Loading...
HomeMy WebLinkAboutNCC241794_Site Plan or Location Map_20240612 �\ �\ MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION 4 54.,ry.4 \ \�� -- �� -� ` �� \ General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum. The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control / measures, If lot construction dictates,measures will be relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible. Silt fences and gravel construction entrances will be maintained as suggested in the erosion control It �- \ �� - manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. _ o��~ o _ \ __ Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it "re // ��` /_ out as necessary. Immediately remove all objectionable materials spilled,washed,or tracked onto public roadways. �� a,sva = �� "'alk Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be �` _ _J i ```\R. removed and disposed of properly to insure that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. ihir 5- e'°� - _ _ _� / X Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to q. e�'� / / close,since this could inhibit adequate growth and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. o -' // -- 1 Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are .� / i I I '� germinating properly. Any bare areas should be repaired, and reseeded as soon as possible. If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a 9 / , - / ` Permanent grass. • = =�_/ �- �� 1 ( Wattles Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one third of the 1 I\ \ wattles functional freeboard height.Removed sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. �i �\ �` \ , Relefercetl Slit Fence of -Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout Remove and replace stone as necessary as it SITE ®$ _ /- \ ` \ Z becomes clogged with sediment Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. MONTROSB ROAD 9R-12,5 v . 1. . ) 1 / v °.fro° \� � / //// / CONSTRUCTION SCHEDULE I-Obtain all necessary Dermr6 and Dian approvals.Erosion and sediment Control(EA$C)permit and a CO..,of Cove.. \/) \ %1IVi• / (CDC)must be obtained lufore any land disturbing activities occur.A copy of the EASC permit,the COC and a hard copy of the DATE: PAGE: �y¢ $' \ / \ _ I I ( ///// // plan must bekep[onsite,preferably inapermi66ox,and accessible during inspection.\`// Zlnemllgmvcl construction.trances first,tM1cn silt lmcee,reinlmeN Mllhme _ _...... oldsand wanleo y� (\/ // 3.FiniaM1 cicarin8 anJ gobbing any necessary areas on tM1e loss as they are ambled.I / /// 4.Begin lu,&ceding anJ exwvalion 'A° •B• °C° •D• 'E° "F'I) V Begin or con rue wiM1house coM actor dviti p'n a7 illalaillH) // 6.Fin�sM1 all rough gadin8 and house wnatruction.111 q 11 P p % i I P , e % % _ ].Inam^I drivewoy walks end�atios t ¶ 1 ll d'� E. ) L 8.Ba61 Me gadln6 o[Im are ll R 5 T T ✓e e % % C o I [ l // �j//�/ 9.Final grassing,mulching and stabilizing of lot. most cases this will involve the installation of sod on the lot The silt fence will a e a e e . , e HOUS�, n l p0 / / in plane Pntu metro aodaea org<aaaingn'ob�>'�eana rake ho�d�wn measures g 4�4 ll�ll =o �G Houst°v �Hous nvvcc 1. o / lilt ��/ 10 Thew sh 11 d If pe feces and sahm 1 and complete Me followin BE • /� /� comb d If f fo d h DEMLR websne �g Oita �..fa