Loading...
HomeMy WebLinkAboutSW8000420_Approved Plans_20000418 1442 1443 1448 1450 1443 1445 S-BORO 1444 / 1446 1476 1434 ,, 1512 SITE -. „4„ ,„, 14321 CENTERLINE CURVE DATA ac 2° 15os 1 1551 I510 1552 r a 1579 3 CURVE RADIUS TANGENT LENGTH DELTA CHORD CH.BEARING DISTURBED AREAS: 1a3I QUEENS CK. F C-I 230.00' 17.64' 35.21' 8°46'16" 35.18' N 47°40'24"E I) LOT 7 (ENTIRE LOT) = 1.55 ACRES 1550 3 .4I C-2 592.97' 80.70' 160.41' I5°30'00" 159.93` N 44°l8'32"E 2) R.B.O. I (ENTIRE LOT) = 1.04 ACRES 1576 1508 1 '46 3) R.B.O. II (ENTIRE LOT) = 104 ACRES 1428 1547 1503 �4' 4) STOCKPILE SOIL AREA = 0.7 ACRES 1565 ♦ 1507 Q RZW CURVE DATA 5) THREE (3) SWALES SOUTHEAST SIDE ROAD: 851 ' X 20' = 0.4 ACRES _, �� QG 6) FOUR (4) SWALES NORTHWrST SIDE ROAD: 965' X 20' = 0.44 ACRES 1744 1501 c~n 6p�, o CURVE RADIUS TANGENT LENGTH DELTA CHORD CH.BEARING ONE SWALE: 270' X 10' = 0.06 ACRES 1566 cp 1503 1502 H O `t NC 172 ? C-3 562.97' 76.62' 152.30' l5°30"00'" l5/.83' S 44°l8'32'`W 1so5 ,4 C-4 260.00' 19.94' 39.80' 8°46'16" 39.76' S 47°40'24"W 144 504 TOTAL DISTURBED AREA = 5.24 ACRES , S VICINITY MAP-NOT TO SCALE TIMBER a AGRICULTURAL USE p54.4o 784.55,1 N 35.54'j2"E - w- - - \ RESERVED BY OWNER �_w �w- a W�-W \ \\ \ \ \ 167.01 N c� 0000 CD \I •N 5/° 5'38"E 968.00' . I p2 g3` \ce‘a STOCKPILE SOIL AREA 0 I • 0 CD 284.36` 166.54' cnI66.54' 150.00' 134.01' 66.55' v,cn cn WOOD LINE cn N PTO BE CLEARED) ¢ ¢ N \(3L'1 cv I L \moor; ?;' (ti z cn a'� �N �0) 0 0 I \,,,„ 10 N 0.89 ACRES `�'w w�"�w N u' ti IN N IN) O m TEMPORARY CUL-DE-SAC 2 /6+51.35 N R.B.O. I N R.B.O. II N 8 N 9 Voim 0.90 ACRES \ NO1.04 C S OO �' N311.56 ACRES Nw ARE �W 1.04 ACRESw0.94 ACRES �'`� 1.02 ACRES ,• :« /. - o cP 40 I 'co co �0 (Di.) , rAi.s., N '` ' - A RESERVED BY OWNER (TO BE CLEARED) ,4, .\, ,,, EXISTING 18" X 42' �; 167•�{"'• ,� :+. s• �;. N/F ONSLOW COUNTY 1 � I �a No \ 5 PLASTIC PIPE ++� :t .26033'30 �s��i h s '+.+' BK. 1142, PG. 301 N 1 S,OO��.F. N [� 12+70.36 +�{,+•S s/s, R_35 ,3 '°33' E R in 5,000 S.F. I _ '''' -,1_ \ EXISTING /8" X 42' <n BLDG. N 36 .69 NATURAL OUTLET _ii ,Z \ F-- PLASTIC PIPE 2 3+70.46 ; {t I67•�/s/' N 96 N cn cn cn CHECK DAMS 51.6 I 1 s _-s-- _, -"S/S ,� �. x x \ S 43°1 7'16"W 5.91'.c \ , I :. , ;`�'tY, ���•' �,` , 4 s I C-4 /68.36' "•.•',` 166.54' •t S 52 0332'W/66.5 • . 150.00' ,�+,' C-3 sI /- \ +IO 1 s/ & S • ",,,„ s S • + PTco •. '\ S___ 5 - --+'c 1+ PT 3+98.56 SETH THOMAS LANE (60' R/W) PRIVATE PC l0+50 + c 2 ---- _- . i irn S _-_-_ _--���5: ,�-S S S S S S S S S S S S 5 -�5 N W • 0+00 �a�s --- sus-s v i.x w \ ___ s I �' a, 7 CONSTRUCTION SEQUENCE: NATURAL OUTLET v y CI Ox• Z 1.99 ACRES / I) OBTAIN SEDIMENTATION & EROSION CONTROL APPROVAL BEFORE m \ \ 1.54 ACRES / ANY LAND DISTURBING 1 1 "O: 2 o ® I / I ACTIVITY BEGINS. o\ c O `� o O �' -. ;#, \1.44 ACRES .