Loading...
HomeMy WebLinkAboutSW5240301_Application Form_20240614 IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. The Southern portion of the project lies within Phase II.Clean water diversions will be placed along proposed road right-of-way;temporary sediment basins will be placed at the low ends of the site and runoff will be slowly released in 3-5 days. The Northern/non-Phase II portion of the site is shown on the vicinity map;see plan for more information. 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑Approval of a Site Specific Development Plan or PUD Approval Date: ❑Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: n Coastal SW-1995 ®Ph II-Post Construction 3. Stormwater runoff from this project drains to the Neuse River basin. 4. Total Property Area:46.6 acres 5. Total Coastal Wetlands Area:0 acres 6. Total Surface Water Area:2.6 acres 7. Total Property Area(4) -Total Coastal Wetlands Area(5)-Total Surface Water Area(6) =Total Project Area+:44 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water(NHW)line or Mean High Water (MHW)line,and coastal wetlands landward from the NI-W(or MHW)line. The resultant project area is used to calculate overall percent built upon area (BUA). Non-coastal wetlands landward of the NHW(or MHW)line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area/ Total Project Area)X 100 =3.2 9. How many drainage areas does the project have?2(For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 I Drainage Area_ Drainage Area Receiving Stream Name Juniper Creek Beaverdam Cr Stream Class * C-NSW WS-III Stream Index Number* 27-86-6-2 27-86-11-3 Total Drainage Area(sf) 703,926 1,793,052 On-site Drainage Area(sf) 571,112 1,459,545 Off-site Drainage Area(sf) 132,814 333,507 Proposed Impervious Area**(sf) 14,569 47,385 Impervious Area**(total) 2.55 3.25 Impervious**Surface Area Drainage Area 1 Drainage Area 2 Drainage Area Drainage Area On-site Buildings/Lots(sf) 0 0 On-site Streets (sf) 14,569 47,385 On-site Parking (sf) 0 0 On-site Sidewalks (sf) 0 0 Other on-site (sf) 0 0 Future(sf) 0 0 Off-site (sf) 0 0 Existing BUA***(sf) 0 0 Total (sf): 14,569 47,385 * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications Form SWU-101 Version Oct. 31,2013 Page 3 of 6