a �R /� htrps//www.deq. g bo bd- gy I and land resources/ er prognMnpdea consweuon program. Ag 5R-1]a a0// / / TwelveM f completep f shall be keg d availablef pxnon at all times It is recommended a Ir b ,t.Up1Y,BR0 3�� / copy be kept p boar fGS 3 4.dun gh G.S. 3 $ CAC 04A.0101 through ISA L LCURB NLEr�EDGE OF CURBr AY Notes:ROB AY SRO rWAY O ai AV O AY ROM AY AkIIIIIIL • // / "^\ n Activities. I I.SIf NCACpectio General1M P ns for erosion a NCO 010000 NPDE5f C b performed least once every seven calendar days and VICINITY MAR' 1 I him h f ry greater Me I inch.Any ne led p shall be made immediately W maintain measures a If needed,Tree Protection fencing should be installed along the buffer zone wetland N.T.S. I / designed.All ESC b minis specified in the c details on this plan.Arun gauge shall be installed LEGEND boundary and/or around protected trees,proWd ng a radius of at least 1.25 feet for each ___ ' / at Me project site for monitoring. N inch orwnkaameler. �777��� 1 I / / ) 12.Inspatian and final acceptance less.When the project is complete the pmninecs shall.^tact DEMLR to close out the E&SC 2.Install Silt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on \ I \\ \ \ 1 ' / s/ / glen.ARer DeMLR infomu the pemnnee of the projen close ou0 we i�upation repo^,tAe perminee shell visit schematic/diagram and field adjusted,If necessary,for placement at low points.If lots are tlg \\\ \ / / "deq.ne govMCGOc'to submit unelectronic Notice of krminetion(e)rvOT).ASllq annual general permit fee will be charged sftOi FENcemo contiguous and have different land owners or builders.each lot should have individual Sri a31/ until the a-NOT has been filled out. Fences. ..., �'�� / SILT rnscncoTLET MO 3.Install required Silt Fence within,0 feet of property line to ensure there is no conflict with CONSTRUCTION ash-_ 9rcm grope y / / II(/ ENTRANCE setics stem.it is the responsibilityof the budder le ensure the installation of sediment \; ,, \ \ / .5�� 1 ( c euRB INLET COPbol measures does noimpact the septic system antl repair area(sl. \ „ \ \ d.Al least one Construction Entrance/Exit be installed per lot. GROUND STABILIZATIONJ l- A"SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 5.Waste bins and other areas dedicated for managing building material waste shall be at I j 3/ \ 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that SITE AREA STABILIZATION ., - EXCEL SPREADSHEET. no other alternative exists.If this separation cannot be achieved,these areas must be EXCEPTIONS \ \ AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND contained behind Silt Fence. DESCRIPTION TIME FRAME I 15 N\ I \ \ \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECTSITE.RULE I5A NCAC 04B. B.sedi ant 1m the of tlistuLbances shoultl be protecoetl;streets should be swept when PERIMETER DIKES, 7DAYS NONE \ 0131 MsTEASUREAT-...DOCUMENTATION SHALL BE ACCOMPLISHED T.Y INITIALING AND DATING seed deonwt rota the construction activity is present. IL) _ 1 EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND ..VdC-EnNronmentallpeg 7.