Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW5230802_Stormwater Narrative_20240612
e2s ENGINEERING & ENVIRONMENTAL SCIENCE COMPANY 3008 ANDERSON DRIVE,SUITE 102 RALEIGH,NC 27609 (919)781-7798 June 11, 2024 Mr. Harvey Harman Chatham Habitat for Humanity PO Box 883 Pittsboro,NC 27312 RE: Stormwater Evaluation Stormwater Permit No. SW5230802 Chatham Habitat for Humanity Townhouse Development TBD Craft Lane Siler City,NC Chatham County Dear Mr. Harman: Engineering & Environmental Science Company (E2S) has completed the stormwater plan evaluation for the above referenced project. Following is a brief discussion of this project and our evaluation. Project Information The subject property is located off Craft Lane, approximately 1,200 ft. south of the intersection of HWY 64 and N. Chatham Avenue in Siler City,NC. The site totals 3.12 acres and is generally wooded. An existing building totaling approximately 3,280 sf is present near the northeast property corner. This structure will be removed. A vicinity map taken from a portion of the USGS Quadrangle Map is provided as Figure 1 of Attachment A. Proposed for construction are three (3) townhouse buildings with associated gravel parking area and driveway. The accompanying 24"x36" site drawings show the existing and proposed conditions for the site. The site is not located within a regulatory floodplain. No streams or riparian buffers are located within the project area. The existing ground at the site generally slopes from north to south with grades of 5 to 7%. Cut and fill construction activities will be required for the proposed buildings and parking areas. The total proposed land disturbance is 2.4 acres. An Erosion Control & Sedimentation Permit has been obtained through NCDEQ (Permit No. CHATH-2023-011). Low Density Permitting The proposed impervious/BUA at the site will be less than 24%. Runoff will generally be conveyed by vegetated swales and sheet flow over vegetated areas. These design requirements for Low Density permitting per 15A NCAC 02H .1003(2) are met for this project. To comply with stormwater ordinances reviewed and enforced by the local jurisdiction (Town of Siler City), a runoff detention area with sufficient storage to meet these local requirements is provided on-site. Please note that this is not a state required SCM, and is only being installed to meet local jurisdiction requirements. Discharge from the detention area will be to a wide vegetated area, which will allow all runoff from the site to be conveyed off-site via dispersed flow over vegetated areas. A minimum 30' vegetated area will be provided between the detention area discharge and the property line. Pre- and Post-Development Conditions The majority of the site is currently wooded. An existing building totaling approximately 3,280 sf is present near the northeast property corner. This structure will be removed. The total proposed post-development impervious surface for the site is 28,583 sf. The remainder of the site for the post development condition is assumed to be grassed or wooded. The site is within the Georgeville silt loam (GaC) soil group, which is a HSG 'B' soil. Figure 2 contains a copy of the USDA Soil Survey Map showing the site location and soil type. The delineated drainage areas for the vegetated swales for the post-construction conditions are provided on Sheet 3B of the accompanying plans. Design details for the vegetated swales are provided on Sheet 3C. The calculations for the proposed vegetated swales are provided in Attachment B. The calculations for the runoff detention area are also provided in Attachment B. Please note that the runoff detention area is not a state required SCM, and the design and calculations will be reviewed by the Town of Siler City. Seasonally High Water Table (SHWT)Evaluation According to the U.S. Department of Agriculture Soil Survey of Chatham County, North Carolina, the subject property is underlain by Georgeville soils which have an estimated seasonally high groundwater table of greater than 80 inches. below ground surface (BGS) (See Figure 5). For site specific evaluation purposes, two (2) hand auger borings were conducted at the proposed runoff detention area location. The base of the proposed area will be near existing ground levels near the outlet structure, but will be approximately 7 ft. below existing ground level at the front portion of the area. e2s As the soils were augered, the soil color was compared to the Munsell Soil Color Chart to estimate seasonally high water tables and the soils were visually classified in accordance with the Unified Soil Classification System. Any mottling or soil color with a Chroma of 3 and less is considered indicative of the seasonally high water levels. Based on soil color and site observations, the separation between the base of the detention area and the seasonally high water table is greater than 1 ft. The proposed base of the detention area is at elevation 612.0', and the SHWT elevation is lower than 609.0'. The boring logs for the hand augering conducted at the proposed SCM location are provided in Attachment C. Closure We appreciate serving you on this project. Please contact us if you have any questions. Sincerely, Robert W. Brantly, P.E. of E s Sao .�i,L Q� . y Project Engineer — : SEAL 9 04198 Attachment A: Figures 'o.. NG` % • Attachment B: Calculations /1i�;�FT lNEE BRp.•�.��\\��/ii( °1 Attachment C: Boring Logs W \ i`2S Attachment A: Figures E2s c-C-CO , t ) 7 ,,, i1C. r, ___ ____,, ,,,,„: 0 700,„ ,_ m .4‘ 401401,__, '� A1 ____A W 11 T .ST1 MP-17V c-c--- -4:----;:a‘—kwOod .Ts Cemy \\ = TANGLEWOOD DsM& Or All DRIFTWOOD O�R \, ei ) \ RKWOOD DR111000 o� 1 N,Si ,61 \1_ \,,t1 _ I C‘ 1\ *10` LAKE DR ►� 1. ►-S400 II' GN, tir , l cnG3G- o r IF__- Z 4t7L #o vi, ‘ ) \ ‘ N ---7---'-A-1/7 T` .e.. / /1\4111 A 1 11 ink sc ry , i A Or V Is 4,111fr f � 5 ,�,,„,,, .4o,1 '\ W--- / 4140 7- W 1 01 41 _. . (7,O .10111Pwft ir vn N,cx -�../ _ - Y.,ifit"" vr:\ ^2 C ENGINEERING&ENVIRONMENTAL SCIENCE COMPANY A ` RALEIGH,NOR H CAROLINAE 27609 J (919)781-7798 %p Vicinity Map DATE: ) Chatham Habitat for Humanity 5/10/23 Townhouse Devp. FIGURE NO. Scale 1 = 1 ,000' Craft Lane 1 Siler City,NC 1 -11,7-ir .W.Ehilent� t 64 at IIIIIMIMIIIIPIMMMr r W Eleventh St y L i... '' i :j - Vo . ,' , Me�morlal,DrJ 1 t' I . t.g.i. 0 ii 111, !I I II £ .. visegagep 0 �C�m GneRd C co G$. No - r 11. 0 'I:it a. •I 4l a C 0 . .1 - t\ . in co _____ap fitir ; ._ 1 -r _ VUII t � WNmth St L'Cr I �3p�� ,:ali. 1 * c7•+‘ (4 r ► '' Gr•ay ,.. . n C 1 ... .• /Y lip .,. 4 .17 ii r r , 0 4 : . " ill A 0,06 SYMBOL SOIL NAME HSG ChA Chewacla and Wehadkee B/D GaC Georgeville silt loam B GnC Georgeville-Urban land complex B Note: Typical depth to SHWT for Georgeville Soils is greater than 80 inches. ENGINEERING&ENVIRONMENTAL e 2 SCIENCE COMPANY 3008 ANDERSON DR.,SUITE 102 RALEIGH,NORTH CAROLINA 27609 1I) (919)781-7798 I) USDA Soil Map DATE: 'I) Chatham Habitat for Humanity 5/10/23 Townhouse Devp. FIGURE NO. Scale 1" = 300' Craft Lane 2 Siler City,NC 215 Memorial Dr • 1012 931: • • 1010r 9 Oakmod 10'101 927 • Cemetery 79521 • • ',�% • 925 ,• • $70 '1 •1002 •92: `C n„ . ti , • n I 9 1 � • 921 i 660• 926 • S27 4004 • 9 4 918 916 • 9 • • 70067 r •9 7 •912 1 911 906 70750 • 907 I. I 821 PRE-DEVELOPMENT 829 • DRAINAGE AREA II * \ 825 I • �`f\ -T •206 r 207 • 821 \ ♦°1q..1. - •817 205 • •105 8 „...\ ♦ • ♦ \c,,, ♦ •\\\ 106 6N • ' 832 6 \ \ 104‘ „."'" ".. _, f/ \sikL0,00.0.,, • ioi 204 \\r\C: 204• f907 `f T.`Ls�' \ ..e.