Loading...
HomeMy WebLinkAbout20071834 Ver 1_No Written Concurrence_20071207O~oF W A rFR pG Michael F. Easley, Governor ~ ~ William G. Ross Jr., Secretary } r North Carolina Department of Environment and Natural Resources -I Q -~ Coleen H. Sullins, Director Division of Water Quality December 7, 2007 New Hanover County DWQ Project #: 07 1834 K'~4 Penny Tillery 403 North Lumina Avenue , f. Wrightsville Beach, NC 28480 ~ ~_ "' Subject Property: Penny Tillery 403 North Lumina Avenue ~s NO WRITTEN CONCURRENCE NEEDED Dear Ms. Tillery: You have our approval, in accordance with the attached conditions; to relocate a boatlift to your existing private docking facility, as described in your LAMA Major application dated September 15, 2007. After reviewing your application, we have decided this impact is below the threshold for written authorization as long as all conditions of General Water Quality Certification Number 3624 are met. This certification may also be viewed on our website at http://h2o.enr.state.nc.us/ncwetlands. This Certification allows you to use the Regional General # 198700056 Permit when issued by the US Army Corps of Engineers. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you maybe required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation maybe required as described in 15A NCAC 2H .0506 (h) (6) and (7). This approval shall expire when the corresponding Nationwide Permit expires or as otherwise provided in the General Certification. For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. Conditions of Certification: 1. Upon completion of the project, the applicant shall complete and return the enclosed "Certification of Completion Form" to notify DWQ that all the work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Internet: www.ncwaterauality org Location: 512 N. Salisbury St. Raleigh, NC 27604 One No Carolina atura!!y Phone (919) 733-7015 Customer Service Fax (919)733-2496 1-877-623-6748 An Equal OpportunitylAffrmative Aclion Employer - 50°/ Recycledll0% Post Consumer Paper z Penny Tillery DWQ Project #: 07 1834 December 7, 2007 If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ian McMillan at 919-733-1786 or Chad Coburn at our Wilmington Regional Office at (910) 796-7215. Sincerely, Chad Coburn Senior Environmental Specialist Enclosures: GC 3624 Certification of Completion cc: Ed Flynn - F&S Marine Contractors, Inc., P.O. Box 868 Wrightsville Beach, NC 28480 Dave Timpy - USACE Wilmington Rob Mairs -DCM Wilmington Doug Huggett -DCM Morehead Ian McMillan -DWQ 401 Oversight Unit Central Files WiRO WQC #3624 GENERAL CERTIFICATION FOR PROJECTS ELIGIBLE FOR CORPS OF ENGINEERS NATIONWIDE PERMIT NUMBERS 3 (MAINTENANCE), 4 (FISH AND WILDLIFE HARVESTING DEVICES AND ACTIVITIES), 5 (SCIENTIFIC MEASUREMENT DEVICES), 6 (SURVEY ACTIVITIES), 7 (OUTFACE STRUCTURES AND ASSOCIATED INTAKE STRUCTURES), 19 (25 CUBIC YARDS OF FILL), 20 (OIL SPILL CLEANUP), 22 (REMOVA OF VE S~LS), 25 (STRUCTURAL DISCHARGE), 30( MOIST SOIL MANAGEMENT FQILDLf~E), 32 '(COMPLETED ENFORCEMENT ACTIONS), 36 (BOAT RAMPS [IN Nbt~~CIE~L~'WD SITESJ)'; 45 (REPAIR OF UPLANDS DAMAGED BY DISCRETE EVENTS), 47 (PI~?ELINE.SAFE~TY PROGRAM DESIGNATED TIME SENSITIVE INSPECTIONS AND R ppjQtt=2S),~AND d8,(EXISTING COMMERCIAL SHELLFISH AQUACULTURE ACTIVITIES), AND REGION~I~P,,ERMIT 197800056 (PIERS, DOCKS AND BOATHOUSES) AND REGIONAL p~F2Ml.T 197800725 GOAT RAMPS), AND RIPARIAN AREA PROTECTION RULES (BUF`~F~R RULES) This General Certification is issued in conformity with the requirements of Section`401, Public Laws 92-500 and 95-217 of the United States and subject to the. North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 and 15 NCAC 26 .0200 forthe discharge of fill material to waters and wetland areas which are waters of the United States as- described in 33 CFR 330 Appendix A (B) (3, 4, 5, 6, 7, 19, 20, 22, 25, 30, 32, and 36) of the Corps of Engineers regulations and Regional Permits 197800056 and 19780125 and for the Riparian Area Protection Rules (Buffer Rules) in 15A NCAC 26 .0200. This Certification replaces Water Quality Certification Number 3376 issued on March 18, 2002 and WOC Number 3494 issued March 18, 2002. This WQC is rescinded when the Corps of Engineers re-authorizes any of these Nationwide or Regional Permits or when deemed appropriate by the Director of the Division of Water Quality. The State of North Carolina certifies that the specified category of activity will not violate applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92-500 and 95-217 if conducted in accordance with the conditions hereinafter set forth. Conditions of Certification: 1. These activities do not require written concurrence from the Division of Water Quality as long as they comply with all conditions of this General Certification. If any condition in this Certification cannot be met, application to and written concurrence from DWQ are required. Also, Condition No. 8 is applicable to all streams in basins with riparian area protection rules; 2. If the activity is associated with or in response to a Notice of Violation or an enforcement action initiated by DWQ or the Division of Land Resources, this General Certification requires application to and prior written concurrence from the Division of Water Quality; That appropriate sediment and erosion control practices which equal or exceed those outlined in the most recent version of the "North Carolina Sediment and Erosion Control Planning and Design Manual" or the "North Carolina Surface Mining Manual" whichever is more appropriate (available from the Division of Land Resources (DER) in the DENR Regional or Central Offices) shall be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to assure compliance with the appropriate turbidity water quality standard; 4. All sediment and erosion control measures placed in wetlands or waters shall be removed and the natural grade restored within two months after the Division of Land Resources has released the project; WQC #3624 5. If an environmental document is required, this Certification is not valid until a Finding of No Significant Impact (FONSI) or Record of Decision (ROD) is issued by the State Clearinghouse; 6. Measures shall be taken to prevent live or fresh concrete from coming into contact with waters