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are SWALELOPES DITCHES B L ITS SEDIMENTATION CONTROL PLAN OR BY COMPLETING,DATING AND SIGNING AN INSPECTION provided on additional sheets.Erosion and sediment control details are not drawn to scale. SLOPES I rtc��T'v�n"T^"'a Z2020 TYPICAL LOT LAYOUT WITH CURB AND GUTTER REPORT THAT LISTS EACH MEASURE,PRACTICE OR DEVICE SHOWN ON THE APPROVED HIGH QUALITY 7 DAYS NONE (\\JI / I I 1 EROSION AND SEDIMENTATION CONTROL PLAN.' 11111111111111111111 WATER ZONES /0. �'p/ G4/ / (HOW) _ / J tot ) / / SLOPES STEEPER 7DAYS IF SLOPES ARE 10' THAN 3:1 OR LESS IN LENGTH / AND ARE NOT co -. STEEPER14DAYS 2:1, / uM 13 /I / / / /,/ 14 DAYS ARE ALLOWED / / Aft / / // / m.,ar"nnEaw SLOPES 3:1 OR 14 DAYS 7 DAYS FOR / SODDING FLATTER SLOPES GREATER // DATE: PAGE: THAN 50'IN LENGTH /J PATFERN.EMU THE STRIPS TIGHT,PGAIX,EACH 01-HEP. ALL OTHER AREAS 14 DAYS NONE(EXCEPT FOR / 1 (( r .11 // ® DO NOT LEAVE 5,10E5.0 no WITH SLOPESTHAN PERIMETERSWZONES) M�a�'iil ®' p FLATTER THAN 4:1 HQW ZONES \ / Mal Enos NrDmuM Nq HEws\ \ �a� uTwapcpaaacnv E 1r.00 l DATE: an sow warm PAGE: 1 ase� \ �(///' QJ�\`O /I I_ � a0�. Te re' FLOW-y a•�I F a•�l Silt e ,Noy,. 1 . \\� 1 \ I I 1 / _ �w try II III sm ag`g'-g ha eubeo'�'a tlafor \ ) �\ \ \ I \I I / �~ si ,r '� snkea n. II..„'Y aonnry x;m wmpmo� / I \ 1 \ l\ _^ _i 7..P.7.�4v.'r - _ M gar pm N m,r nmae^rear I 4: s 11 ebenamee pee elm \ \1 1 \ \ 1,,.••' •1 Y s SECTION beyond tone 2 MOW WREN THE SOO. / 40 1 I \ \ \ A\ II t l e Min. • a�r ) 3 .. SECTION ,rststs.flat areas should m le1 be turn.a to..nds of the a am to 4111.I I 1 \ \ \ \\ \ Vsti{ 'Ll'i I / f �f 7 °eland A,0 , ,.. sock/wenelffren p undtheendofine t1 \ \ WIm,RES°, nndm ODIa EMOWER 3 wm..re•re !__-z:r: +°spa' agltl.g0"°" I upsooN HIG1112., -�4. 0ncac rum ould be Wiven / APPEARANCE OF GOOD SOD Construction: Maimenence: WWW! IuIJI / 1.Clear the entrance and exit area of all vegetation,roots,and other objectionable 1.Per NCG-01 Inspect at least once a week and after each 1 inch or socl.attle.Stakes should wee pie.al ass . material and properly grade it. greater rainfall;make any required repairs immediately. Trench into Ire con soavwmae:Dlawdma4mch / 4' / E 2.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gavel pad in a contlition to prevent mud or setliment I smooth It. from leaving the construction site.This may require periodic Wood Mulch or compost ground 4 urn. 5. bur rite uwh« / / *Ai / wmxpenpxr 3.provide dreinage to carry water[oasetliment Yap or other suitable outlet. topdressing with 2inch stone. To,height.log uNTaENCHEOINsruunoN pavement)has / / J I I Doom 4.Use 9eo[extlle fables lnorder oo improve stability of the foundetlon In locatlons 3.Immediately remove all objectionable materials spilletl,washed or „ ,,,w,�w.u..«.w.em,.rewwr:ewm.....,w.�_ oM IbeNm tie h^nnm / a // / / I Yauv. „z.iac subject to seepage or high water taNe. tracked onto public roadways. ISOMETRIC VIEW NmapatvnrauM baneaer eklyanaau / / / u" m.unr r ro« m1. mwm / / //// III CONSTRUCTION ENTRANCE/EXIT MIN° m DmreM1a s° O ens INm rve as sediment ego;any as - -/needed to allowNNW / / // / o ro J m General Erosion Control Notes C/ NC Nam shcetFIwoyJ/ O Silt Sm.em ��'�% wm1 �n,l t hrem. ba"«Iarger diameter or a different�rea If /'Reinstall if damaged or dislodged. �� , /�// / / /� p2 rk Through am jea Ho. i,i'v,,°"wmmml Om tu'i°,"^"mml m'Mr,/ a / -/ / 2.All disturbed areas shall be grassed and / // / Z mulched a soonasr possible and maintained disturbance is w r mesa rehaa been perms iete and mmanently amue area rnae1a / / until pemanent cove sestablished. SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION / - IAN. e0/7 / / / // // / DATE: Wire Fence Filter Fabric PAGE: I ^ sj °-71__ �j// s«I FaM�' sMay.Extra sire gL fabric wnMutwire fen Wire Fence W. Backfill trench \ I / 'Or M Max.Standard Strength fels.will,wlre • !..r: 1 6teel poem _ thoroughly i NNW, /�// FENCE } / DATE: PAGE: �' �" � / ' %i - MIN -� PAGE 1 of 2 Plastic or ?,e.