-'---- \ PRE-DEVELOPMENT DRAINAGE AREA - 0.32 AC. IMPERVIOUS ENGINEERING&ENVIRONMENTAL 2.18 AC. GRASS SCIENCE COMPANY 8.19 AC. WOODS 2 3008 ANDERSON DR.,SUITE 102 10.69 AC. TOTAL RALEIGH,NORTH CAROLINA 27609 WEIGHTED CN= 58 (919)781-7798 TC= 15.9 MIN. -- DATI Note: Provided to NCDEQ for informational purposes only. Pre-Development Drainage Area Map Peak flow/volume attenuation required by Town Chatham Ilabitat for Humanity 6/11/24 of Siler City will he reviewed by Town of Siler City. Townhouse Devp. F1fl111IF:NO. Scale 1" = 200' Craft Lane 3 Siler City,NC i��Me111°fk1I Dr •215 - 1012 - 931' 1010- 9 Oakwood 1010 927 • Centetery 79521 • • 925 1002 ''" �����U'Ocirl t:�'',lr'i@4"y�'r+ —� 921 • �1 ooi 660 926• • 1127 • 9 POST-DEV • D.A.DRAINING o 918 916 PROPOSED 9* • • BASIN • 70067 9 7 ' 912 I ilk911 906 70750 '1 • 907 I. FUTURE 1 821 IMPERVIOUS SURFACE 829 • • I 1 6 • • 825 4 PROPOSED 206 202 821 3�• .00 GRAVEL •0 • • •• ' P RKING/DRIVE ,I ,J_( oI ....... . '' cm...pr s, •817 •I ,-- NI 205 POST-DEV • •105 8 \\s)\ D.A.BYPASSING• PROPOSED ! { 1 • BASIN 5 '—( •106 �� 1 103 1 • Y j ,8216 •104\ Iv 4.1 —r C% . 204 V9�4 PR►`•OSED ti; • ' TOWN 0 USES 302 el • ''J iw 902 cP2' • Scale 1" = 200' I Future Impervious Surface(48,034 sf) Note: 48,034 sf of future impervious is included for dry detention basin design ^ ENGINEERING&ENVIRONMENTAL calculations.This future development will be permitted separately at a later date. ' ` SCIENCE COMPANY POST-DEVELOPMENT DRAINAGE AREA POST-DEVELOPMENT DRAINAGE AREA 2 3008 ANDERSON DR.,SUITE 102 BYPASSING PROPOSED DRY DETENTION BASIN DRAINING TO PROPOSED DRY DETENTION BASIN RALEIGH,NORTH CAROLINA 27609 0.76 AC. IMPERVIOUS N/ (919)781-7798 0.94 AC.WOODS 1.10 AC. FUTURE IMPERVIOUS 0.94 AC.TOTAL 7.89 AC.GRASS DATE: WEIGHTED CN=55 9.75 AC.TOTAL Post-Development Drainage Area Map TC=9.7 MIN. WEIGHTED CN=68 Chatham Habitat for Humanity 6/11/24 TC=12.7 MIN. Townhouse Devp. FIGURE No: Note:Provided to NCDEQ for informational purposes only. Peak flow/volume attenuation required by Town Craft Lane of Siler City will be reviewed by Town of Siler City. Siler City,NC Attachment B: Stormwater Routing Calculations e2s NOAA Atlas 14,Volume 2,Version 3 lio Location name:Siler City,North Carolina,USA* , ' '"r Latitude:35.7298°, Longitude: -79.4693° noon Elevation:629 ft** • 11# 'source:ESRI Maps 'q "�°°` "source:USGS �" "" POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Marlin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inchesjl Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 0.417 0.494 0.573 0.627 0.686 0.724 0.759 0.787 0.817 0.837 (0.381-0.457) (0.452-0.542) (0.523-0.629) (0.571-0.686) (0.622-0.750) (0.654-0.792) (0.682-0.830) (0.704-0.862) (0.724-0.895 (0.736-0.918) 10-min 0.666 0.790 0.917 1.00 1.09 1.15 1.21 1.25 1.29 1.32 (0.608-0.730) (0.722-0.868) (0.838-1.01) (0.913-1.10) (0.991-1.20) (1.04-1.26) (1.08-1.32) (1.12-1.37) (1.14-1.42) (1.16-1.44) 15-min 0.832 0.994 1.16 1.27 1.39 1.46 1.52 1.57 1.63 1.65 (0.761-0.913) (0.908-1.09) (1.06-1.27) (1.16-1.39) (1.26-1.52) (1.32-1.60) (1.37-1.67) (1.41-1.72) (1.44-1.78) (1.45-1.81) 30-min 1.14 1.37 1.65 1.84 2.05 2.20 2.33 2.45 2.59 2.68 (1.04-1.25) (1.25-1.51) (1.50-1.81) (1.67-2.01) (1.86-2.24) (1.99-2.41) (2.10-2.55) (2.19-2.68) (2.29-2.84) (2.36-2.94) 60-min 1.42 1.72 2.11 2.39 2.73 2.98 3.22 3.44 3.71 3.91 (1.30-1.56) (1.57-1.89) (1.93-2.32) (2.18-2.62) (2.48-2.99) (2.69-3.26) (2.89-3.52) (3.07-3.76) (3.29-4.07) (3.44-4.29) 2-hr 1.70 2.07 2.56 2.92 3.38 3.72 4.06 4.38 4.80 5.12 (1.55-1.88) (1.89-2.28) _(2.33-2.82) (2.65-3.22) (3.05-3.72) (3.34-4.09) (3.62-4.46) (3.88-4.82) (4.21-5.28) (4.45-5.64) 3-hr 1.82 2.21 2.75 3.15 3.67 4.07 4.46 4.86 5.39 5.80 (1.66-2.00) (2.02-2.43) (2.51-3.02) (2.86-3.45) (3.32-4.02) t (3.66-4.46) (3.98-4.89) (4.31-5.33) (4.72-5.91) (5.02-6.38) 6-hr 2.19 2.65 3.30 3.79 4.45 4.97 5.49 6.02 6.74 7.31 (2.01-2.40) (2.44-2.91) (3.02-3.61) (3.46-4.14) (4.03-4.85) (4.46-5.41) (4.90-5.98) (5.31-6.56) (5.86-7.34) (6.28-7.98) 12-hr 2.60 3.14 3.93 4.55 5.40 6.07 6.77 7.50 8.51 9.32 (2.38-2.84) (2.89-3.45) (3.60-4.31) (4.15-4.98) (4.88-5.88) (5.45-6.60) (6.01-7.34) (6.58-8.13) (7.34-9.22) (7.92-10.1) 24-hr 2.99 3.61 4.52 5.22 6.19 6.95 7.74 8.54 9.65 10.5 (2.79-3.20) (3.38-3.87) (4.22-4.84) (4.87-5.61) (5.75-6.65) (6.44-7.47) (7.14-8.32) (7.86-9.20) (8.84-10.4) (9.60-11.4) 2-day 3.51 4.22 5.25 6.04 7.11 7.95 8.82 9.70 10.9 11.9 (3.29-3.76) (3.96-4.53) (4.92-5.63) (5.64-6.48) (6.62-7.64) (7.38-8.54) (8.15-9.49) (8.94-10.5) (10.0-11.8) (10.8-12.9) 3-day 3.72 4.47 5.53 6.36 7.48 8.36 9.27 10.2 11.5 12.5 (3.49-3.99) (4.19-4.80) (5.18-5.93) (5.94-6.82) (6.96-8.02) (7.75-8.97) (8.56-9.96) (9.40-11.0) (10.5-12.4) (11.4-13.5) 4-day 3.94 4.72 5.82 6.68 7.85 8.78 9.72 10.7 12.0 13.1 (3.69-4.22) (4.42-5.06) (5.44-6.23) (6.23-7.15) (7.29-8.41) (8.13-9.40) (8.98-10.4) (9.84-11.5) (11.0-13.0) (11.9-14.2) 4.52 5.40 6.56 7.49 8.75 9.76 10.8 11.8 13.3 14.5 7-day (4.26-4.83) (5.07-5.76) (6.16-7.00) (7.02-7.99) (8.18-9.35) (9.08-10.4) (9.99-11.5) I (10.9-12.7) (12.2-14.3) (13.2-15.6) 10-day 5.15 6.12 7.35 8.32 9.63 10.7 11.7 12.8 14.2 15.3 (4.86-5.48) (5.77-6.52) (6.92-7.83) (7.82-8.86) (9.01-10.3) (9.94-11.4) (10.9-12.5) (11.8-13.6) (13.1-15.2) (14.1-16.5) 20-day 6.92 8.16 9.64 10.8 12.4 13.6 14.9 16.2 17.9 19.3 (6.54-7.31) (7.73-8.62) (9.11-10.2) (10.2-11.4) (11.7-13.1) (12.8-14.4) (13.9-15.8) (15.1-17.2) (16.6-19.1) (17.8-20.6) 30-day 8.56 10.1 11.7 13.0 14.7 16.0 17.2 18.5 20.2 21.6 (8.17-9.02) (9.60-10.6) (11.1-12.3) (12.3-13.7) (13.9-15.4) (15.1-16.8) (16.2-18.2) (17.4-19.6) (18.9-21.4) (20.1-22.9) 45-day 10.9 12.8 14.6 16.1 17.9 19.3 20.7 22.1 23.9 25.3 (10.4-11.5) (12.2-13.4) (13.9-15.3) (15.3-16.8) (17.0-18.8) (18.3-20.3) (19.6-21.8) (20.8-23.2) (22.5-25.2) (23.7-26.7) 60-day 13.1 15.2 17.2 18.7 20.7 22.2 23.6 25.0 26.8 28.1 (12.5-13.7) (14.6-16.0) (16.5-18.0) (17.9-19.6) (19.7-21.7) (21.1-23.2) (22.4-24.8) (23.7-26.2) (25.3-28.2) (26.5-29.7) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical O <IA> <sBI> 0 0 <SB2> DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA SWALE#1 SWALE#1A SWALE#2 SWALE#3 SWALE#SB1 SWALE#SB2 at Reach Pon Routing Diagram for 2yr-Swales 1,1A,2,3,SB1,SB2 ubcit J Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC 2yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=5.93 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1: DRAINAGE AREA SWALE #1 Runoff = 0.10 cfs @ 0.09 hrs, Volume= 0.008 af, Depth> 3.37" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 760 0.35 Vegetated/Pervious 520 0.95 Impervious 1,280 0.59 Weighted Average 760 59.38% Pervious Area 520 40.63% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 2yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=5.93 in/hr Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1A: DRAINAGE AREA SWALE #1A Runoff = 0.32 cfs @ 0.09 hrs, Volume= 0.026 af, Depth> 2.91" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 3,380 0.35 Vegetated/Pervious 1,200 0.95 Impervious 4,580 0.51 Weighted Average 3,380 73.80% Pervious Area 1,200 26.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 2yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=5.93 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2: DRAINAGE AREA SWALE #2 Runoff = 6.83 cfs @ 0.09 hrs, Volume= 0.544 af, Depth> 2.46" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 100,695 0.35 Vegetated/Pervious 15,035 0.95 Impervious 115,730 0.43 Weighted Average 100,695 87.01% Pervious Area 15,035 12.