HomeMy WebLinkAboutSW3240503_Supplement-EZ Form_20240612 SUPPLEMENT-EZ COVER PAGE
LOAD SUPPLEMENT FORMS
PROJECT INFORMATION
1 Project Name Aurora at Price Mill Creek
2 Project Area(ac) 79.5
3 Coastal Wetland Area(ac) N/A
4 Surface Water Area(ac) 2.17
5 Is this project High or Low Density? High
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided(feet) 30
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? Yes
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretention Cell
13 Wet Pond 1
14 Stormwater Wetland
15 Permeable Pavement
16 Sand Filter 1
17 Rainwater Harvesting(RWH)
18 Green Roof
19 Level Spreader-Filter Strip(LS-FS)
20 Disconnected Impervious Surface(DIS)
21 Treatment Swale
22 Dry Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 Filterra
LOAD SUPPLEMENT FORMS
DESIGNER CERTIFICATION
27 Name and Title: Danis E.Simmons,PE;Civil Engineering Director
28 Organization: ESP Associates,Inc.
29 Street address: 20484 Chartwell Center Drive,Suite D
30 City,State,Zip: Cornelius,NC 28031
31 Phone number(s): 704-990-9428
32 Email: dsimmons@espassociates.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that
the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,
specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer
4/Y0 CAR
LICENSE NO..• _ = t SEAL `••� Signatur of Designer
F-1407 _ _ : 025775 = for E P Associates, Inc.
%: :
:•
�•�•'........... ` i •• tom ����
'/ Oiil ii ��``` ''�� �i111 i t►�o�```` Date 05/13/24
Seal
DRAINAGE AREAS
1 Is this a high density project? Yes
2 If so,number of drainage areas/SCMs _ 2
3 Does this project have low density areas? _ No
4 If so,number of low density drainage areas _ 0
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site 1 2
4 Type of SCM _ Wet Pond Sand Filter _
5 Total drainage area(sq ft) 3470860.8 _ 918244.8 511394.4
6 Onsite drainage area(sq ft) 3470860.8 _ 918244.8 488401.4
7 Offsite drainage area(sq ft) 0 0 22993
8 Total BUA in project(sq ft) 381150 sf 230868 sf 150282 sf
New BUA on subdivided lots(subject to
9 permitting)(sq ft) 184513 sf 111078 sf 73435 sf
New BUA not on subdivided lots(subject to
10 permitting)(sf) 196637 sf 119790 sf 76847 sf
11 Offsite BUA(sq ft) N/A N/A N/A
12 Breakdown of new BUA not on subdivided lots: N/A N/A N/A
-Parking(sq ft) N/A N/A N/A
-Sidewalk(sq ft) N/A N/A N/A
-Roof(sq ft) N/A N/A N/A
-Roadway(sq ft) N/A N/A N/A
-Future(sq ft) N/A N/A N/A
-Other,please specify in the comment box
below(sq ft) N/A N/A N/A
New infiltrating permeable pavement on
13 subdivided lots(sq ft) N/A N/A N/A
New infiltrating permeable pavement not on
14 subdivided lots(sq ft) N/A N/A N/A
Existing BUA that will remain(not subject to
15 permitting)(sq ft) N/A N/A N/A
16 Existing BUA that is already permitted(sq ft) N/A N/A N/A
17 Existing BUA that will be removed(sq ft) N/A N/A N/A
18 Percent BUA 5% 25% 29%
19 Design storm(inches) 1.0 in 1.0 in 1.0 in
20 Design volume of SCM(cu ft) 171763 cf 105357 cf 66406 cf
21 Calculation method for design volume N/A HRT Method Simple Method
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
WET POND
I 1 Drainage area number 1 I
2 Minimum required treatment volume(Cu ft) 21609 cf
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes
4 Is the SCM located away from contaminated soils? Yes
5 What are the side slopes of the SCM(H:V)? 3:1
6 Does the SCM have retaining walls,gabion walls or other engineered No
side slopes?
7 Are the inlets,outlets,and receiving stream protected from erosion Yes
(10-year storm)?
8 Is there an overflow or bypass for inflow volume in excess of the Yes
design volume?
9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice
10 If applicable,will the SCM be cleaned out after construction? Yes
11 Does the maintenance access comply with General MDC(8)? Yes
12 Does the drainage easement comply with General MDC(9)? Yes
If the SCM is on a single family lot,does(will?)the plat comply with
13 N/A
General MDC(10)?
