HomeMy WebLinkAboutNC0024970_Application Attachment_20240612 ATTACHMENT
SIDESTREAM TREATMENT UNIT AND MECHANICAL EQUIPMENT INFORMATION
FINAL DEWATERING CENTRATE EQUALIZATION BASINS(FDWCEN EQ BASINS)
Treatment No.of Plan Sheet Specification Calculations
Unit Units Type Size per Unit Reference Reference Provided.
Yes or No
32 ft x 24 ft, 10. ft
Equalization 75 M-7 M-8
Basin 2 Rectangular side water depth, M-9 --- Yes
66,000 gal each
CHEMICAL SYSTEMS—TANKS
No.of Plan Sheet Specification Calculations
Tank Tanks Size per Tank Reference Reference Provided.
Yes or No
12 ft diameter,
Mg0 Silo 1 2,700 ft'live volume, M-13,M-22 466383 No
65 tons 130,000 lbs
Mg(OH)2 8 ft diameter, 10 ft M-18,M-19,
Makedown 2 side wall height, 466383 No
Tanks 3,570 gallons each M-20,M-21
CHEMICAL SYSTEMS—PUMPS
Capacity of Calculations
Location No.of Purpose Type each pump Plan Sheet Specification Provided?
Pumps Reference Reference
GPM TDH (Yes or No)
M O Horizontal M-18
g Mg0 centrifugal,
Makedown 2 Transfer open 80 65 M-19, 466383 No
Area M-20,M-21
impeller
1.67 134
Acid Feed 2 Acid Feed Diaphragm (100 (58 M18,M-22 466383 No
hpsi)
PRODUCT PROCESSING
Plan Sheet Specification Calculations
Process No. Size per Unit Reference Reference Provided.
Yes or No
Dewatering 1 2.5 HP M-10,M-11, 466383 No
Screen M-139 M-17
Dryer 1 1,600 lbs/hr M-10,M-11, 466383 No
M-13,M-17
Conveyor 1 1,600 lbs/hr M-10,M-11, 466383 No
M-13,M-17
Classifier M-10 M-11
Screen 1 2.5 HP M-13,M-17 466383 No
Storage Silo 1 36 tons M-10,M-11, 466383 No
M-13,M-17
Page 1 of 2
PEARL NUTRIENT RECOVERY SYSTEM REACTOR
Plan Sheet Specification Calculations
Process No. Size per Unit Reference Reference Provided.
Yes or No
Nutrient M-10,M-11,
Recovery 1 2.7 MGD 466383 Yes
Reactor M-12,M-14
Page 2 of 2