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 2yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=5.93 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 3: DRAINAGE AREA SWALE #3 Runoff = 7.75 cfs @ 0.09 hrs, Volume= 0.617 af, Depth> 2.51" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 109,622 0.35 Vegetated/Pervious 18,625 0.95 Impervious 128,247 0.44 Weighted Average 109,622 85.48% Pervious Area 18,625 14.52% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 2yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=5.93 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment SB1: DRAINAGE AREA SWALE #SB1 Runoff = 1.72 cfs @ 0.09 hrs, Volume= 0.137 af, Depth> 3.03" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 16,775 0.35 Vegetated/Pervious 6,925 0.95 Impervious 23,700 0.53 Weighted Average 16,775 70.78% Pervious Area 6,925 29.22% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 2yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, lnten=5.93 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment SB2: DRAINAGE AREA SWALE #SB2 Runoff = 0.03 cfs @ 0.09 hrs, Volume= 0.002 af, Depth> 2.00" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 618 0.35 Vegetated/Pervious 618 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 4 <4A> © <5A> ( 6 ) <6A> DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA SWALE#4 SWALE#4A SWALE#5 SWALE#5A SWALE#6 SWALE#6A Subcat Reach on. Link Routing Diagram for 2yr-Swales 4,4A,5,5A,6,6A Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC 2yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=5.93 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 4: DRAINAGE AREA SWALE #4 Runoff = 0.87 cfs @ 0.09 hrs, Volume= 0.070 af, Depth> 3.83" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 4,490 0.35 Vegetated/Pervious 5,010 0.95 Impervious 9,500 0.67 Weighted Average 4,490 47.26% Pervious Area 5,010 52.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 2yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, lnten=5.93 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 4A: DRAINAGE AREA SWALE #4A Runoff = 0.92 cfs @ 0.09 hrs, Volume= 0.073 af, Depth> 3.66" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 5,490 0.35 Vegetated/Pervious 5,010 0.95 Impervious 10,500 0.64 Weighted Average 5,490 52.29% Pervious Area 5,010 47.71% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 2yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=5.93 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 5: DRAINAGE AREA SWALE #5 Runoff = 0.74 cfs @ 0.09 hrs, Volume= 0.059 af, Depth> 4.40" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 2,072 0.35 Vegetated/Pervious 4,928 0.95 Impervious 7,000 0.77 Weighted Average 2,072 29.60% Pervious Area 4,928 70.40% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 2yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=5.93 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 5A: DRAINAGE AREA SWALE #5A Runoff = 0.79 cfs @ 0.09 hrs, Volume= 0.063 af, Depth> 4.11" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 3,082 0.35 Vegetated/Pervious 4,928 0.95 Impervious 8,010 0.72 Weighted Average 3,082 38.48% Pervious Area 4,928 61.52% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 2yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=5.93 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 6: DRAINAGE AREA SWALE #6 Runoff = 0.85 cfs @ 0.09 hrs, Volume= 0.068 af, Depth> 4.74" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 1,540 0.35 Vegetated/Pervious 5,910 0.95 Impervious 7,450 0.83 Weighted Average 1,540 20.67% Pervious Area 5,910 79.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 2yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=5.93 in/hr Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 6A: DRAINAGE AREA SWALE #6A Runoff = 0.94 cfs @ 0.09 hrs, Volume= 0.075 af, Depth> 4.11" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=5.93 in/hr Area (sf) C Description 3,560 0.35 Vegetated/Pervious 5,910 0.95 Impervious 9,470 0.72 Weighted Average 3,560 37.59% Pervious Area 5,910 62.41% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min O <IA> © © <SBI> DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA SWALE#1 SWALE#1A SWALE#2 SWALE#3 SWALE#SB1 SWALE#SB2 4ubca) Reach '0l1• 1111 Routing Diagram for 10yr-Swales 1,1A,2,3,SB1,SB2 Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC 10yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, lnten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1: DRAINAGE AREA SWALE #1 Runoff = 0.13 cfs @ 0.09 hrs, Volume= 0.010 af, Depth> 4.27" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 760 0.35 Vegetated/Pervious 520 0.95 Impervious 1,280 0.59 Weighted Average 760 59.38% Pervious Area 520 40.63% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 10yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1A: DRAINAGE AREA SWALE #1A Runoff = 0.41 cfs @ 0.09 hrs, Volume= 0.032 af, Depth> 3.69" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 3,380 0.35 Vegetated/Pervious 1,200 0.95 Impervious 4,580 0.51 Weighted Average 3,380 73.80% Pervious Area 1,200 26.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 10yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2: DRAINAGE AREA SWALE #2 Runoff = 8.66 cfs @ 0.09 hrs, Volume= 0.690 af, Depth> 3.11" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 100,695 0.35 Vegetated/Pervious 15,035 0.95 Impervious 115,730 0.43 Weighted Average 100,695 87.01% Pervious Area 15,035 12.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 10yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 3: DRAINAGE AREA SWALE #3 Runoff = 9.82 cfs @ 0.09 hrs, Volume= 0.782 af, Depth> 3.19" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 109,622 0.35 Vegetated/Pervious 18,625 0.95 Impervious 128,247 0.44 Weighted Average 109,622 85.48% Pervious Area 18,625 14.52% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 10yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment SB1: DRAINAGE AREA SWALE #SB1 Runoff = 2.19 cfs @ 0.09 hrs, Volume= 0.174 af, Depth> 3.84" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 16,775 0.35 Vegetated/Pervious 6,925 0.95 Impervious 23,700 0.53 Weighted Average 16,775 70.78% Pervious Area 6,925 29.22% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 10yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment SB2: DRAINAGE AREA SWALE #SB2 Runoff = 0.04 cfs © 0.09 hrs, Volume= 0.003 af, Depth> 2.54" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 618 0.35 Vegetated/Pervious 618 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 4 <4A> © <5A> < 6 > <6A> DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA SWALE#4 SWALE#4A SWALE#5 SWALE#5A SWALE#6 SWALE#6A ubcat) Reach on. Link Routing Diagram for 10yr-Swales 4,4A,5,5A,6,6A Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC 10yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 4: DRAINAGE AREA SWALE #4 Runoff = 1.11 cfs @ 0.09 hrs, Volume= 0.088 af, Depth> 4.85" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 4,490 0.35 Vegetated/Pervious 5,010 0.95 Impervious 9,500 0.67 Weighted Average 4,490 47.26% Pervious Area 5,010 52.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 10yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 4A: DRAINAGE AREA SWALE #4A Runoff = 1.17 cfs @ 0.09 hrs, Volume= 0.093 af, Depth> 4.64" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 5,490 0.35 Vegetated/Pervious 5,010 0.95 Impervious 10,500 0.64 Weighted Average 5,490 52.29% Pervious Area 5,010 47.71% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 10yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 5: DRAINAGE AREA SWALE #5 Runoff = 0.94 cfs @ 0.09 hrs, Volume= 0.075 af, Depth> 5.58" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 2,072 0.35 Vegetated/Pervious 4,928 0.95 Impervious 7,000 0.77 Weighted Average 2,072 29.60% Pervious Area 4,928 70.40% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 10yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 5A: DRAINAGE AREA SWALE #5A Runoff = 1.00 cfs @ 0.09 hrs, Volume= 0.080 af, Depth> 5.22" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 3,082 0.35 Vegetated/Pervious 4,928 0.95 Impervious 8,010 0.72 Weighted Average 3,082 38.48% Pervious Area 4,928 61.52% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 10yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 6: DRAINAGE AREA SWALE #6 Runoff = 1.08 cfs @ 0.09 hrs, Volume= 0.086 af, Depth> 6.01" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 1,540 0.35 Vegetated/Pervious 5,910 0.95 Impervious 7,450 0.83 Weighted Average 1,540 20.67% Pervious Area 5,910 79.