Loading...
HomeMy WebLinkAboutBoone Branch Credit Release Schedule-SignedProject Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non-Forested Wetland CreditsWarm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Non-Riparian Coastal 5915.000 6.570 Scheduled Releases Warm Water Cool Water Cold Water Scheduled Releases Riparian Riverine Riparian Non-Riverine Non-Riparian Scheduled Releases Coastal 1 (Bank/Site Establishment)1, 2 15%887.250 15%0.986 15%4/30/2024 6/10/2024 2 (Year 0/As-Built)3 15%887.250 15%0.986 15% 3 (Year 1 Monitoring)10%591.500 10%0.657 10% 4 (Year 2 Monitoring)10%591.500 10%0.657 15% 5 (Year 3 Monitoring)10%591.500 15%0.986 20% 6 (Year 4 Monitoring)5%295.750 5%0.329 10% 7 (Year 5 Monitoring)10%591.500 15%0.986 15% 8 (Year 6 Monitoring)5%295.750 5%0.329 NA NA 9 (Year 7 Monitoring)10%591.500 10%0.657 NA NA Stream Bankfull Standard4 10%591.500 NA NA NA NA NA NA Varies4 Total Credits Release to Date 15%887.250 15%0.986 Date Guilford 03030003 2024 6/4/2024 County: 8-Digit HUC: Year Project Instituted: Date Prepared: Actual Release Date Potential Credits from As-Built Survey Stream Credits Credit Classification Non-Forested Wetland CreditsForested Wetland CreditsStream Credits Current and Future Credit Releases Credit Release Milestone Wilmington District Mitigation Bank Credit Release Schedule 4 - A 15% reserve of credits to be held back until the bankfull event performance standard has been met. 1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 - The second credit release is based on the credit totals from the as-built survey, and may differ slightly from the credit totals stated in the mitigation plan. Contingencies (if any): None Signature of Wilmington District Official Approving Credit Release Boone Branch Site Davey Mitigation, a Division of Davey Resource Group SAW-2022-02279 20221574 v.1 Potential Credits from Mitigation Plan Forested Wetland Credits Total Potential Credits Projected Release Date June 10, 2024