� UL / 2) NO CONSTRUCTION ENTRANCE IS NECESSARY BECAUSE THE ROAD IS COMPLETELY " \ \ "' m m ''+a,,*` \ w 1/ ROCKED. m o O / 18.3" w� I �, 1� • 3) BEGIN CLEARING OPERATIONS, EITHER BURNING DEBRIS OR HAULING TO APPROVED N F DESJI, LLC ' RESERVED BY Oi�NE' 2.03 ACRES \ ",,,Q DUMP SITES. \ cP \ BK. 1469, PG. 934 \ PETERSON & LAWSON SUBDIVISION o 4) COMPLETE GRUBBING AND DISPOSAL OF BIODEGRADABLE MATERIALS. % 5) IMMEDIATELY SEED CLEARED AREAS ACCORDING TO SEEDING SCHEDULE AND SEEDING *1 SECTION I I 1.81 ACRES N w 4. Q. Q °�' SPECIFICATIONS. ,-.....\ m M.B. 38, PG. 56 / \w Q �� \ \ / \ / uL �� ti 6) PRESENT EROSION CONTROL MEASURES AS PER PREVIOUSLY APPROVED PLAN TO \ I \ I Ca wL � REMAIN UNTIL NEW DISTURBED AREAS ARE COMPLETED. .a, 7) CONSTRUCT PROPOSED SWALES AS SHOWN AND INSTALL CHECK DAMS. \ ;+ \�� v' CHECK DAMS N / \ oh`� 8) SEED ALL REMAINING DENUDED AREAS. a,++ \I 9) MONITOR SEEDED AREAS AND IMMEDIATELY RESEED AREAS THAT DO NOT ADEQUATELY \ / COVER THE,�,$ *it t ,H / DENUDED AREAS. n \ - I \w___w_ V W / \ WL -- WOOD LINE \ 83 3 1' • /\ 2 °5543 APPROVED I \ 8 NORTH CAROLINA ENVIRONMENTAL SEE S TORMWA TER PERMIT NO. SW8 s MANAGEMENT COMMISSION \ / 990833 FOR RESERVED BY OWNER & DIVISION OF WATER QMAUTY0,� \ I LOTS 3-5 APPROVAL. Dat•--VIOL MOBILE HOME PARK f &mew p kwatikagaLtia }RECEIVED RESIDENTIAL SUBDIVISION TIMBER BUFFER APR 1 8 2000 SHEET 1 OF 2 BFY: DDT STORMWATER PLAN & o�- N cARo�y SEDIMENTATION & EROSION CONTROL PLAN OF = oEEss10 'A Peterson Peterson & Lawson Subdivision ,-- 5631 SWANSBORO TWSP., ONSLOW COUNTY, N.C. 4 Ftic1NE�� SCALE: I " = 100', DATE: APRIL 12, 2000 `� P. M c1-EPr F LEGEND: , • l' ' ENGINEERING BY: SURVEYED BY: { - ' JOHN P. McLEAN ENGINEERING ALAN BELL SURVEYING, P.A. -CHECK DAM 106 MANATEE ST. 604E CEDAR POINT BLVD. SPECIAL NOTE: THIS SHEET ( I OF 2) SHOWS THE NEW AREA TO BE DISTURBED CAPE CARTERET, N.C. SWANSBORO, N.C. s s- -SWALE t 5:i) AND ADDITIONAL SEDIMENTATION & EROSIONCONTROL MEASURES. SHEET 2 OF 2 (252)-393-2219 (252)-393-6101 IS THE ORIGINAL APPROVED PLAN SHOWING THE SEEDING SCHEDULE, SEEDING . N cAR0 SPECIFICATIONS, DETAILS OF EROSION CONTROL DEVICES, ETC. WHICH SHALL o �oFESSfoNcil. APPLY TO SHEET I OF 2. , Q. 0 � ` 1 4E4T9e Q 100 0 100 200 300 i .0SUR`I N, � S ALAN gV� GRAPHIC SCALE - FEET FOR STORMWATER 8 SEDIMENTATION & EROSION CONTROL PLAN PURPOSES ONLY; NOT INTENDED FOR CONVEYANCE OF PROPERTY. JOB No., COGO FILE: 99235 GRAPHIC FIL LAYERS: 5,2/,28E.,60,62,699235E 3,65 1442 1443 1448 1450 �l 1443 1445 S-BORO CURVERADIUS TANGENT LENGTH DELTA CHORD CH.BEARING 444 1446 1476 1474 1457 / C-! 