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 10yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 6A: DRAINAGE AREA SWALE #6A Runoff = 1.19 cfs @ 0.09 hrs, Volume= 0.094 af, Depth> 5.22" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 3,560 0.35 Vegetated/Pervious 5,910 0.95 Impervious 9,470 0.72 Weighted Average 3,560 37.59% Pervious Area 5,910 62.41% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 411 <IA> <sBI> © © <SB2> DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA SWALE#1 SWALE#1A SWALE#2 SWALE#3 SWALE#SB1 SWALE#SB2 4ubcat Reach Pon 111 Routing Diagram for 25yr-Swales 1,1A,2,3,SB1,SB2 Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC 25yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=8.23 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1: DRAINAGE AREA SWALE #1 Runoff = 0.14 cfs @ 0.09 hrs, Volume= 0.011 af, Depth> 4.68" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 760 0.35 Vegetated/Pervious 520 0.95 Impervious 1,280 0.59 Weighted Average 760 59.38% Pervious Area 520 40.63% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 25yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, lnten=8.23 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1A: DRAINAGE AREA SWALE #1A Runoff = 0.44 cfs @ 0.09 hrs, Volume= 0.035 af, Depth> 4.04" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 3,380 0.35 Vegetated/Pervious 1,200 0.95 Impervious 4,580 0.51 Weighted Average 3,380 73.80% Pervious Area 1,200 26.20% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 25yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=8.23 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2: DRAINAGE AREA SWALE #2 Runoff = 9.48 cfs @ 0.09 hrs, Volume= 0.755 af, Depth> 3.41" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 100,695 0.35 Vegetated/Pervious 15,035 0.95 Impervious 115,730 0.43 Weighted Average 100,695 87.01% Pervious Area 15,035 12.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 25yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, lnten=8.23 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 3: DRAINAGE AREA SWALE #3 Runoff = 10.75 cfs © 0.09 hrs, Volume= 0.856 af, Depth> 3.49" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 109,622 0.35 Vegetated/Pervious 18,625 0.95 Impervious 128,247 0.44 Weighted Average 109,622 85.48% Pervious Area 18,625 14.52% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 25yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, lnten=8.23 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment SB1: DRAINAGE AREA SWALE #SB1 Runoff = 2.39 cfs @ 0.09 hrs, Volume= 0.190 af, Depth> 4.20" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 16,775 0.35 Vegetated/Pervious 6,925 0.95 Impervious 23,700 0.53 Weighted Average 16,775 70.78% Pervious Area 6,925 29.22% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 25yr- Swales 1,1A,2,3,SB1,SB2 Rainfall Duration=60 min, Inten=8.23 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Pace 7 Summary for Subcatchment SB2: DRAINAGE AREA SWALE #SB2 Runoff = 0.04 cfs @ 0.09 hrs, Volume= 0.003 af, Depth> 2.77" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 618 0.35 Vegetated/Pervious 618 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 4 <4A> © <5A> < 6 > <6A> DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA DRAINAGE AREA SWALE#4 SWALE#4A SWALE#5 SWALE#5A SWALE#6 SWALE#6A SUbCat Reach 'on. MI Routing Diagram for 25yr-Swales 4,4A,5,5A,6,6A Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC 25yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=8.23 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 4: DRAINAGE AREA SWALE #4 Runoff = 1.21 cfs @ 0.09 hrs, Volume= 0.097 af, Depth> 5.31" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 4,490 0.35 Vegetated/Pervious 5,010 0.95 Impervious 9,500 0.67 Weighted Average 4,490 47.26% Pervious Area 5,010 52.74% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 25yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=8.23 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 4A: DRAINAGE AREA SWALE #4A Runoff = 1.28 cfs @ 0.09 hrs, Volume= 0.102 af, Depth> 5.07" Runoff by Rational method, Rise/Fa►l=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 5,490 0.35 Vegetated/Pervious 5,010 0.95 Impervious 10,500 0.64 Weighted Average 5,490 52.29% Pervious Area 5,010 47.71% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 25yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, lnten=8.23 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Pace 4 Summary for Subcatchment 5: DRAINAGE AREA SWALE #5 Runoff = 1.03 cfs @ 0.09 hrs, Volume= 0.082 af, Depth> 6.10" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 2,072 0.35 Vegetated/Pervious 4,928 0.95 Impervious 7,000 0.77 Weighted Average 2,072 29.60% Pervious Area 4,928 70.40% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 25yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=8.23 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 5A: DRAINAGE AREA SWALE #5A Runoff = 1.10 cfs @ 0.09 hrs, Volume= 0.087 af, Depth> 5.71" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 3,082 0.35 Vegetated/Pervious 4,928 0.95 Impervious 8,010 0.72 Weighted Average 3,082 38.48% Pervious Area 4,928 61.52% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 25yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, Inten=8.23 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 6: DRAINAGE AREA SWALE #6 Runoff = 1.18 cfs @ 0.09 hrs, Volume= 0.094 af, Depth> 6.58" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 1,540 0.35 Vegetated/Pervious 5,910 0.95 Impervious 7,450 0.83 Weighted Average 1,540 20.67% Pervious Area 5,910 79.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min 25yr- Swales 4,4A,5,5A,6,6A Rainfall Duration=60 min, lnten=8.23 in/hr Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 6A: DRAINAGE AREA SWALE #6A Runoff = 1.30 cfs @ 0.09 hrs, Volume= 0.103 af, Depth> 5.71" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=8.23 in/hr Area (sf) C Description 3,560 0.35 Vegetated/Pervious 5,910 0.95 Impervious 9,470 0.72 Weighted Average 3,560 37.59% Pervious Area 5,910 62.41% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min Ni cri - Ni N � O n =r-r COD w 3 = w a al m S Q N O r' "ll O (D O� O. L N v ^ a) 0 (D �71 Sideslope, A. P A A Fig. 8.05b Z1 o O N C� in.) .-P.-, .), +, J1-p Sideslope, al 0 0 0 o Z2 -1 co 0 0 o Max. Depth, o o rn o rn o Fig. 8.05b d Fri- a) ac> w 0 V1 Ni Ni o Fig. 8.05b Top Width, T o P Cross- N o 0 o Fig. 8.05b N sectional 0) o area, A ..-. 1p G, Fig. 8.05b Wetted .A oz. Ni n.) Fig. P 0 r) 0 0 0 o Hydraulic z o 0 0 o Fig. 8.05b c 0) cfl co al Radius, R 3 C Z v 0 0 0 co Table Manning's m alco cri a)) N.) 8.05e Coefficient, n u) C) o w Manning's n w - o E n. Velocity, V m 5' (jiq v I I LINER Velocity arr ) REQ'D Check v -I 0 0 0 0 o Continuity Channel n cs, cn .p Eqn. Capacity, Q o cD OK OK OK OK Capacity Check Ni - - o f Shear 0) o of ono N Stress, Tau OK OK Shear Stress Check N - N) N h D 0 '~ C n Z7 D g D_ w C_'' (D S n CD E ��" -n.6ODi N N N 3 or Q A) 0 CD k< Sideslope, .A -A -P .A Fig. 8.05b Z1 o CD o N O N W t a, .A .A ,A Sideslope, 01 . N.) -' b Co. 0 o Z2 —I _ O o O Max. Depth, v p o Fig. 8.05b v d m _. co (TI N cn in �4N, Co iv Fig. 8.05b 9- Top Width, T b N O N O -p- Cross- CD CD O o Fig. 8.05b N sectional J 0) co `0 area, A w co iv Fig. 8.05b Peerimeter, P 5 o 0 01 N z iv - - o Fig. 8.05b - 3 Radius, R 0 m v 0 0 0 o Table Manning's m b N in N 8.05e Coefficient, n Cl) 0 in - 6 o Manning's Velocity, V 3 Co N) o Eqn. v � 3 D I LINER Velocity o- REQ'D Check v --1 0 o O o o Continuity - Channel D rn A C'„ N Eqn. Capacity, Q 0 3 CD OK OK OK OK Capacity Check ry — O 0- Shear U, N N Stress, Tau Shear Stress OK OK Check N — N N ' DO = C n J O CD 0 CD CD - CD Cr h Q cn a (n =. ... �.