LETTER OF APPROVAL
Town of Cary
ATTN: Robert Hirt, Utilities Engineering Manager
PO Box 8005
Cary,NC 27512-8005
RE: Project Name: 2023 Water Main Replacements
Acres Approved: 5.81
Project ID: WAKE-2024-022
County: Wake
City: Cary
Address: King St., Union St., etc.
River Basin: Neuse
Stream Classification: C;NSW
Submitted By: Alex Biermann PE, CJS Conveyance
Date Received by LQS: November 3, 2023
Plan Type: Revised/Utility
Dear Mr. Hirt:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must
be posted at the job site. This plan approval shall expire three (3) years following the date of
approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC
4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
processed, you will receive the COC via email. As the Financially Responsible Party shown on
the FRO form submitted for this project, you MUST obtain the COC prior to commencement of
any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct
questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If
North D Quality y,Mineral and Land Resources
Raleigh RegCarolinaional Office 1628of MailEnvironmental Service Center 3800Division Barrettof DriveEnerg RaleiI
gh,North Carolina 27609
NORTH CAROLINA
Department of Environmental uwiM 919.791.4200
Letter of Approval
Town of Cary
November 16, 2023
Page 2 of 3
the owner/operator of this project changes in the future, the new responsible party is required to
apply for his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project,it is determined that the erosion and sedimentation control plan is inadequate to meet
the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws,regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land-disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. This permit allows for a land-
disturbance, as called for on the application plan,not to exceed the approved acres. Exceeding the
acreage will be a violation of this permit and would require a revised plan and additional
application fee. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
%Milli 3(\lAltk
Sharan Chawla
Assistant Regional Engineer
Land Quality Section
'
D �,• North o Dvnm Quity I f Erg ,��� RaleighCar Regionallina Of epartmentfice 11628of MailEn Serviceiroental Centeral 13800Division Barretto Drivene I y RalMineraleigh,Northand CarLandoResourceslina 27609
NORTH CAROLINA
Department m Environmental Quality 919.791.4200
Letter of Approval
Town of Cary
November 16, 2023
Page 3 of 3
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
cc: Regional Office file
Alex Biermann, PE, CJS Conveyance
Jeremy Rivenbark, PE, CJS Conveyance
�D_E NorthRaleigh CarolinaRegional D Oepartmentff11628 Mail of EnvironmentalCenter Quality DivisionBarrett ofDrive Energy,Mineral
Raleigh, andNorth LanCarolinad Resources
ice Service 3800 27609
NORTH CAROLINA
Department Environmental QuaDepartment o ty 919.791.4200