230.00' 17.64' 35.2/' 8°46'/6" 35.18' N 47°40'24"E 1737 1512 C-2 592.97' 80.70' 160.4/' 15°30'00" l 59.93' N 44°18'32"E .•:$ C/L RAW 6c 0' 432 SITE 5' 4' RIGHT OF WAY �� 2�L 1510 1509 1551 552 } / LEGEND: 35' 6' I ►� a 6` 22' WIDE 6" ABC �+ 6' 6' 157s w 3 `� • QUEENS CK. F.G.-FINISHED ROCK GRADE SHOULDER (NO) PAVEMENT SHOULDER DITCH 1 43 1 I. SLOPE AS REQUIRED I"/FT. 1550 3 -EXISTING GROUND ELEVATION X -FINISHED GRADE ELEVATION 1 .4s �,` -FINISHED SWALE ELEVATION 3• / 3- - 1 QF. S-SWALE 5�0 1576 1• PER FT. I/4" PER FT. 1508 \ 1428 1547 1503 4�5' ELEVATIONS BASED ON ASSUMED DATUM PLANE. 3 SECT I CV A -A S�OQE s65 dip � �'� \ 111 507 � 4 1744 1501 �� Cr CROSS-SECTION Awl 6 1566 g ' 46 RESERVED BY OWNER MIL' r c 17z 502 503 Z ��• \ RESERVED BY OWNER 1504 ' ► 1505 I \ 1 N/F ONSLOW COUNTY \ , ' ;/ ' s _.�`/� \ ; As��s/ I, r VICINITY MAP—NOT TO SCALE BK. 1142, PG. 301 " �� x ' x.7. 4 ` s/----- I R-s5• c3g�� • 1 7`,X 'a 'ZJ ` ,� ! 1 p 18 X 42 C.M.P. @ 12+70.36 � �' SD.$ �N '' 'GS M#''. waEC? T- � (Aj k__ ,r ?., 1� r ~ - 18OOc: r:/acre ` A t Ip�,,. ,_--'_sue TEMPORARY CUL-DE-SAC @ 16+51.35 (Z 7XZ 4 /S X 42 C.M.P.C,M,P, @ 3+70.46 r / , s 1 A� m "i s/.i" sue' ? �a S 1 F t'A? (g E s!, s-� s -s ems,. s s s s - s s-��s • s ' ' - "+ P T 12� "��� �L^ _� c t+ PT 3+98.56 SETH THOMAS LANE 60 R s -- 35 __ ( /W) PRIVATE PC 1Ot50 + _2_ " �� ; ��4I. N , -�� ___-- PC 3+63___ - -- . lad _t X r \ e Cross section Fi!:e• r rP • s --- _ -- ,. _s was-•-- -s-•&--sue-: s ra -s mac. s - -le--s s--1.---s- s _ s- to TEMP. �E1). 6ACIttC _- , s aw a 7 ' 0 0o rr s_ -._-__dos I _ C (' l- C .. )tS (`A r� F F ',r A I 1 �Zi/b �� NATURAL OUTLET SE.V• ('‘)EF: [TTA 1 1,-. ) CD \ X 1- tACI' ` CJ1 ED © ® 1.54 ACRES I � � a � � —�1�1_,111_1�11=� CL t i I E_. t - , o` ���1� [ T \ 1 44 ACRES RESERVED BY OWNER \ .� '`.�' wti.... III �S_J,"�,X E^�.y_"-r r,a3 L,, F 1 4' iil ti p'- 1 C) t �f3.✓ f 7 1c to 1 1 s.c1 s'':.: 1 — na,( N3'u, C3^ ' \ m ► S%JUrI 2.03 ACRES 3 r: BK. /1469SPG. 934 ` PETERSON & LAWSON SUBDIVISION RESERVED BY OWNER I SECTION I 1.81 ACRES I I Stone section ...._.,\ m M.B. 38, PG. 56 ,1 \ �: I A e rM�KAE:Y �?ED!M E 1�Z BETE KTl 0 t.1 EMIR aTAIL5 \ \ — -� SEDIMENTATION' & EROSION CONTROL PLAN OF: ) � � ' / �r I % Peterson & Lawson Subdivision cz 1 . _ a _) SEEDING /.SC:HEDULE \ i ,, FABRIC. SWANSBORO TWSP., it \ /_� y- t t4 F A,;� r All disturbeareasc,ithin Peterson & Lawson Subdivision ONSLOW COUNTY, N.C. �� Date / Type Planting Rate \ / ��EAN w) j1 tE� -�_.N EU • Of5TE HORIZONTAL SCALE: 1 " = 100', VERTICAL SCALE: 1 " = 4' . it - . Mar / Apr 1 Fescue 20 I 4, 4r - SEEDING SPECIFICATIONS L>isitT5ED 4I & = i Y:) 1_.f,�( = & . ; �:C.cer \ - . .I. 11, July 30 Hulled Bernruda;**rays I 12 Ibs'acre E ENGINEERING BY: SURVEYED L.0.