(CD 0 n ,Q D) —1 iii m Et Q- w m c -a Sv a- w D" O Fp M n () O rr ,l -i co N -o 0 0 -g oO �- mm - co -a Da 6p cn cn cn cn Fig. 8.05b Sideslope, Z o N N 0 0 0 — Fig. 8.05b Bottom al of � CO 0 0 0 o Width, b in 0 0 0 CD Max. Depth, 00 p IP w iv Fig. 8.05b v ca rn co cn co can d co a) 5 0 cn N 3 cn w co io Fig. 8.05b v Top Width, T 0 0 0 o co CD .A 01 Cross- *co No o a, Fig. 8.05b N sectional N cn cn area, A co ^' Fig. Wetted o rn w Perimeter, P g 'U O 0 0 o Hydraulic a• :A �,, i, Fig. 8.05b V CD 0 o CD i Radius, R 5 a Z Z c 3 0 co o Table Manning's 3 m y w N 8.05e Coefficient, n m (n C) NJ N A Manning's W W o :p Velocity, V co 5- CD n•co Ea ID N 3 I I INFR Velocity CT in Check m —1 o co rn Continuity 6- Channel 3 'cobo io N Eqn. Capacity, Q 3 CD cn OK OK OK OK Capacity Check 0 0 3 Shear o b o N Stress, Tau Shear Stress OK Check CD ,511 -' CD a) :=1: .OQ cn C —1 3 W " c, ca. __ ig n cn i. m " cD m n -. 2) --I cn _ na v O m N n (D O -No O O o EF (.D (D - v ^ @ 0 — o o 0 0 Fig. 8.05b Sideslope, Z o CD y N N -> — — Bottom cri o . 01 0 0 0 o Fig. 8.05b - Width, b 0 0co. o o Max. Depth, o p j 0 w Fig. 8.05b v d m Cb co � iv 0 01 ,,o —. N cri o 0' °' Fig. 8.05b Top Width, T o o o CD 0 v 01 01 a, +, Cross- rn Co Fig. 8.05b sectional co not co 00 °1 area, A 0 01 j o Fig. 8.05b Wetted Perimeter, P 0 'D 0 0 0 p Hydraulic i7f 3. - N N --• Fig. o N Radius, R o c z °' 0 o 0 o Table Manning's 3 ci) o, coo coon N 8.05e Coefficient, n m C) y o Manning'sEll b Velocity, V co 0) co Co Eqn. FrT 5- w 3 I I INFR Velocity v 0 REQ'D Check i —1 0 o y Continuity Channel 3 iv 0D O Eqn. Capacity, Q o co Cn OK OK OK OK Capacity Check 0 0 3 Shear c0 co -4 N Stress, Tau OK Shear Stress Check � n ' C - ', `G N (D :' s-' D - (CD (D -I 5 � sa 21 C �.• ._. �.(0 (12 Q) a (n () M" n (p O 3-h kncD Q. v 0 = CD 0 0 0 o Fig. 8.05b Sideslope, Z1 _. o 0) o N O N eo , -' Sideslope, cri cNn :P -s 0 0 0 0 O 0 0 o Z2 0 0 0 o Max. Depth, 0- _ o rn in W Fig. 8.05b v d m .� 0 0 N cn O 0 0 o Fig. 8.05b Top Width, T p j Cross- co cNi, m o Fig. 8.05b sectional .A o O O) area,A o �o co Fig. 8.05b 9 Perimeter, P a) 01 o O 0 0 o Hydraulic z ° iV N - b Fig. 8.05b 9 c (I)co cn cn m Radius, R 9 0 m v 0 0 0 o Table Manning's m cNi, i..) o N 8.05e Coefficient, n � c) 0 o n) Manning's =� sy n :A. o :A. N Velocity, V ci 5- o -.1 N .A Eqn. Sv 3 I !!NPR Velocity v REQ'D Check i H 0 0 o Continuity Channel cn a) N co Egli_Egli v Capacity, Q o CD 0) OK OK OK OK Capacity Check 0 0 0 0 0- Shear bo-.1 w o- N Stress,Tau OK OK Shear Stress Check CD - Si,) -0 5L) w * c, (Q Tl C —I (n. CD (• Q (n m = a (D p D- 1l O co N (D CD CT >� . 0 -1 ^ CCD .71 Sideslope, a, a, a, 01 Fig. 8.05b ZI — o (3) o N N a, 01 a, 01 Sideslope, �o .AI - 0 0 0 o Z2 —I O 0 0 o Max. Depth, a' p al rn OD w Fig. 8.05b v d m w y 0 0 Nin a) al co ivcn O 0 0 o Fig. 8.05b 5. Top Width, T N OD _ACross- in i ov Fig. 8.05b N sectional - Ni a) -- area,A ca 01 co w Fig. 8.05b ,, Wetted co — OD 01 Perimeter, P o -13 0 0 0 o Hydraulic Z o 'co iv — Fig. 8.05b Nic 0 - _A.(0 - Radius, R Cr z v o 0 0 o Table Manning's m • 0 cNi, ao tov 8.05e Coefficient, n al cn n 0 o w Manning's n N.) ccoo co Eqn. v Velocity, V t 3 D I LINER Velocity a- REQ'D Check v 0 Continuity Channel a w - w Eqn. Li..) Capacity, Q ca m CD OK OK OK OK Capacity Check Ni o ur Shear w c~i, o Ni N Stress, Tau OK Shear Stress Check al o ,., ,& •-ii m 3 ---h ccD C -' - -' Iv � 7o: .a cn -n < Si) ui• � " m 2 �� N v � crT o_ 0) a FIT o ,o Er N N Cr cL mac, ^ v p 0 0 o Fig. 8.05b 0Sideslope, Z1 o 0) 0 N N O 0 0 0 Sideslope, 01 0o . - 'o b O b Z2 O 0 0 o Max. Depth, Q O o :P. � N ; ,, Fig. 8.05b v F. io n rn op co c d op 'P < O a iv Ul iv w b cri N Fig. 8.05b v Top Width, T o o 0 0 0 0, Cross- 6-1 ooi N Fig. 8.05b N sectional N N co area,A N o co Wetted Fig. 8.05b Perimeter, P 01 .A iv iv • 0 0 0 o Hydraulic z �• K) O Fig. 8.05b c o w co iv w Radius, R 3 o 0 z v O p 0 o Table Manning's 0 iv O o, 8.05e Coefficient, n CP C n 0 0 w Manning's Velocit , V co v o N w o0o E9n y DO cn 3 I I !NPR VP.Incity a.) REQ'D Check v 0 0 o o ContinuityChannel n b o c~o Eon. Capacity, Q o 3 m (I) OK OK OK OK Capacity Check 0 0 �- Shear N 00 01 N Stress, Tau Shear Stress OK Check 6 co ` -1 CD /`n- lm_ — r((DDJD D w Q (Q. ran (D TO Q —I (a' Q. w n (I) (DT a v CD 0 -1 ^ CD �G Sideslope, cn cn rn rn Fig. 8.05b Z1 0 rn o N N b 0) a) a) o Sideslope, cn cn -P CO 0 0 0 Co Z2 —I co 0 o Max. Depth, o- o rn 0) o Fig. 8.05b 9 d a) -.4 C 0 cn ,p iv cn o N N o Fig. 8.05b Top Width, T 0 0 Cross- - .con k) K) Fig. 8.05b sectional area, A ca tted w o w Fig. 8.05b 9 Perimeter, P 5 ij 0 O 0 0 0 Fig. 8.05b Hydraulic z C. ccoo w cn o Radius, R 3 0 Z SD O 0 0 o Table Manning's 3 0 cN„ v, con N CD 8.05e Coefficient, n 0 0 0 w Manning's w I. a) a) n Eqn. Velocity, V Cl) DO ccn 3 D I LINER Velocity a REQ'D Check iv 0 0 o Continuity Channel n - con cn°' bo of Eqn. Capacity, Q o m 0) OK OK OK OK Capacity Check - - 0 0 P Shear Co � iso N C N Stress, Tau OK Shear Stress Check 13 n C N (D D- a- n � (D s X a) r+ .0 W. a C a) �" w (3.3. Q. O co 13) cn el CT Q. = v o CD 0 0 0 o Fig. Sideslope, Z1 � O 0) Co N :P O N OD .0 0 0 0 o Sideslope, (n (n .4 01 0 0 0 o Z2 0 0 0 p Max. Depth, 0- -' p co iv Fig. 8.05b d c o o co ? 0 C iv.001 en 0 0 0 IP o Fig. 8.05b Top Width, T oo Cross- IV o 'CA b) iv Fig. 8.05b N sectional area, A wN Wetted CP Fig. 8.05b - A Perimeter, P o II o 0 0 o Hydraulic z ° 6. iv o Fig. 8.05b 3 .A COo Co Radius, R0 0 z 1 a) o 0 0 o Table Manning's a) cNi, •u, rov 8.05e Coefficient, n Cl)cn C) 0 0 o.) Manning's v e ill . Eqn. 0 Velocity, V m a rn 3 I I INFR Velocity gar REQ'D Check v —I 0 o o Continuity Channel 0o W co w Eqn. Capacity, Q o 0 OK OK OK OK Capacity Check 0 0 3 Shear o N Cow N Stress, Tau OK Shear Stress Check N N N a- 'O 0 = C n tJ 0 DI N D w `, C (fl 2. "fl C (D (D = O' C (Q Q. u) A) (n (D = n (D (- ,3 TI Cos, (D a' m Cr CL A) � m p 1< Sideslope, 00 00 CO CO Fig. 8.05b Z1 o rn o iv -P o N CO O 0 0 o Sideslope, (n co .P -s 0 Co 'co Co Z2 —I o 0 0 o Max. Depth, 6_ - p in 4 N Fig. 8.05b d m 03 Co 0 0 ivA N) al N rn Fig. 8.05b v Top Width, T (,o Cross- CO o Fig. 8.05b 1 sectional oo N 01 area,A w Fig. 8.05b V Wetted o a) co Perimeter, P o 73 N N o p Fig. 8.05b v Hydraulic m co co a) co Radius, R 3 0 0 z v o 0 0 o Table Manning's o 0 01 01 8.05e Coefficient, n cn (n C) 0 0 w Manning's v a) :s, a) iv o Velocity, V m St co 0o N o Eqn. B) It D I I INFR Velocity a REQ'D Check v —1 0 - -_, — Continuity 3 Channel m 0.) o a) am. Capacity, Q 0 CD OK OK OK OK Capacity Check co 0 0 F- Shear a a)) co N Stress, Tau OK Shear Stress Check N -` I�) I.) 4. D 0 ^ C (')� Xi 0 3• m w C (p In e Cn � � � C � Co a m = , (D p ,3 -n O co >y ^ CD N O 5 ] >Z - w p 5 ^ CD Sideslope, w o) w w Fig. 8.05b Z1 o rn N Ni co co o.) co Sideslope, 01 o -A Ni O 0 0 o Z2 -I _ 0 0 o Max. Depth, cr !`� o (COO N J Fig. 8.05b v d m — i cfl 0 w .0 N 01 w 'oND Fig. 8.05b v Top Width, T N.)A .A N) N W co _ Cross- b) w v, Fig. 8.05b N sectional co am rn area, A b) C in Co Fig. 8.05b - Wetted .A co cn -- Perimeter, P o T 0 0 0 o Hydraulic z Crt N N Fig. 8.05b Radius, R 3 0 3 O z v 0 0 o Table Manning's o iv0 N 8.05e Coefficient, n • C) O o ry Manning's a, a, e r�"v w N `IA Eqn. N Velocity, V iv An 3 co i I INFR \/elnrity sv e- REQ'D Check v --1 0 — Continuity Channel n N.) N) — . N Eqn. Capacity, Q 0 .A 3 co 0) OK OK OK OK Capacity Check O 0 0 0 0- Shear 0 CP COn' N Stress, Tau OK OK Shear Stress Check n ._ C `$ ` m m =- a- n - CD CD -. co v a: v.o cn z W c.0 ' 0 n C _I � m cn 0 cu sw m S Q ( o h -n0 o1 CD Q. v ^ v 0 m n< Sideslope, co coc,> co Fig. 8.05b Z1 o o N N Sideslope, 01 N CD co 0) co w 0 0 0 o Z2 e Max. o C. 0 0 o Depth, p iv iv v1 6 Fig. 8.05b d m o 5, 0 a ct N _a o o cn im o Fig. 8.05b 9 Top Width, T o .p Cross- i _a 6o 0 o Fig. 8.05b sectional -P --,I -.1 N area, A 0 o Wetted .iv 2n Fig. 8.05b iv Perimeter, P o 0 0 0 0 o Fig. 8.05b Hydraulic z o. CO .A Radius, R 3 0 Cr Z v 0 0 0 o Table Manning's CD cNn iv N 8.05e Coefficient, n (i) 0 0 o o — Manning's s iv iv in iv Velocity, V co o) Ivcn cm 0 Eqn. m u) 3 Co = VEG Velocity N v ONLY Check v H 0 0 0 o Continuity 0 Channel m 0 CP b 0A w Eqn. Capacity, Q 0 . CD CD OK OK OK OK Capacity Check 0 0 0 0 3 Shear cc"'n o cc. N Stress, Tau OK OK Shear Stress Check 1S Pre-Development 2S 3S1> 1 Post-Development Post-Development Dry Detention Basin Bypassing Basin Draining to Basin Subcat Reach on• Link Routing Diagram for Chatham Habitat for Humanity-Stormwater Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Chatham Habitat for Humanity- Stormwater Type 1124-hr 9 yr Rainfall=2.99" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: Pre-Development Runoff = 1.67 cfs @ 12.15 hrs, Volume= 0.241 af, Depth= 0.27" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.99" Area (ac) CN Description 8.190 55 Woods, Good, HSG B 2.180 61 >75% Grass cover, Good, HSG B * 0.320 98 Impervious 10.690 58 Weighted Average 10.370 97.01% Pervious Area 0.320 2.