HomeMy WebLinkAboutSW3230608_Email_20231003 Peck, Kaitlin
From: svc_post_construction_stormwater
Sent: Tuesday, October 3, 2023 3:50 PM
To: smayo@gaveldorn.com; andrew@prespro.com
Cc: Eplin, Jerry W
Subject: RE: SW3230608; Stoneglen Subdivision (Rowan)
Attachments: Add Info 10-3-23.pdf
Good Afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater
Management Permit Application for the subject project on July 6, 2023 and September 25, 2023. A review of that
information has determined that the application is not complete. Attached is a letter describing the items that need to
be submitted. If you have any questions, please feel free to contact me. My contact information is listed below.
Thanks,
Jim Farkas
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deg.nc.gov
D_ E
NCH I H CAHOLINA
kl ;
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>
Sent:Thursday,July 6, 2023 3:22 PM
To: smayo@gaveldorn.com; andrew@prespro.com
Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Eplin,Jerry W<jerry.eplin@deq.nc.gov>
Subject: SW3230608; Stoneglen Subdivision (Rowan)
This email is to correct the subject header for DEQ tracking purposes. Please see previous email for project review
updates.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.Peck@deg.nc.gov
i
NCH I H CAHOLINA 74M Q
D_ E
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Peck, Kaitlin
Sent:Thursday,July 6, 2023 3:20 PM
To: 'smayo@gaveldorn.com' <smayo@gaveldorn.com>; 'andrew@prespro.com' <andrew@prespro.com>
Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Jerry W<lerry.eplin@deg.nc.gov>
Subject: RE: Stoneglen Subdivision; Granite Quarry, Rowan County
Good Afternoon,
We received your post-construction stormwater permit application for the subject project 7/6/23. Reviews under the
Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the
review queue by emailing Jim Farkas (He has an autoreply set up that has the review queue on it). Please upload all
documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the
Primary Contact office.
https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the
"State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST-
CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type
dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last
file type selected,the submission will get flagged during review, and you will need to resubmit the files. Please do not
upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file
type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps
expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan
sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for
review.
Please type in permit#: SW3230608
This project will be reviewed by Jim Farkas, if you have any questions, please contact them at iim.farkas@deg.nc.gov or
at 919-707-3646.
Thank you,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
2
Office: (919) 707-9209
Kaitlin.peck@deg.nc.gov
D_ E
NOH I H CAHOLINA 74M Q
ti ;
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Peck, Kaitlin
Sent: Friday,June 9, 2023 2:14 PM
To: smavo@gaveldorn.com
Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Jerry W<lerry.eplin@deg.nc.gov>
Subject: Stoneglen Subdivision; Granite Quarry, Rowan County
Good Morning,
We received your application for a new post-construction stormwater permit on 5/31/23. At this time, the submission is
not administratively complete and cannot be accepted for review in its current condition. Please provide the following
submittal items within 30 calendar days (by close of business on 7/9/23) so that we may accept the project and begin
the review process, otherwise, the project will be returned as administratively incomplete.
• 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC
02H .1042(2)(a) and per Section VI, 1 of the Application):
• Section III, 1b—The contact information for the applicant is incomplete. Please revise as needed.This
contact information is required per 15A NCAC 02H .1042(2)(a)(vii).
• Section III, 2b—The contact information for the property owner is incomplete. Please revise as needed.
This contact information is required per 15A NCAC 02H .1042(2)(a)(vii).
• Section IV, 8—The percent impervious area for the project area does not appear to be calculated
correctly. Project density calculation information can be found in 15A NCAC 02H .1003(1). Please note
that"existing BUA" refers to BUA that was in-place prior to the rules going into effect in this area, not
just what BUA happens to currently be on the site. Please revise and provide a calculation in the
calculation booklet showing how the percent BUA for the site is calculated.
• Section IV, 10—Please show the total drainage area in square feet instead of acres.
• Section IV, 10—Please use the information for the first named surface water("Crane Creek", "C", "12-
115-(2)for the receiving stream name, classification and index number. NOTE:There seemed to be a
typo in your original submittal.
• 1x hard copy of the complete, original Supplement-EZ Form (This item is required per Sections V&VI, 3 of the
Application).This form can be found on our website at the following
address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater-
3
program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and
uses macros to generate the relevant sheets based on the information entered into the cover page.
• 2x signed &sealed hard copies of a plan sheet showing the following corrected additions:
• Existing site conditions.This item is required per Section VI, 8k&8n of the Application and 15A NCAC
02H .1042(2)(g)(v).
• Details of roads, sidewalks, drainage features, piped collection systems, and the proposed stormwater
controls.This item is required per Section VI 81 of the application.
NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that
may be brough up during the engineering review.
If these items are received within the stipulated timeframe, we can accept the project and begin the review process.
Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our
two reviewer positions is currently vacant).
Hard copies should be mailed to the following address:
For Fed Ex/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640E
Raleigh, NC 27604
For USPS:
Jim Farkas
1612 Mail Service Center
Raleigh, NC 27699-1612
If you have any questions, please contact Kaitlin Peck at Kaitlin.peck@deg.nc.gov or at(919) 707-9209.
Thank you,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.Peck@deg.nc.gov
4
NCH I H CAHOLINA 74M Q
D- E
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
5