„�- vlETip n f E;Xti--E 1,;, E-� ,� ., _ N. Apr 1 - Jul 1� STaN BY .I a° •.r �. y Sericea Lespedeza ;o lbsi'acre JOHN P. MCLEAN ENGINEERING ALAN BELL SURVEYING, P.A. • r i '� ;( rs F. 4 Sept - March 1 Unscarified Sericea seed .>0 lbs/acre 106 MANATEE ST. 604E CEDAR POINT BLVD. Spread topsoil, rake and remove all root mat, debris or foreign material, leaving,surface p: reasonably smooth and uniform , r r.!!. t .� fr , T '.r lLi ! lT C.'T11; IT august 30 March 1 Hulled rye o�r ,t 1 f_.r T - (,rain) > Ibs,acre r1i 1T S t Q,+ ' r i r(�?I C i� �-� q / 74. Ir E TT 1S R'D�', :l`�Jti1aledi CAPE CARTERET, N.C. SWANSBORO, N.C. Apply agricultural lime, (in absence of soil test use 3,000 Ibs/acre) Slopes (2:1} �.�r�=o Jr II �l g i 11 (2J52�-393"i 219 252 393-6101 eititrai ‘t.I�1-•'I�I���frr ', " �,�. ' Mar 1 - June 1 •i�t�ii�'d .911.41.AMir ,.� . ., . Apply seed on freshly prepared bed and cover seed sli;htly with cultipacker or other Sericea Lespedeza �0 Ib %acre �f� �- � . .46 seeding equipment ' cue 60 lbs./acre w` � and Tall Fes _�FILTEtZ a Y - —T Mar l - Jun(*rt Hulled Bermudarass I_ bs3:r_ Ili:�' -1 Mulch immediatelywith wheat straw or hay(at a rate of 4,000 Ibslacre ) August 30 - Mar I Hulled rye(grain) 25 lbs/acre FA�(�C- 1 ` Crimp mulch with anchoring equipment or with disk set straight �.. . ten.. "4. r , Additional information,is available for different grass varieties by consulting the local Soil ^-; .. ^ of .;, - f - gin, r � Conservation office in Jacksonville The seed schedule offered herein is sufficient for local l,I E C �Q I"1TA((�5 9 Inspect all seeded areas and make necessary repairs or reseeding within the planting areas 4 _ G �f44eesstissmort". A' � conditions Allow Sercea to reseed by not cutting until the fall season and plants are mature - r: s 't`", ltn v. ti ti , .5O' - - or 2 N sk N 6 N _ W 1 O t5 24 `_ T r� h IC C 2 r o► „ 24' -• . 2- I z ca,+1Li _ F.G. _ +O.O9 ,! �_ - - — n �+-'— _� • its I rn 0S S 1\ 5,4t � ,I,i � � - -.I 4 1 ti a ' 1 M1�F 1•O - S I - - t - - - 18' — 3 I u �'w v> T� - -` --' s ' CAI=CK DAMS,, z IAA ' n.a. EAR SIDE b cn - 4,F SETtc naor�A.S LAME. / .r.S7NC. PA 7r. G `` 14 1 V I to— /Z - IU - r. — - - _ G _ ti G° P2 P'OS C, = '_Z- _ _ _'C� W...(3ufrV`Z 15 G?_`..':_;; - �r 1 0 8 8 8 8 0 8 8 8 8 8 8 8 8 8 8 8 8 8 �E PORARY GRAVEL CONSTRUCTION ENTRANCE O N M , cD r\ co 0) O N n+ Ch t\ JOB NO., & COGO FILE: 99235 GRAPHIC FILE: 99235D PROFILE FILE: 99235