of the state until the concrete has hardened; 7. Access roads constructed for any of these permits shall be constructed so as to minimize wetland fill as much as is practicable and shall be restored to grade immediately after the project is completed. The site shall be re-vegetated with native species which shall be in place within three months following construction or before initiation of the next growing season; 8. In accordance with North Carolina General Statute Section 143-215.3D(e), any request for written concurrence fora 401 Water Quality Certification must include the appropriate fee. If a project also requires a CAMA Permit, one payment to both agencies shall be submitted and will be the higher of the two fees; 9. Impacts to any stream length in the Neuse, Tar-Pamlico, Randleman and Catawba River Basins (or any other river basins with Riparian Area Protection Rules [Buffer Rules] in effect at the time of application) requires written concurrence from DWQ in accordance with 15A NCAC 28.0200. Activities listed as "exempt' from these rules do not need to apply for written concurrence under this Certification. New development activities located in the protected 50-foot wide riparian areas (whether jurisdictional wetlands or not) within the Neuse and Tar-Pamlico River Basins shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 2B .0200. All new development shall be located, designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices; 10. Placement of culverts and other structures in waters, streams and wetlands must be placed below the elevation of the streambed to allow low flow passage of water and aquatic life unless it can be shown to DWO that providing passage would be impractical. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ.• Additionally, when roadways, causeways or other fill projects are constructed across FEMA-designated floodways or wetlands, openings such as culverts or bridges must be provided to maintain the natural hydrology of the system as well as prevent constriction of the floodway that may result in destabilization of streams or wetlands. If more than 150 linear feet of additional stream is filled, culverted, rip-rapped, relocated, excavated or dredged as a result of this permit, then an application to DWQ is needed and compensatory mitigation may be required; 11. Additional site-specific conditions may be added to projects for which written concurrence is required or requested under this Certification in order to ensure compliance with all applicable water quality and effluent standards; 12. Applications for riprap groins proposed in accordance with 15A NCAC 07H .1401 (NC Division of Coastal Management General Permit for construction of Wooden and Riprap Groins in Estuarine and Public Trust Waters) must meet all the specific conditions for design and construction specified in 15A NCAC 07H .1405. 13. Concurrence from DWQ that this Certification applies to an individual project shall expire three years from the date of the cover letter from DWQ or on the same day as the WQC #3624 expiration date of these corresponding Nationwide and Regional General Permits, whichever is sooner; 14. Projects with any impacts to streams, wetlands, and/or waters that have received a Notice of Violation from the Division of Land Resources and/or the Division of Water Quality are required to submit a complete application and receive written concurrence to use this Certification regardless of the proposed impact amount to streams, wetlands, and waters. 15. Wfie~~ written concurrence is required, the applicant is required to use the most recent version of the Certification of Completion form to notify DWQ when all work included in the 401 ~;ertification has been completed; 16. Standard Erosion and Sediment Control Practices: Erasion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Contro! Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion. Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. e. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 17. No Impacts Beyond those in Application No tivaste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-construction Notification. All con:>~ruction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no vic'- ;ions of state water quality standards, statutes, or rules occur. 18. No Sediment and Erosion Control Measures in Wetlands Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wellands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated prc, ram has released the project. Non-comp'' once with or violation of the conditions herein set forth by a specific fill project shall result in rep ocation of this Certification for the project and may result in criminal and/or civil penalties. WQC #3624 The Directo of the North Carolina Division of Water Quality may require submission of a formal application t r Individual Certification for any project in this category of activity if it is determined that the project is likely to have a significant adverse effect upon water quality including state or federally list; d endangered or threatened aquatic species or degrade the waters so that existing uses of the v~etland or downstream waters are precluded. Public heari~ gs may be held for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of ~''ater Quality. Effective date: 19 March 2007 DIVISION OF WATER QUALITY By Alan W. Klimek, P.E. Director WQC # 362 Certification of Completion DWQ Project No.: Applicant: Project Name: Date of Issuance of Wetland Permit: County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to th~~~401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh; NC,,, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. Ii is'~ot.necessary to send certificates from all of these. ~- _ - ~ .~ ._, Applicant's Certificntinn - ~ -"~ '~ ,~ h h ,hereby state that, to the best of my abilities, due care~ar~1 cg~nr`~''"vvas used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: .Date: Agent's Certification ~, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that t11e construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was desi~ ned by a Cep°tifced Professional I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permtttee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No. Date