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0180 0.17 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 6.3 1,281 0.0450 3.42 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 15.9 1,381 Total Chatham Habitat for Humanity- Stormwater Type 1124-hr 1 yr Rainfall=2.99" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 2S: Post-Development Bypassing Basin Runoff = 0.08 cfs @ 12.09 hrs, Volume= 0.015 af, Depth= 0.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.99" Area (ac) CN Description 0.940 55 Woods, Good, HSG B 0.940 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.6 100 0.0470 0.25 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 3.1 262 0.0800 1.41 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 9.7 362 Total Chatham Habitat for Humanity- Stormwater Type Il 24-hr 1 yr Rainfall=2.99" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 3S: Post-Development Draining to Basin Runoff = 7.30 cfs @ 12.07 hrs, Volume= 0.505 af, Depth= 0.62" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.99" Area (ac) CN Description 7.890 61 >75% Grass cover, Good, HSG B * 0.760 98 Impervious * 1.100 98 Future Impervious 9.750 68 Weighted Average 7.890 80.92% Pervious Area 1.860 19.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0180 0.17 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 1.6 390 0.0600 3.94 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.9 460 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 0.4 170 0.0500 7.47 17.92 Channel Flow, Area= 2.4 sf Perim= 5.7' r= 0.42' n= 0.025 0.2 40 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 12.7 1,160 Total Chatham Habitat for Humanity- Stormwater Type II 24-hr 1 yr Rainfall=2.99" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 5 Summary for Pond 1 P: Dry Detention Basin Inflow Area = 9.750 ac, 19.08% Impervious, Inflow Depth = 0.62" for 1 yr event Inflow = 7.30 cfs © 12.07 hrs, Volume= 0.505 af Outflow = 0.28 cfs @ 17.33 hrs, Volume= 0.501 af, Atten= 96%, Lag= 316.0 min Primary = 0.28 cfs @ 17.33 hrs, Volume= 0.501 af Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 613.52' @ 17.33 hrs Surf.Area= 8,676 sf Storage= 11,989 cf Plug-Flow detention time= 596.4 min calculated for 0.501 af(99% of inflow) Center-of-Mass det. time= 592.6 min ( 1,485.2 - 892.6 ) Volume Invert Avail.Storage Storage Description #1 612.00' 49,675 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 612.00 6,944 0 0 613.00 8,060 7,502 7,502 614.00 9,248 8,654 16,156 614.50 9,800 4,762 20,918 615.00 10,508 5,077 25,995 616.00 11,840 11,174 37,169 617.00 13,172 12,506 49,675 Device Routing Invert Outlet Devices #1 Primary 612.00' 6.0" Round Culvert L= 30.0' CPP, projecting, no headwall, Ke= 0.900 Inlet/ Outlet Invert= 612.00'/ 611.70' S= 0.0100 '/' Cc= 0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.20 sf #2 Device 1 612.00' 3.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 615.00' 8.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Primary 615.50' Asymmetrical Weir, C= 3.27 Offset (feet) 0.00 4.50 14.50 19.00 Height (feet) 1.50 0.00 0.00 1.50 Primary OutFlow Max=0.28 cfs @ 17.33 hrs HW=613.52' (Free Discharge) 1=Culvert (Passes 0.28 cfs of 0.84 cfs potential flow) aL2=Orifice/Grate (Orifice Controls 0.28 cfs @ 5.68 fps) 3=Orifice/Grate ( Controls 0.00 cfs) 4=Asymmetrical Weir ( Controls 0.00 cfs) Chatham Habitat for Humanity- Stormwater Type 1124-hr 2 yr Rainfall=3.61" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 1S: Pre-Development Runoff = 4.52 cfs @ 12.12 hrs, Volume= 0.443 af, Depth= 0.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2 yr Rainfall=3.61" Area (ac) CN Description 8.190 55 Woods, Good, HSG B 2.180 61 >75% Grass cover, Good, HSG B * 0.320 98 Impervious 10.690 58 Weighted Average 10.370 97.01% Pervious Area 0.320 2.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0180 0.17 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 6.3 1,281 0.0450 3.42 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 15.9 1,381 Total Chatham Habitat for Humanity- Stormwater Type II 24-hr 2 yr Rainfall=3.61" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 2S: Post-Development Bypassing Basin Runoff = 0.34 cfs @ 12.06 hrs, Volume= 0.030 af, Depth= 0.38" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2 yr Rainfall=3.61" Area (ac) CN Description 0.940 55 Woods, Good, HSG B 0.940 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.6 100 0.0470 0.25 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 3.1 262 0.0800 1.41 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 9.7 362 Total Chatham Habitat for Humanity- Stormwater Type 1124-hr 2 yr Rainfall=3.61" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 3S: Post-Development Draining to Basin Runoff = 12.21 cfs @ 12.06 hrs, Volume= 0.785 af, Depth= 0.97" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 2 yr Rainfall=3.61" Area (ac) CN Description 7.890 61 >75% Grass cover, Good, HSG B * 0.760 98 Impervious * 1.100 98 Future Impervious 9.750 68 Weighted Average 7.890 80.92% Pervious Area 1.860 19.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0180 0.17 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 1.6 390 0.0600 3.94 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.9 460 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 0.4 170 0.0500 7.47 17.92 Channel Flow, Area= 2.4 sf Perim= 5.7' r= 0.42' n= 0.025 0.2 40 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 12.7 1,160 Total Chatham Habitat for Humanity- Stormwater Type 1124-hr 2 yr Rainfall=3.61" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 9 Summary for Pond 1P: Dry Detention Basin Inflow Area = 9.750 ac, 19.08% Impervious, Inflow Depth = 0.97" for 2 yr event Inflow = 12.21 cfs @ 12.06 hrs, Volume= 0.785 af Outflow = 0.36 cfs @ 18.09 hrs, Volume= 0.780 af, Atten= 97%, Lag= 361.6 min Primary = 0.36 cfs © 18.09 hrs, Volume= 0.780 af Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 614.47' @ 18.09 hrs Surf.Area= 9,770 sf Storage= 20,661 cf Plug-Flow detention time= 748.4 min calculated for 0.779 af (99% of inflow) Center-of-Mass det. time= 746.1 min ( 1,622.8 - 876.8 ) Volume Invert Avail.Storage Storage Description #1 612.00' 49,675 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 612.00 6,944 0 0 613.00 8,060 7,502 7,502 614.00 9,248 8,654 16,156 614.50 9,800 4,762 20,918 615.00 10,508 5,077 25,995 616.00 11,840 11,174 37,169 617.00 13,172 12,506 49,675 Device Routing Invert Outlet Devices #1 Primary 612.00' 6.0" Round Culvert L= 30.0' CPP, projecting, no headwall, Ke= 0.900 Inlet/ Outlet Invert= 612.00' /611.70' S= 0.0100 '/' Cc= 0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.20 sf #2 Device 1 612.00' 3.0"Vert. Orifice/Grate C= 0.600 #3 Device 1 615.00' 8.