HomeMy WebLinkAbout20231351 Ver 2_Riparian Buffer Authorization Request_20240606Original Submittal 6/6/2024
A. Owner/Applicant Information
General Information Q
..........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Primary Contact Email: * tom@buildwithpdc.com
Please list the contact person's email for questions or payment on this project if needed.
Who is submitting the application?* 0 Owner
O Applicant other than Owner
O Agent
Is there an agent working on this application but Yes
not submitting it? No
1. Property Owner Information:
.............................................................................................................
1a. Name on Recorded Deed:*
1b. Responsible Party:
1c. Mailing Address:*
1 d. Telephone:* 7045822156
Planishek Development & Construction, LLC.
(for Corporations)
Street Address
7679 Rabbit Cir
Address Line 2
City
State / Province / Region
Denver
North Carolina
Postal / Zip Code
Country
28037-9477
United States
B. Project Information and Prior Project History
1. Project Information
le. Email Address:* tom@buildwithpdc.com
1a. Name of Project: * 8134 Bay Point Dr
(Subdivision, facility, or establishment name)
1b. Is this a publicly -funded transportation project?*
Yes
No
1d. Subdivision Name: West Bay
le. Nearest Municipality: Denver
1f. Property Size: 0.81
acres
1 g. County (or Counties) where the project is located:*
Lincoln
1h. Property ID#
70872
Tax PIN or Parcel id
11. Deed Information
Date of Purchase
8/18/2023
Type of Book Book#11 Page#
Deed F
664
Map F
1 j. Attach a copy of the recorded map that indicates when the lot was last platted.
Click the upload button or drag and drop files here to attach document
Rev_8134 Bay Point Drive Boundary -Survey
287.49KB
18x24.pdf
PDF only
1k. How would you like to provide the Latitude and Longitude information?
Address Lookup
Manually
Address Lookup
Street Address
8134 Bay Pointe Drive
Address Line 2
City
Denver
Postal / Zip Code
28037
Latitude* 35.51474 Longitude*
11. Is the project located in any of North Carolina's twenty coastal counties?*
2. Surface Waters
2a. Name of the nearest body of water to proposed project: * Lake Norman
2b. Water Quality Classification of nearest receiving water: 0
State / Province / Region
NC
Country
us
-80.9657919
Yes No
2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
0
(linear feet only)
3. Project Description: C
....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:
Previously constructed rip -rap and graded pathway to pier
3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site.
Click the upload button or drag and drop files here to attach document
x xTmA94xNgQB2-
M3SMgsv7KQ..x x_ags_5154aef6-240e-11ef- 426.14KB
b8e7-124c00e73aa9. pdf
PDF only
3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site.
Click the upload button or drag and drop files here to attach document
x xTmA94xNgQB2-
M3SMgsv7KQ..x x_ags_5154aef6-240e-11ef- 426.14KB
b8e7-124c00e73aa9. pdf
PDF only
4. Proposed Activity
Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:
Post construction approval for revised walkway
Attach a site plan as applicable to the project:
Click the upload button or drag and drop files here to attach document
PDF only
5. Jurisdictional Determinations
5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project
(including all prior phases) in the past?*
Yes
QQ No
6. Project History
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?
Yes
No
6b. List any permits/approvals that have been requested or obtained for this project in the past.
Application Date Date Issued Permit Type
9/20/2023 11 /15/2023 Buffer Authorization
6c. Please explain and detail according to "help file" instructions.
Per discussion with Michael Burkhard, this application is submitted to document final layout of our installed walkway through the
buffer zone at 8134 Bay Point Dr. in Denver NC.
When we began cleaning up and removing weeds, it became apparent that an existing flattened area existed on the site prior to our
construction start. The "flattened area" ran along side of the existing rip rap but was covered with weeds at time of previous
documentation.
We made the determination in the field that this existing path would be a safer path of travel for people walking between the pier and
home. Additionally, we felt there would be less disturbance to the remaining trees if we had gone up the hill.
The attached images illustrate the pre- and final conditions of the walkway from pier to home.
Additionally, we chose to use flagstone set into gravel fines in lieu of techno bloc pavers set on gravel fines as it is also a documented
pervious paving system. We made this decision to preserve a more natural look in the buffer zone.
We are requesting modification from previously submitted and approved plan and documenting the final location of walkway.
7. Future Project Plans 8
..........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
7a. Is this project a phased project?* Yes No
C. Proposed Impacts Inventory
Buffer Impacts
Project is in which protected Basin?*
Neuse River Basin (15A NCAC 02B.0233)
Catawba River Basin (15A NCAC 026.0243)
Randleman Lake Watershed (15A NCAC 0213.0250)
Tar -Pamlico River Basin (15A NCAC 02B.0259)
Jordan Lake Watershed (15A NCAC 02B.0267)
Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 0213.0607)
Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
-11
Site# - Reason 11 Stream Name Buffer Impact* Impact Type11 Zone 111 Zone 2
Lake Norman
Permanent (P)
Allowable
280.00
80.00
Map label (e.g. Road Crossing 1)
Perm or Temp
Square Feet
Square Feet
Total Zone 1 Impacts: 280.00
Total Zone 2 Impacts: 80.00
Total Buffer Impacts: 360.00
Comments:
Per 15A NCAC 02B .0614 -Section n of chart
Installed path is 4' wide which is equal to or less than six feet
Installed path did not result in the removal of tree(s) within the buffer
Installed Path does not result in the addition of built upon area to the riparian
buffer
D. Impact Justification and Mitigation
1. Avoidance and Minimization
..................................................................................................................................................................................................................................................................................................................................................................................................................................................................
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.
Used existing grade as pathway. Placed flagstone over gravel fines which is a pervious pavement system.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
All work was conducted along the path being installed, area was kept clear, and erosion control was added during construction.
Additional boulders were added to existing "cut" to preserve the existing slope.
E. Diffuse Flow Plan
la. What type of SCM are you providing? *
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Proposed project will not create concentrated stormwater flow through the buffer
Other SCM that removed minimum of 30% nitrogen
1 c. Diffuse Flow Documentation Click the upload button or drag and drop files here to attach document
Memo Style.pdf 1.5MB
PDF only
F. Supplementary Information
Environmental Documentation
1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes
No
Violations
2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface
Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)?
2b. Is this an after -the -fact buffer authorization application?
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
See attached letter. Per discussion with Michael we are submitting for approval the change of direction of pathway. All other buffer
work has been completed per previous authorization.
G. Additional Information
Please upload any additional information you would like the Division to consider during application review.
Additional Attachments: Click the upload button or drag and drop files here to attach document
Pathway Change.pdf 293.78KB
Memo Style.pdf 1.5MB
PDF only
Additional Comments:
H. Sign and Submit
By digitally signing below, I certify that:
I
o I have given true, accurate, and complete information on this form;
o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions
Act')
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act');
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the application form."
Print Name:* Thomas Planishek
Signature
PONY (P-�,?Iwv !/ to
Submission Date: 6/6/2024
(Auto populated field)
Initial Review
Is this accepted into the review process?*
Is this project a public transportation project?*
ID#*
Version:
Select Reviewer:
Select Reviewing Office*
Has payment been received?*
Yes No
Yes No
20231351
2
Andrew Pitner:andrew.pitner
Mooresville Regional Office - (704) 663-1699
No Payment Needed
Fee Received
Need Fee - send electronic notification