Loading...
HomeMy WebLinkAboutNC0024970_Application Attachment_20240612 ATTACHMENT SIDESTREAM TREATMENT UNIT AND MECHANICAL EQUIPMENT INFORMATION FINAL DEWATERING CENTRATE EQUALIZATION BASINS(FDWCEN EQ BASINS) Treatment No.of Plan Sheet Specification Calculations Unit Units Type Size per Unit Reference Reference Provided. Yes or No 32 ft x 24 ft, 10. ft Equalization 75 M-7 M-8 Basin 2 Rectangular side water depth, M-9 --- Yes 66,000 gal each CHEMICAL SYSTEMS—TANKS No.of Plan Sheet Specification Calculations Tank Tanks Size per Tank Reference Reference Provided. Yes or No 12 ft diameter, Mg0 Silo 1 2,700 ft'live volume, M-13,M-22 466383 No 65 tons 130,000 lbs Mg(OH)2 8 ft diameter, 10 ft M-18,M-19, Makedown 2 side wall height, 466383 No Tanks 3,570 gallons each M-20,M-21 CHEMICAL SYSTEMS—PUMPS Capacity of Calculations Location No.of Purpose Type each pump Plan Sheet Specification Provided? Pumps Reference Reference GPM TDH (Yes or No) M O Horizontal M-18 g Mg0 centrifugal, Makedown 2 Transfer open 80 65 M-19, 466383 No Area M-20,M-21 impeller 1.67 134 Acid Feed 2 Acid Feed Diaphragm (100 (58 M18,M-22 466383 No hpsi) PRODUCT PROCESSING Plan Sheet Specification Calculations Process No. Size per Unit Reference Reference Provided. Yes or No Dewatering 1 2.5 HP M-10,M-11, 466383 No Screen M-139 M-17 Dryer 1 1,600 lbs/hr M-10,M-11, 466383 No M-13,M-17 Conveyor 1 1,600 lbs/hr M-10,M-11, 466383 No M-13,M-17 Classifier M-10 M-11 Screen 1 2.5 HP M-13,M-17 466383 No Storage Silo 1 36 tons M-10,M-11, 466383 No M-13,M-17 Page 1 of 2 PEARL NUTRIENT RECOVERY SYSTEM REACTOR Plan Sheet Specification Calculations Process No. Size per Unit Reference Reference Provided. Yes or No Nutrient M-10,M-11, Recovery 1 2.7 MGD 466383 Yes Reactor M-12,M-14 Page 2 of 2