14 Is there an O&M Agreement that complies with General MDC(11)? Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes
16 Does the SCM follow the device specific MDC? Yes
17 Was the SCM designed by an NC licensed professional? Yes
WET POND MDC FROM 02H.1053
18 Sizing method used HRT
19 Has a stage/storage table been provided in the calculations? Yes
20 Elevation of the excavated main pool depth(bottom of sediment 568.50
removal)(fmsl)
21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 569.00
22 Elevation of the bottom of the vegetated shelf(fmsl) 573.00
23 Elevation of the permanent pool(fmsl) 573.50
24 Elevation of the top of the vegetated shelf(fmsl) 574.00
25 Elevation of the temporary pool(fmsl) 574.40
26 Surface area of the main permanent pool(square feet) 17980
27 Volume of the main permanent pool(cubic feet) 61033 cf
28 Average depth of the main pool(feet) 3.39 ft
29 Average depth equation used Equation 2
30 If using equation 3,main pool perimeter(feet)
31 If using equation 3,width of submerged veg.shelf(feet)
32 Volume of the forebay(cubic feet) 12230 cf
33 Is this 15-20%of the volume in the main pool? Yes
34 Clean-out depth for forebay(inches) 45 in
35 Design volume of SCM(cu ft) 105357 cf
36 Is the outlet an orifice or a weir? Orifice
37 If orifice,orifice diameter(inches) 3 in
38 If weir,weir height(inches)
39 If weir,weir length(inches)
40 Drawdown time for the temporary pool(days) 2.4
41 Are the inlet(s)and outlet located in a manner that avoids short- Yes
circuiting?
42 Are berms or baffles provided to improve the flow path? No
43 Depth of forebay at entrance(inches) 66 in
44 Depth of forebay at exit(inches) 60 in
45 Does water flow out of the forebay in a non-erosive manner? Yes
46 Width of the vegetated shelf(feet) 10 ft
47 Slope of vegetated shelf(H:V) 10:1
48 Does the orifice drawdown from below the top surface of the No
permanent pool?
49 Does the pond minimize impacts to the receiving channel from the 1- Yes
yr,24-hr storm?
50 Are fountains proposed?(If Y,please provide documentation that No
MDC(9)is met.)
51 Is a trash rack or other device provided to protect the outlet system? Yes
52 Are the dam and embankment planted in non-clumping turf grass? Yes
53 Species of turf that will be used on the dam and embankment Fescue
54 Has a planting plan been provided for the vegetated shelf? Yes
ADDITIONAL INFORMATION
55 Please use this space to provide any additional information about the
wet pond(s):
2
SAND FILTER
1 Drainage area number 2
2 Minimum required treatment volume(cu ft) 10052 sf
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out? Yen
4 Is the SCM located away from contaminated soils? Yes
5 What are the side slopes of the SCM(H:V)? 3:1
6 Does the SCM have retaining walls,gabion walls or other engineered No
side slopes?
7 Are the inlets,outlets,and receiving stream protected from erosion Yes
(10-year storm)?
8 Is there an overflow or bypass for inflow volume in excess of the Yes
design volume?
9 What is the method for dewatering the SCM for maintenance? Pump(preferred)
10 If applicable,will the SCM be cleaned out after construction? Yes
11 Does the maintenance access comply with General MDC(8)? Yes
12 Does the drainage easement comply with General MDC(9)? _ Yes
If the SCM is on a single family lot,does(will?)the plat comply with
13 N/A
General MDC(10)?
14 Is there an O&M Agreement that complies with General MDC(11)? Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes
16 Does the SCM follow the device specific MDC? Yes
17 Was the SCM desi ned b an NC licensed rofessional? Yes
SAND FILTER MDC FROM 02H.1056
18 SHWT elevation(fmsl) 569
19 Type of sand filter(open or closed) Open
20 If closed,will the filter will be pre-cast or pour-in-place?
21 If closed,top of grate elevation(fmsl)
22 Is this sand filter designed to attenuate peak flows? Yes
Sediment Chamber
23 Volume that can be retained in the sediment chamber(cubic feet) 5265 cf
24 Will there be a permanent pool in the sediment chamber? No
25 Bottom of the sediment chamber(fmsl) 574.00
26 Area of the sediment chamber(square feet) 3470 sf
27 Physical depth of the sediment chamber(inches) 30 in
28 Ponding depth in the sediment chamber,above any permanent pool 30 in
(inches)
29 Elevation of top of weir between chambers(fmsl) 576
Sand Chamber
30 Volume that can be retained in the sand chamber(cubic feet) 17735 cf
31 Bottom of the sand chamber(fmsl) 572.00
32 Area of the sand chamber(square feet) 900 sf
33 Physical depth of the sand chamber(inches) 42 in
34 Ponding depth in the sand chamber,above the sand surface 24 in
(inches)
35 Elevation of the bypass device(fmsl) 575.5
36 Type of bypass device orifice
37 Mechanism for distributing flow over the sand surface sheet flow
38 Sand specification for sand chamber C-33
39 Depth above underdrain pipe(inches) 18 in
40 Will the media be maintained to drain at least two inches per hour at Yes
the sand surface? _
41 Is at least one clean-out pipe provided at the low point of each Yes
underdrain line?
42 Will clean-out pipes be capped? Yes
ADDITIONAL INFORMATION
43 Please use this space to provide any additional information about the
sand filter(s):
SHWT NOT ENCOUNTERED ABOVE THIS ELEVATION
2