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Primary 615.50' Asymmetrical Weir, C= 3.27 Offset (feet) 0.00 4.50 14.50 19.00 Height (feet) 1.50 0.00 0.00 1.50 Primary OutFlow Max=0.36 cfs © 18.09 hrs HW=614.47' (Free Discharge) -1=Culvert (Passes 0.36 cfs of 1.11 cfs potential flow) ' 2=Orifice/Grate (Orifice Controls 0.36 cfs @ 7.38 fps) 3=Orifice/Grate ( Controls 0.00 cfs) -4=Asymmetrical Weir ( Controls 0.00 cfs) Chatham Habitat for Humanity- Stormwater Type II 24-hr 10 yr Rainfall=5.23" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 1S: Pre-Development Runoff = 15.62 cfs @ 12.10 hrs, Volume= 1.156 af, Depth= 1.30" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10 yr Rainfall=5.23" Area (ac) CN Description 8.190 55 Woods, Good, HSG B 2.180 61 >75% Grass cover, Good, HSG B * 0.320 98 Impervious 10.690 58 Weighted Average 10.370 97.01% Pervious Area 0.320 2.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0180 0.17 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 6.3 1,281 0.0450 3.42 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 15.9 1,381 Total Chatham Habitat for Humanity- Stormwater Type II 24-hr 10 yr Rainfall=5.23" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 2S: Post-Development Bypassing Basin Runoff = 1.41 cfs @ 12.03 hrs, Volume= 0.086 af, Depth= 1.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10 yr Rainfall=5.23" Area (ac) CN Description 0.940 55 Woods, Good, HSG B 0.940 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.6 100 0.0470 0.25 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 3.1 262 0.0800 1.41 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 9.7 362 Total Chatham Habitat for Humanity- Stormwater Type II 24-hr 10 yr Rainfall=5.23" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 3S: Post-Development Draining to Basin Runoff = 27.38 cfs @ 12.05 hrs, Volume= 1.662 af, Depth= 2.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 10 yr Rainfall=5.23" Area (ac) CN Description 7.890 61 >75% Grass cover, Good, HSG B * 0.760 98 Impervious * 1.100 98 Future Impervious 9.750 68 Weighted Average 7.890 80.92% Pervious Area 1.860 19.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0180 0.17 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 1.6 390 0.0600 3.94 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.9 460 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 0.4 170 0.0500 7.47 17.92 Channel Flow, Area= 2.4 sf Perim= 5.7' r= 0.42' n= 0.025 0.2 40 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 12.7 1,160 Total Chatham Habitat for Humanity- Stormwater Type II 24-hr 10 yr Rainfall=5.23" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 13 Summary for Pond 1P: Dry Detention Basin Inflow Area = 9.750 ac, 19.08% Impervious, Inflow Depth = 2.04" for 10 yr event Inflow = 27.38 cfs @ 12.05 hrs, Volume= 1.662 af Outflow = 3.94 cfs @ 12.55 hrs, Volume= 1.655 af, Atten= 86%, Lag= 29.7 min Primary = 3.94 cfs @ 12.55 hrs, Volume= 1.655 af Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 615.68' @ 12.55 hrs Surf.Area= 11,410 sf Storage= 33,560 cf Plug-Flow detention time= 548.6 min calculated for 1.655 af(100% of inflow) Center-of-Mass det. time= 546.2 min ( 1,399.4- 853.2 ) Volume Invert Avail.Storage Storage Description #1 612.00' 49,675 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 612.00 6,944 0 0 613.00 8,060 7,502 7,502 614.00 9,248 8,654 16,156 614.50 9,800 4,762 20,918 615.00 10,508 5,077 25,995 616.00 11,840 11,174 37,169 617.00 13,172 12,506 49,675 Device Routing Invert Outlet Devices #1 Primary 612.00' 6.0" Round Culvert L= 30.0' CPP, projecting, no headwall, Ke= 0.900 Inlet/ Outlet Invert= 612.00'/611.70' S= 0.0100 '/' Cc= 0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.20 sf #2 Device 1 612.00' 3.0"Vert. Orifice/Grate C= 0.600 #3 Device 1 615.00' 8.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Primary 615.50' Asymmetrical Weir, C=3.27 Offset (feet) 0.00 4.50 14.50 19.00 Height (feet) 1.50 0.00 0.00 1.50 Primary OutFlow Max=3.92 cfs @ 12.55 hrs HW=615.68' (Free Discharge) -1=Culvert (Inlet Controls 1.38 cfs @ 7.04 fps) -2=Orifice/Grate (Passes < 0.45 cfs potential flow) 3=Orifice/Grate (Passes < 1.38 cfs potential flow) -4=Asymmetrical Weir (Weir Controls 2.53 cfs © 1.30 fps) Chatham Habitat for Humanity- Stormwater Type 1124-hr 25 yr Rainfall=6.19" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 1 S: Pre-Development Runoff = 23.71 cfs @ 12.10 hrs, Volume= 1.671 af, Depth= 1.88" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25 yr Rainfall=6.19" Area (ac) CN Description 8.190 55 Woods, Good, HSG B 2.180 61 >75% Grass cover, Good, HSG B * 0.320 98 Impervious 10.690 58 Weighted Average 10.370 97.01% Pervious Area 0.320 2.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0180 0.17 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 6.3 1,281 0.0450 3.42 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 15.9 1,381 Total Chatham Habitat for Humanity- Stormwater Type II 24-hr 25 yr Rainfall=6.19" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 2S: Post-Development Bypassing Basin Runoff = 2.21 cfs @ 12.03 hrs, Volume= 0.128 af, Depth= 1.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25 yr Rainfall=6.19" Area (ac) CN Description 0.940 55 Woods, Good, HSG B 0.940 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.6 100 0.0470 0.25 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 3.1 262 0.0800 1.41 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 9.7 362 Total Chatham Habitat for Humanity- Stormwater Type II 24-hr 25 yr Rainfall=6.19" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 3S: Post-Development Draining to Basin Runoff = 37.37 cfs @ 12.05 hrs, Volume= 2.249 af, Depth= 2.77" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Type II 24-hr 25 yr Rainfall=6.19" Area (ac) CN Description 7.890 61 >75% Grass cover, Good, HSG B * 0.760 98 Impervious * 1.100 98 Future Impervious 9.750 68 Weighted Average 7.890 80.92% Pervious Area 1.860 19.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.6 100 0.0180 0.17 Sheet Flow, Grass: Short n= 0.150 P2= 3.60" 1.6 390 0.0600 3.94 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.9 460 0.0200 8.41 14.86 Pipe Channel, 18.0" Round Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, bends & connections 0.4 170 0.0500 7.47 17.92 Channel Flow, Area= 2.4 sf Perim= 5.7' r= 0.42' n= 0.025 0.2 40 0.0500 3.60 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 12.7 1,160 Total Chatham Habitat for Humanity- Stormwater Type II 24-hr 25 yr Rainfall=6.19" Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 17 Summary for Pond 1 P: Dry Detention Basin Inflow Area = 9.750 ac, 19.08% Impervious, Inflow Depth = 2.77" for 25 yr event Inflow = 37.37 cfs @ 12.05 hrs, Volume= 2.249 af Outflow = 16.34 cfs @ 12.22 hrs, Volume= 2.242 af, Atten= 56%, Lag= 10.4 min Primary = 16.34 cfs @ 12.22 hrs, Volume= 2.242 af Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 616.05' @ 12.22 hrs Surf.Area= 11,901 sf Storage= 37,746 cf Plug-Flow detention time= 418.6 min calculated for 2.242 af(100% of inflow) Center-of-Mass det. time= 416.7 min ( 1,261.0 - 844.3 ) Volume Invert Avail.Storage Storage Description #1 612.00' 49,675 cf Custom Stage Data (Prismatic)Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 612.00 6,944 0 0 613.00 8,060 7,502 7,502 614.00 9,248 8,654 16,156 614.50 9,800 4,762 20,918 615.00 10,508 5,077 25,995 616.00 11,840 11,174 37,169 617.00 13,172 12,506 49,675 Device Routing Invert Outlet Devices #1 Primary 612.00' 6.0" Round Culvert L= 30.0' CPP, projecting, no headwall, Ke= 0.900 Inlet/ Outlet Invert= 612.00'/ 611.70' S= 0.0100 '/' Cc= 0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.20 sf #2 Device 1 612.00' 3.0"Vert. Orifice/Grate C= 0.600 #3 Device 1 615.00' 8.0" Horiz. Orifice/Grate C= 0.600 Limited to weir tlow at low heads #4 Primary 615.50' Asymmetrical Weir, C=3.27 Offset (feet) 0.00 4.50 14.50 19.00 Height (feet) 1.50 0.00 0.00 1.50 Primary OutFlow Max=15.66 cfs @ 12.22 hrs HW=616.03' (Free Discharge) 1=Culvert (Inlet Controls 1.45 cfs @ 7.39 fps) AL2=Orifice/Grate (Passes < 0.47 cfs potential flow) 3=Orifice/Grate (Passes < 1.71 cfs potential flow) 4=Asymmetrical Weir (Weir Controls 14.21 cfs @ 2.04 fps) Figure 8.06a: Design of outlet protection from a round pipe flowing f tailwater condition (Tw<0.5 diameter) Outlet W a D° + La 9:3 .. .i.: ::1:•�•-- '- .is pipe I :. i,; .. is ..,"* io diameter (00) `�..