Loading...
HomeMy WebLinkAboutSW5230802_Plansheet - Grading/Drainage Plan_20240612 (2) ri I I W 64 P� k T 60 z Q$ R Cy" % 0 I M I - I SWALE LINER/NETTING DETAILS ........... F w II Nettingand Synthetic Liner Installation v P4 '• 'o"o ° H/ F�°>o Temporary Liner(Straw Mulch held in place with Plastic of Jute Netting) Roll out strips of netting parallel �` _ o to the direction of the flow J •:CD ?, 1. Start the laying of net from the top of the upstream end of the channel and w u? _ I i4" unroll it downgrade. Do NOT stretch netting. .L ,, c►5 -' 2. Bury the upslope end and staple the net every 12" across the top end,every • �.' C U stream end 1 °°°, 0 ' PIPE 1.18"DIA. - 3 feet around the edges and across the net so that the straw is held closely • d'd L1Sr` - p 3 3 �w 'S 103950 SF DRAINAGE AREA. III I I against the soil. Do NOT stretch the netting when stapling. 0 ' °° (11260 SF IMPERVIOUS) ` �' I �I I I- 3. Netting strips should be joined together along the sides with a 3"overlap !41 I-III= =i and stapled together. III-� 4. To join ends of strips,insert the new roll of net in a trench as with upslope 4�t =III_ end and overlapit 1-8"with the previously laid upper roll. Turn under 6' of i I W I=I I the 18 overlap and staple every 12 across the end. Liner/Netting Maintenance Considerations Anchor nettin m a 6"trench 1. Inspect Liner and Netting (RECP) at least weakly and after each significant(1/2 inch or greater) rain fall event. Make any necessary repairs immediately. 2. Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. l� 3. Any areas of the Liner and Netting that are damaged or not in close contact with the ground shall be repaired and stapled. z 4. If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. W l • _ _ - ' I III �T=��l�ll�IlWI1� �1 7TT-I� I U round I11 rrii S. Monitor and repair the Liner and Netting as necessary until ground cover is established. Downstream end � W Join stn s b anchorm and overlapping USGS MAP 1 =300' z OQ WaterShed Area s ft. Flow Rate cfs Temp. Stabilization U q• C Minimum t (min) V ft/sec Shear Allowable V ft/sec Depth , ft Swale Side Bottom (average) Slope, ft/ft 2 Stress, Shear 10 ' 10 Slope Width, Swale # Total Q2 Q10 Q25 (Unlined) Ib/ft3 Stres3s, (vegetated) Depth, ft. (H.V) ft O Ib/ft �n 1 1280 0.59 5 0.1 0.13 0.14 0.125 3.50 1.25 1 .45 1 .15 0.18 0.68 4:1 0 1 A 4,580 0.51 5 0.32 0.41 0.44 0.077 3.60 1 .15 1 .45 1 .14 0.30 0.80 4:1 0 //7 2 115,730 0.43 5 6.83 8.66 9.48 0.05 4.49 0.90 1.45 2.15 0.35 0.85 5:1 10 3 128,247 0.44 5 7.75 9.82 10.75 0.05 4.09 0.87 1.45 1 .53 0.38 0.88 2 :1 10 Z 4 9,500 0.67 5 0.87 1 .11 1 .21 0.025 2.44 0.47 1 .45 0.47 0.50 1 .00 10:1 0 O >_ 4A 10,500 0.64 5 0_92 1 .17 1 .28 0.05 3.89 1 .19 1 .45 0.78 0.56 1 .06 5:1 0 w 5 7,000 0.77 5 0.74 0.94 1 .03 0.05 3.08 0.78 1 .45 0.62 0.39 0.89 10:1 0 Q U 5A 8,010 0.72 5 0.79 1 .00 1 .10 0.05 3.56 0.97 1.45 0.83 0.46 0.96 6:1 0 1 w 6 7,450 0.83 5 0.85 1 .08 1 .18 0.05 3.21 0.81 1 .45 0.74 0.39 0.89 10:1 0 6A 9,470 0.72 5 0.94 1 .19 1 .30 0.033 3.00 0.66 1 .45 0.68 0.47 0.97 8:1 0 Q Z w SB1 23,700 0.53 5 1 .72 2.19 2.39 0.01 2.74 0.45 1 .45 0.93 0.89 1 .39 3:1 0 = Q LLi Z SB2 618 0.35 5 0.03 0.04 0.04 0.02 1 .29 0.19 1.45 0.25 0.24 0.74 3:1 0 `w Z Q = Q 1 = O � Q BOTTOM WIDTH Q U U O Z W ZZ 0 < Q) M Fgrury 2: Cr _S Qctian of an L;S•FS > � o Q0 00 N > � r-, 0 v Z 0 0C z F 1ft Ift 30 WU ! ; U 00 2 DRY DETENTION BASIN OULET DETAILS W Q z U 00 ,.1 1, ., Cap to Prevent Trash/Debris C Z O Cd I e*d Fe ad e r from Clogging Riser Z W a Q 25-Year(616.04') ♦ Top of Berm El.617.00 � N W BERMUDA SOD ------------------------- r Alt rSlap8" Dia. PVC Riser _ 10=Years 15.6�--� --- - - 1 r 10 YEAR,24-HRRAINEVENTCALCULATIONS U � O 7 }ice - � ^kd - ---- - _ �~ 6 DEEP Invert El. 615.00' AKFLPRE-DEV POST-DEV PRE-DEV POST-DEV W PEAK FLOW PEAK FLOW RUNOFF VOL. RUNOFF VOL. L/ J _ _ _ 2-Year____ (614_45') v_ (CFS) (CFs) (AC-Fr) (AC-FT) W � r3 3" PVC Drawdown Orifice. 15.62 5.35 1.149 1.138 Invert E I. 612.00' � NOTE:DRAINAGE AREA MAPS AND CALCULATIONS PROVIDED Z 4" Perfor ted CPP t0. WITH STORMWATER EVALUATION NARRATIVE. v��J }y F Prevent logging of ` •� - I Drawdown Orifice Z � . j 1 ��.� 1 I I1 I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I Base El. 612.00' '° ° Invert El.612.00 30'Lon 6" Dia. PVC Pies=0.01 ft/ft W [�] NON-WOVEN GEOSYNTHETIC FILTER FABRIC ),� p Invert El. 611.70 �•~� � WALL" 3 HT. #4 REBAR ELLS 12n OC. (6n ELL), r WL '1 #4 REBAR EVERY V HORIZONTALLY. w FOOTING: 8" THICK, 3'-6"WIDE, #4 REBAR 12" OC BOTH WAYS -III- 1.5' x 1.5' x 1' High Conc. Anti-Flotation Block Q ^^� COMPACTED SUBGRADE ALL REBAR 2" MIN. CLEAR FROM EDGES OF 3000 PSI CONCRETE SMALL PERMANENT POOL FILLED WITH NO. 57 STONE � TO REDUCE CLOGGING OF THE DRAWDOWN ORIFICE AMC • e�t`4E 40' LONG X 1'WIDE CONCRETE LEVEL SPREADER, (TOP ELEVATION 614.0), 3'WIDE GRAVEL STRIP, & 40'WIDE X 30' LONG SOD AREA Please note that thlb Is not a state Please note that th/s /s not a state requ#vd ", and is only b&479 bsta/led to r+sulrod ", and is only be ft beft led to meet local .*rlsdktlan (Town of SVer Clty) meet local .*itsdktlon (Town of Sler City) regU#VMdnts requkeomdnts