pr nw - 3'-10' TWOPIPES a THREE PIPES T4- t/s 9. 7 9 3/15 10. rj 1 PLAN I6.-2' TWO PIPES 23 -10 THREE PIPES iv 2-Vl 0 V-4 Cy STR. FACE O� T F —7—RI T T2 OF T3 TOP & BOTTOM T5 O 6' TOP & BOTTOA' 6 SPA. 0 9" 2' BARS IN TOP OF FOOTING Zt Z2 5 SPA. 0 9' 2-N2, 2-N3, 2-N4 SEE STD. # 83&4.5 FOR GENERAL NOTES. 10" 2- FILL FACE 2' T-N-09- .r 'H' 0 3'-0' SECTION - BB 2 OR G3 t-N1 O B' FILL FACE If«- Vi STR. FACE N yNj -2-82 o tt a -3' DRAINS SLOPE ABOVE {6 FLOW LINE �lCONST. ,1T,., I 2-83 -et TAPER DETAIL m Nj O 8" FILL FACE m ,-I 5 SPA. 09' FILL SP 9' STR CE 2-N1 2-N3 2-N4 a z z z Ht ' "� 4'-11' H2- 2'-11' 1'-1' I._..I "H" BARS -�! "N-" BARS 'H "N', & 'Z' BAR DIMENSIONS ARE OUT TO OUT. FACE 2-HI, 1-H2 3 SPA. 0 1'-2' FILL H2 Z7 3'-5" FACE 3-Hi, 1-H2 SPA. O V-6' FILL FACE Z2 3'-0' N2 1 Y2, 1-V3, 1-V4 Z3 2°-7" N4 6' 1— HK. V4 "Z" BARS N NT4 'r WING ELEVATION CONCRETE CURB & GUTTER SCALE: NTS T4 T4 �d L N SECTION — AA z 0 U) t= y. Q Q = U o oa-oz ftU)= WQz = I,-O<L Co Q (r0- ~ _ F- J 00< Z 0— 0 W 0 3-1 J W J Y Q U) Of O Q 0) Z W I Z LEI D< P p LLJ -0 � U � Z 00 J Z U a- V) Q W = U � � W mom Z LL- D w Z 0 w 0 L� 838.22 A B A B A B A B A 00 o 0 r ELEVATION PLAN A B (PIPE DIA.) HEADWALL LOCATION ft.) (in. PARADISE BAY BLVD 1 1 1 24 HEADWALL DETAIL 30' VEGETATED FILTER STRIP (GRASSED) W W W W W W W W W W W W W W W W W W W W 3-FOOT WIDE LAYER OF #57 STONE `" 4, w (4-INCHES DEEP) UNDERLAIN WITH W W W y W FILTER FABRIC W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W � REINFORCED CONCRETE FOOTING LEVEL SPREADER 3" SOLID MASONARY BLOCK LIP STUBBED ABOVE GRADE 24' STANDARD 24" SPILL ROLLED CURB CURB —DROP DETAIL (ROLL CURB) 24" RaL CURB AND GUTTER B-16 10' SOLID MASONARY BLOCK LE\!EL SPREADER 6-FOOT WIDE (1-FOOT DEEP) TRIANGULAR CHANNEL ® 0.00% SLOPE LINED WITH LANDLOK TURF REINFORCEMENT MATING 450 D MASONARY BLOCK - CHANNEL SHALL BE LINED WITH LANDLOK TURF REINFORCEMENT MATTING 450 AND SEEDED PER SEEDING SCHEDULE (SEE LINING ANCHOR DETAILS SHEET PD-1D) 6' i (—IIII I —III— 8" (TYP) 1 8" 1 1- 3 I I I SOLID MASON Y BLOCK 3 -I iII II- �IIIII�I- III REINFORCED CONCRETE FOOTIN 2Ti- UNDISTURBED EARTH 4" -� CROSS-SECTION 12" (3) #4 REBARS CONTINUOUS #4 REBAR @ 18" O.C.__l 8" (TYP) F12" 8" a � . 3" (TYP) a 4" 24" 2" DEEP CONTINUOUS KEYWAY FOOTING DETAIL GENERAL NOTES: 1. CONSTRUCT CONCRETE LEVEL SPREADER LIP ON A ZERO PERCENT GRADE TO ENSURE UNIFORM SPREADING OF FLOW. 2. LEVEL SPREADER SHOULD BE CONSTRUCTED ON UNDISTURBED SOIL, AND NOT ON FILL 3. THE TRIANGULAR CHANNEL SHOULD BE CONSTRUCTED ON A ZERO PERCENT GRADE. 4. THE TRIANGULAR CHANNEL SHOULD BE LINED WITH LANDLOK TURF REINFORCEMENT MATTING 450 OR APPROVED EQUIVALENT. THE TRM MATTING SHOULD BE ANCHORED PER THE DETAILS PROVIDED. THE TRM MATTING SHOULD BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 5. THE 3-INCH LAYER OF #57 STONE SHALL BE UNDERLAIN WITH MIRAFI FILTERWEAVE 400 OR APPROVED EQUIVALENT. LEVEL SPREADER DETAILS T. S. SIN=1 DRAWING — NOT RELEASED FOR CONSTRUCTION U um �Ny o U 0 Z I cq zN P 0 p t; z w o rn J'°e'eee ►s{����o' f ' 4� 3�3652�v ,sD. " 'if1►/1►eee`, W a. 0 h Wo o�l Q04 0) �0 Z Z Li ci W o V) w W a � w E_ j4 �i Z G*] o <C z la o o J ova 0 nib4 EQa. V? � W 0 a W > m co a O W 00 PROJECr NO. WDL-07023 1�H.sNe>m, WDL07010-DT DESIGNED BY' MAD DRAWN BY: K AM SCALE: AS NOTED DATE: 8-21-07 SHEET N0. 2 aMeADAMS