�.i I: ;IJ ., . I' j. rii' La ---•4 A0, 1 .. , . . '" tAr � i water 0.5D° ' H I 1.,1;I I ; 01. )%44,I(ri�f 11) 7 I_ 1-- 'I; - Ill I} " ,pry �a�v �i11 .„.• 1 , 1 . I I: I :Ij ,r i it �,p 60 .. _ I I . ',/ 1ddl'ill i I ( Ir , _ l l' , i'. l l III l,il ii11 4 r 0 • A d(� 1 4 ilir• : I : ;••'I1111I • 00lraIai1I . L 1Il1Il1 I 1 1 I Z �rii� a 1I1- 1 . ,:,-�, lfhill 1111 . ........ 151..�� r' ‘ I J : f$gIIIIjIIRIg i 1,�IIo �, 20 AI 1 1. 1p . 1.. , .. 11 dQii'• ' ' I . .,II 3 .n.,. . :I 1: ' 1 f t ` 0 !tifi' ,�- 41., 11111111111:Mgqi:r11.11"!;17;..11,' il) llllill I - tln , I ; r f ii!!a 1►PoI u�r �Ripe. 111�,111I;►�IIII1 Milli -�it it Mil !'.' : '1 ' ' . , : 0;101 �li . 11 firm 0$1, i I i I 1111111111111 I; ,I it i �P� ''� !,ljl�sil����� Ii u I 11it I11 QII i -. !: j 1�1::j '►1 ,I��I I , 1 , ;i., +i� !;,�, ,,�i'i + III, uII �, %?S- � � .��r�Ill{r9 al 1�Iii�l, kl II II B1 0 �, 1 . 4 - ril:11i ,ii•4 ,, 1 OIPhiii ;1 II 1h v �. - .:�- .., . 11.�fli�' t} iIi1iIi1iI I I, All I, ,. 15 lipo- -�..� : I i; I I. I ti I,.,II `III 1 i i ��' ..�rm_. r . r 1 1 1 I il::' ll I. r1 .1 1 ;; L- I1 : . : C 3 5 10 20 50 100 200 500 'ACC ;I Discharge(ft3/sec) ! Curves may not be extrapolated. Figure 8,O6a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter) I(,, ree S 6 f f A La 10 0)p ai A, _ l t " /. S it - 1S > A > 3R DRAINAGE AREA FOR PIPE #1 SWALE #2 PIPE #1 (Subca Reach 'on. Ili Routing Diagram for Pipe#1 Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Pipe#1 Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: DRAINAGE AREA FOR PIPE #1 Runoff = 7.42 cfs @ 0.09 hrs, Volume= 0.591 af, Depth> 2.97" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 11,260 0.95 Impervious 92,690 0.35 Grass 103,950 0.41 Weighted Average 92,690 89.17% Pervious Area 11,260 10.83% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min Pipe #1 Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 3 Summary for Reach 3R: SWALE #2 Inflow Area = 2.386 ac, 10.83% Impervious, Inflow Depth > 2.97" Inflow = 7.42 cfs @ 0.09 hrs, Volume= 0.591 af Outflow = 7.42 cfs @ 0.37 hrs, Volume= 0.582 af, Atten= 0%, Lag= 16.8 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Max. Velocity= 2.02 fps, Min. Travel Time= 0.8 min Avg. Velocity= 1.96 fps, Avg. Travel Time= 0.8 min Peak Storage= 360 cf @ 0.36 hrs Average Depth at Peak Storage= 0.32' Bank-Full Depth= 0.98' Flow Area= 14.6 sf, Capacity= 56.10 cfs 10.00' x 0.98' deep channel, n= 0.070 Earth, grassed &winding Side Slope Z-value= 5.0 '/' Top Width= 19.80' Length= 98.0' Slope= 0.0498 '/' Inlet Invert= 629.00', Outlet Invert= 624.12' Pipe #1 Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Pond 2P: PIPE #1 Inflow Area = 2.386 ac, 10.83% Impervious, Inflow Depth > 2.97" Inflow = 7.42 cfs @ 0.09 hrs, Volume= 0.591 af Outflow = 7.42 cfs @ 0.09 hrs, Volume= 0.591 af, Atten= 0%, Lag= 0.0 min Primary = 7.42 cfs @ 0.09 hrs, Volume= 0.591 af Routing by Dyn-Stor-Ind method, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Peak Elev= 630.95' @ 0.09 hrs Device Routing Invert Outlet Devices #1 Primary 629.36' 18.0" Round Culvert L= 36.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 629.36' / 629.00' S= 0.0100 '/' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max=7.42 cfs @ 0.09 hrs HW=630.95' TW=629.31' (Dynamic Tailwater) L1=Culvert (Barrel Controls 7.42 cfs @ 4.93 fps) 1 S -> 2P - > 3R DRAINAGE AREA FOR PIPE #2 SWALE #3 PIPE #2 (Subcat Reach 'on• Link Routing Diagram for Pipe#2 Prepared by E2S HydroCAD®10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Pipe #2 Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment IS: DRAINAGE AREA FOR PIPE #2 Runoff = 8.66 cfs @ 0.09 hrs, Volume= 0.690 af, Depth> 3.11" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Rainfall Duration=60 min, Inten=7.52 in/hr Area (sf) C Description 15,035 0.95 Impervious 100,695 0.35 Grass 115,730 0.43 Weighted Average 100,695 87.01% Pervious Area 15,035 12.99% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 5-min Pipe #2 Rainfall Duration=60 min, Inten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 3 Summary for Reach 3R: SWALE #3 Inflow Area = 2.657 ac, 12.99% Impervious, Inflow Depth > 3.11" Inflow = 8.66 cfs @ 0.09 hrs, Volume= 0.690 af Outflow = 8.66 cfs @ 0.54 hrs, Volume= 0.676 af, Atten= 0%, Lag= 27.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Max. Velocity= 1.46 fps, Min. Travel Time= 1.1 min Avg. Velocity = 1.41 fps, Avg. Travel Time= 1.2 min Peak Storage= 595 cf© 0.53 hrs Average Depth at Peak Storage= 0.35' Bank-Full Depth= 1.01' Flow Area= 30.5 sf, Capacity= 80.52 cfs 10.00' x 1.01' deep channel, n= 0.090 Side Slope Z-value= 20.0 'I' Top Width= 50.40' Length= 100.0' Slope= 0.0500 '/' Inlet Invert= 624.00', Outlet Invert= 619.00' Pipe #2 Rainfall Duration=60 min, lnten=7.52 in/hr Prepared by E2S HydroCAD® 10.00-26 s/n 07329 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Pond 2P: PIPE #2 Inflow Area = 2.657 ac, 12.99% Impervious, Inflow Depth > 3.11" Inflow = 8.66 cfs @ 0.09 hrs, Volume= 0.690 af Outflow = 8.66 cfs @ 0.09 hrs, Volume= 0.690 af, Atten= 0%, Lag= 0.0 min Primary = 8.66 cfs @ 0.09 hrs, Volume= 0.690 af Routing by Dyn-Stor-Ind method, Time Span= 0.00-1.00 hrs, dt= 0.01 hrs Peak Elev= 626.14' @ 0.09 hrs Device Routing Invert Outlet Devices #1 Primary 624.12' 18.0" Round Culvert L= 12.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 624.12' / 624.00' S= 0.0100 '/' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf Primary OutFlow Max=8.66 cfs @ 0.09 hrs HW=626.14' TW=624.33' (Dynamic Tailwater) 4-1=Culvert (Barrel Controls 8.66 cfs @ 4.90 fps) Attachment C: Boring Logs e2s CLIENT: Chatham Habitat for Humanity BORING NO.: B-1 DATE:4/26/23 PROJECT NAME: Chatham Habitat for Humanity Townhomes JOB NO.: PROJECT LOCATION: TBD Craft Lane Siler City, NC STATION: BORING METHOD: Hand Auger FOREMAN: Robert Brantly ROCK CORE DIA.: INSPECTOR: SHELBY TUBE O.D.: **SPT u WELL DIAGRAM H„ DESCRIPTION & REMARKS w goy a o9 to w t- Q > EQ.NrI- q Uz 0 U .O SURFACE ELEVATION:_. 619.0 m a - Dark brown silty CLAY(CL),moist 1.0 - Reddish brown(2.5YR-4/6) silty 2 — CLAY(CL), moist 3 — 4 - 5 — 6 - 7- 8.0 8— _ _ Boring Terminated at 8 ft. (El. 611.0) - (1 -Ben Well Legend lonite ®-Cement Grout -Sand _ --2De r4N VCScreen. 2'Line:PVC BORING METHOD GROUND WATER HSA-HOLLOW STEM AUGER \\,/ NOTED ON RODS Dry FT. _ AFTER FIRS. FT. CFA-CONTINUOUS FLIGHT AUGER *ORGANIC VAPOR METER, DC-DRIVEN CASING PARTS PER MILLION Iv. AT COMPLETION Dry FT. _ AFTER HRS. FT. MD-MUD DRILLING RC-ROCK CORING **STANDARD PENETRATION TEST _ AFTER HRS. FT. _ AFTER_ HRS. FT. CLIENT: Chatham Habitat for Humanity BORING NO.: B-2 DATE:4/26/23 PROJECT NAME: Chatham Habitat for Humanity Townhomes JOB NO.: PROJECT LOCATION: TBD Craft Lane Slier City, NC STATION: BORING METHOD: Hand Auger FOREMAN: Robert Brantly ROCK CORE DIA.: INSPECTOR: SHELBY TUBE O.D.: **SPT u WELL DIAGRAM u� QF a F H DESCRIPTION & REMARKS 4 0. a goF Qul v t- Nz e 8 2 $ " SURFACE ELEVATION: 614.0 ro P ; - Dark brown silty CLAY(CL),moist 1.0 1 - Reddish brown(2.5YR-4/6) silty 2 - CLAY (CL),moist 3 - 4- 5.0 5 - _ Boring Terminated at 5 ft. (El. 609.0) it - II Well Legend ®-Bentonite ®-Cement Grout — 0-Sand _ 2"Diameter No.10 Screen, _ Schedule 40 PVC 111 2"DiamPi.er PVC Solidete BORING METHOD GROUND WATER HSA-HOLLOW STEM AUGER N.,./ NOTED ON RODS DryFT. ler AFTER HRS.__ FT. CPA-CONTINUOUS FLIGHT AUGER *ORGANIC VAPOR METER, DC-DRIVEN CASING PARTS PER MILLION AT COMPLETION Dry FT. _ AFTER HRS. FT. IMD-MUD DRILLING RC-ROCK CORING **STANDARD PENETRATION TEST _ AFTER HRS. FT. _ AFTER FIRS. FT.