�. f , I , , f6LT al" \ \ I I 8 / a3c- i��� / /� / TOTAL DISTURBED ACREAGE:0.46 ACRES / ��_ / �/ LOT EROSION CONTROL PLAN 1 ref Fame =en°e;o-e rim / \ \ \ i �/ �� / /� aD ET ETGPD LOT 14 1.2.Econ. beIyhl°MeseEmentfenceace;notexceed24inchesabuethemD d IHI h f CROSS SECTION I \ ��/ � '/ /� WRTHE EF WASHED aT HIDDEN may impound volumes m mrananantmnanaafe nrenrmeaLmmn a,� \ r ((ç / STEEL F VALLEY necessary 3.Construct the lter...inurely fasten n tont Clothus roll onyata'to the appeHDoe coth ofme bate'm `I 4.S darn S.ngu(liter fabric by wire mean fasten.securely m the uplOp old h .EMend crane I I \ \ \/avoid joi..When joi.are c \ // / / HaeowARE CLOTH FRon7 vlEw �F FOR the Mrs mesh support to the bottom of the trench.Fasten the w,reln,cement then%tine on the M.O. 1.side of the fence post.Wire or plastic zip.should have a minimum SO pound tensilemmamnm^rare I>a. Pstrength. ""rahwa l,a driven Ma"neoam sedimentrenwe at aaatnntaaweek a�aata.wmppe., r� #\ \ I greater5.When a wire mesh support fence is used,spa.posts a s.Should the I:e`4osnru�p y,'�a • _ WAaHEDaTDNE _ CLOTHR DREAM FINDERS Hwreplace it • fasten Me round a minimum o1.24 a4/ Oa \/ I (' /n. /, �� PTSET7.Excavate the 6.Extra strength filter pp "mBRI / 1 \ / / \ 8.;,�.:.I oN 0TER FA NOTES: cloth and gra�el should overlay the sit fence at least l2 HOMES, L L C alarm the bosom and aide of toe trench r tun contributing \ \.\ 1[ d rR- ,, I / .'.�o°°°NNX°a ;'I "`he`. QUEWHIFFLE TOWNSHIP HOKE COUNTY S.mar Do not the inches upslope from h th o�pieced over Om filter end compeer,Thom o...Von of beckfill la aremage area has been properly stabanier. A Remove all fencing materials and ilize ed I /I \ .••o.•:06 I 2.Stone based o should be placed on low elevation areas of silt fence sting trees. Ttfan I and NTENAd°"field conditions. SCALE: 1"=120' MAY 2024 MAINTENANCE \ \ BURY WIRE FENCE AND B RV B.OF UPPER E.E OF HARD H rLTERraeacNreoscn ' ger catCG-0l inspect°Cole[aNest once anyMM redcweek pairsim edOh 1 tely. r GRAPHIC SCALE \NGEnvi,.n a lel,wa greeter minted event Completeenaccumulation repairs-inhale 120 0 60 120 240 480 SILT FENCE \ \ \ \ \ \ 2 KenooFreshenshfee henof debris a vide adequate flow. inches. 3.Keep mesh free of tlebris to provide atlequaoe flow. M \ SECTION VIEW 4.Remove sediment when half of stone outlet is covered. 1 \�\ , ) 5.Replace stone as needed to facilitate de-watering. IN FEET 4°1'4 _WC-EnM It tel.lpeM ( ) 1 __ SILT FENCE OUTLET 1 inch = 120 ft MOORMAN,KIZER&REITZEL,INC,115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 \ \ \ 1 \ 11 1 \ I I I / /// / i - ` PHONE(910)484-5191 FAX(910)484-0388 LICENSE#F-0106 LAST SAVED:5/16/2024 2:35 PM LAST PLOTTED:5/16/20.2:53 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\H A H CONSTRUCTORS\24-136]-02HIDDENVALLEY-EC\PLANS\EC-LOTI4.DWG