Loading...
HomeMy WebLinkAboutSW3230608_Email_20240613 Peck, Kaitlin From: Farkas, Jim J Sent: Thursday, June 13, 2024 11:30 AM To: smayo@gaveldorn.com; andrew@prespro.com Cc: Peterson, Kathryn S; svc_post_construction_stormwater;jhord@granitequarrync.gov; Seitz, Phillip K Subject: RE: SW3230608; Stoneglen Subdivision (Rowan) Attachments: Cover Letter & Permit 6-13-24.pdf Good Morning, The Division of Energy, Mineral, and Land Resources(DEMLR), received a complete Stormwater Management Permit Application for the subject project on March 15, 2024. Staff review of the plans and specifications has determined that the project, as proposed,will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000- 1062 rules.We are forwarding Permit No. SW3230608,dated June 13,2024,for the construction, operation and maintenance of the subject project and the stormwater system.This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee,Andrew Waltz,at the following address(NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): J2 Land Investments, LLC Attn:Andrew Waltz, CPO 6549 Morehead Road Harrisburg, NC 28075 We will hold onto our hard copy of this project for 30 days(in case any issues/typos with the permit are noticed and corrections need to be made) after which point, it will be kept on file at the Mooresville Regional Office. If you have any questions,or need additional information concerning this matter, please contact us at postconstruction@deq.nc.gov. Thanks, Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919)707-3646 Jim.farkas@deq.nc.gov tc����D E ; NORTH CAROLINA - tal Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 From: svc_post_construction_stormwater Sent:Tuesday, October 3, 2023 3:50 PM To: smayo@gaveldorn.com; andrew@prespro.com Cc: Eplin,Jerry W<jerry.eplin@deq.nc.gov> Subject: RE: SW3230608; Stoneglen Subdivision (Rowan) Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for the subject project on July 6, 2023 and September 25, 2023. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thanks, Jim Farkas Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D_ E NOH I H CAHOLINA 74M Q ti ; Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Thursday,July 6, 2023 3:22 PM To: smayo@gaveldorn.com; andrew@prespro.com Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Jerry W<lerry.eplin@deq.nc.gov> Subject: SW3230608; Stoneglen Subdivision (Rowan) This email is to correct the subject header for DEQ tracking purposes. Please see previous email for project review updates. Take care, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.Peck@deg.nc.gov z NCH I H CAHOLINA 74M Q D_ E Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin Sent:Thursday,July 6, 2023 3:20 PM To: 'smayo@gaveldorn.com' <smayo@gaveldorn.com>; 'andrew@prespro.com' <andrew@prespro.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Jerry W<lerry.eplin@deg.nc.gov> Subject: RE: Stoneglen Subdivision; Granite Quarry, Rowan County Good Afternoon, We received your post-construction stormwater permit application for the subject project 7/6/23. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected,the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW3230608 This project will be reviewed by Jim Farkas, if you have any questions, please contact them at iim.farkas@deg.nc.gov or at 919-707-3646. Thank you, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality 3 Office: (919) 707-9209 Kaitlin.peck@deg.nc.gov D_ E NOH I H CAHOLINA 74M Q ti ; Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin Sent: Friday,June 9, 2023 2:14 PM To: smavo@gaveldorn.com Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Jerry W<lerry.eplin@deg.nc.gov> Subject: Stoneglen Subdivision; Granite Quarry, Rowan County Good Morning, We received your application for a new post-construction stormwater permit on 5/31/23. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 7/9/23) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application): • Section III, 1b—The contact information for the applicant is incomplete. Please revise as needed.This contact information is required per 15A NCAC 02H .1042(2)(a)(vii). • Section III, 2b—The contact information for the property owner is incomplete. Please revise as needed. This contact information is required per 15A NCAC 02H .1042(2)(a)(vii). • Section IV, 8—The percent impervious area for the project area does not appear to be calculated correctly. Project density calculation information can be found in 15A NCAC 02H .1003(1). Please note that"existing BUA" refers to BUA that was in-place prior to the rules going into effect in this area, not just what BUA happens to currently be on the site. Please revise and provide a calculation in the calculation booklet showing how the percent BUA for the site is calculated. • Section IV, 10—Please show the total drainage area in square feet instead of acres. • Section IV, 10—Please use the information for the first named surface water("Crane Creek", "C", "12- 115-(2)for the receiving stream name, classification and index number. NOTE:There seemed to be a typo in your original submittal. • 1x hard copy of the complete, original Supplement-EZ Form (This item is required per Sections V&VI, 3 of the Application).This form can be found on our website at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- 4 program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: • Existing site conditions.This item is required per Section VI, 8k&8n of the Application and 15A NCAC 02H .1042(2)(g)(v). • Details of roads, sidewalks, drainage features, piped collection systems, and the proposed stormwater controls.This item is required per Section VI 81 of the application. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Kaitlin Peck at Kaitlin.peck@deg.nc.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist North Carolina Department of Environmental Quality Office: (919) 707-9209 Kaitlin.Peck@deg.nc.gov 5 NCH I H CAHOLINA 74M Q D- E Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 6