HomeMy WebLinkAboutBoone Branch Credit Release Schedule-SignedProject Name:
Sponsor Name:
USACE Action ID:
NCDWQ Action ID:
Non-Forested
Wetland
CreditsWarm
Water
Cool
Water
Cold
Water
Riparian
Riverine
Riparian
Non-Riverine Non-Riparian Coastal
5915.000 6.570
Scheduled
Releases
Warm
Water
Cool
Water
Cold
Water
Scheduled
Releases
Riparian
Riverine
Riparian
Non-Riverine Non-Riparian Scheduled
Releases Coastal
1 (Bank/Site Establishment)1, 2 15%887.250 15%0.986 15%4/30/2024 6/10/2024
2 (Year 0/As-Built)3 15%887.250 15%0.986 15%
3 (Year 1 Monitoring)10%591.500 10%0.657 10%
4 (Year 2 Monitoring)10%591.500 10%0.657 15%
5 (Year 3 Monitoring)10%591.500 15%0.986 20%
6 (Year 4 Monitoring)5%295.750 5%0.329 10%
7 (Year 5 Monitoring)10%591.500 15%0.986 15%
8 (Year 6 Monitoring)5%295.750 5%0.329 NA NA
9 (Year 7 Monitoring)10%591.500 10%0.657 NA NA
Stream Bankfull Standard4 10%591.500 NA NA NA NA NA NA Varies4
Total Credits Release to Date 15%887.250 15%0.986
Date
Guilford
03030003
2024
6/4/2024
County:
8-Digit HUC:
Year Project Instituted:
Date Prepared:
Actual Release
Date
Potential Credits from As-Built Survey
Stream Credits
Credit Classification
Non-Forested Wetland
CreditsForested Wetland CreditsStream Credits
Current and Future Credit Releases
Credit Release Milestone
Wilmington District Mitigation Bank Credit Release Schedule
4 - A 15% reserve of credits to be held back until the bankfull event performance standard has been met.
1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan.
2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria:
1) Execution of the MBI or UMBI by the Sponsor and the USACE;
2) Approval of the final Mitigation Plan;
3) Mitigation bank site must be secured;
4) Delivery of the financial assurances described in the Mitigation Plan;
5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE;
6) 404 permit verification for construction of the site, if required.
3 - The second credit release is based on the credit totals from the as-built survey, and may differ slightly from the credit totals stated in the mitigation plan.
Contingencies (if any): None
Signature of Wilmington District Official Approving Credit Release
Boone Branch Site
Davey Mitigation, a Division of Davey Resource Group
SAW-2022-02279
20221574 v.1
Potential Credits from Mitigation Plan
Forested Wetland Credits
Total Potential Credits
Projected
Release Date
June 10, 2024